HomeMy WebLinkAboutNCS000528_Fact sheet binder_20230920 DEQ / DEMLR
FACT SHEET FOR NPDES INDUSTRIAL INDIVIDUAL
STORMWATER PERMIT DEVELOPMENT
Basic Information for Permit Issuance and Renewals:
Permit Writer/Date Brianna Young 9/20/2023
Permit Number NCS000528
Owner/Facility Name Premiere Fibers
SIC AICS Code/Category 2824 (325220)/Manmade organic fiber
Basin Name/Sub-basin number Yadkin Pee-Dee/03-07-10
Receiving Stream/HUC UT to Buffalo Creek/030401040205
Stream Classification/Stream Segment C/ 13-18-1
Is the stream impaired on 303 d list]? No
Any TMDLs? No
Any threatened and/or endangered species? No
Any compliance concerns? See Section 2 below
Any perinit mods since lastpermit? No
New expiration date 10/31/2028
Comments on Draft Permit? See Section 6(below)
Section 1. Facility Activities and Process:
Premiere Fibers produces manmade organic fiber that converts Nylon-Type 6,Nylon-Type 6.6, and
polyester pellets into a wound fiber. Synthetic oils are applied for future processing. There are
approximately 35 motoring wells located across the site. Per the SWPPP submitted with the permit
application, the dumpsters, storage silos, and shipping and receiving bays are the only areas where
pollutants could potentially enter the stormwater drainage system.
Per information in the permit file, materials that could potentially be exposed to stormwater include
yarn, finish oils, degreasing soap, metal powder, boiler chemicals,perchloroethylene, refrigerant oils,
coil cleaners, and maintenance supplies. These materials are shipped/received in closed containers,
loaded and unloaded in covered loading docks, and stored inside.
Outfall SW001:
Drainage area consists of a parking lot,part of the facility, diesel fuel tank, propane tank, trash and metal
dumpsters, hydrogen cylinders, wooden pallet storage, loading/unloading dock, and drum storage.
Outfall SWO02:
Drainage area consists of a driveway, part of the facility, and grassy areas.
Outfall SWO03:
Drainage area consists of a loading/unloading dock, driveway, and grassy and forested areas.
Outfall SWO04:
Drainage area consists of a loading/unloading dock, mechanical storage trailers, and part of the facility.
Outfall SWO05:
Drainage area consists of raw materials silos (polyester chips), nitrogen tank, diesel fuel tank,
transformers, and part of the facility.
Page 1 of 7
Why Industrial Sites with Stormwater are Subject to a Permit: Federal NPDES regulations define
stormwater discharge associated with industrial activity in 40 CFR §122.26 (b)(14) as: "the discharge
from any conveyance that is used for collecting and conveying storm water and that is directly related to
manufacturing,processing or raw materials storage areas at an industrial plant. The term does not
include discharges from facilities or activities excluded from the NPDES program under this part 122.
For the categories of industries identified in this section, the term includes, but is not limited to, storm
water [sic] discharges from industrial plant yards; immediate access roads and rail lines used or traveled
by carriers of raw materials, manufactured products, waste material, or byproducts used or created by
the facility; material handling sites; refuse sites; sites used for the application or disposal of process
waste waters (as defined at part 401 of this chapter); sites used for the storage and maintenance of
material handling equipment; sites used for residual treatment, storage, or disposal; shipping and
receiving areas; manufacturing buildings; storage areas (including tank farms) for raw materials, and
intermediate and final products; and areas where industrial activity has taken place in the past and
significant materials remain and are exposed to storm water. For the purposes of this paragraph, material
handling activities include storage, loading and unloading, transportation, or conveyance of any raw
material, intermediate product, final product, byproduct or waste product. The term excludes areas
located on plant lands separate from the plant's industrial activities, such as office buildings and
accompanying parking lots as long as the drainage from the excluded areas is not mixed with storm
water [sic] drained from the above described areas."
Section 2. Monitoring Information and Compliance History:
• February 2015 to March 2023,benchmarks exceeded for:
o Spring 2021 sampling event missed due to sampling technician contracting long-term
Covid(per info provided 6/23/2023)
o SW001: TSS 3x, pH min not reached 5x
o SW002: pH min not reached 4x
o SW003: pH min not reached 6x
o SW004: COD 3x, pH min not reached Ix
o SW005: TSS 3x, pH min not reached 3x
• NOD issued February 2015 as site inspection noted qualitative and analytical monitoring had not
been conducted and recorded
• Per June 2023 inspection report:
o SWPPP not implemented per permit requirements
o Qualitative and analytical monitoring not conducted per permit requirements
o Several benchmark exceedances noted in data available, but appropriate tiered response
actions not taken
o BMP summary and feasibility study not included in SWPPP
o Erosion was observed near the outlet of Outfall 4 with recommendations of repair and
groundcover stabilization
• NOV issued June 2023 for violations of the SWPPP, qualitative monitoring, and analytical
monitoring
Page 2 of 7
Threatened/Endangered Species:
There are not threatened/endangered species in the nearby vicinity of the facility, however, there is a
species of concern: Copper Emerald(Somatochlora georgiana; NC status: SR)
Section 3. Proposed Monitoring for Stormwater Discharges:
The Division considered potential pollutants from past and present industrial activities and data was
submitted for February 2015 to March 2023. Quantitative sampling included pH, TSS, COD, and one
sample each of O&G, total phosphorus, TKN, and total nitrogen.
Parameters are based on potential pollutants in the drainage area, sampling results, and in some cases,
dependent upon future activities (e.g., ash removal through the drainage area). Below is a table of the
proposed monitoring for each outfall at the Premiere Fibers site.
Outfall SWO01
Quarterly monitoring
Total Suspended Solids BASIS: Potential pollutant from drainage area and BMP effectiveness
(TSS) indicator.
Quarterly monitoring
pH BASIS: Pollutant indicator
Quarterly monitoring
Total Rainfall BASIS: Discharge potential indicator
Quarterly monitoring
Non-Polar Oil &Grease BASIS: Potential pollutant from lubricants; Method 1664 SGT-HEM
targets petroleum-based O&G
Quarterly monitoring
Monthly Oil Usage BASIS: Potential pollutant from drainage area
Quarterly monitoring
BOD BASIS: Discharge potential indicator
Quarterly monitoring
COD BASIS: Discharge potential indicator
Page 3 of 7
Outfalls SW002, SW003, and SWO04
Quarterly monitoring
Total Suspended Solids BASIS: Potential pollutant from drainage area and BMP effectiveness
(TSS) indicator.
Quarterly monitoring
pH BASIS: Pollutant indicator
Quarterly monitoring
Total Rainfall BASIS: Discharge potential indicator
Quarterly monitoring
Non-Polar Oil &Grease BASIS: Potential pollutant from lubricants; Method 1664 SGT-HEM
targets petroleum-based O&G
Quarterly monitoring
Monthly Oil Usage BASIS: Potential pollutant from drainage area
Quarterly monitoring
COD BASIS: Discharge potential indicator
Outfall SWO05
Quarterly monitoring
Total Suspended Solids BASIS: Potential pollutant from drainage area and BM? effectiveness
(TSS) indicator.
Quarterly monitoring
pH BASIS: Pollutant indicator
Quarterly monitoring
Total Rainfall BASIS: Discharge potential indicator
Quarterly monitoring
Non-Polar Oil &Grease BASIS: Potential pollutant from lubricants; Method 1664 SGT-HEM
targets petroleum-based O&G
Quarterly monitoring
Monthly Oil Usage BASIS: Potential pollutant from drainage area
Quarterly monitoring
COD BASIS: Discharge potential indicator
Quarterly monitoring
Total Nitrogen BASIS: Potential pollutant from drainage area
Page 4 of 7
Stormwater Benchmarks and Tiered Response: Rather than limits,North Carolina NPDES
Stormwater permits contain benchmark concentrations. Stormwater benchmarks are numerical action
levels for stormwater monitoring. Benchmarks are not effluent limits, and benchmark exceedances are
not permit violations. Benchmarks provide facilities a tool for assessing the significance of pollutants in
stormwater discharges and the effectiveness of best management practices (BMPs). Benchmark
concentrations are intended as guidelines for the facility's development and implementation of the
Stormwater Pollution Prevention Plan (SWPPP).
Benchmark exceedances require the permittee to increase monitoring, increase management actions,
increase record keeping, and/or install stormwater BMPs in a tiered program. The permit establishes a
tiered approach to specify actions the permittee must take in response to analytical results above
benchmark concentrations. The tiered structure of the permit provides the permittee and DEMLR wide
flexibility to address issues that may arise with one or more parameters and/or outfalls.
Metals benchmarks are calculated to mimic acute water quality standards and with the guidance of
DWR. NC DWR follows established federal procedures for calculating acute standards when developing
the benchmarks. Just like the acute standards, metals benchmarks normally reflect one half of the
calculated Final Acute Value (the "1/2 FAV"). In most cases, translation into total recoverable values is
based on an assumed hardness of 25 mg/L and a total suspended solids (TSS) concentration of 10 mg/L.
Acute standards protect aquatic life from negative impacts of short-term exposure to higher levels of
chemicals where the discharge enters a waterbody. The Stormwater Permitting Program applies this
approach because of the ephemeral nature of rainfall events.
The Division may evaluate results to determine if a smaller suite of parameters for some outfalls is
adequate to characterize potential pollution or BMP effectiveness. For example, one or more metals or
other parameters may serve as an adequate tracer for the presence of ash pollution during disturbance or
ash removal in specific drainage areas at this site. For parameters that do not have a stormwater
benchmark, the Division may develop a benchmark value if appropriate toxicity data become available
or if rising trends in concentrations suggest a persistent source.
A summary of the benchmarks in the draft permit, and their basis, is below:
Parameter Benchmark Basis
Total Suspended 100 mg/L National Urban Runoff Program(NURP) Study, 1983
Solids TSS
H 6 s.u. —9 s.u. NC Water Quality Standard(Range)
Non-Polar Oil & Review of other state's daily maximum benchmark
Grease 15 mg/L concentration for this more targeted O&G;NC WQS that
EPA Method 1664 does not allow oil sheen in waters
SGT-HEM
BOD 30 mg/L BPJ; Based on Secondary Treatment Regulation(40 CFR
133.03
COD 120 mg/L BPJ; Generally found at levels 4x BOD5 in domestic
wastewaters
Total Nitrogen 30 mg/L TKN +Nitrate+Nitrite Benchmarks (Expressed in mg/L of
N
Page 5 of 7
Stormwater Pollution Prevention Plan: The proposed permit conditions reflect the EPA and NC's
pollution prevention approach to stormwater permitting. The Division's maintains that implementation
of Best Management Practices (BMPs) and traditional stormwater management practices that control the
source of pollutants meets the definition of Best Available Technology (BAT) and Best Conventional
Pollutant Control Technology(BCT). The permit conditions are not numeric effluent limitations but are
designed to be flexible requirements for implementing site-specific plans to minimize and control
pollutants in stormwater discharges associated with the industrial activity. Title 40 Code of Federal
Regulations (CFR) §122.44(k)(2) authorizes the use of BMPs in lieu of numeric effluent limitations in
NPDES permits when the agency finds numeric effluent limitations to be infeasible. The agency may
also impose BMP requirements which are "reasonably necessary" to carry out the purposes of the Act
under the authority of 40 CFR 122.44(k)(3). The conditions proposed in this draft permit are included
under the authority of both of these regulatory provisions. In essence, the pollution prevention and BMP
requirements operate as limitations on effluent discharges that reflect the application of BAT/BCT.
Flexibility in Tier Responses: Tier Two actions provide an opportunity for the permittee to propose an
alternative monitoring plan for approval by the Region:
• Alternatively, in lieu of steps 2 and 3, the permittee may, after two consecutive exceedances,
exercise the option of contacting the DEMLR Regional Engineer as provided below in Tier
Three. The Regional Engineer may direct the response actions on the part of the permittee as
provided in Tier Three, including reduced or additional sampling parameters or frequency.
• If pursuing the alternative above after two consecutive exceedances, the permittee may propose
an alternative monitoring plan for approval by the Regional Engineer.
The permit therefore allows the permittee to petition the Regional Office for monitoring changes sooner
than Tier Three (upon any four benchmark exceedances) and gives guidance on one option to take. For
example, the permittee may request that mercury only be monitored semi-annually under the tiers, or
that only parameters over the benchmark be monitored more frequently. In this way, changes to the
monitoring scheme for any outfall could be handled outside of a permit modification.
Other Proposed Requirements:
• It is standard for Stormwater Pollution Prevention Plan(SWPPP)requirements to include an
annual certification that stormwater outfalls have been evaluated for the presence of non-
stormwater discharges, and if any are identified, how those discharges are permitted or otherwise
authorized.
• Requirement to submit a request for permit modification if the facility identifies or creates any
new outfalls, removes outfalls, or alters any drainage area that changes potential pollutants.
• The Division expects the permittee to apply best professional judgment and consider the safety
of its personnel in fulfilling sampling obligations under the permit.
• Federal regulations require electronic submittal of all discharge monitoring reports (DMRs). If a
state does not establish a system to receive such submittals, then permittees must submit DMRs
electronically to the EPA.
• Quarterly QualitativeNisual Monitoring to assure regular observation of outfalls throughout
year.
Section 4. Chances from previous permit to draft:
• Monitoring increased from semi-annually to quarterly for all parameters (qualitative and
quantitative)
Page 6 of 7
• "No discharge" clarifications made
• Feasibility study requirement removed per updated stormwater program requirements
• eDMR requirement added
• Boilerplate language moved into body of the permit; boilerplate no longer attached
• Outfall-specific monitoring been implemented to reflect industrial activity and potential
pollutants specific to each discharge area
• Monitoring for BOD added to SW001 due to storage of wooden pallets in drainage area
• Benchmarks updated for parameters per guidance from DWR Standards group on stormwater
benchmarks
Section 5. Changes from draft to final:
• None
Section 6. Discussions with the Facility and Regional Office:
• Initial contact with facility: 3/3/2023 (requested permit application be submitted);
acknowledgement sent 6/6/2023; Add info request sent 6/8/2023
• Initial contact with Regional Office: 6/8/2023
• Draft sent to CO peer review: N/A
• Draft sent to Regional Office: 7/26/2023
• Final permit sent for supervisor signature: N/A
Section 7. Comments received on draft permit:
• Melissa Joyner(DEMLR FRO; via email 7/27/23): The NCS000528 draft permit for Premiere
Fibers looks good. I do not have any further comments.
Page 7 of 7
LOCALiQ
StarNewsl The lispatchlTimes-News PO Box 631697 Cincinnati,OH 45263-1697
Sun Journal I The D IY News I The Star
The Free Press I Gaston Gazette
The Fayetteville Observer
NORTH CAROLINA
PROOF OF PUBLICATION ENVIRONMENTAL
MANAGEMENT
COMMISSION INTENT
Brianna Young TO ISSUE
Brlanna YoungNPDES STORMWATER
DISCHARGE PERMITS
Ncdeq Dernh The North Carolina Environ-
1612 Mail Service CTR mental Management
Commission proposes to
Raleigh NC27699-1600 issue NPDES stormwater
discharge permits) to the
person(s) listed below.
Public comment or oblecticn
STATE OF NORTH CAROLINA,COUNTY OF CUMBERLAND to Invited. Written W itten Permitshe draft comments
regardingregarding the proposed
The Fayetteville Observer,a newspaper distributed in the county permit will be accepted until
YtY 30 daft after the publish date
of Cumberland,published in the City of Fayetteville,County of of this notice and considered
Cumberland,State of North Carolina printed and published and In the final determination
P P regarding Permit Issuance
personal knowledge of the facts herein state and that the notice and Permit provisions. The
hereto annexed was Published in said newspapers in the issues Director of the NC Division
of Energy, Mineral, and
dated on: Land Resources (DEMLR)
may hold a Public hearing
Oa/02/2023 should there be a significant
degree of public interest.
Please mail comments
and/or Information requests
and that the fees charged are legal. The Fayetteville Observer to DEMLR at 1612 Mail
was a newspaper meeting all the requirements and qualifications Service Center, Raleigh, NC
prescribed by Sec. No. 1-597 G.S,of N.C. 27699-1612.. Premiere Fibers, LLC [PO
Sworn to and subscribed before on 08/02/2023 Box 8930, Bristol, VA 2e203)
has requested renewal of
Permit NCS000528 for the
Premiere Fibers facility in
Anson County. This facility
discharges to an unnamed
tributary to Buffalo Creek In
the Yadkin Pee-Dee River
Basin.
Interested Persons may visit
DEMLR at 512 N. Salisbury
Street, Raleigh, NC 27606 to
review Information on file.
Additional information on
Legal Clerk NPDES permits and this
s notice may be found on our
website:
httm://dea.nc.9ov/obout/dlvls
Nota ,State of W1,County f Brown lons/ener9y-mineral-and-
ry, LY land-resources/stormwa-
ter/stormwater-
/7�2 PrograMstormwater-public.
notices, or by contacting
My CAR1mISlOD expires Brlanna Young at
Publication Cost: $207.89 9i9 nno.yvao7 noOdea.nc.gov or
Order No: 9101575 a= 9101575
#of Copies:
Customer No: 929332 )
PO#:
THIS IS NOT AN INVOICE!
Pfeare do not use thisform for pgytuear remittance.
DENISE ROBERTS
Notary Public t�CCj ,
State of Wisconsin C AUG 12013 E®
6X R•StormwaterPro9rarrt
Page 1 of 1
Compliance Inspection Report
Permit:NCS000528 Effective: 06/01/15 Expiration: 05/31/20 Owner: Premiere Fibers
SOC: Effective: Expiration: Facility: Premiere Fibers
County: Anson 10056 US Hwy 52 N
Region: Fayetteville
Ansonville NC 28007
Contact Person:Dewey Fulton Title: Phone: 276-645-9719
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
On-site representative Chris Fowler 910-995-0740
Related Permits:
Inspection Date: 06/16/2023 Entry Time 10:30AM Exit Time: 12:45PM
Primary Inspector:Melissa A Joyner Phone:
Secondary Inspector(s):
Denise Bruce
Kelly Jonas
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000528 Owner-Facility:Premiere Fibers
Inspection Date: 06/16/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The current permit expired on May 31, 2020. An application for the permit renewal has been submitted and is being
processed with the renewed permit currently under draft review. An inspection was conducted to determine compliance with
the conditions of the current/expired permit.
Melissa Joyner, Denise Bruce and Kelly Jonas met with Mr. Chris Fowler, EHS Manager. The facility's Stormwater Pollution
Prevention Plan (SWPPP), including the Analytical and Qualitative Monitoring records was reviewed. The SWPPP did not
have documentation of the annual review and update which should include all items listed under Part Il,Section A, Item 8 of
the current permit. The site map needed to be updated to include all items as listed under Part ll,Section A, Item 1 c of the
permit. The Spill Prevention and Response Procedures (SPRP)did not include the dated names and signatures of the
facility personnel responsible for implementing the SPRP. No records were available for review of the required semi-annual
facility and stormwater system inspections. There was no documentation of the required annual Employee Training available
for review during the inspection.A Best Manangement Practices Summary and Feasibility Study was not included in the
SPPP.
The Analytical and Qualitative Monitoring records were reviewed. In 2019, during Period 1, there were exceedances of the
benchmark values for Total Suspended Solids(TSS), at Outfall 1 and for Chemical Oxygen Demand (COD) at Outfalls 4 and
5. Tier One response actions were not initiated in response to these exceedances. No Analytical and Qualitative Monitoring
occurred during Period 1 in 2020. Qualitative Monitoring also did not occur during Period 2 in 2020 and Period 1 in 2021.
During Period 2, in 2020 there was another exceedance of the benchmark value for TSS at Outfall 1. During Period 1 in
2022, at Outfall 4, there was an exceedance of the benchmark value for COD. In Period 2 in 2022, no discharges occurred at
Outfalls 1-5. No monitoring occurred for Period 1 in 2023. At Outfall 4, during Period 2, in 2023, there was an exceedance of
the benchmark value for COD.Tier One and Tier Two response actions have not been initiated for these benchmark
exceedances. There have been two consecutive exceedances of COD at Outfall 4, not including the periods of non-dischargE
and non-sampling. Therefore, per the Tier Two response actions, immediately initiate at Outfall 4 monthly Analytical and
Qualitative Monitoring of all parameters until three consecutive sample results are below the benchmark value or within the
benchmark range.
Observations were made of site conditions including Outfalls 1-5. Erosion was observed near the outlet of Outfall 4 with
recommendations of repair and groundcover stabilization. An open, uncovered container with liquid contents was observed
on a pallet.
Page 2 of 3
Permit: NCS000528 Owner-Facility:Premiere Fibers
Inspection Date: 06/16/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑
Comment: The Stormwater Pollution Prevention Plan has not been implemented per the conditions of the
permit.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ 0 ❑ ❑
Comment: Qualitative Monitoring has not been conducted per the conditions of the permit.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Analytical Monitoring has not been conducted per the conditions of the permit.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑
Comment:
Page 3 of 3
ROY COOPER :is
Governor
ELIZABETH S.BISER
� 4Y
Secretary
DOUGLAS R.ANSEL NORTH CAROLINA
interim Director Environmental Quality
June 27, 2023
CERTIFIED MAIL: 7010 1870 0003 47751683
RETURN RECEIPT REQUESTED
Premiere Fibers
Attn: Dewey Fulton
P.O. Box 8930
Bristol, VA 24203
Subject: NOTICE OF VIOLATION (NOV-2023-PC-0269)
Premiere Fibers
NPDES Stormwater Individual Permit NCS000528
Anson County
Dear Mr. Fulton:
On June 16, 2023, Melissa Joyner, Kelly Jonas and Denise Bruce from the Fayetteville Regional Office of the Division of
Energy, Mineral and Land Resources(DEMLR), conducted a site inspection for the Premiere Fibers facility located at 10056
US Hwy 52 N, Ansonville, Anson County, North Carolina. A copy of the Compliance inspection Report is enclosed for your
review. Chris Fowler, EHS Manager was also present during the inspection and his time and assistance is greatly.
appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater Individual
Permit NCS000528. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated
as an UT(un-named tributary)to Buffalo Creek, a Class C stream in the Yadkin-Pee Dee River Basin.
As a result of the site inspection, the following permit conditions violations are noted:
1) Stormwater Pollution Prevention Plan (SWPPP)
Per Part II, Section A...A Stormwater Pollution Prevention Plan (SWPPP) has not been properly implemented.
2)Qualitative Monitoring
Per Part II, Section C...Qualitative monitoring has not been conducted and/or recorded in accordance with permit
requirements.
3)Analytical Monitoring
Per Part I, Section B...Analytical monitoring has not been conducted and/or recorded in accordance with permit
requirements.
Other Observations
Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the
inspection.
Requested Response
You are asked to respond to this office, in writing,within 30 calendar days from receipt of this notice.Your written response
should include a reasonable explanation as to why the aforementioned violations have occurred as well as a Plan of Action
to prevent these violations from recurring.
Action Items
Immediately review and amend the facility's SWPPP as needed and begin incorporating documentation pertaining to the
annual update requirements of the permit. Conduct and record monitoring per the conditions of the permit.
R' North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
.'e: D E� Fayetteville Regional Office 1225 Creep Street.Suite 7141 Fayetteville,North Carolina 28301
N:1R?F'C:A6?CiFANi. �F
Thank you for your attention to this matter. This office requires that the violations, as detailed above, be properly
resolved. These violations and any future violations are subject to a civil penalty assessment of up.to$25,000 per
day for each violation. Should you have any questions regarding these matters, please contact Melissa Joyner or myself
at(910) 433-3300.
Sincerely,
Ti othY�L.. LaBou PE
Regional Engineer
DEMLR
TLLlmaj
Enclosure: Compliance Inspection Report
ec: Chris Fowler, EHS Manager— Premiere Fibers (via email)
Toby Vinson, Jr., PE, CPESC, CPM, Chief of Program Operations—DEMLR (via email)
Brad Cale, PE, Chief of Regional Operations—DEMLR (via email)
Michael Lawyer, CPSWQ—Stormwater Program Supervisor—DEMLR (via email)
Kieu Tran, Environmental Specialist, Stormwater Program— DEMLR (via email)
DEMLR NPDES Stormwater Permit Laserfiche File
CC" FRO — DEMLR, Stormwater Files
Compliance Inspection Report
Permit:NCS000528 Effective: 06/01/15 Expiration: 05/31/20 Owner: Premiere Fibers
SOC: Effective: Expiration: Facility: Premiere Fibers
County: Anson 10056 US Hwy 52 N
Region: Fayetteville
Ansonville NC 28007
Contact Person:Dewey Fulton Title: Phone:276-645-9719
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
On-site representative Chris Fowler 910-995-0740
Related Permits:
Inspection Date: 06/16/2023 Entry Time10:30AM Exit Time: 12:45PM/Primary Inspector:Melissa A Joyner Phone:
Secondary Inspector(s):
Denise Bruce
Kelly Jonas
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: ❑ Compliant 0 Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000528 Owner-Facility:Premiere Fibers
Inspection Date: 06/16/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The current permit expired on May 31, 2020.An application for the permit renewal has been submitted and is being
processed with the renewed permit currently under draft review.An inspection was conducted to determine compliance with
the conditions of the currentlexpired permit.
