HomeMy WebLinkAbout20150626 Ver 1_Certification of Completion_20150812o12@20WR
,/ D
Certificate of Completion AUG 1 2 2015
DENR - WATER'RESOURCES
/ 401 $ BUFFER PERMITTING
DWI2 Project No. 11%`"�`pZ`p County: 6640 O #"
Applicant: e<00-air I40 A0000
Project Name: af4W &&tom CJ i�L�lo•� .Ji�i �f ���ii � �
Date of Issuance of 401 Water Quality Certification: tx/y ,41 ,.?D/S
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules,
and any subsequent modifications, the applicant is required to return this certificate to the
401 /Wetlands Unit, North Carolina Division of Water Resources, 1617 Mail Service Center,
Raleigh, NC, 27699 -1650. This form may be returned to DWRby the applicant, the applicant's
authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, Ace a/w/e/ , hereby state that, to the best of my abilities, due care and
diligence 4S used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the ap:A;:� ecifications, and other supporting materials.
Signature: Date: aAa /.S
Agent's Certification
I, ' hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to
built within substantial compliance and intent of the 401 Water Quality Certification and Buffer
Rules, the approved plans and specifications, and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, , as a duly registered Professional
(i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been
authorized to observe (periodically, weekly, full time) the construction of the project, for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans
and specifications, and other supporting materials.
Signature: Registration No.: Date: