Loading...
HomeMy WebLinkAboutNCS000489_MS4 Annual Report (2022-23 FY)_20231025 Reporting Year Ilulv1-tun<301 it R Mepermef. e Ref. Measurable Goal Reporting Metric Comments Prepare,certify,and submit the Annual Self- Annual Self-Assessment Assessment to NCDEQ prior to October 31 received by NCDEQ no later 2023 2.12 1.3.1 each veer. than October 31 each year. Yes 1.Participate in an NPDES M.PermR Compliance Audit,as scheduled and 1.6 2.6.1 performed by EPA or NCDEQ. 1.Yes/No No Audit was conducted during this reporting period 2.Self-audit and document any stormwater program components not audited by EPA or NCDEQ utilizing the DEO Audit Template. Submit Self-Audit to DEMLR(required component of permit renewal application 1.6 2.8.2 Package). 2.Yes/No/Partial Yes 3.Certify the stormwater permit renewal application(Permit renewal application,Self- Audit,and Draft SWMP far the neat 5-year Pertail cycle(and submit package to NCDEQ 1.6 2.8.3 at least 180 days prior to permit expiration. 3.Ves/No/Partial Renewal Application Pending Review exssng documentation methods to determine if all reporting metrics in the 1.Documents Reviewed 1.6 3.8.1 SWMP are included (Y/NI Yes Participate in leducation program targeted at grade schools(3rd-6th)&high school(9th-1.Yes/No,Number of 3.2.2&3.2.4 0.B.1 12th) participants Yes,300 2.Yes/No,Number of 3.2.2&3.2.4 0.8.2 Participate in annual Kids in the Creek Event participants Yes,300 Develop/Update and distribute a utility bill inwrt with information on general stormwater awareness,illicit discharges,and 1.Number of utility bills 3.2.2&3.2.4 S.B.1 pollution prevention mailed Not Performed-Information is provided via CRyStormwater Webpage 1.Number of brochures 3.2.2&3.2.0 6.B.1 Distribute Water Protection Guide Brochure distributed 2.Number of posters 3.2.2&3.2.0 Distribute Water Protection Poster distributed Display Stormwater brochures at the City Operations Center entrance and Customer 3.2.2&3.2.4 J.B.1 Service desk at City Hall 1.Yes/No Yes Install a vinyl wrap On the new street sweeper that provides information about the stormwater program including the storrnwater hotline and link to the CiNs 3.2.2&3.2.4 8.B.1 Website I.Wrap installed(Y/N) Yes Install educational signage at stormwater demonstration protects around the City of 1.Yes/No,Number of signs 3.2.2&3.2.0 9.8.1 Hendersonville. installed Y.,J Develop an annual stormwater report far the 3.2.2&3.2.0 10.6.1 public 1.Yes/No/Partial Partial-Developed a Stormwater Story map using ArcolS online Distribute the Annual Report via City Website,2.Yes/No/Partial,Number 322&3.2.0 10.6.2 Press releases and utility bill inserts. of Reports distributed Partial-Storymap is available on the stormwater websbe Select a local civic group or business group to 3.2.2&3.2.0 11.6.1 1.Yes/No Yes Devtarget or identify one presentation to cover target pollutams for the selected target 3.2.2&3.2.0 11.8.2 audience 2.Yes/No Yes 3.2.2&3.2.0 11.6.3 Present to the selected target audience 3.Yes/No Yes 1.Date the web Page went 2.1.7,3.2.3,&3.6.5< 12.6.1 Establish the stormwater web page live 2017 Maintain the stormwater web page 2.Yes/No Yes 3.Dare and number of web Update the web page as necessary page updates completed Last update September 2023 Add Stormwater Hotline contact information 5.Date the information was to the web page. added 2017 6.Document ways the stormwater web page is advertised through various Advertise the stormwater web page media The stormwater Webpage is promoted via the City of Hendersonville's social media accounts,press releases,on the Street sweeper and the City Stormwater Truck The hotline is a direct line to the stormwater administrator and will use an answering device.Calls will be monitored daily by 3.2.5 13.8.1 staff. 