HomeMy WebLinkAbout20150305 Ver 1_Approved Soil Erosion Plan_20150812Letter of Transmittal S &ME, Inc *S&ME 9751 Southern Pine Blvd Charlotte, NC 28273 6.13.2015 (704) 523 -4726 Soil Erosion and Sediment Control Plan Guilford County, NC (704) 525 -3953 fax 7.29.2015 N C Division of Water Resources 450 W Hanes Mill Rd. Suite 300 Winston Salem, North Carolina 27105 WE ARE SENDING YOU: ® Attached ❑ Shop drawings ❑ Prints ® Copy of letter ❑ Report DATE: August 10, 2015 I JOB NO: 4335 -14 -220 ATTENTION- Ms. Sue Homewood Gas Pipeline MP1357 Pipeline Replacement Approved Soil Erosion Plan RECEIVED N C Dept of ENR AUG 12 2015 Winston -Salem ❑ Under separate cover via R ® Plans ❑ Draft ❑ Specifications COPIES DATE NO DESCRIPTION 1 6.13.2015 1 Soil Erosion and Sediment Control Plan Guilford County, NC 1 7.29.2015 2 NC Division of Land Quality Letter of Approval with Modifications 1 5.1.2015 3 Approximate Waters of the U.S. Figure THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ For approval ❑ As requested ❑ FORBIDS DUE: ® For your record ❑ For review and comment ❑ ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: For your records regarding approved 401 water quality certification (DWR # 15 -0305) Williams Gas Pipeline has received approval of their Soil Erosion and Sediment Control Plan that will involve the placement of rip -rap (RP Detail) within the stream -bed of Stream S3 (reference Figure 4) Please let me know if you have questions. Thank you - Darrnn Peine SIGN. DC"A- N' pt4-� COPY TO: File, Williams IF ENCLOSURES ARE NOT AS NOTED, PLEASE NOTIFY US AT ONCE This Letter of Transmittal and the documents accompanying this Letter of Transmittal contain information from S &ME, Inc , which is confidential and legally privileged The information is intended only for use of the individual or entity named on this Letter of Transmittal If you are not the intended recipient, you are hereby notified that any disclosure, copying, distribution or the taking of any action in reliance on these documents is strictly prohibited S &ME SFG -001 (Rev 04/04) ,.,IP 6 o MALI REPLACEMENT MAN LAME 6E" A' ,m - ;..f M.P. 176627 '- ec 9.. ♦X Ce REP , A!,[ ;'I NT ... yr. VICINITY MAP 1. T. S. SOIL EROSION AND SEDIMENT CONTROL PLAN 2015 DOT REPLACEMENT 30" MAIN LINE "A" M.P. 1356.99 TO M.P. 1358.27 GUILFORD COUNTY, NORTH CAROLINA PROJECT DESCRIPTION THE SCORE OF THIS PROJECT CONSISTS OF THE REPLACEMENT OF TRN600IINTINENTAL CAS PIPELINE'S 134L) HIGH PRESSURE NATURAL CAS M+IIEIIE 'A' AS FOLLOWS : NO LOW OSTM MOLItDDIr Da OTUL w YDTAL mm 10Lti1 TWA, LEON 11Q71 lOKY TWAL LAW 1ST GMQ Ihm) A 1316.0 131A.m 1.111 AAD1' KR/OO [YT 14.10 AM IFt • ILPM Vu:S.t +. SURVEY AND STARE PIPELINE CENTERLINE AND WORK AREA LIMIT. 