Loading...
HomeMy WebLinkAbout010010_Compliance Evaluation Inspection_20211202 Division of Water Resources Facility Number - Division of Soil and Water Conservation 0 Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County:4LTdyU1 Region: Farm Name: ���IQ V V !FM-MS Owner Email: Owner Name: C e' SQCCA Phone: Mailing Address: -7-2 6(n o NL��/ Physical Address: I Facility Contact: �I 6 Title: Phone/��k I " Onsite Representative: / Integrator: Certified Operator: V Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: y D l 11 Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish L ayer DairyCow Wean to Feeder Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Capacity Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Other DischarEes and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes �No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA 0 NE b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA 0 NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes No ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters N Yes 0 No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 21412015 Continued Facili Number: - Date of inspection: Waste Collection&Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes No ❑ NA ❑ N E a. If yes,is waste level into the structural freeboard? ❑ Yes No ❑ NA ❑ NE Structure 1 Struc�tu�r/e�Q2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): Observed Freeboard(in): 1 5.Are there any immediate threats to the integrity of any of the structures observed? 0 Yes 19 No ❑ NA ❑ NE (i.e.,large trees, severe erosion,seepage,etc.) 7� 6.Are there structures on-site which are not properly addressed and/or managed through a [ Yes ❑ No [:] NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? VYes ❑ No ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes � No ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Vy Waste Application 10. Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes ❑ No ❑ NA ANE maintenance or improvement? 11. Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA 14 NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12.Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No NA ❑NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA NE Required Records&Documents 19. Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑ No ❑ NA NE 20. Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes ❑ No ❑ NA CXNE the appropriate box. ❑WUP ❑Checklists ❑Design [:]Maps [:]Lease Agreements ❑Other: 21. Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes ❑ No ❑ NA y NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall [:]Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA N NE 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? [—] Yes ❑ No X NA ❑NE Page 2 of 3 511212020 Continued Facili Number: U t - Date of Inspection: 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No ❑ NA NE 25.Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes ❑ No NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [� No ❑ N A ❑ N F� 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ] No ❑ NA ❑ N F. Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes Na�IVI NA ❑ N F and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes % No 0 NA ❑ N F, If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes ❑ No ❑ NA ( NE permit?(i.e.,discharge,freeboard problems,over-application) 7� 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes ❑ No IX NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? 'X Y�e 9 No ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). U 3N %(t UV�Cuvty e d e dv�c -e+e qk'j- sj) << r)pt_-vj •� )MaA 1 u�6UvO v Va U� Fri ic�i �� n v + . v3k \pbk t� 51 C USN v Mn Woody Reviewer/Inspector Name: G��- �^' �l Phone:eML: :L �"�— Reviewer/Inspector Signa Date: 'a Page 3 of 3 21412015