No preview available
HomeMy WebLinkAbout20230803 Ver 1_More Info Received_20231013 (4)Baker, Caroline D From: Homewood, Sue Sent: Monday, October 16, 2023 1:06 PM To: Baker, Caroline D Subject: FW: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 Attachments: Jacobs Creek SWP response letter.pdf; Jacobs Creek -Storm water management plan rev 10 12_REDUCED.pdf Here's what I tried to upload today to 20230803. Can you figure out what is missing, or just replace the entire thing? Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jim Mason <james.mason@threeoaksengineering.com> Sent: Friday, October 13, 2023 3:50 PM To: Mcdaniel, Chonticha<chonticha.mcdaniel@deq.nc.gov>; Homewood, Sue <sue.homewood@deq.nc.gov> Subject: RE: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Chonticha — Attached are the updated SMP and response letter for the subject project. Please let me know if you have any questions or require any additional information. Thanks and have a great weekend, M11 From: Mcdaniel, Chonticha <chonticha.mcdaniel@deg.nc.gov> Sent: Monday, October 2, 2023 10:49 AM To: Jim Mason <lames. mason @threeoaksengineerinR.com>; Homewood, Sue <sue.homewood@deg.nc.Rov> Subject: RE: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 Hi Jim, Here are my additional comments on the revised SMP for Phase I: 1. The Supplemental EZ form is missing an engineer's seal, signature, and date. 2. Supp EZ form, item # 18; The percent BUA should reflect the number that is used in the design calculation. 3. Supp EZ form, item # 49; The answer to this question needs to be reviewed/revised. 4. The orifice sizing for pond 2 need to fall between 2 - 5 day drawdown. Please review and revise as needed. 5. Please provide calculations of forebay volume vs. main -pool volume that meet the 15-20% requirement. Also, amend this information on the Supp EZ form and drawings as needed. 6. Orifice size in the calculations and on the drawings should be the same. Please review and make sure that these numbers are consistent on all documents. 7. Plan Sheet EC-4; Pond's top view still being identified as a dry pond. Please amend as needed. 8. We are still missing the signed/notarized O&M agreement to cover both wet ponds. Please feel free to let me know if you have any questions. Thank you! Chonticha McDaniel (she/her/hers) 401 Stormwater Engineer, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 707-3634 chonticha.mcdaniel@deq.nc.gov D_ E_ � NORTH CAROLINA7.AM Q C1110) Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jim Mason <james.mason@threeoaksengineering.com> Sent: Friday, September 29, 2023 11:48 AM To: Homewood, Sue <sue.homewood@deg.nc.gov>; Mcdaniel, Chonticha <chonticha.mcdaniel@deg.nc.gov> Subject: Re: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sue - sorry for missing your call earlier. Thank you very much for the update on the permit application and the desire to have the phase 1 stormwater completed and approved before issuing. I will let summit know, and we will work towards getting what is required for the project. Thanks to both of you and have a great weekend, Jim James Mason Three Oaks Engineering, Inc. (704)604-8358 From: Homewood, Sue <sue.homewood@deg.nc.gov> Sent: Friday, September 29, 2023 11:13:15 AM To: Mcdaniel, Chonticha <chonticha.mcdaniel@deg.nc.gov> Cc: Jim Mason dames.mason@threeoaksengi nee ring.com> Subject: FW: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 Chonticha, Will you please forward your comments on this to Jim Mason at Three Oaks so that he can pass them onto the engineers. Jim, it may be easiest if the engineers contact Chonticha directly to talk through the last items she needs to finalize the Phase 1 SMP. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jim Mason <james.mason@threeoaksengineering.com> Sent: Wednesday, September 27, 2023 4:59 PM To: Homewood, Sue <sue.homewood@deg.nc.gov> Subject: RE: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sue - Attached is a revised version of the SMP with the information you requested. The document shows the overall concept for the development, with specific design for Phase 1. The ponds in phase 1 have been designed as wetponds to meet water quality standards for 1" storm runoff. The outfalls of the ponds are designed to have non -erosive flows at a 10 year storm event. The pre / post for the 1 year storm have been met for both ponds. The EZ supplement tool and design calculations for the wetponds are part of the document. For item 4, we have a proposal in place to have a soil scientist measure the SHWT. We hope to have them under contract soon so that we can provide you with that information. Thanks, Jim From: Homewood, Sue <sue.homewood@deg.nc.gov> Sent: Monday, September 25, 2023 8:30 AM To: Jim Mason <lames. mason @threeoaksengineerinR.com> Subject: RE: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 Jim, In accordance with 15A NCAC 02H .0506(b), a 401 certification may only be issued when certain criteria has been met: listed as items (1) — (6). (2) and (3) state that the project may not cause or contribute to a violation of water quality standards or result in secondary or cumulative impacts that would cause or contribute to .... This has been a criteria of the 401 review process for the last 15 years. As you know, high density developments contribute to stream degradation and pollution and that's why we have federal and state stormwater programs. As indicated in my addinfo request (attached), in order to document there will not be downstream degradation, the applicant may provide either a complete stormwater management plan that meets the post construction stormwater design standards for water quality treatment, OR calculations and documentation that otherwise shows the project will not cause downstream degradation. As I am extremely limited on time with this project, if they prefer to opt for the latter documentation, I will need to deny the application as incomplete, and you can reapply with the stormwater calculations and documentation which we will review in depth. Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Jim Mason <james.mason@threeoaksengineerinR.com> Sent: Sunday, September 24, 2023 9:22 PM To: Homewood, Sue <sue.homewood@deg.nc.gov> Subject: RE: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sue - I wanted to let you know that Summit is working on your requests. They did have one question: Why would an official SCM pond be required to be built when these ponds are only being used to meet pre / post flows? Please let me know if you require any additional details regarding this question. Thanks, Jim From: Homewood, Sue <sue.homewood@deg.nc.gov> Sent: Friday, September 22, 2023 3:13 PM To: Jim Mason <lames. mason @threeoaksengineering.com> Subject: FW: [External] RE: Request for Additional Information for Jacobs Creek Residential Development - Rockingham County - DWR#20230803 Jim, In order to complete our stormwater review we require the following information: 1. Application form SWU-101 (application fee and last two signature pages are not required). In particular, we need more information on the BUA within each drainage area (DA-1 and DA-2). 2. Supplement EZ form for each pond 3. O&M agreement to cover both ponds 4. Information on SHWT Elevation to ensure that the pond bottom is at least 6 inches higher than the SHWT where the ponds will be located. DWR understands that #3 and #4 may take some time for field investigation. Is it possible for you to provide items 1-3 by COB Wed 9/27 so that we can finish the technical review? Thanks, Sue Homewood (she/her/hers) 401 & Buffer Permitting Branch Division of Water Resources sue.homewood@deg.nc.gov please note my new email address 336 813 1863 mobile 919-707-3679 office Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Chonticha Mcdaniel 401 Stormwater Engineer NCDEQ Division of Water Resources October 13, 2023 RE: Jacobs Creek Residential Development - Rockingham County - DWR#20230803 comments 10/2/23 Here's our responses to the revised SMP for Phase I: 1. The Supplemental EZ form is missing an engineer's seal, signature, and date. RESPONSE: This has been sealed. 2. Supp EZ form, item # 18; The percent BUA should reflect the number that is used in the design calculation. RESPONSE: form has been updated. 3. 4. Supp EZ form, item # 49; The answer to this question needs to be reviewed/revised. RESPONSE: changed to yes. 5. The orifice sizing for pond 2 need to fall between 2 - 5 day drawdown. Please review and revise as needed. RESPONSE: orifice calculations have been updated. 6. Please provide calculations of forebay volume vs. main -pool volume that meet the 15-20% requirement. Also, amend this information on the Supp EZ form and drawings as needed. RESPONSE: Added calculation in the design calc package. 