12. RETURN TOPSOIL TO DESIGNATED AREAS. OWNER / APPLICANT THE REPLACEMENT IS af,UNINC DIYE TO THE NEED FOR MAIN LINE 'A' TO HAVE NIDIRECTIOIAL FLOW.wINLINE 'A CUIENRT US TO REGULATE FLOW GOING MONTH. INSTEAD OF ANOTHER SET O REGLATORS TO REGULATE FLOW 001NIG SOTRL THE PIPE WILL E UPGRADED TO COMPLY WITH THE EXISTING CLASS 111 AKA. THE MEW PIPELINES WILL E PLACED WITHIN THE SAME TRENCHES AS THE KINDRED PIPELINES. AND ALL O THE VI STUNNED AREA SMALL KE RESTORED TO THE ORIGINAL COON- TIE DISTUFM AREAS W[LL E PRIMARILY WITHIN THE EXISTING WAIMEAIED TGPL COR DOR. THE PROPOSED WON IS SCHEDULED TO BEGIN APPROXIMATELY AK, 2015 NO WILL BE COMPLETED DT APPROXIMATELY SEPTEMBER. 2015. ALL WOE PERFORMED WILL E IN GUILFORD COUNTY. NORTH CM0.1MA. SEQUENCE OF CONSTRUCTION i NO HAY OR STRAW MULCH SHALL BE PLACED ON WATEMY BANKS. AT A MINIMUM. ALL WATERBODT BANKS SHALL BE COVERED WITH AN EROSION CONTROL FABRIC. F-, Grq.M St.M4.tlr• .._.._ .____ SIk Ar,. I. WA APPROVALEOF TYETENVIRONEIITAL PUN AND 10. FINAL GRADE RIGHT-0F -WAY AFTER BACKFILL OF TRENCH. TAKE SPECIFIED PIPELINES LINE OUT OF SERVICE AND EVACUATE GAS. 2. MARE NOTIFICATIONS ACCORDING TO PERMIT REQUIREMENTS. 11. INSTALL PERMANENT EROSION AND SEDIMENT CONTROL MEASURES. 9.2. 3. CONDUCT A PRE-CONSTRUCTION CONFERENCE PRIOR TO STARTING. mE1CTMl 9"0= IFt • ILPM Vu:S.t +. SURVEY AND STARE PIPELINE CENTERLINE AND WORK AREA LIMIT. 12. RETURN TOPSOIL TO DESIGNATED AREAS. OWNER / APPLICANT 5. INSTALL CONSTRUCTION ACCESS. 13. COMPLETE FINAL STABILIZATION. INCLUDING SOIL TREATMENT. ■ILLIM6 GAS PIPELINE - TRANSCO 6. GRIRI SCR SAFETY FENCE. SEDIMENT BARRIERS AND OTHER SEDIMENT ; d.,, SEEDED PREPARATION. SEED APPLICATION AND MULCHING. P.D. BOX 1396 N TNAPF DEVICE TNAPPIH� 011121 S71A[RR 9.5 2800 POST DIX BOLLEVARO i. INSTALL SUETY FENCE, SEpIMENT BARPIEpS AID OTHER SEDIMENT TRAPPING DEVICES. 1+. UPON COMPANY APPROVAL OF STABILIZATION AID REVEGETATION. HOUSTON. TEXAS 77251 -1396 ■ITN RIP RAP IRP) ACR05S ENTIRE TEMPORARY WORKSPACE AND ALONG CHANNEL BANKS AFTER NSTAL E 1PIENT CROSSING Ulf APPL CABLE,. AND MULCH REQUIREMENTS REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL IEASlIRES CONTACT: RADALL FLOWERS PERMIT AGENT I. STRIP TOPSOIL FROM DESIGNATED AREAS AND ROUGH GRADE RIGHT-0F -WAY. wnb