Melissa Joyner, Denise Bruce and Kelly Jonas met with Mr. Chris Fowler, EHS Manager.The facility's Stormwater Pollution
Prevention Plan (SWPPP), including the Analytical and Qualitative Monitoring records was reviewed.The SWPPP did not
have documentation of the annual review and update which should include all items listed under Part 11,Section A, Item 8 of
the current permit.The site map needed to be updated to include all items as listed under Part 11,Section A, Item 1 c of the
permit. The Spill Prevention and Response Procedures(SPRP)did not include the dated names and signatures of the
facility personnel responsible for implementing the SPRP. No records were available for review of the required semi-annual
facility and stormwater system inspections.There was no documentation of the required annual Employee Training available
for review during the inspection.A Best Manangement Practices Summary and Feasibility Study was not included in the
SPPP.
The Analytical and Qualitative Monitoring records were reviewed. In 2019, during Period 1, there were exceedances of the
benchmark values for Total Suspended Solids(TSS), at Outfall 1 and for Chemical Oxygen Demand (COD)at Outfalls 4 and
5. Tier One response actions were not initiated in response to these exceedances. No Analytical and Qualitative Monitoring
occurred during Period 1 in 2020. Qualitative Monitoring also did not occur during Period 2 in 2020 and Period 1 in 2021.
During Period 2, in 2020 there was another exceedance of the benchmark value for TSS at Outfall 1. During Period 1 in
2022, at Outfall 4, there was an exceedance of the benchmark value for COD. In Period 2 in 2022, no discharges occurred at
Outfalls 1-5. No monitoring occurred for Period 1 in 2023.At Outfall 4, during Period 2, in 2023, there was an exceedance of
the benchmark value for COD.Tier One and Tier Two response actions have not been initiated for these benchmark
exceedances. There have been two consecutive exceedances of COD at Outfall 4, not including the periods of non-discharg(
and non-sampling.Therefore, per the Tier Two response actions, immediately initiate at Outfall 4 monthly Analytical and
Qualitative Monitoring of all parameters until three consecutive sample results are below the benchmark value or within the
benchmark range.
Observations were made of site conditions including Outfalls 1-5. Erosion was observed near the outlet of Outfall 4 with
recommendations of repair and groundcover stabilization. An open, uncovered container with liquid contents was observed
on a pallet.
Page 2of3
Permit: NCS000628 Owner-Facility:Premiere Fibers
Inspection Date: 06/16/2023 Inspection Type:Compliance Evaluation Reason for visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑
#Does the Plan include a General Location(USGS)map? 0 ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? E ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ W ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑
#Does the facility provide all necessary secondary containment? N ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ 0 ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan(SPRP)?. 0 ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? E ❑ ❑ ❑
#Does the facility provide and document Employee Training? E ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
#Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑
Comment: The Stormwater Pollution Prevention Plan has not been implemented per the conditions of the
permit.
Qualitative Monitorina Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ E ❑ ❑
Comment: Qualitative Monitoring has not been conducted per the conditions of the permit.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ E ❑
Comment: Analytical Monitoring has not been conducted per the conditions of the permit.
Permit and Outfalis
Yes No NA NE
#Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? 0 ❑ ❑ ❑
#If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? 110 ❑ ❑
Comment:
Page 3 of 3
Compliance Inspection Report
Permit:NCS000528 Effective: 06/01/15 Expiration: 05/31/20 Owner: Premiere Fibers
SOC: Effective: Expiration: Facility: Premiere Fibers
County: Anson 10056 US Hwy 52 N
Region: Fayetteville
Ansonville NC 28007
Contact Person:Dewey Fulton Title: Phone: 276-645-9719
Directions to Facility:
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
On-site representative Chris Fowler 910-995-0740
Related Permits:
Inspection Date: 06/16/2023 Entry Time 10:30AM Exit Time: 12:45PM
Primary Inspector:Melissa A Joyner Phone:
Secondary Inspector(s):
Denise Bruce
Kelly Jonas
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Stormwater Discharge, Individual
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 3
Permit: NCS000528 Owner-Facility:Premiere Fibers
Inspection Date: 06/16/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The current permit expired on May 31, 2020. An application for the permit renewal has been submitted and is being
processed with the renewed permit currently under draft review. An inspection was conducted to determine compliance with
the conditions of the current/expired permit.
Melissa Joyner, Denise Bruce and Kelly Jonas met with Mr. Chris Fowler, EHS Manager. The facility's Stormwater Pollution
Prevention Plan (SWPPP), including the Analytical and Qualitative Monitoring records was reviewed. The SWPPP did not
have documentation of the annual review and update which should include all items listed under Part Il,Section A, Item 8 of
the current permit. The site map needed to be updated to include all items as listed under Part ll,Section A, Item 1 c of the
permit. The Spill Prevention and Response Procedures (SPRP)did not include the dated names and signatures of the
facility personnel responsible for implementing the SPRP. No records were available for review of the required semi-annual
facility and stormwater system inspections. There was no documentation of the required annual Employee Training available
for review during the inspection.A Best Manangement Practices Summary and Feasibility Study was not included in the
SPPP.
The Analytical and Qualitative Monitoring records were reviewed. In 2019, during Period 1, there were exceedances of the
benchmark values for Total Suspended Solids(TSS), at Outfall 1 and for Chemical Oxygen Demand (COD) at Outfalls 4 and
5. Tier One response actions were not initiated in response to these exceedances. No Analytical and Qualitative Monitoring
occurred during Period 1 in 2020. Qualitative Monitoring also did not occur during Period 2 in 2020 and Period 1 in 2021.
During Period 2, in 2020 there was another exceedance of the benchmark value for TSS at Outfall 1. During Period 1 in
2022, at Outfall 4, there was an exceedance of the benchmark value for COD. In Period 2 in 2022, no discharges occurred at
Outfalls 1-5. No monitoring occurred for Period 1 in 2023. At Outfall 4, during Period 2, in 2023, there was an exceedance of
the benchmark value for COD.Tier One and Tier Two response actions have not been initiated for these benchmark
exceedances. There have been two consecutive exceedances of COD at Outfall 4, not including the periods of non-dischargE
and non-sampling. Therefore, per the Tier Two response actions, immediately initiate at Outfall 4 monthly Analytical and
Qualitative Monitoring of all parameters until three consecutive sample results are below the benchmark value or within the
benchmark range.
Observations were made of site conditions including Outfalls 1-5. Erosion was observed near the outlet of Outfall 4 with
recommendations of repair and groundcover stabilization. An open, uncovered container with liquid contents was observed
on a pallet.
Page 2 of 3
Permit: NCS000528 Owner-Facility:Premiere Fibers
Inspection Date: 06/16/2023 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? 0 ❑ ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑
Comment: The Stormwater Pollution Prevention Plan has not been implemented per the conditions of the
permit.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? ❑ 0 ❑ ❑
Comment: Qualitative Monitoring has not been conducted per the conditions of the permit.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑
Comment: Analytical Monitoring has not been conducted per the conditions of the permit.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑
Comment:
Page 3 of 3
Young, Brianna A
From: Phil Rahn <prahn@watersedgeenv.com>
Sent: Thursday,July 20, 2023 1:44 PM
To: Young, Brianna A; Dewey Fulton; Chris Fowler
Subject: Fwd: [External]Fwd: [External] Additional Questions for Premiere Fiber NPDES Permit
Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Answers to your circled questions below.
Top center of the picture is a dry van trailer (empty), to the right of that in the field is a groundwater pump
house for the groundwater. On the east side in the middle is a pad area with transformers sitting on it. On the
west side, those are air accumulators.
---------- Forwarded message---------
From: Chris Fowler<cfowler@premierefibers.com>
Date: Wed,Jul 19, 2023 at 2:03 PM
Subject: RE: [External]Fwd: [External] Additional Questions for Premiere Fiber NPDES Permit Application
To: Phil Rahn <prahn@watersedgeenv.com>, Dewey Fulton <dewey.fulton@universalfibers.com>
Top center of the picture is a dry van trailer(empty),to the right of that in the field is a freshwater pump house for the
ground water. On the east side in the middle is the ground with transformers sitting on it. On the west side,those are air
accumulators.
Chris Fowler
EHS Manager
Premiere Fibers
10056 US 52
Ansonville, NC 28007
Office: 704-826-1100
Cell: 910-995-0740
Email:cfowler@premierefibers.com
i
From: Phil Rahn <prahn@watersedgeenv.com>
Sent:Wednesday,July 19, 2023 1:53 PM
To: Dewey Fulton <dewey.fulton@universalfibers.com>; Chris Fowler<cfowler@premierefibers.com>
Subject: [External]Fwd: [External] Additional Questions for Premiere Fiber NPDES Permit Application
[EXTERNAL EMAIL]
Will obviously rely on you guys to help respond to this request.
Sent from my iPhone
Begin forwarded message:
From: "Young, Brianna A" <Brianna.Young@deq.nc.gov>
Date:July 19, 2023 at 1:39:53 PM EDT
To: Phil Rahn <prahn@watersedgeenv.com>, Dewey Fulton <dewey.fulton@universalfibers.com>
Subject: RE: [External]Additional Questions for Premiere Fiber NPDES Permit Application
Good afternoon,
After reviewing the site map again in conjunction with your answers below,there are a few
items/structures with unidentified purposes. Please see the attached map and identify the items
outlined in red boxes.
Thank you,
Brianna Young, MS(she/her)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@deg.nc.gov(e-mail preferred)PLEASE NOTE NEW EMAIL ADDRESS
**DEQ is updating its email addresses to @deg.nc.aov in phases from May 1st to June 9th. Employee email
addresses may look different, but email performance will not be impacted.
2
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
The Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and
public. Please check with the appropriate staff before visiting our offices,as we may be able to handle your
requests by phone or email.
From: Phil Rahn <prahn@watersedReenv.com>
Sent:Tuesday,July 18, 2023 2:18 PM
To:Young, Brianna A<Brianna.YounR@deg.nc.Rov>; Dewey Fulton
<Dewey.Fulton @universalfibers.com>
Subject: [External] Additional Questions for Premiere Fiber NPDES Permit Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Brianna- You had some additional questions which Dewey and I
have tried to answer below:
1. There are used wooden pallets stored outside until an amount for pickup. Used pallets are
stored on the North side of the facility, location reference see Figure 3 near E (trash
dumpster). There are also 2 totally enclosed storage trailers on the East side of the building
used to store electrical and mechanical materials, location reference see Figure 3 near MW-4.
2. There are utility transformers on the east side of the main building and one additional
transformer on the south side of the main building.
3. The materials listed are all stored inside and loaded and unloaded in covered loading docks. I
don't understand the possibility of contact with storm water. Perchloroethylene and refrigerant
oils are no longer on site.
4. There is no industrial activity in storm water outfall areas.
5. Dumpsters are located on the north side of the building(see Figure 3 of the permit application).
3
Hope this provides additional clarification.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
arties b an authorized state official.
5
s y
i 5'.'k;A
• 1LKi i
i . 7
4
1
•11
k
4
Young, Brianna A
From: Phil Rahn <prahn@watersedgeenv.com>
Sent: Tuesday, July 18, 2023 2:18 PM
To: Young, Brianna A; Dewey Fulton
Subject: [External] Additional Questions for Premiere Fiber NPDES Permit Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Brianna- You had some additional questions which Dewey and I have
tried to answer below:
1. There are used wooden pallets stored outside until an amount for pickup. Used pallets are stored on the North
side of the facility, location reference see Figure 3 near E (trash dumpster). There are also 2 totally enclosed
storage trailers on the East side of the building used to store electrical and mechanical materials, location
reference see Figure 3 near MW-4.
2. There are utility transformers on the east side of the main building and one additional transformer on the south
side of the main building.
3. The materials listed are all stored inside and loaded and unloaded in covered loading docks. I don't understand
the possibility of contact with storm water. Perchloroethylene and refrigerant oils are no longer on site.
4. There is no industrial activity in storm water outfall areas.
5. Dumpsters are located on the north side of the building(see Figure 3 of the permit application).
Hope this provides additional clarification.
Young, Brianna A
From: Phil Rahn <prahn@watersedgeenv.com>
Sent: Tuesday, July 18, 2023 2:18 PM
To: Young, Brianna A; Dewey Fulton
Subject: [External] Additional Questions for Premiere Fiber NPDES Permit Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Brianna- You had some additional questions which Dewey and I have
tried to answer below:
1. There are used wooden pallets stored outside until an amount for pickup. Used pallets are stored on the North
side of the facility, location reference see Figure 3 near E (trash dumpster). There are also 2 totally enclosed
storage trailers on the East side of the building used to store electrical and mechanical materials, location
reference see Figure 3 near MW-4.
2. There are utility transformers on the east side of the main building and one additional transformer on the south
side of the main building.
3. The materials listed are all stored inside and loaded and unloaded in covered loading docks. I don't understand
the possibility of contact with storm water. Perchloroethylene and refrigerant oils are no longer on site.
4. There is no industrial activity in storm water outfall areas.
5. Dumpsters are located on the north side of the building(see Figure 3 of the permit application).
Hope this provides additional clarification.
Young, Brianna A
From: Young, Brianna A
Sent: Friday, June 30, 2023 3:21 PM
To: Phillip Rahn; Dewey Fulton
Subject: RE: [External] Additional Questions for Premiere NPDES Permit Application
Good afternoon,
Thank you for providing this information. After reviewing everything, I have a few follow-up questions.
1. Are wooden pallets and/or storage trailers outside?
2. Is there an electrical transformer located onsite? If so, please indicate where.
3. What materials are shipped/received from the facility? Information in the permit history indicates materials that
could potentially be exposed to stormwater include yarn,finish oils, degreasing soap, metal powder, boiler
chemicals, perchloroethylene, refrigerant oils, coil cleaners, and maintenance supplies.
4. You provided information on what appears to be industrial activities in the drainage areas outside of the facility.
I apologize if this was not clear in my last request. Please confirm the activities taking place in drainage areas for
each outfall of the facility(SW001 through SW005).
5. Please confirm what drainage area the 2 dumpsters on east side of facility are in.
Please let me know if you have any questions on this request.
Thank you,
Brianna Young, MS(she/her)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brlanna.Young@deg.nc.gov(e-mail preferred)PLEASE NOTE NEW EMAIL ADDRESS
**DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email addresses may look
different, but email performance will not be impacted.
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
The Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Please
check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email.
From: Phillip Rahn <prahn@watersedgeenv.com>
Sent: Friday,June 23, 2023 4:29 PM
To:Young, Brianna A<Brianna.Young@deq.nc.gov>; Dewey Fulton <Dewey.Fulton@universalfibers.com>
Subject: [External] Additional Questions for Premiere NPDES Permit Application
1
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Brianna- I have tried to answer the additional questions raised for the Premiere NPDES Permit Application from your
earlier email.They are attached to this email. Have a good weekend.
Phil Rahn P.G.
President
Waters Edge Environmental, LLC
1434 Chester Road
Raleigh, NC 27608
919.219.5820 (cell)
prahn@watersedgeenv.com (email)
watersedgeenvironmenta1.net (website)
2
WATERS EDGE ENVIRONMENTAL,LLC
1434 CHESTER ROAD • RALEIGH, N.C.27608 • PHONE 919.219.5820
MEMORANDUM
Date June 23, 2023
To Brianna Young, MS
Industrial Individual Permits Coordinator
Stormwater Permitting Program
From Mr. Phil Rahn P.G. - Waters Edge
Copy Mr. Dewey Fulton - Premiere Fibers
Subject Additional DEQ Requests
Premiere Fibers NPDES Permit Renewal
10056 US S.R. 52N
Ansonville, North Carolina 28007
Stormwater Permit No. NCS000528
Waters Edge Job No. R9-21
You had sent an email requesting Premiere to provide additional information. We have
provided answers to each request in italics as follows:
• Description of chemicals stored onsite;
Answer
We have provided a list contained in Appendix A;however, we would state that
the only chemicals stored outside the building is fuel oil used to fire the boilers.
The remaining chemicals are stored inside and should not be subject to any
stormwater runoff.
• Description of industrial activity in each drainage area;
Answer
The drainage areas depicted in the May 23, 2023 NPDES permit application
(Figure 1) are in an area outside ofAnsonville that has no development other
than residential or farming so there would be no industrial activity.
• An electronic spreadsheet summarizing all of the monitoring data (visual and
analytical)that has been collected since the effective date of the current permit;
Answer
We have provided a spreadsheet of the analytical data since the effective date
of the currentpermit in AppendixB. Please realize that some of the Outfalls do
not have flow during rain events and we missed the Spring 2021 sampling
interval since our sampling technician contacted long-term Covid. We could
not make an Excel spreadsheet of the visual data, but it is included in all of our
individual submittals to NCDEQ.
Additional DEQ Requests
Premiere Fibers NPDES Permit Renewal
10056 US S.R. 52N
Ansonville,North Carolina 28007
June 23,2023
Page 2 of 2
• Table D of EPA Form 217;
Answer
We have included Table D in Appendix C.
• Summary of onsite BMPs;
Answer
The onsite BMPs have not changed since what was stated in the February 24,
2009 Stormwater PPP which is contained in Appendix D.
• Summary of significant changes that have occurred at the site since the last permit
renewal.
Answer
There have been no changes since the last permit renewal.
If there are any questions, please contact me at prahn(a,watersedgeenv.com or
919.219.5820.
APPENDIX A
List of Chemicals Stored at Premiere Fibers
Ansonville, North Carolina
Spin Finish
Spin finish concentrate composition and the oil-in-water emulsion made from the concentrate for
application for conventional speed or high speed melt spinning processes for producing polyester or
polyamide yarns, consists essentially of oil lubricant component, pentaerythritol ester lubricant,
ethoxylated sorbitan monooleate of HLB ranging from 6 to 15, anionic antistatic agent, water soluble
sulfosuccinate wetting agent, and oil soluble ethoxylated polymethylsiloxane wetting agent having
molecular weight of 400 to 700 and an aqueous surface tension value of less than 21 dynes/cm. The
concentrate has long term stability.
Dowtherm
Versatile Heat Transfer Fluid that can operate in either liquid or vapor phases in order to collect,transport,
and store heat in a variety of heat transfer applications, such as concentrated solar power(CSP)systems.
DOWTHERMTM A Heat Transfer Fluid is designed to provide a consistent and reliable source of heat
transfer at high temperature applications up to 400°C (750°F)
Fuel oil
No. 2 fuel oil (heating oil): A distillate fuel oil that has a distillation temperatures of 400 degrees
Fahrenheit at the 10-percent recovery point and 640 degrees Fahrenheit at the 90-percent recovery point
and meets the specifications defined in ASTM Specification D 396.
Compressor oil
A long life PAO oil, specifically developed for use in Atlas Copco oil injected screw compressors. (PAO)
fluids are the most common major synthetic base oil used in industrial and automotive lubricants. These
synthetic hydrocarbons are designed to provide superior lubrication performance over a wider operating-
temperature range than petroleum oils and typically are less volatile.