1.Hotline is active(Ves/No) Yes Calls to the rCity can be delegated to the appropriate stag and issues will be handled in 1.Number stormwater 3.2.5 14.6.1 a timely manner related calls received Not Tracked Develop an online reporting tool that will be 325 14.6.2 hosted on the Ciris Website 2.Yes/No Yes E58 will hold public meeting monthly and allow for public input on the stormwater 3.3.1 15.8.1 program 1.Number of meetings held 12 3.3.1 16.8.1 Stormwater hotline is active 1.Yes/No Yes Identity areas that contribute to trash/litter reaching waterways and waterways that an 1.Potential areas identified 3.3.3 17.8.1 be cleaned by volunteers IY/Nl en Yes 2.Number of participants Coordinate at least l cleanup event in local and amount of trash 3.3.2 17.6.2 watervvays. collected(lbs.) 12,approximately 1500 lbs Install and maintain the Greenworks Trash I.Trash Trout still active 3.3.2 18.6.1 Trout IY/NI Yes 2.Number of volunteers that visited the trash trout 3.33 18.3.2 Engage volunteers in trash trout clean ups annually 20 Identify potential areas for other trash 3.3.3 18.3.3 capture devices 3.Areas identified 10/NI Yes 4.Additional device 3.3.3 18.3.4 Install additional devices installed lY/NI Yes 1.Drain marking materials 3.3.3 19.3.1 Maintatin stack of drain marking materials stocked IWN) Vey Number2. of even 1 event Organize at least one drain stenciling event organized&number of 5Partcipantz 3.3.2 19.6.2 annually participants/drains marked 29 markers placed Host at least one public educational event 1.Yes/No/Partial,Number 3.3.2 20.6.1 annually of participants Yes-16 Add new outhllz identified from new 1.Yes/No, constrrytion and annual stream/outfall 2.Number of new outfalls Yes 3.0.1 21.8.1 surveys as necessary added annually None 2.Number of outfalls 3.0.1 21.3.2 Name/Number/Photograph of new outtalk updated annually None Add new infrastructure points within City 1.Number of new 3.0.1 22.3.1 ROW new development stormwater systems added 2.Number of new and updated stormwater structures surveyed and a 3.4.1 22.6.2 Maintain the stormwater system inventory located annually None Add new.Ms to mapping dahbaw when An 1.Number of new SCM's 3.4.1 23.6.1 built is approved by City Engineering Dept. installed annually 4 Complete the lDPA using the information I.Completed: 3.4.1 24.6.1 provided in Brown 20041DDE Manual Yes/No/Partial Yes Establish and ordinance and update if revision 1.Ordinance Established 3.4.2 25.6.1 isrequired to maintain legal authority. Yes/No Yes Complete the lDPA using the information I.Completed: 3.4.3 26.6.1 provided in Brown 20041DDE Manual Yes/No/Partial Yes Inspect 2016 of major outhlls within the MS0 1.Percent of major auttalls 3.4.3 27.6.1 annually. inspected 85 Test dry weather Rows with LaMotte 3.4.3 17.6.2 Stormwater Kit E.Yes/No Yes Evaluate dry weather screening SOP and 3.Create and updated SOP 3.4.3 27.6.3 updateaccordingty (Y/NI Yes Train new stormwater staff on Dry weather O.Number of stormwater 3.4.3 27.6.0 screening SOP staff trained 2 Continue to inspect,at a minimum,2016 of I.Number of auttalls 3.4.3 29.6.1 major outfalls annually. inspected 3.0.3 29.8.2 Maintain the Stormwater Hotline 2.Yes/No Yes 3.Number of employees 3.0.3 29.8.3 Train necessary City Staff inIDDE trained 73 Inspect facilities with high potential for illicit discharge or generating polluted stormwater I.Number of inspections 3.4.3 30.6.1 runoff conducted. 