HomeMy WebLinkAboutNCC232722_NOT Closeout Documents_20231009 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699
County: Mecklenburg Project: West Ramp Expansion Ph II,West Lay River basin: Catawba
Person financially responsible:City of Charlotte-Jeff McSwain,Director of Development Project#: MECKL-2020-048
Address: 5601 Wilkinson Blvd,Charlotte,NC 28202
1. Project Location: 5501 Josh Birmingham Parkway,Charlotte
Pictures: No
2. Weather and soil conditions: Sunny,Workable Soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No One Onsite Title:
Inspection report: Sent Report Date given/sent: August 05,2022
9. Corrective action needed:
10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion,however there are
some bare areas that need to be stabilized along Rental Car Road.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT)unless permit approval date was prior to April 2019.
The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note
that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Jeffrey Chandler Others present:
Date of inspection: August 02,2022 Time arriving on site: 11:45 AM Time leaving site: 12:00 PM
CC: