Loading...
HomeMy WebLinkAboutR5861_Rdy_detour_permitsheets_addendumP P PPES18" 24" RCP-III2 ELBOWS18" w/ 2 ELBOWS24" w/BSTUS19/129 BLAI RSVI LLE HW Y 27' PAVED ROADW AYUS19/129 BLAIRSVILLE HWY 26' PAVED ROADWAY BROKEN ASPHALT/GR4SBW (48") 4SBW(48")GRLT 1.5SFD LT ANDREA MORROW RDGR 1SFD WALL RETAINING 10" CONC MTL MTL WOODS W OODSWOODS WOODS SIGN GEORGIANORTH CAROLINAGEORGIANORTH CAROLINAEI PEI PR/ W MONEIP N 87°43'02" WN 84°17'00" W86.50'N 84°41'56" W98.80'N 87°37'03" W24.12'1.51' R/W TO EIPN 11°50'47" W 389.13'N 85°52'50" E342.13' TOTAL0.63' EIP TO R/WEX I STI NG R/ WEXISTING R/ W N 11°50'47" W 735.70' N 11°50'47" W 252.00' S 72°02'38" E 11.43'S 80°17'32" E103.97'N 19 °36'03 " E 203 .84'S 72°02'38" E158.73'S 72°02'38" E75.26'S 72°02'38" E277.09'N 15°16 '24" E 150 .03 '353.26' COR TO R/WN 84°50'38" W362.22'N 25°00'49" W 40.29'N 13°00'58" W 53.04' N 03°59'23" W 79.43' N 08°53'42" E 35.27' N 15°38 '14" E 118 .93 ' S 82°53'14" E 35.41'N 82°21'30" W148.61'S 84°48'29" E71.47'S 89°29'23" E26.44'N 82°55'15" E27.32'N 74°24'25" E34.16'N 68°07'17" E12.82'N 67°37'20" E44.45'100.00'100.00'100.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W TANK SEPTIC LINES DRAIN TANK SEPTIC JAMES S. SCROGGS DB 1337 PG 369 DB 222 PG 11 DB 1337 PG 365 DB 1337 PG 373 JAMES TANNER DB 896 PG 82 DB 1475 PG 506 PC B SLIDE 154A DB 414 PG 149 JAMES TANNER JAMES TANNER DB 896 PG 82 SARA INC PC C SLIDE 112 DB 1188 PG 1 SOIL & GRAVELESTATE WILMA EVA HUGHES AND LARRY EUGENE KEPHART TRACEY MORROW KEPHART DB 1337 PG 373 KEPHART LARRY EUGENE KEPHART AND TRACEY MORROW AMY MICHELLE HOGSED TRACY MORROW KEPHART, ET AL TRACY MORROW KEPHART, ET AL 15" CMP 15 " CMP 6 0 " RCP4 8" CMP 18" CMPCONC HWHW CONC INV=1688 .88 'INV=1693.60' Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/ 2011 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 2B-1R-5861 9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_1_psh2B-1.dgnesp8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -L_DET1-MATCHLINE -L_DET1- STA. 22+00 SEE SHEET 2B-2www.rkk.com Engineers | Construction Managers | Planners | Scientists SEE SHTS. 4 & 5 FOR R/W AND EASEMENT STATIONS/OFFSETS ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE FOR TRAFFIC CONTROL PLANS SEE SHTS. TMP-1 THRU TMP-56 FOR -L_DET1- PROFILE SEE SHT. 38 FOR DITCH DETAILS SEE SHTS. 2D-1 & 2D-2 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY 5 2 3 4 6 3 7 1 7 F F C C F F F C F C F F F F FF F -L_DET1-PT Sta. 15+76.12 -L_DET1- PRC Sta. 13+79.36 BEGIN CONSTRUCTION -L_DET1- SE=0.06 SE=0.06 -L_DET1- DS = 50 MPH DS = 50 MPH RO = 140 RO = 140 -L-10+0015+00 20+00 PI Sta 11+93.13 D L = 379.36' T = 193.13' R = 835.00' PI Sta 14+78.25 D L = 196.76' T = 98.90' R = 835.00' 10 + 00 15+00 20+00 TEMP GREU TL -3 GREU TL-3 TEMP GREU TL-3 TEMP IA TL-3 TEMP -L_DET1- PT Sta. 19+73.82 (22.00' RT) BEGIN TEMPORARY SHORING 0.34' RT. -L- POC Sta. 12+09.43 -L_DET1- PC Sta. 10+00.00= SEE DETAIL F W/ CL I RIPRAP CHANNEL CHANGE RETAI NRETAINCOLLAR D1-2 D1-3 D1-1 RETA IN D1-7 D1-5 D1-4 D1EX1 W/10 SY GEOTEXTILE 3 TONS CL B RIPRAP COLLAR2GIB-NSS RETAINRETAI NSEE DETAIL H W/ CL B RIPRAP TOE PROTECTION IN FRONT OF WALL. ADD CLASS A RIPRAP PROTECTION OF TEMPORARY RETAINING WALL, IF NO DITCH PRESENT IN FRONT SEE DETAIL B LATERAL V DITCH ELEV. 1725.8' FS MIN D1-6 FS 2GIB-NSS ON BANKS ONLY W/75 SY GEOFAB 40 TONS CL I RIPRAP REMOVE 9' EX. 18" CMP D1EX7TEMP 6 0 " 18" TEMP18" TEMP 18" TEMP D1-23D1-25 D1-26 W/7 SY GEOTEXTILE 2 TONS CL B RIPRAP 18" TE MP SEE DETAIL F W/ CL I RIPRAP CHANNEL CHANGE SEE DETAIL H W/ CL B RIPRAP TOE PROTECTION COLLAR TEM P 15 " PHASE 3 DRIVEWAY IN TCP TEMPORARY ALIGNMENT OF PIPES ELONGATED FOR TO 18" D1-1 POSITIVE DRAINAGE ALONG -L_DET1- FINAL GRADE, NEED TO ENSURE AS -L- IS CUT DOWN TO RETAIN REMOVE HW REMOVE HW 15" 15" P P P P P P PPES REM OVE48" RCP-III (BURIED 0.8')15" 15" 2 ELBOWS15" w/ PPES 26' PAVED ROADWAYUS19/129 BLAIRSVILLE HWY GR GR 1SFD WOODS WOODS S S S SIGN T T EIP R/W MON EIP S 5 1°3 3'2 7" W7 10.7 5' C OR T O R/W1.0 6' R/W T O EIP100.00' EXISTING R/W EXISTING R/W TANKSEPTIC LINE DRAIN JANET B. STILES MURPHY HIGHWAY LLC DB 1325 PG 30 PC A SLIDE 166DB 1001 PG 508 ASPHALT 19' PAVED ROADWAY SR 1664 JIM CORDELL RD 20.5' PAVED ROADWAYSR 1590 MOCCASIN CREEK RDUS19/129 BLAIRSVILLE HWY 26' PAVED ROADWAY CONC GR GRCONC RETAINING WALL 7" WD BST CONC CONC 1SMTLBUS WALL RETAINING 7" WD GR WALL RETAINING 7" WD COOP CHICKEN CAN 2SFD WALL RETAINING 12" WD CONC 18" WD 18" WD 18" WD WALL RETAINING 8" WD BST GR 1SFD 1SFD 1SFD GR BST MTL WOODS WOODS WOODS WOODS WOODS WOODS SIGN SIGN SIGN SIGN SIGN SIGN SIGN T Frontier Communications of America Inc.N 78°43'36" W189.26'N 83°02'34" W145.69'S 13°36 '25" W 299.49 'N 24°07'29" E471.93' EIP S 65°22'04" E88.21'S 77°41'00" E96.72' R/W TO COR13.52' EIP TO R/WN 87°32'00" E417.12'R/W MON R/W MON R/W MON N 73°07'17" W39.11'N 67°30'17" W57.18'N 72°22'17" W66.84'N 73°29'17" W76.60'100.00'100.00' EXISTING R/W EXISTING R/W EXISTING R/WEXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/W 50. 