No preview available
HomeMy WebLinkAbout20230803 Ver 1_More Info Received_20230927Storm Water Management Plan Jacobs Creek Subdivision 21-0208.010 Stokesdale, NC (Rockingham County) FIRST ISSUED: September 27, 2023 OWNER IAPPLICANT: Mr. Josh Spiegel LGI HOMES- NC, LLC 5511 Capital Center Dr Suite 560 Raleigh, NC 27606 P (980)722-0391 Headquarters Office 320 Executive Court, Hillsborough, NC 27278 ESS/0�-°e�i,9 ; SEALk3 24627 f ENGINEER/CONSULTANT: Don Sever, PE Summit Design & Engineering Services 320 Executive Court Hillsborough, NC 27278 P (919)732-3883 / F (919)732-6676 'on.sever surr.....___...- 919.732.3883 // www.summitde.com � it Table of Contents 1. Cover Sheet 2. Table of Contents 3. Project Narrative Narrative and Calculations PROJECT NAME: Jacobs Creek Subdivision PROJECT NUMBER: 21-0208 PROJECT LOCATION: Stokesdale, NC (Rockingham County) TOTAL AREA: 427.64 Acres ZONING: RM STORMWATER REG. BASIN: None RIVER BASIN: Roanoke WATERSHED PROTECTION AREA: None PROJECT NARRATIVE: Introduction: The subdivision is in the Rockingham County's jurisdiction. No stormwater impact analysis is required in this watershed. During the 401 Permit review, a Stormwater Management Plan was requested for the development. An exhibit EX-1 shows the overall stormwater management plan. The following description explains the drainage basin on a global scale. The drainage basin delineation was created for StreamStats, and superimposed on the USGS Ellisboro NC quadrangle map. To get a better understanding of the drainage areas within the property, we have included the StreamStats report that lists these areas. Overall the property is divided into two different watersheds by US 220. On the east side of US 220, the drainage basin is mostly flowing into Jacobs Creek. Jacobs Creek is a FEMA regulated stream within the property boundary. Jacobs Creek flows south to north, with the drainage boundary at NC Highway 65. On the east side of Griffin Road, the runoff flows to an unnamed branch of Jacobs Creek. A drainage area of roughly 60 acres is at this location. For the west side of US 220, the drainage basin is the beginning of Hogans Creek. Like Jacobs Creek, the watershed flows from south to north. The property is designed to have townhomes, single family homes, and commercial sections. Our present design is for the phase 1 which is east of Griffin Road. The concept that is used for phase 1 will be followed in the remaining phases. Our plans have only conceptual layout. For stream permitting purposes, we identified where stream crossings are anticipated and developed impacts based on our conceptual design. The crossings have been given enough flexibility to be constructed within the proposed footprint. We anticipate that the impacts shown would be worst case scenarios. It is anticipated that all ponds in Phase 1 will be wetponds. The basins will be located outside of any stream buffer or wetland area. The intent is to locate the detention basins where sediment basins are needed. The sediment basin would then be converted to a wetpond when completed. The flow from the pond will be designed for the pre / post to meet a 1 year design storm. The pipe outlets will have riprap dissipator pads to handle the 10 year design storm flow to a non -erosive velocity. Typical outlet velocity for the ponds are around 6 feet per second. The overall exhibit shows conceptually where storm water ponds will be located throughout the site. Typically a pond will be located on both sides of the stream channel. The ponds are located behind lots where possible. During final design, one or two lots might be lost for a storm pond. No further environmental impacts are anticipated with the construction of the ponds than we have already identified with the impact maps. For phase 1, we have included the hydraflow design for the two detention ponds. DA-1 has a 1 year flow of PRE 50.02 cfs / Post 17.18 cfs after routing through the pond. DA-2 has a 1 year flow of PRE 15.8 cfs / POST 5.84 cfs. These basins meet the criteria of meeting the pre / post development flows for the 1 year storm event. PHASE 4 PHASES I & 2 PHASE 3 QUPL POREsy D � io SITE � IW SITE ppD �—RT DR B I / SITE _ 220 `2 I 2 T a ROCKWppD O� 2 �O 6E� / m N � SITELj--- � Pa ROOK WELCOME HOME Rp W 00 DR 73 \ LEMONS RD B8 220 BENNET FAR RD PHASES O tisRO / 65 VICINITY & OVERALL SITE LAYOUT MAP NOT TO SCALE 2214 ❑T 826.910 TPED F F F F —, r— , r F F I I I I I I I I I I I JI i I I i 1 I ► I I I ► I I I I ► I I J L —J L—J L_____JI L L L , I L-__--J L---- J I I I I I I I I I I I I I I �—I L-J LJ I I I I I I I L-J L JI I I I I I I I I I I I I I I I I I I I I I \ \v/ L—J L —J L—J L— J L_ J L— J L— J L —J L (� POST DA - \\ /TSBA \ A=52.33 AC \ I I \ I \ I I I \\ I I I I I I I ' I I I I I I I I I I I - _ C] 0 LEDGEND POST DA - 1 / TSB A - A=52.33 AC WOODED AREA OPEN SPACE STRUCTURES: 119 x 3,500 SF = 416,500 SF AREA PAVEMENT AND PARKING: 182,394 SF AREA SIDEWALKS: 44,106 SF AREA POST DA - 2 / TSB-BA=11.36 AC WOODED AREA OPEN SPACE STRUCTURES: 43 x 3,500 SF = 150,500 SF AREA PAVEMENT AND PARKING: 48,214 SF AREA SIDEWALKS: 8,913 SF AREA n -POSTDA-2/ � tSBlBA=l 1.36 AC 1 I � LU � `, 4 f � � POST DA -2 BYPASS 7 A=5.13 A� ni i 1 ' / ♦� / s / 1 I I I GRAPHIC SCALE 50 0 25 50 100 200 Know what's below. (IN FEET) Call before you dig. I inch = 100 ft. I Qm M N O LU CV �Q C O co CV O CV N �n Z O Z (n LU LU 0 C' W U Z Of w d W co W w w OO�6zWW,X,= U. V] m Q U W ZO Z W= Z m U Z LLV�ULU�w¢0LL0 c�Z yW�w }��L, o mow - z �oo3QaZWo.W Ov C7 � W W O Z J w 2�aLU =2) ¢¢ F C7 any <>- i�x Om� f -- �ww¢pz l L Z F F¢ p (n q L L / (� W Z p�=D W Z�=w�ZO zU�Z¢Oz=X LU 0 P. W o�oJ>w�a?5)a ¢ULU �— �z o W UHH U z >U)LU <��0W LU 20 H Z) F Co z 0 U OLj _ � W O ~ U q U _ LU w S W U LU _ Z:) W LU Z O a U aU a Z Z Q W w W U LU U Z Z¢ o W W O N Q CV Of Cn Of¢ X d Q d 10 0 1-L o CAR �ooQ�oFEss�o�,9<'G� SEAL 0 0 24627 0 O°°° 41 °° FvlINoo- EF�°' 01� 07-14-2023 to W %.i y Cm W � W Z N � W � 10 v � w c� M � tA encn �, � N � t 9�W UPLq z (M �4 W .y V W U5 M w Z � 0 Q W LJJ C Q W q- Q Ow �U� U (AI z >Q o0 Q OwQ z Q I z Z U��� m 0 U� Q V 0-0 (PROJECT NO. 21-0208 DRAWING NAME: 21-0208_imp exh.dwg SHEET NO. DA-1 SUPPLEMENT-EZ COVER PAGE RMSLOADED INFORMATION 1 Project Name Jacobs Creek Phase 1 2 Project Area ac 60 3 Coastal Wetland Area ac 0 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? H' h 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4 7 Width of vegetated setbacks provided (feet) 6 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? NIA 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 2 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 22 DEy Pond 23 Storm Filter 24 1 Silva Cell 25 Bayfilter 26 j Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Donald A. Sever, PE Sr. Project Manager 28 O anization: Summit Design and Engineering Services 29 Street address: 3301 Benson Dr Suite 400 30 City, State, Zip: Raleigh NC 27609 31 Phone numbe0s)_:_ Email: 919 732-3883 32 _ don. sever0summltde.mm Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signature of Designer DRAINAGE AREAS 1 I Is this a high densi r9ject? Yes 2 1 If so, number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM we and we nd 5 Total drainage area ft 3696066 2279494.8 494841.6 6 Onsite drainage area ft 2613600 1197028.8 494841.6 7 Offsite drainage area ft 1082466 1082466 0 8 Total BUA in project ft 850626 sf 642999 sf 207627 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft 567000 sf 416500 sf 150500 sf 10permitting) New BUA not on subdivided lots (subject to s 283626 sf 226499 sf 57127 sf 11 Offsite BUA ft sf sf 12 Breakdown of new BUA not on subdivided lots: Parking (sq ft 37393 sf 37393 sf Sidewalk (sq 11) 53019 sf 44106 sf 8913 sf - Roof ft sf - Roadway ft Future sq ft) Other, please specify in the comment box below ft New infiltrating permeable pavement on subdivided lots ft 193214 sf 145000 sf 48214 sf 13 sf 14 New infiltrating permeable pavement not on subdivided lots ft sf 15permitting) Existing BUA that will remain (not subject to ft 0 sf 16 Existing BUA that is already permitted ft sf 17 Existing BUA that will be removed Isq ftJ sf 18 Percent BUA 0% 0% 19 Desi n storm inches 1.0 in 1.0 in 20 Design volume of SCM cu ft 57722 cf 17633 cf 21 1 Calculation method for design volume 1" storage 1 1" storage ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 2 Minimum required treatment 1 1 2 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes 3:1 Yes 3:1 5 What are the side slopes of the SCM (H:V)? 