aLTK. fWIn AND STABILIZE AREA DISTURBED BY REMOVAL. IT13) 215 -2630 9. FACILITY CONSTRUCTION PHASE. SHALL THEN NOT BE REMOVED AT ANY POINT OARING OR AFTER CONSTRUCTION. RESTARILIZATION SHALL E ACCOMPLISHED IN ACCORDANCE WITH THE YIX TYPE COMPONENTS APPLICATION RATES NORTH CAROLINA MANUAL REOUIREMENTS. i NO HAY OR STRAW MULCH SHALL BE PLACED ON WATEMY BANKS. AT A MINIMUM. ALL WATERBODT BANKS SHALL BE COVERED WITH AN EROSION CONTROL FABRIC. F-, Grq.M St.M4.tlr• .._.._ .____ SIk Ar,. ly 51.b1M."_TTtr D Mu. •.. 9.1. TAKE SPECIFIED PIPELINES LINE OUT OF SERVICE AND EVACUATE GAS. :.S A 4 �••- -� 1.6 9? wok,. d.,b, 9.2. CUT AND REMOVE PIPE AT ENDS OF REPLACEMENT SECTION STATE OF mE1CTMl 9"0= IFt • ILPM Vu:S.t 9.7. PIG EXISTING PIPE SECTION AM COLLECT LIQUIDS FOR DISPOSAL. NORTH CAROLINA ]6... S••.. /..nn 9.+ FOR MINOR WATERBODY CROSSING IMBC). CHAAWEL WILL NOT E DISTURBED UNTIL DAY LM• R. Kwum S DIMM OMID v.rc HI ♦Np., vm+ IWa!I ; d.,, O PIPE INSTALLATION. 01 N It d. v.rc .IN+ N 011121 S71A[RR 9.5 FOR YINOI WATEABODY CROSSING INK). CHANNEL WILL BE IMMEDIATELY STABILIZED .Ny..,l•n IJJA., Fi.ma ,WWI S"kn 1alur T Q ■ITN RIP RAP IRP) ACR05S ENTIRE TEMPORARY WORKSPACE AND ALONG CHANNEL BANKS AFTER TABLE 1: SEED MIXTURES, SOIL SUPPLEMENTS AND MULCH REQUIREMENTS N_ All ..Iba. m,•., CHANNEL PIPE INSTALLATION IS COMPLETE AT THE END OF THE WORK DAY. RIP RAP (RP) la'u.Pl 1.n wnb aLTK. fWIn RAJ... I'•''na•1.�. v.l t6.n A I ER SHALL THEN NOT BE REMOVED AT ANY POINT OARING OR AFTER CONSTRUCTION. tt YIX TYPE COMPONENTS APPLICATION RATES APPLICATION DATES A TEMPORARY COVER FOR UPLAND RYE (GRAIN) l 120 LB / N21E t JAN 1 - MAY 1 9.6. EXCAVATE AND REIDVE EXISTING PIPE. AND RIPARIAN AREAS. KOBE LESPEDEZA YIX 50 LB / ACRE YIX 9.7. HAUL NEW PIPE TO Al HT-OF WAY. PLANT ON EXPOSED SLOPES GERMAN MILLET 40 LB / ACRE MAY 1 - AUG 15 9. D. BhO, PLACE ON SUPPORT. ALIGN. AND VELD PIPE REPLACEMENT SECTION. WITHIN 7 DAYS. RYE IGRAIN) 120 LB / ACRE AUG 15 - NOW 15 9.9. PERFORM INSPECTION OF WELDS AND APPLY COATING TO WELD AREA. SEE TABLES 6.10 a. D. 0 AGRICULTURAL LINE 2000 LB / ACRE ALL SEAM 9.10. PREPARE TRENCH FOR INSTALLATION OF NEW PIPE. EROSION AND SEOIIENT CONTROL FERTILIZER 110 - 111-10) 750 LB /ACRE JAN 1 MAY 1 PLANNING AND DESIGN MANUAL. 