Loading...
HomeMy WebLinkAbout20201091 Ver 2_Task 3 Credit Release_20231019DocuSign Envelope In 3E317)089F-8FDA-4ABA-65A7-7E13F9BEB85C ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director NORTH CAROLINA Environmental Quality October 19, 2023 Environmental Banc & Exchange, LLC DWR Project #: 2020-109lv2 Attn: Jamey Mceachran Wayne County (via electronic mail: jmceachrangres.us ) Re: RES 2021 Neuse Umbrella Mitigation Banking Instrument (UMBI) Shady Grove Bank Parcel Credit Release — Task 3 Dear Ms. Mceachran, On October 13, 2023, the Division of Water Resources (DWR) received an As -Built Report from Environmental Banc & Exchange, LLC (EBX) for the Shady Grove Site. According to the As -Built survey and corresponding project credits table submitted with the As -Built Report, there are slight adjustments in the total amounts of Riparian Buffer credits and Nutrient Offset credits as compared to the approved Bank Parcel Development Package. The subject site has generated 563,359 ft2 (28,942.848 lbs-Nitrogen) of nutrient offset credits, 29,707 ft2 of buffer restoration credits and 1,980.400 ft2 of buffer Preservation credits. DWR received a performance bond (#612402580) issued to EBX from United States Fire Insurance Company, in the amount of $100,000, to cover monitoring and maintenance at the subject site. The term of this bond applies beginning August 16, 2023 and ends August 16, 2024. Future credit releases will be dependent on both the renewal of this performance bond and the annual monitoring reports. In accordance with the UMBI, signed on November 30, 2021, the following Project Milestones have been met and the corresponding credits shall be released: Task/Milestones Credit 3) DWR Monitoring Financial Assurance Posted & Approval of As -Built Report 10% By copy of this correspondence, DWR confirms that you have satisfied the above requirements for the above -referenced tract and the following credits are released to sell: • 10% of the Neuse buffer Restoration credits (0.10 x 29,707 ft2 = 2,970.700 ft2) • 10% of the Neuse buffer Preservation credits (0.10 x 1,980.400 ft2 = 198.04 ft2) • 10% of the Nitrogen nutrient offset credits (0.10 x 28,942.848 lb-N = 2,894.285 lb-N) North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh, North Carolina 27699-1611 NORTH CARCLINA 919.707.9000 DocuSign Envelope ID: 3E3D089F-8FDA-4ABA-B5A7-7E13F9BEB85C Shady Grove Site EBX October 19, 2023 Please note that nutrient offset credits generated at this site must be used for impacts in HUC 03020201 of the Neuse River Basin excluding the Falls Lake Watershed pursuant to 15A NCAC 02B .0703, which became effective on April 1, 2020. Additionally, the riparian buffer credits must be used for impacts in the Neuse River Basin in accordance with guidelines in the Consolidated Buffer Mitigation Rule, 15A NCAC 02B .0295, which became effective on November 1, 2015 Please feel free to contact Katie Merritt ( katie.merritt(cr�,deq.nc.gov ) if you have any questions regarding this correspondence. cc:File Copy (Blake Hartshorn) EBX — Travis Cooke (via electronic mail) Sincerely, EDocuSigned by, ��� C1(JSS 755ABFOCD808428... Stephanie Goss, Supervisor 401 & Buffer Permitting Branch Page 2 of 2