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion 7 (10 year storm)? No No Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? No No 91 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump referred 101 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC 8 ? Yes Yes 12 Does the drainage easement comply with General MDC 9 ? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC j 10 !? No Yes No Yes 14 Is there an O&M Agreement that complies with General MDC (11)? 15 Is there an 0&M Plan that complies with General MDC (12)? Yes Yes 16' Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by, an NC licensedprofessional? Yes Yes 18 Sizing method used SA/DA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 798.00 Yes 778.00 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 799.00 779.00 22 Elevation of the bottom of the vegetated shelf fmsl 802.50 782.00 23 Elevation of the permanent pool fmsl 802.50 782.00 24 Elevation of the top of the vegetated shelf fmsl 803.50 783.00 25 Elevation of the temporary pool (fmsl) 806.00 783.50 26 Surface area of the main permanent pool(square feet 18600 10800 27 Volume of the main permanent pool cubic feet 365727 cf 58250 cf 28 Average depth of the main pool feet 3.00 ft 3.00 ft 29 Average depth equation used Equation 2 Equation 2 30 If using equation 3, main pool perimeter feet 31 If using equation 3, width of submerged veg. shelf feet 32 Volume of the foreb cubic feet 23500 cf 1650 cf 33 Is this 15-20% of the volume in the mainpool? Yes Yes 34 Clean -out depth for foreba inches 12 in 12 in 35 Design volume of SCM cu ft 57722 cf 17633 cf 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter inches If weir, weir height inches If weir, weir length (inches_) Drawdown time for the temporary of (daYsL Are the inlet(s) and outlet located in a manner that avoids short- circuiti ? Are berms or baffles provided to improve the flow path? 2 in 2 in 38 39 40 2 2 41 Yes Yes 42 No 48 in No 48 in 43 Depth of forebay at entrance inches 44 Depth of forebay at exit (inches) 12 in 12 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 461 Width of the vegetated shelf feet 6 ft 6 ft 47 Slope of vegetated shelf (H:V) Does the orifice drawdown from below the top surface of the permanent pool? Does the pond minimize impacts to the receiving channel from the 1- r, 24-hr storm? Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. 6:1 6:1 48 Yes Yes 49 No No 50 No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes 531 Species of turf that will be used on the dam and embankment centipede centipede 54t Hasa planting plan been provided for the vegetated shelf? Yes Yes AMO ONAL INFORMATION 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 11:23 AM 9/27/2023 a « Q r) .to 4) � C! a Q � o L O NI 0 O w, _O C — 3 p rf� Co0CACAr H N CI 00 0 0 rIncocom � It co 'q u CR C II a E T T T T N N N O w 0 NCO Mr O II rO+ fIi coco O CO O M fM r 0 LO N N Ih p� 11 ? cl r N � r c0 CO cD 1l CO ii T T T T T T T N � LO N co LO r m co o OHO m � N M I O O co �IAC LO T T T c M lt7 ' N � o u u LL � OC V d 00000 o0 00000 c0 L6 L6ui LO o Sri V) O) > 00d�'4 NNOCOM NCOOO" (D £ � 0 O r I, -I) M CA N M 0 1) 04 r r N CO M G N U U- G d E a3 ' O N L U E > 00 g 0 Z� � O O 00LO 0 o c votiLo Ov_Cn cc1- co cm - cor- N N ti N Cq N Lo M �- E Cl)0 a `a E r W L 7 0 O LL R i 000 O O O O O a 000 001,-00 L 0 N T CO It vco0DV)O O co I-T co 0) 3 T N N N N M M M O co 0 co Co V r T II co CV co Co G . ti v7 CD O LO 0 N M O O T T T N T r- � C) CO co, O CD co MCd LCO �N 11 Co d � N � O Q to a) V) L L L L L 0 � U p Q r C r0+ C aO+ C r0 C aO+ C Q u 0 0 0 0 0> m j w w w + w Q w o > a)>A ram+ lolalacaE ram p) Q C. W O 0 0 0 0 0 0 C W E E E E p N Q0. O mode cccc� LL N C C N m J 0 0 co 0 N O N N O N N_ M N 0 N ti N a � < � � � « � k 7 � J « ,k ) .2y $ § 2 » 0 + f_ k/ Cc Cl) � § \ Ifci e o a w V (a CY c / � a . . . „ \ L O FL 0 2 Z a - Lo � 0 \ QC to W �.H _=y ) ? 2 Z// 7 %/ )� O$E § 3 §)\Rq ®' « ?7 �% 2 da^ q W \ 2 . + , _ = 2 2 77 > ��� .if ..,.. En �e . o •ew eomeo s . d $ §aaaa n<�§ tt > Q \ �.. k �� 2 . , j\ cy q §R�d B k ' ■ L co 2 ) , 7§E r k) ° 2 co 0 In tn 2 � $ J /Kt LEo] ) )§\\ NO 33/� k 2« JI kk « _a c * Q LOS+ m o w Q G o L 7 NI iL p a * o E O Lo Md d 000 cY� 'R CI00, Mtpo, (Op�C) C 11 E 0 a T T T T T N N CD Wm Cl* O 3 i II CO OOLONrT O C+ a1 Maj co N N v L1) Lo r� LO 9 CI coN N LIA� 11 Qj0 000 rr ri T T r r T T LO N N r � ram+ t: O v Lo LO co h 00 00 N V% L N ?� o II 11 LL ci d 00 00 O O 0 0 0 p o O Ln Ln Ln ui ui ui > Q 00 N N N N I� r— p T Ln LO r M T r 00I: ti O N" r-- Lo T N N CM LO O (4 ti OCO (� � 0 Q d 3 U U- Q 03 U o Q > 0 o0 000 000 N o 0 0 0 O 0 +°vo° C O O T ce) oOOLLoo C7 Iq N R O 0) E 00 T Trr M It 3 � V/ C� E V — C L O) 7 U) m N L CD O O 00 0 0 0 Q 0000 O 0 0 0 0 0 C%j co 00v01--I� L O O N It LL) LL) O y C r co rn O U Oq 0 r M r 1� T CO CDr r N CO V� I,- 00 00 00 00 00 00 00 O M 1� co 00 uy O N a N � L 7 w cr o w ate+ ao+ w Q u c 0 0 0 0 0> to A o �> O �, = •10 X (°:3:: N LO LO ::::::w M LO l0 E Q 7 O pf d Q w d d 5 03 coO 0 u= p QCL c c d c c c N X IT c �N in c O CL N Cl) N p N I` N O � « s Im � - « � k 7 " © E £ o � « � \ � © ■ � iE § (04 gLLJ 0 4 0- k§ m / $ 1 \ § o a j r i LU . � ƒ 2 § a Z. � � 2 W �tt / Ww� Dw\ ^ N v z__? W 7 my Caloc= a) Co . £ -0:5 ©� J » ® t�kt2 � / « 7� �0E } �0 oU')I- NLO 87 7®4�m as> 2 § F7 �2 f E u S ƒ 2 0 G \ - S p I i ( i i. i i > § o 4- o co § m m; e m .. 6 6 d w § k (n fCY rr 22 « tt £ \�� §� q § i i i i k k COCO 7 2 ; R LL U �ƒE§ \§f & c�>> 2 gg=2 . >>-5 S 33E o §f O2 a \R � , Hydraflow Results Phase 1 Watershed Model Schematic I Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 1 - PRE DA - 1 2 - POST DA SCM A 5 - PRE DA - 2 6 - POST DA SCM B 7 - POST DA - 2 BYPASS 3 - WETPOND A 8 - WETPOND B Jqpf 9 - Combined Post B Legend Hvd. Origin Description 1 SCS Runoff PRE DA - 1 2 SCS Runoff POST DA SCM A 3 Reservoir WETPOND A 5 SCS Runoff PRE DA - 2 6 SCS Runoff POST DA SCM B 7 SCS Runoff POST DA - 2 BYPASS 8 Reservoir WETPOND B 9 Combine Combined Post B Project: Phase-1-PRE-POST final.gpw Wednesday, 09 / 27 / 2023 Hydrograph Return Period Recap draflow Hydrographs Extension for AutodeskO Civil 3D® by Autodesk, Inc. v2023 Hyd. Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type hyd(s) Description (origin) SCS Runoff ------ 1-yr 2-yr 3-yr 5-yr 10-yr T25-yr 50-yr 100-yr PRE DA - 1 1 50.02 76.46 ------- ------- 159.52 220.80 269.73 322.81 2 SCS Runoff ------ 62.55 91.57 ------- ------- 179.97 243.34 293.42 347.39 POST DA SCM A 3 Reservoir 2 17.18 54.83 ------- ------- 116.08 131.51 142.28 152.43 WETPOND A 5 SCS Runoff ------ 15.85 24.00 ------- ------- 49.38 68.14 83.10 99.31 PRE DA - 2 6 SCS Runoff ------ 18.70 26.35 ------- ------- 49.08 65.06 77.58 91.01 POST DA SCM B 7 SCS Runoff ------ 5.837 8.839 ------- ------- 18.19 25.09 30.60 36.57 POST DA - 2 BYPASS 8 Reservoir 7 0.275 0.349 ------- ------- 6.697 16.99 24.62 32.12 WETPOND B 9 Combine 7,8 5.984 9.060 ------- ------- 18.53 36.81 51.51 66.27 Combined Post B Proj. file: Phase-1-PRE-POST final.gpw Wednesday, 09 / 27 / 2023 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutodeskO Civil 3D® by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) 50.02 Time interval (min) 2 Time to Peak (min) 726 Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) ------ Hydrograph Description PRE DA - 1 1 168,532 ------ ------ 2 SCS Runoff 62.55 2 724 181,867 ------ ------ ------ POST DA SCM A 3 Reservoir 17.18 2 738 179,665 2 805.29 107,678 WETPOND A 5 SCS Runoff 15.85 2 722 43,117 ------ ------ ------ PRE DA - 2 6 SCS Runoff 18.70 2 722 49,047 ------ ------ ------ POST DA SCM B 7 SCS Runoff 5.837 2 722 15,879 ------ ------ ------ POST DA - 2 BYPASS 8 Reservoir 0.275 2 886 15,837 7 780.88 24,384 WETPOND B 9 Combine 5.984 2 722 31,715 7,8 ------ ------ Combined Post B Phase-1-PRE-POST final.gpw Return Period: 1 Year Wednesday, 09 / 27 / 2023 Hydrograph Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 1 PRE DA - 1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 56.150 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 K� 30.00 20.00 10.00 0.00 ' 1' 0 2 4 Hyd No. 1 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 50.02 cfs Time to peak = 12.10 hrs Hyd. volume = 168,532 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 PRE DA - 1 Hyd. No. 1 -- 1 Year Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 i i I I I I I 1 11% 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 2 POST DA SCM A Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 52.330 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.87 in Storm duration = 24 hrs * Composite (Area/CN) _ [(24.850 x 74) + (27.480 x 80)] / 52.330 Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 1' 0 2 4 Hyd No. 2 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 62.55 cfs Time to peak = 12.07 hrs Hyd. volume = 181,867 cuft Curve number = 77* Hydraulic length = 0 ft Time of conc. (Tc) = 16.10 min Distribution = Type II Shape factor = 484 POST DA SCM A Hyd. No. 2 -- 1 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 1011111 i i I I I I I I --I% 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 3 WETPOND A Hydrograph type = Reservoir Peak discharge = 17.18 cfs Storm frequency = 1 yrs Time to peak = 12.30 hrs Time interval = 2 min Hyd. volume = 179,665 cuft Inflow hyd. No. = 2 - POST DA SCM A Max. Elevation = 805.29 ft Reservoir name = WET POND A Max. Storage = 107,678 cuft Storage Indication method used. Wet pond routing start elevation = 802.50 ft. WETPOND A Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 6 12 18 24 30 36 42 48 54 60 66 72 Time (hrs) Hyd No. 3 Hyd No. 2 Total storage used = 107,678 cuft Pond Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Pond No. 1 - WET POND A Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 799.00 ft Stage / Storage Table Stage (ft) Elevation (ft) 0.00 799.00 1.00 800.00 2.00 801.00 2.50 801.50 3.50 802.50 4.50 803.50 6.00 805.00 11.00 810.00 12.00 811.00 13.00 812.00 Culvert / Orifice Structures [A] Rise (in) = 42.00 Span (in) = 42.00 No. Barrels = 1 Invert El. (ft) = 799.00 Length (ft) = 94.00 Slope (%) = 2.12 N-Value = .013 Orifice Coeff. = 0.60 Multi -Stage = n/a Contour area (sqft) 299 4,100 10,495 17,688 21,110 24,800 28,800 34,870 36,500 39,000 Incr. Storage (cuft) 0 1,835 7,051 6,967 19,372 22,928 40,159 158,917 35,678 37.739 Weir Structures Total storage (cuft) 0 1,835 8,886 15,853 35,225 58,153 98,312 257,229 292,908 330,647 [B] [C] [PrfRsr] [A] [B] [C] [D] 3.50 0.00 0.00 Crest Len (ft) = 24.00 0.00 0.00 0.00 3.50 0.00 0.00 Crest El. (ft) = 805.00 0.00 0.00 0.00 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 802.50 0.00 0.00 Weir Type = 1 --- --- --- 1.00 0.00 0.00 Multi -Stage = Yes No No No 0.00 0.00 n/a .013 .013 n/a 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D ExfiI User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 799.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 1.00 1,835 800.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.00 8,886 801.00 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 2.50 15,853 801.50 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 3.50 35,225 802.50 0.00 0.00 --- --- 0.00 --- --- --- --- --- 0.000 4.50 58,153 803.50 0.30 is 0.30 is --- --- 0.00 --- --- --- --- --- 0.297 6.00 98,312 805.00 0.49 is 0.49 is --- --- 0.00 --- --- --- --- --- 0.494 11.00 257,229 810.00 140.67 is 0.05 is --- --- 140.50 s --- --- --- --- --- 140.56 12.00 292,908 811.00 148.16 is 0.04 is --- --- 147.84 s --- --- --- --- --- 147.89 13.00 330,647 812.00 155.27 is 0.04 is --- --- 154.88 s --- --- --- --- --- 154.91 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 5 PRE DA - 2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 13.930 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 18.00 15.00 12.00 • m .M 3.00 0.00 ' 1' 0 2 4 Hyd No. 5 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 15.85 cfs Time to peak = 12.03 hrs Hyd. volume = 43,117 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 PRE DA - 2 Hyd. No. 5 -- 1 Year Q (cfs) 18.00 15.00 12.00 M M 3.00 i i I I I I I I X 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 6 POST DA SCM B Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 11.360 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 •M .M M11111 0.00 ' 1' 0 2 4 Hyd No. 6 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 18.70 cfs Time to peak = 12.03 hrs Hyd. volume = 49,047 cuft Curve number = 80 Hydraulic length = 0 ft Time of conc. (Tc) = 10.60 min Distribution = Type II Shape factor = 484 POST DA SCM B Hyd. No. 6 -- 1 Year Q (cfs) 21.00 18.00 15.00 12.00 M . Me 3.00 J- — ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 7 POST DA - 2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 2 min Drainage area = 5.130 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.87 in Storm duration = 24 hrs Q (cfs) 6.00 5.00 K 3.00 2.00 1.00 0.00 ' 1' 0 2 4 Hyd No. 7 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 5.837 cfs Time to peak = 12.03 hrs Hyd. volume = 15,879 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 10.00 min Distribution = Type II Shape factor = 484 POST DA - 2 BYPASS Hyd. No. 7 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 i i I I I I I I IV 1 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 8 WETPOND B Hydrograph type = Reservoir Peak discharge = 0.275 cfs Storm frequency = 1 yrs Time to peak = 14.77 hrs Time interval = 2 min Hyd. volume = 15,837 cuft Inflow hyd. No. = 7 - POST DA - 2 BYPASS Max. Elevation = 780.88 ft Reservoir name = WET POND B Max. Storage = 24,384 cuft Storage Indication method used. Wet pond routing start elevation = 780.00 ft. Q (cfs) 6.00 5.00 K 3.00 2.00 1.00 WETPOND B Hyd. No. 8 -- 1 Year Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 mroyffins 0 6 12 18 24 30 36 42 48 54 60 66 Time (hrs) Hyd No. 8 Hyd No. 7 Total storage used = 24,384 cuft Pond Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Pond No. 3 - WET POND B Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 776.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 776.00 1,200 0 0 4.00 780.00 7,890 16,221 16,221 5.00 781.00 10,800 9,306 25,527 6.00 782.00 12,400 11,590 37,117 7.00 783.00 14,000 13,191 50,307 8.00 784.00 15,700 14,840 65,148 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 3.50 0.00 0.00 Crest Len (ft) = 16.00 10.00 0.00 0.00 Span (in) = 24.00 3.50 0.00 0.00 Crest El. (ft) = 781.70 782.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 779.00 780.00 0.00 0.00 Weir Type = 1 Broad --- --- Length (ft) = 40.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 3.75 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Wet area) Multi -Stage = n/a Yes No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 776.