Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6120801_Stormwater Report_20120822
A 51,1 G 12 o:�-O I LOT 1, AVERITT PROPERTIES CUMBERLAND COUNTY, NORTH CAROLINA STORMWATER / EROSION CONTROL NARRATIVE Prepared for: FULLBLOCK, LLC 321 NORTH FRONT STREET WILMINGTON, NC 28401 Prepared by: PA.RAMC)tJ-T*,4TE J= fV 1--71 1 fV F= 1= 1—� 1 N CD 1 N [: 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 Project n12113.1"E August 2012 �•SNflii Z, Z7f la "3FA L > fir 3�rr,��C LOT 1, AVERITT PROPERTIES CUMBERLAND COUNTY, NORTH CAROLINA Project #12113.PE Table of Contents Design Narrative Proposed Improvements Maintenance Erosion and Sedimentation Control Specification Soils Map USGS Map Calculations Page LOT 1, AVERITT PROPERTIES CUMBERLAND COUNTY, NORTH CAROLINA Project #12113.PE DESIGN NARRATIVE Fullblock, LLC proposes to construct a warehouse building at the corner of Airport Road (S.R. 2260) and Aviation Drive (a private street) within Cumberland County, NC. As a result, please find this design narrative, plans, and supporting calculations sufficient for the stormwater duality and quantity control according to NCDENR and Cumberland County regulations. The address of the property is 185 Airport Road, Fayetteville, NC 28306 with a latitude and longitude of 34' 59' 51" N, 78' 53' 31" W (Parcel ID# 0435-24-2118; Deed Book 8509 page 169). There is currently no existing impervious across the property and the ground cover is mostly fair open space with a few sparse trees. Soils consist of Wagram-Urban complex (WgB) and Lakeland -Urban complex, according to the provided soils map from NRCS and have a HSG classification of A. According to the attached USGS map, the project drains to Big Sandy Run which has a stream classification of C (18-31-25) and is within the Cape Fear River Basin. PROPOSED IMPROVEMENTS It is proposed that all runoff resulting from impervious surfaces will be collected by a storm drainage system and then be conveyed to a wet detention pond where stormwater quality requirements gill be met. The pond has been designed to NCDENR requirements which include a forebay and a drawdown orifice at permanent pool. Stormwater from greater storm events will be allowed to exit the wet detention pond by means of a riser barrel outlet structure and a secondary spillway during emergency situations. In regard to erosion control, please find that it is proposed to use the wet detention pond as a sediment basin during construction activities. As a result, please find that we have designed the sediment basin to NCDENR land quality requirements (per NCDENR Erosion and Sediment Control Design and Planning Manual (June 1.,", 2006)) and have also added a skimmer to the draw down orifice at permanent pool in order to prevent sediment from leaving the outlet structure prior to the site being fully stabilized. Other than the sediment basin, it is proposed to install inlet protection to the storm drain inlets to prevent sediment from entering the system as well as silt fence and temporary construction entrances along Aviation Parkway. Please see sheet C-1.0 for all Erosion Control and Sequence of Construction notes. The sedimentation and erosion control design will commence.as depicted in the construction sequence. Please find all reference material and stormwater / erosion control calculations in the following pages of this report. Note that some calculations have also been located on the plans for easy reference during construction. MAINTENANCE Contractors shall be responsible for periodic inspection and maintenance of all indicated erosion control devices in accordance with the plans and specifications. In addition, inspection and any necessary maintenance will be required immediately following any significant storm event. Any erosion control measure that fails to function as intended shall be repaired immediately. Upon completion of construction and the establishment of stabilized ground cover, the property owner shall be responsible for any on going site maintenance. EROSION AND SEDIMENTATION CONTROL SPECIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENT A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 WORK INCLUDED A. Contractor shall take every reasonable precaution throughout construction to prevent the erosion of soil and the sedimentation of streams, lakes, reservoirs, other water impoundments, ground surfaces, or other property as required by State and local regulations. B. Contractor shall, upon suspension or completion of land -disturbing activities, provide protection covering for disturbed areas. Permanent vegetation shall be established at the earliest practicable time. Temporary and permanent erosion control measures shall be coordinated to assure economical, effective, and continuous erosion and sediment control throughout the construction and post construction period. 