Loading...
HomeMy WebLinkAboutWQ0032289_Staff Report_20230810DocuSign Envelope ID: 67056B01-6076-4689-9C33-9E6A1074139130 ;s State of North Carolina Division of Water Resources Water Quality Regional Operations Section Environmental Staff Report Quality To: ❑ NPDES Unit ® Non -Discharge Unit Attn: Alys Hannum From: Dorothy M Robson Raleigh Regional Office I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted? ❑ Yes or ® No a. Date of site visit: b. Site visit conducted by: c. Inspection report attached? ❑ Yes or ❑ No d. Person contacted: and their contact information: xxx ext. e. Driving directions: N/A 2. Discharge Point(s): N/A Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: N/A Classification: River Basin and Sub -basin No. Application No.: NCIWQ0032289 Facility Name: Utley Creek — (Town of Holly Springs) Reclaimed Water local program and Generation, Conjunctive Utilization, Bulk Distribution and Distribution System County: Wake Describe receiving stream features and pertinent downstream uses: II. EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility? ❑ Yes ❑ No ❑ N/A ORC: Certificate 9: Backup ORC: Certificate 9: 2. Are the design, maintenance and operation of the treatment facilities adequate for the type of waste and disposal system? ❑ Yes or ❑ No If no, please explain: Description of existing facilities: operate and maintain local reclaimed water permitting program and operation of 1.5M gallons per day reclaim water generation facility. Proposed flow: Current permitted flow: 1.5M GPD FORM: WQROSSR 04-14 Page 1 of 3 DocuSign Envelope ID: 67056B01-6076-4689-9C33-9E6A1074139130 Explain anything observed during the site visit that needs to be addressed by the permit, or that may be important for the permit writer to know (i.e., equipment condition, function, maintenance, a change in facility ownership, etc.) 3. Are the site conditions (e.g., soils, topography, depth to water table, etc.) maintained appropriately and adequately assimilating the waste? ® Yes or ❑ No If no, please explain: 4. Has the site changed in any way that may affect the permit (e.g., drainage added, new wells inside the compliance boundary, new development, etc.)? ❑ Yes or ® No If yes, please explain: 5. Is the residuals management plan adequate? ® Yes or ❑ No If no, please explain: 6. Are the existing application rates (e.g., hydraulic, nutrient) still acceptable? ® Yes or ❑ No If no, please explain: 7. Is the existing groundwater monitoring program adequate? ❑ Yes ❑ No ® N/A If no, explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment, storage and disposal sites? ❑ Yes or ® No If yes, attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ® Yes or ❑ No If no, please explain: 10. Were monitoring wells properly constructed and located? ❑ Yes ❑ No ® N/A If no, please explain: 11. Are the monitoring well coordinates correct in BIMS? ❑ Yes ❑ No ® N/A If no, please complete the following (expand table if necessary): Monitoring Well Latitude Longitude C I II C I II C I II C I II C I II C I II C I II C I II C 12. Has a review of all self -monitoring data been conducted (e.g., DMR, NDMR, NDAR, GW)? ® Yes or ❑ No Please summarize any findings resulting from this review: The facility has had frequency violations. The change in frequency should alleviate the violations. Provide input to help the permit writer evaluate any requests for reduced monitoring, if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ® Yes or ❑ No If yes, please explain: this modification addresses the BIMS violations. There have been no violations within 12 months 14. Check all that apply: ® No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑ Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD, etc.) If the facility has had compliance problems during the permit cycle, please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ❑ Yes ❑ No ❑ N/A If no, please explain: FORM: WQROSSR 04-14 Page 2 of 3 DocuSign Envelope ID: 67056B01-6076-4689-9C33-9E6A1074139130 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑ Yes ® No ❑ N/A If yes, please explain: 16. Possible toxic impacts to surface waters: NA 17. Pretreatment Program (POTWs only): NA III. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑ Yes or ® No If yes, please explain: 2. List any items that you would like the NPDES Unit orNon-Discharge Unit Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ❑ Hold, pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ® Issue ❑ Deny (Please state reasons: ) 6. Signature of report preparer: g P P P DocuSigned by: �/aant,ssa Signature of regional supervisor: B2g1BESA832144F... Date: 8/9/2023 IV. ADDITIONAL REGIONAL STAFF REVIEW ITEMS FORM: WQROSSR 04-14 Page 3 of 3