HomeMy WebLinkAboutNCC232972_ESC Approval Submitted_20231005 J�(04BE coc,
m ,4 Planning & Development Department
irle - 11-
4
William Jason Guess
PEOPLE TO MATOH j Erosion Control Officer
OUR MOUNTAINS
FORTH CARO''
LETTER OF APPROVAL
September 23, 2023 NOTICE— This is not a permit
Riverside Woodfin Development, LLC
Mr. David Day
P.O. Box 549
Fairview, NC 28730
RE: Project Name: WEST CITY VIEW-PHASE 1 LOTS
Acres Approved: 1.62 AC
Project#: ER02023-00052
County: BUNCOMBE
City: WOODFIN
Address: NORTHBEND DRIVE
River Basin: FRENCH BROAD
Stream Classification: C
Submitted By: MR. DAVID DAY
Date Received by: 9/08/2023
Plan Type: RESIDENTIAL
Dear Sir/Madam,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval. This approval shall become
null and void if you have not made progress on the site within six months after the date of
approval. A one-time six-month extension can be granted for good cause shown upon
receiving a written request from you before the expiration of the approved plan. This letter
of approval is being issued prior to the issuance of the stormwater permit due to
concurrent reviews, but any land disturbing activity associated with this project shall not
begin prior to issuance off all required permits including the stormwater permit and the
land disturbing permit.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent(eNOl) form requesting a Certificate of Coverage (COC)under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially R .
46 Valley Street—Asheville, NC 28801
p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org
Responsible Party shown on the FRO form submitted for this project, you MUST obtain
the COC prior to commencement of any land disturbing activity. The eNOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the
Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition,
it would be helpful if you notify this office of the proposed starting date for this project.
Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
• 1••••\tUriev.. ku‘b
W. Jason Guess
Erosion Control Officer
Enclosures: NPDES NCG01 Fact Sheet
Cc: Advanced Civil Engineering, PA
J�GoMBE coGti�
m ,4 Planning & Development Department
irile --.1'
t
William Jason Guess
PEOPLE TO MATCH j Erosion Control Officer
OUR MOUNTAINS
NORTH CARD'-��P
MODIFICATIONS FOR APPROVAL
Project name: WEST CITY VIEW-PHASE 1 LOTS
Project No. ER02023-00052
Location: NORTHBEND DRIVE
Date Approved: SEPTEMBER 23, 2023
Person financially responsible: MR. DAVID DAY
1. Contractor to ensure that any import or export material be from a permitted site.
2. Erosion control measures must be installed in accordance with the approved engineering
plans for single lots and maintained at all times. Alternate measures must first be
approved with the engineer of record and regulatory site inspector prior to installation.
3. Clearing limits for grading must be clearly delineated in the field as shown on the
approved engineering plans for lots. Any additional clearing or land disturbing activity
that disturbs the ground surface outside of those limits will constitute a violation of the
County's Ordinance and will be subject to penalties.
4. Any deviations in the original approved construction plans or design changes to land
clearing to the overall site must first be submitted for review to this regulatory office and
approved prior to continuation of construction. Failure to resubmit could result in
possible issuance of stop work orders, holding of any building inspections, or issuance of
certificates of occupancy.
5. Erosion control measures must be in good working condition and in place at the
completion of construction each day and on holidays to prevent possible off-site
sedimentation associated with changing weather events.
6. NCG010000 Construction General Permit must be obtained prior to beginning
construction and issuance of Buncombe County Land Disturbance Permit.
41111
46 Valley Street—Asheville, NC 28801
p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org