Loading...
HomeMy WebLinkAboutNCC191973_NOT Closeout Documents_20231004 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094 (910)433-3300 Town of Biscoe Sanitary Sewer County: Montgomery Project: Rehabilitation River basin: Cape Fear Person financially responsible:Town of Biscoe-Brandon Holland,Manager Project#: MONTG-2020-001 NCC191973 Address: 110 West Main Street,Biscoe,NC 27209 1. Project Location: See Plans,Biscoe Pictures: No 2. Weather and soil conditions: sunny/partly cloudy workable soils Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Cameron Stewart Title: Inspector Inspection report: Sent Report Date given/sent: September 15,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Penny Markle Others present: Date of inspection: September 14,2023 Time arriving on site: 12:14 PM Time leaving site: 1:00 PM cc: