Loading...
HomeMy WebLinkAboutNCC233001_Site Plan or Location Map_20231006 v q i Sheet List Table _ Sheet Number Sheet Title • `1 ��%///A,�///1/�.0 ® -- . -t� C01 COVER 1 \ �4 yp•*�/ At CO2 ORIGINAL SURVEY J�_/'71'®�'/�/� / CO2A RECOMBINATION PLAT / . fiA V -AV CO2B SURVEY ADJACENT Rq CO2C DEMO PLAN �� /f®B _ CO3 SITE PLAN '� O CO3A RIGHT OF WAY PLAN t. �1yu W&A CO4 PHI EROSION CONTROL PLAN r �� _` I^' -IP. •�, ENGINEERING It M B1f 64 COS PH2 EROSION CONTROL PLAN I l\ I ' 4 C06 PH3 EROSION CONTROL PLAN �.f /$, issJM miseI— 007 PH4 EROSION CONTROL PLAN ;' I / �,.' v,f� 121 GILEAD RD 7:7711 • fff F IG COB OVERALL GRADING&DRAINAGE PLAN g i33 3 J � ajelL HUNTERSVILLE,NC 28078 CO9 DETAILED GRADING • 1 REVIEWED by Randy Frazier �\ a V3��/ __ILE 1 P:(704)875-1615 C10 DETAILED GRADING&STORM TABLES Fire Plans Examiner ��, `e./ ;s �/ ���_ l Y WAENGINEERING.COM CII STORM PROFILES Mecklenburg County Code Enforcement �� �t'�r+' t ® �( j 'I �$n \ r--J NC ENGINEERING BOARD C12 UTILITY PLAN NOTICE Y -0I �,_�p®� I LICENSE*P2743 I I EPM # 4461 0 2 •, ea ®�w 5 NC ANDSCA ENGINEERINGI BOARD R BOARD Fire Marshal approval of the plans conceptual 4#r� �._ O a�s� LICENSE#.C-614 C 12 DUKE PHOTOMETRIC PLAN n na IC C13 LANDSCAPE PLAN A full"For Constructor Civil set of drawings �9 fAimaea4 SCSLGENSE#COAo65 must be Submitted at the time of permitting �" C14 SITE DETAILS review � ® ® LICENSES LAF477 and will be the foal approved drawings 7 � r /�yr (//�`I .... SC LANDSCAPE ARCHITECTURAL BOARD C15 EROSION DETAILS r rt "IPA I i I` ,,esi ia— 14 C16 EROSION DETAILS CONT. J ®A g I� a tal J rk C17 TRAFFIC CONTROL DETAILS 1�! ' "" /"" R, �^�� � N ® I C18 BMP DETAILS III CI9 BMPDETAIL3 CIVIL SITE PLAN PACKAGE (1 C20 BMP DETAILS 3 C21 BMP DETAILS 4 VICINITY MAP C223 DRIVEWAY PLAN AND PROFILE P R O P OS ED C23 IVEWAYSIGHT IPLANANDCE R SCALE: N.T.S. C24 FIRETRUCK AUTOTURN C25 SU-30AUTOTURN STORYHILL CHURCH " ,• �„ .hk HensonFoley ;.i� P .:... o •k; DAVIDSON , M E C K L E N B U R G COUNTY N C Landscape 704.875 ture095 I Civil Engineering �/ �' 121 Gilead,Huntersville NC 28078 ��qy• p:704.875.1615 I f:704.875.0959 I veww.hensonfoley.com /i/ON;HM 'vvx`� NOTE EFFECTIVE 04/01/2023,HENSONFOLEY HAS MERGED WITH W&A ENGINEERING. so O M W EPM REFERENCE NUMBERS: _ O co CONSTRUCTION DOCUMENTS : EPM#446102 U S Z ce ^ O THE FOLLOWING IS A LIST OF POST CONSTRUCTION SUBMITTALS THAT NEED TO BE CONCEPT PLAN : EPM#402016 o PROVIDED AFTER = co Q I2 o CONSTRUCTION PLAN APPROVAL AND PRIOR TO THE ISSUANCE OF A C.O. f 1 '2 w FINAL PLAT SUBMITTAL �J cal LU w w 0 I. PLAT REVIEW FEE$1,500 —I (`7 2. FINAL PLAT N N BOND(CONSTRUCTION/MAINTENANCE(SUBMITTAL = o Z U a. SUBMIT TO EITHER HANNAH.SMITH@MECKNC.GOV OR VIRGINIA.MULLIS@MECKNC.GOV Q b. BOND INSPECTION REQUEST FORM > CO c. BOND ESTIMATE FORM OWNER/DEVELOPER: d. BOND ADMIN FEE$1,200 e REFERENCE APPROVED CONSTRUCTION PLAN EPM ifN 0 f. REFERENCE APPROVED PLAT EPM# STORYHILL CHURCH, INC o O i) ALL BONDS SHALL BE ASSOCIATED WITH A RECORDED PLAT P.O. B O U/\ 2 V 2 V.J 2. PE OF BOND REQUESTING O TYPE Nr a. CONSTRUCTIONZ IT I) INFRASTRUCTURE/BMP(3ves) NOTICE TO OWNER/DEVELOPER/CONTRACTOR: DAVIDSON I DS O N NC C 28036 d NI" BMP FOR C.O.(6M0) I I RECORDED BMP ACCESS&MAINTENANCE EASEMENT PLAT 21 BOND APPLICATION FORMS FOR GUARANTEEING THE INSTALLATION OF BMPS THIS LAND DEVEOPMENT PLAN HAS NOT BEEN REVIEWED OR APPROVED BY (704)-796-7851 (APPENDIX 9-1) the North Carolina Department of Transportation(NCDOT)VIA EPM. b. MAINTENANCE I) ROADWAY(1YRI PRIOR TO CONSTRUCTION: ii) BMP(lYR)OR IF POST-CONSTRUCTION THEN NS) I I RECORDED BMP ACCESS&MAINTENANCE EASEMENT PLAT Please contact NCDOT(980-523-0000 office)regarding your development. �.� 2) BOND APPLICATION FORMS FOR GUARANTEEING BMP MAINTENANCE r,y tl6' 6 (APPENDIX 9-12) A TEMPORARY OR PERMANENT DRIVEWAY PERMIT FOR CONSTRUCTION favL"�sgn EPM#446102 Pt 3. TYPE OF BOND FINANCING ENTRANCES IN NCDOT RIGHT-OF-WAY IS REQUIRED TO BE SUBMITTED TO THE _,..... a. CASH EROSION CONTROL INSPECTOR IN ORDER TO SCHEDULE THE ,.J b. ER OF CREDIT PRE-CONSTRUCTION MEETING. Approved REVISIONS: c. SURETY as noted 8/21/22023 2023/01/04-CLTW COMMENTS BMP AS-BUILT SUBMITTAL REMS(REQUIRED FOR FINAL C.O.EVEN IF CONSTRUCTION BOND IS IN PLACE): NCDOT BUILDING PERMIT HOLDS WILL BE PLACED UNTIL THE FINAL NCDOT The approval of these plans are applicable only to the pertinent parts 2023/01 CLTW COMMENTS I. AS-BUILT SURVEY SIGNED&SEALED DRIVEWAY PERMIT IS EXECUTED. reviewed by the approval agencies for the type of review under which 2023/05/17-NCDOT COMMENTS a. THE AS-BUILT SURVEY SHALL ACCURATELY REFLECT REQUIRED BUFFERS,UNDISTURBED OPEN SPACE they were submitted. Refer to the EPM FAQ for more information. AREAS,BUILT UPON AREAS,AND BMP DIMENSIONS AND ELEVATIONS.(PCO ADMIN MANUAL 2023/05/23-1ST EPM COMMENTS SECTION 12.1.6) PLATS IMPACTING OR MODIFYING NCDOT RIGHT-OF-WAY WILL NOT BE T„...owes..man ,Dew..•,a.o nB A2023/06/29-PERMIT REVISIONS 2. COPY OF APPROVED PLAN WITH PROPOSED INFO CROSSED OUT WITH AS-BUILT INFO ADDED APPROVED WITHOUT THE EXECUTED FINAL NCDOT DRIVEWAY PERMIT. Date:08/21/2023 #s�.