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 4.00 16,221 780.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 5.00 25,527 781.00 0.30 is 0.30 is --- --- 0.00 0.00 --- --- --- --- 0.297 6.00 37,117 782.00 0.44 is 0.44 is --- --- 8.75 0.00 --- --- --- --- 9.192 7.00 50,307 783.00 0.56 is 0.54 is --- --- 78.97 9.19 --- --- --- --- 88.71 8.00 65,148 784.00 0.64 is 0.63 is --- --- 185.85 47.77 --- --- --- --- 234.24 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 9 Combined Post B Hydrograph type = Combine Peak discharge = 5.984 cfs Storm frequency = 1 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 31,715 cuft Inflow hyds. = 7, 8 Contrib. drain. area = 5.130 ac Q (cfs) 6.00 5.00 K 3.00 2.00 1.00 0.00 0 4 Hyd No. 9 Combined Post B Hyd. No. 9 -- 1 Year 8 12 Hyd No. 7 16 20 Hyd No. 8 24 28 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 --" 0.00 32 Time (hrs) Hydrograph Summary Report 14 Hydraflow Hydrographs Extension for Autodesk@ Civil 3D® by Autodesk, Inc. v2023 Hyd. No. Hydrograph type (origin) SCS Runoff Peak flow (cfs) Time interval (min) 2 Time to Peak (min) 724 Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) ------ Hydrograph Description PRE DA- 1 1 322.81 1,011,268 ------ ------ 2 SCS Runoff 347.39 2 722 983,655 ------ ------ ------ POST DA SCM A 3 Reservoir 152.43 2 734 981,437 2 811.61 315,869 WETPOND A 5 SCS Runoff 99.31 2 720 258,721 ------ ------ ------ PRE DA - 2 6 SCS Runoff 91.01 2 720 240,801 ------ ------ ------ POST DA SCM B 7 SCS Runoff 36.57 2 720 95,279 ------ ------ ------ POST DA - 2 BYPASS 8 Reservoir 32.12 2 724 95,237 7 782.41 42,476 WETPOND B 9 Combine 66.27 2 722 190,516 7,8 ------ ------ Combined Post B Phase-1-PRE-POST final.gpw Return Period: 100 Year Wednesday, 09 / 27 / 2023 Hydrograph Report 15 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 1 PRE DA - 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 56.150 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.04 in Storm duration = 24 hrs Q (cfs) 350.00 250.00 150.00 100.00 50.00 0.00 ' 1' 0 2 4 Hyd No. 1 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 322.81 cfs Time to peak = 12.07 hrs Hyd. volume = 1,011,268 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 16.80 min Distribution = Type II Shape factor = 484 PRE DA - 1 Hyd. No. 1 -- 100 Year Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 -r ' ' ' ' - ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 16 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 2 POST DA SCM A Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 52.330 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.04 in Storm duration = 24 hrs * Composite (Area/CN) _ [(24.850 x 74) + (27.480 x 80)] / 52.330 Q (cfs) 350.00 250.00 150.00 100.00 50.00 0.00 ' 1' 0 2 4 Hyd No. 2 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 347.39 cfs Time to peak = 12.03 hrs Hyd. volume = 983,655 cuft Curve number = 77* Hydraulic length = 0 ft Time of conc. (Tc) = 16.10 min Distribution = Type II Shape factor = 484 POST DA SCM A Hyd. No. 2 -- 100 Year Q (cfs) 350.00 300.00 250.00 200.00 150.00 100.00 50.00 -' ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 3 WETPOND A Hydrograph type = Reservoir Peak discharge = 152.43 cfs Storm frequency = 100 yrs Time to peak = 12.23 hrs Time interval = 2 min Hyd. volume = 981,437 cuft Inflow hyd. No. = 2 - POST DA SCM A Max. Elevation = 811.61 ft Reservoir name = WET POND A Max. Storage = 315,869 cuft Storage Indication method used. Wet pond routing start elevation = 802.50 ft. WETPOND A Q (cfs) Hyd. No. 3 -- 100 Year Q (cfs) 350.00 350.00 300.00 300.00 250.00 250.00 200.00 200.00 150.00 150.00 100.00 100.00 50.00 50.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 3 Hyd No. 2 Total storage used = 315,869 cuft Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 5 PRE DA - 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 13.930 ac Basin Slope = 0.0 % Tc method = TR55 Total precip. = 8.04 in Storm duration = 24 hrs Q (cfs) 100.00 40.00 20.00 0.00 ' 1' 0 2 4 Hyd No. 5 6 8 Wednesday, 09 / 27 / 2023 Peak discharge = 99.31 cfs Time to peak = 12.00 hrs Hyd. volume = 258,721 cuft Curve number = 74 Hydraulic length = 0 ft Time of conc. (Tc) = 10.20 min Distribution = Type II Shape factor = 484 PRE DA - 2 Hyd. No. 5 -- 100 Year Q (cfs) 100.00 9.1`iZiI7 40.00 20.00 -r ' ' ' 0.00 10 12 14 16 18 20 22 24 26 Time (hrs) Hydrograph Report 19 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 6 POST DA SCM B Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 11.360 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.04 in Storm duration = 24 hrs Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 Hyd No. 6 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST DA SCM B Hyd. No. 6 -- 100 Year Wednesday, 09 / 27 / 2023 = 91.01 cfs = 12.00 hrs = 240,801 cuft = 80 = 0 ft = 10.60 min = Type II = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 Hydrograph Report 20 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hyd. No. 7 POST DA - 2 BYPASS Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = 5.130 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.04 in Storm duration = 24 hrs Q (cfs) 40.00 30.00 20.00 10.00 0.00 ' 1' 0 2 4 Hyd No. 7 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor POST DA - 2 BYPASS Hyd. No. 7 -- 100 Year 6 8 10 12 14 16 Wednesday, 09 / 27 / 2023 = 36.57 cfs = 12.00 hrs = 95,279 cuft = 74 = 0 ft = 10.00 min = Type II = 484 Q (cfs) 40.00 30.00 20.00 10.00 0.00 18 20 22 24 26 Time (hrs) Hydrograph Report 21 Hydraflow Hydrographs Extension for Autodesk® Civil 3D8 by Autodesk, Inc. v2023 Hyd. No. 8 WETPOND B Hydrograph type = Reservoir Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 7 - POST DA - 2 BYPASS Reservoir name = WET POND B Storage Indication method used. Wet pond routing start elevation = 780.00 ft. Q (cfs) 40.00 30.00 20.00 10.00 0.00 -' 0 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage WETPOND B Hyd. No. 8 -- 100 Year 4 8 12 Hyd No. 8 Hyd No. 7 Wednesday, 09 / 27 / 2023 = 32.12 cfs = 12.07 hrs = 95,237 cuft = 782.41 ft = 42,476 cuft 16 20 24 28 Total storage used = 42,476 cuft Q (cfs) 40.00 30.00 20.00 10.00 0.00 32 Time (hrs) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Wednesday, 09 / 27 / 2023 Hyd. No. 9 Combined Post B Hydrograph type = Combine Peak discharge = 66.27 cfs Storm frequency = 100 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 190,516 cuft Inflow hyds. = 7, 8 Contrib. drain. area = 5.130 ac Combined Post B Q (cfs) Hyd. No. 9 -- 100 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Time (hrs) Hyd No. 9 Hyd No. 7 Hyd No. 8 V —1t Il11 IlAli r���� —� �i�/�� iir� �r��iii %3///5 ���` ✓- -,-� � 4 � �. `�.� � ��=� � 0 1l� �' ��� ,-�r/ 7 \\\ \ \ \\ � 111YU Wit��lll1��l 1 Z 1 �r� a o� � \ Know what's below. Call before you dig. � 1 I o /Ir�\ <o/ \NV LN t-► f-- r� .�\ �, ��� �1>� �a -P — s f� r )1 �� 1 �� ,�`� � ♦ � � � \ f � � �� i ��\,� � .� � � �. � . a ��� � � .f If1 � IIII 111� � \� � \ \ f \ / l /I ♦— >>\� ti �J� 1 D\ .\ a �� 4 K f I r �� \ —f 1 1 \\1C{��> ♦, �'�\ �\ \ � I \� � �� � �, �� � ,� Q �� � 1 6a s� �' � � � �l ���� � � �� �f �` �� ��,f �1 /� 1 � �� �� �� tip\ V _-�• \ \ 9. l o .!... - ' � o\ � ilk/� 1 � a ���� /,� � `\\'� � -\ o \)NZ \ A v, VW 00, GRAPHIC SCALE 60 0 30 60 120 240 ( IN FEET) I inch = 120 ft. om M w N Q �o 0 M N 0 N N �z o z u, O � w 0 z w 0 w w I` CO Ln � M N � co Cn W 0 W 00 JcczHOY NZQoaZ� W OZ `c WE �ZmC=Z m Ca U aU�UmW-QovO �¢? o Q�w�ZZ�w�a� C, OO5)i>Z, U W OC7 °=aQ�>i '-< w wwOz W ~ W J l.L Q W W Z Q J W W Q Q Z U 0 m H w�Ha00tn�Fli o�xo�zrn=�Zo ✓-' Q OZQ JOZ W J(nO a z o qauo >�Naa�� J Q W w j W O Z W 2 ,zWu,U��O=U z > U)W Z 00 Q W W Q w U O z 0 Q Q O D (nJJZQ�%�JH WJ:�m° w w o 0 _� w w W @� W > > w 0 Z O o W H H LU U:) m U) U) co W w U z Z Q o W W O N oa o� Q=. U� W� jr a Q CL rn o li o CARO���'�, ° SEAL < °' o 0 24627 07-14-2023 y W V y Cz W � W Z � L� z W � a w M CO3 M n pMp yJ O � (V 00 ++ w o U -? 