750 U / ACRE MAY 1 - AUG 15 9.11. INSPECT MEN PIPE COATING, AND LOWER PIPE IN PLACE. t00D LB / ACRE AUG 15 - NOV 15 9.12, INSTALL PERMANENT TRENCH PLUGS, PAD PIPE. AND BACKFILL TRENCH. S PERENNIAL COVER FOR UPLAND TALL FESCUE 80 LB Pl. / ACRE l FALL POSSIBLE: 9.13. PERFORM HYDROSTATIC TEST OF PIPE REPLACEMENT SECTION. AND RIPAR IAN AREAS. KOBE LESPEDEZA YIX 20 LB PLS / ACRE MIX AUG 20 - OCT 25 9.14. COPLETE FINAL -INS. SEE TABLE 6.11.1 PAGE 6.11.20 9.15. yTIE WITH NATURAL GAS AND PLACE EROSION AND SEDIMENT CONTROL NURSE PLAITS: PIPEL IANENCINASERYICE.IRE PLANNING AND DESIGN MANUAL GERMAN MILLET ADD 10 LB / ACRE TO ABOVE MIX MAY 1 - A11G 15 RYE (GRAIN) ADD 40 LB / ACRE TO ABOVE MIX PRIOR TO MAY 1 OR AFTER AUG 15 AGRICULTURAL LINE 2 TON / ACRE OR TO PH-6 FERTILIZER 110 - 10-101 lIDDO LB / ACRE MAY OR STRAW MULCH s 4000 LB / ACRE C WETLANDS AREAS RTE (GRAIN) 40 LB PLS /ACRE COVER FOA WETLANDS AREAS WITH NO INC FERTILIZER, LIIE. NAY ALL DATES DECIDED BY STANDINO WATER. (NO UPLAND MIX OR STRAW MULCH SHALL CORP OF ENGINEERS �H81C£ C O PERENNIAL GRASSES AND LEGUMES APPLIED.) IXMNMR lia SHALL BE PLANTED IN WETLANDS.) i NO HAY OR STRAW MULCH SHALL BE PLACED ON WATEMY BANKS. AT A MINIMUM. ALL WATERBODT BANKS SHALL BE COVERED WITH AN EROSION CONTROL FABRIC. F-, Grq.M St.M4.tlr• .._.._ .____ SIk Ar,. Au6N4nM• 51.b1M."_TTtr D Mu. •.. T_ l Fns. F.— E. :.S A 4 mm mmE Alm 1.6 9? wok,. d.,b, 1.9.11 A 11 6 ER• mE1CTMl 9"0= IFt • ILPM Vu:S.t G. minsLTN SERIOUS STMEII� K ne 0K)NI ]6... S••.. /..nn W 1 NMI LM• R. Kwum S DIMM OMID v.rc HI ♦Np., vm+ IWa!I ; d.,, A« -." in kyrb.uJ . u. ­q­ h. 1. 01 N It d. v.rc .IN+ N 011121 S71A[RR m T.LM +A, .Igwn .Ny..,l•n IJJA., Fi.ma ,WWI S"kn 1alur © w knFi6 10 O N_ All ..Iba. m,•., R la'u.Pl 1.n wnb aLTK. fWIn RAJ... I'•''na•1.�. v.l t6.n A I ER 111 N /wr• �r�R�•tn.am uu'A w��y �.00..1 Wm v..,lb„.. u0M W..P..' 1. amMnn tMi suA. a..nrb..r NrAp.eNoble ° Itiaa NRpMbll IN SHEET INDEX IESCMIITIM MELT tAIIKI OB MER 1 PL/6 :.S A 4 mm mmE Alm 1.6 9? =Io. cartax 31w1ES 1.9.11 A 11 0 MATERIAL SUMMARY ITDI MWITTTT WAIT 111011"m SMT S a LO. FT. mom mo CI 6 ER• mE1CTMl 9"0= IFt 1 G. minsLTN SERIOUS STMEII� A 1 EA. ANN " W 1 NMI LM• R. Kwum S DIMM OMID AFO 1 tA. Illla /ICED 011127 01 N tA. 011121 S71A[RR m m IA• I'llml01 THERM NOTE: QUANTITIES ARE FOR THE SOIL EROSION CONTROL MEASURE ITE16 LISTED. WMT171ES FOR ALL OTHER ITEMS. INCLUDING BUT NOT LIMITED TO DIVERSIONS. STREAM CROSSINGS. TEMPORARY CULVERT CROSSINGS. MINOR L INTERMEDIATE WATERBODY CROSSINGS. TRENCH PLUGS. EROSION CONTROL BLANKETS. CHECK DAMS AM HYDROSTATIC DEMATERING STRUCTURES, SHALL BE THE RESP061BILITY OF THE CONTRACTOR. DISTURBED AREA AREA N=FTIMI A'm am 1 Lm AM SMT S LM ACRES SKU 1 t.93 am MAL IISIINID AREA 1410 AM DETAIL LEGEND RQT