1.3 RELATED SECTIONS A. Related Sections — The following Sections contain requirements that relate to this Section: 1. 01011 — Existing Underground Utilities 2. 01015 — Special Conditions for this Contract 3. 01070 — Shop Drawings, Project Data & Samples 4. 02200 — Earthwork, Excavation Trenching, and Backfilling 5. 02230 — Site Clearing 6. 02240 -- Dewatering 7. 02485 — Seeding General Areas 1.4 REGULATORY REQUIREMENTS A. Contractor shall be responsible for prevention of damage to properties outside the construction limits from siltation due to construction of the project. The Contractor will assume all responsibilities to the affected property owners for correction of damages that may occur. Erosion control measures shall be performed by the Contractor, conforming to the requirements of, and in accordance with plans approved by applicable state and local agencies and as per the erosion control portion of the construction drawings and these specifications. The Contractor shall not allow mud and debris to accumulate in the streets. Should the Contractor pump water from trenches during construction, appropriate siltation preventative measures shall be taken prior to discharge of pumped water into any storm drain or stream. PART 2 - PRODUCTS 2.1 Open mesh biodegradable mulching cloth,. 2.2 Fertilizer shall be 10-10-10 grade or equivalent 2.3 Lime shall be dolomitic agricultural ground 1 limestone containing not less than 10 percent magnesium oxide. 2.4 Phosphate shall be 20 percent super phosphate or equivalent. 2.5 Provide grass seed mixture as shown on the plans. 2.6 Silt fence shall consist of non -biodegradable filter fabric (Trevira, Mirafi, etc.) wired to galvanized wire mesh fencing and supported by wood or metal posts. 2.7 rNTCDOT Class B stone for erosion control. PART 3 - EXECUTION 3.1 CLEARING A. Clearing and grubbing shall be scheduled and performed in such a manner that subsequent grading operation and erosion control practices can follow immediately thereafter. Excavation, borrow, and embankment operations will be conducted such that continuous operation. All construction areas not otherwise protected shall be planted with permanent vegetative cover within 21 calendar days after completion of active construction. .1 3.2 STABILIZING A. The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion control devices or structures. All disturbed areas not to be paved and left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with either temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. 3.3 REGULATORY REQUIREMENTS A. Whenever land disturbing activity is Undertaken on a tract, a ground cover sufficient to restrain erosion must be planted or other wise provided within 21 calendar days on that portion of the tract upon which further active construction is to being undertaken. 3. If any earthwork is to be suspended for -any reason whatsoever for longer than 21 calendar days, the areas involved shall be seeded with vegetative cover or otherwise protected against excessive erosion during the suspension period. Suspension of work in any area of operation does not relieve the Contractor of the responsibility for the control of erosion in that area. PART 4 - CONSTRUCTION PHASE 4.1 PRACTICES A. Avoid dumping soil or sediment into any streambed or watercourse. Backfill for stream crossings shall be placed dry and compacted to minimize siltation of the watercourse, where applicable. 13. Maintain an undisturbed vegetative buffer where possible between a natural watercourse and trenching and grading operations. C. Avoid equipment crossings of streams, creeks, and ditches where practicable. PART 5 - SEDIMENT CONTROL FEATURES 5.1 GENERAL A. All devices (silt Fences, retention areas, etc.), for sediment control shall be constructed at the locations indicated prior to beginning excavation on the site. All devices shall be properly maintained in place until a structure or paving makes the device unnecessary or until directed to permanently remove the device. 5.2 DESIGN APPLICATIONS A. Mulch shall be used for temporary stabilization of areas subject to excessive erosion, and for protection of seed beds after planting where required. 1. jute, mesh, etc. should be installed as per manufacturer's instructions. 