Loading...
HomeMy WebLinkAboutSW6230606_Supplement-EZ Form_20231009 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECTINFORMATI 1 Project Name BENHAVEN EMERGENCY SERVICES 13 2 Project Area(ac) 2.49 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 1 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? YES 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 1 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 iSand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED F NER CERTIFICATION Name and Title: BLAIR P.PITTMAN,SITE DEPT.MANAGER Organization: BOBBITT DESIGN BUILD,INC. Street address: 600 GERMANTOWN DR City,State,Zip: RALEIGH,NC 27607 Phone number(s): 919-851-1980 Email: bpittman@bobbitt.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision,that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete,and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer Seal Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Bioretention Cell 5 Total drainage area(sq ft) 108392 62984 6 Onsite drainage area(sq ft) 108392 60962 sf 7 Offsite drainage area(sq ft) 2022 8 Total BUA in project(sq ft) 32000 sf 34022 sf New BUA on subdivided lots(subject to 9 permitting)(sq ft) New BUA not on subdivided lots(subject to 10 permitting)(so 11 Offsite BUA(sq ft) 2022 sf 12 Breakdown of new BUA not on subdivided lots: Parking(sq ft) 17950 sf 17950 sf Sidewalk(sq ft) 1850 sf 1850 sf Roof(sq ft) 12200 sf 12200 sf Roadway(sq ft) Future(sq ft) Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement not on 14 subdivided lots(sq ft) Existing BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 30% 54% 19 IDesign storm(inches) 1.0 in 20 1 Design volume of SCM(cu ft) 2850 cf 21 Jualculation method for design volume Simple Method ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Although only 1746 SF of offsite area is existing impervious,all 2022 SF is considered as BUA for calcultion purpose as per 15A NCAC 02H .1003(3)(b) BIORETENTION CELL 1 Drainage area number 1 2 Minimum required treatment volume cu ft c GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? 3:1 Does the SCM have retaining walls,gabion walls or other 6 engineered side slopes? No Are the inlets,outlets,and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 8 design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? N/A 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? N/A 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designedy an NC licensedprofessional? Yes BIORETENTION CELL MDC FROM 02H.1052 18 SHWT elevation(fmsl) 274.42 19 Bottom of the bioretention cell(fmsl) 276.67 20 Ponding depth of the design storm(inches) 12 in 21 Surface area of the bioretention cell(square feet) 2850 sf 22 Design volume of SCM(cu ft) 2850 cf 23 Is the bioretention cell used for peak attenuation? Yes 24 Depth of peak attenuation over planting surface(in) 10 in 25 Height of peak attenuation outlet above the planting surface(in) 12 in 26 Infiltration rate of the in situ soil(inch/hour) N/A 27 Diameter of the underdrain pipes(if applicable) 4"&6" 28 Does the design include Internal Water Storage(IWS)? Yes 29 if so,elevation of the top of the IWS(fmsl) 279 30 Elevation of the planting surface(fmsl) 280.5 31 What type of vegetation will be planted? (grass,trees/shrubs, other)? Grass 32 Media depth(inches) 30 in 33 Percentage of medium to coarse washed sand by volume 75%-85% 34 Percentage of fines(silt and clay)by volume 8%-10% 35 Percentage of organic matter by volume 5%-10% 36 Type of organic material Pine bark fines 37 Phosphorus Index(P-Index)of media(unitless) 10 to 30 38 Will compaction be avoided during construction? Yes 39 Will cell be maintained to a one inch/hour standard? Yes 40 Depth of mulch,if applicable(inches) N/A 41 Type of mulch,if applicable N/A 42 How many clean out pipes are being installed? 11 43 1 ype or pretreatment tha will be useGrassed Swale ADDITIONAL INFORMATION 44 Please use this space to provide any additional information about the bioretention cell(s): Bioretention 3 2:12 PM 10/9/2023