Ms. Karen Higgins
NCDENR 401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC27699-1617
11111111111111[ilf, i, 111111,113111
ME 6 =0
Jackson County has been delegated local authority • the State of Rorth Carolina to
administer a stormwater program in Jackson County, Watershed III Protection
Ordinance, adopted January 1, 1994.
The Lena Davis Landing Project site is both within the jurisdiction of Jackson County
and the State
• North Carolina.
Jackson County has reviewed the site plan as proposed and it felt that an official
stormwater plan would not be required as the area of disturbance is less than one acre-
The NCDENR Division of Energy, Mineral and Land Resources- Division of Land
Resources, would not require an "Official Erosion Control,Plan" for projects less than
one acre.
Duke Energy submitted the plans to Jackson County to ensure the project was being
supervised and the erosion measures were implemented correctly and maintained.
The plan was approved on 5/26/2015.
If acceptance of the erosion control plans by Jackson County's Local Program was in
error, please advise.
In further review, the impervious surface areas exceeded the allowable 12 percent as
described in Chapter 10, Division 3, Article 11, See. 10-590 (d) of the Jackson County
Watershed Protection Ordinance. This has been corrected by revising the plans and
installing a gravel paver system instead of Heavy Duty Asphalt Paving.
Sincerely
•
'i•- M I -
M4 R N &W*J I I 1 -1
Cc: Tim Fox, Wiatt Wehunt, Joseph Carriker, Debora Hood, Tony Elders