7. Orifice size in the calculations and on the drawings should be the same. Please review and make sure that these numbers are consistent on all documents. RESPONSE: updated the size in calculations and drawings. 8. Plan Sheet EC-4; Pond's top view still being identified as a dry pond. Please amend as needed. RESPONSE: updated text. 9. We are still missing the signed/notarized O&M agreement to cover both wet ponds. RESPONSE: added O&M agreement in calc package at the end. This completes our responses at this time. Let us know if you have any questions. Sincerely, Dom Sever Donald A. Sever, PE Senior Project Manager Raleigh Dice 3301 Benson Drive, Suite 400, Raleigh, NC 27609 919.322.0115 // www.summitde.com 13 SUMMIT DESIGN AND ENGINEERING SERVICES Storm Water Management Plan Jacobs Creek Subdivision 21-0208.010 Stokesdale, NC (Rockingham County) FIRST ISSUED: September 27, 2023 Revised October 12, 2023 OWNER/APPLICANT: Mr. Josh Spiegel LGI HOMES- NC, LLC 5511 Capital Center Dr Suite 560 Raleigh, NC 27606 P(980)722-0391 Josh.spieL7el@lgihomes.com Headquarters Office 320 Executive Court, Hillsborough, NC 27278 o�oFESS/Q env SEAL �J 24627 _ 2 °° ENGINEER/CONSULTANT: Don Sever, PE Summit Design & Engineering Services 320 Executive Court Hillsborough, NC 27278 P (919)732-3883 / F (919)732-6676 don.sever@summitde.com 919-732.3883 // www.summitde.com Table of Contents 1. Cover Sheet 2. Table of Contents 3. Project Narrative Narrative and Calculations PROJECT NAME: Jacobs Creek Subdivision PROJECT NUMBER: 21-0208 PROJECT LOCATION: Stokesdale, NC (Rockingham County) TOTAL AREA: 427.64 Acres ZONING: RM STORMWATER REG. BASIN: None RIVER BASIN: Roanoke WATERSHED PROTECTION AREA: None PROJECT NARRATIVE: Introduction: The subdivision is in the Rockingham County's jurisdiction. No stormwater impact analysis is required in this watershed. During the 401 Permit review, a Stormwater Management Plan was requested for the development. An exhibit EX-1 shows the overall stormwater management plan. The following description explains the drainage basin on a global scale. The drainage basin delineation was created for StreamStats, and superimposed on the USGS Ellisboro NC quadrangle map. To get a better understanding of the drainage areas within the property, we have included the StreamStats report that lists these areas. Overall the property is divided into two different watersheds by US 220. On the east side of US 220, the drainage basin is mostly flowing into Jacobs Creek. Jacobs Creek is a FEMA regulated stream within the property boundary. Jacobs Creek flows south to north, with the drainage boundary at NC Highway 65. On the east side of Griffin Road, the runoff flows to an unnamed branch of Jacobs Creek. A drainage area of roughly 60 acres is at this location. For the west side of US 220, the drainage basin is the beginning of Hogans Creek. Like Jacobs Creek, the watershed flows from south to north. The property is designed to have townhomes, single family homes, and commercial sections. Our present design is for the phase 1 which is east of Griffin Road. The concept that is used for phase 1 will be followed in the remaining phases. Our plans have only conceptual layout. For stream permitting purposes, we identified where stream crossings are anticipated and developed impacts based on our conceptual design. The crossings have been given enough flexibility to be constructed within the proposed footprint. We anticipate that the impacts shown would be worst case scenarios. It is anticipated that all ponds in Phase 1 will be wetponds. The basins will be located outside of any stream buffer or wetland area. The intent is to locate the detention basins where sediment basins are needed. The sediment basin would then be converted to a wetpond when completed. The flow from the pond will be designed for the pre / post to meet a 1 year design storm. The pipe outlets will have riprap dissipator pads to handle the 10 year design storm flow to a non -erosive velocity. Typical outlet velocity for the ponds are around 6 feet per second. The overall exhibit shows conceptually where storm water ponds will be located throughout the site. Typically a pond will be located on both sides of the stream channel. The ponds are located behind lots where possible. During final design, one or two lots might be lost for a storm pond. No further environmental impacts are anticipated with the construction of the ponds than we have already identified with the impact maps. For phase 1, we have included the hydraflow design for the two detention ponds. DA-1 has a 1 year flow of PRE 50.02 cfs / Post 17.18 cfs after routing through the pond. DA-2 has a 1 year flow of PRE 15.8 cfs / POST 5.84 cfs. These basins meet the criteria of meeting the pre / post development flows for the 1 year storm event. V f.J1r1C1LIV11 ac IVIC1111LGIld11L:C MIJ11C111WIL Project Name: Jacobs Creek Phase 1 Project Location:IStokesdale, Robinson Coun Cover Page aintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. iy deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can fect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). ie SCM(s) on this project include (check all that apply & co Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Quantity: Stormwater Wetland Quantity: Permeable Pavement Quantity: Sand Filter Quantity: Rainwater Harvesting Quantity: Green Roof Quantity: Level Spreader - Filter Strip Quantity: Proprietary System Quantity: Treatment Swale Quantity: Dry Pond Quantity: Disconnected Impervious Surface Present: User Defined SCM Present: Low Density Present: onding O&M sheets will Location(s): Location(s): Location(s): 2 Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): No Location(s): No Location(s): No Type: 14cknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for ;ich SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to �%,e system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature: -�'Z-t Josh Spiegel Vice President Land Development, LGI Homes NC, LLC 5511 Capital Center Dr Suite 560 Raleigh, NC 27606 980 772-0391 iosh.sWeael0laihomes.com Date: /a, /Z "?d ?-3 �� �V•l`' tE(jdq nt(a_ , a Notary Public for the State of �� QT1� i�tR.OI,�IUPt � aunty of��(,F- , do hereby certify that ;grsonally appeared before me this day of 0EFeg. and "nowledge the due execution of the Operations an�dy Maintenance Agreement. Jitness my hand and official seal, 0 '�y J g �pT-4 A J B`�G U r xxxaN =al My commission expires - �102,(P ORM-EZ 10/12/2( I. S Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). _ No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. _ Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. _ If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. _ At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. _ The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one - formed. time fertilizer application. The inlet pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment off -site. The inlet pipe is cracked The inlet device or otherwise damaged (if Repair or replace the pipe. applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design depth for sediment location where it will not cause impacts to streams or the SCM. storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design sediment storage location where it will not cause impacts to streams or the SCM. depth. Algal growth covers over Consult a professional to remove and control the algal growth. The main treatment area 50 /o of the area. Cattails, phragmites or Remove the plants by wiping them with pesticide (do not other invasive plants cover spray). 50% of the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, Plants are dead, diseased disease, etc. Remedy the problem and replace plants. Provide or dying. a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. gg g Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. are growing on the mat. Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. Wet Pond Maintenance Reauirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water. Wet Detention Pond Design Summary SCM A Pretreatment other No than forebay? Has Veg. Filter? No SCM B Pretreatment other No than forebay? Has Veg. Filter? FOREBAY Permanent Pool El. 802.5 Temporary Pool El: 805.29 Clean Out Depth: 3 Sediment Removal E 799.5 Bottom Elevation: 798.5 Permanent Pool El. 780 Temporary Pool El: 781.17 Clean Out Depth: 3 Sediment Removal E 777 Bottom Elevation: 776 MAIN POND Permanent Pool El. 802.5 Temporary Pool El: 805.29 Clean Out Depth: 3 Sediment Removal E 799.5 Bottom Elevation: 798.5 MAIN POND Permanent Pool El. 780 Temporary Pool El: 781.17 Clean Out Depth: 3 Sediment Removal E 777 Bottom Elevation: 776 ENVIRONMENTAL IMPACTS JACOBS CREEK - PHASE I TO 5 185 BENNETT FARM RD STOKESDALE, NC OVERALL STORM MANAGEMENT PLAN 3 m SU�1t*11T DESIGN AND ENGINEERING SERVICES State License #° P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net O o Z� °N AQO-° y cn - -z D N°o D N oo R PROJECT ENGINEER/ARCHITECT AM (ALEX.MANGOT@SUMMITDE.COM) PROJECT MANAGER DS (DON.SEVER@SUMMITDE.COM) DRAWN BY JA (JIM.ASHLEY@SUMMITDE.COM) FIRST ISSUE DATE 01-12-2023 COPYRIGHT CZ) 2023 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 7 6 5 4 3 2 1 REVISED PER COE COMMENTS 6/30/23 7/12/23 DAS REVISIONS DATE BY 7 Ir I L —__ I I I I I I I ---J L—J L—J L—J L—J L—J `---J L---J I I I I I I I I I I I I I I I I I I I I I I I I I I I I I----- I I I I I I I I I I I I I I I I I I I I I I I I I --J �— r I I I I I I I I I I I I I I L---- 1I I I I I I I I I I I J L—1 —--� I I I I I I I I I I I J L_I I L_---j L_J L— I L ---_I I - 1 � I I I I L_—_J I I <1 I �\ \ --J I---J I--- i I---1 ---- oN)N) o 0 p,mg �—.wlgw 1 I I I �I I I I I I i I I I -- - �- Cn O Cn ` � 1 ♦ `_woo0 \ ♦ waft ftw000 0000 ♦ ` m 0 z 0 LN Ilf-_1LESS O x O�� m tDln m r 0 m� oCIR E A A o QA PRICE F,qR A MRO o N A V O 0 m 0 o Z D A A a m � x � N m A \ 2 N 800tlf m m m x ^� N o�NO��� m 20 cn m cn O m m D m n � o Z C ---1 A n D D m m m , p D o x Cn W n Z D o n (D m Cl) D -n N 11 W 4, j A W U) U1 m 00 D Cl) n D D �1 m D ♦ �-p c 0* ♦ ♦ II �' O to o Cr♦ / CD \ l< o ♦ CA CL \ CQ ♦ 0 m D 0 \ ♦ �^ VJ D 5 Z nCl) C A n D Cyl♦ 0 ' O0 D p m m D ♦ W � m D�7 w x O ♦ T > T Z W O S* i-. n CTI O > / / D m -n II O 0 o o C� / / m m U) n > m D > m D O 0 / r m v m z v CON JA 185 BE STOKE POST DRAINAGEAREA --a ° = °� 0 ' '� ° % W PROJECT ENGINEER/ARCHITECT AM (ALEX.MANGOT@SUMMITDE.COM) 7 1 � m N O o O Z Z I00 > N o m O X ZY TRUCTION DRAWINGS O B S CREEK — PHASE I NETT FARM RD DALE NC DESIGN AND ENGINEERING SERVICES State License #: P-0339 320 Executive Court Hillsborou NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net „I u I l I I,, Q °° NQ ' a° °°° ° I ° °°° °�'°°a =�j N O� e y Cn = �' D (� 11 D = J r O e moo° O °� Sao ° ^ °°°°°„°°°, °°° d� I I I I COPYRIGHT D 2023 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF CENSED ARCHITECT, PROFESSIONAL ENGINEER, NEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION ..ALTERED BY" FOLLOWED BY HIS HER SIGNATURE DESCRIPTION OF THE ALTERATIONS. S. 6 PROJECT MANAGER DS (DON.SEVER@SUMMITDE.COM) 5 �l �F DRAWN BY JA JIM.ASHLEY SUMMITDE.COM ( @ ) 3 DEVELOPED MAP n 2 FIRST ISSUE DATEOR 11, 01-12-2023 1 REVISED PER NCDEO COMMENTS 5 26 2023 07-14-2023 DAS REVISIONS DATE BY SUPPLEMENT-EZ COVER PAGE PROJECT INFORMATION 1 Project Name 2 ;Protect Area (ac) 3 Coastal Wetland Area (acl 4 _ '.:Surface Water Area 5 IS ttds.roect High or Law Densit _ 6 Does this project use an off -site SCM? CGfdIItrANCE WriTA i2K-10ri:i�4y Creek 60 0 No 7 Width of vegetated setbacks , rovided feet) 6 8 Will the vegetated setback remain vegetated? yes 9 If BUA is proposed in the setback, does it meet NC_AC 02H.1003(4j(c-d)? _ WA 10 is streambank stabilization proposed on this project? j No NUMBER AND TYPE OF SCMs: 11 Pinfiltration System 12 Bioretention Cell 13 f Wet Pond L_14_ Stormwater Wetland 15 _,Permeable Pavement 16 !Sand Filter 17 _ Rainwater Harvestin, RWH 18 Green Roof 19 Level ader-Filter Strip LS. 20 Disconnected Impervious Surf. 21 'Treatment Swale .i _22_^ Dry Pond 23 !StormFliter 24� ;Silva Cell 25 I Bayfiiter 26 Fifterra FORMS10ADED DESIGNER CERTIFICATION - 27 1 Name and Title: 1 Donald A. Sever, PE 3r. Pro'ect Mana r 28 Orgganization: _ _ _Summit Design and En ineerin Services 29_ _ !Street address: 3301 Benson Dr Suite 400 30 , City,_ State, Zb: Raleigh NC 27609 31 i Phone numbsr(s1: _ 919 732-3883 32 Ji Email: _ don.severCaummude-com Certification Statement I certify, under penalty of taw that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the Information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that fhe engineering plans, specifications, operation and maintenance agreements and other supporting Information are consistent with the Information provided hare. Designer °CAR�� i o Essioti�< �9 °F SEAL.' �3 a 24627% 0 °�NGINE��" J� ° rr r r rMn'`` Signature of Designer M DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? I No FORMS LOADED DRAINAGE AREA INFORMATION Type of SCM Entire Site 1 2 4 wetpond wet and 5 Total drainage area (sq ft 3696066 2279494.8 494841.6 6 Onsite drainage area (sq ft 2613600 1197028.8 494841.6 7 Offsite drainage area (sq ft 1082466 1082466 0 8 Total BUA in project (sq ft New BUA on subdivided lots (subject to s ft 850626 sf 642999 sf 207627 sf 9permitting) 567000 sf 416500 sf 150500 sf 10permitting) New BUA not on subdivided lots (subject to sf Offsite BUA (sq ft 283626 sf _ 226499 sf 57127 sf 11 sf 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft 37393 sf 37393 sf - Sidewalk (sq ft 53019 sf 44106 sf 8913 sf - Roof (sq ft sf - Roadway s ft 193214 sf 145000 sf 48214 sf - Future (sq ft - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on Isubdivided lots (sq ft New infiltrating permeable pavement not on subdivided lots (sq ft sf 14 sf 15permitting) Existing BUA that will remain (not subject to s ft 0 sf 16 Existing BUA that is already permitted (sq ft sf 17 Existing BUA that will be removed (sq ft sf 18 Percent BUA 33% 28% 42% 19 Design storm inches 1.0 in 1.0 in 20 Design volume of SCM cu ft 57722 cf 17633 cf 21 Calculation method for design volume 1" storage 1" storage ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND r::fl Drainage area number 1 2 21 Minimum required treatment volume (cu ft) 57722 cf 17633 cf 31 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other en ineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No No 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC 10 ? Is there an O&M Agreement that complies with General MDC (11)? No No 14 Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed bX an NC licensedprofessional? Yes Yes WET POND MDC FROM 02H .1053 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 798.00 778.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) Elevation of the bottom of the vegetated shelf (fmsl) Elevation of the permanent pool (fmsl) Elevation of the top of the vegetated shelf (fmsl) 799.00 779.00 22 802.50 782.00 23 802.50 782.00 24 803.50 783.00 25 Elevation of the temporary pool (fmsl) 806.00 783.50 261 Surface area of the main permanent pool (square feet) 21100 7890 27 Volume of the main permanent pool (cubic feet) 74475 cf 24580 cf 28 Average depth of the main pool (feet) 3.00 ft 3.00 ft 29 Average depth equation used Equation 2 Equation 2 30 If using equation 3, main pool perimeter (feet) 311 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 14800 cf 4195 cf 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 12 in 12 in 35 Design volume of SCM (cu ft) 57722 cf 17633 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 371 If orifice, orifice diameter (inches) 4 in 2 in 381 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2 2 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes No Yes No 42 Are berms or baffles provided to improve the flow path? 43 Depth of forebay at entrance (inches) 48 in 48 in 44 Depth of forebay at exit (inches) 12 in 12 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) 6 ft 6 ft 471 Slope of vegetated shelf (H:V) _ 6:1 Does the orifice drawdown from below the top surface of the Yes per anentpool? Does the pond minimize impacts to the receiving channel from the 1- Yes r, 24-hr storm? 6:1 48 Yes 49 Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. 51 Is a trash rack or other device provided to protect the outlet system? 52 Are the dam and embankment planted in non -clumping turf grass? No No Yes Yes Yes Yes 53 Species of turf that will be used on the dam and embankment centipede centipede 541 Hasa planting plan been provided for the vegetated shelf? Yes Yes )ITIONAL INFORMATION Please use this space to provide any 55 the wet pond(s): itional information about Wet Pond 2 2:14 PM 10/12/2023 a « Q r) .to 4) � C! a Q � o L O NI 0 O w, _O C — 3 p rf� Co0CACAr H N CI 00 0 0 rIncocom � It co 'q u CR C II a E T T T T N N N O w 0 NCO Mr O II rO+ fIi coco O CO O M fM r 0 LO N N Ih p� 11 ? cl r N � r c0 CO cD 1l CO ii T T T T T T T N � LO N co LO r m co o OHO m � N M I O O co �IAC LO T T T c M lt7 ' N � o u u LL � OC V d 00000 o0 00000 c0 L6 L6ui LO o Sri V) O) > 00d�'4 NNOCOM NCOOO" (D £ � 0 O r I, -I) M CA N M 0 1) 04 r r N CO M G N U U- G d E a3 ' O N L U E > 00 g 0 Z� � O O 00LO 0 o c votiLo Ov_Cn cc1- co cm - cor- N N ti N Cq N Lo M �- E Cl)0 a `a E r W L 7 0 O LL R i 000 O O O O O a 000 001,-00 L 0 N T CO It vco0DV)O O co I-T co 0) 3 T N N N N M M M O co 0 co Co V r T II co CV co Co G . ti v7 CD O LO 0 N M O O T T T N T r- � C) CO co, O CD co MCd LCO �N 11 Co d � N � O Q to a) V) L L L L L 0 � U p Q r C r0+ C aO+ C r0 C aO+ C Q u 0 0 0 0 0> m j w w w + w Q w o > a)>A ram+ lolalacaE ram p) Q C. W O 0 0 0 0 0 0 C W E E E E p N Q0. O mode cccc� LL N C C N m J 0 0 co 0 N O N N O N N_ M N 0 N ti N a � < � � � « � k 7 � J « ,k ) .2y $ § 2 » 0 + f_ k/ Cc Cl) � § \ Ifci e o a w V (a CY c / � a . . . „ \ L O FL 0 2 Z a - Lo � 0 \ QC to W �.H _=y ) ? 