9 �uzM .9 �U 2 0 �� U W w � W � Aw Q W 0—I Q UC1�1z z �Ozo 0 z U jW w O �o V M--� ° U PROJECT NO. 21-0208 DRAWING NAME: 21-0208_ph 1-ec. dwg SHEET NO. EX-1 ,.)KI� D �� kW�41 � -- \ T W)") o, II � �,. /J/IfIlI 1(I I _ --- � lll� , �11 1 \) 0 /✓/ � A v �r,l 1 �r� <� C1,11 Know what's below. Call before you dig. e /� ��� l i vN Q , Jar IIl IJII \ \ GRAPHIC SCALE 60 0 30 60 120 240 ( IN FEET) I inch = 120 ft. -7 w OO�Wz�wW In Wx W O Z O M w D Z m U Z cnQW W:dQo�`O ozv z ZW�L}},�3W� c� d i WMz-u� LLga I P ��pVaQ�t��Uw O cz7 Lil a O w, , W} W W O Z Q w LL.aaWQ�x a F.WE-W aw-a Q3�omWW rh Q 'Zi--1' LL Z W N O Q p V1 LL 0�2ao6zm=�Zz W L z Q J j z H LL J 0 adz gaWW�DW0zWE O �wozw� OUZWNU�FOxU � z <W W 00Q��oW W (nZJZzgU0JO o �� w F-3mz U O O W ~ U _ LLI LLJ F a� CE w '� � F- Z z of o LLI w U w U Z z¢ o O¢ O a U) N o O � a Q a o o LL o ° ° °°° �o°Q�oFEss�a�,9<'1y SEAL - 0 0 24627 a Jam'\ 07-14-2023 y W V ti C z � W W N Z � Z W � 0 v a w ca � M � y M � M W � N � N a 0 U M Q uzM �; a oCD rl " y o w �x Q Q w Qw Q zw � O�� Q ~-q z_ UC1)1z Q 0 Lzu , zUww cn O��o O u �'� PROJECT NO. 21-0208 DRAWING NAME: 21-0208_ph 1-ec.dwg SHEET NO. EX-2 om M w N �Q �o 0 M N 0 N N �z �o z �, o � w 0 z w 0 w w I� kol � � M N � 0 DRY DETENTION BASIN DETAIL - SCM A SCALE: I" = 30' VEGETATED SHELF PLANTING CHART Total Planting Area = 3600 SF SHALLOW LAND PLANTS Shallow Water Planting Area, SF 3600 Total Plants Required 900 SCIENTIFIC NAME COMMON NAME QTY. % OF QTY SIZE 4" POT ASCLEPIAS INCARNATA SWAMP MILK WEED 180 20% 4" POT LOBELIA CARDINALIS CARDINAL FLOWER 180 20% 4" POT EUPATORIADELPHUS FISTULOSU JOE PYE WEED 180 20% 4" POT HIBISCUS COCCINEUS SCARLET ROSE MALLO 180 20% 4" POT KOSTELETZKYA VIRGINICA SEASHORE MALLOW 180 20% 4" POT 4" POT GRAND TOTAL 900 100% * @ 2' O.C. DECORATIVE rMNlrinln LEGEND: + + SHALLOW LAND AREA 3,600 SF NOTES: 1. INSTALL WETLAND PLANTS PER SUBCHAPTER 9.4 OF THE NCDENR STORMWATER BMP MANUAL. 2. SHALLOW WATER AND SHALLOW LAND PLANTS SHALL BE INSTALLED 2 FOOT ON CENTER AT A RATE OF 50 PLANTS PER 200 SQUARE FEET. 3. SOD INTERIOR BANK OF BMP ABOVE SHALLOW LAND ELEVATION WITH CENTIPEDE GRASS. USE TALL FESCUE ON TOP OF DAM AND ON DAM EMBANKMENT. 4. MAINTAIN HEALTH OF WETLAND PLANTINGS PER SUBCHAPTER 9.5 OF THE NCDENR STORMWATER BMP MANUAL 5. PROVIDE 1 YEAR WARRANTY FOR PLANTS. WETLAND PLANTING NOTES: 6. ONE YEAR (1 YR.) WARRANTY SHALL BE FULLY TRANSFERABLE TO ANY SUBSEQUENT OWNER UPON CONVEYANCE OF THE PROPERTY PRIOR TO ITS 1. CONTACT ENGINEER PRIOR TO CONSTRUCTION FOR PRE -CONSTRUCTION CONFERENCE. EXPIRATION. 2. SOILS USED WITHIN THE WETLAND MUST ADHERE TO THE FOLLOWING REQUIREMENTS: 2.1. THE SOIL MIX MUST BE UNIFORM AND FREE OF STONES, STUMPS, ROOTS, OR OTHER SIMILAR MATERIAL GREATER THAN 2 INCHES IN DIAMETER. 2.2. THE PH SHOULD BE BETWEEN 4.5 AND 7.0. IF THE PH FALLS OUTSIDE OF THIS RANGE, CONTRACTOR SHALL FOLLOW RECOMMENDATIONS OF SOIL TEST RESULTS FOR APPROPRIATE APPLICATION RATES. 2.3. ALL TOP SOILS TO BE USED WITHIN THE WETLAND SHALL BE ANALYZED AT A SOIL TESTING LAB, AND CONTRACTOR SHALL FOLLOW RECOMMENDATIONS OF SOIL TEST RESULTS BEFORE PLANTING. 3. ALL MANAGED PERVIOUS AREAS SHALL BE SEEDED OR PLANTED PER THE FOLLOWING CRITERIA: 3.1. TILL OR DISC SOIL TO APPROPRIATE DEPTH PER NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL PERMANENT STABILIZATION REQUIREMENTS. 3.2. AMEND SOIL TO PROVIDE SUFFICIENT ORGANIC MATTER FOR LONG-TERM VEGETATION GROWTH AND INFILTRATION. 3.3. IF SOIL IS NOT AMENDED PROVIDE JUSTIFICATION I.E. SOIL TEST RESULTS FOR WHY THE AMENDMENT WAS NOT NECESSARY. 3.4. ADDITIONAL AMENDMENTS AS NECESSARY TO ENSURE THAT THE PERVIOUS SURFACE IS INFILTRATING STORMWATER AT PRE -DEVELOPMENT RATES. 4. SOIL AMENDMENTS SHOULD BE INCORPORATED AT THE END OF THE SITE DEVELOPMENT PROCESS AND THE THE WETLAND SHOULD BE PLANTED AND MULCHED IMMEDIATELY AFTER AMENDING THE SOIL TO STABILIZE THE SITE AS SOON AS POSSIBLE. 5. WETLAND PLANTS SHALL BE OBTAINED FROM A SIMILAR PLACE OF ORIGIN OR LOCAL SOURCE TO ENSURE SURVIVABILITY. WETLAND SEED MIXES ARE NOT ALLOWED. 6. INSTALL STORMWATER WETLAND PLANTS PER SUBCHAPTERS A-3 AND C-4 OF THE NCDEQ STORMWATER DESIGN MANUAL. 7. SOD INTERIOR BANK OF SCM ABOVE SHALLOW LAND ELEVATION WITH CENTIPEDE GRASS. 8. MAINTAIN HEALTH OF STORMWATER WETLAND PLANTINGS PER SUBCHAPTER C-4 OF THE NCDEQ STORMWATER DESIGN MANUAL. CONTRACTOR SHALL REPLACE ANY PLANT LOSSES WITH THE APPROPRIATE SHALLOW WATER OR SHALLOW LAND PLANTINGS AS SHOWN ON THIS SHEET FOR A MINIMUM OF 1 YEARS FROM INSTALLATION. ALL PLANTS THAT DO NOT SURVIVE AT THE END OF THE FIRST YEAR WARRANTY PERIOD MUST BE REPLACED. IF A MINIMUM COVERAGE OF 70 PERCENT IS NOT ACHIEVED IN THE PLANTED WETLAND ZONES AFTER THE SECOND GROWING SEASON, SUPPLEMENTAL PLANTING SHOULD BE COMPLETED. 9. ENSURE NEWLY INSTALLED PLANTINGS ARE PROVIDED WITH ADEQUATE WATER, ESPECIALLY DURING DRY PERIODS. 10. NEW PLANTINGS SHOULD BE INSPECTED FREQUENTLY AND MAINTENANCE PERFORMED OR PLANTING REPLACED AS NEEDED. 11. TREES OR SHRUBS SHALL NOT BE PLANTED ON ANY PORTIONS OF WATER IMPOUNDING EMBANKMENTS, WITHIN THEIR SPILLWAYS/CHANNELS, AND THE REQUIRED ACCESS AND MAINTENANCE EASEMENT. Know what's below. Call before you dig. GRAPHIC SCALE 15 0 7.5 15 30 60 ( IN FEET) I inch = 30 ft. `SEE DETAIL FOR PIPE SIZE SLOPE STABILIZATION NOTE: EXPOSED INTERIOR 3:1 OR POND RISER STRUCTURE GREATER SLOPES SHALL BE STABILIZED BY THE INSTALLATION (SEE DETAIL) 6' W OF CENTIPEDE SOD TO THE TOP OF BANK. LITTORAL SHELF 6' W LITTORAL SHELF SLOPE-� 3:1 PPE = 802.50'� SLOPE \\ MAX .50 ELEV. 6:1 -1 L __­r_ - ANTI -SEEPAGE COLLAR NTS 6.0' 0.5' (TYP.) PROVIDE LOCKING MECHANISM FOR ACCESS HATCH. o � in o � d CONCRETE ANCHOR BOLT (TYP., SEE NOTE #2) THE BOLD LINETYPE DENOTES THE J FABRICATED ALUMINUM/STAINLESS ACCESS HATCH TO BE PROVIDED BY STEEL HINGES FOR THE 3'xT ACCESS THE TRASH RACK FABRICATOR HATCH. ACCESS HATCH SHALL BE POSITIONED OVER STEPS. NOTES: 1. ALL MATERIAL TO BE ALUMINUM ROD. 2. FASTEN TO CONCRETE STRUCTURE WITH $" X 3" STAINLESS STEEL CONCRETE WEDGE ANCHORS AT 24" MAXIMUM SPACING. A MINIMUM OF 4 ANCHORS SHALL BE USED. 3. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL FOR ALUMINUM TRASH RACK PRIOR TO CONSTRUCTION/FABRICATION. ALUMINUM TRASH RACK DETAIL GEOTEXTILE TO EXTEND MIN 24" INTO ADJACENT MATERIAL NOTE: WALL THICKNESS AND REINFORCEMENT DESIGN TO BE DETERMINED BY PRECAST t Q CONCRETE MANUFACTURER 6" PVC SCREW TYPE PLUG- 6" PVC TEE 6" PVC CAP WITH 3.5" DRILLED HOLE 4" ORIFICE FOR SKIMMER PIPE. SEAL AFTER SEDIMENT POND IS CONVERTED. ° CHANNEL BOTTOM 798.50' 5'W x 51 x (1.5'THICK) ANTI-BOUYANCY CONCRETE ANCHOR / BLOCK. BLOCK SHALL BE PERMANENTLY SECURED TO RISER BASE UNIT WITH WATER TIGHT JOINTS/CONNECTIONS AND STAINLESS STEEL STRAPS / HARDWARE. N.T.S. nPE 24" Th CLASS B RIP RAP TRASH RACK 5" X 5" OPENINGS REFER TO DETAIL T P ELE .- 805. O' 6" PVC STUB INTO BOX ELEV. 802.5' BOTTOM J SLOPE TO DRAIN 94' 797.00' 42" RCP @ 2.1 W/ O-RING CONCRETE BOTTOM 5'X5' PRE -CAST CONCRETE OUTLET STRUCTURE NOT TO SCALE SLOPE 2:1 SEDIMENT STORAGE 42" O-RING RCP (CLASS III) * DEPTH AND ELEVATION RELATIVE TO SECTION VIEW ONLY. CONCRETE ANCHOR BOLT (TYP., SEE NOTE #2) ROADWAY ELEV 813.0 WETPOND DETAIL - SECTION A -A ALUMINUM TRASH RACK (ABOVE) ANCHOR TRASH RACK TO MANHOLE WALL .