Listing of Individual Chemicals Contained Inside Building at Premiere Fibers
Item No Description U/M Store Location
THERMINOL Therminol LT, Heat Transfer Fluid 55 al drum DRUM
508716 Chemical, Air washer MG-200, 5 Gallon EA PART ROOM
508570 Chemical, Air washer CL-4005 , 5 Gallon EA PART ROOM
508569 Chemical, Corrosion lnhibitor,CL-6050MB EA PART ROOM
Cooling Tower ,Chen
508568 Microguard, MG-906, Biocide Cooling Tower EA PART ROOM
Chemical, 5-Gallon
508567 Chemical, Air washer CL-4550, 5 Gallon EA PART ROOM
508566 Peroxide, Chemical, CL-10, 5 Gallon EA PART ROOM
508391 Coverage Plus,NPD (4 X 1 Gallon Plastic Bottles) CASE
- Fiberboard B-
507679 Cleaner, Alkaline, 55 Gallon Drum, Metal Medic G PROD.SERV
7035, Sodium Hydroxide
507621 Coil Cleaner, Evaporative Foam No Rinse EA PART ROOM
Eva orator, 6 of Nu-Cal on
507562 Cleaner/Degreaser, 55 gallon Water-Based, Clear G PART ROOM
Yellowish, For O
507534 Reagent,Hexane(s) ACS, Minimum Assay 95% n- EA PART ROOM
Hexane
507255 Hydrogen Peroxide, 35%, 5 Gallon(20L) Drum, DRUM PART ROOM
Technical Grade
506962 Reagent, C3270240-2.5Y, Phenol/1,1,2,2- EA
Tetrachloro ethane,
506595 Acetone, 5 Gallon,20L Pail, CAS # 67-64-1, EA PART ROOM
CH3COCH-3
506288 Petroleum Ether A.C.S Reagent, in Poly coated Ltr PART ROOM
Bottles
506169 Solution, Godet Cleaner BGC 2009, 5Litre, EA PART ROOM
F/Cleaning Godet SL
506067 Trieth lene Glycol LBS PART ROOM
505696 Argon Industrial Shielding Gas Mix, Size 300 EA PART ROOM
C linder, CGA-580
505594 Hydrofluoric Acid, 48%, 1L EA PART ROOM
504925 Urethane Conformal Coating, Aerosol, 12 FL.OZ EA ELECT.SHOP
504752 Kit, Acid Treatment, Spill-X, 6 - 2-lb. Shaker EA PART ROOM
Bottles
504439 Coil Cleaner, No Rinse, Aerosol, 18 Oz, EA PART ROOM
Evaporator Cleaner
504198 Nitrogen Gas Cylinder, Nitrogen Industrial 300 EA PART ROOM
Vol-608.00 FT
504152 Acid, Hydrochloric, Reagent ACS 21/2L EA PART ROOM
503740 1 Sodium Phosphate Monobasic,Reagentplus 500G I DRUM I PART ROOM
503556 lsopropyl Alcohol , 1 Gallon, 99% EA ELECT.SHOP
503536 Nitric Acid, 1% (V/V) Aqueous Volumetric EA PART ROOM
Solution, 2.5L
503420 Biocide, Ultra Kleen Solution-2, 5G SXBSXS2- EA PROD.SERV
0047
503419 Biocide, Ultra Kleen Solution-1, 5G SXBI-0041 EA PROD.SERV
503411 Brakleen, 19 fl. oz,Brake Parts Cleaner Aerosol EA PART ROOM
503371 Sodium Hydroxide, Purified pellets, 500G/Case CASE PROD.SERV
503285 Chemical pump, with programmable timer EA PART ROOM
503217 Minimal Expansion Foam, 12 Wt. Oz, CRC- EA ELECT.SHOP
14077
502874 Parts-Wash Solution, Gen. Purpose, Liquid EA PART ROOM
Formula, 5 Gallon Size
502745 Acid dye for Nylon,PERMALON VIOLET FBL LBS PART ROOM
180%
502587 Xceltherm LVI, Heat transfer Fluid 55 Gallon EA WNDR.SHOP
Drum Dowtherm A E
502404 Acetic Acid, 2.5L, Poly-Coated Glass Bottle EA PART ROOM
502277 Solution, Rydlyme, Biodegradeable Descaler, 55 DRUM PART ROOM
Gallon Drum
502273 Pyrophosphate Tetrasodium, 500G DRUM PART ROOM
501825 Soduim DiH dro en Phosphate Extra Pure EA PART ROOM
501620 Xceltherm MKI, Heat transfer Fluid 55 Gallon EA WNDR.SHOP
Drum Dowtherm A
501360 Grease, AUTOL TOP 2000 EA PART ROOM
501260 Cleaner, Alkaline, EZE 2945, 50 Gallon Drum/ LBS PROD.SERV
598 LBS
501013 Hydrogen Peroxide, 35%, 15 Gallon Drum, DRUM PART ROOM
Technical Grade
500945 Oxygen Gas Cylinder, OXY Industrial 282 CF EA PART ROOM
500944 Argon Gas Cylinder, ARGON Industrial 336 CF, EA PART ROOM
500675 Cleaner, Contact, CRC2000 QD EA ELECT.SHOP
500504 Cleaner, Contact, CRC2000 EA ELECT.SHOP
500299 Perchloro ethylene, Freon Grade (55Gal Drum), DRUM PART ROOM
700Lbs
500280 Solution, Cleaning, PRODAN (IOLitre) EA PART ROOM
500081 Super Rustripper, Oakite LBS PROD.SERV
500080 Biocide, Acticide LA LBS PROD.SERV
400117 Reprocess Dowtherm A LBS WNDRSHOP
APPENDIX
B
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 001
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 4/24/18
Threshold
Total Suspended Solids mg/L 100 231 5.5 57.0 2.9 5.0 39.2 159 BDL
pH SU 6.0-9.0 4.0 6.7 6.3 5.9 6.4 6.5 6.2 NA
Chemical Oxygen mg/L 120 BDL BDL BDL 46.0 BDL BDL BDL NA
T)Pmand
NCDENR
Analytical Parameter Units Permit 8/2/18 6/7/19 7/24/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22
Threshold
Total Suspended Solids mg/L 100 2.8 1,250 8.9 10.2 9.4 No Flow 2.6 BDL
pH SU 6.0-9.0 6.0 5.4 NA 6.1 5.1 No Flow 5.1 6.2
Chemical Oxygen mg/L 120 BDL 45.7 NA BDL BDL No Flow BDL BDL
n rl
NCDENR
Analytical Parameter Units Permit 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 No Flow No Flow
pH SU 6.0-9.0 No Flow No Flow
Chemical Oxygen mg/L 120 No Flow No Flow
M-M!And
SU- Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 001
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 002
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 8/2/18
Threshold
Total Suspended Solids mg/L 100 4.6 38.2 BDL BDL 5.5 BDL BDL BDL
pH SU 6.0-9.0 6.1 6.5 6.3 6.5 6.5 6.6 6.3 6.3
Chemical Oxygen
llPmnn mg/L 120 BDL BDL BDL BDL BDL BDL BDL BDL
NCDENR
Analytical Parameter Units Permit 6/7/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 BDL 5.3 34.0 7.7 5.7 BDL No Flow 3.7
pH SU 6.0-9.0 5.6 6.4 5.8 5.6 4.2 6.2 No Flow 6.2
Chemical Oxygen mg/L 120 BDL BDL 27.3 BDL BDL BDL No Flow BDL
nt-mnnd
NCDENR
Analytical Parameter Units Permit
Threshold
Total Suspended Solids mg/L 100
pH SU 6.0-9.0
Chemical Oxygen mg/L 120
SU-Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 002
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 003
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 8/2/18
Threshold
Total Suspended Solids mg/L 100 4.1 15.1 12.3 67.9 2.6 5.3 26.8 10.1
pH SU 6.0-9.0 6.1 6.0 6.0 6.2 5.9 6.5 6.2 5.5
Chemical Oxygen
llPmnn mg/L 120 BDL BDL BDL BDL BDL BDL BDL BDL
NCDENR
Analytical Parameter Units Permit 6/7/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 9.2 5.0 8.9 4.0 10.6 23.6 No Flow 11.0
pH SU 6.0-9.0 5.5 6.3 6.2 5.0 5.3 6.1 No Flow 5.9
Chemical Oxygen mg/L 120 38.6 BDL BDL BDL BDL 30.3 No Flow 31.6
nt-mnnd
NCDENR
Analytical Parameter Units Permit
Threshold
Total Suspended Solids mg/L 100
pH SU 6.0-9.0
Chemical Oxygen 11,E 120
DPMnnfI
SU-Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 003
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 004
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 8/2/18
Threshold
Total Suspended Solids mg/L 100 19.8 6.5 54.8 35.2 23.2 BDL 16.9 24.6
pH SU 6.0-9.0 8.3 6.3 6.8 6.9 6.3 7.2 6.9 6.3
Chemical Oxygen mg/L 120 45 BDL 94.0 97.0 34.0 BDL 88.0 37.9
T)Pmanrl
NCDENR
Analytical Parameter Units Permit 6/7/19 7/24/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22 11/11/22
Threshold
Total Suspended Solids mg/L 100 18.0 NA 9.2 20.3 23.3 9.9 15.7 7.0
pH SU 6.0-9.0 6.1 NA 7.0 7.0 6.8 5.9 6.8 7.6
Chemical Oxygen mg/L 120 136 258 104 58.4 59.5 25.7 125 41.1
n rl
NCDENR
Analytical Parameter Units Permit 3/2/23
Threshold
Total Suspended Solids mg/L 100 7.7
pH SU 6.0-9.0 6.7
Chemical Oxygen mg/L 120 90.2
ilPmanrl
SU- Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 004
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 005
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 10/23/17 3/1/18
Threshold
Total Suspended Solids mg/L 100 54.5 5.9 33.0 15.9 51.3 115 24.7 27.9
pH SU 6.0-9.0 8.3 6.3 7.1 6.9 6.4 6.8 6.8 6.5
Chemical Oxygen mg/L 120 BDL BDL 97.0 107 63.0 BDL 310 107
T)Pmand
NCDENR
Analytical Parameter Units Permit 8/2/18 6/7/19 7/24/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22
Threshold
Total Suspended Solids mg/L 100 27.5 96.5 NA 100 19.6 187 39.8 3.8
pH SU 6.0-9.0 6.3 6.2 NA 4.3 5.9 6.9 5.9 6.5
Chemical Oxygen mg/L 120 28.4 148 275 85.0 51.7 78.9 28.0 BDL
n rl
NCDENR
Analytical Parameter Units Permit 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 8.6 5.3
pH SU 6.0-9.0 7.4 6.6
Chemical Oxygen mg/L 120 48.3 76.2
ilPmanrl
SU- Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 005
APPENDIX C
EPA Identification Number NPDES Permit Number Facility name Outfall Number Form Approved 03/05/19
NCD986230159 NCS000528 Premiere Fibers 001-005 OMB No.2040-0004
STORMTABLE D. • ' • I
Provide data for the storm event(s)that resulted in the maximum daily discharges for the flow-weighted composite sample.
Number of Hours Between
Total Rainfall During Maximum Flow Rate
Duration of Storm Event (in inches) Beginning of Storm Measured and (in gpm or specify units) Total Flow from Rain Event
Date of Storm Event (in hours) Storm Event End of Previous Measurable Rain During Rain Event (in gallons or specify units)
Event
06/19/2023
Approximately 1 hour .31" 4/23-4/27, approximately 96 hours 5GPM 300 gal.from each outfall
Provide a description of the method of flow measurement or estimate.
Flow from each outfall 001-005 are discharged at the invert of a reinforced concrete pipe. No flow meters or measuring devices are in use. However,the predominant flow originates
from roof drains.The discharge is rapid flowing and the duration is very limited upon cessation of the rain event.Some laminar flow is caught in the outfall 003 catch basin from the
asphalt drive.Minimal flow is observed on the gravel and asphalt areas and is captured within the grassy areas.This water is moved to drainage features along the North,South and West
due to the grade of the landscape.Total flow was estimated at 5 GPM for 60 minutes.
Click to go back to the beginning of Form
EPA Form 3510-21F(Revised 3-19) Page 13
APPENDIX D
STORM WATER POLLUTION PREVENTION PLAN
PREMIERE FIBERS, INC.
10056 US HIGHWAY 52 NORTH
ANSONVILLE , NORTH CAROLINA
1175/1176
:0.'s: Premiere
jf��1 P I B E R S
Pe•pa ..i I...I —
STORM WATER POLLUTION PREVENTION PLAN
PREMIERE FIBERS, INC.
10056 US HIGHWAY 52 NORTH
ANSONVILLE, NORTH CAROLINA
Prepared for:
PREMIERE FIBERS, INC
Prepared by:
PREMIERE FIBERS, INC.
ANSONVILLE, N.C.
February 24th 2009
:s:'s: Premiere
"ll
F I B E R S
'P_P_..I Innovaion
TABLE OF CONTENTS
Page No.
1.0 INTRODUCTION 1
2.0 POLLUTION PREVENTION TEAM 1
3.0 COMPARISON WITH OTHER PLANS 2
4.0 DESCRIPTION OF POTENTIAL POLLUTION SOURCES 2
4.1 FACILITY SITE MAP 2
4.2 INVENTORY OF EXPOSED MATERIALS 2
4.3 NON-STORM WATER DISCHARGES 2
4.4 STORM WATER MONITORING DATA 5
4.5 POLLUTANT SOURCE IDENTIFICATION 5
5.0 MEASURES AND CONTROLS 6
5.1 GOOD HOUSEKEEPING 6
5.2 PREVENTIVE MAINTENANCE 7
5.3 INSPECTIONS 8
5.4 SPILL PREVENTION AND RESPONSE PROCEDURES 8
5.5 SEDIMENT AND EROSION CONTROL 9
5.6 MANAGEMENT OF RUNOFF 9
5.7 EMPLOYEE TRAINING PROGRAM 9
5.8 STORM WATER DISCHARGE MONITORING 9
6.0 IMPLEMENTATION 9
7.0 SITE COMPLIANCE EVALUATION 10
8.0 CERTIFICATION 11
LIST OF FIGURES
1 Site Map 3
2 Site Plan 4
3 Compliance Evaluation Form 12
LIST OF TABLES
1 Pollution Prevention Team Roster 1
2 Preventive Maintenance Schedule 8
3 Storm Water Sampling Parameters 10
LIST OF APPENDICES
A Inventory of Significant Materials On-Site
B Non-Storm Water Discharge Certification
Premiere
I B L; R S
'['..p• ua! Innva�ion
1.0 INTRODUCTION
This Storm Water Pollution Prevention Plan (SWPPP) has been prepared to comply with
the provisions of 40 CFR Part 122. Its purpose is to control the discharge of pollutants in storm
water runoff from the Premiere Fibers Plant at 10056 US Highway 52 North in Ansonville
North Carolina. Premiere Fibers is engaged primarily in the conversion of Nylon and
Polyester chips into partially oriented yarn through a heating and extrusion process
This document represents the continuing effort of Premiere Fibers to insure compliance
with environmental regulations and assist all Premiere Fibers employees in the performance of
their duties.
2.0 POLLUTION PREVENTION TEAM
Responsibilities of the Pollution Prevention Team leader include signatory authority,
coordinating all stages of plan implementation, coordinating the employee training program,
keeping all records, and ensuring reports are submitted. Team member responsibilities include
noting changes affecting the environment, conducting inspections, implementing the preventive
maintenance program, coordinating spill response, and overseeing good housekeeping.
Table 1 presents the Premiere Fibers Pollution Prevention Team.
Table 1
Pollution Prevention Team Roster
Leader: Kevin Bowers
Technical Manager.
(704) -826-8321
Responsibilities include coordinating plan implementation; coordinating
employee training program; ensuring records maintenance and report filing;
overseeing inspections and "good housekeeping".
Members: Joe Shelton
Safety Manager
(704)-826-8321
Responsibilities include notifying team leader of any changes affecting the
environment and assisting with inspections.
Ravi Thandayuthapani
Maintenance Manager:
(704)-826-8321
Responsibilities include coordinating spill response efforts and implementing the
preventive maintenance program.
Premie1, 1re
■■�
page 1
3.0 COMPARISON WITH OTHER PLANS
Premiere Fibers, Inc. does not maintain any management plans with elements that might
overlap with the emergency response, inspection, and training portions of this SWPPP.
4.0 DESCRIPTION OF POTENTIAL POLLUTION SOURCES
In this section, activities, materials, and physical features of the facility that may contribute
significant amounts of pollutants to storm water runoff or, during periods of dry weather, result in
pollutant discharges through the separate storm sewers or storm water drainage systems that drain
the facility are described.
4.1 FACILITY SITE MAP
Figure 1 is a general location map generated from the U.S. Geological Survey's Ansonville North Carolina,
and provided by the North Carolina Department of Environment and Natural Resources
showing the facility's location in relation to transportation routes and surface waters. Figure 2 presents a map
of the facility depicting storm water drainage patterns and places where significant materials are exposed to
rainfall and runoff. Figure 2 also depicts areas where loading and unloading activities occur.
4.2 INVENTORY OF EXPOSED MATERIALS
Appendix A presents an inventory of materials that are or may have been handled, stored,
processed, treated, or disposed of in a manner to allow exposure to storm water at the facility
within the three years prior to February 24th 2009. This inventory was prepared by the Technica
Manager at Premiere Fibers, Inc. who conducted an inspection of the site and related records. The
inventory includes a description of the methods and locations of on-site storage and disposal and
practices used to minimize contact of materials with rainfall and runoff.
According to Premiere Fibers, Inc. records, no significant spills have occurred at the facility within three
years prior to February 24th 2009.
4.3 NON-STORM WATER DISCHARGES
Appendix B presents certifications, signed by the Technial Manager at Premiere Fibers, Inc.,
that discharges from the facility have been tested or evaluated for the presence of non-storm water
discharges. The certifications include the results of any tests and/or evaluations (i.e. observation
of outfalls during dry weather) conducted to detect such discharges, the test method used, the
dates on which the tests and/or evaluations were performed, and the on-site drainage points
directly observed during the test and/or evaluation.
In I Premiere.2an
Page 2
0 o .71W
y'
. 1
NJ
.r3a'•..
' 1 - , •� ..._ .yr+'-r'..� _...: � 1J is ' �-f
Pr*-Ililere Fibers
F+I.UAL + 5IfE a-e9fa -
4 ti I Cc'.Irty; ?5115Lj1
Rfi,,H 6vxj St,oa1.}; UT k6 Buffalo
5A•I' qn: l]y-rOM(Odin R"free RNA Bin) Facility Lot.-ilit�ll
wo Z7M�%ORr154°Mr �y- 7rtai
Page 3
. S . .%` : • �
{ . �
Q � »
-----------
mB@ .
@¥
---
\
: --;GzC-Sn, ----' ��
. _
�
- -
I §) \� ��� ~ � ^
f "
4.4 STORM WATER MONITORING DATA
At present, no data are available on the quality or quantity of storm water discharges from
the facility. However,the North Carolina Department of Environment, Health and Natural
Resources(NCDEHNR)considers Premiere Fibers, INC.to be a Manufacturing
facility,and requires visual monitoring of storm water discharges at such facilities(see Section 5.8).
4.5 POLLUTANT SOURCE IDENTIFICATION
This section is a narrative assessment of the risk potential that sources of pollution at the
facility pose to storm water quality.Specific activities,materials,and physical features at the facility
are clearly pointed to. For this assessment,loading and unloading practices,outdoor storage,
manufacturing,and processing activities,significant dust or particulate generating processes,and
on-site waste disposal practices are considered.The pollutant parameters associated with each
source are included in the assessment.
The dumpsters,storage silos,and shipping and receiving bays appear
to be the only areas where pollutants could potentially enter the storm water drainage system.
These areas were inspected.
An enclosed garbage dumpster is located on the North side of the facility. Solid waste from
manufacturing and office activities awaiting off site disposal is stored in this dumpster.These types
of waste would not be expected to leach if exposed to storm water.The risk for exposure of
pollutants to storm water from this activity is low.
Six storage silos are located on the West side of the facility.These silos store
Polyester chips,raw materials to Premiere Fibers, INC. manufacturing process.
Although the silos are closed,chips could potentially be released and exposed to
storm water during loading/unloading activities.
Materials that could potentially be exposed to storm water during loading/unloading activities
at the shipping and receiving bays are yarn,finish oils,degreasing soap, metal powder, boiler
chemicals, perch loroethylene, refrigerant oils,coil cleaners,and other maintenance and
janitorial supplies.Because these materials are shipped or received at the facility in closed
containers,the risk for exposure of pollutants to storm water from this activity is low.
Two dumpsters are located on the East side of the facility.Solid waste from manufacturing
awaiting off site disposal is stored in these dumpsters.These types of waste would not be
expected to leach if exposed to storm water.The risk for exposure of pollutants to
storm water from this activity is low.
:eus Premiere
Page 5 iiDC�
5.0 MEASURES AND CONTROLS
This section presents an evaluation, selection, and description of pollution prevention
measures, best management practices(BMPs), and other controls which will be implemented at
the facility.
5.1 GOOD HOUSEKEEPING
All Premiere Fibers, Inc. employees will use common sense to identify ways to maintain a clean
and orderly facility and keep contaminants out of separate storm sewers. Ppemiere Fibers, Inc. has
established protocols to reduce the possibility of mishandling chemicals or equipment and trains
employees in good housekeeping techniques. These protocols are described as follows:
Operation and Maintenance
• Management will ensure that dry and clean floors and ground surfaces are maintained by
providing brooms, shovels, vacuum cleaners, or cleaning machines.
• Management will ensure that garbage and waste material are regularly picked up and
disposed of. No more than 50 empty 55-gallon metal or polyethylene drums will be located
on-site at any time.
• Management will ensure that equipment is working properly(see Section 5.2 on preventive
maintenance).
• Management will routinely inspect for leaks or conditions that could lead to discharges of
chemicals or contact of storm water with raw materials, intermediate materials,waste
materials, or products (see Section 5.3 on inspections).
• Management will ensure that spill cleanup procedures are understood by employees(see
Section 5.4 on spill prevention and response procedures).
Material Storage Practices
• Management will provide adequate aisle space to facilitate material transfer and easy
access for inspections.
• Management will ensure that containers, drums, and bags are stored away from direct
traffic routed to prevent accidental spills (see Section 5.4 on spill prevention and response
procedures).
• Management will ensure that containers are stacked according to manufacturers
instructions to avoid damage to them from improper weight distribution.
Management will ensure that containers are stored on pallets or similar devices to prevent
corrosion of the containers which can result when they come in contact with moisture on
the ground.
Premiere
Page 6
• Management will assign the responsibility of hazardous material inventory only to people
who are trained to handle hazardous materials.
Material Inventory Procedures
Premiere Fibers, Inc. will keep an up-to-date inventory of all materials (hazardous and non-
hazardous). During the inventory, the following tasks will be performed:
• Management will identify all chemical substances present in the workplace by reviewing
purchase orders.
• Management will ensure that all containers are labeled to show the name and type of
substance, expiration date, health hazards, suggestions for handling, and first aid
information. This information will be obtained from the Material Safety Data Sheet (MSDS)
maintained at the facility.
• Management will ensure that hazardous materials requiring special handling, storage, use,
and disposal considerations are clearly marked on the inventory.
Employee Participation
Premiere Fibers,lnc. will train employees in good housekeeping techniques. Employee training
will occur as follows:
• Management will incorporate information sessions on good housekeeping practices into the
facility's employee training program.
• Management will discuss good housekeeping at employee meetings.
• Management will publicize pollution prevention concepts through postings.
• Management will post bulletin boards with updated good housekeeping procedures, tips,
and reminders.
5.2 PREVENTIVE MAINTENANCE
Premiere Fibers, Inc. has developed a preventive maintenance program that involves regular
inspection and maintenance of storm water management devices and other equipment and
systems. The devices, equipment, and systems that will be inspected, the inspection and testing
schedule, and the appropriate adjustments, cleaning, repair, or replacement actions are discussed
on Table 2.
:s�'s: Premiere
Page 7 9r®�� l , B L a s
T—P,1u l Innovation
5.3 INSPECTIONS
The Pollution Prevention Team members identified in Section 2.0 will inspect the equipment
and areas of the facility as discussed in Table 2. Complete and detailed records of routine
preventive maintenance inspections and associated corrective action, repairs, or replacements will
be provided to the Pollution Prevention Team leader who will file them with other visual inspection
records.
Table 2
Preventive Maintenance Schedule
Inspection
Device, equipment or systems Frequency Corrective action
Enclosed Dumpster Monthly Contain, divert, and cleanup any spill:
Two Dumpsters Monthly Contain, divert, and cleanup any spill;
Storage Silos Monthly Contain, divert, and cleanup any spill;
Shipping and receiving bays Monthly Dry and sweep area
Paved areas Monthly Move potential pollutants under coves
and out of storm water flow paths; cleat
up any spill:
Unpaved areas Monthly Seed any areas lacking vegetation
mulch and stabilize any sodded area:
plant vegetative buffer strips, a!
necessary; install structural controls, a
necessary
5.4 SPILL PREVENTION AND RESPONSE PROCEDURES
Based on an assessment of possible spill scenarios, the following material handling
procedures, storage requirements, containment/diversion equipment, and spill cleanup procedures
are specified because they will minimize the potential for spills and, in the event of a spill, enable
proper and timely response.
If a leak develops or a spill occurs, the employee who discovers the discharge will contact
his/her supervisor who will in turn contact the Pollution Prevention Team leader. The Pollution
Prevention Team leader will obtain the following information:
• Location of the spill or leak, material involved, and source (valve, pipe, drum, etc.).
• The approximate amount spilled or an estimate of the discharge rate, and the direction of
discharge flow.
'sE�'s: Premiere
0��It r 1 1i e a s
Page 8 Pr.,.r..
The Pollution Prevention Team leader will dispatch facility personnel to the spill site to try
to stop the leak and contain, divert and clean up the spill.
5.5 SEDIMENT AND EROSION CONTROL
Landscaped areas at the facility have a high potential for significant soil erosion. It is the
responsibility of the Pollution Prevention Team leader to ensure that vegetation of these areas is
maintained.
5.6 MANAGEMENT OF RUNOFF
Traditional storm water management practices that divert, infiltrate, reuse, or otherwise
manage storm water runoff so as to reduce the discharge of pollutants do not appear to be
reasonable and appropriate for the facility at this time.
5.7 EMPLOYEE TRAINING PROGRAM
Employees and contractor personnel at all levels of responsibility will be informed of the
components and goals of the SWPPP. Good housekeeping, materials management, and spill
response procedures will be incorporated into the existing annual training program. Specific
training topics are as follows:
Good Housekeeping -Vacuuming and sweeping, prompt spill cleanup, locations of spill response
equipment, securing drums and containers, checking for leaks and spills, perform daily.
Materials Management Practices - Store materials neatly, identify and discuss handling of toxic and
hazardous substances.
Spill Prevention and Resnonse - Identify potential spill areas and drainage pathways, reporting
spills to maintenance supervisor, practice with spill response equipment.
5.8 STORM WATER DISCHARGE MONITORING
The NCDEHNR considers Premiere Fibers, Inc. to be a Manufacturing facility, and
requires semi-annual visual monitoring of storm water discharges at such facilities. Table 3
identifies the characteristics which must be observed at each outfall.
6.0 IMPLEMENTATION
The selected new BMPs and the training described above will be implemented by
April 1 2009.
:::'s: Premiere
//�1, P I B E R S
T"p-.1 I.........
Page 9
Table 3
Storm Water Discharge Characteristics to be Observed
Color
Odor
Clarity
Floating Solids
Suspended Solids
Foam
Oil Sheen
Other obvious indicators of storm water pollution
7.0 SITE COMPLIANCE EVALUATION
Pollution Prevention Team members will perform comprehensive site inspections to (1)
confirm the accuracy of the description of potential pollution sources, (2) determine the
effectiveness of the plan, and (3)assess compliance with the terms and conditions of the permit
on a semi annual basis. This comprehensive evaluation will include:
• Inspecting the storm water drainage areas for evidence of pollutants entering the drainage
system.
• Evaluating the effectiveness of measures to reduce pollutant loadings and whether
additional measures are needed.
• Observing structural measures, sediment controls, and other storm water BMPs to ensure
proper operation.
• Inspecting any equipment needed to implement the plan, such as spill response equipment.
• Revising the plan as needed within two weeks of inspection.
• Implementing any necessary changes within twelve weeks of the inspection.
• Preparing a report summarizing inspection results and followup actions, if any. Include the
date of the inspection and the name of the person who conducted the inspection. Identify
incidents of non-compliance or certify that the facility is in compliance with plan. The report
must be signed and kept with this SWPPP.
sill Premiere
It P I 1l I. R 5
Pag 10
Records of spills, leaks, or other discharges that will be maintained with the SWPPP include
the following:
• The date and time of any incident, weather conditions, duration, cause, environmental
problems, response procedures, parties notified, recommended revisions to the BMP
program, operating procedures, and/or equipment needed to prevent recurrence.
• Formal written reports on any spills of a reportable quantity called in to the National
Response Center.
• A list of procedures for notifying the appropriate plant personnel and the names and
telephone numbers of responsible employees.
Records of inspections and maintenance activities include the following:
• Field notebooks.