2 Z// 7 %/ )� O$E § 3 §)\Rq ®' « ?7 �% 2 da^ q W \ 2 . + , _ = 2 2 77 > ��� .if ..,.. En �e . o •ew eomeo s . d $ §aaaa n<�§ tt > Q \ �.. k �� 2 . , j\ cy q §R�d B k ' ■ L co 2 ) , 7§E r k) ° 2 co 0 In tn 2 � $ J /Kt LEo] ) )§\\ NO 33/� k 2« JI kk « :. N O N K3 O N O w m sv n m cQ� (n 0 N CD N 0 N W CD N O U) N' 7' X Cn 0 O -0 .3.. m .3•. m .3•. m m .3.. m .3. m O -� ° 3 3 3 m 3 3° D v �Q,Q,a< QQm O Co CD 0 M m CDFOOO m m mCD 00 7 cl� < 0 0 0 0 0 D 7 7 3 3 3 D O O O 0 0 O C C C C C v cn CD N -0 .' O � - O O. Q CD G o can V j O C W 0 Ln C o m v v v CD O CC) co 00 OD A A W PQ — —O CA V s W < W ;v co Ul II ~ Ul n o Cb O 7 O Ui(nANO Ova �I O o o 0 A 0 00 0 OD 0 � o D 0 0 0 0 0 0 0 0 CD m N m o 0 7 �l CD 3 AA '' V+ CD ? W Co N - M O w � -P, cn 0 (D 7 CD CL O p p Cn O o 0. CDp p CD (b co' Cln p (/) C D c N o n D 0 0 0 0 Iv m m - D rn 41 wwCCcnw w N a c cn 4 Ul Cn 3 in in � in (.0 min o CPP ccn ccn ccn cNP cNP O CD 0 O 0 0 0 0 0 00, 00000 0O 3 CD n o < II II N zT Cb Cb -1 O Cn UT A O N CD w CD N ' N 41 U1 A �IIO o 0 0 0 0 O co N w IO � o W�� (A (A 0 CA w 0 CO � II W O O O o o v CD _ .� O it 0 N N O O CO -1 M CA W 7 0 C y -1 o v o A m CO CD o CD o 00 rn N o O C= O ��oo�� �w 3 ::gCD v CD i� 7 rr _ S C O O 0 CD N 0 n j 0 + M Cn — v � D � * CD CD \/ Q =_ CD ±ƒ$$ mIE N /[&& \ - - ® 3Emm ƒ CD CD \ 7 - -4 - ?0 i 0 C) } W 0 7 \ „„ „ „ 2\ §§ /\CL m t{ CD o . c ■ /2\/\§ �g o c g �° m}mm\ 6 a 0 < \ § ( \/ 0 A3 » m Cl) ~ ° 2 y \ �m CD g� ¥3 N ° < m 7 ;:§M p®b oa 0 c0 \\T\\ E\ ƒC E` O �� k k/ D I(Z Jf z 7 E w, � 0')-4 � « \ o � Q _ ^ F , ( N 0 Z Q \ C O / „ 4 2 B ƒ g o o k i \ § M. 0 \ / k 2 C ± k \ ) 2- N < \ CD7a CD CD 0 » M Jo ) i 3 (D a a » D � U2 � » � USUMMIT DESIGN AND ENCINEERING SERVICES Creatively Inspired -Technically Executed 3301 Benson Drive, Suite 400 Raleigh, NC 27609 Ph: 919-322-0115 www.summitde.com JOB c I - o � � � - -_J41-c7bs Gf9 X- Ph i SHEET NO. CALCULATED BY CHECKED BY OF DATE mil■ 7—IZ3 DATE Hydraflow Results Phase 1 Watershed Model Schematic I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 1 - PRE DA - 1 2 - POST DA SCM A 5 - PRE DA - 2 6 - POST DA SCM B 7 - POST DA - 2 BYPASS 3 - WETPOND A 17' CD CD 8 - WETPOND B 9 - Combined Post B Legend Hvd. Origin Description 1 SCS Runoff PRE DA - 1 2 SCS Runoff POST DA SCM A 3 Reservoir WETPOND A 5 SCS Runoff PRE DA - 2 6 SCS Runoff POST DA SCM B 7 SCS Runoff POST DA - 2 BYPASS 8 Reservoir WETPOND B 9 Combine Combined Post B Project: Phase-1-PRE-POST final.gpw Wednesday, 09 / 27 / 2023 Hydrograph Return Period Recap draflow Hydrographs Extension for AutodeskO Civil 3D® by Autodesk, Inc. v2023 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) 1-yr 2-yr 3-yr 5-yr 10-yr T25-yr 50-yr 100-yr 50.02 76.46 ------- ------- 159.52 220.80 269.73 322.81 1 SCS Runoff ------ PRE DA - 1 2 SCS Runoff ------ 62.55 91.57 ------- ------- 179.97 243.34 293.42 347.39 POST DA SCM A 3 Reservoir 2 17.18 54.83 ------- ------- 116.08 131.51 142.28 152.43 WETPOND A 5 SCS Runoff ------ 15.85 24.00 ------- ------- 49.38 68.14 83.10 99.31 PRE DA - 2 6 SCS Runoff ------ 18.70 26.35 ------- ------- 49.08 65.06 77.58 91.01 POST DA SCM B 7 SCS Runoff ------ 5.837 8.839 ------- ------- 18.19 25.09 30.60 36.57 POST DA - 2 BYPASS 8 Reservoir 7 0.111 0.349 ------- ------- 6.697 16.99 24.62 32.12 WETPOND B 9 Combine 7,8 5.984 9.060 ------- ------- 18.53 36.81 51.51 66.27 Combined Post B Proj. file: Phase-1-PRE-POST final.gpw Wednesday, 09 / 27 / 2023 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 1 Hydrograph type (origin) SCS Runoff Peak flow (cfs) 50.02 Time interval (min) Time to Peak (min) 726 Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) ------ Hydrograph Description PRE DA - 1 2 168,532 ------ ------ 2 SCS Runoff 62.55 2 724 181,867 ------ ------ ------ POST DA SCM A 3 Reservoir 17.18 2 738 179,665 2 805.29 107,678 WETPOND A 5 SCS Runoff 15.85 2 722 43,117 ------ ------ ------ PRE DA - 2 6 SCS Runoff 18.70 2 722 49,047 ------ ------ ------ POST DA SCM B 7 SCS Runoff 5.837 2 722 15,879 ------ ------ ------ POST DA - 2 BYPASS 8 Reservoir 0.11 2 886 15,837 7 781.17 24,384 WETPOND B 9 Combine 5.984 2 722 31,715 7,8 ------ ------ Combined Post B Phase-1-PRE-POST final.gpw Return Period: 1 Year Wednesday, 09 / 27 / 2023 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 1 PRE DA - 1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 56.150 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 20.00 10.00 0.00 ' 1' 0 2 4 Hyd No. 1 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 50.02 cfs Time to peak = 12.10 hrs Hyd. volume = 168,532 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 PRE DA - 1 Hyd. No. 1 -- 1 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 i i I I I I I 1 11% 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 2 POST DA SCM A Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 52.330 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.87 in Storm duration = 24 hrs * Composite (Area/CN) _ [(24.850 x 74) + (27.480 x 80)] / 52.330 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1' 0 2 4 Hyd No. 2 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 62.55 cfs Time to peak = 12.07 hrs Hyd. volume = 181,867 cuft Curve number = 77* Hydraulic length = 0 ft Time of conc. (Tc) = 16.10 min Distribution = Type II Shape factor = 484 POST DA SCM A Hyd. No. 2 -- 1 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 1 i 1 1 1 1 1 1 I`. 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 3 WETPOND A Hydrograph type = Reservoir Peak discharge = 17.18 cfs Storm frequency = 1 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 179,665 cuft Inflow hyd. No. = 2 - POST DA SCM A Max. Elevation = 805.29 ft Reservoir name = WET POND A Max. Storage = 107,678 cuft Storage Indication method used. Wet pond routing start elevation = 802.50 ft. WETPOND A Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 6 12 18 24 30 36 42 48 54 60 66 72 Time (hrs) Hyd No. 3 Hyd No. 2 Total storage used = 107,678 cuft Pond Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Pond No. 1 - WET POND A Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 799.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 799.00 299 0 0 1.00 800.00 4,100 1,835 1,835 2.00 801.00 10,495 7,051 8,886 2.50 801.50 17,688 6,967 15,853 3.50 802.50 21,110 19,372 35,225 4.50 803.50 24,800 22,928 58,153 6.00 805.00 28,800 40,159 98,312 11.00 810.00 34,870 158,917 257,229 12.00 811.00 36,500 35,678 292,908 13.00 812.00 39,000 37,739 330,647 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 42.00 3.50 0.00 0.00 Crest Len (ft) = 24.00 0.00 0.00 0.00 Span (in) = 42.00 3.50 0.00 0.00 Crest El. (ft) = 805.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 799.00 802.50 0.00 0.00 Weir Type = 1 --- --- --- Length (ft) = 94.00 1.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 2.12 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 799.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 1,835 800.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.00 8,886 801.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.50 15,853 801.50 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.50 35,225 802.50 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.50 58,153 803.50 0.30 is 0.30 is --- --- 0.00 --- --- --- --- --- 0.297 6.00 98,312 805.00 0.49 is 0.49 is --- --- 0.00 --- --- --- --- --- 0.494 11.00 257,229 810.00 140.67 is 0.05 is --- --- 140.50 s --- --- --- --- --- 140.56 12.00 292,908 811.00 148.16 is 0.04 is --- --- 147.84 s --- --- --- --- --- 147.89 13.00 330,647 812.00 155.27 is 0.04 is --- --- 154.88 s --- --- --- --- --- 154.91 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 5 PRE DA - 2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 13.930 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 • m .M 3.00 0.00 ' 1' 0 2 4 Hyd No. 5 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 15.85 cfs Time to peak = 12.03 hrs Hyd. volume = 43,117 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 PRE DA - 2 Hyd. No. 5 -- 1 Year Q (cfs) 18.00 15.00 12.00 M M 3.00 1 .1 I 1 1 1 1 1 X 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 6 POST DA SCM B Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 11.360 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 •M .M M11111 0.00 ' 1' 0 2 4 Hyd No. 6 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 18.70 cfs Time to peak = 12.03 hrs Hyd. volume = 49,047 cuft Curve number = 80 Hydraulic length = 0 ft Time of conc. (Tc) = 10.60 min Distribution = Type II Shape factor = 484 POST DA SCM B Hyd. No. 6 -- 1 Year Q (cfs) 21.00 18.00 15.00 12.00 M . I1 3.00 J-- ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 7 POST DA - 2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 5.130 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 K 3.00 2.00 1.00 0.00 ' 1' 0 2 4 Hyd No. 7 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 5.837 cfs Time to peak = 12.03 hrs Hyd. volume = 15,879 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 POST DA - 2 BYPASS Hyd. No. 7 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 i f I I I I I I X 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 8 WETPOND B Hydrograph type = Reservoir Peak discharge = 0.111 cfs Storm frequency = 1 yrs Time to peak = 14.77 hrs Time interval = 2 min Hyd. volume = 15,837 cuft Inflow hyd. No. = 7 - POST DA - 2 BYPASS Max. Elevation = 781.17' Reservoir name = WET POND B Max. Storage = 24,384 cuft Storage Indication method used. Wet pond routing start elevation = 780.00 ft. Q (cfs) 6.00 5.00 K 3.00 2.00 1.00 WETPOND B Hyd. No. 8 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 mroyffins 0 6 12 18 24 30 36 42 48 54 60 66 Time (hrs) Hyd No. 8 Hyd No. 7 Total storage used = 24,384 cuft Pond Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Pond No. 3 - WET POND B Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 776.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 776.00 1,200 0 0 4.00 780.00 7,890 16,221 16,221 5.00 781.00 10,800 9,306 25,527 6.00 782.00 12,400 11,590 37,117 7.00 783.00 14,000 13,191 50,307 8.00 784.00 15,700 14,840 65,148 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 2.00 0.00 0.00 Crest Len (ft) = 16.00 10.00 0.00 0.00 Span (in) = 24.00 2.00 0.00 0.00 Crest El. (ft) = 781.70 782.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 779.00 780.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 3.75 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 776.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 4.00 16,221 780.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 5.00 25,527 781.00 0.30 is 0.30 is --- --- 0.00 0.00 --- --- --- --- 0.297 6.00 37,117 782.00 0.44 is 0.44 is --- --- 8.75 0.00 --- --- --- --- 9.192 7.00 50,307 783.00 0.56 is 0.54 is --- --- 78.97 9.19 --- --- --- --- 88.71 8.00 65,148 784.00 0.64 is 0.63 is --- --- 185.85 47.77 --- --- --- --- 234.24 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 9 Combined Post B Hydrograph type = Combine Peak discharge = 5.984 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 31,715 cuft Inflow hyds. = 7, 8 Contrib. drain. area = 5.130 ac Q (cfs) 6.00 5.00 K 3.00 2.00 1.00 0.00 0 4 Hyd No. 9 Combined Post B Hyd. No. 9 -- 1 Year 8 12 Hyd No. 7 16 20 Hyd No. 8 24 28 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 --" 0.00 32 Time (hrs) Hydrograph Summary Report 14 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 1 Hydrograph type (origin) SCS Runoff Peak flow (cfs) 322.81 Time interval (min) Time to Peak (min) 724 Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) ------ Hydrograph Description PRE DA- 1 2 1,011,268 ------ ------ 2 SCS Runoff 347.39 2 722 983,655 ------ ------ ------ POST DA SCM A 3 Reservoir 152.43 2 734 981,437 2 811.61 315,869 WETPOND A 5 SCS Runoff 99.31 2 720 258,721 ------ ------ ------ PRE DA - 2 6 SCS Runoff 91.01 2 720 240,801 ------ ------ ------ POST DA SCM B 7 SCS Runoff 36.57 2 720 95,279 ------ ------ ------ POST DA - 2 BYPASS 8 Reservoir 32.12 2 724 95,237 7 782.41 42,476 WETPOND B 9 Combine 66.27 2 722 190,516 7,8 ------ ------ Combined Post B Phase-1-PRE-POST final.gpw Return Period: 100 Year Wednesday, 09 / 27 / 2023 Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 1 PRE DA - 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 56.150 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.04 in Storm duration = 24 hrs Q (cfs) 350.00 250.00 150.00 100.00 50.00 0.00 ' 1' 0 2 4 Hyd No. 1 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 322.81 cfs Time to peak = 12.07 hrs Hyd. volume = 1,011,268 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 PRE DA - 1 Hyd. No. 1 -- 100 Year Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 —r ' ' ' I I 1 11 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 2 POST DA SCM A Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 52.330 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.04 in Storm duration = 24 hrs * Composite (Area/CN) _ [(24.850 x 74) + (27.480 x 80)] / 52.330 Q (cfs) 350.00 250.00 150.00 100.00 50.00 0.00 ' 1' 0 2 4 Hyd No. 2 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 347.39 cfs Time to peak = 12.03 hrs Hyd. volume = 983,655 cuft Curve number = 77* Hydraulic length = 0 ft Time of conc. (Tc) = 16.10 min Distribution = Type II Shape factor = 484 POST DA SCM A Hyd. No. 2 -- 100 Year Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 -' ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 3 WETPOND A Hydrograph type = Reservoir Peak discharge = 152.43 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 981,437 cuft Inflow hyd. No. = 2 - POST DA SCM A Max. Elevation = 811.61 ft Reservoir name = WET POND A Max. Storage = 315,869 cuft Storage Indication method used. Wet pond routing start elevation = 802.50 ft. WETPOND A Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 2 Total storage used = 315,869 cuft Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D8 by Autodesk, Inc. v2023 Hyd. No. 5 PRE DA - 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 13.930 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.04 in Storm duration = 24 hrs Q (Cfs) 100.00 :1 11 •1 11 40.00 20.00 Wednesday, 09 / 27 / 2023 Peak discharge = 99.31 cfs Time to peak = 12.00 hrs Hyd. volume = 258,721 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 PRE DA - 2 Hyd. No. 5 -- 100 Year 0.00 I I- 0 Q (cfs) 100.00 :1 11 [1011111 40.00 20.00 rm 2 4 6 8 10 12 14 16 18 20 22 24 26 Hyd No. 5 Time (hrs) Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 6 POST DA SCM B Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 11.360 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.04 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 Hyd No. 6 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST DA SCM B Hyd. No. 6 -- 100 Year Wednesday, 09 / 27 / 2023 = 91.01 cfs = 12.00 hrs = 240,801 cuft = 80 = 0 ft = 10.60 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D8 by Autodesk, Inc. v2023 Hyd. No. 7 POST DA - 2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 5.130 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.04 in Storm duration = 24 hrs Q (Cfs) 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST DA - 2 BYPASS Hyd. No. 7 -- 100 Year 0.00 0 2 4 Hyd No. 7 Wednesday, 09 / 27 / 2023 = 36.57 cfs = 12.00 hrs = 95,279 cuft = 74 = 0 ft = 10.00 min = Type II = 484 Q (Cfs) 40.00 30.00 20.00 10.00 rna 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D8 by Autodesk, Inc. v2023 Hyd. No. 8 WETPOND B Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 7 - POST DA - 2 BYPASS Reservoir name = WET POND B Storage Indication method used. Wet pond routing start elevation = 780.00 ft. Q (cfs) 40.00 30.00 20.00 10.00 0.00 -' 0 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WETPOND B Hyd. No. 8 -- 100 Year 4 8 12 Hyd No. 8 Hyd No. 7 Wednesday, 09 / 27 / 2023 = 32.12 cfs = 12.07 hrs = 95,237 cuft = 782.41 ft = 42,476 cuft 16 20 24 28 Total storage used = 42,476 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 32 Time (hrs) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 9 Combined Post B Hydrograph type = Combine Peak discharge = 66.27 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 190,516 cuft Inflow hyds. = 7, 8 Contrib. drain. area = 5.130 ac Combined Post B Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 9 Hyd No. 7 Hyd No. 8 0 CA� z II � Ny m N O m m N o XZ ON ON 0 I00 > - m 0 00 c6 Q cc CONSTRUCTION DRAWINGS JACOBS CREEK - PHASE I 185 BENNETT FARM RD ,STOKESDALE, NC PRE DRAINAGE AREA MAP SU tl*l t+l IT DESIGN AND ENGINEERING SERVICES State License #o P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net N�1N� ld ♦ � \ \� L ✓ f r aS�•r � I(n \ � p or PROJECT ENGINEER/ARCHITECT AM (ALEX.MANGOT@SUMMITDE.COM) PROJECT MANAGER DS (DON.SEVER@SUMMITDE.COM) DRAWN BY JA (JIM.ASHLEY@SUMMITDE.COM) FIRST ISSUE DATE 01-12-2023 COPYRIGHT (Z) 2023 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. el 7 6 5 4 3 2 1 REVISED PER NCDEQ COMMENTS 5-26-2023 07-14-2023 DAS REVISIONS DATE BY I 0 (A Z 0 II � .. 