� C 2023/07/19-2ND EPM COMMENTS 3. COPY OF APPROVED CALCS WITH PROPOSED INFO CROSSED OUT WITH AS-BUILT INFO ADDED a. RE-RUN CALCS WITH AS-BUILT INFO AND PROVIDE RESULTS LAND DEVELOPMENT PLAN REVISIONS DUE TO PLAN COMMENTS BY NCDOT 4. COPY OF THE RECORDED PC019 FORM COMMENTS WOULD REQUIRE SUBMISSION OF A REVISED CONSTRUCTION 5. COPY OF THE RECORDED PLAT PLAN TO THE TOWN/COUNTY FOR REVIEW. ALL ADDITIONAL FEES DUE TO THE sac 0.21no23 Signature: [Tsa-.74.....%•. 6. MECKLENBURG COUNTY BMP MAINTENANCE AND INSPECTION CHECK LISTS(APPENDIX 7-3) PLAN REVISION TO BE PAID BY THE OWNER/DEVELOPER/CONTRACTOR. 7. POST-CONSTRUCTIN STORM WATER ORDINANCE COMPLIANCE CERTIFICATION(APPENDIX 12-1) 8. BOND ESTIMATE FORM THESE PLANS ARE FOR THE PLAN 9. COPY OF THE ESCROW/SAVINGS ACCOUNT STATEMENT FOR CONTINUED MAINTENANCE&REPLACEMENT REVIEW AND APPROVAL OF AND (HOA ONLY) NOTICE TO CONTRACTOR: WORK ASSOCIATED FOR THE Note:This review was carried out based on the information provided STRUCTURE AT 490 S MAIN ST, STORM SEWER AS-BUILT SUBMITTAL ITEMS: by the design engineer.This review was done using the minimum DAVIDSON NC 28036 I. AS-BUILT SURVEY SIGNED&SEALED THIS LAND DEVEOPMENT PLAN HAS NOT BEEN REVIEWED OR APPROVED BY CHARLOTTE WATER VIA EPM. acceptable standards of the town and county. 2. COPY OF APPROVED PLANS WITH PROPOSED INFO CROSSED OUT WITH AS-BUILT INFO ADDED 3. COPY OF APPROVED CALCS WITH PROPOSED INFO CROSSED OUT WITH AS-BUILT INFO ADDED PRIOR TO CONSTRUCTION: 1. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE CO1-COVER.DWG a. RE-RUN CALCS WITH AS-BUILT INFO AND PROVIDE RESULTS PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO Please contact Mike Garbark(704-432-5797 mgarbark@ci.charlotte.nc.us)with CHARLOTTE WATER regarding your development.4. COPY OF THE RECORDED SUBDIVISION PLAT SHOW N BEGINNING CONSTRUCTION. G THE STORM DRAINAGE EASEMENTS Know what's below. PROJECT NUMBER: 219014 5. BOND ESTIMATE FORM 2. CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING a, FILL OUT THE TOTAL COST OF PAVEMENT,STONE BASE,CURB,DRIVEWAY APRONS,SIDEWALK, LAND DEVELOPMENT PLAN REVISIONS DUE TO PLAN COMMENTS BY CHARLOTTE WATER COMMENTS WOULD REQUIRE FLAGMEN,ETC.,AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 1 l Call before you dig. DATE:p2/03/2023 DRAWN BY: HFI 3. ALL PAVEMENT CUTS,CONCRETE OR ASPHALT,ARE TO BE REPLACED ( •ram STREET TREES,STORM SEWERS,&BMP'S FOR EACH ASSOCIATED PLAT TO CONVERT FROM SUBMISSION OF A REVISED CONSTRUCTION PLAN TO THE TOWN/COUNTY FOR REVIEW. ALL ADDITIONAL FEES DUE TO ACCORDING TO STANDARDS OF THE DEPARTMENT OF TRANSPORTATION. '/ CO 1 1 2S CONSTRUCTION BOND TO MAINTENANCE BOND. THE PLAN REVISION TO BE PAID BY THE OWNER/DEVELOPER/CONTRACTOR. 4. SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART / 1926 SUBPART P,OR AS AMENDED. SHEET OF