-�F WITH FOUR EQUALLY SPACED STAINLESS STEEL CONCRETE WEDGE ANCHORS. EACH CLAMP ATTACHED TO MANHOLE RISER BY 2-4"x1/4" CONCRETE ANCHOR BOLTS EACH CLAMP TO BE COATED W/ AN EPDXY COATING. NTS 42" BARREL CONC.CUTOFF WALL RIPRAP PLUNGE POOL 1 CONCRETE COLLAR AS PER DETAIL KEYWAY TRENCH TO BE PROVIDED PER THE DIRECTION OF THE SITE GEOTECHNICAL ENGINEER. A KEYWAY TRENCH (KEY TRENCH) OF A MINIMUM WIDTH OF FIVE FEET (5'), CENTERED ON THE CENTERLINE OF THE DAM, SHALL BE INCORPORATED. THE KEYWAY TRENCH SHALL EXTEND TO A MINIMUM DEPTH OF TWO FEET (2'), HOWEVER IN ALL CASES IT SHALL EXTEND INTO SOILS SUITABLE FOR EMBANKMENT FOUNDATIONS. WETPOND STRUCTURE DETAILS DESIGN INLET STRUCTURE 60" PRECAST BOX EMER. OVERFLOW (WEIR) ELEV 805.00 PEAK FLOW ORIFICE ELEV 802.50' PEAK FLOW ORIFICE SIZE 5" DEWATERING ORIFICE SIZE/ELEV 5" @ 802.50' TOP OF DAM 813.0' OUTLET PIPE/ BARREL 42" OUTLET PIPE INVERT 797.00' Q1 FLOW FROM BASIN(cfs) 17.18 ELEV. 805.29' NOTES: 1. SOD INTERIOR BANK OF BMP ABOVE BOTTOM ELEVATION WITH CENTIPEDE GRASS. USE TALL FESCUE ON TOP OF DAM AND ON DAM EMBANKMENT. 2. PROVIDE 1 YEAR WARRANTY FOR PLANTS. 3. ONE YEAR (1 YR.) WARRANTY SHALL BE FULLY TRANSFERABLE TO ANY SUBSEQUENT OWNER UPON CONVEYANCE OF THE PROPERTY PRIOR TO ITS EXPIRATION. DECOMMISSIONING A SEDIMENT BASIN: 1. CALL FOR ON -SITE DETERMINATION/MEETING WHEN REQUESTING TO DECOMMISSION/ PHASE OUT A TEMPORARY SEDIMENT BASIN. 2. DETERMINATION CAN ONLY BE MADE BY THE LOCAL EROSION CONTROL SPECIALIST AND/OR HIS OR HER SUPERVISOR. 3. ONCE IT HAS BEEN AGREED THAT THE TEMPORARY SEDIMENT BASIN CAN BE REMOVED, IT MUST BE MARKED AND INITIALED BY THE EROSION CONTROL INSPECTOR. 4. IF THE SEDIMENT BASIN HAS WATER IN IT, THE WATER MUST BE PUMPED OUT FROM THE SURFACE INTO A FILTER BAG ON A LEVEL AREA FREE OF DEBRIS (OR ANOTHER APPROVED METHOD WITH NON -EROSIVE PROPERTIES). 5. REMOVE SKIMMER AND PLUG ANY HOLES IN THE RISER (IF APPLICABLE) AND REMOVE ALL BAFFLE MATERIALS. 6. IF THERE IS A LOT OF SEDIMENT/SILT IN THE BOTTOM OF THE BASIN, MIX WITH DRY MATERIAL OR SET ASIDE TO DRY, BEFORE HAULING OFF. 7. FILL/CONVERT BASIN PER THE APPROVED GRADING PLAN. 8. AFTER FINAL GRADING HAS BEEN COMPLETED, AREA MUST BE STABILIZED WITH LIME, SEED, FERTILIZER, STRAW AND TACK ACCORDING TO DURHAM COUNTY'S SEEDING APPLICATION RATES AND SPECS. DAM EMBANKMENT CONSTRUCTION STANDARDS: 1. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS OF THE FOUNDATION SOILS WITH CRUSHED STONE. 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE GEOTECHNICAL ENGINEER. 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR MINIATURE SELF-PROPELLED ROLLERS. 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE PERMITTED. 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 2- TO 3- INCH LAYER OF TOPSOIL SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND SODDED OR HYDROSEEDED. } a m a M o W N V Q ti 0 O M 0 CV cal (n \n z cn Q z Cn LU LU OO U c� w 0 U z w 0- 0 w w f1_ Co 14*1011Cj w ooQooz�= n Q W W O Z w w Z m U Z a 0 W Q o LL O O'er U N Q J Z Z WCn 1QwwQ ¢ LL=ZZNw0'K z x W 0 XooC)¢¢Z�� w ¢ Gw�rrOW, >wwoz� O� L7 W LL Ix a w J= a¢ W w Q a0¢¢ZOOm r O� U 00, Q a a < m G F w z ozD=o =zU,=WWZo W ¢ 0zQ<Oz F- w �FTg O �Up�W>mUQ¢ad ¢ w w w O Z WE C7 Z w" O�Zw�O JF- TO >cnwzo0¢ 00w W ¢ w U 0 z ¢¢ 0 (nJJZ¢ V 0J ~ F 7 w J F� m O H 5 U UU LU I_ wp _ F- W (� O U w W O¢ LU (D Z U W O O (D Ld U) � LLI Z U o z � Q LLi U) > Z =5 fU 0 w Z) U) o N `2 W d Q of 0- Cn ED 0 Q IL o CARo �°o��FESS/p�9< ° SEAL ' o 0 24627 07-14-2023 y W V W C#* 6U W 1 9 W Z N � 6 z JAW W00 r. � w n tA ai W cn pMp N a 0 U C? 0 �UzM N a� of t 0 y W tli 0 00 15 M m C%] r' rW V J r� V I W A �y ova ULL Cis z � l__ LU FBI �OJ U zw zo LU O m Lr)O V �, ° U) -00 2 0�^ vJ J_ Q LLI 0 0 Z O 0- � I I � 120 FES STORMWATER ACCESS & i MAINTENANCE EASEMENT / \ WETPON D DETAIL - SCM B VIAL POOL 0.01 10'TO I W� Q�ELEV. .00' J/XI � o - \I r 20' L X 10' W EMERGENCY \ J ) I SPILLWAY W/ RIPRAP I / 1 @ ELEV. 782.50' I / f �111 I PROVIDE 12" THICK, I I I I 1' HIGH CLASS B I I I RIPRAP II ' AT FOREBAY BERM. ------- I I I 1 j SCALE: I " = 30' WET DETENTION POND STRUCTURE DETAILS VEGETATED SHELF PLANTING CHART Total Planting Area = 2900 SF SHALLOW LAND PLANTS Shallow Water Planting Area, SF 2900 Total Plants Required 725 SCIENTIFIC NAME COMMON NAME QTY. % OF QTY SIZE 4" POT ASCLEPIAS INCARNATA SWAMP MILK WEED 145 20% 4" POT LOBELIA CARDINALIS CARDINAL FLOWER 145 20% 4" POT EUPATORIADELPHUS FISTULOSUl JOE PYE WEED 145 20% 4" POT HIBISCUS COCCINEUS SCARLET ROSE MALLO 145 20% 4" POT KOSTELETZKYA VIRGINICA SEASHORE MALLOW 145 20% 4" POT DESIGN AS -BUILT INLET STRUCTURE 48" PRECAST BOX EMER. OVERFLOW (WEIR) ELEV 781.70' PEAK FLOW ORIFICE ELEV NA PEAK FLOW ORIFICE SIZE NA DEWATERING ORIFICE SIZE/ELEV 3.5" @ 780' TOP OF DAM 784.00' DESIGN STORM ELEV (1") 781.70' DESIGN STORM VOLUME (1") 17633 CF OUTLET PIPE/ BARREL 24" OUTLET PIPE INVERT 779.00' Q1 FLOW FROM BASIN(cfs) 0.28 4" POT GRAND TOTAL 725 100% 2' O.C. NOT INSTALL WETLAND PLANTS PER SUBCHAPTER 9.4 OF THE NCDENR STORMWATER BMP MANUAL. 2. SHALLOW WATER AND SHALLOW LAND PLANTS SHALL BE INSTALLED 2 FOOT ON CENTER AT A RATE OF 50 PLANTS PER 200 SQUARE FEET. 3. SOD INTERIOR BANK OF BMP ABOVE SHALLOW LAND ELEVATION WITH CENTIPEDE GRASS. USE TALL FESCUE ON TOP OF DAM AND ON DAM EMBANKMENT. 4. MAINTAIN HEALTH OF WETLAND PLANTINGS PER SUBCHAPTER 9.5 OF THE NCDENR STORMWATER BMP MANUAL 5. PROVIDE 1 YEAR WARRANTY FOR PLANTS. WETLAND PLANTING NOTES: 6. ONE YEAR (1 YR.) WARRANTY SHALL BE FULLY TRANSFERABLE TO ANY SUBSEQUENT OWNER UPON CONVEYANCE OF THE PROPERTY PRIOR TO ITS 1. CONTACT ENGINEER PRIOR TO CONSTRUCTION FOR PRE -CONSTRUCTION CONFERENCE. EXPIRATION. 2. SOILS USED WITHIN THE WETLAND MUST ADHERE TO THE FOLLOWING REQUIREMENTS: 2.1. THE SOIL MIX MUST BE UNIFORM AND FREE OF STONES, STUMPS, ROOTS, OR OTHER SIMILAR MATERIAL GREATER THAN 2 INCHES IN DIAMETER. 2.2. THE PH SHOULD BE BETWEEN 4.5 AND 7.0. IF THE PH FALLS OUTSIDE OF THIS RANGE, CONTRACTOR SHALL FOLLOW RECOMMENDATIONS OF SOIL TEST RESULTS FOR APPROPRIATE APPLICATION RATES. 2.3. ALL TOP SOILS TO BE USED WITHIN THE WETLAND SHALL BE ANALYZED AT A SOIL TESTING LAB, AND CONTRACTOR SHALL FOLLOW RECOMMENDATIONS OF SOIL TEST RESULTS BEFORE PLANTING. 3. ALL MANAGED PERVIOUS AREAS SHALL BE SEEDED OR PLANTED PER THE FOLLOWING CRITERIA: 3.1. TILL OR DISC SOIL TO APPROPRIATE DEPTH PER NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL PERMANENT STABILIZATION REQUIREMENTS. 3.2. AMEND SOIL TO PROVIDE SUFFICIENT ORGANIC MATTER FOR LONG-TERM VEGETATION GROWTH AND INFILTRATION. 3.3. IF SOIL IS NOT AMENDED, PROVIDE JUSTIFICATION (I.E. SOIL TEST RESULTS) FOR WHY THE AMENDMENT WAS NOT NECESSARY. 3.4. ADDITIONAL AMENDMENTS AS NECESSARY TO ENSURE THAT THE PERVIOUS SURFACE IS INFILTRATING STORMWATER AT PRE -DEVELOPMENT RATES. 4. SOIL AMENDMENTS SHOULD BE INCORPORATED AT THE END OF THE SITE DEVELOPMENT PROCESS AND THE THE WETLAND SHOULD BE PLANTED AND MULCHED IMMEDIATELY AFTER AMENDING THE SOIL TO STABILIZE THE SITE AS SOON AS POSSIBLE. 5. WETLAND PLANTS SHALL BE OBTAINED FROM A SIMILAR PLACE OF ORIGIN OR LOCAL SOURCE TO ENSURE SURVIVABILITY. WETLAND SEED MIXES ARE NOT ALLOWED. 6. INSTALL STORMWATER WETLAND PLANTS PER SUBCHAPTERS A-3 AND C-4 OF THE NCDEQ STORMWATER DESIGN MANUAL. 7. SOD INTERIOR BANK OF SCM ABOVE SHALLOW LAND ELEVATION WITH CENTIPEDE GRASS. 8. MAINTAIN HEALTH OF STORMWATER WETLAND PLANTINGS PER SUBCHAPTER C-4 OF THE NCDEQ STORMWATER DESIGN MANUAL. CONTRACTOR SHALL REPLACE ANY PLANT LOSSES WITH THE APPROPRIATE SHALLOW WATER OR SHALLOW LAND PLANTINGS AS SHOWN ON THIS SHEET FOR A MINIMUM OF 1 YEARS FROM INSTALLATION. ALL PLANTS THAT DO NOT SURVIVE AT THE END OF THE FIRST YEAR WARRANTY PERIOD MUST BE REPLACED. IF A MINIMUM COVERAGE OF 70 PERCENT IS NOT ACHIEVED IN THE PLANTED WETLAND ZONES AFTER THE SECOND GROWING SEASON, SUPPLEMENTAL PLANTING SHOULD BE COMPLETED. 9. ENSURE NEWLY INSTALLED PLANTINGS ARE PROVIDED WITH ADEQUATE WATER, ESPECIALLY DURING DRY PERIODS. 