12 1.Reviewed SOP's(Y/N) Yes 3.4.3 31.8.1 Review and Updates to GIDE SOPS annually 2.Number of 50Ps updated No updates Evaluation meeting with Stormwater Division 3.4.3 32.8.1 staff 1.Yes/No Yes 3.4.4 33.8.1 Keep digital records of NOV's .Number of NOV's issued 0 Database established and 3.4.4 33.3.2 Maintain tracking database for ID reports. maintained FON) Yes Provide training to all field staff.(Public 1.Number of staff trained 3.4.5 30.3.1 works,Water/Sewer,Fire,Police,Inspection) annually 73 The monnwater hotline is a direct line to the stormwater administrator and will use answering device.Calls will be monitored 3.4.6 35.8.1 daily bystormwater staff. 1.Hotline is active(Yes/No) Yes 1.Date the web page went 3.4.6 36.8.1 Establish the starmwater web page live 2017 Maintain standard operating procedures for IDDE identification,response,and Dry 3.4.6 37.8.1 weather screening 5.SOPs Maintained jY/N) Yes Train municipal saff on proper handling of construction site runoff control and waste 3.5.6 38.8.1 management complaints 1.Number of staffed trained 73 Document the number of violations identified and referred to Henderson County Site 2.Report the number of 3.5.6 38.8.2 Development violations referred 2 1.Stormwater hotline active 3.5.6 39.3.1 Maintain Starmwater Hotline It/N) Yes Add link to Muddy Water WatCh webpage to 3.5.6 40.3.1 the City's Starmwater Webpage 1.Yes/No Yes Track number of reports submitted inthe 2.Number of reports 3.5.6 02.8.2 MS4 Jurisdictional area submitted 0 1.Henderson County Erosion Control NOV Reduce the amount of sediment in Ist/document and audit 3.5.5 43.8.1 construction site runoff documents 2 Develop facts..to share at preconrtruction 3.5.5 44.8.1 meetings 1.Yes/No/status No 3.5.5 44.8.2 Addfact sheet to website 2.Yes/No/Status No Distribute fact sheet atpreconstructn 3.Number of fact sheets 3.5.5 00.8.3 meetings distributed No Maintain Legal Authority to enforce It 1.Ordinance Established 3.5.5 43.8.1 program Yes/No Yes,2011 3.5.5 44.8.1 Develop routine inspection program 1.Yes/No/Status No 3.5.5 44.8.2 Develop standard inspection form 2.Yes/No/Status No evelop tacking database to identify repeat 3.5.5 44.8.3 offenders 3.Yes/No/Status No 4.Number of Inspections 3.5.5 00.3.4 Conduct routine construction site inspections conducted 0 1.Number of plan reviews Track plan reviews performed. performed 8 Maintain a current inventory of projects and constructed SCMs including SCM type, 2.number of SCMs added to 3.6.5a,3.6.5b,&0.1.3 45.8.2 location,and last inspection date. the inventory 4 3.Number of SCM 3.6.5a,3.6.56,&4.1.3 45.8.3 Track number of SCM inspections performed.inS 130 Track number and type of enforcement 4.Number and type of 3.6.5a,3.6.56,&4.1.3 46.8.4 actions taken. enforcement actions taken. 0 3.6.3 47.8.1 See Table 19 I.See Table 19 0 3.6.3 48.8.1 See Table 19 1.See Table 19 0 1.Pet waste signs and waste bag dispensers are stalled at City dog parks,parks,and 3.6.6 09.8.1 along the grsnwa I.Pet waste stations installe Yes Contact the City's Utility Department when 3.6.6 50.3.1 any water/sewer issue occurs 1.Water/Sewer records Sewer Contact Henderson County for any septic tank 2.Referrals to Henderson 3.6.6 50.3.2issues/failure County 0 Thermal imagery survey for pmential sewer 3.Number of hotspots 3.6.6 50.3.3 leaks identified by imagery 0 potential sewer leaks identified in 4.Number ofhotspots 3.6.6 50.3.4 thermal aimagery survey instigated 0 Partner with Henderson County Health Deparvnent to provide educational material to septic system owners in the Citys 5.Number and type of 3.6.6 50.8.5 jurisdiction materials distributed 0 1.Number of sites sampled Number of sites monitored,and sources 2.Number of fecal coliform 3.6.6 51.8.1 identified sources identified None Maintain an inventory of municipal facilities and operations that have Me potential far 3.7.1 55.8.1 generating polluted stormwater runoff. 