Loading...
HomeMy WebLinkAbout20150029 Ver 1_SKMBT_C28015081010050_20150811N.OIER REfEIENCE NO. SNFft NO. C� f K-4908 EC-09/CONSTD9 / MV SHfR NO. PO.��W/.Y ORIGN HtDGU11C5 ENGMEFA ENGINEEII CULVERT CONSTRUCTION SEQUENCE STA. 41 + 56.10 -Ll- PHASE I PHASE II 7. CONSTRUCT STILLING BASIN (240 CYf. 4. REMOVE IMPERVIOUS DIKES A AND B, AND 24 INCH TEMPORARY PIPE, ALLOWING NORMAL FLOW THROUGH CULVERT. 2. CONSTRUCT IMPERVIOUS DIKES A AND B, AND INSTALL 24 INCH TEMPORARY PIPE, DIVERTING FLOW. 5. REMOVE STILLING BASIN. 3. CONSTRUCT PROPOSED CULVERT EXTENSION, FLOODPLAIN BENCH, AND INLEf CHANNEL IMPROVEMENTS. 6. COMPLEfE ROADWAY. NPD 8y SAS 2001 NAD By SRS 2p07 STORAGE ]4 INCH r140 CY� T�POMRY PIPE T �\ � �\ / �� \♦ / �5 � T� '� / �c,/ �,/ �i �c�/ \ UIPERVIOUS ��� �� DIKE B � \� �� �\ \ O �� � �� �� � �� � �� �` �� � �� �\F J �� IMPERVIDUS `��\ `��\ � OIKE A S \ � � � � ♦ % ��/�/ / j�%// ��` /%//// /%/�// "_� /� / /� / Fj"r� /// j/ Fj f� MOJER 0.FFE0.ENCE NO. SHEFf NO. �yj K-4908 ec-ioicoxsrne / I � � ! ww snen vo. 0.0AOWAY �ESIGN NYpMUI1C5 CULVERT CONSTRUCTION SEQUENCE STA. 15 + 59.42 -L3- E�G��fEp E����A PHASE I PHASE II 1. UiILIZE SKIMMER BASIN 8.1 AS SiILLING BASIN. 7�7���yy,�� 4. REMOVE IMPERVIOUS DIKES A AND B,AND 24 INCH TEMPORARY PIPE,ALLOWING NORMAL FLOW THROUGH CULVERT. 2. CONSTRUCT IMPERVIOUS DIKES A AND B, AND "'°T' ti�� � '°E, DIVERTING fLOW. 5. RETAIN SKIMMER BASIN 8.1 FOR ROADWAY CONSTRUCTION. 3. CONSTRUCT PROPOSED CULVERT EMENSION AND OUTLET CHANNEL IMPROVEMENTS. 6. COMPLEfE ROADWAY. hov- �y/d" �4h1-�� 2�° I � W ffN � �j3 lm��� �'�- af ���v�' ���w-���- N�3� SRS 2p07 NAp By SRS 2001 ����� ` /����\ / � '---- F3 ------'�--�—�� �1_---- \ � � / /� i� INCH TEMPORA0.V / / / PIPE / � Q UIPERVIOUS � / O DIKE B \ � � / v' `������ � ____� V) _ \ F3 �',,, ,— F--- --F3-- IMPFRVIOUS DIKE A �� /, / 50 x 24 x 3 50 x 24 x 3 7.5 inch Skimmer 1.5 inch Skimmer wiih 1.0 inch wi}h 1.0 inch Orifice Diomefer Orifice Diometer 7 fr. weir 7 fr. weir ID 8.1 ID 8.1