13. Silt fences shall be used at the base of slopes and in drainage swales to restrict movement of sediment from the site. Straw bales may be required for reinforcement. C. Riprap shall be used at the proposed outfall pipes as indicated on plans. D. Establish vegetative cover on all unpaved areas disturbed by the work. J. Preparation of Seedbed. Areas to be seeded shall be scarified a depth of 6 inches until a firm, well -pulverized, uniform seedbed is prepared. Lime, phosphorous, and fertilizer shall be applied during the scarification process in accordance with the following rates. a. Lime — 2 ton per acre b. Nitrogen —100 pounds per acre C. P:Os — 200 pounds per acre 2. Seeding. Disturbed areas along roads and ditches shall be permanently seeded with 10- 20 pounds per acre of centipede during the period from March through September. Seeding performed during the period from April to August shall be temporarily seeded with 40 pounds per acre of German Millet. The permanent vegetative cover will be over seeded at the earliest possible time as specified above. 3. Mulch all areas immediately after seeding. Mulch shall be applied and anchored as specified hereinbefore, 5.3 MAINTENANCE A. The Contractor shall be responsible for maintaining all temporary and permanent erosion control measures in functioning order. Temporary structures shall be maintained until such time as vegetation is firmly established and grassed areas shall be maintained until completion of the project. Areas which fail to show a suitable stand of grass or which are damaged by erosion shall be immediately repaired. 5.4 REMOVAL OF SEDIMENT CONTROL DEVICES A. Near completion of the project, when directed by the Owner's agent, the Contractor shall dismantle and remove the temporary devices used for sediment control during construction. All erosion control devices in seeded areas shall be left in place until the grass is established. Seed areas around devices and mulch after removing or filling temporary control devices. END OF SECTION 02410 Soil Map --Cumberland County, North Carolina h fn 692: 34' 59 59' r 34' 59 46" IJ iDLLOV 07LJ I 9yLJ9U 0.YGJ 1 1 1 1 a Y Map Scale: 1:5,450 d panted an A size {8.5" K 41 ") sheet. n '� N Meters 0 40 20 40 60 Feet 0 50 100 200 300 USA Natural {resources Web Soil Survey iNIIIIIIIIIIIIII Conservation Service National Cooperative Soil Survey m N t+1 N m 34' 59 57' JJ L�. n � P l n II� WA m M 7/30/2012 Pagel of 3 34" 59' 47" Soil Map—Cumbertand County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest (AOI) fZ Very Stony Spot Map Scale: 1:1,460 if printed on A size (8.5" x 11") sheet. 0 Area of Interest (AOI) wet Spot The soil surveys that comprise your AOI were mapped at 1:24,000. Solis Soil Map Units � Other Warning: Soil Map may not be valid at this scale. Special Point Features Special Line Features.4 Enlargement of maps beyond the scale of mapping can cause Blowout Gully misunderstanding of the detail of mapping and accuracy of soil line v Short Steep Slope placement. The maps do not show the small areas of contrasting ® Borrow Pit soils that could have been shown at a more detailed scale. Omer X Clay Spot Political Features Please rely on the bar scale on each map sheet for accurate ma Y p ♦ Closed Depression 0 Cities measurements. X Gravel Pit water Features Source of Map: Natural Resources Conservation Service Gravelly Spot ,- . Streams and Canals Web Soil Survey URL: http://websoilsurvey.nres.usda.gov Coordinate System: UTM Zone 17N NAD83 ® Landfill Transportation ,—, This product is generated from the USDA-NRCS certified data as of Lava Flow Rails the version date(s) listed below. ,k. Marsh or swamp interstate Highways Soil Survey Area: Cumberland County, North Carolina R Mine or Quarry US Routes Survey Area Data: Version 11, Jul 3, 2012 p Miscellaneous water Major Roads Date(s) aerial images were photographed: 6/21/2006 © Perennial water Local Roads The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background v Rock Outcrop imagery displayed on these maps. As a result, some minor shifting t Saline Spot of map unit boundaries may be evident. Sandy Spot — Severely Eroded Spot 0 Sinkhole Slide or Slip 0 Sodic Spot Spoil Area Q Stony Spot USDA Natural Resources Web Soil Survey 7/30/2012 21111111111 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Cumberland County, North Carolina Map Unit Legend Cumberland County, North Carolina (NC051) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Lbi3 Lakeland -Urban land complex, 1 to 8 percent slopes 1.2 23.5°% WgB Wagram-Urban land complex, 0 to 8 percent slopes 3.9 76.5°% Totals for Area of Interest 5.2 100.0% USDA Natural Resources Web Soil Survey 7/30/2012 2" Conservation Service National Cooperative Soil Survey Page 3 of 3 Depth to Water Table —Cumberland County, North Carolina M m 34° 59 59' 34" 59 43' MopScale 1:1,450 d prated on A see (8 S' x 11") sheer. N Meters m A 0 10 20 40 60 N Feet 0 50 100 200 300 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey D7LLN W/.S� DyGSw o'.1GJ I V 1 8 3' A ME ti 34' 59 57" n ti 16 34" 59 47" 30 m 7/30/2012 Page 1 of 3 Depth to Water Table —Cumberland County, North Carolina MAP LEGEND MAP INFORMATION Area of Interest (ACI) Map Scale: 1:1,460 if printed on A size (8.5" x 11") sheet. Q Area of Interest (A01) The soil surveys that comprise your AOI were mapped at 1:24,000, Solis Soil Map units Warning: Soil Map may not be valid at this scale. Soil Ratings Enlargement of maps beyond the scale of mapping can cause 0 0 - 25 misunderstanding of the detail of mapping and accuracy of soil tine placement. The maps do not show the small areas of contrasting 0 25 - 50 soils that could have been shown at a more detailed scale. Q 50 - 100 Please rely on the bar scale on each map sheet for accurate map 0 100 - 150 measurements. 