0 Y �n IV 41 O rn m N o X� o Z z � m 0 N 1 NI°° >oo 3 m O 00 CD Q cQ CONSTRUCTION DRAWINGS JACOBS CREEK - PHASE I 185 BENNETT FARM RD �STOKESDALE, NC POST DRAINAGE AREA MAP 00 a • 7� r� S U tl*l tvl IT DESIGN AND ENGINEERING SERVICES State License # P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net NX1N0ldW Z�SdNd� 00000 00 +< A AQ0 y cn - pz D N°o D N PROJECT ENGINEER/ARCHITECT AM (ALEX.MANGOT@SUMMITDE.COM) PROJECT MANAGER DS (DON.SEVER@SUMMITDE.COM) DRAWN BY JA (JIM.ASHLEY@SUMMITDE.COM) FIRST ISSUE DATE 01-12-2023 COPYRIGHT CZ) 2023 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 0 cr CD o N \\ �K • el 7 6 5 4 3 2 1 REVISED PER NCDEQ COMMENTS 5-26-2023 07-14-2023 DAS REVISIONS DATE BY (O W v W Ui A (O N D�zmcn��cn�cnzD�D(nwiv jD�(n0 ZmDmZDz0mZ�zO 0 r m _ w m X O D C r y Z D 0 D D m 0 E m F D m r- p= y= D mzzzZm�mzm��00mo�OzoopDO���m(n(n mcn�mc' Omer=_ D =zpmp OC G) zm= OOm p X G) 7- m m- n D X A MO 0 D o m z p D- O m Cl) �_� r G) Acw >-<m-m�Z-zOD��icn-0zO�p• ��z m0°cnZ-m M �DD2D�m(n��mD��0nm0�mc X=m 0�0U)m2;UZ07�. C()M �KDOzop<_-_wco �Z� D= C D Z� O m = o= z z m m � 0 0 0 r m m M T nDrPDC�rrmm DDO Oz O cZmcanm m= mrOmr�OzOcnm orom�X�O�COwwmmmC0m m p D�z�z�zO�DD pymmZ-mKmmomz_m0 Zmcnz�X - --I mz p-o�mcnDmcZ0C1)-O-0m mz(� m--iz>> Om Dmz (nOTl��cn��mz zoo Dy�OcnmD�mMD myz MOO' yDcmn=m(n zC� zzmcn2p���2Z Ohm Omm �r�2XD Dcn z m m X z-4 z= r� (n X Z X m c Z 0 m m=� 0 D E C D O m m 00 D= Z O m p O D D� 0 m Cl) m 0� OZOmmm�mO�A DG)m ��G) =mmm_Uo mmz mDm0mnmDrrDc (n 0 �Dz mm m,I Omm D-< Z D 0 m y m D z m m O- n m O m D 0= m 0 0 0 Omcnmmz7-D Om �Zy nzO0 m OOA mmz�mz��m< arm cm� mmm=z -n mmm �00=0m�mm�_m DOzO mcnm Ozmr�yDr �00 mD0 DOcnAOD mmm =�p �'mz00 m7-(n m-10 =pZ.P m°'= �m� z-0z> (Z ��A z c < 0 r m z O r m =- 0 z m 0 zy-) can z n �zm OV,<DOO G)m� ��G) III �� 0 ��O mn c �m �m mmm m= N m pmz Om� ZZI��zA Z2 cn m m m III m m =< m� t Om z cn < Q 7- X � O D O O O Zpm r>,0 .0. 0Dp (nmm -O D U) ��m ZG)OaC) =O IV 0OmZD�C�� 0Z Oz �zmcnmm =0m0mo>CnzD- m m mpmm0D cZ OX cn m mmn�nX O O*>O � O7�zZDDz-iQ ?I D K - O m o m c m r m m Z 00n zzZ NG) 0?tmp D ZaoD �z= Z D m� 0 z D A m c m z D A D O Z z m m�) mU) Z) 0 pmZ D O m U) --j 0 m = Z Z- 0 n = D D m T m m c m G) z 0 O D r n D m (n m r G) Zm- mX A z < = OcDn� T) X m m c z m* O p < m X X G) D O D mcDn� =�cnm D oDo m O� Z 0 r- m �z mmz:5 z � m �4p � O O X cn m (n D O Z C r � z Z z =o C) zK z mn' C = _ z�zC m (n �(n m 7-O N Fri G)�=> D OC X X O K n _ cn 0 0 z 0 p m =Z m m D C m D z zU)m� m z ---Iz Z 0 i D 0 O m m -n D Z mz0 X O D A m m m 0 C-) I I io>m Du MODmI z m W I I —III IIIZ —I l m om - Z D° m �CDOW —II—III r < o Z o X III —III —I t o X-n 5 >Z�,WD II IIIIIIIIII11� mmm 0 �m--(� IIIIIIIIIIIIII E m X =(zDNo=- 2 —III—III 0 (n o D o > A v z r I —III —III—I —I I m E D o m m c) o m m III=III=11 o Z m mD�1A z —III—III illllllll l m A O -III—III— Z, 0 Cn A IIIIIIIIIIIIII Cl)m I III —IIIE1—III—I O � .III -III -III_ y,'M1dJ lye Ocn �yy n Crl \ 1 O 11J MyM 11J c) 0 z n m m m O O r z Z Z G) 0 m 7+=mr� 0WCOGO cn r�r n>r-m -0 co m[n❑5- N n�yuD n nnr—Z oo� z Cn �z=nX m � m C � z 0 n C z � M � � m C r b m o A2w m m()0 � > > Ma� 0 o N * m C Ir a3 r �0m yrY-rl � m Im p m r ❑ y r m 0 m w 0) a Z ❑ 2 O C 0 00 0 co 0 co 0 co 0 co 0 I _ e -4 s 0 N 00000 0 v N 0 o N 0 a N 0 o N 0 a ❑ -n e D O o O � 00 0 00 00 O �Cn A W N �Z O mc��O��cn�pmcn�z(nzzm xomzx>CDZ-omcn=ncn(n 10-11 �Gm-<OC=�ODZoDDzD �DmDmrOZOOmwm*wr ommAm mm0*0p-D0m D D- D m- r 0m�� coi,��=mm0mEz TIC =DOZTODDC z�DD mmom7moz�m z m r ��vD Z--n, 0C�Z O U) Z z Z� 0 m m Z D mcco�� n>�mm m -U -U Om(nm m0OmG) W �JOD Lml �0a: z�EAp D*Zcn C D m z r m m D z ww m D z D m O�mz 0--17 DOr= X 0�� E�zmD m� Ozr `<���0 Oz m m m m m 01 m C X m D m= m m Z r O z �0 zF m Cl) m = m m 0 z --I Om W X (n m m mz=_ 0 O< 22 n rn m m m 0 z m0 < m z-<zcmn 0 O m c -0 _� 0= m D�mz C D 0 70 m Z m m W mz m r m�� O ' m o �mn 00 r)pXm O �, c m 0 � x Z V C) m A N j (O W V CJ7 A p N 1�� W-4 6) (Ji A W N D�2(�Omm 0--1�cmcnTDzm��>>--j r XOm0m>F0X�=zOcrz0r-m r- )=-O 71 DD�T��TIOoc� m D�-o� r z p m m p C� D-<� r m� r o D� z m m r m m z m D (nm DD=D mmODm,iO ?t=<pz= m m0=mmmr m m 0 m p n m z m c m Z T m Gxj D Z z m O m= Z 0 c_ - � m 0 D O `< D O �_ D m z O m m O D m cn T D D O o zO ZDmOZzZ�Om�DrOZ0<mm�0 00 zr 1r =m(n D(nm-<TO�0Zm jG)XmmX—m�00�=0TI DG)mOm ZZmZ - p= n 0 0 D m m= D D== G) D O D D- m m r- m D � z Co z n m cnmcnmDOrmEDcnzmD�On�Z=�mD TZ �'�z�z m(DnDz� OG)=zOOmnny���pZ�OmOm0DD�� /\ Z0m(n0 AzXO� o�DC/5U) zm�m>U)Xcn�Dm(1m�Zom� K �=Ao�:D> mDrOOzcnmO Om ��cnm�DOm �DAm n'7 mcDi�=mG)mu,0mz D�Zm 0 m�m�wmmmcnKc)Oc)z�oX�c) m nmmZDm�=mD zzOx :�>OmDDmz�O�mzOmCnoC°ommm Z �'m-0 O��D0 _,DIm -zOmm ) W 0�mr =OZMZ0 ? n OmC ��1 zQ omm=oz ,X r fCT1�'Twj�=npcpm m Z� C 0 XD �_� 0 20p��m�m�m 0 05(n 0mmZm�Ozmo= �c0 m� zm= 0 mrG)mz����z mzmmm�mm-<D�>mD 0mm 00 �)JO mS2 mX0� M m� Cn m T m D m m p= C W O m A O x n 0 z� ;a D A y m 0 C O 0 A z-U n m 0 m O Z= o D C> M y v m M m m �y�O��z0mm0w00 ��z oZ �r2 mrOA Op DD0;a K 2 z0zr-ADDmDOrM-2 mDm *E ZF0 C^ Uzm� �zzU) IvmzC�=zD0=000 nmm G)W �Dm `! 00 Cn0 -0>00 mmxC�O�zmz�c mmm =� �z m zD ccnZ ODzr-mcnZ=-n-n Xr Km0 �D �m� � �w vzT0 (, m O A u D� 0 O z=� n O O z_ D m m m O z m z- n ZZ��nDr' (n00mpoz CI<TI� r-m �O� N �0 cmm� C)DDG)r� ODC Z 0 cn � m x c) rD= mm m000D0 mD� Om COZ 0 �K mmr-U) -<mD mD �zZmzr- mom m0 gym= �< K0�0 m Dn 00cnnom z Z m< 7 = m z 0m n0 O*OzX --j �m� (Cn0 O > Z m� m�0= m C 0 O m> 0 = D r- m m z m� Q A (n S O D � n W m 0 - m D z X n m p m N m m D m O�m r� =A�rcAO 0m0 E ZT00 0 m 0m mw 0 Cn mmm =D G)z=z�GCL7 ZOD 0= Omz o �m mo�o0� O�� pr OzCZoDoO C��� mT +Q� 0 m �D ��x� =z� m� m0(nmm� Z=0 (n7- Omm TXm 0XXK Dr-m �� 2XmA000 G)n(n G)r X�� r 0mn Tmc0 7- mD z0OD-z D(�C m> ��cn m -ji F X m Z z m O z m Z0 -� - m A � M m D 0 m z A ZD7 -0 G) cn> DTOcnZX 0D0 A� �U) � mCn(n D= Om: z�mDOc) Xmr0 �D mmm y m GD)��� (gym =m G)o �0� mmz D� nD� g m pD � mc� D zD m�0 «m Z� m r p zm m OD ok m0 KZ> �m(�n cam �On o m rm W �m z D� D _� >r Dm z0� =yz =0 m>� GDj c m= z Oz mm rm O=m rcn(�n Zp pWrn v ;m Cl) (Z U)00 cX 0 m m z U inn n O DD CD �z => DZpn m = �n U)O= „ �0 0 0 D m D- Z- m A m 0 O K r o m z 0 p C O � Z D> m m m m z D p O n z mD D= <- pmZ A m C) --I mmm 0� r (n m n 0 r n 0 O m r O m 50 M -< c O -< TI O 0 m 0 zC �cn w;u mz0 n m0 ZImTI �p0m � (�-nz z(Z mp cnm ZOO D = cn mZ �� D� mmZ -n D Dm �0� >m z 0 m= r m o m m z � z m W 0 z� Cnn m� z z 0 m m M O m z o o A c m 0 O z� m m p A o -1-<_ i m _ * r - O 0 X m C r { � nU �� O y r= pz mO0 cn v m� yc �r mCr O m m� pOm m O D D m C � 0 Z r r < 0 (n m (n 2 2 2 m �1 Cn m (n -< G) 0 ZICn z(nm m o m m m (n Z + + + r + + m + m + + z + 0 + + DD w r o* o r m Z 0 i K K G) �z0 m N X =m D Z � O m ti m m 101 m 3 a m 00 r (oi, 0 ;(1 D —7) (l 2' Aq� mXy ma,(n ZI 2 DOD g n N MZ� r D G) 0 r U m N D A D m 1 z c m== m amrm0 z c 0 00 � O C CC) zo 0> 2 m y X, OO mmmnc= D- O m D x 2 m m --i > T O z3OU) n � X Z M > T D z X O z p D O o O m= n O m 0 0 y r <(Ciimm�m O D co m m D co D D = < n C - S �W D � z0 m� z D nm m� m D Dn m m m(n mW �po 12�'p0 1 1 1 � - � 1 > co 0 �1 II m X 02(� Z1 N Cn n7-1 3d0-1s �'Z � cn w n i� m A� Zn +++++ ++++ ++++ X� �� + + + o + + v� + + m + t o un / ++ FOREBAY + / + + + + / + + + + + ++++ 0�m + ++ i + % + / + i + N G N� O + m /\ + o� „ + / m O + o�l Cn � W z m +t N p D G � + I o a o + ' �o m O + r m C + rn + I + v + I I + + + , o + I + + + + + + + + + _ + + t + + + + + + + + + + + - + + * * + + +� +��� + > cn o m � x ZJ N 0 I I m p (J] z0D=_ n0�G) G))D�� mNm m=z z =o / � N D o m mm o w>" -z 2(n0 O � O mxr Z O N y D - D O I ZA, r(!1 Dn� 6.0' mmyZ D ==m �A o 0�p A DOS 0.5'(TYP.) O O C O D n m m z O C O r 0 T7�coZ � mXM D O m 0 O D O Z Acnm m A<O om DKGZ)m D �m� O D m O w e z��XZ A<m c c _�� 3 O C ( m yam o r go- t Z mPo � A C coD' mOX AOw ODD m> N n m A Z X0 w D = r- S C CM>m °DZD mO n G)m mm(n OmmD O C < m m r m m D A Z D mnmc 0 mm z O (n In w (n 2 m D w D n O m y TI � m r(D7? mZ m0 N D COOm ZO yG DU) m mma 0m 0 X GC) Cl) m 1 m 1- y N D m 00 M z xr m = _ �z O O M X A XK O 0 n D D � z r U) 4o m N m m m 1 D 0 A D m z m 7- Cn m m > VJ m 0 r r D w N Z O m()�pm0�cnm Xp�zAD -O� G O O O 0 m mD m m r m �zDm0��0 A G m-<� D n z r cc r r z p m D T D T m X -I m D m D m o z m O m O m p Z O m-0-0 D O O< C z n W Z m O M�� m m K Z** G) m m Q Om�>0m� co z z z 0 T��-A�mD --j0 MG)z m D < m X T �I n �I n m I2DDD>KDT zX�m�0 cn z m m n m m cn m m (n XC,) zZ�co N r N m m X 0CooZ-<Kcm m G m U)m m m= 0 m r m < C m -<zD; DO < m m r m r< Z r r r m m D m m m� O v� ^? W w in w in W N W ;U O (mn C� C� 1 00 � o w o� o o w TI N Omr- m� m 00 m T) 0 m m C Z r r G o U1 () G) � � O 00 U Z m O D �_03 C O O -n (o O D z X 'r^ V) Z r D y < m OO m m c) m o u O m v z m < z U) z O ll� r y y� m N r z Z 0 rI� X V 1 O M m `^ D l 1 �_ I--�I O r Inm.