Two PUMAREA a Ttuall"Iml 31111101 WO110 MDO ORLIT mM ARE /M 17011K TOM MIATOIRE 1 DO corm alum ON 1 m MAIM. TEMMa + Q marwim mwm / CITY 1 ME MET Om amm1 OM IK 1 © FILED SO 1 ® vallow NMIER 111 ® MIMO<TATIC MOLTE11K STNCTK 10 O KI*W= 101MEME/HOMER t1 © NODE FILTER DTIV 10 O tATOI WASIN tt R 1IP- AM, 11 ® MIKE EKU,DIT a ssloc 11 ER DMIDA 31AOET tt Tual0l" CATAIN tt ® IKICMES SOIL EIIREIO CU1111L WASM DETAIL OMF115HIP T 8 F BERRY L L C L L W 595A1 VARREN, DOROTHY LEE L/T. ET AL L L NO 5958 WILLIAMS DOROTHY. JANICE D LASPINA JEFF M lASPINA STATE HIGHWAY W 2190 EYENSFIELD ROAD '- CLARK. JON B M ZIMIFAYW. T JACK JR t L L NO 595 2B - RRFAT POLEL. JR . ADAM LEE LAW L L MO 596A ' DEWAR. LARRY 5 1 DETIAR. JO ANN STATE n L L NO 5968 W1 NO W 2228 PEWS GROVE ROAD W .°P MCIM705H. PATRICIA M L L NO 596 2A , IfiRNA P TURNER L L ND TTTT7 ; MCINTSH. PATRICIA Y L L NO 596 2A L L NO 595C .R L L 596 t CONSTRUCTION MIIOOM OR RESTRICTION i NOME CONSTRUCTION METRO $ $s SIND TOPSOIL SALVAGE TS2 DIVERSION TERRACES 9tty IBM BREAKERS ' Y � % NEEDLE LNG SUPPLY 10 LINE j •� � i % ��j / ^ PINE NEEDLE LNC DISCHARGE 24 LINE '8 i//• - -;,� 1 ` \'( 1 \•� ` ��� \ � -� ��r. _q� z PROO JECT SPECUit MD7E is T Ise � / ti SEE PRBIEGT SPECSIC NODE • 6 � � / I � \' � /� , / %,�, �� �'I C(�; \ � SE PROIECf�7PEGIFIC ,lOIE5.5.;d.B��r \� -/ �" �a"% 1 �/ �� ��' /J i / A � � ���_ � � ���\ � �Lt -�•�� �� %� � / � Yl ,l' � � � ! %� "� r�/•�1 %' w � I�' �� � `� V'V A �� i��� �I��\ AY � ��� � Id�� �VV', � ---��� '�'� �:'y��/ ��i� +wC �' r •, ,,� ! 1 I ^'i ___�� ��� \ `' ff_ LE _ , , �� , r �r� ,�RSB / r �t 1 V ,D5,1��, �l OSN DT , �� CE �, ,fEl� ,, -- $SQL ,,•,RFD, DS, `� A l i I' .RSe � _ nst- -0i- — � •m., � )�I � � �� ��/ ' { 1 R � �l /� � � 1 ��� V � �"i� ",� - -- --- ----_ \ �` � � _ �.�_A- / �' —•�� N630 '�1r \IXISTIWIN LINE 'A' • \�� - DT ' '� �J� r' �� r I�� � ������ � � •,, -use � 1 ., �/• __. \ �Q V � T, \11 14 / _ N\V/ \ � Y) I 1 I I ) I I I I �'0�\ a \ \�Atv�J;,Ay�11111i;'�, IXISTING 36' WIN LAN: 'B' • -� \ \ 1 \ " \ -� "- -� ' \ -� \� PINE NEEDLE LNG "TER STATION EXI5TIX0 /2 WIN LINE 'C' \ IY ,�\ � \\� �\ \ O _ \ � \.� � �J •.�� { ,/ ' / /////�1// /// 651 /�� RSB /rill l I r+l 1 I I /// / / �`-` 1 1 / y i // j, I� � � �/ ' � �" \ \ / �\ \ 8581 \ �� ��{ �, �� ��i �.. - -_ lD \ // l \ \` � � 11 J/ / �� Y lI lI I � "'_ \-_\ Y U", �- ' -��� � � � 1� \ � � ''� � � ��� � � l •`;�� � ! '� i��� i ��� ( V'� �' ��. -� �� �i �j 1 �� Ill /i ;�'r;� �I ��--�— �--.' i i i�� � � � _� i V�'� :v'V \�� ��1 1 v- 8g � 88 Ila1 9 1 HN1118 a GO Go 3 &'£ YY T - • ^• E . �3' T: T2'a^�a^i ai� 4�4R S Y FR'^.TT mad Ms °Mvt„ n n� msr nn� ImIN ERER F 97' 120 15' { '�' N�—�y AB' I ^ 120' 720' LIMITS ff DISTURBANCE X., � �y 'Z-' J ...IlllL 7` - - - -_ I1 I 1 Ir_-- - - -_ -_ \ �-- - _----------- _ - - - - -� Tn�- EXISTING JO' WIN LIRE 'A' - --------------- __ -_ -_ -_f _ - -_ _ ---- — ----- _---------------- / - _- _- _--- _-- - - - - -_ __---- -_ -_ -_ ------ - - - - -- EXISTING 76' WIN LIKE 'B' PRIPDSED 70' WIN LINE REPLACEMENT IN LINE 'C' l.- _- _- _' - - - - -- EXISTING 36' J - -_- - -_ -- -_- -� _ _ - -, _ sI_- _- _ - - -__- -_ -_ - 210' I - 115' 16_� �- 50' X7 PINE METALS LNG FUEL METER STATION LIMITS ff DISNRBANCE Q M co LP9 GENERAL NOTES CONSTRUCTION LEGEND EROSION CONTROL LEGEND PROJECT SPECIFIC NOTES SOIL LEGEND EROSION CONTROL TYPICAL LAYOUT 1 THE TOPOGRAPHIC FEATURES SHORN MERE COMPILED FAON FIELD SURVEY MEASUREMENTS AND ARE REFERENCED TO THE NORTH AMER CAN VERTICAL DATUM ff 1988 STND - STANIARD CONSTRUCTION RIGHT ff WAY CLEANING AND GRADING CLEAN VEGETATION AND PERFORM GRADING ONLY WITHIN CERTIFICATED AND STAKED CONSTRUCTION LIMITS DRY - BATERSOOY CONSTRUCTION RIGHT-CF-VA Y CLEARING AND GRADING. CUT VEGETATION OFF AT CRUD ® EROSION CONTROL MEASURE CI82 O.IFFIRO SANDY CLAY LDW 2 TO 6 PERCENT SLOPES. MODERATELY ERODED t EROSION CONTROL MEASURE AS DEPICTED IN THESE PLANS ARE INTENDED AS GUIDELINES AND WY LIMITS IF p. BE ADJUSTED BY WILLIAMS ENVIRONMENTAL INSPECTORS TO MEET ACTUAL FIELD COOITIUMS CIC2 CLIFFOD SANDY CLAY LDW. 6 TO 10 PERCENT AffES. MODERATELY ERODED DIST I\L aF o - J� - - - -- - - - - -- - 2 MILE POST. STATIONING AND DISTANCES SHORN ALONC THE PIPELINE IIIONT-0FiAY ARE BASED a SURVEY MEASUREMENTS WOE TO CONFORM TO THE NATURAL GAWK SURFACE PROFILE LEVEL. LEAVING ROOT SYSTEMS IN PLACE AND REMOVE VEGETATION FOR DISP06AL LIMIT PILLING TREES. STUDS AND GRADING ACTIVITIES TO DIRECTLY OVER TRENCH LINE WET - CONSTRUCTION f ----- 4rZ-- SEDIMENT BARRIER REINFORCED SEDIMENT BARRIER 2 COMPANY ENVIRM409AL INSPECTOR SHALL DETERMINE LOCATION WHERE HYDROSTATIC DEVATFRING NA DAN RIVER LOW, 0 TO 2 PERCENT AGES FREQUENTLY FLOODED STRUCTURE IDS 2) 15 TO BE LOCATED HOC HALIFAX SANDY LOU 6 TD 10 PERCENT AffES 3 ALL PILE POSTS AND STATIONING ARE BASED a WIN LINE 'A' STATIONING A BEARINGS SHON ARE GRID BEARINGS AND REFER 70 THE MONTH CAROLINA ATLANI RIGHT ff WAY CLEARING AND GRADING REM CUT VEGETATION OFF AT GPOILD LEVEL. LEAVING ROOT SYSTEMS IN PUCE AND REMOVE VEGETATION Fa