150 - 200 Source of Map: Natural Resources Conservation Service [] > 200 Web Soil Survey URl_: http:l/websoilsurvey.nres.usda.gov Coordinate System: UTM Zone 17N NAD83 Political Features This product is generated from the USDA-NRCS certified data as of p Cities the version date(s) listed below. Water Features Soil Survey Area: Cumberland County, North Carolina 1- Streams and Canals Survey Area Data: Version 11, Jul 3, 2012 Transportation Date(s) aerial images were photographed: 6/21/2006 Rails The orthophoto or other base map on which the soil lines were .v Interstate Highways compiled and digitized probably differs from the background iv US Routes imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Major Roads Local Roads USDA Natural Resources Web Soil Survey 7/30/2012 am Conservation Service National Cooperative Soil Survey Page 2 of 3 Depth to Water Table —Cumberland County, North Carolina Depth to Water Table Depth to Water Table— Summary by Map Unit— Cumberland County, North Carolina INC051j Map unit symbol Map unit name Rating (centimeters) Acres in AOI Percent of AOI LbB Lakeland -Urban land >200 1.2 23.5% complex, 1 to 8 percent slopes WgB Wagram-Urban land 192 3.9 76.5% complex, 0 to 8 percent slopes Totals for Area of Interest 5.2 100.0% Description "Water table" refers to a saturated zone in the soil. It occurs during specified months. Estimates of the upper limit are based mainly on observations of the water table at selected sites and on evidence of a saturated zone, namely grayish colors (redoximorphic features) in the soil. A saturated zone that lasts for less than a month is not considered a water table. This attribute is actually recorded as three separate values in the database. A low value and a high value indicate the range of this attribute for the soil component. A "representative" value indicates the expected value of this attribute for the component. For this soil property, only the representative value is used. Rating Options Units of Measure: centimeters Aggregation Method: Dominant Component Component Percent Cutoff.' None Specified Tie -break Rule: Lower Interpret Nulls as Zero: No Beginning Month: January Ending Month. December Natural Resources Web Soil Survey 7/30/2012 Conservation Service National Cooperative Soil Survey Page 3 of 3 Tow o �6" � .' ' �Ir :.ti:. y S 1 .: )Q 'fir• � ` + i ' -J leid •L y1,\.k rr►•.'' - r-' �� h M _a-fi e' •' �...'. 'r•I .1•s `. ••� A�.a •'"�• i �� O it � `r � L,p ff�. ' rr •� ; _ � :' .a - •�.•. '- � �• . ;� �_• 3�ate� rr5 u tl s .i }tl4 :� • t�� e !V/ J^ �ti e'l.e�� + i } 10V_� �. Y •" �\ �* \S _ �' ri� � = ;�.,Q. � . \J' •.ti C Fib U ;'� .� � r'� �„t-�5 l '• 1� / Z20 .. J � ii��L �+J I. _ •�.�� - --• � • - _ J � _ � v - - � r� � ` f �v Y �:+.-> �i! ?-m,,'' � A.3- . - l 1131V' .� �h .rR.a �N _ems 1, ►,i 1 s v1 f \ Z. •ila ('ate K 'l I� �'��tx unE P. �'. `�• _ d• :�� I�r� � f q4 •l>� r -mil � �`r` �.�"` 1,` >f44 �f �t . _ i�f ; �.••:. ' /�} �.�•�I �/ I1 /�///fir� • r,5 / J Jr; �• � 'l Si��'��..�•�`� rs ` � � ��.�--1t, rw-- •i•� � �� r ����} � ,�7! {J _ 217r' �'��1. �,�� �T ��,-` L r14� %• % .F "F '• - .����j: ��f' � fj, l�%•�' �j;! _ �' SS ` ]� \ !' ter`/ % . ��� to , /,� i �/ {% � , � 1 � ��` � �, i�i � � �i J � � �•I , % �� ; f f emsv _ - .y,.��r �� YS�=-'' �• "r���� _1 `rr�a� �\%/ i1* �FsY2 C� S-`/�J�j Y7 \r�1y Fsadler11 / Mvnicipal�rport unici I !4r rtA ••�'C��i , �.rC ! f; : fir`%/ Zj =� -,: - P.' �� �Granng'Fro1d� • _GranniSpFie>d,` /l � � f �• l �f , r Gem �� �� R 1 ... ` 7t- j+ —: (J � '�%.• 4 •1 14 N / _�, f. `� \Cf /1✓ . ; it k4 � �}r �G•.J' � / 1..,; • ;�.' � ri: /�"f. �..., r~�' �.�' t� Gate �� \�'.i �� � 1. -�• . ; � : ��� �� � ' � , �..,, ,� ,.� � , 1 -11 [\\�\+I rcem -C:;p ,» Postm = '{i�'.} f•� �' `:.� { �``�r"� Qt'� 41 • \S8 dpi%�� �,��� —' tp�,� �.� ` IIII � ,/�g%.. � �y� % � ... 1, i, .fir-.�� � i� '�� �:. a, r�r,! y s• 4� 1 �� !1 � / ,� x• � "' I•,�1 / \' \ � i\. ��'�% � r�'� � } tt �/ram".' �'d •� `� � � �'� } �5,� � r I�� �1�. �\ � ' +1.11.