Loading...
HomeMy WebLinkAboutSWA000195_email_20230321 Peck, Kaitlin From:Farkas, Jim J Sent:Tuesday, March 21, 2023 3:07 PM To:Jess Gardner; Michael Cain Cc:Smith, Mike M; Lawyer, Mike Subject:RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County We received the application fee for the subject project today in the mail. The 30-day review period begins today, but I probably won’t enter this project into our system until later this week (this doesn’t impact the review, just letting you know). Would you like us to return the expired check? Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Jess Gardner <jgardner@cdcgo.com> Sent: Monday, March 20, 2023 10:43 AM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Michael Cain <mcain@cdcgo.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jim, What is the overnight address we can send this check too? Thanks, Jesse G. From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Monday, March 20, 2023 10:18 AM To: Jess Gardner <jgardner@cdcgo.com>; Michael Cain <mcain@cdcgo.com> 1 Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County Sorry for not getting back to you sooner, we were internally discussing the existing BUA for this site based on the information that you provided on 3/2/22. I looked over the submittal items and everything is good to go except for the review fee check. The provided check (Check # 87030, dated 7/26/22) expired on 1/22/23 and is required per 15A NCAC 02H .1043(3). Please proved a valid review fee check and we will get started on the Fast-Track review. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Jess Gardner <jgardner@cdcgo.com> Sent: Monday, March 20, 2023 9:43 AM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Michael Cain <mcain@cdcgo.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Jim/Mike Lawyer, Trying to get some traction and get this project in the queue. Please help. You have had our submittal package since November. Happy to discuss, below thread pretty much sums it up. We have grading and USACE permits but want to get the stormwater permit in hand. Thanks, Jesse Gardner 828-216-8399 From: Jess Gardner Sent: Thursday, March 16, 2023 2:38 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Michael Cain <mcain@cdcgo.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County 2 Jim, Still looking for an answer on this project. You have a complete submittal for a fast track and would like to get it rolling if at all possible. Happy to discuss the details with you but hope you have everything you need to get me in the queue. Look forward to hearing from you. Thanks, Jesse G. From: Jess Gardner Sent: Thursday, March 2, 2023 4:43 PM To: Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Michael Cain <mcain@cdcgo.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County Jim, Here is the approval from the Town. Let me know if you have any other questions or needs. Jesse G. From: Farkas, Jim J <Jim.Farkas@ncdenr.gov> Sent: Thursday, March 2, 2023 4:33 PM To: Jess Gardner <jgardner@cdcgo.com>; Michael Cain <mcain@cdcgo.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County Sorry for not getting back to you sooner (I’ve been pretty swamped since Margie left). Can you provide the subdivision approval? There’s nothing on the provided plan that indicates that this was approved. Jim Farkas State Stormwater Engineer North Carolina Department of Environmental Quality Office: (919) 707-3646 Jim.farkas@ncdenr.gov From: Jess Gardner <jgardner@cdcgo.com> Sent: Monday, February 6, 2023 4:22 PM To: DeBerry, Margie <Margie.DeBerry@ncdenr.gov>; Michael Cain <mcain@cdcgo.com> 3 Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Margie, I wanted to follow back up on this email and submittal. This property did have an approval/vesting prior to 2006. This property was part of the Hollabrook Farms Subdivision. I have attached the previous masterplan that was submitted and approved prior to DEQ stormwater rules. As you can see the impervious areas line up with this plan. Our client purchased the property in 2008, however the work that was completed by previous owner and was permitted accordingly. Let me know if you need any other additional information in order for our project to proceed with the Fastrack review. I apologize for delay, however it took us some time to track down this previous plan. Thanks, Jesse Gardner From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Monday, November 28, 2022 10:10 AM To: Michael Cain <mcain@cdcgo.com>; rgrant@beverly-grant.com Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Jess Gardner <jgardner@cdcgo.com> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County Good morning, We received your additional information for a new Fast-Track ATC post-construction stormwater permit on 11/28/2022. Regarding the last comment from the initial email, we still have a question about the existing gravel road on the project site that appears to have disturbed more than 1 acre. Based on historical imagery, the gravel road did not exist prior to and during 2006; it appears to have been built during or after 2007. Was the gravel road also permitted before 2006? Please provide more details or clarification about the existing BUA permitted prior to 2006 (see prior comment/response below and project site screenshots).  Prior Comment: Section E.5 of the application listed BUA associated with Existing Development. Please note that “Existing development” as defined in 15A NCAC 02H .1002, means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. If the existing BUA indicated on the application was built after the post-construction stormwater rules went into effect (2006), and cumulatively disturbed 1.0 acre or more, a stormwater permit was required, and the proposed project is not eligible to be permitted under the Fast-Track ATC process. – Please provide the construction date and total area of the existing pavement, buildings, bridge, and gravel road shown on the submitted plans. CDC – Based on discussions with the current owner, it is our understanding that the site was previously permitted before 2006 by a now defunct developer. Since 2006, the only improvements to the site have been the pavement associated with the temporary sales center. These improvements disturbed less than 1 acre and this impervious area will be removed once the project is complete. Based on this information it is our understanding that Phase 1 can continue as a fast-track review. 