0 0'EXISTING R/WEXISTING R/WEXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W S 07°06'57" W 156.70'TEIPTANK SEPTIC LINE DRAIN LINES DRAIN 20.00' 20.00'1.27'72" W DASPHS 81°40'06" E105.44'TANK SEPTIC LINES DRAIN LINES DRAIN TANK SEPTIC DB 944 PG 168 JAMES S. SCROGGS RICHARD S. HOHMAN DB 1122 PG 786 JANET B. STILES JANET B. STILES PC A SLIDE 166 DB 1001 PG 508 JANET B. STILES DB 955 PG 375 DAVID HOBBY DB 1607 PG 591 CHRISTOPHER W. WOOD JANET B. STILES DB 1441 PG 323 PC A SLIDE 166 DB 1001 PG 508 NATION JOHNNY R. PG 119 DB 479 PC A SLIDE 166 DB 1001 PG 508 27' PAVED ROADWAYUS19/129 BLAIRSVILLE HWY AND LARRY EUGENE KEPHART TRACEY MORROW KEPHART DB 1337 PG 373 JASON AND CHRISTINA HOBBY LIVING TRUST DB 1692 PG 1374 TRACY MORROW KEPHART, ET AL WELL DRILLED WELL BORED CONC 36" CMP 30" CMPCONC HW 15" CMP 18" CMP18" CMP 15" CM P18" CMP36" CMP18" CMPCONC HW CONC HW CONC HW CONC HW 8" HDPETResponsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 2B-2R-5861 9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_1_psh2B-2.dgnesp8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/ 2011 -L_DET1-MATCHLINE INSETMATCHLINE INSETMATCHLINE -L_DET1- STA. 22+00 SEE SHEET 2B-1-L- STATION/OFFSETS SEE SHTS. 5 AND 6. FOR R/W AND EASEMENT www.rkk.com Engineers | Construction Managers | Planners | Scientists ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE FOR TRAFFIC CONTROL PLANS SEE SHT. TMP-1 THRU TMP-56 FOR -DET_Y1- PROFILE SEE SHT. 42 FOR -L_DET1- PROFILE SEE SHT. 38 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY 11 12 8 13 13 13 14 9 10 C C FF 13 15 -L_DET1- PC Sta. 27+13.93 -L_DET1- SE=0.04 -L- DS = 50 MPH RO = 90' 25+00 30+00 35+00 PI Sta 33+73.45 D L = 1,296.84' T = 659.52' R = 2,895.00' 25+00 30+00 35+00 -L_DET1- -L- GREU TL-3 TEMP TEMP. GREU TL-3 IA TL-3TEMP PI Sta 12+46.36 D L = 195.50' T = 117.48' R = 150.00' 10+00 -DET_Y1- POT Sta. 10+00.00 -DET_Y1- PC Sta. 11+28.89 -DET_Y1- SE=0.04 DS = 25 MPH RO = 90' -L_DET1- POT Sta. 25+00.00 -DET_Y1- PT Sta. 13+24.39 = -L_DET1- PT Sta. 28+41.82 (22.00' RT) END TEMPORARY SHORING GREU TL-3TEMP. 6 AND LARRY EUGENE KEPHART TRACEY MORROW KEPHART DB 1337 PG 373 C F F C F C C C C C C F F C F F F F F F CF ELEV. = 1745.61 109.21' RT -L- 38+80.35 BM#2 40+00 40+00 -L_DET1- GREU TL-3 TEMP. 51.08' LT. -L- POT. Sta. 42+38.95 -L_DET1- PT Sta. 40+10.78 = END CONSTRUCTION RETAIN D1-18 W/21 SY GEOTEXTILE 8 TONS CL B RIPRAP D1-17 D1EX6 COLLAR RETAI N2GIB-NSS C H A N N EL R EESTA BLISH ED D ETO U R A LIG N M EN T IS R EM O V ED & B O X D 1-22 TO M A IN TA IL FLO W U N TIL PR O PO SED PIPE 0601/0602 TO JU N C TIO N D U RIN G C O N STR U C TIO N C O N N EC T FIN A L RETAIN 15" TEMP 30" TEMP D1-21 D1-9 D1-8 D1EX2 RETAINREMOVE RETAIN RETAI ND1-20 D1-10 D1-11 D1EX3 2GIB-NSS D1-14 D1-13 D1EX4 D1-16 D1-15 D1EX5JB w/MH RETAINRETAINON BANKS ONLY W/50 SY GEOTEXTILE 26 TONS CL I RIPRAP RETAI N2GIB-NSS W/10 SY GEOTEXTILE 3 TONS CL B RIPRAP SEE DETAIL H W/ CL B RIPRAP TOE PROTECTION SEE DETAIL H W/ CL B RIPRAP TOE PROTECTION D1-12 D1-19 SEE DETAIL H W/ CL B RIPRAP TOE PROTECTION REMOVE 11' EX. 18" CMP TB JB w/MH FS JB w/Slab Lid JB w/Slab Lid JB w/MH SP. DET. D1-22 CHANNEL REESTABLISHED ALIGNMENT IS REMOVED & MAINTAIN FLOW UNTIL DETOUR TO JUNCTION BOX D1-19 TO FINAL PROPOSED PIPE 0509 DURING CONSTRUCTION, CONNECT CHANNEL REESTABLISHED DETOUR ALIGNMENT IS REMOVED & BOX D1-22 TO MAINTAIL FLOW UNTIL PROPOSED PIPE 0601/0602 TO JUNCTION DURING CONSTRUCTION CONNECT FINAL FS 15" TEMP TEMP 36" TEMP 36" T E MP18" 18" TEMP18" TEMP15" TEMP 18" TEMPW/10 SY GEOTEXTILE 3 TONS CL B RIPRAP (BURIED 1.0') 48" RCP-III TEMP. TO 18" D1-1 ALONG -L_DET1- ENSURE POSITIVE DRAINAGE FINAL GRADE, NEED TO AS -L- IS CUT DOWN TO TBJB w/Slab Lid P P P P P P P P P P (NOT BURIED)36" RCP-IV18" 30" RCP-III P 15" PPES 2 ELBOW S24" w/ ASPHALT GRBOBCAT LN (PVT)ASPAHLTMOUNTAIN WILLOW RD (PVT)26' PAVED ROADWAY US19/129 BLAIRSVILLE HWY WOODS G GR 36" WDGR RETAINING WALL6" WD36" WDBS T1SFD DOGHOUSE48" CHLPOSTMTL GATE BOLLARDWD POLEABANDONED BST PORCHSTONE POSTGATEMTL MTL MTL SOIL BUS1SMTL 48" CHL 48" CHL BST SOIL SOILMTL 48" CHL GR 1SFD BARN 36" WDBARN W IR E SOIL WINDMILL ORNAMENTAL WELL MTL 1SBKD GREENHOUSE WOODS WOODS WOODS WOODS SIGN SIGN SIGN SIGN SIGNSIGN T T T T S 6 3 ° 3 0' 2 4 " W6 5. 2 8' S 21°58'36" E 92.20' EIP S 85°45'36" EN 70°11'24" E76.31'261.23' R/W TO COR0.80' EIP TO R/WR/W MON S 74°27'39" E115.19'N 87°47'24" W212.22'N 79°43'36" EN 70°11'24" E80.23'N 01°17 '36" E 140 .24 'N 19°25'36" E97.03'S 83°50'14" W221.47'S 17°34'24" E S 26°56'36" WS 47°48'36" W80.14'S 69°15'03" E209.58'N 15°58'57" E118.20'N 2 5°2 9'3 6" E14 9.6 8' EIP S 27°35'16" E 23.33'S 83°13'49" W61.38'N 13°55'49" W 50.12'N 77°11'39" E92.27'N 07°53'02" E 41.91' N 35°48'56" E 77.75' N 36°35'19" W36.21'N 73°21'19" W32.50'S 5 8 ° 3 2' 3 4 " W3 5. 5 8'N 87°19'24" W165.73'N 44°18'36" E 95.97'N 15°58'57" E41.52' EIP 8.39'N 13°36'19" W 67.50' N 01°27'21" W 103.37'S 88°31'48" E235.88' R/W TO COR2.16' EIP TO R/WN 01°18 '51" E 187 .23 'S 30°42'00" W118.40' S 44°59'35" E 127.70' EIP 100.00'100.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EIPEIP EIP EIP EIP S 0 4 °4 9'49 " W 166 .7 1' S 0 5 °2 0'4 6 " W 16 5 .2 4'N 74°56'49" W202.32'EIP EIP N 50°51'42" E 49.85' S 48°31'14" W172.66'S 74°56'49" E63.00'N 74°35'28" E52.00'34.72' S 03°37'48" E 117.91'30.00'N 73°24'09" E203.56' S 00°53'48" E 172.67'N 74°41'01" E257.65' S 01°53'21" E 188.98' S 0 6 °4 1' 14 " W 5 8 . 1 4' S 47°48'14" W100.31'N 81°49'59" E126.69'N 30°24'11" W 74.04' N 12°04'53" W 47.98' N 12°04'53" W 58.19'S 76°37'57" W197.14' EIP 1.58' EIP 16.22'S 70°39'09" W244.91'S 69°34'01" W174.46'S 69°42'50" W72.50'S 6 1° 5 5' 3 8 " W4 1. 