Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCC232983_ESC Approval Submitted_20231005
\WA Xliii AWl ,m I.,i.1889 LETTER OF APPROVAL (REVISED FOR NEW OWNER) Margaret Puckett Tri Pointe Homes Holdings, Inc. 6325 Ardrey Kell Road Suite 125 Charlotte,NC 29277 Re: Project: Old Town Village Acreage: 9.96 ACRES UNION COUNTY CATAWBA RIVER BASIN SUBMITTED BY: Land Design DATE RECEIVED: 9/24/2021 PLAN TYPE: CONSTRUCTION PLAN Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. The plan has been found to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. Per Section 159.16 (G)of the Town of Waxhaw Erosion and Sedimentation Control Ordinance the plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken, or if no land-disturbing activity has occurred with three (3)years. If, following commencement of a land-disturbing activity pursuant to an approved plan, the Erosion Control Inspector determines that the plan is inadequate to meet the requirements of this ordinance, the Erosion Control Inspector may require any revision of the plan that is necessary to comply with this ordinance. A copy of the approved plan and the Certificate of Plan Approval shall be maintained at the job site by the persons conducting the land-disturbing activity. Per Section 159.18(A)the Erosion Control Inspector will periodically inspect land-disturbing activities to ensure compliance with the Act, this ordinance, or rules or orders adopted or issued pursuant to this ordinance, and to determine whether the measures required in the plan are effective in controlling erosion and sediment resulting from land-disturbing activity. The landowner, the financially responsible party, or the landowner's or the financially responsible party's agent shall perform an inspection of the area covered by the plan after each phase of the plan has been completed and after establishment of temporary ground cover. The inspection records shall be kept on site accessible to the Erosion Control Inspector. a(ita Aargaas•ks its Aaaa Hours:Mond. p.m. P.704.843.2195 P.O.Box 6 © Y Y '� www.waxhaw.com 1150 North Broome St � 8:00 a.m.—5:00 p.m. F.704.843.2196 Est �KR9 Waxhaw,NC 28173 �pWN U i WA XIIIAW Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You requested to file an amended form if there is any change in the information included on the form. Finally, please notify this office of the proposed starting date for this project and of any planned preconstruction conference. Please be aware that your project is no longer covered by the NPDES General Stormwater Permit NCGO1000 automatically with the approval of the erosion and sedimentation control plan. This coverage can be obtained after receiving the erosion and sedimentation control plan approval by completing an e-NOI available at deq.nc.gov/NCG01. If the applicant revises the approved plan, a full erosion and sedimentation control application and must be submitted. Your cooperation is greatly appreciated, and I look forward to working with you during the development of this project. Thank you, Chia �fi_ /1?LC Christopher Rice Sedimentation and Erosion Control Inspector Enclosure: Certificate of Approval /f 'ry�9F."...n!AP?Gi.'. \\ f'A\ X II II �� Hours:Monday-Friday .� P.704.843.2195 el vww.w�aw.com J1H 8:00 a.m.—5:00 p.m. F.704.843.2196 IF 1150 North Broome St Waxhaw,NC 28173 l;ct, IPoo