• Dated and timed photographs.
• Video tapes.
• Drawings and maps.
All records relating to storm water pollution prevention will be kept on file at the facility.
8.0 CERTIFICATION
I certify under penalty of law that this document and all attachments were prepared under
my direction or supervision in accordance with a system designed to ensure that qualified
personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who managed the system, or those persons directly responsible for gathering
the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
Kevin Bowers
Technical Manager
ss Premiere
elect r 1 1; e a s
Page 11
Figure 3
COMPLIANCE EVALUATION FORM
Date and time of inspection:
Inspector:
(name and title)
Pollutant potential to enter drainage system:
Measures to reduce Measure(s)
Pollutant loadings: Evaluated Status
Equipment
inspected: Status
Action recommended as a result of this evaluation:
Changes to SWPPP:
Date:
Comments:
9: s:Premiere
9/�_\F I B E R S
P..p.i n.l Innoraon
Page 12
APPENDIX A
INVENTORY OF SIGNIFICANT MATERIALS ON-SITE
on 11 Premiere
Sheet of
MATERIAL INVENTORY Completed by
Title Date
Instructions: List all materials used,stored,or produced onsite.Assess and evaluate these materials for their potential to contribute pollutants to
Storm Water runoff.Also complete"Description of Exposed Material"worksheet if the material has been exposed during the last three years.
Quality Past Significant
(Units) Quality Exposed In Likelihood of Contact with Storm Water Spill or Leak
Materials Purpose/Location Used Produced Stored Last 3 Years If yes,describe reason. Yes-7 No
:Premiere
... . 1
APPENDIX B
NON-STORM WATER DISCHARGE CERTIFICATION
:::_: Premiere
NON-STORM WATER DISCHARGE Sheet of
ASSESSMENT AND CERTIFICATION Completed by
Title Date
Outfall Directly Observed
Date of During theTest Method Used to Describe Results from Test for Name of Person Who
Test or (identity as indicated on Test or Evaluate the Presence of Non-Storm Identify Potential Conducted the Test or
Evaluation the site map) Discharged Water Discharge Significant Sources Evaluation
CERTIFICATION
I, (responsible corporate offical), certify under penalty of law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or person's who manage the system or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief,true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
A. Name&Official Title(type or Print B.Area Code and Telephone Number
C.Signature. D. Date Signed
'.��:Premiere
Young, Brianna A
From: Phillip Rahn <prahn@watersedgeenv.com>
Sent: Friday, June 23, 2023 4:29 PM
To: Young, Brianna A; Dewey Fulton
Subject: [External] Additional Questions for Premiere NPDES Permit Application
Attachments: 23-046 mem6.23.23 Premier NPDES Permit Renewal Additional Questions.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Brianna- I have tried to answer the additional questions raised for the Premiere NPDES Permit Application from your
earlier email.They are attached to this email. Have a good weekend.
Phil Rahn P.G.
President
Waters Edge Environmental, LLC
1434 Chester Road
Raleigh, NC 27608
919.219.5820 (cell)
prahn@watersedgeenv.com (email)
watersedgeenvironmenta1.net (website)
i
WATERS EDGE ENVIRONMENTAL,LLC
1434 CHESTER ROAD • RALEIGH, N.C.27608 • PHONE 919.219.5820
MEMORANDUM
Date June 23, 2023
To Brianna Young, MS
Industrial Individual Permits Coordinator
Stormwater Permitting Program
From Mr. Phil Rahn P.G. - Waters Edge
Copy Mr. Dewey Fulton - Premiere Fibers
Subject Additional DEQ Requests
Premiere Fibers NPDES Permit Renewal
10056 US S.R. 52N
Ansonville, North Carolina 28007
Stormwater Permit No. NCS000528
Waters Edge Job No. R9-21
You had sent an email requesting Premiere to provide additional information. We have
provided answers to each request in italics as follows:
• Description of chemicals stored onsite;
Answer
We have provided a list contained in Appendix A;however, we would state that
the only chemicals stored outside the building is fuel oil used to fire the boilers.
The remaining chemicals are stored inside and should not be subject to any
stormwater runoff.
• Description of industrial activity in each drainage area;
Answer
The drainage areas depicted in the May 23, 2023 NPDES permit application
(Figure 1) are in an area outside ofAnsonville that has no development other
than residential or farming so there would be no industrial activity.
• An electronic spreadsheet summarizing all of the monitoring data (visual and
analytical)that has been collected since the effective date of the current permit;
Answer
We have provided a spreadsheet of the analytical data since the effective date
of the currentpermit in AppendixB. Please realize that some of the Outfalls do
not have flow during rain events and we missed the Spring 2021 sampling
interval since our sampling technician contacted long-term Covid. We could
not make an Excel spreadsheet of the visual data, but it is included in all of our
individual submittals to NCDEQ.
Additional DEQ Requests
Premiere Fibers NPDES Permit Renewal
10056 US S.R. 52N
Ansonville,North Carolina 28007
June 23,2023
Page 2 of 2
• Table D of EPA Form 217;
Answer
We have included Table D in Appendix C.
• Summary of onsite BMPs;
Answer
The onsite BMPs have not changed since what was stated in the February 24,
2009 Stormwater PPP which is contained in Appendix D.
• Summary of significant changes that have occurred at the site since the last permit
renewal.
Answer
There have been no changes since the last permit renewal.
If there are any questions, please contact me at prahn(a,watersedgeenv.com or
919.219.5820.
APPENDIX A
List of Chemicals Stored at Premiere Fibers
Ansonville, North Carolina
Spin Finish
Spin finish concentrate composition and the oil-in-water emulsion made from the concentrate for
application for conventional speed or high speed melt spinning processes for producing polyester or
polyamide yarns, consists essentially of oil lubricant component, pentaerythritol ester lubricant,
ethoxylated sorbitan monooleate of HLB ranging from 6 to 15, anionic antistatic agent, water soluble
sulfosuccinate wetting agent, and oil soluble ethoxylated polymethylsiloxane wetting agent having
molecular weight of 400 to 700 and an aqueous surface tension value of less than 21 dynes/cm. The
concentrate has long term stability.
Dowtherm
Versatile Heat Transfer Fluid that can operate in either liquid or vapor phases in order to collect,transport,
and store heat in a variety of heat transfer applications, such as concentrated solar power(CSP)systems.
DOWTHERMTM A Heat Transfer Fluid is designed to provide a consistent and reliable source of heat
transfer at high temperature applications up to 400°C (750°F)
Fuel oil
No. 2 fuel oil (heating oil): A distillate fuel oil that has a distillation temperatures of 400 degrees
Fahrenheit at the 10-percent recovery point and 640 degrees Fahrenheit at the 90-percent recovery point
and meets the specifications defined in ASTM Specification D 396.
Compressor oil
A long life PAO oil, specifically developed for use in Atlas Copco oil injected screw compressors. (PAO)
fluids are the most common major synthetic base oil used in industrial and automotive lubricants. These
synthetic hydrocarbons are designed to provide superior lubrication performance over a wider operating-
temperature range than petroleum oils and typically are less volatile.
Listing of Individual Chemicals Contained Inside Building at Premiere Fibers
Item No Description U/M Store Location
THERMINOL Therminol LT, Heat Transfer Fluid 55 al drum DRUM
508716 Chemical, Air washer MG-200, 5 Gallon EA PART ROOM
508570 Chemical, Air washer CL-4005 , 5 Gallon EA PART ROOM
508569 Chemical, Corrosion lnhibitor,CL-6050MB EA PART ROOM
Cooling Tower ,Chen
508568 Microguard, MG-906, Biocide Cooling Tower EA PART ROOM
Chemical, 5-Gallon
508567 Chemical, Air washer CL-4550, 5 Gallon EA PART ROOM
508566 Peroxide, Chemical, CL-10, 5 Gallon EA PART ROOM
508391 Coverage Plus,NPD (4 X 1 Gallon Plastic Bottles) CASE
- Fiberboard B-
507679 Cleaner, Alkaline, 55 Gallon Drum, Metal Medic G PROD.SERV
7035, Sodium Hydroxide
507621 Coil Cleaner, Evaporative Foam No Rinse EA PART ROOM
Eva orator, 6 of Nu-Cal on
507562 Cleaner/Degreaser, 55 gallon Water-Based, Clear G PART ROOM
Yellowish, For O
507534 Reagent,Hexane(s) ACS, Minimum Assay 95% n- EA PART ROOM
Hexane
507255 Hydrogen Peroxide, 35%, 5 Gallon(20L) Drum, DRUM PART ROOM
Technical Grade
506962 Reagent, C3270240-2.5Y, Phenol/1,1,2,2- EA
Tetrachloro ethane,
506595 Acetone, 5 Gallon,20L Pail, CAS # 67-64-1, EA PART ROOM
CH3COCH-3
506288 Petroleum Ether A.C.S Reagent, in Poly coated Ltr PART ROOM
Bottles
506169 Solution, Godet Cleaner BGC 2009, 5Litre, EA PART ROOM
F/Cleaning Godet SL
506067 Trieth lene Glycol LBS PART ROOM
505696 Argon Industrial Shielding Gas Mix, Size 300 EA PART ROOM
C linder, CGA-580
505594 Hydrofluoric Acid, 48%, 1L EA PART ROOM
504925 Urethane Conformal Coating, Aerosol, 12 FL.OZ EA ELECT.SHOP
504752 Kit, Acid Treatment, Spill-X, 6 - 2-lb. Shaker EA PART ROOM
Bottles
504439 Coil Cleaner, No Rinse, Aerosol, 18 Oz, EA PART ROOM
Evaporator Cleaner
504198 Nitrogen Gas Cylinder, Nitrogen Industrial 300 EA PART ROOM
Vol-608.00 FT
504152 Acid, Hydrochloric, Reagent ACS 21/2L EA PART ROOM
503740 1 Sodium Phosphate Monobasic,Reagentplus 500G I DRUM I PART ROOM
503556 lsopropyl Alcohol , 1 Gallon, 99% EA ELECT.SHOP
503536 Nitric Acid, 1% (V/V) Aqueous Volumetric EA PART ROOM
Solution, 2.5L
503420 Biocide, Ultra Kleen Solution-2, 5G SXBSXS2- EA PROD.SERV
0047
503419 Biocide, Ultra Kleen Solution-1, 5G SXBI-0041 EA PROD.SERV
503411 Brakleen, 19 fl. oz,Brake Parts Cleaner Aerosol EA PART ROOM
503371 Sodium Hydroxide, Purified pellets, 500G/Case CASE PROD.SERV
503285 Chemical pump, with programmable timer EA PART ROOM
503217 Minimal Expansion Foam, 12 Wt. Oz, CRC- EA ELECT.SHOP
14077
502874 Parts-Wash Solution, Gen. Purpose, Liquid EA PART ROOM
Formula, 5 Gallon Size
502745 Acid dye for Nylon,PERMALON VIOLET FBL LBS PART ROOM
180%
502587 Xceltherm LVI, Heat transfer Fluid 55 Gallon EA WNDR.SHOP
Drum Dowtherm A E
502404 Acetic Acid, 2.5L, Poly-Coated Glass Bottle EA PART ROOM
502277 Solution, Rydlyme, Biodegradeable Descaler, 55 DRUM PART ROOM
Gallon Drum
502273 Pyrophosphate Tetrasodium, 500G DRUM PART ROOM
501825 Soduim DiH dro en Phosphate Extra Pure EA PART ROOM
501620 Xceltherm MKI, Heat transfer Fluid 55 Gallon EA WNDR.SHOP
Drum Dowtherm A
501360 Grease, AUTOL TOP 2000 EA PART ROOM
501260 Cleaner, Alkaline, EZE 2945, 50 Gallon Drum/ LBS PROD.SERV
598 LBS
501013 Hydrogen Peroxide, 35%, 15 Gallon Drum, DRUM PART ROOM
Technical Grade
500945 Oxygen Gas Cylinder, OXY Industrial 282 CF EA PART ROOM
500944 Argon Gas Cylinder, ARGON Industrial 336 CF, EA PART ROOM
500675 Cleaner, Contact, CRC2000 QD EA ELECT.SHOP
500504 Cleaner, Contact, CRC2000 EA ELECT.SHOP
500299 Perchloro ethylene, Freon Grade (55Gal Drum), DRUM PART ROOM
700Lbs
500280 Solution, Cleaning, PRODAN (IOLitre) EA PART ROOM
500081 Super Rustripper, Oakite LBS PROD.SERV
500080 Biocide, Acticide LA LBS PROD.SERV
400117 Reprocess Dowtherm A LBS WNDRSHOP
APPENDIX
B
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 001
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 4/24/18
Threshold
Total Suspended Solids mg/L 100 231 5.5 57.0 2.9 5.0 39.2 159 BDL
pH SU 6.0-9.0 4.0 6.7 6.3 5.9 6.4 6.5 6.2 NA
Chemical Oxygen mg/L 120 BDL BDL BDL 46.0 BDL BDL BDL NA
T)Pmand
NCDENR
Analytical Parameter Units Permit 8/2/18 6/7/19 7/24/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22
Threshold
Total Suspended Solids mg/L 100 2.8 1,250 8.9 10.2 9.4 No Flow 2.6 BDL
pH SU 6.0-9.0 6.0 5.4 NA 6.1 5.1 No Flow 5.1 6.2
Chemical Oxygen mg/L 120 BDL 45.7 NA BDL BDL No Flow BDL BDL
n rl
NCDENR
Analytical Parameter Units Permit 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 No Flow No Flow
pH SU 6.0-9.0 No Flow No Flow
Chemical Oxygen mg/L 120 No Flow No Flow
M-M!And
SU- Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 001
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 002
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 8/2/18
Threshold
Total Suspended Solids mg/L 100 4.6 38.2 BDL BDL 5.5 BDL BDL BDL
pH SU 6.0-9.0 6.1 6.5 6.3 6.5 6.5 6.6 6.3 6.3
Chemical Oxygen
llPmnn mg/L 120 BDL BDL BDL BDL BDL BDL BDL BDL
NCDENR
Analytical Parameter Units Permit 6/7/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 BDL 5.3 34.0 7.7 5.7 BDL No Flow 3.7
pH SU 6.0-9.0 5.6 6.4 5.8 5.6 4.2 6.2 No Flow 6.2
Chemical Oxygen mg/L 120 BDL BDL 27.3 BDL BDL BDL No Flow BDL
nt-mnnd
NCDENR
Analytical Parameter Units Permit
Threshold
Total Suspended Solids mg/L 100
pH SU 6.0-9.0
Chemical Oxygen mg/L 120
SU-Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 002
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 003
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 8/2/18
Threshold
Total Suspended Solids mg/L 100 4.1 15.1 12.3 67.9 2.6 5.3 26.8 10.1
pH SU 6.0-9.0 6.1 6.0 6.0 6.2 5.9 6.5 6.2 5.5
Chemical Oxygen
llPmnn mg/L 120 BDL BDL BDL BDL BDL BDL BDL BDL
NCDENR
Analytical Parameter Units Permit 6/7/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 9.2 5.0 8.9 4.0 10.6 23.6 No Flow 11.0
pH SU 6.0-9.0 5.5 6.3 6.2 5.0 5.3 6.1 No Flow 5.9
Chemical Oxygen mg/L 120 38.6 BDL BDL BDL BDL 30.3 No Flow 31.6
nt-mnnd
NCDENR
Analytical Parameter Units Permit
Threshold
Total Suspended Solids mg/L 100
pH SU 6.0-9.0
Chemical Oxygen 11,E 120
DPMnnfI
SU-Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 003
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 004
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 3/1/18 8/2/18
Threshold
Total Suspended Solids mg/L 100 19.8 6.5 54.8 35.2 23.2 BDL 16.9 24.6
pH SU 6.0-9.0 8.3 6.3 6.8 6.9 6.3 7.2 6.9 6.3
Chemical Oxygen mg/L 120 45 BDL 94.0 97.0 34.0 BDL 88.0 37.9
T)Pmanrl
NCDENR
Analytical Parameter Units Permit 6/7/19 7/24/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22 11/11/22
Threshold
Total Suspended Solids mg/L 100 18.0 NA 9.2 20.3 23.3 9.9 15.7 7.0
pH SU 6.0-9.0 6.1 NA 7.0 7.0 6.8 5.9 6.8 7.6
Chemical Oxygen mg/L 120 136 258 104 58.4 59.5 25.7 125 41.1
n rl
NCDENR
Analytical Parameter Units Permit 3/2/23
Threshold
Total Suspended Solids mg/L 100 7.7
pH SU 6.0-9.0 6.7
Chemical Oxygen mg/L 120 90.2
ilPmanrl
SU- Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 004
Table 1
Historical Stormwater Outfall Analytical Results
Premier Fibers
Ansonville, North Carolina
OUTFALL # 005
NCDENR
Analytical Parameter Units Permit 2/23/15 11/3/15 5/5/16 9/21/16 4/6/17 9/12/17 10/23/17 3/1/18
Threshold
Total Suspended Solids mg/L 100 54.5 5.9 33.0 15.9 51.3 115 24.7 27.9
pH SU 6.0-9.0 8.3 6.3 7.1 6.9 6.4 6.8 6.8 6.5
Chemical Oxygen mg/L 120 BDL BDL 97.0 107 63.0 BDL 310 107
T)Pmand
NCDENR
Analytical Parameter Units Permit 8/2/18 6/7/19 7/24/19 10/16/19 2/11/20 11/11/20 8/3/21 6/17/22
Threshold
Total Suspended Solids mg/L 100 27.5 96.5 NA 100 19.6 187 39.8 3.8
pH SU 6.0-9.0 6.3 6.2 NA 4.3 5.9 6.9 5.9 6.5
Chemical Oxygen mg/L 120 28.4 148 275 85.0 51.7 78.9 28.0 BDL
n rl
NCDENR
Analytical Parameter Units Permit 11/11/22 3/2/23
Threshold
Total Suspended Solids mg/L 100 8.6 5.3
pH SU 6.0-9.0 7.4 6.6
Chemical Oxygen mg/L 120 48.3 76.2
ilPmanrl
SU- Standard Units
NA -Not Analyzed
BDL -Below Detection Limit
Bolded numbers exceed NCDENR Permit Threshold
OUTFALL 005
APPENDIX C
EPA Identification Number NPDES Permit Number Facility name Outfall Number Form Approved 03/05/19
NCD986230159 NCS000528 Premiere Fibers 001-005 OMB No.2040-0004
STORMTABLE D. • ' • I
Provide data for the storm event(s)that resulted in the maximum daily discharges for the flow-weighted composite sample.
Number of Hours Between
Total Rainfall During Maximum Flow Rate
Duration of Storm Event (in inches) Beginning of Storm Measured and (in gpm or specify units) Total Flow from Rain Event
Date of Storm Event (in hours) Storm Event End of Previous Measurable Rain During Rain Event (in gallons or specify units)
Event
Approximately 1 hour .31" 4/23-4/27, approximately 96 hours SGPM 300 gal.from each outfall
Provide a description of the method of flow measurement or estimate.
Flow from each outfall 001-005 are discharged at the invert of a reinforced concrete pipe. No flow meters or measuring devices are in use. However,the predominant flow originates
from roof drains.The discharge is rapid flowing and the duration is very limited upon cessation of the rain event.Some laminar flow is caught in the outfall 003 catch basin from the
asphalt drive.Minimal flow is observed on the gravel and asphalt areas and is captured within the grassy areas.This water is moved to drainage features along the North,South and West
due to the grade of the landscape.Total flow was estimated at 5 GPM for 60 minutes.
Click to go back to the beginning of Form
EPA Form 3510-21F(Revised 3-19) Page 13
APPENDIX D
STORM WATER POLLUTION PREVENTION PLAN
PREMIERE FIBERS, INC.
10056 US HIGHWAY 52 NORTH
ANSONVILLE , NORTH CAROLINA
1175/1176
:0.'s: Premiere
jf��1 P I B E R S
Pe•pa ..i I...I —
STORM WATER POLLUTION PREVENTION PLAN
PREMIERE FIBERS, INC.
10056 US HIGHWAY 52 NORTH
ANSONVILLE, NORTH CAROLINA
Prepared for:
PREMIERE FIBERS, INC
Prepared by:
PREMIERE FIBERS, INC.
ANSONVILLE, N.C.
February 24th 2009
:s:'s: Premiere
"ll
F I B E R S
'P_P_..I Innovaion
TABLE OF CONTENTS
Page No.
1.0 INTRODUCTION 1
2.0 POLLUTION PREVENTION TEAM 1
3.0 COMPARISON WITH OTHER PLANS 2
4.0 DESCRIPTION OF POTENTIAL POLLUTION SOURCES 2
4.1 FACILITY SITE MAP 2
4.2 INVENTORY OF EXPOSED MATERIALS 2
4.3 NON-STORM WATER DISCHARGES 2
4.4 STORM WATER MONITORING DATA 5
4.5 POLLUTANT SOURCE IDENTIFICATION 5
5.0 MEASURES AND CONTROLS 6
5.1 GOOD HOUSEKEEPING 6
5.2 PREVENTIVE MAINTENANCE 7
5.3 INSPECTIONS 8
5.4 SPILL PREVENTION AND RESPONSE PROCEDURES 8
5.5 SEDIMENT AND EROSION CONTROL 9
5.6 MANAGEMENT OF RUNOFF 9
5.7 EMPLOYEE TRAINING PROGRAM 9
5.8 STORM WATER DISCHARGE MONITORING 9
6.0 IMPLEMENTATION 9
7.0 SITE COMPLIANCE EVALUATION 10
8.0 CERTIFICATION 11
LIST OF FIGURES
1 Site Map 3
2 Site Plan 4
3 Compliance Evaluation Form 12
LIST OF TABLES
1 Pollution Prevention Team Roster 1
2 Preventive Maintenance Schedule 8
3 Storm Water Sampling Parameters 10
LIST OF APPENDICES
A Inventory of Significant Materials On-Site
B Non-Storm Water Discharge Certification
Premiere
I B L; R S
'['..p• ua! Innva�ion
1.0 INTRODUCTION
This Storm Water Pollution Prevention Plan (SWPPP) has been prepared to comply with
the provisions of 40 CFR Part 122. Its purpose is to control the discharge of pollutants in storm
water runoff from the Premiere Fibers Plant at 10056 US Highway 52 North in Ansonville
North Carolina. Premiere Fibers is engaged primarily in the conversion of Nylon and
Polyester chips into partially oriented yarn through a heating and extrusion process
This document represents the continuing effort of Premiere Fibers to insure compliance
with environmental regulations and assist all Premiere Fibers employees in the performance of
their duties.
2.0 POLLUTION PREVENTION TEAM
Responsibilities of the Pollution Prevention Team leader include signatory authority,
coordinating all stages of plan implementation, coordinating the employee training program,
keeping all records, and ensuring reports are submitted. Team member responsibilities include
noting changes affecting the environment, conducting inspections, implementing the preventive
maintenance program, coordinating spill response, and overseeing good housekeeping.
Table 1 presents the Premiere Fibers Pollution Prevention Team.
Table 1
Pollution Prevention Team Roster
Leader: Kevin Bowers
Technical Manager.
(704) -826-8321
Responsibilities include coordinating plan implementation; coordinating
employee training program; ensuring records maintenance and report filing;
overseeing inspections and "good housekeeping".
Members: Joe Shelton
Safety Manager
(704)-826-8321
Responsibilities include notifying team leader of any changes affecting the
environment and assisting with inspections.
Ravi Thandayuthapani
Maintenance Manager:
(704)-826-8321
Responsibilities include coordinating spill response efforts and implementing the
preventive maintenance program.
Premie1, 1re
■■�
page 1
3.0 COMPARISON WITH OTHER PLANS
Premiere Fibers, Inc. does not maintain any management plans with elements that might
overlap with the emergency response, inspection, and training portions of this SWPPP.
4.0 DESCRIPTION OF POTENTIAL POLLUTION SOURCES
In this section, activities, materials, and physical features of the facility that may contribute
significant amounts of pollutants to storm water runoff or, during periods of dry weather, result in
pollutant discharges through the separate storm sewers or storm water drainage systems that drain
the facility are described.
4.1 FACILITY SITE MAP
Figure 1 is a general location map generated from the U.S. Geological Survey's Ansonville North Carolina,
and provided by the North Carolina Department of Environment and Natural Resources
showing the facility's location in relation to transportation routes and surface waters. Figure 2 presents a map
of the facility depicting storm water drainage patterns and places where significant materials are exposed to
rainfall and runoff. Figure 2 also depicts areas where loading and unloading activities occur.
