Loading...
HomeMy WebLinkAboutSW6080804_Admin Review_20081002First Submittal ❑ Re-su Development/Project Name: Receiving stream name_ Application Completeness Review Date Received: �'/� Date Reviewed: Si 2s By 2 Yd !✓�L.F G� �— For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. :7q.17M3 79.23G2 T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): Latitude and Longitude: 3S-`5e o—• �/ ' +✓ Jurisdictio T-Or f Project Address: I FAY9TMVILL,E flab. + 2 REFo,tA A,1 Engineer name and firm: v >1#&' r SAACS o-A.ouP ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets C High Density ❑ Other ❑ 401/404 im�gac s to surface waters, wetlands, and buffers (add language to cover letter and/or addinfo letter) cf BUA ?3 0' Check for $505.00 included RY Original signature (not photocopy) on application B' Legal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: hltp://www.secretary.state.nc.us/corporations/thepa,c.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. AIA ❑ For subdivided projects, a signed and notarized deed restriction statement &� Sealed, signed & dated calculations V Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road e' Two sets of sealed, signed & dated layout & finish grading plans with appropriate details a' Narrative Description of stormwater management provided Soils report provided $kT Ne S/fWT ESTIM' 7?:4> ❑ Wetlands delineated or a note on the plans that none exist on site and/or adjacent property rARI�'W °✓emu o- Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; rK Dimensions & slopes provided o' Drainage areas delineated [Pervious and impervious reported for each ❑ Areas of high density ®" Inspection and maintenance agreements provided ❑ Application complete dApplication Incomplete Returned: (Date) Cie C.01AI ut'Y41T) Comments A10T cAf-PAI A4-AL❑ IMP. 4deEqS, ,Mu5T u59 sli-tpr<G May 14, 2008 Revision SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density projects i ...K ❑ No more than two dwelling units per acre or'24%o builtpupon'area;''' ❑ Vegetated conveyances to the maximum extent practicable; ❑ Built -upon areas at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of�,48'•hours, but not more than:1,20_ hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. f ❑ Achieve 85% average annual removal of total suspended solids. ❑ For BMPs that require a separation from the seasonal hlgh-watentable,(SHWT) the•separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; z ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Post -Construction Runoff Controls for T&E Species Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffers ❑ 200' undisturbed buffers on perennial streams ❑ 100' undisturbed buffers on intermittent streams Low -density projects ❑ All built upon area shall be limited to 10 percent. ❑ Use of vegetated conveyances to the maximum extent practicable; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures High -density projects ❑ The stormwater control measures must control and treat the difference between the pre -development and post -development conditions for the 1-year 24-hour storm. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ All structural stormwater treatment systems must be designed to achieve 85% average annual removal of total suspended solids; ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c)•,'; ;.r. , ;{tir ❑ _ . Deed restrictions, protective covenants, and/or other restrictive language/measures. ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices High Density Projects that require a 401/404 within an NSW ❑ 85% TSS ❑ 30% TP. ..., � '.i -.1P}: ... ,- 1' -. .. rya �"•y '". t:.�. e�Y5:i' , May 14, 2008 Revision