HomeMy WebLinkAboutNCC232994_ESC Approval Submitted_20231006 STATt
hN na �•
ROY COOPER j,r ` '2y
Governor
�2
ELIZABETH S.BISER ` -..,L,�a°
Secretary ,e, ..�-
DOUGLAS R.ANSEL NORTH CAROLINA
Interim Director Environmental Quality
June 16, 2023
LETTER OF APPROVAL WITH MODIFICATIONS
SP FDS, LLC
ATTN: Will Stronach
4004 Barrett Drive #106
Raleigh,NC 27609
RE: Project Name: Dollar Tree
Acres Approved: 1.15
Project ID: WARRE-2023-002
County: Warren
City: Norlina
Address: US Hwy 158
River Basin: Tar-Pamlico
Stream Classification: C;NSW
Submitted By: W. Russell Folsom, PE
Date Received by LQS: May 18, 2023
Plan Type: New/Commercial
Dear Mr. Stronach:
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable with modifications and hereby issue this letter of Approval with
Modifications. The Modifications Required for Approval are listed on the attached page.
This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage(COC)under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain
the COC prior to commencement of any land disturbing activity. The eNOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about the eNO1 form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
D E Q4� North Dm Q I grc
Raleigh RegionalCarolina Officeepart 11628entof MailEnvironmental Service Centeruality 13800Division Barrett Driveof Ener I y,Raleigh,Mineral North
andLand CarolinaResou 276es09
919.791.4200
Letter of Approval
SP FDS, LLC
June 16, 2023
Page 2 of 5
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is
any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
`/ Raleigh Regional Office 11628 Mail Service Center 3800 Barrett Drive I Raleigh,North Carolina 27609
919.791.4200
Letter of Approval
SP FDS, LLC
June 16, 2023
Page 3 of 5
Your cooperation is appreciated.
Sincerely,
Dylan Reinhardt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Regional Office file
W. Russell Folsom, PE [electronic]
D_E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
`/ Raleigh Regional Office 11628 Mail Service Center 3800 Barrett Drive I Raleigh,North Carolina 27609
919.791.4200
Letter of Approval
SP FDS, LLC
June 16, 2023
Page 4 of 5
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Dollar Tree
Project ID: WARRE-2023-002
County: Warren
1. Provide the location of the site, to scale as near as possible and enlarged sufficient to
adequately view details, on a USGS quad map. Quad maps can be obtained through the
following website: https://store.usgs.gov/map-locator(GS 113A-57.4(c), 15A NCAC 04B
.0105, 15A NCAC 04B .0106(a)(1) and(a)(3),NCG01 Part II Section A (4))
2. Add the following statement to the construction sequence: "Erosion and Sediment Control
(E&SC) permit and a Certificate of Coverage (COC) must be obtained before any land
disturbing activities (including timbering and demolition) occur." The COC can be
obtained by filling out the electronic Notice of Intent(e-NOI) form at deq.nc.gov/NCG01.
Please note, the e-NOI form may only be filled out once the plans have been approved. A
copy of the E&SC permit, the COC, and a hard copy of the plan must be kept on site,
preferably in a permits box, and accessible during inspection.
3. Add the following statement to the construction sequence, "When the project is complete,
the permittee shall contact DEMLR to close out the E&SC Plan." After DEMLR informs
the permittee of the project close out, via inspection report, the permittee shall visit
deq.nc.gov/NCG01 to submit an electronic Notice of Termination(e-NOT). A$100 annual
general permit fee will be charged until the e-NOT has been filled out.
4. Add the following statement to the construction sequence, "Per NPDES requirements, a
rain gauge, self-inspections records, permit, Certificate of Coverage, and S&E plan are
required to be maintained on site and accessible during inspection. It is recommended that
these items be placed in a permits box at the beginning or entrance of project." (NCG01
Part III Sections A and B, 15A NCAC 04B .0131)
5. Add the following statement to the construction sequence: "Install construction entrance,
tree protection fence, silt fence, and silt fence outlets prior to any land disturbing activities
(including any tree clearing or demolition). Clear only as necessary to install these devices
as specified on the approved plan sheet. Install all other erosion control measures as
required by NCDENR including sediment basins,barriers,and diversion ditches as needed.
Clear only as necessary to install these devices. Install ditch liners and temporary culvert
pipe as noted on plans. Seed temporary diversions, berms, and basins immediately after
installation. Install coir wattles or check dams in temporary diversions." (GS 113A-57(3),
15A NCAC 04B .0113)
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
`/ Raleigh Regional Office 11628 Mail Service Center 3800 Barrett Drive I Raleigh,North Carolina 27609
919.791.4200
Letter of Approval
SP FDS, LLC
June 16, 2023
Page 5 of 5
6. Discharge water into the basin in a manner to prevent erosion. Provide a stable conveyance
from diversions into basins(i.e.rip rap lined channel, slope drain,tarp,etc.) Provide stable
conveyance(extend pipe,provide tarp or other acceptable practice)from outlet of skimmer
to perimeter silt fence/silt fence outlet. (15A NCAC O4B.O1O6(4))
7. Provide two copies of the plan set (one full-size and one half-size), showing the
modifications required for approval. To facilitate DEMLR review, bubble, highlight, or
otherwise identify the changes to your resubmittal. Provide one copy of additional
items (such as design calculations). Provide a cover letter referencing the project name,
project ID, and purpose for submittal. (G.S. 113A-57(4))
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC O4A.O1O1 through 15A NCAC O4E.O5O4
General Permit NCG 010000 NPDES for Construction Activities
D_E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Raleigh Regional Office 11628 Mail Service Center 3800 Barrett Drive I Raleigh,North Carolina 27609
u�.,,mre,i mr,:;o„��si aenry 919.791.4200