LETTER OF APPROVAL
Dominion Land Corporation
ATTN: Nathan S. Sanders, President
PO Box 3167
Wilmington,NC 28406
RE: Project Name: Audubon Park
Acres Approved: 14.65
Project ID: BRUNS-2024-015
County: Brunswick
City: Boiling Spring Lakes
Address: Fifty Lakes Drive
River Basin: Cape Fear
Stream Classification: Other
Submitted By: J. Phillip Norris, PE,Norris & Tunstall Consulting Engineers,P.C.
Date Received by LQS: August 23, 2023 and September 8,2023
Plan Type: Residential
Dear Mr. Sanders:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter
of Approval with Modifications and Performance Reservations. A list of the modifications and
reservations is attached. This plan approval shall expire three (3)years following the date of approval, if
no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the
plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit. After the form is reviewed and found to be complete,you will receive a link
with payment instructions for the $100 annual permit fee. After the fee is processed,you will receive the
COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future,the new responsible party must obtain a new COC.
North Carolina Department of Er varonmental Quality 1 Division of Energy.Mineral and Land Resources
Wilmington Regional Office 127 Cardinal Drive Extensors Wilmington,North Carolina 28405
ftailtv 910196,7215
Letter of Approval
Dominion Land Corporation
September 11,2023
Page 2 of 4
Title 15A NCAC 4B .0118(a)and the NCGO l peunit require that the following documentation be keR,t on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office
may require revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. This permit allows for a land-disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. You are requested to file an amended form if
there is any change in the information included on the foini. In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
7Sai
Rhonda Hall
Assistant Regional Engineer
Land Quality Section
Enclosures: Approval Comments and Conditions
NPDES NCG01 Fact Sheet
cc: J. Phillip Norris, PE,Norris & Tunstall Consulting Engineers, P.C.
1429 Ash-Little Rive Road,Ash,NC 28420
Wilmington Regional Office file
Letter of Approval
Dominion Land Corporation
September 11,2023
Page 3 of 4
APPROVAL COMMENTS AND CONDITIONS
Project Name: Audubon Park
Project ID: BRUNS-2024-015
County: Brunswick
1. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity
has been undertaken, as is required by Title 15A NCAC 4B .0129.
2. The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation
control measures prove insufficient, the developer must take those additional steps necessary to stop
sediment from leaving this site (NCGS 113A-57(3)). Each sediment storage device must be inspected
after each storm event (NCGS 113A-54.1(e)). Maintenance and/or clean out is necessary anytime the
device is at 50% capacity. All sediment storage measures will remain on site and functional until all
grading and final landscaping of the project is complete(15A NCAC 04B .0113).
3. Any and all existing ditches on this project site are assumed to be left undisturbed by the proposed
development unless otherwise noted. The removal of vegetation within any existing ditch or channel is
prohibited unless the ditch or channel is to be regarded with side slopes of 2 horizontal to 1 vertical or less
steep (15A NCAC 04B .0124 (d)). Bank slopes may be mowed, but stripping of vegetation is considered
new earth work and is subject to the same erosion control requirements as new ditches (NCGS 113A-
52(6)).
4. The developer is responsible for obtaining any and all permits and approvals necessary for the development
of this project prior to the commencement of this land disturbing activity. This could include our agency's
Stormwater regulations and the Division of Water Resources' enforcement requirements within Section
401 of the Clean Water Act, the U.S. Army Corps of Engineers'jurisdiction of Section 404 of the Clean
Water Act, the Division of Coastal Management's CAMA requirements, the Division of Solid Waste
Management's landfill regulations, the Environmental Protection Agency and/or The U.S.Army Corps of
Engineers jurisdiction of the Clean Water Act, local County or Municipalities' ordinances, or others that
may be required. This approval cannot supersede any other permit or approval; however, in the case of a
Cease and Desist Order from the Corps of Engineers, that Order would only apply to wetland areas. All
highland would still have to be in compliance with the N.C. Sedimentation Pollution Control Act.
5. If any area on site falls within the jurisdiction of Section 401 or 404 of the Clean Water Act,the developer
is responsible for compliance with the requirements of the Division of Water Resources(DWR),the Corps
of Engineers and the Environmental Protection Agency(EPA)respectively. Any erosion control measures
that fall within jurisdictional wetland areas must be approved by the aforementioned agencies prior to
installation. The Land Quality Section must be notified of a relocation of the measures in question to the
transition point between the wetlands and the uplands to assure that the migration of sediment will not
occur. If that relocation presents a problem or contradicts any requirements of either DWR,the Corps, or
the EPA, it is the responsibility of the developer to inform the Land Quality Section regional office so that
an adequate contingency plan can be made to assure sufficient erosion control remains on site. Failure to
do so will be considered a violation of this approval(NCGS 113A-54.1(b)).
Letter of Approval
Dominion Land Corporation
September 11,2023
Page 2 of 4
Title 15A NCAC 4B .0118(a)and the NCGO 1 permit require that the following documentation be ket on file
at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office
may require revisions to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Foiin, which you provided. This peiuiit allows for a land-disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Siincerely,
i /Z/&y //a&
Rhonda Hall
Assistant Regional Engineer
Land Quality Section
Enclosures: Approval Comments and Conditions
NPDES NCGO1 Fact Sheet
cc: J. Phillip Norris, PE,Norris & Tunstall Consulting Engineers, P.C.
1429 Ash-Little Rive Road,Ash,NC 28420
Wilmington Regional Office file