Loading...
HomeMy WebLinkAboutNCC203891_Annual Fee NOD Letter (2023 Fee)_20231016 ROY COOPER _ ELIZABETH S.BISER Serrrrary WILLIAM E.TOBY VINSON,JR NOR•H CAROLINA rnrenm Drrtrrpr Environmental Quality 10/16/2023 She-Can, LLC Attn:Scott Shealy PO BOX 2805 Asheville, NC 28801-3200 Subject: Notice of Deficiency-Failure to Pay Annual Fee Invoice No. NCC203891-2023 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of$100 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4).The annual fee was billed on 9/1/2023 and was due on 10/1/2023.The annual fee applies to the following construction site: Rosewood MHP Expansion 5 Stoli Dr,Arden, NC Buncombe County Certificate of Coverage No. NCC203891 NC Reference No. NCG01-2020-3891 If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website(deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date, please pay the permit fee using the Stormwater ePayment website(deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to$25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact me at toby.vinson@deq.nc.gov. Sincerely, William E.Vinson,Jr., PE,CPESC,CPM Interim Director Division of Energy, Mineral,and Land Resources 0-11 Q North Carolina Department of 1—irmmental Quality I Division o1 Energy.Mneral and lend Rea ea _ SR N-th Salisbury Street I Ib12 Mail 5er,i—Center Ralrgh,North Carolina Z7699 1612 w n..��....w� V 919.702.9200