HomeMy WebLinkAboutNCC233035_ESC Approval Submitted_20231010 ``Mc STATE'
:(....''''- / 1,t,11:'
ROY COOPER s, Z1
Governor g
2
ELIZABETH S.BISER ` .. , a
.•
Secretary 9.1
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
October 06, 2023
LETTER OF APPROVAL
NVR Inc. dba Ryan Homes
Attn: Mr. Greg Knapp, Division Manager/VP of Ryan Homes
4525 South Blvd Suite 100
Virginia Beach, VA 23452
RE: Project Name: Tooley Harbor (Ryan Homes)
Project ID: Pasqu-2024-002
County: Pasquotank Acres Approved: 10.24
City: Elizabeth City
Address: Sailor's Way
River Basin: Pasquotank
Date Received by LQS: September 08, 2023
Submitted By: Ryan Homes
Plan Type: New
Dear Sir,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications.The Modifications Required for Approval are listed on the attached page.This
plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eN 01) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater
Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a new COC.
.,- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
..;) Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889
NOr}CAROLINA v
o.nwM,n of Ew OW e� awx� /`#4 252.946.6481
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Sincerely,
c) (,,,
Samir Dumpor, PE
Regional Engineer
Land Quality Section
cc w/o enc: Greg Knapp, Ryan Homes (email)
Adam Beck, Ryan Homes (email)
WaRO Division of Water Resources (email)
D_E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889
NV/3 tH CMC,JI,IN
Department m u,Y►m.Mnw w.N+r 252.946.6481
PROJECT INFORMATION SHEET
APPROVAL DATE: October 06, 2023
RESPONSIBLE PARTY: NVR Inc. dba Ryan Homes
PROJECT NAME: Tooley Harbor (Ryan Homes)
COUNTY: Pasquotank NO.: Pasqu-2024-002
OFF-SITE BORROW
AND/OR DISPOSAL SITE: NO.:
START-UP DATE:
CONTRACTOR:
ON-SITE CONTACT:
ON-SITE PHONE NO.:
OFFICE PHONE NO.:
COMPLETE & RETURN THIS FORM
PRIOR TO THE START OF CONSTRUCTION TO:
N.C.D.E.Q.
LAND QUALITY SECTION
ATTN: Bradley West
943 WASHINGTON SQUARE MALL
WASHINGTON, NORTH CAROLINA 27889
donald.west@deq.nc.gov
E North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources
Washington Regional Office I943 Washington Square Mall I Washington,North Carolina 27889
r�cwnl c�viw, 252.946.6481
Oep.Mrnl nl EmYwrcn W Ouapry
CERTIFICATE OF PLAN APPROVAL
f; Or Y 1, ''<44S.
t h
,� , , ,
'tSP Qt,%1,vtuti'�
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
1 permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b). 'r0 k• L,r CILI o V‘...44%)
S ...‘ye 6t w." C S ) a Er,IZA. C.
Project Name and Location
ItIOIO3 Stabw %r Aldllfr'
Date of Plan Approval _� Regional Engineer
P-"E'tw �
Certificate of Coverage Number ? A" 024 " 012