-�n0In.7 [ m m m T Zi m n �M <ZD,,, < O W D m D m m; Z Z O� 1 A m m m m A z O C 2 Z n m m n m Z n O �m L/) y� D D � = m r 0 77 �ZDD2 Zm V) K D m K O 2 v v mr X m z;0 m Z n m = - m 0< 0 Om m D m S M 1 n m D D c Z� O m m �� - 0InDz� <m O D Z O D A n j m �/,X 0z z o z m n n p O m m = �_ z m 0 0 0 _ = z < Z O O Om m = O m m = z n O = m + O 0 W w r O M 0 O A� \ 002 0Y m a1>� cn o m r C) ! x �) N A a X� -- D r-- U) 1 rn 7- 0 �m m 7 O rn r a) U) _ r N O r TI m pzcn I m0 mDm I z I m0F m N I D 0cmn� �Cn =0 Z I 0r0 U, 2 Io o mmm m Io m�X I< I� pW0 I00 I< Dmo to I z 0- I �° m Z N _ CA r- C2 I� mz G 2 I 7Li D I z I I O 0 I A r � Io A m Imrn M 7, m m 0 1= I� Dc X -- -- ;0 O D 0 D m r m < 00 w N � m D C-) Dr O X m Z r r n 0 r— n Or Z A G) 0 O m T CONSTRUCTION DRAWINGS JACOBS CREEK - PHASE I 185 BENNETT FARM RD STOKESDALE, NC WET POND A DETAILS DESIGN AND ENGINEERING SERVICES State License #e P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net PROJECT ENGINEER/ARCHITECT AM (ALEX.MANGOT@SUMMITDE.COM) PROJECT MANAGER DS (DON.SEVER@SUMMITDE.COM) DRAWN BY JA (JIM.ASHLEY@SUMMITDE.COM) FIRST ISSUE DATE 01-12-2023 COPYRIGHT (D2023 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 7 6 5 4 3 2 1 REVISED PER NCDEQ COMMENTS 5-26-2023 07-14-2023 DAS REVISIONS DATE BY j O O PO V O p A W N \ W W W W p N N N y�zm(n��Cn�CnzD�Dcn �wiv -D�Cn(7) m pmmczi>Dm?DD0wmMp0 _ OZ _ O D c r ---I Z D D D m T D m r O= D= c D m O D m z m - r z � K m p w m D r z 0 - m m C) X�Ozzwuom=��DpnZo�9ZO-roODO�'jmmCnmj mcn_ C' mrm-0r--0mp-p-XG)0m=�00M Z �CWm-,mDmm�oo��z�ZO�O���mZ );a0 1z m0°tnz EDD=D�mCn���D��Onmpr-mc X=m cn � zDp �cn zwX5w(nr KZm DcnpmZ?(An�°T�m =0CnmmK°M0<-j-j�p c X r ��r�DCm���� (1 �DO�Oz�O�zZOOC�i7m �m2 mrpmr�ODOC * rlmC�UKO C0�(nmTOo Co O mzmp�n�ZX�� mrpDmmp'UDD000M mIX Z O �z y p>0om�� mmXmX C�� ommZ�X�O -jOp IZ 00 -m�D"cz0"'- „�O ^Z Dy��u7Mr>-Cn X CmnD mD� mon�DD-=�u, ��� UJ zZm(n=O��m=z pK� c7mm -1 zXD zX Z mm71XOc-4Z=�>cn mzO (mi7`c� omm=-jp pDn 0 z O p 0o m r m o z T m r-* D o m Z 0 OZ r DO -O =m-1ma- mmz T M COmU�D-0r(n C/) --I C)D UU) Aj M mzZ<0mymDzOco -_� O�Z mo07D(�= ��0 Cn mOM<pma-l-i»zrD �Om czi7oD nAOp- pO� m�z��Z���<� mrm Cm� m�m=Z= zmm �Z5Dp-�mrmm-ccn cDiU)0 m0OT O�"D�. �00 O z m = 0= C) 0 D� ��� Z mz W cmvj i7 p c 0W TImO mz�W�D TO-ro= �mr Dmazz. ��c DDT m�0==o �mcn m�z 0 r- - (j)� mnm pmDnn G)�� mmG) V, N m Omz �m z��mm� Z2m m�-1 mm m mm> 2GmAv0 �(nM ��M m0 o Cn O OHO OTC �m�Op= om� c(a< zr D = OmTI Z�m z=�OTOZ >(n� cam Oz O D �zm �c7 (n z P z =�z G)pC� om>mcD)M OCn OZ D=� �n m m mom MXr- �p0z'p �Dm m�z r- n _[n y�� �O�p mcn0 W 0 �m z z D z z= z 0 0 0 M m> 0 z D D M > Z A m�� pmp(n mcncn Pm� ? 0o n z N T-0 O0 D Z W D � Z= Z ---ID (nZ7p zmD� m cm0 ��z D p m 0 c0rU) C�T nnrm M r MCcDO��' cn �nyyrnn a O z m nn O 2 m zy r- nQJ zr Z zi zCn-U'n yv 3 �' w C n N M M a Nb m C 1 1 �3 Z_`o nn�� _E m mnC- >nm cc > C/) M n � 0roi r m V7 a m m 3 0 3= r- C7 �Om � ya o nco ab z vR mu a r � K n m m o n m II r Z n o za � N � z � N cn 4 [s1 4 C-n [ I cn A cn _ 0 0 IV o 0 N 0000 0 N 0 N 0 N o ❑ -nCrt D ti p Cn N 000000oo -< Cn � D p m --I Z z Z o C� D D =Dm Tm�� C m C) -1 p z r rn(n a w N) �Z zm21 Ii�Dj(n� G� < _ �Dr S2 ---I r ZOj O �00 X�Dp Z < m zcn= 0 D m me --10MK E0mcnmzcnZzm m(Di)� =�Cn(mn D 00 m �0-1 Z r- m �zDmOzooZZ<OpXm>npmcn M (n D O z D � D D m z z A � X T D m D D D �_ 0 r 0 X � �o cm7�z� Z mn C = X = ODm� Tz00M nm*w* rp z�OZ p DCmi7 r D n z ?nDC� mmozOz�*OM DpmZC r- _ IT! > m T N mm�DLIJ (or—K- ,,Q0mK> G)X=D y OC X X O n ��_ A (n=D=ym0m�Z _ ��C/) p p z O z m =>yD OT0zZzm�DD-0 =Z Cn co m Cl) mz;0 Q'p�zzpmD z �CnmA m z z �cn�z mmzmW m=0o� D p r O O z Zip zDcn cr- m0 z Cl) mp�-< nDEpm-0 mr Xz m m O Xmcn0 pmzpmG)W X0 ;0 D Cl) p m �O=� zmKDO D�zCn mZr� �Zzcnm DZDn O�mz 0 Cl) X0 = X 0 � Z � c�' KOzmD mD � OMr- Dm�>� Om X C ;UD T r o Cn � 0 W m z Tr = 0 OZ 0 z � C U) 00 = M m mito Ill 11=1 I I= 0 np m c7 p i g z III —III —I t o Z D °� n 0z Z° —III—III IIIIIIIIIIIIIl0 � < N� (n 0 m m r m K -n� m m m � "'��_ m z 0 0 I I=I I I=I I =III —III � o�T r n K0Kz I =1 11=1 I -III-III 0 m g U) m n p m < z 00 Z (min III -III -II � = 0 m T � --I Cn —III—III III —III —I I mK � o� m= m -0 r D�0z n- 0 —III—III—III— -III=III=III—_III—_ m -0 � > 0Z -0 z m —III—III—III—I I -III—III—I11=1I1=1I 0 m o 1=1II—III—III—III -III—III—III—III—I I I —III —III —III —I I I I U) , m -IIIIIIIIIIIIIIIIIIIIIIIIIIIIII mz m Om 0 x MO r � c . 0on m 00 P . E O Q C W 00 p Z o v V 0 K=(n:ED (D D � D r A A D � r �ozm� A`cmAO \l .4. o mAU) om n� C N A ((n O D D G OOm\z O C7 IcoMmo n Z o m A m O G)C� mz U) mom W O In i LrI M z z=z O Z O 0 O O C m � m N j O O 0 v W U1 W N W -I W Ut Z, W N =�=c7�_m?I��TImTIcnD��C�DK�c� O D O Z A m Z Z 0 z r m z M, m m z Om D �m<�D�D00DZTzTITC��<��� r-M,ax0==mmr OMm(i�*y�1f�T1���10TIrm�� W �Uz� wc m DmZmOov��K0 0>-0 XOmzOmO*Dm.TmMM0=5 p /Dm�n7,--> pCO-0ZwT"M0�z0ZD-<ZDX 0�p Zr 0D-�KWo = m m - (nm-<-n0�mOO m (nmm0 > yom0�mz� =Z -a�Opmr�mX�U)>0>M-0 mD0_ 7o z(�m <�mXmIT! Cn�Dm(nmcDnzDynzZ��D Z (ngzmzm>Dzo mDXO mm m �wD0w � -nD( o=morm=Im?z >r r0�=m=C�-<� W Do m + -< wD��c<> -<K 5000*XFmc-j0>0Mpi-I�c�-i7z-0- fn ((Di�mD�zmDD�� D w O O= z X ccn = z C T O 0O m m c mp z m = m m= m z -nmmr-20m-npOmOpm�(7C��OW ( 0 0;0zm W m mr- -n- C�Tc��p�mDOo� 0o� W M--IM C)r-(nT-z--jZCnCDr(ncnmm= mrG)mzN��=z n 0= m n O O m m= K p 0= X X m m 0 m A O» = o m 0 mmp� OD�pmmnFOXMFOz=m Z oo�m *y0� ��m -nr- =m 0CUprm (1Z��00 z�� DAym CEX DCnmT ��mmr�0(nDT� DO�in m�rz O Z-0G)m m�npDD�zmTln mr0A �mAm Oc�i>D ���D ZO�Xp(n W r-nmz �Z=> cf)MCn Z0A c>cmi> DTzo*mmOKo�OD /C^� mm ao�z� D<D C)m=- rnCC�Op(n(n<r `J Dr mmnz Nam z-0z0 MEC0=TI �Omm w Cn 02> C:LnZ ODD m(nDT G��m�0O�DT�G) 0 �� vzAo w� (nDm� m(nn��Z?0om�m Z 2 �z ozU)0 zz� Dr-G)Zp XWZmD�wmO�X `^ ry �v cmm� � r032D Dr�MO000X-1?I- VJ p =� �An� rD(n 0omm0 oDOmm�m��DZ 0 m �m>(n -<mD ITID�7Z Cn T7�mp1DOCZ= �< �O�0 U) r- c7mDpm DOomMCnXUK=p Z r DD =0z-0 -nC� ��(nD mC=DDm=mOD� 0 m -yw c�A(Di� �0co �pcm mZ o�r(nDO� m V) r- -n ;a m U)==z p OZ �w mmoo /� m Ar IT!D o 0 m m => n 0 z y= 0 D z= 0 OO z o m K m m A y rCnK mr�D �COOC �0M0E7, `�^ T �D z�=� =z� 00��� Z07m�z O FZym v, �� ODmm O� �� mcn00 -ZrmnZ r O- D�Cn� rCp mD(n0 pOOD CzDZm(n m �i Fvm� W DmCnZ zCrn Cn [n ;U-<�Zp= 0 mz7J C7 MG) Z(n>D- �z=0 n�mD00 Cn ;UW�in(n cX 0 z nm O=0oz Cp�m Zo 00 W D m G)D�� p n D Cn n D �� z M z 0- 0 Z� D O Z m z X zDr�_ m0 ODcnD z A DD O D 0� 0 0 Z Z D� � Z ;U Z O p m r w w _ > m M D y 0 0 0 0 c Ir m z 0z mm�m zDm� �rO�Zrn D C� �;0 �� U)Oz_X Z�-V cor-M o W-0>r— n O Tcn O .ZC> KZ�D OZD-0 �T7n��2 T AO CO 0 C p A 0 y -U � 0 0 p 0 GZ7 00 pC D=p= ITI�Zm �GZ(0oD(n mz m> r- Cn 20��r (-)0000Zr 0 w0 07m Epp >00-< TITS0 0 M ((0r 0 or DC� ��pM= rZ mom= o c wz nIT! �OD ==--j --J z� 7) �� U 0T(An D �m D m 0 m� ��CK �13 Za: pia D� Z� omzz WD00 M-n mz 0X cm p�m� m(Zi>m� ��m m= � m A= ��pq z pZl O�mp Dr o n Cn m n _ � O 0 Z y 0 V) v mr- Dc-4� m(n�0 =�L Xm m O z> �mmCCn �n = �� �r z m om M, �c m �0 Om c� v � -0 Cn m (n O� 0 O o D Z K � � m M =- Dn Ong 0� D D z W m n y= (n m n r�� zz= z M n rM mz O 0 X cTI GZjD _ _ z 0� D y zn mD m z n m0 Z n m0 O� Z G) CT A p I mZ �00 m --ID Lig Cl) � Om ---1Cn_ o p O m m �M 0 m O F n DCn m r Z01 = � m m n m p 0 m k� O O p p p m m m z n��(n(n D D m m r r r 0 0 0 D *�� z z m m r r 0 cn m :2 :2 D O O CG Z��ME O m m X X 0 0 0 m Z W O 22 X r C W< D< m x-n O X D m O r ?I n n m Z�mc< mcnm� r m (n N m U m m < m m r r m m < < O -i N V E 00 N D D -4 0 W O_ O W O p m o �U) M G) D z 00 O X D Cn W C P W In I D Oz 0D Z1 '-U U! p T X M (., Cn = OmD Or pZz m mz m D G ' M r U) z ���m== A a A n T 0 Z O o A J O 0 M M M = >,om�A = o D O m< D Z 0 0 OT �=,M> D O=> 2 K m Z A O Z O D O 00m=�� m <AODr Cnmu, m OD'OmmD =<0Q), G) K0 -z0 M N 22?m >�F Om 0 O D m C) � mm z Z 0 I � 800 I I D � z �mK z D —� nm DD 3 80 --_� — _3dplS �£ \ + I y + + ++++ r \++++;_+++ +r V J \ + + m J J \ + -4 C) O C-) m + J + IIII \ I� J + m� \ ++ U) w W \ Cn + Cn r- + + + 0 + + + + + ++ + + + M ��t�� ._ f M r- / T m� O G D o 1 I \ �i 0 Or /\ \\ �� D W r W X 00 171 (N»�m F o - x co D o F F m Cl) ) m m X3 coCn� / AA F �X� < D> m W �// -0 —�� _� < _ �� f < <I < I < E < / Q� Cn -0ON r-m� / X 3 Z n -< Z D �0Cn O�Xo0 O OK� OT X D M U) 0 m n 'D m Cn m (7) O m * o D M I o 02 T (n -I 0 N m (n 0 r Z r M D Cn -< CQ --in w= N = 121 Xm mO ZM pm N � M r D m n r = z Lnm oX M D ITI _ mm SOW W N O = n O D m D. OZa>,rO A =m=z n i p A D W-0 ZAr-0 Dr omm T(j)Z � mAm D O T O O D O Z Ac>-m m A<O o UJZ� D C-),mM O�D� Ow= z T, A 3 A< m _ z C Z L -U � � O C A A D M, O ZT� C) A = Cl)D z D=x A O`_ T 2(n> vim ODmW �(nD 0 M M A = ? O = D 0m ZDz>i o n h m O m i < m T C D m i A D A 3 C O 0 Z K z m=m� Z n Ow(n C A D w D M = m 0000 C)z = m m) o in >m D 0 A = O A � O W m y C/] m 0 Iv �m� �3 * Zy (- � 0 Cn O TI Cn m�W <�� rn X W MC)U) 0 O TI 5.0' 0.5(TYP.) m0 IT 0M