HomeMy WebLinkAboutSW6221006_email_20230124 (2) Peck, Kaitlin From:Farkas, Jim J Sent:Tuesday, January 24, 2023 1:06 PM To:Ethan Hart Subject:RE: \[External\] RE: SW6221006 +/- 20,000-SF Distribution Facility Expansion for CCBCC - Fayetteville You can use the equation \[(Total Proposed BUA) – (Existing BUA)\] / \[(Total Project Area) – (Existing BUA)\] to calculate project density, however, for the project to be considered as low-density, all of the design criteria outlined in 15A NCAC 02H .1003(2) must be met (a big one is no new piping except for certain situations like driveway culverts). If the project meets the low-density requirements, you can change/update the submittal items to indicate this when you resubmit (The Supplement-EZ Form and O&M Agreement Form have low-density options, the Application would need to be revised, and new/different calculations may need to be provided). Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Ethan Hart <ehart@strategisse.com> Sent: Tuesday, January 24, 2023 12:58 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: RE: \[External\] RE: SW6221006 +/- 20,000-SF Distribution Facility Expansion for CCBCC - Fayetteville CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jim, Since we are only adding 0.73-ac of impervious area, would we be able to classify this site as a low density development? We are only at a 10% ratio of new BUA to total project area excluding existing BUA. Thanks, Ethan Ethan Hart, P.E. Strategis, Inc. 803.331.2991 1 P.O. Box 515 Columbia, SC 29202 ehart@strategisse.com From: Ethan Hart Sent: Tuesday, January 24, 2023 9:08 AM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: RE: \[External\] RE: SW6221006 +/- 20,000-SF Distribution Facility Expansion for CCBCC - Fayetteville There are a couple. This is also my first stormwater submittal to DEQ as I’m based in SC and I think a quick phone call will save a lot of back and forth through email. Thanks, Ethan Ethan Hart, P.E. Strategis, Inc. 803.331.2991 P.O. Box 515 Columbia, SC 29202 ehart@strategisse.com From: Farkas, Jim J \[mailto:Jim.Farkas@ncdenr.gov\] Sent: Tuesday, January 24, 2023 9:06 AM To: Ethan Hart <ehart@strategisse.com> Subject: RE: \[External\] RE: SW6221006 +/- 20,000-SF Distribution Facility Expansion for CCBCC - Fayetteville Is there a particular comment (or comments) that are unclear? Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 2 From: Ethan Hart <ehart@strategisse.com> Sent: Tuesday, January 24, 2023 9:03 AM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: \[External\] RE: SW6221006 +/- 20,000-SF Distribution Facility Expansion for CCBCC - Fayetteville CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jim, Can you please give me a call when you have a chance to discuss these comments? Thanks, Ethan Ethan Hart, P.E. Strategis, Inc. 803.331.2991 P.O. Box 515 Columbia, SC 29202 ehart@strategisse.com From: Farkas, Jim J \[mailto:Jim.Farkas@ncdenr.gov\] Sent: Monday, January 23, 2023 3:37 PM To: Melanie.Sabella@CokeConsolidated.com; Ethan Hart <ehart@strategisse.com> Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: RE: SW6221006 +/- 20,000-SF Distribution Facility Expansion for CCBCC - Fayetteville Good Afternoon, The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application th for the subject project on October 25, 2022. A review of that information has determined that the application is not complete. Attached is a letter describing the items that need to be submitted. If you have any questions, please feel free to contact me. My contact information is listed below. Thank you Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov 3 From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Tuesday, October 25, 2022 12:17 PM To: Melanie.Sabella@CokeConsolidated.com; ehart@strategisse.com Cc: Lawyer, Mike <mike.lawyer@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: SW6221006 +/- 20,000-SF Distribution Facility Expansion for CCBCC - Fayetteville Good afternoon, We received your post-construction stormwater permit application for the above mentioned project on 10/25/2022. Reviews under the standard permitting process generally take 75 calendar days, but can take up to 90 calendar days per statute (our other reviewer, Corey Anen, no longer works for the State, so this review may exceed 75 days). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the “Add Another Post-Construction File Upload” link directly below the “State Stormwater Information Uploads” section of the form. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. Please type in permit #: SW6221006 If you have any questions, please contact Jim Farkas Jim.Farkas@ncdenr.gov 919-707-3646. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 4 5