4 5 6 7 Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov From: DeBerry, Margie Sent: Tuesday, November 22, 2022 3:25 PM To: Michael Cain <mcain@cdcgo.com>; rgrant@beverly-grant.com Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Jess Gardner 8 <jgardner@cdcgo.com> Subject: RE: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County Good afternoon Mr. Cain, Thank you for the update and heads up. If you are sending the package overnight tomorrow, we will probably not receive it in our office until Monday due to the holiday. However, we will look out for the package and confirm receipt when it arrives. Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov From: Michael Cain <mcain@cdcgo.com> Sent: Tuesday, November 22, 2022 3:18 PM To: DeBerry, Margie <Margie.DeBerry@ncdenr.gov>; rgrant@beverly-grant.com Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov>; Jess Gardner <jgardner@cdcgo.com> Subject: \[External\] RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Ms. DeBerry, I wanted to confirm that the project will be resubmitting the requested information tomorrow. The Owner is out of town, so we have been having some difficulties gathering his signature for the second original application. I’m expecting it to arrive in the morning and we will package this up and send overnight to Mr. Farkas’ attention. We appreciate the help. Michael Cain, P.E. Civil Design Concepts, P.A. (828) 252-5388 Office locations: 168 Patton Avenue Asheville, NC 28801 | 52 Walnut Street ~ Suite 9 Waynesville, NC 28786 Mailing address: P.O. Box 5432 Asheville, NC 28813 www.cdcgo.com 9 Privileged and Confidential: The information contained in this email message and any attachments is confidential information intended only for the use of individuals or entities named above. If the reader of this message is not the intended recipient you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this email in error, please notify us immediately by email at the originating address. From: DeBerry, Margie <Margie.DeBerry@ncdenr.gov> Sent: Friday, November 18, 2022 3:31 PM To: rgrant@beverly-grant.com; Michael Cain <mcain@cdcgo.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: RE: Legacy at Mills River - Ph. 1, Mills River, Henderson County As of today, 11/18/2022, we have not yet received the requested information to complete our review. Please provide this information to us by close of business on 11/24/2022 or the project will be returned as administratively incomplete. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov From: DeBerry, Margie Sent: Tuesday, October 25, 2022 11:09 AM To: rgrant@beverly-grant.com; Michael Cain <mcain@cdcgo.com> Cc: Smith, Mike M <michael.smith@ncdenr.gov>; Farkas, Jim J <Jim.Farkas@ncdenr.gov> Subject: Legacy at Mills River - Ph. 1, Mills River, Henderson County Good morning, We received your application for a new Fast-Track ATC post-construction stormwater permit on 10/21/2022. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 11/24/2022) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.  1x original, signed hard copies of the Application with the following corrections made (A complete application is required per 15A NCAC 02H .1042(3)(a) and per Section F of the Application). – One hard copy of the Application was provided, but two original signed hard copies are required.  1x hard copy of a USGS map identifying the project location and GPS coordinates for the project. This is required per 15A NCAC 02H .1043(3)(e) and per Section F of the Application. – One hard copy of a USGS map was provided (in the Hydrology and Erosion Control Study), however two hard copies are required.  1x hard copy of the construction sequence discussing how any future development on the project may be phased. This is required per 15A NCAC 02H .1043(3)(g). – One hard copy of the construction sequence was provided (in the Hydrology and Erosion Control Study), however two hard copies are required. 10  2x hard copies of documentation from the NC Secretary of State or other official documentation which supports the titles and positions held by the persons listed in Section C.2 of the Application per 15A NCAC 2H. 1043(3)(b). This is required per Section F of the Application.  Please indicate whether both phases of the project are being permitted with the submitted application, or only Phase 1. The project name stated on the application is “Legacy at Mills River – Ph. 1.”  Section E.5 of the application listed BUA associated with Existing Development. Please note that “Existing development” as defined in 15A NCAC 02H .1002, means those projects that are built or those projects that have established a vested right under North Carolina law as of the effective date of the state stormwater program or applicable local government ordinance to which the project is subject. If the existing BUA indicated on the application was built after the post-construction stormwater rules went into effect (2006), and cumulatively disturbed 1.0 acre or more, a stormwater permit was required, and the proposed project is not eligible to be permitted under the Fast-Track ATC process. – Please provide the construction date and total area of the existing pavement, buildings, bridge, and gravel road shown on the submitted plans. NOTE: This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brought up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the Fast-Track process can take up to 30 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 If you have any questions, please contact Margie DeBerry at Margie.DeBerry@ncdenr.gov or 919-707-9209. Thank you, Margie DeBerry Environmental Specialist, Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9209 margie.deberry@ncdenr.gov 11