4.2 INVENTORY OF EXPOSED MATERIALS
Appendix A presents an inventory of materials that are or may have been handled, stored,
processed, treated, or disposed of in a manner to allow exposure to storm water at the facility
within the three years prior to February 24th 2009. This inventory was prepared by the Technica
Manager at Premiere Fibers, Inc. who conducted an inspection of the site and related records. The
inventory includes a description of the methods and locations of on-site storage and disposal and
practices used to minimize contact of materials with rainfall and runoff.
According to Premiere Fibers, Inc. records, no significant spills have occurred at the facility within three
years prior to February 24th 2009.
4.3 NON-STORM WATER DISCHARGES
Appendix B presents certifications, signed by the Technial Manager at Premiere Fibers, Inc.,
that discharges from the facility have been tested or evaluated for the presence of non-storm water
discharges. The certifications include the results of any tests and/or evaluations (i.e. observation
of outfalls during dry weather) conducted to detect such discharges, the test method used, the
dates on which the tests and/or evaluations were performed, and the on-site drainage points
directly observed during the test and/or evaluation.
In I Premiere.2an
Page 2
0 o .71W
y'
. 1
NJ
.r3a'•..
' 1 - , •� ..._ .yr+'-r'..� _...: � 1J is ' �-f
Pr*-Ililere Fibers
F+I.UAL + 5IfE a-e9fa -
4 ti I Cc'.Irty; ?5115Lj1
Rfi,,H 6vxj St,oa1.}; UT k6 Buffalo
5A•I' qn: l]y-rOM(Odin R"free RNA Bin) Facility Lot.-ilit�ll
wo Z7M�%ORr154°Mr �y- 7rtai
Page 3
. S . .%` : • �
{ . �
Q � »
-----------
mB@ .
@¥
---
\
: --;GzC-Sn, ----' ��
. _
�
- -
I §) \� ��� ~ � ^
f "
4.4 STORM WATER MONITORING DATA
At present, no data are available on the quality or quantity of storm water discharges from
the facility. However,the North Carolina Department of Environment, Health and Natural
Resources(NCDEHNR)considers Premiere Fibers, INC.to be a Manufacturing
facility,and requires visual monitoring of storm water discharges at such facilities(see Section 5.8).
4.5 POLLUTANT SOURCE IDENTIFICATION
This section is a narrative assessment of the risk potential that sources of pollution at the
facility pose to storm water quality.Specific activities,materials,and physical features at the facility
are clearly pointed to. For this assessment,loading and unloading practices,outdoor storage,
manufacturing,and processing activities,significant dust or particulate generating processes,and
on-site waste disposal practices are considered.The pollutant parameters associated with each
source are included in the assessment.
The dumpsters,storage silos,and shipping and receiving bays appear
to be the only areas where pollutants could potentially enter the storm water drainage system.
These areas were inspected.
An enclosed garbage dumpster is located on the North side of the facility. Solid waste from
manufacturing and office activities awaiting off site disposal is stored in this dumpster.These types
of waste would not be expected to leach if exposed to storm water.The risk for exposure of
pollutants to storm water from this activity is low.
Six storage silos are located on the West side of the facility.These silos store
Polyester chips,raw materials to Premiere Fibers, INC. manufacturing process.
Although the silos are closed,chips could potentially be released and exposed to
storm water during loading/unloading activities.
Materials that could potentially be exposed to storm water during loading/unloading activities
at the shipping and receiving bays are yarn,finish oils,degreasing soap, metal powder, boiler
chemicals, perch loroethylene, refrigerant oils,coil cleaners,and other maintenance and
janitorial supplies.Because these materials are shipped or received at the facility in closed
containers,the risk for exposure of pollutants to storm water from this activity is low.
Two dumpsters are located on the East side of the facility.Solid waste from manufacturing
awaiting off site disposal is stored in these dumpsters.These types of waste would not be
expected to leach if exposed to storm water.The risk for exposure of pollutants to
storm water from this activity is low.
:eus Premiere
Page 5 iiDC�
5.0 MEASURES AND CONTROLS
This section presents an evaluation, selection, and description of pollution prevention
measures, best management practices(BMPs), and other controls which will be implemented at
the facility.
5.1 GOOD HOUSEKEEPING
All Premiere Fibers, Inc. employees will use common sense to identify ways to maintain a clean
and orderly facility and keep contaminants out of separate storm sewers. Ppemiere Fibers, Inc. has
established protocols to reduce the possibility of mishandling chemicals or equipment and trains
employees in good housekeeping techniques. These protocols are described as follows:
Operation and Maintenance
• Management will ensure that dry and clean floors and ground surfaces are maintained by
providing brooms, shovels, vacuum cleaners, or cleaning machines.
• Management will ensure that garbage and waste material are regularly picked up and
disposed of. No more than 50 empty 55-gallon metal or polyethylene drums will be located
on-site at any time.
• Management will ensure that equipment is working properly(see Section 5.2 on preventive
maintenance).
• Management will routinely inspect for leaks or conditions that could lead to discharges of
chemicals or contact of storm water with raw materials, intermediate materials,waste
materials, or products (see Section 5.3 on inspections).
• Management will ensure that spill cleanup procedures are understood by employees(see
Section 5.4 on spill prevention and response procedures).
Material Storage Practices
• Management will provide adequate aisle space to facilitate material transfer and easy
access for inspections.
• Management will ensure that containers, drums, and bags are stored away from direct
traffic routed to prevent accidental spills (see Section 5.4 on spill prevention and response
procedures).
• Management will ensure that containers are stacked according to manufacturers
instructions to avoid damage to them from improper weight distribution.
Management will ensure that containers are stored on pallets or similar devices to prevent
corrosion of the containers which can result when they come in contact with moisture on
the ground.
Premiere
Page 6
• Management will assign the responsibility of hazardous material inventory only to people
who are trained to handle hazardous materials.
Material Inventory Procedures
Premiere Fibers, Inc. will keep an up-to-date inventory of all materials (hazardous and non-
hazardous). During the inventory, the following tasks will be performed:
• Management will identify all chemical substances present in the workplace by reviewing
purchase orders.
• Management will ensure that all containers are labeled to show the name and type of
substance, expiration date, health hazards, suggestions for handling, and first aid
information. This information will be obtained from the Material Safety Data Sheet (MSDS)
maintained at the facility.
• Management will ensure that hazardous materials requiring special handling, storage, use,
and disposal considerations are clearly marked on the inventory.
Employee Participation
Premiere Fibers,lnc. will train employees in good housekeeping techniques. Employee training
will occur as follows:
• Management will incorporate information sessions on good housekeeping practices into the
facility's employee training program.
• Management will discuss good housekeeping at employee meetings.
• Management will publicize pollution prevention concepts through postings.
• Management will post bulletin boards with updated good housekeeping procedures, tips,
and reminders.
5.2 PREVENTIVE MAINTENANCE
Premiere Fibers, Inc. has developed a preventive maintenance program that involves regular
inspection and maintenance of storm water management devices and other equipment and
systems. The devices, equipment, and systems that will be inspected, the inspection and testing
schedule, and the appropriate adjustments, cleaning, repair, or replacement actions are discussed
on Table 2.
:s�'s: Premiere
Page 7 9r®�� l , B L a s
T—P,1u l Innovation
5.3 INSPECTIONS
The Pollution Prevention Team members identified in Section 2.0 will inspect the equipment
and areas of the facility as discussed in Table 2. Complete and detailed records of routine
preventive maintenance inspections and associated corrective action, repairs, or replacements will
be provided to the Pollution Prevention Team leader who will file them with other visual inspection
records.
Table 2
Preventive Maintenance Schedule
Inspection
Device, equipment or systems Frequency Corrective action
Enclosed Dumpster Monthly Contain, divert, and cleanup any spill:
Two Dumpsters Monthly Contain, divert, and cleanup any spill;
Storage Silos Monthly Contain, divert, and cleanup any spill;
Shipping and receiving bays Monthly Dry and sweep area
Paved areas Monthly Move potential pollutants under coves
and out of storm water flow paths; cleat
up any spill:
Unpaved areas Monthly Seed any areas lacking vegetation
mulch and stabilize any sodded area:
plant vegetative buffer strips, a!
necessary; install structural controls, a
necessary
5.4 SPILL PREVENTION AND RESPONSE PROCEDURES
Based on an assessment of possible spill scenarios, the following material handling
procedures, storage requirements, containment/diversion equipment, and spill cleanup procedures
are specified because they will minimize the potential for spills and, in the event of a spill, enable
proper and timely response.
If a leak develops or a spill occurs, the employee who discovers the discharge will contact
his/her supervisor who will in turn contact the Pollution Prevention Team leader. The Pollution
Prevention Team leader will obtain the following information:
• Location of the spill or leak, material involved, and source (valve, pipe, drum, etc.).
• The approximate amount spilled or an estimate of the discharge rate, and the direction of
discharge flow.
'sE�'s: Premiere
0��It r 1 1i e a s
Page 8 Pr.,.r..
The Pollution Prevention Team leader will dispatch facility personnel to the spill site to try
to stop the leak and contain, divert and clean up the spill.
5.5 SEDIMENT AND EROSION CONTROL
Landscaped areas at the facility have a high potential for significant soil erosion. It is the
responsibility of the Pollution Prevention Team leader to ensure that vegetation of these areas is
maintained.
5.6 MANAGEMENT OF RUNOFF
Traditional storm water management practices that divert, infiltrate, reuse, or otherwise
manage storm water runoff so as to reduce the discharge of pollutants do not appear to be
reasonable and appropriate for the facility at this time.
5.7 EMPLOYEE TRAINING PROGRAM
Employees and contractor personnel at all levels of responsibility will be informed of the
components and goals of the SWPPP. Good housekeeping, materials management, and spill
response procedures will be incorporated into the existing annual training program. Specific
training topics are as follows:
Good Housekeeping -Vacuuming and sweeping, prompt spill cleanup, locations of spill response
equipment, securing drums and containers, checking for leaks and spills, perform daily.
Materials Management Practices - Store materials neatly, identify and discuss handling of toxic and
hazardous substances.
Spill Prevention and Resnonse - Identify potential spill areas and drainage pathways, reporting
spills to maintenance supervisor, practice with spill response equipment.
5.8 STORM WATER DISCHARGE MONITORING
The NCDEHNR considers Premiere Fibers, Inc. to be a Manufacturing facility, and
requires semi-annual visual monitoring of storm water discharges at such facilities. Table 3
identifies the characteristics which must be observed at each outfall.
6.0 IMPLEMENTATION
The selected new BMPs and the training described above will be implemented by
April 1 2009.
:::'s: Premiere
//�1, P I B E R S
T"p-.1 I.........
Page 9
Table 3
Storm Water Discharge Characteristics to be Observed
Color
Odor
Clarity
Floating Solids
Suspended Solids
Foam
Oil Sheen
Other obvious indicators of storm water pollution
7.0 SITE COMPLIANCE EVALUATION
Pollution Prevention Team members will perform comprehensive site inspections to (1)
confirm the accuracy of the description of potential pollution sources, (2) determine the
effectiveness of the plan, and (3)assess compliance with the terms and conditions of the permit
on a semi annual basis. This comprehensive evaluation will include:
• Inspecting the storm water drainage areas for evidence of pollutants entering the drainage
system.
• Evaluating the effectiveness of measures to reduce pollutant loadings and whether
additional measures are needed.
• Observing structural measures, sediment controls, and other storm water BMPs to ensure
proper operation.
• Inspecting any equipment needed to implement the plan, such as spill response equipment.
• Revising the plan as needed within two weeks of inspection.
• Implementing any necessary changes within twelve weeks of the inspection.
• Preparing a report summarizing inspection results and followup actions, if any. Include the
date of the inspection and the name of the person who conducted the inspection. Identify
incidents of non-compliance or certify that the facility is in compliance with plan. The report
must be signed and kept with this SWPPP.
sill Premiere
It P I 1l I. R 5
Pag 10
Records of spills, leaks, or other discharges that will be maintained with the SWPPP include
the following:
• The date and time of any incident, weather conditions, duration, cause, environmental
problems, response procedures, parties notified, recommended revisions to the BMP
program, operating procedures, and/or equipment needed to prevent recurrence.
• Formal written reports on any spills of a reportable quantity called in to the National
Response Center.
• A list of procedures for notifying the appropriate plant personnel and the names and
telephone numbers of responsible employees.
Records of inspections and maintenance activities include the following:
• Field notebooks.
• Dated and timed photographs.
• Video tapes.
• Drawings and maps.
All records relating to storm water pollution prevention will be kept on file at the facility.
8.0 CERTIFICATION
I certify under penalty of law that this document and all attachments were prepared under
my direction or supervision in accordance with a system designed to ensure that qualified
personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who managed the system, or those persons directly responsible for gathering
the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
Kevin Bowers
Technical Manager
ss Premiere
elect r 1 1; e a s
Page 11
Figure 3
COMPLIANCE EVALUATION FORM
Date and time of inspection:
Inspector:
(name and title)
Pollutant potential to enter drainage system:
Measures to reduce Measure(s)
Pollutant loadings: Evaluated Status
Equipment
inspected: Status
Action recommended as a result of this evaluation:
Changes to SWPPP:
Date:
Comments:
9: s:Premiere
9/�_\F I B E R S
P..p.i n.l Innoraon
Page 12
APPENDIX A
INVENTORY OF SIGNIFICANT MATERIALS ON-SITE
on 11 Premiere
Sheet of
MATERIAL INVENTORY Completed by
Title Date
Instructions: List all materials used,stored,or produced onsite.Assess and evaluate these materials for their potential to contribute pollutants to
Storm Water runoff.Also complete"Description of Exposed Material"worksheet if the material has been exposed during the last three years.
Quality Past Significant
(Units) Quality Exposed In Likelihood of Contact with Storm Water Spill or Leak
Materials Purpose/Location Used Produced Stored Last 3 Years If yes,describe reason. Yes-7 No
:Premiere
... . 1
APPENDIX B
NON-STORM WATER DISCHARGE CERTIFICATION
:::_: Premiere
NON-STORM WATER DISCHARGE Sheet of
ASSESSMENT AND CERTIFICATION Completed by
Title Date
Outfall Directly Observed
Date of During theTest Method Used to Describe Results from Test for Name of Person Who
Test or (identity as indicated on Test or Evaluate the Presence of Non-Storm Identify Potential Conducted the Test or
Evaluation the site map) Discharged Water Discharge Significant Sources Evaluation
CERTIFICATION
I, (responsible corporate offical), certify under penalty of law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or person's who manage the system or those persons directly responsible for
gathering the information, the information submitted is, to the best of my knowledge and belief,true, accurate, and complete. I am aware that
there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
A. Name&Official Title(type or Print B.Area Code and Telephone Number
C.Signature. D. Date Signed
'.��:Premiere
Young, Brianna A
From: Young, Brianna A
Sent: Wednesday,April 19, 2023 10:53 AM
To: Phillip Rahn
Subject: RE: [External] Premiere Fiber NPDES Permit Application Renewal Questions- Stormwater
Permit No. NCS000528
Good morning Phil,
Please see below for responses to your questions.
Section 4.1-Provide information on the facility's pollutant sources in the table below.
Outfall Number
Impervious Surface Area(within a mile radius of the facility)
Total Surface Area Drained(within a mile radius of the facility)
How can we be expected to calculate either impervious or total area drained within a mile radius of the facility. I can
see if we are just concentrating on the property but a mile radius seems excessive
The area offsite is helpful as it informs us of the surrounding land use area,which could affect runoff onto the permitted
site.You can provide estimates for these values.
Item 7.2 and Table A.All applicants must complete Table A. If the discharge is an existing discharge and your discharge is
composed exclusively of stormwater(i.e., no process or nonprocess wastewater)then you only need to provide
monitoring data for oil and grease, total phosphorus, total Kjeldahl nitrogen, and total nitrogen.
Is this actually a requirement? I do not know if I will have a representative storm event between now and May 3 with
my 30-day extension.
Yes,this is a requirement.You may submit the application with all items except the monitoring so I can start reviewing
information.Then you would just need to submit the monitoring data as soon as possible.The draft permit cannot
proceed to public notice without all required information submitted.
Please let me know if you have any other questions.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
1
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
From: Phillip Rahn <prahn@watersedgeenv.com>
Sent:Tuesday, April 18, 2023 4:21 PM
To:Young, Brianna A<Brianna.Young@ncdenr.gov>
Subject: [External] Premiere Fiber NPDES Permit Application Renewal Questions-Stormwater Permit No. NCS000528
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Brianna- I am hung up on a couple items for our new permit application. In Form 4F, it asks:
Section 4.1-Provide information on the facility's pollutant sources in the table below.
Outfall Number
Impervious Surface Area(within a mile radius of the facility)
Total Surface Area Drained(within a mile radius of the facility)
How can we be expected to calculate either impervious or total area drained within a mile radius of the facility. I can
see if we are just concentrating on the property but a mile radius seems excessive
Item 7.2 and Table A.All applicants must complete Table A. If the discharge is an existing discharge and your discharge is
composed exclusively of stormwater(i.e., no process or nonprocess wastewater)then you only need to provide
monitoring data for oil and grease, total phosphorus, total Kjeldahl nitrogen, and total nitrogen.
Is this actually a requirement? I do not know if I will have a representative storm event between now and May 3 with
my 30-day extension.
Phil Rahn P.G.
President
Waters Edge Environmental, LLC
1434 Chester Road
Raleigh, NC 27608
919.219.5820 (cell)
prahn@watersedgeenv.com (email)
watersedgeenvironmenta1.net (website)
2
Young, Brianna A
From: Young, Brianna A
Sent: Friday, March 3, 2023 3:57 PM
To: dewey.fulton@universalfibers.com
Cc: kbowers@premierfibers.com; tkalamatas@premierefibers.com
Subject: Premiere Fibers stormwater permit NCS000528
Good afternoon,
Premiere Fibers has stormwater permit NCS000528.This permit expired on May 31, 2020 and a renewal application was
due by December 3, 2019.To date,the Stormwater Permitting Program has not received a renewal application. In
order to keep this permit active, submit a renewal application by April 3, 2023. If an application is not received by this
date, Premiere Fibers may be subject to enforcement action(s).
The appropriate permitting forms can be found on our website here.
In addition to submitting a renewal application, please enter your stormwater permit number into the Stormwater
Permit Summary Report and you will see a form that includes the address of the facility, contact information for the
permit, and the regulated stormwater outfall(s)for the facility. Please review the facility information to make sure it is
correct. Information can be updated using the links provided below, where applicable:
• Facility/Company name or ownership: Name/Ownership Change Form
• Owner Affiliation (Legally responsible person; i.e., someone with the company who is designated to represent
the company per signatory requirements or another authorized representative): Permit Contact Update Request
Form
• Delegation of Signature Authority(DOSA): Permit Contact Update Request Form
• Billing contact: Permit Contact Update Request Form
• Permit contact: Permit Contact Update Request Form
• Facility contact: Permit Contact Update Request Form
• Facility address only: Email Bethany Georgoulias
• Stormwater outfall information: Email Bethany Georgoulias
• Visit the eDMR Six Steps website and complete Steps 1 and 2.
• Pay outstanding permit fees: Stormwater ePayment website
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov(e-mail preferred)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
1
D- E-
cl ;
NORTH CAROLINA 7.AM Q
Department of Environmental Quality
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
2
wr
}; af,
..W •�. i
,e' a ,:.
Y �
ILI
ITI
` � n
.^ F
�� rr
` d
- .t
-
LA"
Young, Brianna A
From: Young, Brianna A
Sent: Wednesday,June 7, 2023 11:09 AM
To: Dewey Fulton; Phil Rahn
Subject: NCS000528 stormwater permit renewal acknowledgement
Good morning,
The Division of Energy, Mineral, and Land Resources (DEMLR) Stormwater Permitting Program
acknowledges receipt of your renewal application for coverage under NPDES Permit Number NCS000528.
Please continue to comply with all conditions and monitoring requirements in your current NPDES stormwater
permit. As long as you have submitted a complete renewal request package and maintain compliance with those
permit conditions, stormwater discharges from this facility are authorized by that permit until the Division
issues a renewal permit or notifies you of an alternative action. Please let me know if you have any questions in
the interim.
Thank you,
Brianna Young, MS(she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@deg.nc.gov(e-mail preferred)PLEASE NOTE NEW EMAIL
DEQ is updating its email addresses to @deq.nc.gov in phases from May 1st to June 9th. Employee email addresses may look
different, but email performance will not be impacted.
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19,the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Please check with the appropriate staff before visiting our offices,
as we may be able to handle your requests by phone or email.We appreciate your patience as we continue to serve the public
during this challenging time.
1
5/31/23,2:39 PM North Carolina Secretary of State Search Results
• File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online -
Add Entity to My Email Notification List • View Filings • Print a Pre-Populated Annual Report form • Print
an Amended a Annual Report form
Limited Liability Company
Legal Name
Premiere Fibers, LLC
Information
Sosld: 1732139
Status: Current-Active O
Date Formed: 7/27/2018
Citizenship: Foreign
State of Incorporation: DE
Annual Report Due Date: April 15th
Currentgnnual Report Status:
Registered Agent: CT Corporation System
Addresses
Mailing Principal Office Reg Office
10056 Us Highway 52 North 10056 Us Highway 52 North 160 Mine Lake Ct Ste 200
Ansonville, NC 28007 Ansonville, NC 28007 Raleigh, NC 27615
Reg Mailing
160 Mine Lake Ct Ste 200
Raleigh, NC 27615
Company Officials
All LLCs are managed by their managers pursuant to N.C.G.S. 57D-3-20.
President Chief Executive Officer Chief Financial Officer
John T Amirtharaj Richard Marcus Ammen Greg Gentry
10056 Us Highway 52 North 10056 Us Highway 52 North 10056 Us Highway 52 North
Ansonville NC 28007 Ansonville NC 28007 Ansonville NC 28007
https://www.sosnc.gov/online_services/Search/Business_Registration_profile?ld=14423878 1/2
5/31/23,2:39 PM North Carolina Secretary of State Search Results
Secretary
Greg Gentry
10056 Us Highway 52 North
Ansonville NC 28007
https://www.sosnc.gov/online_services/Search/Business_Registration_profile?ld=14423878 2/2
'!%WATERS EDGE ENVIRONMENTAL, LLC
1434 CHESTER ROAD.RALEIGH, NC 27608• PHONE 919.219.5820
May 23, 2023
Brianna Young, MS (she/her/hers)
Industrial Individual Permits Coordinator
Stormwater Permitting Program
NC DEQ/ Division of Energy, Mineral, and Land Resources (DEMLR)
1612 Mail Service Center, Raleigh,NC 27699
Reference: NPDES Stormwater Permit Renewal Application
Premiere Fibers Facility
10056 US S.R. 52N
Ansonville, North Carolina 28007
Stormwater Permit No. NCS000528
Waters Edge Job No. R9-21
Dear Ms. Young:
�. We are attaching the NPDES Stormwater Permit Renewal application for the above-mentioned facility
located in Ansonville, Anson County, North Carolina. We have the following attachments:
• EPA NPDES Permit Summary Report-Appendix A
• EPA NPDES Renewal- Certification- Appendix A
EPA NPDES Supplemental Information Form- Appendix A
• EPA Form 3510-1-Appendix B
'• • EPA Form 3510-2f-Appendix C
• Laboratory Documentation of Representative Sampling Event for parameters specified in Item
7.2 and Table A (oil & Grease, total P, total Kjeldahl N, and total N- Appendix D
• Figure I- USGS Project Location Map with Outfall Drainage Areas
• Figure 2- Project Location Map
• Figure 3- Site Map with five (5) outfalls, groundwater monitoring well locations, and exterior
structures including loading and unloading docks.
If you have any questions, or if we may be of further assistance, please contact me at
prahnL�watersedgeenv.com or 919.219.5820.
Sincerely,
Waters Edge Environmental, LLC
Phillip L. Rahn
QED
.;� President
.,a v .I I.tli.11
cc: Mr. Dewey Fulton and Mr. Chris Fowler- Premier Fibers D �ALR Stprm��ater Program
23-021
, { CaA6y AU- \
E,
r _ �
r `\ -
r' 1: o
z Leak Is&
PEE DE
E _A'CIUU /
WILDLIFE REFCiGF.
