Loading...
HomeMy WebLinkAboutNCC232903_ESC Approval Submitted_20230927 SfA 4�'''��� • yt ,' ROY COOPER `r Governor DIONNE DELLI-GATTI Secretary ` BRIAN WRENN NORTH CAROLINA Director Environmental Quality June 1, 2021 LETTER OF APPROVAL WITH MODIFICATIONS MHC at Piper Meadows, LLC Attention: Ryan McGee, Manager 4608 Carriker Road Monroe,North Carolina 28110 RE: , Project Name: Sabella Estates Acres Approved: 7.0 Project ID: UNION-2021-068 County: Union, City: Monroe Address: Sincerity Rd. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Same Date Received by LQS: May 7, 2021 Plan Type: New Dear Mr. McGee: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01 Please direct questions about the NOI form to .Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However,on or after May 1,2019,a$100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a)and the NCGO 1 permit require that the following documentation be kept on file at the job site: - North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources .DE111 d" Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 NORTH CAROLINA INWthe t of Enwamitru Uu,+ay /`� 704.663.1699 Letter of Approval with Modi„. .lions MHC at Piper Meadows, LLC June 1, 2021 Page2of3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If,following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility-Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, c5fAaduza.,r ceeoym.aii/ Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department Letter of Approval with Modi_ ations MHC at Piper Meadows, LLC June 1, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sabella Estates Project ID: UNION-2021-068 County: Union 1.' If contiguous lots are graded such that one acre or more is disturbed,individual lot controls will be insufficient, and surface dewatering is required in order to maintain compliance with the NPDES general construction permit. This site is limited to individual lot disturbance. Contiguous lot disturbance shall be limited to less than 1 acre of disturbance at all times. 2. The attached NCG01 sheets shall be followed. 3. All disturbed areas shall be permanently stabilized with adequate permanent ground cover. Permanent seeding specifications in the NC E&SC Design Manual shall be followed. Refer to Table 6.11.b starting on Page 6.11.15. 4. Erosion control measures shall not be removed until all areas have been adequately stabilized with permanent ground cover. 1 ttt f ...) g fC7. 5-4 ° 0 'CI 0 ® 0 cr °} 2 E* 111/ ; CD � E. CD CD f t,. CD 8 er H 2 : CD ,ia, ,D Cl f� T ® QSp e yam`, h n Cam`,. ,, '-r-' 0 /- > g CD ),e''), P.t. 0 - ® • CD 1^t CD . iv ` • , Ur? �1 ® 0 ' � $1.) g ta. "•' ® HID Pj E is CM CD "-t til ."-c.....: (4) 0 r� _ > 1• + 0 `° CD 0.A CD CD „4: