Loading...
HomeMy WebLinkAboutSW6101104_401 Certification Application_20121221Permit No. Ito be provided by DWQ) ®yy or0, WATego &*0 STORMWATER MANAGEMENT PERMIT APPLICATION FORM o7 NCDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. I.':,,,PROJECTiINFORMATION '4 `r&'v'F1 kS:+"r Project name TUAS Support Facility at Fat Bragg Contact person Nick Rightmyer Phone number 252-519.2135 Date 802010 Drainage area number 1 «2 (Bio Pond overflow discharges into this pond) II.'SDESIGN''INFORMATIONF..f.'�5,..�.:i`'�.y,4es_`,:ar+.,,- .v"'Sv ._a:x.rq`7 ��4.:�`"ia;"*3 °'?»P.�s;a Site Characteristics Drainage area 139,291.00 ft' (t2"1, 1154- t 2, 016) Impervious area 66,422.00 ft3(4afa 2.1b Impervious 0.48 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.11 in Rational C, pre -development 0.30 (unitless) Rational C, post -development 0.60 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.13 inmr Predevelopment 1-yr, 24-hr peak flow 0.12 ft'Isec Post -development 1-yr, 24-hr peak flow 0.24 ft'lsec Pre/Post 1-yr, 24-hr peak control 0.12 ft'/sec Storage Volume: Non -SA Waters Minimum required volume Provided volume 14,357.00 18,825,00 fl' \ ft' OK ( t 3, 2 ZZ-}5lrb3) Sediment storage volume provided N ry3 OK Storage Volume: SA Waters 1.5' runoff volume rya Pre -development 1-yr, 24-hr runoff volume It Post -development 1-yr, 24-hr runoff volume ft3 Minimum required volume If Provided volume rya Sediment storage volume provided rya Basin Design Parameters Drawdown time 3,00 days OK SHWT elevation first Basin bottom elevation 229.00 fmsl OK Storage elevation 228.50 fmsl Basin side slopes 3.0 :1 OK . Top elevation 234.00 fist OK Freeboard provided 1.00 it OK Basin Bottom Dimensions Basin length 115.00 it Basin width 15.00 It Length to width ratio 8.00 :1 OK Form SW401-Dry &tended Detention Basin-Rev.3 Parts 1.811, Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Additional Information Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build -out? Is a sediment depth indicator included? Does the basin include a drain? ac-in N (Y or N) Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Form SVJ401-Dry Extended Detention Basin-Rev.3 Pans I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found.An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below.lf a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C I.'A 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. C 1 JA 2. Plan details (V = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, - Maintenance access, - Outlet structure, - Overflow device, - Flow distribution detail for basin inflow, and - Vegetation specifications. No7 5 How 0 3. Section view of the basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. Q� C )• S 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. ++. T The supporting calculations. /�) 4 • 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. Y� A 9. A copy of the deed restrictions (if required). �n A i4 • 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Dry Extended Detention Basin-Rev.3 Part III. Required Items Checklist, Page i of 1 Lgin NCDENR urd be provided by DM) Of WATflO m � o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. - The Required Items Checklist (Pad fll) must be printed, filled out and submitted along with all of the required information. Project name TUAS Support Facility at Fort Bragg Contact name - Nick Rightmyer Phone number 252-519-2135 Date August2,2010 Drainage area number 1,. II.DESIGNINFORMATION tZ1'::s;av "�'1;,^' .;P"'r`M`'..:;`. �,`.r �, c^.,.•:,;^;4%I.ar�€'"°,�.cF'.r`z'"'st>i?, r Site Characteristics Drainage area 127,195 It' Impervious area 66,216 ft' Percent impervious 52.1% % Design rainfall depth 1.0 inch Peak Flow Calculations Is preipost control of the 1-yr, 24-hr peak flow required? - N (Y or N) 1-yr, 24-hr runoff depth 3.11 in 1-yr, 24-hr intensity 0.13 inmr Pre -development 1-yr, 24-hr peak flow -0.120 tt'Isec Post -development 1-yr, 24-hr peak flow 0.240 ft'Isec Pre/Post 1-yr, 24-hr peak control 0.120 ft'Isec Storage Volume: Non -SA Waters - Minimum volume required --5,496.0 Ili Volume provided 5.603.0 it' OK Storage Volume: SA Waters 1.5' runoff volume If Pre -development 1-yr, 24-hr runoff - ff' Post -development 1-yr, 24-hr runoff W Minimum volume required 0 ft3 Volume provided It' Cell Dimensions Fording depth of water 12 inches OK Pending depth of water 1.00 it Surface area of the top of the bioretention cell 6,394.0 ft' OK Length: 170 ff OK Width: 30 It OK -or- Radius It Media and Soils Summary Drawdown time, pendent volume hr Drawdown time, to 24 inches below surface m Drawdown time, total: 0 hr In -situ soil: Soil permeability 10.00 in/hr OK Planting media soil.. Soil permeability 2.00 inmr OK Soil composition %Sand (by volume) 86% OK % Fines (by volume) 10% OK Form SW401-eioretention-Rev.8 June 25, 2010 Pads I and II. Design Summary. Page 1 of 3 ms