Loading...
HomeMy WebLinkAboutNCC232975_ESC Approval Submitted_20231004 .(y�,J✓ATEO ROY COOPER i Governor 6 ': ELIZABETH S.BISER a. Secretary *`$F "0`°'* WILLIAM E.TOBY VINSON,JR NORTH CAROLINA Interim Director Environmental Quality September 25, 2023 LETTER OF APPROVAL M.Yoder Construction, Inc ATTN: Mr. Myron Yoder P.O. Box 125 Mill Spring, NC 28756 RE: Project Name: Jarret Cottage and Addition Acres Approved: 0.8 Project ID: POLK-2024-004 County: Polk City: Mill Spring Address: Parkway North River Basin: Broad Stream Classification: WS-IV; CA: Tr Submitted By: M.Yoder Construction, Inc Date Received by LQS: August 28, 2023 Plan Type: Residential Dear Mr. Myron Yoder, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater D k __:,--) North Carolina Department of Environmental Quality i Division of Energy.Mineral and Land Resources Asheville Regional Office 12090 U.S.Highway 70 I Swannanoa.North Carolina 28778 Na TM C?AcuNA Department of Environmental Dual; 828.296.4500 Letter of Approval M.Yoder Construction, In(--' ATTN: Mr. Myron Yoder September 25, 2023 Page 2 of 3 Program staff in the Raleigh central office. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land- disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Chayden Shell Engineer 1 Division of Energy, Mineral,and Land Resources Leuer or approval M.Yoder Construction, ATTN: Mr. Myron Yoder September 25, 2023 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet ec: Mr. Myron Yoder- myoderconstructioninc@gmail.com cc: Regional Office file = �.y �y r�1 c l r..i to imt 4 = : 4 © N * y : Ort - N V CZ ' 44 CI Pi* \' ; C u : g 4.-)• W - '~ : 0 4 ., Ilk c : E-' •P5 •m : ,7 'J• CU �� 4,,, c o Z L * o 9. : 4-4 al �'' I C G� O U ¢ Cd S CAI2plj O' A M C�� � 1\ `,oi .' : ley O r-q V , ,' , ' O y O A c�Fi � 1 ; W`c ',,V, ic,..w -.I,7-77Y Af i ...*., \k .I V �: 4 ett C7h o C Ell. u CI V 44 • NI E .-� V au 1 .-. = cl W u O v ^ N 0 c •ACos) .4 CA Z : : '� © 1•41 0 .'''( 1 cit w4—' E 41 o �' a E ct cd ctV *lot Z A C.)-d ct U a.