1.Yes/No Yes 3.J.1 56.3.1 Maintain existing inspection SOPS and SPPP 5.Yes/No/Status Yes Conduct monthly facilityinspec5ons following 2.Number of inspections 3.J.1 56.3.2 established SOP/SPPP completed 12 Train staff with PPGH responsibilities:Street sweeping,facility maintenance,grounds industrial facility staff,building 1.Yes/No,Number of staff 3.J.1 57.8.1 W/S operations trained in PPGH 123 s Rlpon to 100%of complaints called into 1.Number of service City Staff that peas In to stormwater drainage requests generated in 3.J.1 58.3.1 issues in COP right-of-way City4/orks 30 Develop a comprehensive O&M plan and capital improvements plan for all City awned 3.J.1 58.8.2 stormwater Infrastructure 2.Yes/No/Partial Yes Maintain a.repair City stormwater 3.7.1 58.8.3 infrastructure based on CIP and &M Plan 3.CIP projects Completed 2 Update list of City facilities and operations with spill potential when facilities or 1.Additions/Revisions to 3.J.3 59.3.1 operations are changed Inventory Police dent,and Parking deck 1.Revision/Updates to SPRP 3.J.3 60.3.1 Review/Update spill response procedures and SPPP Train staff with PPGH responsibilities:Street sweeping,facility maintenance,grounds industrial facility staff,building I.Yes/No,Number of staff 3.J.3 61.8.1 maintenance,W/S operations trained in PPGH Yes,123 1.Track Inspection reports, Continue to inspect and maintain the M. surveys,and work orders 3.J.3 62.8.1 conveyance system It/N) Yes 3.J.3 62.8.2 Update GIS database with inspection results 2.GI5 database 0 Update City wide 0&M plan for all municipal 3.O&M plan created and 3.J.3 62.8.3 facilities and operations updated(Y/N) Yes Maintain NC BMP/SCM inspection and once certification for appropriate 3.J.4 63.3.1 staff ten I.Number of staff certified 2 2.Number of SCM's inspected.Number of inspections Passing/failed/requiring 3.J.4 63.3.2 Inspect all SCMs using COH inspection fonts maintenance 130 inspected,18 failed,112 passed Updated map/database of all SCM's within 3.Number of SCMs 3.J.4 63.3.3 COH corporate limits documented 4.Annual SCM maintenance 3.J.4 63.3.4 Maintain municipally owned SCMs records Maintain Right-of-Way Pest/Vegetative 1.Yearly updated pesticide Control,and all other applicator certifications certificates posted for 3.J.5 64.8.1 for appropriate personnel. appropriate staff. Maintained by Public Works Staff members attend training classes in 2.Classes listed in pollution prevention and chemical use, appropriate staffs NC 3.J.5 60.8.2 storage and handling training pesticide license(online). Maintained by Public Works Require all contractors to provide proof of 3.J.5 60.3.3 proper applicator license 3.Yes/No/Status No All vehicle are required to be washed in the 1.Wash vehicles in wash 3.J.6 65.3.1 wash bay area bar IMN) Yes 1.Records of all inspection Perform routine inspections and maintenance and maintenance logs for 3.J.6 66.8.1 of City owned vehicles City vehicles Yes,Tracked in CityWorks Continue to perform routine maintenance on 1.Continue to maintain city 3.J.6 66.8.2 all City vehicles vehicles IY/N) Yes Continue current schedule for street I.Miles of streets swept, 3.J.) 67.8.1 sweeping. Amount of debris collected 0 1.Number of issues few clogged/blocked inlet boxes Inspect drainage systems within along right-of-way that will the City rights-of-way or dedicated need to be cleaned out) 3.2.) 68.0.1 easements(City and State roadways). reported Number oflssues reported:25 2.Contact NCOOT for any deficiencies that need to be corrected on state 3.).) 68.8.2 Maintained Roads(Y/N) Yes Continue pickup service,and documentation 1.Continue brush/leaf 69.0.1 of pickups. collection service(y/N) Yes