Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate the roblem:
The entire BMP
Trash/debris is resent.
Remove the trash/debris.
The perimeter of the
infiltration basin
Areas of bare soil and/or
erosive gullies have formed.
Regrade the soil if necessary to
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer a lication.
The inlet device: pipe or
swale
The pipe is clogged (if
a licable).
Unclog the pipe. Dispose of the
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
a licable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Fonn SW40 I -Infiltration Basin O&M-Rev.3
Page 1 of 3
f-
BMP element:
The forebay
Potential roblem:
Sediment has accumulated
and reduced the depth to 75%
of the original design depth.
How I will remediate the roblem:
Search for the source of the
sediment and remedy the problem if
possible- Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
riprap is displaced.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
revent future erosion roblems.
Weeds are present.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
The main treatment area
A visible layer of sediment
has accumulated.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediate) .
Water is standing more than
5 days after a storm event.
Replace the top few inches of filter
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive re air.
Weeds and noxious plants are
growing in the main
Remove the plants by hand or by
wiping them with pesticide (do not
treatment area.
spray).
The embankment
Shrubs or trees have started
to grow on the embankment.
Remove shrubs or trees
immediately.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair.
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
damage have occurred at the
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
outlet.
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3
Page 2 of 3
Permit Number:
(to be provided by DWQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name: Cashwell Elementary School Addition
BMP drainage area number: 1
Dr. Wilson A. Lacy
Print name:
Executive Director, Operations
Address:2465 Gillespie Street, Fayetteville, NC 28302
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, Y►1L)i' )i�/1 a Notary Public for the State of
Yl r r-M Conn.) 1;,) A , County of OLk . _b",neI , do hereby certify that
&wn A. personally appeared before me this
day of 11DC4,013U, c�?,009, and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
OIAgy'
O
i
mue%.%0 �-
' 9�AND GOJ,:
SEAL
My commission expires �La-i a0/l
Form SW401-Infiltration Basin O&M-Rev.3
Page 3 of 3