DISPOSAL LIMIT PLLLINC TREE STUDS AND GRADING ACTIVITIES DIRECTLY OVER TRENCH LINE CAF _ • SAFER FENCE SILT FENCE 7 CONIRACTCR SHALL BE REWIRED TO KEEP ROADS WERE CONSTRUCTION SPREAD WILL ENTER AND POE PPLAR FOREST SANDY LOAM. 15 TO 75 PERCENT SLOPES + UNLESS MOOED OTHERWISE. ALL SAFETY FENCES. EXIT PROJECT CORRIDOR CLEW O" CONSTRUCTION RELATED DEBRIS AT ALL TIES SEDIMENT BARRIERS AND/OR RE INFORMED SEDIMENT PPC2 PffLAR FOREST CLAY LOW. 6 TO 10 PERCENT SLIDES MODERATELY ERODED BARRIERS SXYL BE IODATED ON THE LIMITS ff PRIERS STATE RAZE COORDINATE SYSTEM. HAD 1983 5 ANY DISTUWAIDE IN A WATERBODY OR WTLAWS SHALL CONFORM WITH THE WATERBODY AND WETLAND CONSTRUCTION AND MITIGATION PROCEDURES RES - RESIDENTIAL COLSTRUCTION RIGHT ff WAY CLEARING AND GRADING OD MDT C06"E CLEWING AND GRADING UNTIL AFTER PIPELINE IS READY TO BE INSTALLED WCKFILL AND BESIDE DISTURBED AREAS AS SOON AS POSSIBLE NSF— F7;t'- •t',(X .i ,H SUPER SILT FENCE EROSION CaTR0. BLANKET / ALL WATERBOD7 CROSSINGS 70 BE INSTALLED USING THE FLLLa1NC METHOD OPEN CUT B DE PPE2 POPLAR FOREST CLAY LOW 15 TO 25 PERCENT SLOPES ERODED 5 OW AND PUMP TO BE INSTALLED IF TIERS IS FLOWING WATER 6 COSTRUCTia AND RESTORATION SHALL CONFORM TO THE UPLAND EROSION COMM PEVEGETATION AND MITIGATION PLAN 7 CONTRACTOR SHALL LIMIT EQUIPMENT TRAVERSING THROUGH THE 151 - STRIP TOPSOIL FROM THE TNONCX LIRE AND SUBSOIL STORAGE AREAS PREVENT TOPSOIL ANO SIDSOIL FROM MIZiNG TS2 -STRIP TOPSOIL FROM THE ENTIRE CERTIFICATED C015TNODTION WORK CORRIDOR AND ALL ASSOCIATED EMS LOCATIONS �— DIVERSION TERRACE TRENCH PLUG REVISIONS 6 PROJECT SPECIFIC MOLE 6 +B' PLASTIC. METAL. OR NUMBER FLUTE PIPING TO BE TRANSCONTINENTAL GAS PIPE LINE COMPANY. LLC INSTKLFD ALONG THE EDGE ff THE REINFORCED SEDIMENT BARRIER FROM 051 AT m DATE BY �^3N ""N" oR AP SOIL EROSION AND SEDIMENT CONTROL PLAN STATIONING 585DH/ TO OD7 AT STAY LOWING 5851494 INLET ff FLUME PIPING LULL COFFER + +2-0]401N W ISSUED FOR REVIEW 1165225 Aw w 2015 DOT REPLACEMENT / RESIDENTIAL ZONES B WATER SHALL BE APPLIED TO WOE AREA SURFACE TO CONTROL DIET THE APPLICATION SHALL BE PERIODICALLY APPLIED AS MFEDED Ts. - SSTTANDING WALTER OR STURRAIOTEDffSOIILAlE PRESENT TRENCH LINE. EXCEPT IN AREAS WERE ® - - - - -- - WY BALES ACCESS ROADS - INGRESS / EGRESS LIMITS OF DISTURBANCE HAVE OW TO DIIEti RUNOFF INTO PIPING cffFFA oW SHALL xm EJ(TDO PAST ' TR LIMITS A 01/30/2015 W ISSUED FOR BID 1165225 AW W MAIN LINE 'A' �� I FOR MINOR WATERBWT CROSSING I WC). CHANNEL WILL NOT BE DISTURBED UNTIL DAY