�/R:"!f/`• ���'i �i�t �� �� �_% J�\���%�� � ��TYI��7! S'� � \ `� ., �� 17,�1:2f� -� �� Copyright (c) 1997, Maptech, Inc. 185 Airport Road, Fayetteville, NC NC DENR Retention Requirements Objective: design a wet detention basin with the following characteristics: a permanent water pool depth between 3- and 5-feet, a surface area that meets TSS removal requirements (values set by NC DENR and included here), a forebay that is approximately 20 % of the total pond volume, a temporary water pool sired to detain the initial 1.0 inch of rainfall runoff, an outlet device that drains the temporary water pool within 2-5 days, and a length -to -width ratio of approximately 3:1. Step 1: Determine the surface area required for 90% TSS removal Post -Development Conditions Total Drainage Area 4.49 ACRE Value from CAD Impervious Drainage Area 2.51 ACRE Value from CAD Impervious Cover 55.9% Impervious Cover -(Impervious Drainage Area)/(Total Drainage Area)*100% Elevation of Permanent Pool Surface 190.50 FT Value selected by designer Average Depth of Permanent Pool 3.30 FT Elevation of Wet Detention Pond Bottom 187.0 FT Value from CAD Approximate Pond Length 180 FT Value from CAD Approximate Pond Width 47 FT Value from CAD Len th:Width Ratio 4:1 Ratio=(Len th)1Width):1 Required SAIDA Ratio for 90% TSS Removal 3.450 Value from chart. Reference: "90% TSS Removal Required Permanent Pool Surface Area 61748 SF Required Surface Area=(Required SAIDA Ratio) Drainage Area) Provided Permanent Pool Surface Area 8,493 SF Interpolated value from stage -storage calculations Step 2: Determine the 1-inch runoff elevation within the wet detention pond. Runoff Coefficient, Rv 0.553 INIIN Rv=0.05+0.009'(% impervious) Required 1 A" Runoff Volume (Volume of 9.013 CF 1.0" Runoff Volume=l inch'Rv'1 foot/12 Temporary Pool) inch *(Total Drainage Area) Total Volnrne to he Controlled 901.1 CF Total Volume to be Controlled=(Volume Below Permanent_ _ Poo + fir_ 24hr. Runoff Volume) Storage Elevation at Required Volume 191.44 FT Value is interpolation based upon stage -storage values. See stage -storage calculations Step 3: Calculate the required forebay volume (18-22% of total pond volume) and compare to the forebay volume provided._ Total Pond Volume 17.104 CF Value from stage -storage calculations Required Forebay Volume 3,421 CF ForebaX Volume=(Total Pond Volume)*20% Provided Forebay Volume 3,339 CF Value from stage -storage calculations Provided Forebay Volume:Total Pond Volume 19.5% (Provided Forebay Volume)/(Total Pond Volume)' 100 % Sten 4: Verifv that time required to drawdown the 1.0-inch runoff volume is within 2 to 5 days Diameter of Proposed Low -Flow Orifice 1,25 IN Value chosen by designer Riser Elevation of Outlet Structure 192.35 FT Value chosen by designer (Total Elevation Head Above Orifice)=(Riser Total Elevation Head Above Orifice 1.85 FT Elevation) -(Elevation of Permanent Pool Surface) (Average Elevation Head Above Orifice)=((Storage Elevation at Required Average Elevation Head Above Orifice 0.62 FT Volume)+(Elevation of Permanent Pool Surface)P3-(Storage Elevation at Required Volume) Cd, Coefficient of Discharge 0.60 Value chosen by designer 0, Flowrate Through Low -Flow Orifice 0.032- CFS Q=Cd"(Pi)"((Diameter of Orifice) *(I fV12 in 2/4' 2'32.2' Ave a Head) 12 Drawdown Time for 1.0"Runoff 3.24 DAYS (Orawdown Time)=(1.0" Runoff Volume)/Q'(1 P:1ProjectslASlantic Brokerage112113.PE 185 Airport Road0ocumentslDesign CalculationslStormwaterlWel Pond Lot 1, 185 Airport Road, Fayetteville, NC Stage -Storage Calculations for Proposed Wet Detention Pond determine the storage capacity and characteristics of the proposed wet detention pond. Pond side slope above Permanent Pool 3 Veg. shelf 6" abovelbelow Perm. Pool 10 FT Side Slope below planted shelf 3 incremental and cumulative storage of the wet detention pond per contour interval Stage/Storage Above Permanent Pool (Including Forebay) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 190,50 8,493 0 0 --Permanent Pool 191,00 10,772 4.816 4,816 192.00 12,214 11,493 16,309 193.00 13,714 12,964 29,273 194.00 15,269 14.492 43,765 StagelStorage Total Pond Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 187.00 2,676 0 0 ---Pond Bottom 188.00 3,786 3,231 3,231 189.00 5,039 4,413 7,644 190.00 6,424 5,732 13,375 190.50 8,493 3,729 17,104 ---Permanent Pool 191.00 10,772 4,816 21,921 191.44 11,386 4,875 26,795 Temporary Pool 192.00 12,214 11,493 33,414 193.00 13,714 12,964 46,378 194.00 15,269 14,492 60,869 Forebay Only (20% of Total Pond) Cumulative Contour Incremental Volume, S Contour Area (SF) Volume (CF) (CF) 187,00 571 0 0 -- Bottom Elev, 188.00 894 733 733 189.00 1,287 1,091 1,823 190.00 1,745 1,516 3,339 Forebay Volume P:1ProjectslAtlantic Brokerage112113.PE 185 Airport Road0ocuments0esign