AO Z O D < Om 0o m(-(i m� 11 a 0 n D z 77 _ Z A ? K co m O O D z =CCn0r- 0MX> O�� W r X Zn�� 0 Cl) D D r M M z v DD r NO 0D U) z m 0 m X I r M < u 0 N I y\ 0 T O I o JD / m / m G / u V / 0 A 0 0 T O I a / r O �T m r O D � r � (n = r 0 r .. T m � V V O G) cn r �m0 i z � m i - m C D U M mr-co u m 0 F i -i 00 U) 7 0 [1) J 0 pro z j O O r O m � m m 7 p - N D X i (n m T -n 0 i J "m M mm r m WN z0� O r o< m X co Z m i U) m n M DC m =- m z > Z w m Z i � N C Cn D O > O z - m r rn A r� o U) = m U r Z G)Cn m D m n 0 �2 r > D 0 Cn Z p v 0 0 X n a r D z " 0 < n K v <o ; _ D �Ap �ZT 4 m j zm MDm z D D m m O m < r Al 0< m Z mm z 1n - (') 00 m r- � m == O n A O ADz=^�m n0 m ^ M N C Din m m W m 7c m m WNW<K` m � Clv �v� � m n Wo Zv'm D(nm m 00 0 - D{ D z n m< m_� f- m= n 0m D D O m x �Xm Zmo O Z� D A 0 m= O D D v D O c z 0 L,Z r Z 0 TI= m= z m A r Z rc7 x p z m D m z m r Z m 0 c C O0N C r^ D r OZ� , 0 N m T CONSTRUCTION DRAWINGS JACOBS CREEK - PHASE I 185 BENNETT FARM RD STOKESDALE, NC WET POND B DETAILS DESIGN AND ENGINEERING SERVICES State License #e P-0339 320 Executive Court Hillsborough, NC 27278 Voice: (919) 732-3883 Fax: (919) 732-6676 www.summitde.net PROJECT ENGINEER/ARCHITECT AM (ALEX.MANGOT@SUMMITDE.COM) PROJECT MANAGER DS (DON.SEVER@SUMMITDE.COM) DRAWN BY JA (JIM.ASHLEY@SUMMITDE.COM) FIRST ISSUE DATE 01-12-2023 COPYRIGHT QQ 2023 SUMMIT DESIGN AND ENGINEERING SERVICES DRAWING ALTERATION IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF LICENSED ARCHITECT, PROFESSIONAL ENGINEER, LANDSCAPE ARCHITECT, OR LAND SURVEYOR TO ALTER ANY ITEM ON THIS DOCUMENT IN ANY WAY. ANY LICENSEE WHO ALTERS THIS DOCUMENT IS REQUIRED BY LAW TO AFFIX HIS OR HER SEAL AND THE NOTATION "ALTERED BY" FOLLOWED BY HIS OR HER SIGNATURE AND SPECIFIC DESCRIPTION OF THE ALTERATIONS. 7 6 5 4 3 2 1 REVISED PER NCDEQ COMMENTS 5-26-2023 07-14-2023 DAS REVISIONS DATE BY StreamStats Drainage Areas OA- Z7 0 r-F (D 0 Q) J C/) 0 ci -1 M U3 CD M' w- m U) 75 (D CL 0 Qi 3 2. m cn Ln 4c4SS Lri r-j r-n C) _0 0 Ln r 0 C) Ln C. -10 C) v Ln CD Ln cn �Goqe Rd CD C) %.0 CD C) zixler R �,,v4ze,d Dr O 11 CD 9 C C C C C C C C cn m C r p _ C 0- CD N ((DD CT C:) (n ((DD CT p 0-n N a i � -6 v O (D v NJLq O (D v O ((D "a*) = (D - Q _ a) (D O T ON z m D m m n CL) (D T D a (D D m -0� m D m u (D D m -u (D D m -0 0 (D D m (D -+ D m 0 (D -` D m m (D o (D < -n O C/) 0 -n O Cl)m v 0 0 0 — -h h �' v� 0 0 0 0 0 0 0 0 0 0_ 0 0 o 0 0 0 0 g (D ,+ C� (n O (D 0 0 m — 3 _p v �' a)(o (D D 0) m 0) m ,+ n N v v m Z7 (D O (D < 0 (D 0 Z m E3 (D ro _0 (D < O D r (� p N C:) (D cQ O p v o C N oo Cn W C:) V �I J W N < w Q (D Q 1.0 0 011 0 0 0 ON 0 W CD 41. 0 m D CO m O O C N < C < 00 v c W W �, W W W W W W C F cD v o (D p Q 7C3 V) m C p C p Q (n l/) (n (n (n (n (n CO C/) 0_ v 0_ (D in -0 3 (D n h 3 7 N iD W 3 1.0 w rn w (r1l) C:)W W W ND�I � J —_ m � (n N O ON ON N cn o CD CD 0 (,n O W C) C) C) . Ln C) CD cn � W co N O — 0 0 0 0 0 0 0' ,rt co m CO --I W cn W N N %.O N N cn N cn W D y CO v J K cn m r CD- 3' ►Ti C 0- v D (D 7- n 0 C/ v n r p � n � CDz D ZJ m D n 0 Q. m D m n v 0� (D '* 3 c0 -+ m (D 0 0 v —h N ' cn 0 o -a v < MO 0' 0 0 c 0 (D v � 0 (D r+ (D (D 3 7 (D 0_ 0 3 z r 0 p N O O 3 (D 0 c 0_ v v (D 1+ StreamStats S3 Report Region ID: INC Workspace ID: NC20230714193135331000 Clicked Point (Latitude, Longitude): 36.28998,-79.94734 Time: 2023-07-14 1 5:31 :56 -0400 N to Ln Lemons RI L NVI.-n Lake- n, - Roadway crossing 53 in phase 5 C. Iz O Collapse All Basin Characteristics Parameter Code Parameter Description Value Unit DRNAREA Area that drains to a point on a stream 0.49 square miles LC061MP Percentage of impervious area determined from NLCD 2006 impervious 1.94 percent dataset PCTREG1 Percentage of drainage area located in Region 1 - Piedmont / Ridge and 100 percent Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge 0 percent PCTREG3 Percentage of drainage area located in Region 3 - Sandhills 0 percent PCTREG4 Percentage of drainage area located in Region 4 - Coastal Plains 0 percent PCTREG5 Percentage of drainage area located in Region 5 - Lower Tifton Uplands 0 percent Jt$ Ln s \ � � O & b � n E ;p C/) 2 ] o ° � E (D 7 CL1� ) 0) w 0 f V_ - k f (D o m & 9 / O / 2 \ /�� C/) c o 00 / / (D o � u o " / u / / \ / 00 \ 3 \ j C c cn o C r o C is y fD D N CD .+ n m Q x m m (D D '+ (D cD m 0 T n T. CD CD _0 — C 0 m D D fD N 1+ m m < ,{ ,.+ 0 0 0 o 0 0 C) m n 0- Cz m_ cn — m cn z!v 3 _ cQ CD O — 0 m _0 D Z 3 m � m (DD 0 o' m O 0 cn _ z (D r fD (Q (Q n cD p O < D N C v O — O C ON F m 0 D O O ID o o<i m r0r in c -0 C C m D c N o < w CD ON N C co N C C cQ C m m Q Q C Cn lD > > v C W w W 0 W cD - N Q U) 0 C 0) CD y � 0-3 m 3. m N 3 - N 0 O CD O o c cn W 0 �o N _ (n cn � O CDa, W W cD O CZ O CD n � 7 o' r W cn m N '-r 7 N w y CL J m .o m Q r m 0 v cr z CD m m m m m 3 0 0 0 0 G) � m (D cn w N D m n n o O cao D d c(D (D ._F n n n 0 n n CD 0) cD m cD m cD co 3 '+M =3 =3m W cQ cQ cQ cQ cQ cQ m cD cD cD co cD co Q 0 0 0 0 0 0 CD - m Q C1 Q Cz om 0 n v n> W. n� W. < o cD 0 cD 0 (D 0 0 w w w n) w 0 — �. u o u (D (D d '. co � 0 0 0 0 0 sv 0 n 0 n 0 sv iv sv iv sv Q CD CD CD CD m ' r C1 C1 C1 C1 CDL (D fD 3 Sv 0 �. Z7 �7 Z77 �7 TJ lD lD lD m CD m Q- cQ co cQ cs� cQ 0 0 0 0 0 7 7 7 7 7 0 3 Cn W N z 0 0 w 0 F n m fD 0- 3 — - Q CD o m C cn Q 0 cD < � sv o• 0- < v w — v m cn `< lD O O O O N O O co N C m cn C m m m CD m m cD 0 cD �0 0 �o c0 0 in Stream Stats Report -Ph asel -Offsite Region ID: NC Workspace ID: NC20230117182520590000 Clicked Point (Latitude, Longitude): 36.29258,-79.91147 Time: 2023-01-17 13:25:41 -0500 6 Basin Characteristics Parameter Code Parameter Description DRNAREA Area that drains to a point on a stream LC061MP Percentage of impervious area determined from NLCD 2006 impervious dataset PCTREGI Percentage of drainage area located in Region 1 - Piedmont / Ridge and Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge PCTREG3 Percentage of drainage area located in Region 3 - Sandhills PCTREG4 Percentage of drainage area located in Region 4 - Coastal Plains PCTREG5 Percentage of drainage area located in Region 5 - Lower Tifton Uplands Peak -Flow Statistics Peak -Flow Statistics Parameters [Region 1 Piedmont rural under 1 sgmi 2014 50301 O Collapse All Value Unit 0.0723 square miles 0.15 percent 100 percent 0 percent 0 percent 0 percent 0 percent Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.0723 square miles 0.1 1 LC061MP Percent Impervious NLCD2006 0.15 percent 0 47.9 Peak -Flow Statistics Disclaimers [Region 1 Piedmont rural under 1 sgmi 2014 5030] One or more of the parameters is outside the suggested range. Estimates were extrapolated with unknown errors. Peak -Flow Statistics Flow Report [Region 1 Piedmont rural under 1 sgmi 2014 5030] Statistic Value Unit 50-percent AEP flood 25.4 ft^3/s Statistic Value Unit 20-percent AEP flood 41.3 ft^3/s 10-percent AEP flood 52.8 ft^3/s 4-percent AEP flood 67.7 ft^3/s 2-percent AEP flood 79.4 ft^3/s 1-percent AEP flood 91.2 ft13/s 0.5-percent AEP flood 103 ft^3/s 0.2-percent AEP flood 123 ft13/s Peak -Flow Statistics Citations Feaster, T.D., Gotvald, A.J., and Weaver, J.C.,2014, Methods for estimating the magnitude and frequency of floods for urban and small, rural streams in Georgia, South Carolina, and North Carolina, 2011 (ver. 1.1, March 2014): U.S. Geological Survey Scientific Investigations Report 2014-5030, 104 p. (http://pubs.usgs.gov/sir/2014/5030/) USGS Data Disclaimer: Unless otherwise stated, all data, metadata and related materials are considered to satisfy the quality standards relative to the purpose for which the data were collected. Although these data and associated metadata have been reviewed for accuracy and completeness and approved for release by the U.S. Geological Survey (USGS), no warranty expressed or implied is made regarding the display or utility of the data for other purposes, nor on all computer systems, nor shall the act of distribution constitute any such warranty. USGS Software Disclaimer: This software has been approved for release by the U.S. Geological Survey (USGS). Although the software has been subjected to rigorous review, the USGS reserves the right to update the software as needed pursuant to further analysis and review. No warranty, expressed or implied, is made by the USGS or the U.S. Government as to the functionality of the software and related material nor shall the fact of release constitute any such warranty. Furthermore, the software is released on condition that neither the USGS nor the U.S. Government shall be held liable for any damages resulting from its authorized or unauthorized use. USGS Product Names Disclaimer: Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Application Version: 4.12.0 StreamStats Services Version: 1.2.22 NSS Services Version: 2.2.1