10. NEW PLANTINGS SHOULD BE INSPECTED FREQUENTLY AND MAINTENANCE PERFORMED OR PLANTING REPLACED AS NEEDED. 11. TREES OR SHRUBS SHALL NOT BE PLANTED ON ANY PORTIONS OF WATER IMPOUNDING EMBANKMENTS, WITHIN THEIR SPILLWAYS/CHANNELS, AND THE REQUIRED ACCESS AND MAINTENANCE EASEMENT. Know wh; Call elow. re you dig. GRAPHIC SCALE 15 0 7.5 15 30 60 ( IN FEET) I inch = 30 ft. LEGEND: SHALLOW LAND AREA: 2,900 SF 5.0' 0.5' (TYP.) SLOPE 3:1 6'W� LITTORAL SHELF SLOPE 6:1 r11 coP�caE�E couna A Mnsnc RVP-1 - 'SEE DETAIL FOR PIPE SIZE ANTI -SEEPAGE COLLAR NTS PROVIDE LOCKING MECHANISM FOR ACCESS HATCH. CONCRETE ANCHOR BOLT (TYP., SEE NOTE #2) THE BOLD LINETYPE DENOTES THE \ I FABRICATED ALUMINUM/STAINLESS THE TRASH RACK FABRICATOR ACCESS HATCH TO BE PROVIDED BY \\(Il- STEEL HINGES FOR THE TxT ACCESS HATCH. ACCESS HATCH SHALL BE POSITIONED OVER STEPS. NOTES: 1. ALL MATERIAL TO BE ALUMINUM ROD. 2. FASTEN TO CONCRETE STRUCTURE WITH e" X 3" STAINLESS STEEL CONCRETE WEDGE ANCHORS AT 24" MAXIMUM SPACING. A MINIMUM OF 4 ANCHORS SHALL BE USED. 3. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL FOR ALUMINUM TRASH RACK PRIOR TO CONSTRUCTION/FABRICATION. N.T.S. SLOPE 2:1 SLOPE STABILIZATION NOTE: EXPOSED INTERIOR 3:1 OR GREATER SLOPES SHALL BE STABILIZED BY THE INSTALLATION OF CENTIPEDE SOD TO THE TOP OF BANK. PPE = 780.00' POND RISER STRUCTURE (SEE DETAIL) MAX ELEV. 639.00' 776" SEDIMENT STORAGE DEPTH AND ELEVATION RELATIVE TO SECTION VIEW ONLY. 10, W 6' W LITTORAL SHELF 781.00 SHALLOW LANDN 24" O-RING RCP (CLASS III) WET POND DETAIL - SECTION A -A NTS TOP OF DAM ELEV = 784.00' WEIR ELEV = 782.5' Q100 ELEV - 782.41" / - - - - - - - - - - - - - - - - - - - - - - - - ELEV 784.00 30" BARREL CONC.CUTOFF WALL RIPRAP PLUNGE \ POOL 1 CONCRETE COLLAR AS PER DETAIL KEYWAY TRENCH TO BE PROVIDED PER THE DIRECTION OF THE SITE GEOTECHNICAL ENGINEER. A KEYWAY TRENCH (KEY TRENCH) OF A MINIMUM WIDTH OF FIVE FEET (5'), CENTERED ON THE CENTERLINE OF THE DAM, SHALL BE INCORPORATED. THE KEYWAY TRENCH SHALL EXTEND TO A MINIMUM DEPTH OF TWO FEET (2'), HOWEVER IN ALL CASES IT SHALL EXTEND INTO SOILS SUITABLE FOR EMBANKMENT FOUNDATIONS. _------ Q1ELEV=780.88- _________ PPE = 778.00' 111:��Fwal I I WEIR / SPILLWAY DETAIL NTS 3'°F CONCRETE ANCHOR BOLT (TYP., SEE NOTE #2) 1.0' 22" Th CLASS B RIP RAP as❑❑�� 0 5' TO EXTEND FROM CREST OF SPILLWAY TO TOE OF DAM ❑❑❑❑❑❑❑❑ z.o' nnnnnnnnnl 0.5' KEY IN SPILLWAY SUCH THAT TOP OF STONE IS AT ±782.50' 10.00, CREST OF SPILLWAY= 782.50' EMERGENCY SPILLWAY NOT TO SCALE ALUMINUM TRASH RACK (ABOVE) ANCHOR TRASH RACK TO MANHOLE WALL-7 WITH FOUR EQUALLY SPACED STAINLESSSTEEL CONCRETE CLAMP ATTACHED WEDGE H O MANHOLE RISER BY24'x1/4" CONCRETE ANCHOR BOLTS EACH GEOTEXTILE TO EXTEND CLAMP TO BE COATED W/ AN EPDXY COATING. MIN 24" INTO ADJACENT 24" Th CLASS B RIP RAP MATERIAL TRASH RACK 5" X 5" OPENINGS REFER TO DETAIL NOTE: J TC1IP ELE .- 781. 0' STANDARD MANHOLE STEPS AT WALL THICKNESS AND 16" O.C. REINFORCEMENT DESIGN TO BE DETERMINED BY PRECAST ° 22" Th CLASS B RIP RAP / TO EXTEND FROM CREST OF SPILLWAY TO ELEV 638.00' GEOTEXTILE LINER EXTEND 2' EACH SIDE RIPRAP CHANNEL NOT TO SCALE CONCRETE MANUFACTURER a DECOMMISSIONING A SEDIMENT BASIN: 4" PVC SCREW TYPE PLUG ALL JOINTS AND CONNECTIONS TO BE WATER TIGHT /BOLTED WITH STAINLESS STEEL STRAPS AND 1. CALL FOR ON -SITE DETERMINATION/MEETING WHEN REQUESTING TO DECOMMISSION/ PHASE OUT A TEMPORARY SEDIMENT BASIN. 4" PVC TEE 4" PVC STUB HARDWARE AND BE 2. DETERMINATION CAN ONLY BE MADE BY THE LOCAL EROSION CONTROL SPECIALIST AND/OR HIS OR HER SUPERVISOR. INTO BOX MORTARED/GROUTED INSIDE AND OUT 3. ONCE IT HAS BEEN AGREED THAT THE TEMPORARY SEDIMENT BASIN CAN BE REMOVED, IT MUST BE MARKED AND INITIALED BY THE EROSION CONTROL INSPECTOR. ELEV. 780.0' 4. IF THE SEDIMENT BASIN HAS WATER IN IT, THE WATER MUST BE PUMPED OUT FROM THE SURFACE INTO A FILTER BAG ON A LEVEL AREA FREE OF DEBRIS (OR ANOTHER APPROVED 4" PVC CAP WITH METHOD WITH NON -EROSIVE PROPERTIES). 2.5" DRILLED HOLE 5. REMOVE SKIMMER AND PLUG ANY HOLES IN THE RISER (IF APPLICABLE) AND REMOVE ALL BAFFLE MATERIALS. 6. IF THERE IS A LOT OF SEDIMENT/SILT IN THE BOTTOM OF THE BASIN, MIX WITH DRY MATERIAL OR SET ASIDE TO DRY, BEFORE HAULING OFF. 7. FILL/CONVERT BASIN PER THE APPROVED GRADING PLAN. 40' 8. AFTER FINAL GRADING HAS BEEN COMPLETED, AREA MUST BE STABILIZED WITH LIME, SEED, FERTILIZER, STRAW AND TACK ACCORDING TO DURHAM COUNTY'S SEEDING APPLICATION RATES AND SPECS. a v 4' • 779.00' 24' RCP @ 3.75° 4" ORIFICE FOR SKIMMER PIPE. W/ O-RING SEAL AFTER SEDIMENT POND IS CONVERTED. tea'. GROUT BOTTOM SLOPE TO DRAIN ---------------------- 1=1=1=1 1=III=III=III=III POND BOTTOM 776.00' -III=III=III=III=I . �=1�1=1�1=1�1=1�1=1�1=1�1=1�1=1�1=1�1=1�1=1�1=1 • .' . -III=III=III=III=III=III=III=III=III=III=III=III '-III-III-III-III-III-III-III-III-III-III-III-I ° . aTI=III-III-III-III-III-III-III III=III=III=III .. . 4'W x 41 x (2'THICK FOR 4" WALLS, 1' T. FOR 6" WALLS) ANTI-BOUYANCY CONCRETE ANCHOR / BLOCK. BLOCK SHALL BE PERMANENTLY SECURED TO RISER BASE UNIT WITH WATER TIGHT JOINTS/CONNECTIONS AND STAINLESS CONCRETE BOTTOM STEEL STRAPS / HARDWARE. 4'X4' PRE -CAST CONCRETE OUTLET STRUCTURE NOT TO SCALE DAM EMBANKMENT CONSTRUCTION STANDARDS: CLASS B RIP RAP SPILLWAY. FOR USE FABRIC AS SHOWN ON DETAIL. TOP OF DAM - 784.00' 1. CONTROLLED FILL, AS SPECIFIED BY THE GEOTECHNICAL ENGINEER, IN THE DAM EMBANKMENT SHALL BE PLACED IN 6-INCH LOOSE LAYERS (3-INCH LOOSE LAYERS WITHIN 3-FEET OF EITHER SIDE OF THE PRINCIPAL SPILLWAY PIPE TO A DEPTH OF 2-FEET OVER THE PIPE) AND SHALL BE COMPACTED TO A DENSITY OF NO LESS THAN 95% OF THE STANDARD PROCTOR MAXIMUM DENSITY AT A MOISTURE CONTENT OF + OR - TWO PERCENTAGE POINTS OF THE OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698. 2. ALL VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS SHALL BE REMOVED FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS WITH ORGANIC MATTER CONTENT EXCEEDING 5% BY WEIGHT SHALL NOT BE USED. STONES GREATER THAN 3-INCH (IN ANY DIRECTION) SHALL BE REMOVED FROM THE FILL PRIOR TO COMPACTION. 3. FILL MATERIAL PLACED AT DENSITIES LOWER THAN SPECIFIED MINIMUM DENSITIES OR AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. 4. ANY FILL LAYER THAT IS SMOOTH DRUM ROLLED TO REDUCE MOISTURE PENETRATION DURING A STORM EVENT SHALL BE PROPERLY SCARIFIED PRIOR TO THE PLACEMENT OF THE NEXT SOIL LIFT. 5. SURFACE WATER AND STREAM FLOW SHALL BE CONTINUOUSLY CONTROLLED THROUGHOUT CONSTRUCTION AND THE PLACEMENT OF CONTROLLED FILL. 6. FOUNDATION AREAS MAY REQUIRE UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. IN NO CASE SHALL THERE BE AN ATTEMPT TO STABILIZE ANY PORTIONS OF THE FOUNDATION SOILS WITH CRUSHED STONE. 7. TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, ETC.) MAY BE REQUIRED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER. ALL SUCH ACTIVITIES SHALL BE CLOSELY MONITORED AND DOCUMENTED BY THE GEOTECHNICAL ENGINEER. 8. FILL ADJACENT TO THE RISER AND PRINCIPAL SPILLWAY PIPE SHALL BE PLACED SO THAT LIFTS ARE AT THE SAME LEVEL ON BOTH SIDES OF THE STRUCTURES. 9. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR MINIATURE SELF-PROPELLED ROLLERS. 10. COMPACTION BY MEANS OF DROP WEIGHTS FROM A CRANE OR HOIST SHALL NOT BE PERMITTED. 11. HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO PASS OVER CAST -IN -PLACE STRUCTURES (INCLUDING THE CRADLE) UNTIL ADEQUATE CURING TIME HAS ELAPSED. 