Loading...
HomeMy WebLinkAbout760022_Plan of Action_20221207 PLAN OF ACTION (PoA) for HIGH WASTE LEVELS IN STRUCTURES AT ANIMAL FACILITIES Facility Number: 7o County: Facility Name: Certified Operator Name: &a,- �,�iNG{�� Operator Phone#: ')_7� �Jl Date that High Waste Level Jwas initially reported to DWR: C � 7— 2 DWR Contact Name: fX(CC\ �✓�t(.iylC%1(:� Current Situation 1. List the current waste level(s) as measured from the waste levels in the lagoon/storage pond to the lowest point on the top of the dam for structures without spillways; and from the waste levels in the structure to the bottom of the spillway for structures with spillways. Also, list the quantity of waste, in inches, above the maximum liquid mark' (also called "start pump"). Structure 1 Structure 2 Structure 3 Structure 4 Structure Name/ID: f`�h �uJ Spillway (yes or no): 610 Waste Levela (inches): Above Maximum Liquid Mark' (inches): _ Is Dam Slumping or Seeping (yes or no): Contributing Factors 2. Brief summary (date, type, and amount) of precipitation events contributing to high waste level: 3. Date and quantity of most recent waste application event: 4. Per the Certified Animal Waste Management Plan (CAWMP), how is animal waste land-applied at your facility (e.g. solid spreader, irrigation, honey wagon, slurry truck)? . 4f) Evaluation of Waste Management System 5. If applicable, have the cattle lot and barns been inspected for leaking drinkers? Have repairs been completed? .4/0- 1, e6tk; 6. If applicable, is there enough guttering on the barns to exclude fresh water from the waste structure? If not, when are installation or repairs to be made? ./C) High Waste Level POA Form-Aug2018 7. If applicable, is the diversion ditch around the waste structure functioning properly and excluding all fresh water from the structure? ! l U 8. Describe all methods employed to contain the waste or to exclude it from surface waters (e.g. berm, ditch, retention hole, alternate application method, removal of cattle to pasture): Proposed Strategv 9. Describe moisture conditions in the field (e.g. standing water, application equipment mars down in field, "trafficability" across the soil, soils able to absorb application without runoff, application fields frozen and/or snow covered): /, U J Q7/r 10. Given optimum soil and weather conditions, what is the earliest possible date that land application could commence? el 11) 11. Do you have a waste analysis obtained within 60 days of application? /o_ 12. List the proposed receiving crop(s), application window(s), and total acreage. Do all the proposed fields have an available PAN balance with which to receive additional animal waste? au Craf J�3 c 13. Is waste to be pumped and hauled to an off-site location not included in the CAWMP? If so, list the volume and PAN content of the waste to be hauled as well as the proposed site(s) with their related facility number, number of acres, receiving crop information, etc. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. hereby certify that I have reviewed the information listed above, and to the best of my knowledge and abilit , the information is accurate and correct. h Phone: ` 36 ? F ility wn r/Manager (print) iZZ Date: Facility Owner/Manager (signature) High Waste Level POA Form-Aug2018