44
77-
se Ro CK haron ., S `• - f ! ~
.J �- E�endshiP CT�gqrch
Of God
LEGEND Ansonville
t ) 1-mile Radius 43� 1 �'
Property Boundary fo, 7:,;Iu Cs_,
o Outfall 1-2 Drainage Area .:,
AYLES
1000 0 1000 20DO 3000 4000 5000 6000 70M 8000 9000 SD000
Outfall 3-5 Drainage Area ; 6Pt: e,nr. FEET
Job No. Tuljo Quad Bare Title Project Location Man�silh Outfall Drainage Areas
,MLWATERS EDGE ENVI RONM ENTAL, LLC R9-21 Ansonville 3.15.2023
File Name hi,qure 5'cale Prvjecr 1'rcn,iere Filers
23-023 I bar scale Ansonville.North Carolina
_C2
LEGEND
Property Boundary 0 5 1,000
500,
Job No. Topo Quad Dare rifle
Project Locafion map
WATERS EDGE ENVIRONMENTAL, LLC
AnsonvilIc 1 3 152023
I'de Name iFigure Scale Project Premiere Fibers
23-023 2 bar scale Ansonville.North Caerolina
STORAGE LOCATIONS
A Nitrogen Tank k '. Kx<�•
B Raw Materials Silos
C Diesel Fuel Tank
D Propane Tank f"
E Trash Dumpster ;
F Hydrogen Cylinders
G Receiving/Loading Dock + owl ,�
H Metal Dumpster
I Drum Storage
7.
S -
t 7 �'
r � +
R t- LEGEND
Monitoring Well
-in
Deep Monitoring Well
Outfall Sampling Location
Outfall Boundaries
job Image/Photo Date Title Site Map with Monitoring Wells and Oull'ail
WATERS EDGE ENVIRONMENTAL. LLC R9-21 2022 Google Farth 3 20 2023 Locations
File Name Figure Sc Premierrl,ihers
23-023 3 hat scale Anson isle.North Carolina
NC Division of Energy, Mineral and Land Resources
W NPDES Stormwater Permit Summary
NC DCMLR has the following information in our Permit Database for vour perinit as of 3/28/2023.
Permit Number: NCS000528 Permit Status: Expired
Permit Type: Stormwater Discharge, Individual
Facility Name: Premiere_Fibers
Facility Addressi: 10056 US Hwy 52 N
Facility Address2:
City, State&Zip: Ansonyille, NC 28007
Owner Information Details:
MUST submit a Change of Name/Ownership form to DEMLR to make any changes to this Owner information.
.Click Here for "Change of Name/Ownership"Form)
Owner Name: Premiere Fibers
Owner Type: Non-Government Owner Type Group: Organization
*** Legally Responsible for Permit***
(Responsible corporate officer/p rinci pie executive officer or ranking elected official/general partner or proprietor;
or any other person with delegated signatory authority from the legally responsible person.)
Owner Affiliation. Dewey Fulton Title:
Addressi: PO Box 8930
v. Address2:
City,State&Zip: Bristol, VA 24203
Work Phone: 423-306-7339 Fax: 276-669-3304
�. Email Address: dewev.fulton@universalfibers.com
*** Permit Annual Fee Billing ***
Billing Month: September
Invoice Number Invoice Date Invoice Due Date Invoice Amount Invoice Status
Owner Contact Person(s)
Contact Name Title Address Phone Fax Email
Facility Contact Person(s)
Contact Name Title Address Phone Fax Email
Kevin Bowers PO Box 436,Ansonville, NC 28007-0436 704-826-8321 704-826-6159 kbowers@premierFb
ers.com
Dewey Fulton PO Box 8930, Bristol, VA 24203 276-645-9719
Permit Contact Person(s)
Contact Name Title Address Phone Fax Email
3/28/2023 Page 1
NC Division of Energy,, Mineral and Land Resources
NPDES Stormwater Permit Summary
NC DEMLR has the following information in our Permit Database for your permit as of 3/28/2023.
Contact Name JW& Address Phone Fax EMU
Dewey Fulton PO Box 8930,Bristol,VA 24203 276-645-9719
4
Type Contact Name 1-ft Address ne Fax Email
air
...........
R ..L NOW
Tvae Contact Name Title Address one Fax
do
UP
Outfall#: 001 Outfall Description: unknown
Outfall Lattitude: 35.212780 Outfall Longitude: -80.110560 Represented by Outfall:
%Stormwater: 100 %Industrial:
Stream Waterbody
Basin Waterbody Name Index Number Classification
Yadkin Buffalo Creek 13-18-1 C
r.
Ad
,w, 3/28/2023 Page 2
r
w
STORMWATER POLLUTION PREVENTION PLAN
DEVELOPMENT AND IMPLEMENTATION
CERTIFICATION
a
North Carolina Division of Energy, Mineral, and Land Resources—Stormwater Program
Facility Name: Premiere Fibms
Permit Number NCs000528
Location Address: ,Goss us Highway 52 North
lid Ansonvi0e,NC 28007
County: Anson
I certify, under penalty of law, that the Stormwater Pollution Prevention Plan (SPPP) document and all
attachments were developed and implemented under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information required by the SPPP.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible
for gathering the information, the information gathered is, to the best of my knowledge and belief, true,
accurate and complete."
And
"I certify that the SPPP has been developed, signed and retained at the named facility location, and the SPPP
has been fully implemented at this facility location in accordance with the terms and conditions of the
stormwater discharge permit."
r
And
"I am aware that there are significant penalties for falsifying information, including the possibility of fines and
imprisonment for knowing violations."
.. Sign(according to permit signatory requirements)and return this Certification. DO NOT
SEND STORMWATER POLLUTION PREVENTION PLAN WITH THIS CERTIFICATION.
a.r Signature _ Da go„�Lkweo GU r
A Print or type me of person signing above Itle
a14
ems.
�u
SPPP Certification 10/13
,r
so
we
SUPPLEMENTAL INFORMATION REQUIRED FOR RENEWAL OF INDIVIDUAL
NPDES STORMWATER PERMIT
Two copies of each of the following shall accompany this submittal in order for the application
to be considered complete:
(Do not submit the site Stormwater Pollution Prevention Plan)
}4 Initials
DF 1. A current Site Map from the Stormwater Pollution Prevention Plan. The location of
industrial activities(including storage of materials, disposal areas, process areas and
loading and unloading areas),drainage structures,drainage areas for each outfall,
building locations and impervious surfaces should be clearly noted.
DF
2. A summary of Analytical Monitoring results during the term of the existing permit
(if your permit required analytical sampling). Do not submit individual lab reports.
The summary can consist of a table including such items as outfall number,
parameters sampled, lab results, date sampled,and storm event data.
DF 3. A summary of the Visual Monitoring results. Do not submit individual monitoring
reports.The summary can consist of a table including such items as outfall number,
parameters surveyed, observations, and date monitoring conducted.
DF 4. A summary of the Best Management Practices utilized at the permitted facility.
Summary should consist of a short narrative description of each BMP's in place at
.r the facility. If the implementation of any BMP's is planned, please include
information on these BMP's.
DF 5. A short narrative describing any significant changes in industrial activities at the
permitted facility. Significant changes could include the addition or deletion of
work processes, changes in material handling practices, changes in material storage
practices, and/or changes in the raw materials used by the facility.
DF 6. Certification of the development and implementation of a Stormwater Pollution
Prevention Plan for the permitted facility(Sign and return attached form).
If the final year analytical monitoring of the existing permit term has not been completed
prior to filing the renewal submittal, then the last years monitoring results should be submitted
within 30 days of receipt of the laboratory reports. (i.e.do not withhold renewal submittal
w waiting on lab results)
p
EPA Identification Number NPDES Perm t Number Faality Name Form Approved 03105119
NCD986230159 NCSODOS28 Premiere Fibers OMB No.2040-0004
Form U.S.Environmental Protection Agency
t t"YEPA Application for NPDES Permit to Discharge Wastewater
NPDES GENERAL INFORMATION
SECTION ! '• 1
1.1 Applicants Not Required to Submit Form 1
Is the facility a new or existing publicly owned Is the facility a new or existing treatment works
1.i.1 treatment works? 1.1.2 treating domestic sewage?
If yes,STOP. Do NOT complete 0 No If yes,STOP. Do NOT No
Form 1.Complete Form 2A. complete Form 1.Complete
Form 2S.
1.2 Applicants Required to Submit Form 1
1.2.1 Is the facility a concentrated animal feeding 1.2.2 Is the facility an existing manufacturing,
E operation or a concentrated aquatic animal commercial,mining,or silvicultural facility that is
a production facility? currently discharging process wastewater?
Ej Yes 4 Complete Form 1 21 No ❑ Yes -* Complete Form 0 No
z and Form 2S. 1 and Form 2C.
1.2.3 Is the facility a new manufacturing,commercial, 1.2.4 Is the facility a new or existing manufacturing,
mining,or silvicultural facility that has not yet commercial,mining,or silvicultural facility that
commenced to discharge? discharges only nonprocess wastewater?
C Yes 4 Complete Form 1 0 No ❑ Yes 4 Complete Form []✓ No
R and Form 2D. 1 and Form 2E.
d)
47 1.2.5 Is the facility a new or existing facility whose
discharge is composed entirely of stormwater
a associated with industrial activity or whose
discharge is composed of both stormwater and
non-stormwater?
0✓ Yes 4 Complete Form 1 ❑ No
and Form 2F
unless exempted by
40 CFR
122.26(b)(14)(x)or
b 15 .
SECTIOND•- AND LOCATION(40
2.1 Facilit
y Name
Premiere Fibers
0 2.2 EPA Identification Number
u
O NCD986230159
ro 2.3 Facility Contact
Name(first and last) Title Phone number
Dewey Fuiton Corporate Engineer (276)645-9719
to Email address
dewey.fulton@universalfibers.com
2A Facility Mailing Address
E Street or P.O.box
R
PO Box 8930
City or town State ZIP code
Bristol VA 24203
EPA Form 3510-1(revised 3-19) Page 1
EPA Identification Number NPDES Permit Number Fa6lity Name Form Approved 03/05/19
NCD986230159 NCS000528 Premiere Fibers OMB No.204M004
y 2.5 Facility Location
Street,route number,or other specific identifier
Q �0 10056 US Highway 52 North
a�
0 County name County code(if known)
Anson
E City or town State ZIP code
E -o
z m Ansonville NC 28007
SECTION • NAICS CODES1
3.1 SIC Code(s) Description(optional)
2824 Man made organic fiber
N
Gl
0
c.3
W
u
z 3.2 NAICS Code(s) Description(optional)
�rs
C
325220
U
W
_ 4.1 Name of Operator
Premiere Fibers
0 4.2 Is the name you listed in Item 4.1 also the owner?
E 0 ❑✓ Yes ❑ No
w
4.3 Operator Status
0
�— 2 ❑ Public—federal ❑ Public—state ❑ Other public(specify)
o IDPrivate ElOther(specify)
4.4 Phone Number of Operator
(276)645-9719
4.5 Operator Address
Street or P.O. Box
E PO Box 8930
c .S City or town State ZIP code
0 o Bristol VA 24203
o Email address of operator
0 dewey.fulton@universalfibers.com
SECTION • • !
0 c 5.1 Is the facility located on Indian Land?
❑Yes ❑✓ Na
EPA Form 3510-1(revised 3-19) Page 2
EPA IdenbficalJon Number NPDES Permit Number Facility Name Form Approved 03105119
NCD986230159 NC5000528 Premiere Fibers OMB No.2040-0004
SECTION •• I
6.1 Existing Environmental Permits(check all that apply and print or type the corresponding permit number for each)
d m NPDES(discharges to surface ❑ RCRA(hazardous wastes) ❑ UIC(underground injection of
o water) fluids)
NC5000528 NCD986230159
w ❑ PSD(air emissions) ❑ Nonattainment program(CAA) ❑ NESHAPs(CAA)
�a
X ❑ Ocean dumping(MPRSA) ❑ Dredge or fill(CWA Section 404) ❑ Other(specify)
LU
SECTI• 1
7.1 Have you attached a topographic map containing all required information to this application?(See instructions for
m specific requirements.)
` ❑/ Yes ❑ No ❑ CAFO—Not Applicable(See requirements in Form 213.)
SECTIONOF I
8.1 Describe the nature of your business.
Man-made organic fiber-SIC 2824
N
a
c
7
O
Gl
7
2
SECTION •! I
9.1 Does your facility use cooling water?
�- ❑ Yes ❑ No 4 SKIP to Item 10.1.
v ' 9.2 Identify the source of cooling water.(Note that facilities that use a cooling water intake structure as described at
� 40 CFR 125,Subparts I and J may have additional application requirements at 40 CFR 122.21(r).Consult with your
o Y NPDES permitting authority to determine what specific information needs to be submitted and when.)
ca
SECTION1 VARIANCE REQUESTS 1 1
10.1 Do you intend to request or renew one or more of the variances authorized at 40 CFR 122.21(m)?(Check all that
apply.Consult with your NPDES permitting authority to determine what information needs to be submitted and
when.)
d ❑ Fundamentally different factors(CWA ❑ Water quality related effluent limitations(CWA Section
x Section 301(n)) 302(b)(2))
d
❑ Non-conventional pollutants(CWA ❑ Thermal discharges(CWA Section 316(a))
Section 301(c)and(g))
Not applicable
EPA Form 3510-1(revised 3-19) Page 3
EPA ldentir:cat on Number WDES Permit Number Facihty Name Form Approved 03105119
NCD996230159 NCSr10052$ Premiere Fibers OMB No 2040-0004
SECTION1 CERTIFICATION STATEMENT(40 . .
111 In Column 1 below,mark the sections of Form t that you have completed and are submitting with your application.
For each section,specify in Column 2 any attachments that you are enclosing to alert the permitting authority.Note
that not all applicants are r uired to provide attachments.
Column 1 Column 2
Section 1:Activities Requiring an NPDES Permit ❑ w/attachments
❑� Section 2:Name,Mailing Address,and Location ❑ wl attachments
0 Section 3:SIC Codes ❑ wl attachments
0 Section 4:Operator Information ❑ wl attachments
❑J Section 5:Indian Land ❑ wl attachments
e
0 Section S:Existing Environmental Permits ❑ wl attachments
❑ Section 7:Map 0 w'topographic ❑✓ w/additional attachments
14map
n 0 Section 8:Nature of Business ❑ wl attachments
a
❑ Section 9:Cooling Water Intake Structures ❑ wi attachments
V
Section 10:Variance Requests El wi attachments
c
[]� Section 11:Checklist and Certification Statement ❑ w/attachments
Y
11.2 Cartificatlon Statement
U
t certify under penalty of law that this document and all attachments were prepared under my direction or supervision
in accordance with a system designed to assure that qualified personnel property gather and evaluate the
information submitted.Based on my inquiry of the person or persons who manage the system,or those persons
directly responsible for gathering the information,the information submitted is,to the best of my knowledge and
belief,true,accurate,and complete. t am aware that there are significant penalties for submitting false information,
including the possibility of fine and imprisonment for knowing violations.
Name(print or type first and last name) Official title
4074
� f
Sign tufe Dale signed
.R
� Z5 ZVZ15
EPA Form 3510.1(revised 3-19) Page 4
EPA Identification Number NPDES Permit Number Facility Name Form Approved D3105119
NCD986230159 NCS000529 Premiere Fibers OMB No.2040-0004
Form U.S Environmental Protection Agency
2F 8,EPA Application for NPDES Permit to Discharge Wastewater
NPDES STORMWATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY
LOCATIONr
1.1 Provide information on each of the facili 's outfalls in the table below
Outfall Receiving Water Name Latitude Longitude
Number
1 Buffalo Creek 35' 07' 14" N 80° 06' 20" W
c
a
u
2 Buffalo Creek 35' 07 14" N 80' 06' 16" W
0
J
3 Buffalo Creek 35' 07' 11" N 80, 06' 15" W
4 Buffalo Creek 35' 07 08" N 80, 06' 16' W
5 Buffalo Creek 35` 07' 08" N 80, 06' 15 W
SECTION - 1 s
2.1 Are you presently required by any federal,state,or local authority to meet an implementation schedule for constructing,
upgrading,or operating wastewater treatment equipment or practices or any other environmental programs that could
affect the discharges described in this application?
❑ Yes [. No 4 SKIP to Section 3.
2.2 Briefly identify each applicable project in the table below.
Brief Identification and Affected Outfalls Final Compliance Dates
Description of Project (list outfatl numbers) Source(s)of Discharge
Required Projected
c
m
E
0
a.
E
2.3 Have you attached sheets describing any additional water pollution control programs(or other environmental projects
that may affect your discharges)that you now have underway or planned?(Optional Item)
❑ Yes ❑ No
EPA Form 3510-2F(Revised 3-19) Page 1
w
EPA Identification Number NPDES Permit Number Facility Name Fors Approved 03/05119
NCD986230259 NC5000528 Premiere Fibers OMB No.2040-0004
SECTION 3.SITE /'A 1
3.1 Have you attached a site drainage map containing all required information to this application?(See instructions for
0 cc C specific guidance.)
in 'cc M
® Yes ❑ No
r
SECTIONPOLLUTANT SOURCESi
4.1 Provide information on the facility's pollutant sources in the table below.
Outfall Impervious Surface Area Total Surface Area Drained
` Number (within a mile radius of the fadlity) (within a mile radius of the facility)
specify units specify units
1 1.13 acres 30.13 acres
—• specify units specify units
2 0.46 acres 30.13 acres
specify units specify units
3 0.46 acres 54.54 acres
specify units specify units
4 0.55 acres 54.54 acres
•--• specify units specify units
5 0.07 acres 54.53 acres
specify units specify units
4.2 Provide a narrative description of the facility's significant material in the space below.(See instructions for content
requirements.)
Premiere Fibers is a converter of Nylon-Type 6,Nylon-Type 6.6 and Polyester pellets into a wound fiber. Synthetic oils
a) are applied for future processing.
0
0
4.3 Provide the location and a description of existing structural and non-structural control measures to reduce pollutants in
stormwater runoff. See instructions fors ecific uidance.
5tormwater Treatment
Codes
from
Outfall
Number Control Measures and Treatment Exhibit
2F-1
list
1 No control measures
2 No control measures
3 No control measures
4 No control measures
5 No control measures
EPA Form 3510-2F(Revised 3-19) Page 2
EPA Wenfificaton Number NPDES Permit Number racirrly Name Farm Approved 03105/19
NCD986230159 NC5000528 Premiere Fibers OMB No.2D40-OD04
SECTION •N STORMWATER 1 r
5.1 1 certify under penalty of taw that the outfall(s) covered by this application have been tested or evaluated for the
presence of non-stormwater discharges. Moreover, / certify that the outfalls identified as having non-stormwater
discharges are described in either an accompanying NPDES Form 2C,2D,or 2E application.
Name(print or type first and last name) Official titte
Dewey Fulton
Signature Date signe
72� 2c�Z
s' 5,2 Provide the testing information requested in the table below.
OuNall Onsite Drainage Points
Number During
of Testing Method Used Dates)of Testing Directly Observed
Duran Test
i Direct Observation 04/25/2023 Yes
2 Direct Observation 04/25/2023 Yes
0
Z
3 Direct Observation 04/25/2023 Yes
4 Direct Observation 04/25/2023 Yes
5 Direct Observation 04/25/2023 Yes
SECTIONOR 1 1
6.1 Describe any significant leaks or spills of toxic or hazardous pollutants in the last three years.
w
None
n
0
se
a
». c
iA
SECTION
DISCHARGE INFORMATION1
See the instructions to determine the pollutants and parameters you are required to monitor and,in turn,the tables you must
com lete.Not all applicants need to complete each table.
7.1 Is this a new source or new discharge?
a ❑ Yes 4 See instructions regarding submission of ❑ No 4 See instructions regarding submission of
estimated d ata. actual data.
CE' Tables A,B,C,and D
u 7.2 Have you completed Table A for each outfall?
[]✓ Yes ❑ No
EPA Farm 3510-2F(Revised 3.19) Page 3
AM
EPA Identification Number NPDES Permit Number Facility Name Form Approved 03/05/19
NCD986230159 NCSOOO528 FPremiere Fibers OMB No.2040-0004
7.3 Is the facility subject to an effluent limitation guideline(ELG)or effluent limitations in an NPDES permit for its process
y„F wastewater?
❑ Yes ❑✓ No 4 SKIP to Item 7.5.
7.4 Have you completed Table B by providing quantitative data for those pollutants that are(1)limited either directly or
a� indirectly in an ELG and/or(2)subject to effluent limitations in an NPDES permit for the facility's process wastewater?
❑ Yes ❑✓ No
7.5 Do you know or have reason to believe any pollutants in Exhibit 2F-2 are present in the discharge?
❑ Yes ❑✓ No 4 SKIP to Item 7.7.
7.6 Have you listed all pollutants in Exhibit 2F-2 that you know or have reason to believe are present in the discharge and
r� provided quantitative data or an explanation for those pollutants in Table C?
❑ Yes ❑ No
7.7 Do you qualify for a small business exemption under the criteria specified in the Instructions?
❑ Yes 4SKIP to Item 7.18. ❑ No
7.8 Do you know or have reason to believe any pollutants in Exhibit 2F-3 are present in the discharge?
.� ❑ Yes ❑✓ No 4 SKIP to Item 7.10.
7.9 Have you listed all pollutants in Exhibit 2F-3 that you know or have reason to believe are present in the discharge in
c Table C?
1
,� �`o� ❑ Yes No
0 7.10 Do you expect any of the pollutants in Exhibit 2F-3 to be discharged in concentrations of 10 ppb or greater?
❑ Yes ❑✓ No-*SKIP to Item 7.12.
�+ o
7.11 Have you provided quantitative data in Table C for those pollutants in Exhibit 2F-3 that you expect to be discharged in
oM concentrations of 10 ppb or greater?
sr El Yes ❑✓ No
7.12 Do you expect acrolein,acrylonitrile,2,4-dinitrophenol,or 2-methyl-4,6-dinitrophenol to be discharged in concentrations
of 100 ppb or greater?
&d ❑ Yes ❑✓ No 4 SKIP to Item 7.14.
7.13 Have you provided quantitative data in Table C for the pollutants identified in Item 7.12 that you expect to be
discharged in concentrations of 100 ppb or greater?
*p ❑ Yes [D No
7.14 Have you provided quantitative data or an explanation in Table C for pollutants you expect to be present in the
discharge at concentrations less than 10 ppb(or less than 100 ppb for the pollutants identified in Item 7.12)?
❑ Yes ❑✓ No
7.15 Do you know or have reason to believe any pollutants in Exhibit 2F-4 are present in the discharge?
❑ Yes ❑✓ No 4 SKIP to Item 7.17.
7.16 Have you listed pollutants in Exhibit 2F4 that you know or believe to be present in the discharge and provided an
explanation in Table C?
r.� ❑ Yes 0 No
7.17 Have you provided information for the storm event(s)sampled in Table D?
❑ Yes ❑✓ No
.w
EPA Form 3510-2F(Revised 3-19) Page 4
ors
EPA ideritEfication Number NPDES Permit Number Facility Name Form Approved 03/05/19
NCD986230159 NCS000528 Premiere Fibers OMB No.2040-0004
Used or Manufactured Toxics
- 7.18 Is any pollutant listed on Exhibits 21 through 2F-4 a substance or a component of a substance used or
8 manufactured as an intermediate or final product or byproduct?
a ❑ Yes �]✓ No 4 SKIP to Section 8.
0
7.19 List the pollutants below,including TCDD if applicable.
1. 4. 7.
m
cc 2. 5. 8.
U
c3 3. 6. 9.
I
SECTIONe eG ICAL TOXICITY TESTING DATA i
8.1 Do you have any knowledge or reason to believe that any biological test for acute or chronic toxicity has been made on
ro any of your discharges or on a receiving water in relation to your discharge within the last three years?
❑ Yes ✓❑ No 4 SKIP to Section 9.
N
8.2 Identify the tests and their purposes below.
Test(s) Purpose of Test(s) Submitted to NPDES gate Submitted
x Permitting Authority?
Q
~ ❑ Yes ❑ No
U_
o ❑ Yes ❑ No
m0
❑ Yes ❑ No
SECTION 9.CONTRACT ANALYSIS INFORMATIONi
9.1 Were any of the analyses reported in Section 7(on Tables A through C)performed by a contract laboratory or
consulting firm?
❑ Yes ❑ No 4 SKIP to Section 10.