5 2' EIP EIP TANK SEPTIC DRAIN LINES SHED S 85°23'11" E 57.46' 1SFD T87.52'S 47°25'43" W TTW N 24°45'36" W 167.85' N 16°08'31" W 177.51'S 70°09'49" W84.69'N 84°10'11" W71.39'S 5 1°5 2'4 9" W48.57'N 83°33'22" W90.28'N 61°46'22" W49.96'10.19' 237.98"N 33°14'16" W CHORDARC = 239.23'R = 676.60' TANKSEPTIC LINEDRAIN LINE DRAIN TANK SEPTIC TANK SEPTIC PHILIP PERLOW DB 1516 PG 148 PAUL R. PRICE DB 1567 PG 96 DB 561 PG 14 HOMER A. SHAFFER DARRELL B. JUMP PC C SLIDE 36B DB 829 PG 189 HOMER A. SHAFFER DB 1591 PG 186 DB 1688 PG 664 SENECAL DEWEY SHELLEY D. FARMER DB 1460 PG 538 SHELLEY D. FARMER DOUGLAS R. HUTHWAITE PC C SLIDE 36 DB 1564 PG 117 PC C SLIDE 36 DB 1526 PG199 O'BRYON MARGUERITE C PROSPERO HOMER A. SHAFFER JR. ROBERTA A. FRANK, ET AL PC C SLIDE 36 DB 1531 PG 546 SLIDE 36PC CPG 147DB 1449 PC C SLIDE 36BDB 829 PG 189 ET UXWILLIAM J. TOVAR, PC C SLIDE 36B DB 1460 PG 538 PC F SLIDE 65ADB 868 PG 91 PC C SLIDE 36 DB 1449 PG 280 PC F SLIDE 65A DB 868 PG 91 HOWARD J. BAUMEISTER DB 781 PG 27 KATIE A. ERWIN DB 1123 PG 357 PC C SLIDE 36B HONEY HARTZELL CARR DB 1707 PG 1270 CARR HARTZELL HONEY PG 1270 DB 1707 GAIL HARTZELL PERROTT DB 1707 PG 1278 BARBARA DIANNE ABSHIER DENNIS RALPH ABSHIER AND WIFE DB 1704 PG 1433 PEGGY MILLER FRANK MILLER AND WIFE, EDNA SMITH DON SMITH AND WIFE, DB 1657 PG 773 CANDACE LOVE, HEIRS CANDACE LOVE, HEIRS 2 4" C MP 15" CMP36" C MP 24" CMP 18" CMP18" CMP18" CMP2 4" CMPU/G JBPOSSIBLE 54" CMP24" CM PCONC HW CONC HW CONC HW CONC HW 18" CMP 12" HDPE 12" HDPEResponsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 POND POND DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_2_psh2B-3.dgnesp8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R-5861 2B-3 MATCHLINE -LDET_2- STA. 24+00 SEE SHEET 2B-4NAD 83/ 2011 -L_DET2- STATIONS/OFFSETS SEE SHTS. 9 AND 10. FOR R/W AND EASEMENTS www.rkk.com Engineers | Construction Managers | Planners | Scientists 45 KATIE A. ERWIN DB 1123 PG 357 PC C SLIDE 36B ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE FOR TRAFFIC CONTROL PLANS SEE SHTS. TMP-1 THRU TMP-56 FOR -L_DET2- PROFILE SEE SHT. 39 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 39 40 34 35 41 4236 37 41A 4337A 37A 37B C C F F F C C F F C C C C F -L_DET2- 80+00 85+00 90+00 PI Sta 14+81.47 D L = 957.61' T = 481.47' R = 3,720.00' 10+00 15+00 20+00 SE= 0.03 DS = 50 MPH RO = 70 -L_DET2- -L_DET2- PT Sta. 19+57.61 BEGIN CONSTRUCTION -L_DET2- -L- -L_DET2- PT Sta. 21+69.85 (17.00' LT) END TEMPORARY SHORING -L_DET2- PT Sta. 16+17.91 (17.00' LT) BEGIN TEMPORARY SHORING GREU TL-3TEMP. GREU TL-3 TEMP. TEMP. B-77 TEMP. B-77 1.09' LT. -L- POC Sta. 79+85.99 -L_DET2- PC Sta. 10+00.00= D2-1RETAINRE T AI NR E T AI N R E T AI N RETA IN SEE DETAIL H W/ CL B RIPRAP TOE PROTECTION SEE DETAIL M W/ CL B RIPRAP BERM BASE DITCH D2-2 2GIB-NSS W/ 7 SY GEOTEXTILE 2 TONS CL B RIPRAP RETAINRETAIND2-3 GTD RETAIN TO TOE PROTECTION TIE BERM BASE DITCH SEE DETAIL A SPECIAL CUT DITCH W/ 14 SY GEOTEXTILE 5 TONS CL B RIPRAP DURING PHASING EXTEND AS REQUIRED SEE DETAIL X W/ CL B RIPRAP SP. CUT BASE DITCHSEE DETAIL X W/ CL B RIPRAP SP. CUT BASE DITCH 15" TEMP24" TEMP 2 ELBOWS18" w/ P P P P P P PPES PPES GR ASPHALT ASPHALT LP LPLP LP LP 2SMTLBUS SIGN T of America Inc. Frontier Communications S 13°14'48" E 234.63'N 85°20'34" W54.94'S 06°54'26" W S 18°44'58" E55.16' EIP EIP EIP EXISTING R/W TANK SEPTIC DRAIN LINE 18.50' BSTASPHALTCOBB BLUFF (PVT)25.5' PAVED ROADWAY US19/129 BLAIRSVILLE HWY ASPHALTSOILGR ASPHALTASPHALT 25.5' PAVED ROADWAY US19/129 BLAIRSVILLE HWY CONCGR MTL 72" CHL 72" CHLMTL 72" CHLMTL POST MTL LP LP GR GR GR ASPHALT WALL RETAINING WD WALL RETAINING WD WALL 12" STONE WALL 12" STONE GARAGE 2SFBUS 1SFD GARAGEWOODS WOODS WOODS WOODS WOODS WOODS S SIGNSIGN SIGN SIGN SIGN SIGN BOLLARD T T T T T T T S 88°31'41" E262.29'EIP EIP N 2 3° 3 4' 5 2" E6 4. 7 0' N 46°19'52" E 49.26' S 52°53'08" E370.88' S 07 °54'08" W 105.05'S 19°03'08" W78.72'S 00°11'07" E 26.97' TOTAL 2.55' EIP TO R/W N 66°20'09" E54.66'S 88°37'39" E54.85'S 75°11'39" E41.87'N 14°51'50" W 281.47'S 81°49'05" E399.06'N 81°49'05" W52.26'N 12°46'39" W 117.90' N 0 7°1 7' 4 3 " E 3 2 2 . 0 6'S 72°52'50" W97.63'S 88°15'47" W88.14'N 82°22'52" W47.13'S 82°39'42" W62.21'N 89°28'51" W57.53'N 00°07 '01" W 87.92 'S 86°28'02" W174.95'EIPN 77°46'05" E112.76'N 39°03'26" W 224.29'N 17°55'58" E283.38' EIP N 83°19'50" W393.74' R/W TO COR4.15' EIP TO R/W100.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W E XISTIN G R/WE XISTIN G R/WEXISTING R/WEXISTING R/W45.00'DRAIN LINESN 25°43'41" W 306.47' TANK SEPTIC DRAIN LINE1SBRDTIMBER WALL EIP EIPSIGNGRSHEDSHED CELLAR ROOTWALL CONC WALL CONC CONC 36" W W 36" WW1SFD EIP EIP S 0 5 °2 0'4 6 " W 16 5 .2 4' S 0 5 °0 0'14 " W 9 3 .3 1' S 05 °0 0'14 " W 72 .6 1'S 82°19'49" E280.16'S 87°18'49" E290.00'N 84°19'11" E121.91'N 87°50'11" E126.23'TANK SEPTIC LINES DRAIN TANK SEPTIC LINE DRAIN KEITH A. LEGERE DB 1582 PG 449 PHILIP PERLOW DB 1516 PG 148 HOWARD J. BAUMEISTER DB 781 PG 27 JOSEPH J. GRUBER DB 781 PG 27 DB 1587 PG 154 RAYMONDE T. BAUMEISTER DB 466 PG 16 DB 1540 PG 332 PC C SLIDE 36B DB 1188 PG 159 ROBERT TRUETT RAYMONDE T. BAUMEISTER DB 466 PG 16 PATRICIA E. PRATT HAL S. ROBERTSON DB 1541 PG 77 BRITTANY RHODES DB 1506 PG 319 DB 1587 PG 154 GENE SNEED DB 457 PG 136 PC C SLIDE 36B DB 1200 PG 754 PC H SLIDE 122 DB 1467 PG 482 KENNETH P. LANCE DB 1070 PG 161 KATIE A. ERWIN DB 1123 PG 357 PC C SLIDE 36B HOWARD J. BAUMEISTER CONC CONC ASPH 17.5' P AVE D R OADWAYP RI C E WE AVE R R DS R 1643 WOODS W HEIRS, ET AL WILLIAM E. CAMPBELL HEIRS, ET AL WILLIAM E. CAMPBELL ROBERTS JR. CLINTON L. 15" CMP15" CMP DI 18" CMPvvv15" CMP 15" CMP 24" CMP 12" CPP 18" CMP18" CMP24" CMP18" CMP18" CMPCONC HWCONC HW CONC HW 15" CMP15" CMP 18" CMP8" HDPE Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 POND POND ELEV. = 1731.58 109.54' LT -L- 97+32.27 BM#5 HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R-5861 2B-4 NAD 83/ 2011 MATCHLINE -LDET_2- STA. 24+00 SEE SHEET 2B-3-L_DET2- -L-SEE INSETMATCHLINE -LDET_2- STA. 38+00 INSETMATCHLINE -LDET_2- STA. 38+009/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_2_psh2B-4.dgnespHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.5/14/99SHEET NO.PROJECT REFERENCE NO. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -L- -L- STATIONS/OFFSETS SEE SHTS. 10 AND 11. FOR R/W AND EASEMENT www.rkk.com Engineers | Construction Managers | Planners | Scientists ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE SHTS. TMP-1 THRU TMP-56 FOR TRAFFIC CONTROL PLANS SEE FOR -L_DET2- PROFILE SEE SHT. 39 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 43 45 47 52 53 54 43 44 48 47 44 108 110+00 38.99' RT. -L- POT Sta. 108+87.08 -L_DET2- PT Sta. 39+12.26= END CONSTRUCTION F C C C C C C F F C C C F C F F C F C -L_DET2- 95+00 100+00 105+00 PI Sta 30+33.74 D L = 384.27' T = 192.51' R = 2,500.00' PI Sta 38+00.98 D L = 222.80' T = 111.52' R = 2,000.00' 25+00 30+00 35+00 SE= 0.04 DS = 50 MPH RO = 90 SE= 0.05 DS = 50 MPH -L_DET2- PC Sta. 36+89.46 -L_DET2- PT Sta. 32+25.49 -L_DET2- PC Sta. 28+41.22 -L_DET2- RO = 110 49 W/ 7 SY GEOTEXTILE W/ 2 TONS CL B RIPRAP LINE CUT/FILL TRANSITION RETAIN RETAIN RETAINW/ 7 SY GEOTEXTILE W/ 2 TONS CL B RIPRAP LINE CUT/FILL TRANSITION RETAIN RETAINRETAIN RETAIN RETAIND2-4 GTD 4OTCB RETAINW/ 21 SY GEOTEXTILE 8 TONS CL B RIPRAP D2-5 SEE DETAIL X W/ CL B RIPRAP SP. CUT BASE DITCH 30" TEMP18" TEMP GRADE TO DRAIND2-6 18" T EM P D2-7 8' x 9' RCBC= ? 0.3 5 8 (I A) 0.5 9 3 = 374 (DA)100U P PSEE D ETA IL TW / C L I RIPR A PSTD. V D ITC H W /13 SY G EO FA B7 TO N S C L I R IPR A PO N REC EIV IN G BA N K A D D ITIO N A L R IPR A PGR J FIELDING DR (PVT) 26' PAVED ROADWAY US19/129 BLAIRSVILLE HWYAZALEA LN (PVT) GRGR EMERALD DOWNS DR (PVT) ASPHALTGR GR GR W A LLRETAI NI NG W D MTL MT L MTL WALLRETAINING7" WD 72" WD72" CHL GR HTR 1SBKD 1SFD CONC 1SBKD CONC BUS1SMTL BUS1SMTL LP LP LP LP BUS 1SMTL BUS 1SMTL BUS 1SMTL RETAINING WALL7" WD BOLLARDSECURITY KEYPADBOLLARD BOLLARD BOLLARD BOLLARD BOLLARD BOLLARD 72" CHL BOLLARDSECURITY KEYPADBOLLARD BOLLARD BOLLARD BOLLARD BOLLARD BOLLARD WOODS WOODS WOODS WOODS HHS S SIGN SIGN SIGN SIGN SIGN SIGN SIGNS T T T TT T Frontier Communications of America Inc. BKD 1S N 84°20'01" W228.65'N 84°20'01" W195.38'144 .07 'N 85°26'48" W94.90'N 77°27'52" W72.80'N 0 8°29'12" E140.37' N 67°15'44" W 27.13'N 60°10'03" W 52.02' N 50°27'29" W 67.33' N 43°31'26" W 56.11' N 50°03'44" W 101.24' N 63°35'08" W 33.65'N 72°22'41" W43.39'N 79°07'25" W60.63'N 3 5°5 9'5 3" E 2 4 6.9 3'N 64°28'30" W250.17'S 34°03'00" E 100.00'N 88°05'00" W351.33'S 34°03'00" E 484.12'S 81°42'00" W48.04'S 81°42'00" W259.14'S 85°37'51" E48.94'S 16°18 '13" E 26 .78 ' S 31°34'40" E 128.45'N 82°44'39" W354.22'S 3 3°3 7'16" W9 8.4 4' S 3 3°3 7'16" W6 4.8 8'S 53°13'16" W165.77' EIPN 62°58'16" EN 1 1 °2 2' 4 4" W 2 6 6 . 2 3' N 74°18'44" W22.49' 151.89' N 55°31'04" W 125.97' N 35°53'01" W 82.18'S 62°58'56" W266.92'N 24°56'04" W 231.31'N 55°00'10" E68.32' N 74°36'04" W266.08' N 21°48'04" W 61.42'153.97' COR TO R/W0.28' R/W TO EIPN 1 1 °2 4' 0 4" W 40 . 0 5' EIPN 61°09'41" EN 13°44'56" E 126.92'190.86' TOTAL1.19' EIP TO R/W100.00'100.00' EX IS T ING R /W EX IST ING R /W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W POSSIBLE FOUNDATION SIGN TANK SEPTIC DRAIN LINE DRAIN LINES PER OWNER NO SEPTIC SYSTEM GATE LOCKEDACCESS FOR SEPTICCOULD NOT D B 1576 PG 551D B 1501 PG 782M G H I IN TRESTS LLC MANUEL HERNANDEZ DB 1509 PG 370 D B 1575 PG 809M IC H A EL H O W A R TH GENE P. FARMER DB 1548 PG 165 BRUCE C. CHYNOWETH DB 1066 PG 649 BARBARA A. ROBERSON DB 621 PG 173 FRANKIE DOCKERY DB 983 PG 24 WILLARD SMITH DB 1671 PG 398 RICHARD DIEHL DB 1036 PG 105 DB 1552 PG 154 DB 1308 PG 59 STORAGE LLCTITAN SELF D B 1432 PG 686SA R A H SK O M PDB 1432 PG 686SARAH SKOMP RENEGADE SELF-STORAGE,LLC 36" CMP 18" CMP 15" CMP18" CMP60" CMP30" C MP 15" CMP 15" CMP CONC HW CONC HW Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 POND(TY P.)22' (TYP.) 22' (TYP.) 22'11'11'PS6'PS2'SIGN OR WELL DO NOT DISTURB (TYP.)22' G U A R D R A IL T E M P . .04.04.05.06+30.40.06+64.47.05.04.03.02.02+48.85.03.04.05.06.06+20.84.05DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/26/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_3_psh2B-5.dgndefault8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R-5861-L_DET3-NAD 83/ 20112B-5 -L- STATIONS/OFFSETS SEE SHTS. 12 AND 13. FOR R/W AND EASEMENTS www.rkk.com Engineers | Construction Managers | Planners | Scientists ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE FOR TRAFFIC CONTROL PLANS SEE SHTS. TMP-1 THRU TMP-56 FOR -L_DET3- PROFILE SEE SHT. 40 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-26263 