CalculationslStormwaterMet Pond Project Name: 185 Airport Road Client: Atlantic Brokerage Project Number: 12113.PE Prepared By: GLM Date: 8/3/12 Average Depth Calculation: (Option 2 per Errata) *!Vote: Only used areas relative to the main pond Pond #1 ABottom shelf = 4,679 sf ABottom Pond = 2,105 sf APerm Pool = 8,493 Sf Depth = 4.0 ft davq = 3.3 ft PARAM_OUNTE 1= N C., I N f= 1= It 1 N r'.. I N C: Project Name: Client: Lot 1A, 185 Airport Road - — — - --- ..... Atlantic Brokerage pARA M O UNT E Project Number: 12113.PE Prepared By: GLM Date: 7/30112 Basin: DA #1 [PRE] Drainage area= 4.49 acres = 0.007 mil Area Calculations Land Use Area Ac. % of Basin Existing Impervious (Total) = 0.00 0.0% Open Space - Fair 4.49 100.00/0 Sum: 4.49 10011/0 Project Name: Lot 1A, 185 Airport Road /� Client: Atlantic Brokerage PARAMOUNTE Project Number: 12113.PE N ti N Prepared By: GLM Date: 7/30/12 Basin. DA #1 [PRE] Drainage area= 4.49 acres = 0.007 miz Curve Number HSG: A B C D Sum 0/6 of Basin 100.0 0.0 ,'.0.0 0.0 100.0 Land Use % of Basin CN A CN B CN C CND Weighted CN Open Space - Fair 100.0 49 59 79 84 49.00 Impervious 0.0 98 98 98 98 0.00 Sum: 100.0 Sum: 49.00 Curve numbers taken from: TR-55 Use: 49 = values input by user = values calculated by spreadsheet Project Name, Lot 1A. 155 Airport Road Client: Atlantic Brokerage pp, R A M: OUN TE Project Number: 12113.PE Prepared By: GLM Date: 7130/12 Basin: DA #1 [PRE] Drainage area= 4.49 acres = 0.007 miz Time of Concentration Overland Flow Hydraulic Length = 667 ft. Slope = 0.67 Ground Cover = Short Grass V (Figure 12.7) = 0.57 fps T M 19.5 min. T{ = 19.5 min. *Use 5 minutes min. 0 Project Name: Lot 1A. 185 Airport Road — -- ---- - - -- - --- Ghent: Atlantic Brokerage p�:RA M o UNTE Project Number: 12113.PE Prepared By: GLM Date: 7/30112 Basin: DA #1 [POST] Drainage area= 4.49 acres = 0.007 mi' Area Calculations Land Use Area Ac. % of Basin Impervious (Total) = 2.51 55.9% Open Space - Good 1.98 44.111/o Sum: 4.49 100% I Project Name: Lot 1A, 185 Airport Road Client: Atlantic Brokerage PA RA M OUN TE Project Number: 12113.PE ti z Prepared By: GLM Date: 7130/12 Basin: DA #1 [POST] Drainage area= 4,49 acres = 0.007 miz Curve Number HSG: A B C D Sum of Basin 100.0 0.0 0.0 0.0 100.0 Land Use % of Basin CN A CN B CN C CN D Weighted CN Impervious 55.9 98 98 98.- 98 54.78 Open Space - Good 44.1 39 51 74 80 17.20 Sum: 100.0 Sum: 71.98 Curve numbers taken from: TR-55 Use: 72.00 = values input by user = values calculated by spreadsheet I Project Name: Lot 1A, 185 Airport Road_.._._..........._.._..._....._..........._..----_._..._._.._. Cher t. Atlantic Brokerage PA I RA_M0 UNTE Project Number, 12113.PE Prepared By: GLM Date: 813112 Basin: DA #1 [POST] Drainage area= 4.49 -acres = 0.007 miz Time of Concentration Overland Flow Hydraulic Length = 300 ft. Slope = 1 0/0 Ground Cover = Grass / Pav V (Figure 12.7) = 2 fps T = 2.5 min. Tc = 5.0 min. 0 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 0.047 1 888 1,265 ---- ------ ------ Pre-dev 2 SCS Runoff 4.078 1 725 13,783 ---- ------ ------ Post-dev 3 Reservoir 0.043 1 1444 5,095 2 191.63 12.089 Wet Pond I I Wet Pond.gpw Return Period: 1 Year Monday, Jul 30, 2012 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (Cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 2.281 1 741 13,916 ---- ------ ------ Pre-dev 2 SCS Runoff 14.17 1 725 43,794 ---- ------ ------ Post-dev 3 Reservoir 2018 1 759 27,918 2 192.45 22,179 Wet Pond Wet Pond.gpw Return Period: 10 Year Monday, Jul 30, 2012 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 4.361 1 737 23,050 ------ ------ Pre-dev 2 SCS Runoff 19.46 1 725 59,944 ---- ------ ------ Post-dev 3 Reservoir 4.977 1 748 44,042 2 192.79 26,479 Wet Pond Wet Pond.gpw Return Period: 25 Year Monday, Jul 30, 2012 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 6.399 1 736 31,726 ; ------ ------ Pre-dev 2 SCS Runoff 23.97 1 725 73,912 ---- •----• ------ Post-dev 3 Reservoir 10.69 1 736 57,992 2 192.95 28,594 Wet Pond Wet Pond.gpw Return Period: 50 Year Monday, Jul 30, 2012 Hydrograph Summary Report Hydraflow Hydrographs by In,elisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 8.730 1 735 41,624 ---- ------ ------ Pre-dev 2 SCS Runoff 28.73 1 725 88,865 ---- ------ ------ Post-dev 3 Reservoir 18.64 1 730 72,929 2 193.10 30.704 Wet Pond Wet Pond.gpw Return Period: 100 Year Monday, Jul 30. 2012 0 'At Dc — C', k a - -� q- c : f's ,jvre u: vnczzivp 1:zii:l .: :000�: rL:d rnioi;iwrl :;vli,,Xv: 4 tow"" Project Name: Lot 1A, 185 Airport road Client: Atlantic Brokerage Project Number: 12113.PE Prepared By: GLM Date: 7/30/2012 SEDIMENT BASIN CALCULATIONS [Designed Per NCDENR Erosion Control Design Manual (6.61)] Drainage Area (100 Ac. Max.) = 4.35 Ac. QIo r. CaICS: Impervious Area = 2.51 Ac. Denuded Area = 1.84 Ac. Impervious Area % of Basin = 57.70 % Denuded Area % of Basin = 42.30 % P A RA M OUNTE Curve Number HSG: A B C D Sum of Basin 100.0 0.0 0.0 0.0 100.0 Land Use % of Basin CN A CN B CN C CN D Weighted CN Impervious (Pavement/Roof Top) 56.1 98 98 98 98 55.00 Dirt 43.9 72 82 87 89 31.59 Sum: 100.0 Sum: 86.59 Curve numbers taken from: TR-55 Use: 87 Tc *= 5.00 min. - (Pipe Flow from Hydraflow Storm Sewer Analysis) Q,O,,. (From Hydraflow) = 14.17 cfs r • SEDIMENT BASIN CALCULATIONS Requirements: Min. Surface Area (435 sf/cfs) _ Min. Volume (1,800 cf/Ac.) = Provided: Basin Volume: 6,164 sf 7,830 cf Contour Contour Area (SF) Incremental Volume (CF) Cumulative Volume (CF) 187.00 2,676 0 0 188.00 3,786 3,231 3,231 189.00 5,039 4,413 7,644 190.00 6,424 5,732 13,375 190.50 8,493 3,729 17,104 191.00 10,772 4,816 21,921 192.00 12,214 11,493 33,414 192.35 12,719 4,363 37,777 192.75 13,320 5,208 42,985 193.00 13,714 3,379 46,364 194.00 15,269 14,492 60,855 Outlet Structure (See Hydraflow Data): Riser EL. (Principal Spillway)= 192.35 Weir EL. (Emergency Spillway)= 192.75 Proposed Sediment Storage EL. = 191.00 Volume at Proposed EL. = 21,921 cf Surface Area at Proposed EL. = 10,772 sf Pond Dimensions: (@ Principal Spillway El.) Length = 200 ft Width = 71 ft L to W Ratio = 3:1 pARA Mo uN TE F. N .. - N r F_ R I - r- . . - r- Skimmer Discharge Elevation Riser Structure Elevation Emergency Spillway Elevation Skimmer Design: (SEE ATTACHED FAIRCLOTH SKIMMER SELECTION CHART) *Outflow EL. = 190.50 * = Note that the calculated basin volume for dewatering is the difference in the volumes at EL. 192.35 and EL. 190.50 and not from the bottom of the basin. Drawdown Orifice Check Dewater Vol. = 20,673 cf Average Head = 0.62 ft Ca = 0.6 D = 1.5 inches Tpewater = 5 days 1 Determining the Skimmer Size and the Required Orifice for the Faircloth Skimmer®S u rfa ce Drain November 2007 Important note: The orifice, sizing chart in the Pennsylvania Erosion Control Manual and reproduced in the North Carolina Design Manual DOES NOT APPLY to our skimmers. It will give the wrong size orifice and not specify which size skimmer'is required. Please use the information below to choose the size skimmer required for the basin volume provided and determine the orifice size required for the drawdown time, typically 4-7 days in Pennsylvania and 3 days in North Carolina. The size of a Faircloth Skimmer', for example a 4" skimmer, refers to the maximum diameter of the skimmer inlet. The inlet on each of the 8 sizes offered can be reduced to adjust the flow rate by cutting a hole or orifice in a plug using an adjustable cutter (both supplied). Determining the skimmer size needed and the orifice for that skimmer required to drain the sediment basin's volume in the required time involves two steps: First, determining the size skimmer required based on the volume to be drained and the number of days to drain it; and Second, calculate the orifice size to adjust the flow rate and "customize" the skimmer for the basin's volume. The second step is not always necessary if the flow rate for the skimmer with the inlet wide open equals or is close to the flow rate required for the basin volume and the drawdown time. Both the skimmer size and the required orifice radius for the skimmer should be shown for each basin on the erosion and sediment control plan. Make it clear that the dimension is either the radius or the diameter. It is also helpful to give the basin volume in case there are questions. During the skimmer installation the required orifice can be cut in the plastic plug using the supplied adjustable cutter and installed in the skimmer using the instructions provided. The plan review and enforcement authority may require the calculations showing that the skimmer used can drain the basin in the required time. Determining the Skimmer Size Step i. Below are approximate skimmer maximum flow capacities based on typical draw down requirements, which can vary between States and jurisdictions and watersheds. If one 6" skimmer does not provide enough capacity, multiple skimmers can be used to drain the basin. For drawdown times not shown, multiply the 24-hour figure by the number of days required. Example: A basin's volume is 29,600 cubic feet and it must be drained in 3 days. A 3" skimmer with the inlet wide open will work perfectly. (Actually, the chart below gives 29,322 cubic feet but this is well within the accuracy of the calculations and the basin's constructed volume.) Example: A basin's volume is 39,000 cubic feet and it must be drained in 3 days. The 3" skimmer is too small; a 4" skimmer has enough capacity but it is too large, so the inlet will need November 6, 2007 s to be reduced using step 2 to adjust the flow rate for the basin's volume. (It needs a 3.2" diameter orifice.) 