HomeMy WebLinkAboutNCC212922_NOT Signed Certification_20231009 NCGO1 Notice of Termination (NOT) Certification Form
Directions:
Print this form, complete,scan and upload to the electronic NOT(Rescission)form.
Then, mail the original signed form to the NC DEMLR Stormwater Program at:
Division of Energy, Mineral& Land Resources Stormwater Program
512 N.Salisbury Street,6th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED.
THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22]
General Permit Certificate of Coverage (COC) No.: k\CG 'ava.`1a3
Name of Project: G,rni;c__\c y nns
Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement,representation, or
certification in any application, record, report,plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not
to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for
the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge
and belief,such information is true, complete, and accurate. -}� �p \Lh14C?r
Legally Responsible Organizational Entity(must match eNOT):-�ll�1t, a�in(
*Legally Responsible Person (must match eNOT):11) , l500VO 'cefrr
*Title of Legally Responsible Person:at\\Ti U•/-\ 'Q aN,-Y
Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person:
(----Q
*Signature: - Qs Date: \V q.a3
* IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the
construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in
accordance with Part IV, Section B, Item(6)of the NCG010000 permit.
For more information on signatory requirements,see Part IV,Section B, Item(6)of the NCG010000 permit.