Loading...
HomeMy WebLinkAboutNCS000460_MS4 O&M_20230823 Town of Knightdale Public Works KN IGHTDALE 3102 Great Falls Court sloivnw(ifer Knightdale,NC 27545 (919)217.2250 NC Dept of Environmental Quality Municipal Separate Storm Sewer(MS4) JUL 2 5 2023 Operation&Maintenance Plan Raleigh Regional Office Goals and Objectives: To address and reduce potential pollutants that may enter the Town's MS4 or Surface Waters of the State, and to provide necessary maintenance to the Town's existing storm drainage network. Last Update: April 131h, 2023 Program Components a) Storm Drainage System Cleaning b) Street Sweeping c) Inspection d) Storm Drainage Outfall Maintenance Storm Drainage System Cleaning 1. The cleaning of Town maintained storm drainage conveyances will be handled on an as needed basis, depending upon the condition and cleanliness of catch basins, inlets, and outfalls. 2. If storm drainage needs cleaning because it has the potential to contribute to stormwater pollution or cause flooding,the supervisor and Director of Public Works will be notified by Stormwater staff, and a work order will be assigned in the Town's Work Order software. Operations staff will be responsible for ensuring all prescribed maintenance included in the work order is completed in a timely manner. 3. The Operations supervisor is responsible for storm drain cleaning activities and will log the quantity of storm drainage maintained within the Towns work order software.This software will be used to track annual metrics for MS4 permit compliance. Street Sweeping 1. Street sweeping is handled by a third-party contractor. 2. This contract is renewed annually, and covers all Town owned and operated streets. 3. Each street within the Towns corporate limits will be swept once a month,with additional sweeps being conducted prior to Town events or celebrations. 4. Milage totals collected by street sweeping operations will be documented and included as part of the annual MS4 assessment report. Inspection 1. The inspection of storm drainage conveyances shall be conducted routinely as part of the Towns Stormwater Infrastructure Inspection Program (SIIP) 2. 20%of the Towns owned and operated stormwater infrastructure will be inspected annually, with the goal of reaching 100% by the end of the 5-year MS4 permit cycle. 3. In addition to this SIPP, storm drainage infrastructure will be inspected on an as needed basis, dependent upon issues observed by staff,or reported by residents. Town of Knightdale KNIGHTDALE Public works 1102 Great Falls Court Slotwilw tee, Knightdale,NC 27545 (919)217-2250 4. Any maintenance issues discovered during an inspection will be documented by Stormwater staff and forwarded to Operations for remediation. Storm Drainage Outfall Maintenance 1. As part of the SIIP and Dry Weather Outfall Screening Program, Stormwater staff will annually inspect all major outfalls owned and operated by the Town. 2. Inspectors will report any potential Illicit Discharge/Illegal Connections to the Stormwater Program Manager,their supervisor,or stormwater hotline upon detection. 3- Any outfalls that are deemed in need of repair or maintenance during dry weather screenings by Stormwater staff will be referred to Operations for repair. 4. Dump sites or other potential sources of runoff pollution discovered during outfall maintenance should be reported to their supervisor for immediate removal or remediation.