1 %" skimmer; 1,728 cubic feetin 24 hours 6,912 cubic feet in 4 days with a 1'/2" head 3,456 cubic feet in 2 days 12,096 cubic feet in 7 days 5,184 cubic feet in 3 days 2" skimmer: 3,283 cubic feet'in 24 hours 13,132 cubic feet in 4 days with a 2" head 6,566 cubic feet in 2 days 22,982 cubic feet in 7 days 9,849 cubic feet in 3 days 21/2" skimmer: 6,234 cubic feet in 24 hours 24,936 cubic feet in 4 days with a 2.5" head 12,468 cubic feet in 2 days 43,638 cubic feet in 7 days Revised 11-6-07 18,702 cubic feet in 3 days 3" skimmer: 9,774 cubic feet in 24 hours 39,096 cubic feet in 4 days with a 3" head 19,547 cubic feet in 2 days 68,415 cubic feet in 7 days 29,322 cubic feet in 3 days 4" skimmer: 20,109 cubic feet in 24 hours 80,436 cubic feet in 4 days with a 4" head 40,218 cubic feet in 2 days 140,763 cubic feet in 7 days Revised 11-6-07 60,327 cubic feet in 3 days 5" skimmer: 32,832 cubic feet. in 24 hours 131,328 cubic feet in 4 days with a 4" head 65,664 cubic feet in 2 days 229,824 cubic feet in 7 days 98,496 cubic feet in 3 days 6" skimmer: 51,840 cubic feet in 24 hours 207,360 cubic feet in 4 days with a 5" head 103,680 cubic feet in 2 days 362,880 cubic feet in 7 days 155,520 cubic feet in 3 days 8" skimmer: 97,978 cubic feet in 24 hours 391,912 cubic feet in 4 days with a 6" head 195,956 cubic feet in 2 days 685,846 cubic feet in 7 days CUSTOM 293,934 cubic feet in 3 days MADE BY ORDER CALL! Determining the Orifice Step 2. To determine the orifice required to reduce the flow rate for the basin's volume and the number of days to drain the basin, simply use the formula volume _ factor (from the chart below) for the same size skimmer chosen in the first step and the same number of days. This calculation will give the area of the required orifice. Then calculate the orifice radius using Area = Tr rz and solving for r, r=1(Areal3.14) .The'supplied cutter can be adjusted to this radius to cut the orifice in the plug. The instructions with the plug and cutter has a ruler divided into tenths of inches. Again, this step is not always necessary as explained above. An alternative method is to use the orifice equation with the head for a particular skimmer shown on the previous page and determine the orifice needed to give the required flow for the volume and draw down time. C = 0.59 is used in this chart. Example: A 4" skimmer is the smallest skimmer that will drain 39,000 cubic feet in 3 days but a 4" inlet will drain the basin too fast (in 1.9 days) To determine the orifice required use the factor of 4,803 from the chart below for a 4" skimmer and a drawdown time of 3 days. 39,000 cubic {November 6. 2007 1 2 r feet - 4,803 = 8.12 square inches of orifice required. Calculate the orifice radius using Area = n r2 and solving for r, r = (8.1 2 / 3. i 4) and r = 1.61 ". As a practical matter 1.6" is about as close as the cutter can be adjusted and the orifice cut.. Factors (in cubic feet of flow per square inch of opening through a round orifice with the head for that skimmer and for the drawdown times shown) for determining the orifice radius for a basin's volume to be drained. This quick method works because the orifice is centered and has a constant head (given above in Step 1). V/2" skimmer: 960 to drain in 24 hours 3,840 to drain in 4 days 1,920 to drain in-2 days 6,720 to drain in 7 days 2,880 to drain in 3 days 2" skimmer: 1,123 to drain in 24 hours 4,492 to drain in 4 days 2,246 to drain in 2 days 7,861 to drain in 7 days 3,369 to drain in-3,days 2%" skimmer: 1,270 to drain in 24 hours 5,080 to drain in 4 days Revised 11-6-07 2,540 to drain in 2 days 8,890 to drain in 7 days 3,810 to drain in 3 days 3" skimmer: 1,382 to drain in 24 hours 5,528 to drain in 4 days 2,765 to drain in 2 days 9,677 to drain in 7 days 4,146 to drain in 3 days 4" skimmer: 1,601 to drain in 24 hours 6,404 to drain in 4 days Revised 11-6-07 3,202 to drain in 2 days 11,207 to drain in 7 days 4,803 to drain in 3 days 5" skimmer: 1,642 to drain in 24 hours 6,568 to drain in 4 days 3,283 to drain in 2 days 11,491 to drain in 7 days 4,926 to drain in 3 days 6" skimmer: 1,814 to drain in 24 hours 7,256 to drain in 4 days 3,628 to drain in 2 days 12,701 to drain in 7 days 5,442 to drain in 3 days 8" skimmer: 1,987 to drain in 24 hours 7,948 to drain in 4 days 3,974 to drain in 2 days 13,909 to drain in 7 days 5,961 to drain in 3 days J. W. Faircloth & Son, Inc. Post Office Box 757 412-A Buttonwood Drive Hillsborough, North Carolina 27278 Telephone (919) 732-1244 FAX (919) 732-1266 FairclothSkimmer.com jwfaircloth@embargmail.com Orifice sizing Revised 2-2-01, 3-3-05; 2-1-07: 11-6-07 November 6, 2007 3