consultants, Inc. engineers, architects, planners 336 B Carthage Street Sanford, NC 27330 (919)774-7303 FAX: (9 19) 774-6109 www.msconsultants.com DRY DETENTION POND CALCULATIONS Runoff Volume using Simple Method (Section 3.3) Rainfall Depth Drainage Area = 139291 SF Drainage Area = 3.20 Ac Impervious Area = 66422 SF Impervious Fraction (IA) = 0.48 Runoff Coefficient (Rv) = 0.48 Rainfall Depth to control = 1 " Volume = 5562.029 cf Pre/Post Development Differece lyr 24 hr Rainfall Depth = 3.11 " Predev Drainage Area = 139291 sf Predev Impervious Area = 4870 Impervious Fraction = 0,034963 Predev Rv = 0.081466 Volume = 14357 cf Project Name : TUAS Project Number: 64-1281U .. Project Location : Fort Bragg, NC Designed by: NSR Date : 2-Aug-10 = Drainage Area / Impervious Area =0.05+(0.9'IA) = 3630' Depth' Rv' Area = Drainage Area / Impervious Area =0.05+(0.9`IA) = 3630 ' Depth ` ( Rv post -.Rv pre) ' Area Permit (to be provided by DWQ) % Organic (by volume) Phosphorus Index (P-Index) of media 4% OK Total: 100% 20 (unitless) OK Form SW401-Bioretention-Rev.8 June 25, 2010 Parts I and II. Design Summary, Page 2 of 3 Permit Number: fro be provided by DWq) Basin Elevations Temporary pool elevation 232.00 fmsl Type of bioretention cell (answer 'Y" to only one of the two following questions): Is this a grassed cell? (Y or N) Is this a cell with trees/shrubs? y (Y or N) OK media depth Planting elevation (top of the mulch or grass sod layer) 231 fmsl Depth of mulch 4 inches OK Bottom of the planting media soil 228 fmsl Planting media depth 3 ft Depth of washed sand below planting media soil 0 it Are underdrains being installed? N (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 0 ft the bottom of the cell to account for underdrains Bottom of the cell required 228 fmsl SHWT elevation fmsl Distance from bottom to SHWT 228 it . OK Internal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow fmsl Separation of IWS and Surface 231 ft Planting Plan Number of tree species 1 Number of shrub species 3 Number of herbaceous groundcover species 3 OK Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed (Y or N) Excess volume must pass through filler. through a vegetated filter? What is the length of the vegetated filled? ft Does the design use a level spreader to evenly distribute flow? N (Y or N) Show how flow is evenly distributed. Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP located at least 100 feel from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than TV Y (Y or N) OK Is the BMP located in a proposed drainage easement with access to Y (Y or N) OK a public Right of Way (ROW)? Inlet velocity (from treatment system) ft/sec Is the area surrounding the cell likely to undergo development in the N (Y or N) OK future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an'X' in the shaded cell) Gravel and grass (81inches gravel followed by 3-5 ft of grass) Grassed swale X OK Forebay Other Form SW401-Bioretention-Rev.8 June 25, 2010 Parts I and 11. Design Summary, Page 3 of 3 Permit No: (to be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C 1.4 1. Plans IV - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Cell dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROM, - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. C- t't,1 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Cell dimensions - Pretreatment system, - High flow bypass system, - Maintenance access, - Recorded drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), - Clean out pipe locations, - Overflow device, and - Boundaries of drainage easement. - Indicate the P-Index between 10 and 30 C II-18 3. Section view of the bioretention cell (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Underdrain system (if applicable), and - Bioretention cell layers [ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), (A+il rljed SHWT level(s), and overflow structure] 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: - Soil permeability, - Soil composition (%sand, %fines, %organic), and C jig - P-index. 5. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: - A variety of suitable species, - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. C 1' 6. A construction sequence that shows how the bioretention cell will be protected from sediment until the n ' ' entire drainage area is stabilized. 1r4+ 7. The supporting calculations (including underdrain calculations, if applicable). '2'.ZL `>`', S. A copy of the signed and notarized inspection and maintenance (I&M) agreement. <24 a 9. A copy of the deed restriction. Form SW401-Bioretention-Rev.7 Part III, Page 1 of 1 so DRAINAGE AREA 1 TO BIORETENTION DA = 127195 SF DRAINAGE AREA 3 FLOWS OFFSITE \DA = 17680 SF DRAINAGE AREA 2 TO DRY POND DA = 12096 SF 9 POST -DEVELOPMENT D.A.M. DRAINAGE AREA 4 FLOWS OFFSITE DA = 128879 SF or ms COOsuMnts, im. own�ndrm. cm.d a rwr s.i.� x.eawa,.a �u.s smm raraH von %ne www.ce �. unv C 1.4