9.2 Provide information for each contract laboratory or consulting firm below.
Laboratory Number 1 Laboratory Number 2 Laboratory Number 3
Name of laboratory/firm
Pace Analytical
0
.a
E
0
N Laboratory address 370 West Meadow Road
U)
? Eden,North Carolina
�a
a
U
R
0
Phone number
ca (336)623-8921
Pollutant(s)analyzed TSS,COD,and pH(analyzed
semi-annually
0&G,Total P,
Total Kjeldahl nitrogen,and
Total Nitrogen were analyzed
on 4/25/2023
EPA Form 3510-2F(Revised 3-19) Page 5
EPA IdenVication Number NPpES Permit Number raa_Ihy Name Farm Approved 03/05/19
NCD9S623p159 NCS000528 Premiere Fibers OMB No.2040-0004
SECTION 1 1 CERTIFICATION STATEMENT(40 and
10.1 In Column 1 below,mark the sections of Form 2F that you have completed and are submitting with your application.For
each section,specify in Column 2 any attachments that you are enclosing to alert the permitting authority.Note that not
all applicants are required to com fete all sections or provide attachments.
Column 1 Column 2
❑✓ Section 1 ❑ w/attachments(e.g„responses for additional outfalls)
.....................__..........................._......... _._-----._._._........_....__--_......_...._.._._....._._.._................ ...._........_........._..........
❑ Section 2 ❑ wi attachments
Section 3 ❑ wl site drainage map
�. Section 4 ❑ wi attachments
❑ Section 5 ❑ wl attachments
.�. ✓n_ Section 6 ❑ wl attachments
❑� Section 7 El Table A ❑ wl small business exemption request
.�
_ ❑ Table B ❑ wl analyticai results as an attachment
0
❑ Table C ❑ Table D
'~ ❑✓ Section 8 ❑ w/afachments
❑ Section 9 ❑ wlattachments(e.g.,responses for additional contact laboratories or firms)
�" ❑ Section 10 ❑
10.2 Certification Statement
l certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the information
submitted.Based on my inquiry of the person or persons who manage the system or those persons directly responsible
for gathering the information, the information submitted is,to the best of my knowledge and belief, true, accurate,and
complete.l am aware that there are significant penalties for submitting false information,including the possibility of fine
and imprisonment for knowing violations.
Name(print or type first and last name) Official title
Dewey Fulton Director-Health,Safety and Environment
Signatur Date signedff
o
EPA Form 3510.2F(Revised 3-19) Page 6
EPA Identification Number NPDES Permit Number Facility Name 0utfall Number Farm Approved 03195119
NCD986230159 NCS000523 Premiere Fibers 001 0Mt3 No.2040-0004
TABLE A.CONVENTIONAL AND • • • r
You must provide the results of at least one anal sis for every pollutant in this table.Complete one table for each outfall.See instructions for additional details and requirements.
Maximum Daily Discharge Average Daily Discharge Source of
(specify units) (specify units) Number of Storm information
Pollutant or Parameter Grab Sample Taken Flow-Weighted Grab Sample Taken Flow-Weighted Events Sampled (new sourcelnew
During First During First dischargers only;use
30 Minutes Composite 30 Minutes Composite codes in instructions)
1. Oil and grease ND 1 NA
2. Biochemical oxygen demand(BOD5) NA NA NA NA NA NA
3. Chemical oxygen demand(COD) NA NA NA NA NA NA
4. Total suspended solids(TSS) NA NA NA NA NA NA
5. Total phosphorus 0.082 mg/L NA NA NA 1 NA
6, Total Kjeldahl nitrogen(TKN) 1.1 mg/L NA NA NA 1 NA
7. Total nitrogen(as N) 1.4 mg/L NA NA NA 1 NA
pH(minimum) NA NA NA NA
t3.
pH(maximum) NA NA NA NA
Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or
required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3).
EPA Form 3510-2F(Revised 3-19) Page 7
EPA IdenKcation Number NPDES Permit Number Facility Name Outfall Number Form Approved 03 D5119
NCD986230159 NCS000528 Premier Fibers 002 OMB No.2040-OOD4
TABLE A. / / 1 NON CONVENTIONALr
You must provide the results of at least one anal sis toreveTy pollutant in this table.Complete one table for each autfall.See instructions for additional details and requirements.
Maximum Daily Discharge Average Daily Discharge Source of
(specify units) (specify units} Number of Storm Information
Pollutant or Parameter Grab Sample Taken Flow-Weighted Grab Sample Taken Flow-Weighted Events Sampled (newsourcelnew
During First During First dischargers only;use
30 Minutes Composite 30 Minutes Composite codes in instructions)
1. Oil and grease ND 1 NA
2. Biochemical oxygen demand(BOD5) NA NA NA NA NA NA
3. Chemical oxygen demand(COD) NA NA NA NA NA NA
4. Total suspended solids(TSS) NA NA NA NA NA NA
5. Total phosphorus 0.077m8/L NA NA NA 1 NA
6. Total Kjeldahl nitrogen(TKN) 1.3mg/L NA NA NA 1 NA
7. Total nitrogen(as N) 1.6 mg/L NA NA NA 1 NA
pH(minimum) NA NA NA NA
8.
pH(maximum) NA NA NA NA
f Sampling shall be conducted according to sufficiently sensitive test procedures(i.e., methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or
required under 40 CFR chapter 1,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3).
EPA Form 3510-2F(Revised 3-19) Page 7
EPA Identificalion Number NPDES Permit Number Facility Name Outfall Number Form Approved 03 05119
NCD986230159 NC5000528 Premier Fibers 003 OMB No.2040-0004
TABLE A.CONVENTIONAL • • s r
You must provide the results of at least one anal sis for every pollutant in this table.Complete ane table for each oulfall.See instructions for additional details and requirements.
Maximum Daily Discharge Average Daily Discharge Source of
(specify units) (specify units) Number of Storm Information
Pollutant or Parameter Grab Sample Taken Grab Sample Taken (new source/new
During First Flow-Weighted During First Flow•Weighfed Events Sampled dischargers only;use
30 Minutes Composite 30 Minutes Composite ?
codes in instructions
1. Oil and grease ND 1 NA
2. Biochemical oxygen demand(BOD5) NA NA NA NA NA NA
3. Chemical oxygen demand(COD) NA NA NA NA NA NA
4. Total suspended solids(TSS) NA NA NA NA NA NA
b. Total phosphorus ND NA NA NA 1 NA
6. Total Kjeldahl nitrogen(TKN) 0.72 mg/L NA NA NA 1 NA
7. Total nitrogen(as N) 1.7 mg/L NA NA i NA
NA
pH(minimum) NA NA NA NA
B,
pH(maximum) NA NA NA NA
'Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or
required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3).
EPA Form 3510-2F(Revised 3-19) Page 7
EPA Identification Number NPDES Permit Number Facility Name outfall Number Form Approved 03+95119
NCD986230159 NCS000528 Premier Fibers 004 OMB No.204W004
TABLE A.CONVENTIONAL AND • • • t
You must provide the results of at least one anal sis for every pollutant in this table.Complete one table for each out€all.See instructions for additional details and requirements.
Maximum Daily Discharge Average Daily Discharge Source of
(specify unds) (Specltyt1flit,S) Number of Storm Information
Pollutant or Parameter Grab Sample Taken Flow-Weighted Grab Sample Taken Flow-Weighted Events Sampled (new sourcelnew
During First During First dischargers only;use
34 Minutes Composite 30 Minutes Composite codes in instructions)
1. Oil and grease ND 1 NA
2. Biochemical oxygen demand(BOD5) NA NA NA NA NA NA
3. Chemical oxygen demand(COD) NA NA NA NA NA NA
4. Total suspended solids(TSS) NA NA NA NA NA NA
5. Total phosphorus 0.080 mg/L NA NA NA 1 NA
6. Total Kjeldahl nitrogen(TKN) 0.70 mg/L NA NA NA 1 NA
7. Total nitrogen(as N) 1.5 mg/L NA NA Alili
1 NA
pH(minimum) NA NA NA NA
pH(maximum) NA NA NA NA
-------------
'Sampling shall be conducted according to sufficiently sensitive test procedures(i.e., methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or
required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3).
EPA Form 3514-2F(Revised 3-19) Page 7
l I I b I I 1 1 I I 1 ! 4 ! r I 1 1
EPA Identification Number NPDES Permit Number Facility Name putfall Number Form Approved 03105119
NCD986230159 NC5000528 Premier Fibers 005 OMB No.2040-0004
TABLE A.CONVENTIONAL A • NON CONVENTIONAL
You must provide the results of at least one anal sis for every pollutant in this table.Complete one table for each outfall.See instructions for additional details and requirements.
Maximum Daily Discharge Average Daily Discharge Source of
(specify units) (specify units) Number of Storm information
Pollutant or Parameter Grab Sample Taken Flow-Weighted Grab Sample Taken Flow-Weighted Events Sampled (new sourcelnew
During First During First dischargers only;use
30 Minutes Composite 30 Minutes Composite codes in instructions)
1. Oil and grease ND 1 NA
2. Biochemical oxygen demand(BOD5) NA NA NA NA NA NA
3. Chemical oxygen demand(COD) NA NA NA NA NA NA
4. Total suspended solids(TSS) NA NA NA NA NA NA
5. Total phosphorus 0.12 mg/L NA NA NA 1 NA
6. Total Kjeldahl nitrogen(TKN) 1.3 mg/L NA NA NA i NA
7. Total nitrogen(as N) 2.6 mg/L NA NA NA 1 NA
pH(minimum) NA NA NA NA
8.
pH(maximum) NA NA NA NA
Sampling shall be conducted according to sufficiently sensitive test procedures(i.e., methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or
required under 40 CFR chapter I:subchapter N or 0.See instructions and 40 CFR 122.21(e)(3).
EPA Form 3510.21'(Revised 3-19) Page 7
This page intentionally left blank.
EPA Identification Number NPDES Permit Number Facility Name Outfall Number Form Approved 03105119
NCD98623O159 NCSO0O528 Premiere Fibers 001 OMB No.2040-0004
TABLE B.CERTAIN CONVENTIONAL AND NON • • '• 41 CFR 122.26(c)(1)(i)(E)(4) 40
List each pollutant that is limited in an effluent limitation guideline(ELG)that the facility is subject to or any pollutant listed in the facility's NPDES permit for its process wastewater(if the
facility is operating under an existing NPDES permit).Complete one table for each outfall.See the instructions for additional details and requirements.
Maximum Daily Discharge Average Daily Discharge Source of
(spec! units s units Number of Storm, Information
Pollutant and CAS Number(ff available) Grab Sample Taken Grab Sample Taken (new sourcehiew
During First Flow-Weighted During First Flow-Welghted Events Sampled dischargers only,use
Composite During
30 Minutes 30 Minutes codes in instructions)
Sampling shall be conducted according to sufficiently sensitive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or
required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3).
EPA Form 3510-2F(Revised 3-19) Page 9
This page intentionally left blank.
EPA Identification Number NPDES Permit Number Facility Name Outtall Number Form Approved 03105I19
NCD986230159 NC5000528 Premiere Fibers 001 OMB No.2040-0004
TABLE C.TOXIC POLLUTANTS,CERTAIN HAZARDOUS SUBSTANCES,AND ASBESTOS(40 CFR 122.26(c)(1)(i)(E)(4)and 40 CIFIR 122.21(g)(7)(vi)(B)and(vii))'
List each pollutant shown in Exhibits 2F-2, 2F-3,and 2F-4 that you know or have reason to believe is present.Complete one table for each outfall. See the instructions for additional
details and requirements.
Maximum daily Discharge Average Daily Discharge Source of
s eci units s eci units Number of Storm Information
Pollutant and CAS Number(if available) Grab Sample Taken Grab Sample Taken (new sourcelnew
During First Flow-Weighted During First Ffow-Weighted Events Sampled dischargers only;use
30 Minutes Composite 30 Minutes Composite codes in instructions)
Sampling shall be conducted according to sufficiently sens4ive test procedures(i.e.,methods)approved under 40 CFR 136 for the analysis of pollutants or pollutant parameters or
required under 40 CFR chapter I,subchapter N or 0.See instructions and 40 CFR 122.21(e)(3).
EPA Form 3510-2F(Revised 349) Paoe 11
--I —This page intentionally left blank.
an
Pace Analytical Services,LLC
ace Analytical 2]5 East Meadow Road-Suite A
Eden,NC 27288
www.pacelabsxom
{336}623-8921
May 10, 2023
Mr. Phil Rahn
Waters Edge Environmental
1434 Chester Road
Raleigh, NC 27606
RE: Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
Dear Mr. Rahn:
Enclosed are the analytical results for sample(s) received by the laboratory on May 01, 2023. The results relate only to the
samples included in this report. Results reported herein conform to the applicable TNI/NELAC Standards and the
laboratory's Quality Manual,where applicable, unless otherwise noted in the body of the report.
The test results provided in this final report were generated by each of the following laboratories within the Pace Network:
• Pace Analytical Services-Asheville
• Pace Analytical Services-Charlotte
If you have any questions concerning this report, please feel free to contact me.
Sincerely,
Matthew Brainard
matthew.brainard@pacelabs.com
(704)875-9092
Project Manager
Enclosures
P p,CCAF�.
? '. REPORT OF LABORATORY ANALYSIS
;r+ This report shall not be reproduced,except in full,
without the written consent of Pace Analytical Services,LLC. Page 1 Of 16
Pace Analytical Services,LLC
205 East Meadow Road-Suite A
aceAnalytieaf Eden,NC 27288
www,paceiabs.com (336)623-8921
i
CERTIFICATIONS
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
Pace Analytical Services Charlotte
South Carolina Laboratory ID:99006 South Carolina Certification#:99006001
9800 Kil Ave.Ste 100,Huntersville,NC 28078 South Carolina Drinking Water Cert.#:99006003
North Carolina Drinking Water Certification#:37706 Florida/NELAP Certification#:E87627
North Carolina Field Services Certification#:5342 Kentucky UST Certification#:84
North Carolina Wastewater Certification#: 12 Louisiana DoH Drinking Water#:LA029
South Carolina Laboratory ID:99006 Virginia/VELAP Certification#:460221
Pace Analytical Services Asheville
2225 Riverside Drive,Asheville,NC 28804 South Carolina Laboratory ID:99030
Florida/NEtAP Certification#:E87648 South Carolina Certification#:99030001 --
North Carolina Drinking Water Certification#:37712 Virginia/VELAP Certification#:460222
North Carolina Wastewater Certification#:40
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full,
wiftut the written consent of Pace Analytical Services,LLC. Page 2 of 16
Pace Analytical Services,LLC
1! '2ceAnalytical 205 East Meadow Road-Suite
Eden,NC 27288
www.pacalabs.com (336)623-8921
SAMPLE SUMMARY
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
Lab ID Sample I❑ Matrix Date Collected Date Received
92664918001 OUTFALL 001 Water 04/25/23 11:00 05/01123 09:12
92664918002 OUTFALL 002 Water 04/25123 11:15 05/01/23 09:12
92664918003 OUTFALL 003 Water 04/25123 11:30 05/01/23 09:12
92664918004 OUTFALL 004 Water 04125/23 11:45 05/01/23 09:12
92664918005 OUTFALL 005 Water 04/25/23 12:00 05/01/23 09:12
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full,
without the written consent of Pace Analytical Services,LLC. Page 3 of 16
Pace Analytical Services,LLC
_ ace Analytical n 205 East Meadow Road-Suite A
Eden,NC 27288
www.pacelabs.com (336)623.8921
SAMPLE ANALYTE COUNT
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
Analytes
Lab ID Sample 10 Method Analysts Reported Laboratory
92664918001 OUTFALL 001 EPA 1664E REL 1 PASI-C
TKN+NO3+NO2 Calculation MAB2 1 PASI-A
EPA 351.2 Rev 2.0 1993 MFO 1 PASI-A
EPA 353.2 Rev 2.0 1993 KDF1 1 PASI-A
EPA 365.1 Rev 2.0 1993 Zip 1 PASI-A
92664918002 OUTFALL 002 EPA 1664E REL 1 PASI-C
TKN+NO3+NO2 Calculation MAB2 1 PASI-A ..
EPA 351.2 Rev 2.0 1993 MFO 1 PASI-A
EPA 353.2 Rev 2.0 1993 KDF1 1 PASI-A
EPA305.1 Rev 2.01993 Zip 1 PASI-A
92664918003 OUTFALL 003 EPA 1664E REL 1 PASI-C
TKN+NO3+NO2 Calculation MAB2 1 PASI-A
EPA 351.2 Rev 2.0 1993 MFO 1 PASI-A
EPA 353.2 Rev 2.0 1993 KDF1 1 PASI-A
EPA 365.1 Rev 2.0 1993 Zip 1 PASI-A
92664918004 OUTFALL 004 EPA 1664B REL 1 PASI-C
TKN+NO3+NO2 Calculation MA82 1 PASI-A
EPA 351.2 Rev 2.0 1993 MFO 1 PASI-A
EPA 353.2 Rev 2.0 1993 KDF1 1 PASI-A
EPA 365.1 Rev 2.0 1993 Zip 1 PASI-A
92664918005 OUTFALL 005 EPA 1664B REL 1 PASI-C
TKN+NO3+NO2 Calculation MA82 1 PASI-A
EPA 351.2 Rev 2.0 1993 MFO 1 PASI-A
EPA 353.2 Rev 2.0 1993 KDF1 1 PASI-A
EPA 365.1 Rev 2.0 1993 Zip 1 PASI-A
PAS I-A=Pace Analytical Services-Asheville
PAS I-C=Pace Analytical Services-Charlotte
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in Full,
without the written consent of Pace Analytical Services,LLC. Page 4 of 16
Pace Analytical Services,LLC
ac /(n�f' tica J 205 East Meadow Road-Suite A
r�t�l'1 I}/t11� l Eden,NC 27288
www.pacelabs.com
(336)623-8921
ANALYTICAL RESULTS
Project: PREMIERE FIBERS R9.21
Pace Project No.: 92664918
Sample; OUTFALL 001 Lab ID: 92664918001 Collected: 04/25/23 11:00 Received: 05/01/23 09:12 Matrix: Water
Report
Parameters Results Units Limit MDL DF Prepared Analyzed CAS No. Qual
HEM,Oil and Grease Analytical Method:EPA 1664B
Pace Analytical Services-Chadotte
Oil and Grease ND mglL 4.9 1.1 1 05/10/23 05:03
Total Nitrogen Calculation Analytical Method:TKN+NO3+NO2 Calculation
Pace Analytical Services-Asheville
Total Nitrogen 1.4 mglL 0.040 0,040 1 05/09/23 12:21
351.2 Total Kjeldahl Nitrogen Analytical Method:EPA 351.2 Rev 2.0 1993 Preparation Method:EPA 351.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,Kjeldahl,Total 1.1 mg1L 0.50 0.25 1 05/08/23 19:30 05/09/23 04:41 7727-37-9
353.2 Nitrogen,N021NO3 pros. Analytical Method: EPA 353.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,NO2 plus NO3 0.28 mg1L 0.040 0.017 1 05/05/23 08:40
365.1 Phosphorus,Total Analytical Method:EPA 365.1 Rev 2,0 1993 Preparation Method: EPA365.1 Rev 2.0 1993
Pace Analytical Services-Asheville
Phosphorus 0.082 mglL 0.050 0.025 1 05I10I2311:40 05I1012315:01 7723-14.0
Sample: OUTFALL 002 Lab ID: 92664918002 Collected: 04/25/23 11:15 Received: 05/01/23 09:12 Matrix:Water
Report
Parameters Results Units Limit MDL DF Prepared Analyzed CAS No. Qual
HEM,Oil and Grease Analytical Method:EPA 1664E
Pace Analytical Services-Charlotte
Oil and Grease ND mg1L 5.0 1.1 1 05/10/23 05:03
Total Nitrogen Calculation Analytical Method:TKN+NO3+NO2 Calculation
Pace Analytical Services-Asheville
Total Nitrogen 1.6 mglL 0.040 0.040 1 05/09/23 12:21
351.2 Total Kjeldahl Nitrogen Analytical Method:EPA 351.2 Rev 2.0 1993 Preparation Method:EPA 351.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,Kjeldahl,Total 1.3 mglL 0.50 0.25 1 05/08/23 19:30 05/09/23 04A2 7727-37-9
353.2 Nitrogen,NO2/NO3 pres. Analytical Method:EPA 353.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,NO2 plus NO3 0.27 mglL 0.040 0.017 1 05/05/23 08:43
365.1 Phosphorus,Total Analytical Method:EPA 365.1 Rev 2.0 1993 Preparation Method:EPA 365.1 Rev 2.0 1993
Pace Analytical Services-Asheville
Phosphorus 0.077 mglL 0.050 0.025 1 05/1012311:40 05/10/2315:05 7723-14-0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full,
Date:05110/2023 04:39 PM without the written consent of Pace Analytical Services,LLC. Page 5 of 16
Pace Analytical Services,L LC
�CBAnaly " 205 East Meadow Road-Suite A
i G Il.�l^�f r Eden,NC 27288
www.pacelabs.com (336)623-8921
ANALYTICAL RESULTS
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918 .r
Sample: OUTFALL 003 Lab ID: 92664918003 Collected: 04/25/23 11:30 Received: 05/01/23 09:12 Matrix: Water
Report
Parameters Results Units Limit MDL DF Prepared Analyzed CAS No. Qual
HEM,Oil and Grease Analytical Method: EPA 1664E
Pace Analytical Services-Charlotte
Oil and Grease ND mg1L 4.8 1.1 1 05/10/23 05:03
Total Nitrogen Calculation Analytical Method:TKN+NO3+NO2 Calculation
Pace Analyti cal Services-Asheville
Total Nitrogen 1.7 mg1L 0.04D 0.040 1 05/09/23 12:21
351.2 Total Kjeldahl Nitrogen Analytical Method:EPA 351.2 Rev 2.0 1993 Preparation Method: EPA 351.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,Kjeldahl,Total 0.72 mg/L 0.50 0.25 1 05/08/23 19:30 05/09/23 04:44 7727-37-9
353.2 Nitrogen,NO2/NO3 pros. Analytical Method: EPA353.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,NO2 plus NO3 1.0 mglL 0.040 0.017 1 05/05/23 08:45
365.1 Phosphorus,Total Analytical Method:EPA 365.1 Rev 2.0 1993 Preparation Method:EPA 365.1 Rev 2.0 1993
Pace Analytical Services-Asheville ^
Phosphorus ND mglL 1).050 0.025 1 05110/2311:40 05110/2315:07 7723-14-0
Sample: OUTFALL 004 Lab ID: 92664918004 Collected: 04/25/23 11 A5 Received: 05/01/23 09:12 Matrix: Water ^
Report
Parameters Results Units Limit MDL DF Prepared Analyzed CAS No. Qual
HEM,Oil and Grease Analytical Method: EPA 1664E
Pace Analytical Services-Charlotte
Oil and Grease ND mg1L 4.8 1.1 1 05/09/23 03:35
Total Nitrogen Calculation Analytical Method:TKN+NO3+NO2 Calculation
Pace Analytical Services-Asheville
Total Nitrogen 1.5 mg1L 0.040 0,040 1 05109t23 12:21
351.2 Total Kjeldahl Nitrogen Analytical Method:EPA351.2 Rev 2.0 1993 Preparation Method: EPA 351.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,Kjeldahl,Total 0.70 mg/L 0.50 0.25 1 05/08/23 19:30 05/09/23 04:47 7727-37-9
353.2 Nitrogen,NO2/NO3 pres. Analytical Method:EPA353.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,NO2 plus NO3 0.81 mg1L 0.040 0.017 1 05/05/23 08:46
365.1 Phosphorus,Total Analytical Method:EPA 365.1 Rev 2.0 1993 Preparation Method:EPA 365.1 Rev 2.0 1993
Pace Analytical Services-Asheville
Phosphorus 0.080 mg/L 0,050 0,025 1 05/10/23 11 A0 05/10/23 15:08 7723-14-0
REPORT OF LABORATORY ANALYSIS "^
This report shall not be reproduced,except in full,
Date:05/10/2023 04:39 PM without the written consent of Pace Analytical Services,LLC. Page 6 of 16
Pace Analytical Services,LLC
1!2ce
p��r,j�^ r' 205 East Meadow Road-Suite A
H ly t� f Eden,NC 27288
a www.pacelabs.com
(336)623-892 1
ANALYTICAL RESULTS
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
Sample: OUTFALL 005 Lab IQ: 92664918005 Collected: 04/25/23 12:00 Received: 05/01/23 09:12 Matrix: Water
Report
Parameters Results Units Limit MDL DF Prepared Analyzed CAS No. Qual
HEM,Oil and Grease Analytical Method:EPA 1664B
Pace Analytical Services-Charlotte
i Oil and Grease ND mg1L 4.8 1.1 1 05/10123 05:03
Total Nitrogen Calculation Analytical Method:TKN+NO3+NO2 Calculation
Pace Analytical Services-Asheville
Total Nitrogen 2.6 mg/L 0.040 0.040 1 05/09123 12:21
351.2 Total Kjeldahl Nitrogen Analytical Method:EPA 351.2 Rev 2.0 1993 Preparation Method: EPA 351.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,Kjeldahl,Total 1.3 mg1L 0.50 0.25 1 05/08/23 19:30 05/09/23 04:53 7727-37-9
353.2 Nitrogen,NO2IN03 pres. Analytical Method:EPA 353.2 Rev 2.0 1993
Pace Analytical Services-Asheville
Nitrogen,NO2 plus NO3 1.3 mg/L 0.040 0.017 1 05/05/23 08:47
365.1 Phosphorus,Total Analytical Method:EPA 365.1 Rev 2.0 1993 Preparation Method:EPA 365.1 Rev 2.0 1993
Pace Analytical Services-Asheville
Phosphorus 0.12 mg/L 0.050 0.025 1 05/10/2311:40 05110/2315:09 7723-14-0
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full,
Date:05/10/2023 04:39 PM without the written consent of Pace Analytical Services,LLC. Page 7 of 16
Pace Analytical Services,LLC
accAnalyfical r 205 East Meadow Road-Suite AEden,
Eden,NC 27288
www,pacela6s.com (336)623-8921
QUALITY CONTROL DATA `
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
QC Batch: 773091 Analysis Method: EPA 1664B
QC Batch Method: EPA 1664E Analysis Description: 1664 HEM,Oil and Grease
Laboratory: Pace Analytical Services-Charlotte .�
Associated Lab Samples: 92664918004
METHOD BLANK: 4012808 Matrix: Water
Associated Lab Samples: 92664918004
Blank Reporting
Parameter Units Result Limit MDL Analyzed Qualifiers
Oil and Grease mg1L ND 5.0 1A 05/09/23 03:35
LABORATORY CONTROL SAMPLE: 4012809
Spike LCS LCS %Rec ^
Parameter Units Conc. Result %Rec Limits Qualifiers
Oil and Grease mg/L 40 34.2 86 78-114
MATRIX SPIKE SAMPLE: 4012810
92665487001 Spike MS MS %Rec
Parameter Units Result Conc. Result %Rec Limits Qualifiers
Oil and Grease mg/L ND 38.8 32.5 82 78-114 ^
SAMPLE DUPLICATE: 4012811
357959520D1 Dup Max
Parameter Units Result Result RPD RPD Qualifiers
Oil and Grease mg1L 1.81 1.5J 30
Results presented°n this page are In the units Indicated by the"Units"column except where an alternate unit is presented to the right of the result.