12. TO RE-ESTABLISH VEGETATION AFTER CONSTRUCTION, A 2- TO 3- INCH LAYER OF TOPSOIL SHALL BE PLACED ON THE DISTURBED EMBANKMENT SURFACE AND THE AREA SEEDED AND SODDED OR HYDROSEEDED. om M o W N v Q �o 0 M N 0 CV cl W L0 Z co Q zU) LU W � OO O� C� w 0 c) z w a 0 w w r- (O Lf') 't CM N w w 00 JrrZ�WjwF= � Urj u)zQOOZ� W O Z W 7 Z m U Z Z '7 O axLL=ZZNwp�� Z F 5 0 0¢¢ Z O J W ¢ W��cc>wwOZQ �L7w 2 W -awJ3= ¢w aWWQ¢zC)om�� OHOo0,¢0,Do Q , w �a=afaOWof>�0 W,2 O¢u>zwUUwF-0U W 0¢Qp¢ z p wUZaW0 n J J Z¢ J F F 7 W J F m O U w 1= _ W LU U W O LLi O Cl w ¢ w z U W O O U ui > Uj U) Z 0 m Z Q � O w > U.) Z w o DO U) M o c� c" d Q � � fn LL o \\�1111111111///�// \\�N CAR 0� °o00oF0,00 ESS/N/ ° SEAL < ° o 0 24627 °� ° -1,° F/VGINO�00° J� ` 07-14-2023 y W CID TL W W Z N � Cm z o W r, � w N tA`" V! M w N°°� UZ y > .0 -9 � v W 0 �a 0 M rW V J r� V I F� w A �y O IUD u v� z �ILL i_- LLi FBI �0J Uw zo U) O m0 U �, ° ) vie StreamStats Drainage Areas StreamStats Report Region ID: NC Workspace ID: NC20220715195415512000 Clicked Point (Latitude, Longitude): 36.29033,-79.92273 Time: 2022-07-1 5 1 5:54:13 -0400 i Basin Characteristics 1) 5 5` O Collapse All Dal Parameter Code Parameter Description Value Unit DRNAREA Area that drains to a point on a stream 2.47 square miles LC061MP Percentage of impervious area determined from NLCD 2006 impervious dataset 1.48 percent Urban Peak -Flow Statistics Urban Peak -Flow Statistics Parameters [Region 1 Piedmont Urban under 3 sgmi 2014 5030] Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 2.47 square miles 0.1 3 LC061MP Percent Impervious NLCD2006 1.48 percent 0 47.9 Urban Peak -Flow Statistics Flow Report [Region 1 Piedmont Urban under 3 sgmi 2014 5030] PII: Prediction Interval -Lower, Plu: Prediction Interval -Upper, ASEp: Average Standard Error of Prediction, SE: Standard Error (other -- see report) Statistic Value Unit PII Plu ASEp Urban 50-percent AEP flood 324 ft"3/s 174 604 31.9 Urban 20-Percent AEP flood 570 ft^3/s 344 946 25.4 Urban 10-percent AEP flood 773 ft^3/s 475 1260 25 Urban 4-percent AEP flood 1060 ft"3/s 622 1810 27 Urban 2-percent AEP flood 1310 ft"3/s 736 2330 29.3 Urban 1-percent AEP flood 1570 ft^3/s 833 2960 32.1 Urban 0.5-percent AEP flood 1860 ft^3/s 936 3700 35.1 Urban 0.2-percent AEP flood 2190 ft^3/s 1060 4540 37.5 StreamStats S3 Report Region ID: INC Workspace ID: NC20230714193135331000 Clicked Point (Latitude, Longitude): 36.28998,-79.94734 Time: 2023-07-14 1 5:31 :56 -0400 r o• = r - N N i tit Ln y tr Roadway crossing 53 in phase 5 Basin Characteristics . - a ICI I i; X O Collapse All Parameter Code Parameter Description Value Unit DRNAREA Area that drains to a point on a stream 0.49 square miles LC061MP Percentage of impervious area determined from NLCD 2006 impervious 1.94 percent dataset PCTREG1 Percentage of drainage area located in Region 1 - Piedmont / Ridge and 100 percent Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge 0 percent PCTREG3 Percentage of drainage area located in Region 3 - Sandhills 0 percent PCTREG4 Percentage of drainage area located in Region 4 - Coastal Plains 0 percent PCTREG5 Percentage of drainage area located in Region 5 - Lower Tifton Uplands 0 percent StreamStats Report S8 Region ID: NC Workspace ID: NC20230710123751030000 Clicked Point (Latitude, Longitude): 36.29278,-79.92871 Time: 2023-07-10 08:38:10 -0400 Roadway Crossing S8 O Collapse All Mill Basin Characteristics Parameter Code Parameter Description DRNAREA Area that drains to a point on a stream LC061MP Percentage of impervious area determined from NLCD 2006 impervious dataset PCTREG1 Percentage of drainage area located in Region 1 - Piedmont / Ridge and Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge PCTREG3 Percentage of drainage area located in Region 3 - Sandhills PCTREG4 Percentage of drainage area located in Region 4 - Coastal Plains PCTREG5 Percentage of drainage area located in Region 5 - Lower Tifton Uplands Urban Peak -Flow Statistics Urban Peak -Flow Statistics Parameters [Region 1 Piedmont Urban under 3 sgmi 2014 5030] Value Unit 0.22 square miles 2.68 percent 100 percent 0 percent 0 percent 0 percent 0 percent Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.22 square miles 0.1 3 LC061MP Percent Impervious NLCD2006 2.68 percent 0 47.9 Urban Peak -Flow Statistics Flow Report [Region 1 Piedmont Urban under 3 sgmi 2014 5030] PII: Prediction Interval -Lower, Plu: Prediction Interval -Upper, ASEp: Average Standard Error of Prediction, SE: Standard Error (other -- see report) Statistic Value Unit PII Plu ASEp Urban 50-percent AEP flood 60.5 ft^3/s 32.4 113 31.9 Urban 20-Percent AEP flood 99 ft^3/s 59.6 164 25.4 StreamStatsReport-Phasel -Offsite Region ID: NC Workspace ID: NC20230117182520590000 Clicked Point (Latitude, Longitude): 36.29258,-79.91147 Time: 2023-01-17 13:25:41 -0500 Basin Characteristics Parameter Code Parameter Description DRNAREA Area that drains to a point on a stream LC061MP Percentage of impervious area determined from NLCD 2006 impervious dataset PCTREGI Percentage of drainage area located in Region 1 - Piedmont / Ridge and Valley PCTREG2 Percentage of drainage area located in Region 2 - Blue Ridge PCTREG3 Percentage of drainage area located in Region 3 - Sandhills PCTREG4 Percentage of drainage area located in Region 4 - Coastal Plains PCTREG5 Percentage of drainage area located in Region 5 - Lower Tifton Uplands Peak -Flow Statistics Peak -Flow Statistics Parameters [Region 1 Piedmont rural under 1 sgmi 2014 5030] O Collapse All Value Unit 0.0723 square miles 0.15 percent 100 percent 0 percent 0 percent 0 percent 0 percent Parameter Code Parameter Name Value Units Min Limit Max Limit DRNAREA Drainage Area 0.0723 square miles 0.1 1 LC061MP Percent Impervious NLCD2006 0.15 percent 0 47.9 Peak -Flow Statistics Disclaimers [Region 1 Piedmont rural under 1 sgmi 2014 50301 One or more of the parameters is outside the suggested range. Estimates were extrapolated with unknown errors. Peak -Flow Statistics Flow Report [Region 1 Piedmont rural under 1 sgmi 2014 5030] Statistic Value Unit 50-percent AEP flood 25.4 ft^3/s Statistic Value Unit 20-percent AEP flood 41.3 ft13/s 10-percent AEP flood 52.8 ft^3/s 4-percent AEP flood 67.7 ft^3/s 2-percent AEP flood 79.4 ft^3/s 1-percent AEP flood 91.2 ft13/s 0.5-percent AEP flood 103 ft^3/s 0.2-percent AEP flood 123 ft^3/s Peak -Flow Statistics Citations Feaster, T.D., Gotvald, A.J., and Weaver, J.C.,2014, Methods for estimating the magnitude and frequency of floods for urban and small, rural streams in Georgia, South Carolina, and North Carolina, 2011 (ver. 1.1, March 2014): U.S. Geological Survey Scientific Investigations Report 2014-5030, 104 p. (http://pubs.usgs.gov/sir/2014/5030/) USGS Data Disclaimer: Unless otherwise stated, all data, metadata and related materials are considered to satisfy the quality standards relative to the purpose for which the data were collected. Although these data and associated metadata have been reviewed for accuracy and completeness and approved for release by the U.S. Geological Survey (USGS), no warranty expressed or implied is made regarding the display or utility of the data for other purposes, nor on all computer systems, nor shall the act of distribution constitute any such warranty. USGS Software Disclaimer: This software has been approved for release by the U.S. Geological Survey (USGS). Although the software has been subjected to rigorous review, the USGS reserves the right to update the software as needed pursuant to further analysis and review. No warranty, expressed or implied, is made by the USGS or the U.S. Government as to the functionality of the software and related material nor shall the fact of release constitute any such warranty. Furthermore, the software is released on condition that neither the USGS nor the U.S. Government shall be held liable for any damages resulting from its authorized or unauthorized use. USGS Product Names Disclaimer: Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S. Government. Application Version: 4.12.0 StreamStats Services Version: 1.2.22 NSS Services Version: 2.2.1