69 70 71 66 64 655959 NO CLAIM F F C C C F F C F F C F F C F C C C F F C C -L_DET3- PRC Sta. 11+46.54 -L_DET3- PT Sta. 15+08.47 -L_DET3- PC Sta. 17+92.85 -L_DET3- PRC Sta. 21+45.99 PI Sta 10+73.43 D L = 146.54' T = 73.43' R = 1,000.00' PI Sta 13+29.59 D L = 361.93' T = 183.04' R = 1,000.00' PI Sta 19+71.81 D L = 353.13' T = 178.96' R = 900.00' PI Sta 22+26.06 D L = 159.75' T = 80.08' R = 1,000.00' -L_DET3- SE= 0.06 SE= 0.06 SE= 0.06 SE= 0.06 DS = 50 MPH DS = 50 MPH DS = 50 MPH DS = 50 MPH RO = 44 RO = 132 RO = 132 ELEV. = 1676.0938.29' LT-L- 123+65.15B M #712 5+ 0 0 130+00 135+00 1 0 + 0 0 15+00 20+00 -L_DET3- GREU TL-3 TEMP. GREU TL-3 TEMP. -L_DET3- PT Sta. 16+60.00 (20.00' LT) END TEMPORARY SHORING -L_DET3- PT Sta. 15+28.97 (20.00' LT) BEGIN TEMPORARY SHORING IA TL-3 TEMP 53.82' RT OFFSET -L- Sta. POT 121+83.12 -L_DET3- PC Sta. 10+00.00= BEGIN CONSTRUCTION 0.64' LT OFFSET -L- Sta. 134+61.40 -L_DET3- PT Sta. 23+05.73= END CONSTRUCTION IA TL-3 TEMP D3-2 D3-1 RETAINRETAINRETAIN RETAIN RETAIN RETAIN D3-5 D3-4 2GIB-NSS D3-6 RETAI NSEE DETAIL H W/ CL B RIPRAP TOE PROTECTION SEE DETAIL D W/ CL I RIPRAP CHANGE CHANNEL SEE DETAIL D W/ CL I RIPRAP CHANNEL CHANGE 15" TEMP60" TEMP15" TEMP JB w/Slab Lid TEMP60" D3-7 D3-8 ON BANKS ONLY W/ 75 SY GEOTEXTILE 40 TON CL I RIPRAP BOX CULVERT SEQUENCING OF FINAL TO EASE CONSTRUCTION END OF THE EXISTING PIPE TEMPORARILY EXTEND OUTLET OF -L- FILL DURING CONSTRUCTION ELEVATION AS REQUIRED ADJUST RIM TO HIGHER SY GEOTEXTILE RIPRAPW/ 5 1 TON CL B TB JB w/Slab Lid P P P P GR (PVT) GRLONGRIDGE RD GR 18' PAVED ROADWAY SR 1667 TAYLOR HENSEN RD GR ASPHALT ASPHALT ASPHALT 26' PAVED ROADWAY US19/129 BLAIRSVILLE HWY ASPHALT ASPHALTGR GR GR LP BUS1SMTL BUS1SMTL BUS1SMTL BUS1SMTLBOLLARD 72" CHL MOTORGATE KEYPADSECURITY BOLLARD BOLLARD BUS1SF LP W/3 S BW7 2 " CHL1BLKBUS HTR KEYPADSECURITY MOTORGATE BOLLARD STUBPOWER LP 48" WD 48" WW POLE GUY MTL MTL GAZEBO GARAGE 2SFBKD ABANDONED 6 0" WI RE60" WIRE 48" BW1SBKD 48" BWBARN 60" WIRE 1SBKD GARAGE MTL WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS S S SIGN SIGN SIGN SIGN S T T T T T HHHHBLUE RIDGE MOUNTIAN EMS RA IL 6 0 " S PL IT of America Inc. Frontier Communications PORTCAR PORTCAR EIP N 84°01'58" W469.78'N 84°01'58" W137.21'N 73°01'58" W 91.97'S 08°31'21" W S 2 3°0 9'0 2" W2 8.4 2'S 74°31'02" W178.61'N 58°07'02" E328.35'N 68°23'02" E73.00'N 2 4°0 4'0 2" E 3 2 5.2 0' N 06°39'34" E174.23'N 04°02'32" E N 40°17'32" E77.24' EIP S 06°48'54" W932.04' TOTAL8.96' R.W TO EIP N 09°21'56" E 72.24'N 2 3°4 2'5 1" E 6 9.19'N 3 0 ° 4 6' 0 7 " E3 1. 5 4' N 46°40'15" W 44.76' N 51°55'15" W 69.23' N 06°45'45" E46.65' S 88°08 '45" E 18 .95 'N 2 3°4 3'0 2" E 3 5.16'N 2 3°4 3'0 2" E 3 6 8.5 8'100.00'EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W45.00' EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W TO R/W 45.76' CORTO EIP1.20' R/W 18 ' PAVED ROADWAY SR 1667 TAYLOR HENSEN RD N 2 4°0 4'0 2" E 112 1.2 0' TANKSEPTIC DRAIN LINE TANKSEPTIC TANKSEPTIC DRAIN LINE DRAIN LINE FIND SEPTIC TANK COULD NOT CANNOT GPR POSSIBLE SEPTIC TANK SEPTIC EIP EIP N 2 3 °5 4' 13 " W 5 0 . 4 3' N 21°03'28" W 257.54' N 2 3 °2 8' 3 1 " W 8 6 . 3 1' N 37°03'31" W 35.28'N 58°23'14" E162.93'N 58°23'14" E75.76'N 35°21'46" W S 29°47 '42" E DB 1657 PG 447 DB 1598 PG 803 CHRISTINA L. GUTHRIE DB 914 PG 121 BRENDA K INCA IDDB 574 PG 83 CHR IST INA GUTHR IE GEORGETTE HOWERTON PC B SLIDE 116BDB 1559 PG 280 BRENT HEENAN PC B SLIDE 116BDB 1398 PG 346 JUSTIN M. HEDDEN DB 1719 PG 147 DB 574 PG 81 DB 574 PG 81 BRENDA KINCAID DB 574 PG 83 DB 574 PG 83 DB 1657 PG 447 DB 1671 PG 398 CARLY HOPKINS CARLY HOPKINS AND SHEILA H. HOEPPNERKELLY HOPKINS SELF-STORAGE, LLCRENEGADE K INCA ID ESTATE ALFRED F .ESTATEALFRED F. KINCAID W MAINTAINED R/W 16'50'50'50' MONR/W 22.50'EXISTING R/WMONR/W LIFE ESTATE FREDRICK DEAN DALRYMPLE, DB 1690 PG 1231 L IFE ESTATE FREDR ICK DEAN DALRYMPLE , DB 1671 PG 398 DB 1690 PG 1231 HUSBAND, KENNETH HOEPPNER SHEILA HOEPPNER AND AND WIFE, ANGELIA HOPKINS; KELLY R. HOPKINS DB 1688 PG 1090 RENEGADE SELF-STORAGE, LLC vv 15" CMP 18" CMP 12" RCP 18" CPP TOP=1682.69'DI 18" CMP36" CMP30" CMP30" CM P18" CMP12" RCP CONC HW CONC HW INACCESSIBLE DURING SURVEYINV OUT=1677.81' INV=1668.50' INV=1657.20' INV=1655.73' INV=1653.66' INV=1697.16' INV=1699.71' INV=1655.32' Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560GOLD BRANCHDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_4_psh2B-6.dgnesp8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETEDNAD 83/ 2011 R-5861 2B-6-L_DET4-MATCHLINE -LDET_4- STA. 24+00 SEE SHEET 2B-7-L- STATIONS/OFFSETS SEE SHTS. 14 AND 15. FOR R/W AND EASEMENT www.rkk.com Engineers | Construction Managers | Planners | Scientists ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE TMP-1 THRU TMP-56 FOR TRAFFIC CONTROL PLANS SEE SHTS. FOR -DET_DR19- PROFILE SEE SHT. 43 FOR -DET_DR18B- PROFILE SEE SHT. 43 FOR -DET_DR18- PROFILE SEE SHT. 43 FOR -L_DET4- PROFILE SEE SHT. 40 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 75 76 77 79 80 8281 84 76 83 84 82 73A C C F C F F C C C C C C C C C C C C F F F F F F F C C C C C F C C F F F CC C145+00 150+00 PI Sta 11+29.41 D L = 257.55' T = 129.41' R = 1,100.00' PI Sta 14+87.52 D L = 453.26' T = 229.97' R = 1,100.00' PI Sta 19+23.97 D L = 208.26' T = 104.35' R = 1,300.00' 10+00 15+00 20+00 BEGIN CONSTRUCTION -L_DET4- PRC Sta. 12+57.55 -L_DET4- PT Sta. 17+10.81 -L_DET4- PC Sta. 18+19.61 -L_DET4- SE= 0.06 SE= 0.06 DS = 50 MPH DS = 50 MPH RO = 140 RO = 140 -L_DET4- GREU TL-3TEMP. -DET_DR18- PI Sta 10+43.49 D L = 71.59' T = 43.49' R = 50.00' PI Sta 11+05.35 D L = 19.96' T = 9.99' R = 200.00' -DET_DR18B--DET_DR19- D L = 68.30' T = 40.68' R = 50.00' PI Sta 11+14.49 D L = 74.58' T = 46.19' R = 50.00' PI Sta 10+84.76 D L = 102.20' T = 53.17' R = 150.00' PI Sta 11+54.93 D L = 42.22' T = 21.14' R = 300.00'10+00-DET_DR18- POT Sta. 11+87.40 -DET_DR18- PT Sta. 11+42.88 -DET_DR18- PRC Sta. 10+68.30 10+00 -DET_DR18B- POT Sta. 11+40.00 END CONSTRUCTION -DET_DR18- POC Sta. 11+40.00 END CONSTRUCTION -DET_DR18B- POT Sta. 11+40.03 -DET_DR18B- PC Sta. 10+95.36 -DET_DR18B- PT Sta. 11+15.32 -DET_DR18B- PT Sta. 10+71.59-DET_DR18- POC Sta. 10+27.70 -DET_DR18B- PC Sta. 10+00.00= -DET_DR19- PRC Sta. 11+33.78 -DET_DR19- PC Sta. 10+31.58 PI Sta 10+40.68 GREU TL-3 TEMP. KOLB WILLIAM J. PG 464 DB 1136 74 -L_DET4- PT Sta. 20+27.87 -DET_DR19- PT Sta. 11+40.00 END CONSTRUCTION -DET_DR19- PT Sta. 11+76.00 0.04' LT OFFSET -L- POT Sta. 140+70.08 -L_DET4- PC Sta. 10+00.00= 1.14' LT OFFSET -L- POT Sta. 143+98.98 -DET_DR18- PC Sta. 10+00.00= -L- POC Sta. 148+61.40 -DET_DR19- POT Sta. 10+06.07= RETAIN RETAI ND4EX1 D4-2 ON BANKS ONLY W/ 30 SY GEOTEXTILE 15 TONS CL I RIPRAP D4-1 RETAINRETAIN RETAIN REMOVEREMOVE RETAI NW/ 7 SY GEOTEXTILE W/ 2 TONS CL B RIPRAP LINE CUT/FILL TRANSITION D4-3 EX. 36" CMP REMOVE 19' OF SEE DETAIL H W/ CL B RIPRAP TOE PROTECTION SEE DETAIL E W/ CL B RIPRAP LATERAL V DITCH SEE DETAIL B LATERAL V DITCH SEE DETAIL B LATERAL V DITCH SEE DETAIL O W/ CL B RIPRAP SPECIAL CUT DITCH TB 2GB-NSS36" TEMPD4-4 15" TEMP 15" TEMP D4EX4 D4-15 D4-16 TEM P30" COLLAR ON BANKS ONLY W/ 21 SY GEOTEXTILE 8 TONS CL B RIPRAP TO DRAIN GRADE 15" TEMP D4-20 D4-21 15" TEMP GR GR GR 19.5' PAVED ROADWAY SR 1580 HEDDEN RD GR SOI L1 8 .5' PAVED ROADWAY SR 16 6 7 TAYLOR H EN S EN RD GR GR BARN BARN 1SBKD SOIL 1SBKD GARAGE 2 4 " MTLBARN BARN GR 2 .5SFBKD GR MTL GR 2 .5SFBKD WD DECK 2SFBKD TRA ILER ABANDONED GARAGE GARAGE 1SBKD WELL 1SBKD WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS S S W W TT T T T T F ro n tier C om m u n icatio n s o f Am erica In c. RUN OF CREEK PROPERTY LINE IS RUN OF CREEK PROPERTY LINE IS RUN OF CREEK PROPERTY LINE IS RUN OF CREEK PROPERTY LINE ISS 53°13'16" W179.28'N 06°39'34" E 397.46' S 85°51'59" E 206.88'S 66°06'26" W331.81'EIP EIP S 53°10'58" W135.31'N 54°10'58" E90.28'N 51°36'31" W 200.64'N 41°07'10" E155.58' N 45°19'02" W 215.80'N 71°25'58" E74.81'R/W MON EIP N 2 7 ° 0 0' 0 0 " E 17 2. 9 8' R/W T O COR4. 0 3' EI P T O R/WR/W MON S 25 °40 '11" E 91 .41' N 51°29'44" W 100.00'EX IST ING R /W EX IST ING R /W EX IST ING R /W EX IST ING R /W EXISTING R/WEXISTING R/W MONR/W S 53°08'09" E 51.95'S 2 3 °13'0 7 " E 5 9 .9 0'S 08°31'07" E40.08'S 72°01'53" W140.36'S 28°34 '07" E 145 .90 'S 58°22'53" W157.67'N 7 5 °5 3'5 3 " E5 .0 0'S 74°36'53" W208.86'S 62°33'07" E 34.72' S 26°25 '07" E S 13°25'07" E20.90' N 21°20'34" W50 .99' N 20°27'33" W34.69'63.32'N 74°36'53" E96.31'N 58°25'34" W 73.38' N 51°59'34" W 70.25' N 47°12'34" W 44.45' STRUCTURE BLOCK C INDER M T LHTR PUM P HEAT TANK PRO PANEGR E IP S 2 1 °0 8'0 7 " E 12 .5 0' E IP GR50.00'EX IST ING R /W EX I STI NG R/ W 50.00'EXISTING R/WEXISTING R /W EXISTING R /W 50.00'WOOD S WOODS WOOD S N 06°47'11" E287.00' 5 0. 0 0' 7.55'EIP W 6 0 " WW60" WW GATE BARN 1SFD 1SFD SIGN WD POSTS EXISTING R/W EXISTING R/W TANKSEPTIC DRAIN LINES TANK SEPTIC DRAIN LINES TANK SEPT IC DRA IN L INES TANK SEPT IC DRA IN L INE CANNOT GPR SEPTIC NOT FOUND CANNOT GPR SEPTIC NOT FOUND TANK SEPTIC DRAIN FIELD DRAIN LINE TANK SEPTICS 3 4 ° 3 3' 1 4" W3 4 7. 5 9' S 12°57'35" W396.86' N 35°21'46" W 123.37'S 57°53'14" W150.61'S 29°47 '42" E 121.85 'N 50°08'14" E92.17' S 29°47 '42" E 137.15 'S 29°47 '42" E 100.23 'S 53°47'42" E 129.92'S 46°00'19" W143.94' N 82°59'41" W49.62'S 70°00'19" W82.70'S 46°00'19" W66.16'DB 852 PG 178 DB 1464 PG 282 M ICHAEL L . HAMBYDB 482 PG 63 M ICHAEL J . W ILK INS BRENDA K INCA IDDB 574 PG 83 CHR IST INA GUTHR IEDB 817 PG 70 CHR IST INA L . GUTHR IE DB 914 PG 121 N ICK GUTHR IEDB 1020 PG 406 BARBARA GUTHR IE DB 1064 PG 664 DB 652 PG 192 DB 1634 PG 239 DB 1634 PG 239 DB 1717 PG 772CLAUDE W. BEAVERDB 1560 PG 625DB 1622 PG 986DB 1634 PG 239DB 1642 PG 341DB 1513 PG 192GUTHR IE BARBARA STEPHANIE TANNERJAMM IE ADAMS SAVUGOT SAVUGOT JAMM IE ADAMS PG 54 DB 941 BEASTER PAUL W .PG 206 DB 361 GUTHR IE BARBARA PG 206 DB 0361 W CHARLES GREEN HE IRS , ET AL 1SFDABANDONED ER ICA LEANN PORTAL DB 1712 PG 854 ER ICA LEANN PORTAL DB 1712 PG 854ERICA LEANN PORTALPHOEBE M . HEDDEN JARRAD S . HAMPTON DB 1699 PG 1271 JARRAD S . HAMPTON DB 1699 PG 1271 JARRAD S. HAMPTON DB 1699 PG 1271 HUSBAND , CORY FRANKL IN REBEKA FRANKL IN AND HUSBAND, CORY FRANKLIN REBEKA FRANKLIN AND BETTY SUE WHITENERRONNIE D. WHITENER AND N 34°35'34"W SAVUGOT JAMMIE ADAMS KELLY ROGERSAND CRYSTALRITA COLLEEN KELLY SAVUGOTJAMMIE ADAMS 15 " CM P18" CMP18" CMPCMP JB (CONC LID) LOCATE INVERT UNABLE TO CMP JB CONC HW 18" CMPHH18" CMP18" RCP Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_4_psh2B-7.dgnesp8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETEDNAD 83/ 2011 R-5861 2B-7-L_DET4-MATCHLINE -LDET_4- STA. 37+00 SEE SHEET 2B-8MATCHLINE -LDET_4- STA. 24+00 SEE SHEET 2B-6STATIONS/OFFSETS SEE SHT. 15. FOR R/W AND EASEMENT www.rkk.com Engineers | Construction Managers | Planners | Scientists ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE TMP-1 THRU TMP-56 FOR TRAFFIC CONTROL PLANS SEE SHTS. FOR -L_DET4- PROFILE SEE SHT. 41 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 106 85 86 87 88 87 83 91 92 90 93 93 88 88 979693 -L - 155+00 16 0+ 0 0 165+00 PI Sta 32+11.30 D L = 501.03' T = 250.55' R = 12,700.00' 25+00 30+00 35+00 -L_DET4- PC Sta. 29+60.75 -L_DET4- PRC Sta. 34+61.78 SE= N.C.SE= 0.06 -L_DET4- DS = 50 MPH DS = 50 MPH RO = 50 RO = 140 PI Sta 38+91.55 D L = 837.11' T = 429.77' R = 1,500.00' 95 DB 1332 PG 133 HUSBAND, CORY FRANKLIN REBEKA FRANKLIN AND C F C F F C F C F C F C C C C F C F C F C D4-4 RETAINRETA IN D4-5 RETAINSEE DETAIL C SP. LATERAL V DITCH D4-6 D4-7 ADJ. JB D4EX2 W/ 7 SY GEOTEXTILE W/ 2 TONS CL B RIPRAP LINE CUT/FILL TRANSITION D4-10 D4-11 2GIB-NSS D4-12 w/ MH TB JB W/ 14 SY GEOTEXTILE 5 TONS CL B RIPRAP24" TEMP18" TEMP 15" TEMP 18" TEMP 15" TEMP D4-18 D4-19 15" TEMPTEMP 15" 19.5' PAVED ROADWAY SR 1580 HEDDEN RD GR 26' PAVED ROADWAY US19/129 BLAIRSVILLE HWY MTL MTL MTL POSTWD WOODS WOODS WOODS WOODS SIGN T T T N 62°30'00" W 209.71' S 09°10'44" W190.29' COR TO R/W0.11' R/W TO MON R/W MON N 51°29'44" W 614.44'S 60°00'16" W322.90'N 47°23'39" W 280.77'S 37°10'13" W720.72' 1 0 0. 0 0' EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W MONR/W50.00'EXI STI N G R/ W 5 0.0 0' TANKSEPTIC DRAIN LINE DB 1513 PG 192 DB 1634 PG 239 DB 1515 PG 250 L.B. ADAMS DB 575 PG 76 DB 575 PG 76DB 1642 PG 341 DB 575 PG 76 DB 1155 PG 119DB 1155 PG 127U.S.A.DB 1155 PG 119 U.S.A. DB 1155 PG 127 AND CRYSTAL KELLY ROGERS RITA COLLEEN KELLY DB 575 PG 76 50'50' 50' 50' 50' 50' JARRAD S. HAMPTON DB 1699 PG 1271 JARRAD S. HAMPTON AND WILLIAM DALE CLONTS PAUL Q. RAPER HEIRS AND WILLIAM DALE CLONTS PAUL Q. RAPER HEIRS WILLIAM DALE CLONTS PAUL Q. RAPER HEIRS AND W I LLI AM DALE CLONTSPAUL Q. RAPER HEI RSDB 575 PG 76W I LLI AM DALE CLONTS PAUL Q. RAPER HEI RSBETTY SUE WHITENER RONNIE D. WHITENER AND 18" CMP 18" CMP1 8 " CMP 18" CMPCONC HW CONC HW Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_4_psh2B-8.dgnesp8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R-5861 NAD 83/ 2011 MATCHLINE -L_DET4- STA. 37+00 SEE SHEET 2B-7-L_DET4- -L- 2B-8 www.rkk.com Engineers | Construction Managers | Planners | Scientists STATIONS/OFFSETS SEE SHT. 16. FOR R/W AND EASEMENT -DET_5- WAS REMOVED FROM THE PLANS. ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE FOR TRAFFIC CONTROL PLANS SEE SHTS. TMP-1 THRU TMP-56 FOR -L_DET4- PROFILE SEE SHT. 41 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 97 93 96 9898 98 9898 170+00 175+00 180+0010 +00ELEV. = 1690.40 157.00' LT -L- 179+50.03 BM#10 ELEV. = 1690.40 157.00' LT -L- 179+50.03 BM#10 -L- 170+00 SE= 0.06 -L_DET4- DS = 50 MPH RO = 140 PI Sta 38+91.55 D L = 837.11' T = 429.77' R = 1,500.00' END CONSTRUCTION TEMP. GREU TL-3 -L_DET6- POC Sta. 1 4 +1 9. 4 2 -DET_DR2 2- POT Sta. 1 0 +3 2. 5 3 =-DET_DR2 2- PC Sta. 1 1 +8 7. 1 7 GUARDRAIL TIE TO EXISTING 143.33' LT OFFSET -L- POT Sta. 173+66.15 -L_DET4- PT Sta. 42+98.89= 40+00 C F C C F F C C REMOVE COLLAR RETAI ND4-9 D4EX3 D4-8 RETAI NRETAINSEE DETAI L CSP. LATERAL V DI TCHSEE DETAIL H W/ CL B RIPRAP TOE PROTECTION D4-17 D4-13 D4-14 2GID-NSS W/ 7 SY GEOTEXTILE 2 TONS CL B RIPRAP W/ 7 SY GEOTEXTILE 2 TONS CL B RIPRAP 15" TEMP15" TEMP 1 8 " TEMP WH WH P P P P SEE DETAIL RW/ CL I RIPRAPBASE DITCHSTANDARD 5' GR 2 5 .5' PAVED ROADWAY US 19 /12 9 BLA IRSV ILLE HWY MTL MTL MTL HTR GR PLAYHOUSE WOOD WOODS WOODS WOODS WOODS WOODS WOODS S S S S S IGN S T T S 89°28'50" E1072.50'R /W MON N 85°45'08" W1017.59'S 83°45'28" E342.30'100.00' EXISTING R/W EXISTING R/W EX IST ING R /W EX IST ING R /W EXISTING R/W 1SHTRSHED M TL GARAGEMTL WELLSLABCONCFEEDERBI RDH O U SEB IR DGR DB 575 PG 76 DB 575 PG 76 OLIVER MINOR DB 1410 PG 83 DB 1390 PG 530DB 1155 PG 127DB 1155 PG 119U.S.A. DB 1155 PG 127 AND TRACY FOSTERPATRICIA FOSTER DRAIN LINE 1SBKD 50'50' 50' 50' AND WILLIAM DALE CLONTS PAUL Q. RAPER HEIRS AND WILLIAM DALE CLONTS PAUL Q. RAPER HEIRS DB 575 PG 76 AND WILLIAM DALE CLONTS PAUL Q. RAPER HEIRS DB 575 PG 76 WILLIAM DALE CLONTS PAUL Q. RAPER HEIRS vvBRIDGE ROCK48" CMP18" CMP18" CMPCONC HW CONC HW CONC HW 1 0 " HDPE15" CMPResponsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560 ELEV. = 1690.40 157.00' LT -L- 179+50.03 BM#10 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NAD 83/ 2011 -L_DET6-MATCHLINE -LDET_6- STA. 22+00 SEE SHEET 2B-10STATIONS/OFFSETS SEE SHTS. 16 AND 17. FOR R/W AND EASEMENT www.rkk.com Engineers | Construction Managers | Planners | Scientists HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 2B-9R-5861 9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_6_psh2B-9.dgndefault8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -DET_5- WAS REMOVED FROM THE PLANS. ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE TMP-1 THRU TMP-56 FOR TRAFFIC CONTROL PLANS SEE SHTS. FOR -DET_DR22- PROFILE SEE SHT. 43 FOR -L_DET6- PROFILE SEE SHT. 42 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 99 100 98 98 98 F C F C C C C F F FC C C F C C C C C PI Sta 13+02.06 D L = 584.52' T = 302.06' R = 940.00' -L_DET6- PT Sta. 15+84.52 -L_DET6- PC Sta. 19+54.29 -L_DET6- PRC Sta. 21+91.61 PI Sta 20+73.64 D L = 237.32' T = 119.35' R = 900.00' PI Sta 25+40.12 D L = 639.81' T = 348.51' R = 650.00' SE = 0.06 SE = 0.06 SE = 0.06 -L_DET6- DS = 50 MPH DS = 50 MPH DS = 45 MPH RO = 132 RO = 132 RO = 132 180+00 185+00 190+00 10+00 15+00 20+00 -L_DET6- -L- POC St. 178+30.58 -L_DET6- PC Sta. 10+00.00= BEGIN CONSTRUCTION -L_DET6- Sta. 16+34.18 (100.42' RT) BEGIN TEMP SHORING -L_DET6- Sta. 20+44.84 (41.08' RT) END TEMP SHORING -L_DET6- POC Sta. 14+19.42 -DET_DR22- POT Sta. 10+32.53= -DET_DR22- POT Sta. 14+12.68 END CONSTRUCTION -DET_DR22- PT Sta. 13+73.99 -DET_DR22- POT Sta. 14+16.00 -DET_DR22- PRC Sta. 13+20.41 DS = 15 MPH SE = 0.02 PI Sta 13+08.13 L = 133.24' T = 120.96' R = 60.00' D PI Sta 13+48.59 L = 53.57' T = 28.18' R = 70.00' D DS = 15 MPH SE = 0.02 -DET_DR22- -DET_DR22- PC Sta. 11+87.17 -L_DET6- Sta. 19+42.87 (43.12' RT)RETAI NRETAINRETAIN1714 1713 JB w/MH HW 1710 SEE DETAIL C SP. LATERAL V DITCH JB w/ MH SP. DETAIL D6-7 SEE DETAIL O W/ CL B RIPRAP SPECIAL CUT DITCH SEE DETAIL O W/ CL B RIPRAP SPECIAL CUT DITCH 15" TEMP RETAI N(BURIED 1.0') 66" RCP-III (BURIED 1.0') 66" RCP-III 1720 JB w/MH SP. DET.(BURIED 1.0')66" RCP-IIISEE DETAIL R W/ CL I RIPRAP BASE DITCH STANDARD 5' W/45 SY GEOFAB 24 TONS CL I RIPRAP ON RECEIVING BANK ADDITIONAL RIPRAP 1717 (BURIED 1.0')66" RCP-III(BURIED 1.0')2 ELBOWS66" CSPW/ FLOWABLE FILLPLUG & FILL1712 4OTCB P P P P 15"6" BST CURB 6" BST CURB 6" BST CURB 6" BST CURB 6" BST CURB 6" BST CURB CURB6" BST CONC GR US19/129 BLAIRSVILLE HWY 30' BST (PVT) GR DECKER DR GR ASPHALT GR ASPHALT 26' PAVED ROADWAYUS19/129 BLAIRSVILLE HWY ASPHALT GR ASPHALT GR GR G R PL A Y H O U SE W O O D C A N O PY 1SBKD BUS1SF BUS1SF BUS1SF BUS1SF BUS1SF BUS1SF CAN PONDFISHCONC 1SBLK 1SBLK DOG ENCLOSURECONC BLOCK ENCLOSUREDOG BLOCKCONC WD BOOTH 36" WD 1SFBUS 1SFBUS 1SFBUS CAN CAN 72" CHL CANOPY CANOPY PONDFISHSTONE W O O D SW O O D SWOODS WOODS S SIGN SIGN SIGN SIGN SIGN S SIGN SIGN DETERMINE END UNABLE TO T T T T T T 10 ", THE TOWN OF MURPHY BLUE RIDGE MOUNTIAN EMS 3 ", THE TOWN OF MURPHY of America Inc. Frontier Communications of America Inc. Frontier Communications N 33°22'17" E 145.01' N 32°09'21" E 119.93' N 27°43'49" E143.23'N 21°40'44" E 234.00' S 27°46'46" E 180.00'S 71°08'15" W180.00'S 87°53'24" E78.24'N 87°26'35" WEIP EIP EIP N 87°53'25" W8.79'106.39' COR TO R/W22.77' R/W TO EIPN 81°36'08" W301.06'N 84°16'00" E133.72'N 4 5 ° 5 2' 0 0 " E 18 2. 0 8'100.00'100.00' EX IST ING R /W EX IS T ING R /W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W DRA IN L INE DRAIN LINE DRAIN LINE S 79°18'14" WS 10°45'14" W143.63'S 1 0°45'14" W132.87' S 4 7 ° 0 2' 14 " W2 6 5. 11'383.70'WADE W. DECKER DB 1387 PG 954 JOHN T. MCGUIRE DB 563 PG 116 LEWIS E. FOSTER DB 563 PG 114 PC C SLIDE 88 DB 1441 PG 512 DB 1441 PG 506 DB 1426 PG 515 PC C SLIDE 88 DB 1441 PG 512 DB 1441 PG 506 DB 1426 PG 515 DB 1441 PG 510 JERRY DECKER TRUSTEE EVA B. DECKER EVA B. DECKER AND TRACY FOSTER PATRICIA FOSTER SHANNON F. DUFFEK AND WIFE, DAVID S. DUFFEK DB 1698 PG 590 DB 1390 PG 530 DB 1693 PG 934 WIFE, SONYA DECKER CHAD DECKER AND 60" CMP JB 18" CMP 15" CMP 1 8 " CM P 18" CMP TOP=1627.19' DI 18" C MP 15" CMP DI 48" C MP 48" C MP 18" CMP CONC HW 60" C MP 66" CMP TOP=1611.53 W/ SLATE TOP RISER INV=1583.15 DI INV=1616.84' INV=1614.86' INV=1624.68' INV=1626.09' Responsive People | Creative Solutions NC License No. F-0112 Raleigh, North Carolina 27615-3960 8601 Six Forks Road, Forum 1,Suite 700 P: (919) 878-9560ROMINGER CREEKDOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED N A D 83/ 2011-L_DET6-MATCHLINE -LDET_6- STA. 22+00 SEE SHEET 2B-9-L- STATIONS/OFFSETS SEE SHTS. 17 AND 18. FOR R/W AND EASEMENT www.rkk.com Engineers | Construction Managers | Planners | Scientists HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO. 2B-10R-5861 9/25/2023R:\Roadway\Proj\Detour Permit Drawings\R5861_Rdy_dsn_DET_6_psh2B-10.dgndefault8/17/99DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -DET_5- WAS REMOVED FROM THE PLANS. ALL DETOURS WILL BE REMOVED. ALL DRIVES ARE 16' WIDE WITH 10' RADII UNLESS OTHERWISE NOTED. NOTES: PROPOSED DRAINAGE FOR FINAL CONDITION. UTILIZED WHILE THE TEMPORARY DETOUR IS IN PLACE. TEMPORARY DRAINAGE / PERMANENT DRAINAGE TO BE FOR TRAFFIC CONTROL PLANS SEE SHTS. TMP-1 THRU TMP-56 FOR -L_DET6- PROFILE SEE SHT. 42 FOR DITCH DETAILS SEE SHT. 2D-1 & 2D-2 102 103 105 100 101 C F F C C C C F F C C F F F C C F C F F C F -L_DET6- -L_DET6- PRC Sta. 28+31.42 PI Sta 29+89.61 D L = 314.61' T = 158.19' R = 1,215.00' PI Sta 25+40.12 D L = 639.81' T = 348.51' R = 650.00' SE = 0.06 SE = 0.06 DS = 50 MPH END CONSTRUCTION DS = 45 MPH RO = 132 195+00 200+00 25+00 30+00 -L_DET6- -L- POC Sta. 199+29.63 -L_DET6- PC Sta. 31+46.03= RETAIN R E TA IN RETAIN RETAIN RETAIN R ET AI N S YS TE MRETAI N S YS TEMSEE DETAIL B LATERAL V DITCH SEE DETAIL B LATERAL V DITCH D6-5 D6-6 SEE DETAIL B LATERAL V DITCH SEE DETAIL B LATERAL V DITCH W/ 21 SY GEOTEXTILE 8 TONS CL B RIPRAP ELEV. 1631.0' FS MIN SEE DETAIL E W/ CL B RIPRAP LATERAL V DITCH SEE DETAIL E W/ CL B RIPRAP LATERAL V DITCH 36" RCP-IVW/ 28 SY GEOTEXTILE 11 TONS CL B RIPRAP SEE DETAIL AE STANDARD BASE DITCH SEE DETAIL G W/ CL B RIPRAP LATERAL BASE DITCH SEE DETAIL B LATERAL V DITCH SEE DETAIL X W/ CL B RIPRAP SP. CUT BASE DITCH RETAIN SYSTEM18" TEMP D6-8 (TEMPORARY)30" RCP-IV