REPORT OF LABORATORY ANALYSIS —
This report shall not be reproduced,except in full.
Date:05110/2023 04:39 PM without the written consent of Pace Analytical Services.LLC. Page 8 of 16
Pace Analytical Services,LLC
aceAnalyticai` 205 East Meadow Road-Suite A
Eden,NC 27283
a www.pacslahs.com (336)623-8921
QUALITY CONTROL DATA
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
QC Batch: 773286 Analysis Method: EPA 1664B
QC Batch Method: EPA 1664B Analysis Description: 1664 HEM,Oil and Grease
Laboratory: Pace Analytical Services-Charlotte
Associated Lab Samples: 92664918001,92664918002,92664918003,92664918005
METHOD BLANK: 4013763 Matrix: Water
Associated Lab Samples: 92664918001,92664918002,92664918003,92664918005
Blank Reporting
Parameter Units Result Limit MDL Analyzed Qualifiers
Oil and Grease mg/L ND 5.0 1.1 05/10/23 05:03
LABORATORY CONTROL SAMPLE: 4013764
Spike LCS LCS %Rec
Parameter Units Cone. Result %Rec Limits Qualifiers
Oil and Grease mg/L 40 35.8 90 78-114
MATRIX SPIKE SAMPLE: 4014797
92665800001 Spike MS MS %Rec
4 Parameter Units Result Cone. Result %Rec Limits Qualifiers
Oil and Grease mg/L ND 39.2 35.0 83 78-114
SAMPLE DUPLICATE: 4013766
92665830001 Dup Max
Parameter Units Result Result RPD RPD Qualifiers
Oil and Grease mg1L ND ND 30
Results presented on this page are In the units Indicated by the"Units"column except where an alternate unit is presented to the tight or the result.
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full,
Date:05/10/2023 04:39 PM without the written consent of Pace Analytical Services,LLC. Page 9 of 16
Pace Analytical Services,LLC
aceAnalyrica1 Y 205 East Meadow Road-Suite A
Eden,NC 27288
www.pacolabs.com (336)623-8921
QUALITY CONTROL DATA
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
QC Batch: 773107 Analysis Method: EPA 351.2 Rev 2.0 1993
QC Batch Method: EPA 351.2 Rev 2.0 1993 Analysis Description: 351.2 TKN
Laboratory: Pace Analytical Services-Asheville
Associated Lab Samples: 92664918001,92664918002,92664918003,92664918004,92664918005
METHOD BLANK: 4012953 Matrix: Water
Associated Lab Samples: 92664918001,92664918002,92664918003,92664918004,92664918005
Blank Reporting
Parameter Units Result Limit MDL Analyzed Qualifiers
Nitrogen,Kjeldahl,Total mgJL ND 0.50 0.25 05/09/23 04:25 .�
LABORATORY CONTROL SAMPLE: 4012954
Spike LCS LCS %Rec --
Parameter Units Conc. Result %Rec Limits Qualifiers
Nitrogen,Kjeldahl,Total mg1L 10 10A 101 90-110
MATRIX SPIKE&MATRIX SPIKE DUPLICATE: 4012955 4012956
MS MSD
92664918003 Spike Spike MS MSD MS MSD %Rec Max
Parameter Units Result Conc. Conc. Result Result %Rec %Rec Limits RPD RPD Qual
Nitrogen,Kjeldahl,Total mg/L 0.72 10 10 11.0 10.4 103 97 90-110 5 10
MATRIX SPIKE&MATRIX SPIKE DUPLICATE: 4012957 4012958
MS MSD
92664918004 Spike Spike MS MSD MS MSD %Rec Max
Parameter Units Result Conc, Conc. Result Result %Rec %Rec Limits RPD RPD Qual
Nitrogen,Kjeldahl,Total mg/L 0.70 10 10 10.7 11.5 100 108 90-110 6 10
Results presented on this page are in the units Indicated by the"Units"column except where an alternate unit Is presented to the right of the result.
REPORT OF LABORATORY ANALYSIS This report shall not be reproduced,except in full,
Date:05/1012023 04:39 PM without the written consent of Pace Analytical Services,LLC. Page 10 of 16
a�
Pace Analytical Services,LLC
�ce /!n�ry1ra 1 x 205 East Meadow Road-Suite A
,1! H!1 J !U r Eden,NC 27288
www.pacolabs.com (336)623-8921
QUALITY CONTROL DATA
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918
QC Batch: 772073 Analysis Method: EPA 353.2 Rev 2.0 1993
QC Batch Method: EPA 353.2 Rev 2.0 1993 Analysis Description: 353.2 Nitrate+Nitrite,preserved
Laboratory: Pace Analytical Services-Asheville
Associated Lab Samples: 92654918001,92664918002,92664918003,92664918004,92664918005
METHOD BLANK: 4008048 Matrix: Water
Associated Lab Samples: 92664918001,92664918002,92664918003,92664918004,92664918005
Blank Reporting
Parameter Units Result Limit MDL Analyzed Qualifiers
Nitrogen,NO2 plus NO3 mg1L ND 0.040 0.017 05/05123 08:22
LABORATORY CONTROL SAMPLE: 4008049
Spike LCS LCS %Rec
Parameter Units Conc. Result %Rec Limits Qualifiers
Nitrogen,NO2 plus NO3 mg1L 2.5 2.5 100 90-110
MATRIX SPIKE&MATRIX SPIKE DUPLICATE: 4008050 4008051
Ms MSD
10651039001 Spike Spike MS MSD MS MSD %Rec Max
Parameter Units Result Conc, Conc. Result Result %Rec %Rec Limits RPD RPD Qual
Nitrogen,NO2 plus NO3 mg1L 0.58 2.5 2.5 2.9 3.0 94 95 90-110 1 10
MATRIX SPIKE&MATRIX SPIKE DUPLICATE: 4008052 4008053
MS MSD
10651039002 Spike Spike MS MSD MS MSD %Rec Max
Parameter Units Result Conc. Conc. Result Result %Rec %Rec Limits RPD RPD Qual
Nitrogen,NO2 plus NO3 mg1L 0.52 2.5 2.5 2.8 2.8 92 93 90-110 1 10
Results presented on this page are In the units indicated by the"Units'column except where an alternate unit is presented to the right of the result.
'— REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full,
Date:05/10/2023 04:39 PM without the written consent of Pace Analytical Services.LLC. Page 11 of 16
Pace Analytical Services,LLC
aceAnalytrcal' 245 East Meadow Road-Suite R
/ Eden,NC 27288
www.pacelrabs.com (336)623-8921
QUALITY CONTROL DATA
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918 �-
QC Batch: 773403 Analysis Method: EPA 365.1 Rev 2.0 1993
QC Batch Method: EPA 365.1 Rev 2.0 1993 Analysis Description: 365.1 Phosphorus,Total
Laboratory: Pace Analytical Services-Asheville
Associated Lab Samples: 92664918001,92664918002,92664918003,92664918004,92664918005
METHOD BLANK: 4014363 Matrix: Water
Associated Lab Samples: 92664918001,92664918002,92664918003,92664918004,92664918005
Blank Reporting
Parameter Units Result Limit MDL Analyzed Qualifiers
Phosphorus mg/L ND 0.050 0.025 05/1012315:00
LABORATORY CONTROL SAMPLE: 4014364
Spike LCS LCS %Rec
Parameter Units Cone. Result %Rec Limits Qualifiers
Phosphorus mg/L 2.5 2.5 101 90-110
MATRIX SPIKE&MATRIX SPIKE DUPLICATE: 4014365 4014366
MS MSD
92664918001 Spike Spike MS MSD MS MSD %Rec Max
Parameter Units Result Cone. Cone. Result Result %Rec %Rec Limits RPD RPD Qual
Phosphorus mg/L 0.082 2.5 2.5 2.7 2.7 106 106 90-110 0 10
MATRIX SPIKE&MATRIX SPIKE DUPLICATE: 4014367 4014368
MS MSD
92664918002 Spike Spike MS MSD MS MSD %Rec Max
Parameter Units Result Cone. Cone. Result Result %Rec %Rec Limits RPD RPD Qual
Phosphorus mg/L 0.077 2.5 2.5 2.7 2.7 105 105 90-110 0 10
Results presented on this page are in the units indicated by the"Units"column except where an alternate unit is presented to the right of the result.
REPORT OF LABORATORY ANALYSIS r'
This report shall not be reproduced,except in full,
Date:05/10/2023 04:39 PM without the written consent of Pace Analytical Services,LLC. Page 12 of 16
Pace Analytical Services,LLC
//*0"aceAnalXical r 2oe East Meadow goad-Suite A
Eden,NC 27288
www.pacoiabs.cora
(336)623-8921
QUALIFIERS
Project: PREMIERE FIBERS R9-21
_. Pace Project No.: 92664918
DEFINITIONS
OF-Dilution Factor,if reported,represents the factor applied to the reported data due to dilution of the sample aliquot.
NO-Not Detected at or above adjusted reporting limit.
TNTC-Too Numerous To Count
3-Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit.
MDL-Adjusted Method Detection Limit.
PQL-Practical Quantitation Limit.
RL-Reporting Limit-The lowest concentration value that meets project requirements for quantitative data with known precision and
bias for a specific analyte in a specific matrix.
S-Surrogate
1,2-Diphenylhydrazine decomposes to and cannot be separated from Azobenzene using Method 8270.The result for each analyte is
a combined concentration.
Consistent with EPA guidelines,unrounded data are displayed and have been used to calculate%recovery and RPD values.
LCS(D)-Laboratory Control Sample(Duplicate)
MS(D)-Matrix Spike(Duplicate)
DUP-Sample Duplicate
RPD-Relative Percent Difference
NC-Not Calculable.
SG-Silica Gel-Clean-Up
U-Indicates the compound was analyzed for,but not detected.
Acid preservation may not be appropriate for 2 Chloroethylvinyl ether.
A separate vial preserved to a pH of 4-5 is recommended in SW846 Chapter 4 for the analysis of Acrolein and Acrylonitrile by EPA
Method 8260.
N-Nitrosodiphenylamine decomposes and cannot be separated from Diphenylamine using Method 8270. The result reported for
each analyte is a combined concentration.
Reported results are not rounded until the final step prior to reporting.Therefore,calculated parameters that are typically reported as
"Total"may vary slightly from the sum of the reported component parameters.
Pace Analytical is TNI accredited.Contact your Pace PM for the current list of accredited anaiytes.
TNI-The NEtAC Institute.
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full,
Date:05/10/2023 04:39 PM without the written consent of Pace Analytical Services,I.I.C. Page 13 of 16
Pace Analytical Services,LLC
_ aceAnalytical�� 205 East Meadow Road-Suite A
Eden,NC 2728B
www.pacelabs.com (336)623-8921
I
QUALITY CONTROL DATA CROSS REFERENCE TABLE
Project: PREMIERE FIBERS R9-21
Pace Project No.: 92664918 �^
Analytical
Lab ID Sample ID QC Batch Method QC Batch Analytical Method Batch
92664918001 OUTFAL.L 001 EPA 1664E 773286
92664918002 OUTFALL 002 EPA 1664B 773286
92664918003 OUTFALL 003 EPA 1664B 773286
92664918004 OUTFALL 004 EPA 1664B 773091
92664918005 OUTFALL 005 EPA 1664B 773286
92664918001 OUTFALL 001 TKN+NO3+NO2 773293
Calculation
92664918002 OUTFALL 002 TKN+NO3+NO2 773293
Calculation
92664918003 OUTFALL 003 TKN+NO3+NO2 773293
Calculation
92664918004 OUTFALL 004 TKN+NO3+NO2 773293
Calculation
92664918005 OUTFALL 005 TKN+NO3+NO2 773293
Calculation
92664918001 OUTFALL 001 EPA 351.2 Rev 2.0 1993 773107 EPA 351.2 Rev 2.0 1993 773188 -
92664918002 OUTFALL 002 EPA 351.2 Rev 2.0 1993 773107 EPA 351.2 Rev 2.0 1993 773188
92664918003 OUTFALL 003 EPA 351.2 Rev 2.0 1993 773107 EPA 351.2 Rev 2.0 1993 773188
92664918004 OUTFALL 004 EPA 351.2 Rev 2.0 1993 773107 EPA 351.2 Rev 2.0 1993 773188
92664918005 OUTFALL 005 EPA 351.2 Rev 2.0 1993 773107 EPA 351.2 Rev 2.0 1993 773188
92664918001 OUTFALL 001 EPA 353.2 Rev 2.0 1993 772073
92664918002 OUTFALL 002 EPA 353.2 Rev 2.0 1993 772073
92664918003 OUTFALL 003 EPA 353.2 Rev 2.0 1993 772073
92664918004 OUTFALL 004 EPA 353.2 Rev 2.0 1993 772073
92664918005 OUTFALL 005 EPA 353.2 Rev 2.0 1993 772073
92664916001 OUTFALL 001 EPA 365.1 Rev 2.0 1993 773403 EPA 365.1 Rev 2.0 1993 773582
92664918002 OUTFALL 002 EPA 365.1 Rev 2.0 1993 773403 EPA 365.1 Rev 2.0 1993 773582
92664918003 OUTFALL 003 EPA 365.1 Rev 2.0 1993 773403 EPA 365.1 Rev 2.0 1993 773582
92664918004 OUTFALL 004 EPA 365.1 Rev 2.0 1993 773403 EPA 365.1 Rev 2.0 1993 773582
92664918005 OUTFALL 005 EPA 365.1 Rev 2.0 1993 773403 EPA 365.1 Rev 2,0 1993 773582
REPORT OF LABORATORY ANALYSIS
This report shall not be reproduced,except in full.
Date:05/10/2023 0439 PM without the written consent of Pace Analytical Services.LLC- Page 14 of 16
i
• ail # tl Pace'{NorborderN...beror
� CHAIN-OF-CUSTODY Analytical Request Document , 4 �, o
% .ft'aceAnatytical' X, -» �� t � � r
1 Chain-of-Custody is a LEGAL DOCUMENT-Complete all retevenl fields
Coro ny: Billing Information: < a
l.. WSE ONLY.
Add s: Contatner PreservaEfve t Y ^sots
,c. nape
Repor To: ! 1 Email To: ••Preservative types:(1)Mirk add,(?)sulfuric add,(3)bydroddon cad d,(4j sadn+m hydroxide,(5)zinc acetate,
(6)methand.Q odlum bisulfate,(B)sodium thiosutfate,(9)hexan m m e,(A)atcorblcadd,(B)amoniu sullate,
Copy)1r. (� Site Collection Info/Address: IC)ammonium 1prosddc,(0)TSP,(U)Unpreserved,(0)Other
Jl� Analyses b;Proflte no -
Custo er Project Name/Nu er, State: County/City: Zone Collected: Same a pi Checltliettt
E /�-9-L-t : Time,
1 ,�N��,iJ t t PTt )mT{ )CT t eke
t v$todp§¢aXg`Estiaeat7Itttact Y:N
Phone SitelFacilityID p: Compliance Monitoring? : Cbgtody Sigaattsrets 4resent•
Email: P%,Yes t ]No toliector.Sigaotitre Piengot' 9:•lltl
- Bott).eN In.artt �.ill�y NA -
Coil By(print): Purchase Order th OW PWs ID rt: - ccrrgct$otslca + �Y NA
Quote# T—W DW Location Code r Lois
t volttme tm
Coitecde By(s' re): TumaraUnd Date R wired: mm iately P on Ice: a i samplesoc•svoa oa 1e0 mn
e9 " • VeiC 8eadspnce.ZccbylabYn Y p
p8aa.staglflnta�k se31a - Y t
( s [ ]NO ?� `s$ng+2cs 3n tasat3i>iq l�lmoit
`Wt
Sampl§Disposal: Rush: Field Filtered Iif applicable): , ttaaAdu•l.Cb2prsne.vrnaoat, T N t ., .*
Di ' seas ap riate l 1 Return t )Same Day [ j Next Day t )Yes too
Sgmpio ACCe bi
[ )2 DaY [ 13 DaY t )4 DaY t )S Day Analysis �` ' °j Srtripet
(EwpcdttQ Charges APP1Y) :Ld&recap t Z 13
• \ : 'a, rI ead AcrSr stet Stsi •.
Matrix Codes(insert 3n Matrix box below):Drinking Water(DW),Ground Water(GW),Wastewater(WW), }•: e= t ?
Product(P),Soil/Solid(SL),Oil(OL),Wipe(WP),Air(AR),Tissue(TS),B)oassay(B),Vapor(V),Other(OT) �;: r Y said os»tirlLfs
! Comp/ Collected(or Res #of
Customer Sample ID Matrix' Grab Composite Start) Composite End Cl Ctns a, _
• 1:
( Date Time Date Time
t
ur
1 j ''" r f
rAi 2 rl. .l `mil f
I T .:Y .r Egg
r =.
ZN
II i<'' 4: ..•3A: r..N'4. L7'!'iT. ' a4A l.f, -tr
t..
t nit.; :±:'�-''• 'Xw:i �a `C<-_:s�4... ..c...C�--t.. � v. r
Customer Remarks/Special Conditions/Possible Hazards: 7Y)te � � Blue` ':9 Df�3ie ,;. (tX {EjSPAESE�Yi( Z�Itoftr3) fff/A� �` E3b$atnill��@ttlperattJre Info
F ''tV>1Ct _ a _ b;', .i , - t = xi i,. Temp BWrlk�tte t� o Y N
`)`F '4nrJ.G.•YJ. ,t tr s• jy�� `r..^s}i2f1RI � ;
• Carloterx;ielttp.(i�tttnt'tecelpr: •nQ
�..Y-Sl-,. t. i r •r mp) u¢d- �'-'�_..} F t r ec t i' COnIeF'�?�1er111 Ctirr,F f'aC�O �
Tiadyhemsatnple(Y),saeett�d{�c�00t 1,� N {� ■��"'�j{r /�,� _ ar /r�� �/
.l -..x.. ti t �- vy� }.. •4. tf'.��� t'"i.:.nij�-� i; s� �'6T,.�!• � ;WYtQ�i��d�e'"SI.-�W.�••
Refingi ished by/Comps tM W y:IS'ignature) Datemme: ceiv by/Company:(Signare) bate/f'une: ;tfY(T(t:t/x6 LJ$E 01y1 �+ ehtr»
• � �w12 taf�� y� •� , + .
Reiln ished ! an . I nature ime: eceiVCd b� gture): Sit Acctrium i �,•
4y g 1 Y t m Da e/Ttme:
( Terylplafe. TSp9(anlRectred ,=Y K'
. prerogU, ktCf. McQH TSP °that
Relinq 'Shed by/Company:(Signature) Date/Time: Received by/Company:(Signature) Date�me:
PM Hon Cotif Page:
" I DCi Tltte: ENV-FRM-HUNI.0084 v02 Tech Spec Sample Conditlon Upon
9tfo9Mace-
i � Receipt
I i11{TfL'i:Rih+Y Effective[)ate:
two
*Check mark top half of box if pH and/or dechiorination Project e
Is verified and within the acceptance range for �n7irf
preservation samples. PM ltWB Rus Date 6/23
Exceptions:VOA,Collform,TOC,Oil and Grease,DROJ8015(water)DOC,LLHg
**Bottom half of box is to list number of bottles ` ' l�S=Wa ,e's Ed
.. ***Check all unpreserved Nitrates for chlorine
; i
13
iI
a a 0 a a O1 z
v 2 Rro j Z N v Y 2 2 B I a a
9 v v a 3 a a
> > T 0 t3 _ 2 N D e ro .f.4 z
uo a a a i a a a a.l c Q ? E OQ O G 0¢ a u d
E E E a E E E E� �_ u E E J J
= Qy :: E E E oaE E E E Q 1pJE� $ o ROE
rl i�v v�1 r1 „�. fV H H .q N .•�G ry A 7 N �. p N N ry aY�
.. m m m m m m a 3 a a a a a o n a L" in m
1
-N
s
rr k11Q \\N I
2 2; Z 4
i 1
rr
f \\N
I
5 j
�r !
6 I
i 7I N\
i
8
N\ I
NMI i \N\\ iN\
It
10 ff
f
NEW 11 �
i11 \N I
12
- N I I NNNW -N NNN 1 11 1 NN I L
i pH Adjustment Log for Preserved Samples
Sample lD Type of Preservative pH upon receipt Date preservation adjusted Time preservation Amount of Preservailve Lot a
r r If adjusted added
rr
i
` Note: Whenever there is a discrepancy affecting North Carolina compliance samples,a copy of this form will be sent to the North Carolina DEHNR Certification Office(i.e.
r.r i Out of hold,Incorrect preservative,out of temp,incorrect containers)
Qualtrax Document ID:70677 Page 2 of 2
r.
WATERS EDGE ENVIRONMENTAL, LLC
1434 CHESTER ROAD•RALEIGH, NC 27608•PHONE 919.219.5820
February 11, 2020 RECEIVED
Mr. Bradley Bennett MAR 0 9 2020
SW NPDES Permit Coverage
Stormwater Permitting Unit DEM7-LAND QUALITY
1617 Mail Service Center ST1,Mn'JVATE,R,r^E�'Ji�1 tPtii
Raleigh,North Carolina 27699-1617
Reference: Stormwater Permit Renewal
Premiere Fibers
10056 USW Highway 52 North
Ansonville, Anson County, NC
NC Stormwater Permit#NCS000528
Waters Edge Job No R9-21
Dear Mr. Bennett:
The coverage for the above-mentioned permit is set to expire on June 30, 2020. We would like to
request an extension of the existing permit and are hereby submitting this request to your office.
If you have any questions, or if we may be of further assistance, please contact me at
prahngwatersedizeenv.com or 919.859.9987.
Sincerely,
Waters Edge Environmental, LLC
&_44Z ;��
Phillip L. Rahn
President
Cc: Mr. Dewey Fulton- Premiere Fibers
NCDENR Central Files
20-012