ff 0 06/17/2015 W ISSUED FOR CONSTRUCTION 11652 AW w M.P. 1356.99 TO M.P. 1358.27 PIPE INSTALLATION 9 TOTAL DISTURBED AREA THIS SWEET IS 15 91 AC 1 /1257.260 5 F ) 10 TOTAL LENGTH OF SEDIMENT BARRIER THIS SWEET 15 0 L F 111 TOTAL LENGTH ff REINFORCED SEDIMENT RANDIER THIS SHEET [S J.S10 L F Q 100 200 300 - - - - WORK CORRIDOR LIMIT EXISTING ACCESS ROADS Q EXISTING PIPELINE ' B FOR MINOR WTERBODY CROSSING (MWCI. awRWL WILL BE + a /+3/20ts W REVISED PER M C D E N R 116sz AW w GUILFORD COUNTY. NORTH CAROLINA IMMEDIATELY STABILIZED WITH RIP RAP 11P) ACROSS ENTIRE TEMPORARY WORKSPACE AND GNMN BY W DXM 07-2/ -2011 ®.® TOR BIK muc SHORN YANG CHYBEL BANKS AFTER CHANNEL PIPE INSTALLATION IS COMPLETE AT THE END OF NARK O ®® W AW MTE 11- 30jDt/ R11Ot RA OODIRICIOH WLAY. 01 ILLY PROPOSED PIPELINE WATER WELL RTE DAY RIP RAP ARP) SHALL THEN NOT BE REMOVED AT ANY POINT DURING ON AFTER CONSTRUCTION M110.ID Rf IRS INIE 1t- 70 -20t1 pAawO N.W6926 01000- 28— A�82611 2 19R 1165225 6 11 OWEASNIP MLINTOW. PATRICIA N T L L W 596 2A CHEERY. ROBERT A i IEELT. LUPON C L L N0. 596 28 $ STATE NI6NOAT W 2261 WITARE CANT L L MO 595 1 FULAFA. WILLAY LESLEY FLLIFR. DOROTHY Y L L W 596 ED I[O/REN CWT AVER £'' L L NO 596 2E STATE CHICORY W 2117 IWITARE WIYEI L L RD 566 7 i DAVIDSON. WILLIAM Y III 1 DAVIDSON LAW B L L W 596 1 DAVIOSOM. WILLIAM Y III I DAVIDSON. LIMA B L L NO 597AI CC STRUCTION WIDOW W RESTRICTION WERE CONSTRUCTION METHOD SIND TOPSOIL SALVAGE TS2 DIVERSION TERRACES .R TRENCH BREAKERS r ��� -1 � \�' ,r\ 'iii �' \\ \,\\ � \ \� ` � 1 � �' �_ �� , � �j � -�,, ! � •�, � --�� �`� \ \,` `� /�--� J� \ � ' �' { I I I � — J -� SEE PRN`SPECIFIC 1/1 \_� 1 1, \�1r .\t \\ �/� `{ / i l \ 1 1 _ LLJ LLJ ROBERT C / \ pp��EE `� 25 u /EX ST NG 30 i—N LINE 'A! ost Rse �� Dsr _ � _ TP X11 t5B os1 , Rse �\ I I ! I ®` , ` \ �`J, RSB. \ •m �' / / pT% / DY� ON7 ! ON ` �\ _ RSi _. �HSB Rsa r/ iiiii��iii� - • I�n rtt�,R1;� / _�=� �__ - -= ,-*, wC�", J J:'l/ -- = - -'�-' 1,\ `\ V'ti� � � `y \�Avi t� v� \,AA �' lI /� � .,®-iii �ii, •:. � /- / �/� / / / / _— _— �= % % /. // i/� ; / � -- - : - � _ _ _ v. Lo BY - '1 Q of ' i�lidll l ��\ �A `.A` a y�, lIi ;, • /� /� �' 1 , . v { { A .� - , / °o 001 / �' I { tt! / V Av�� �d�(� t�i�`1 \ NX, is 8 8' G 88 88 8 88 $ale Be L-012 p - ED dd a AM U � LN � p I? I ® ens s ME ac ® =11 sass s °s lAJ t� � J _ 70' " - - -_ _— _— _--- _— _--- _-- -' —_ —• 1GU' _ - - -_ 191__ -- _- _1T1' - -- 18J' -- ___161' -1 — " - --/ ^ —_�, �- - -1 _ _797'— " - - -_/ - -i / ' —_ —•\ — .— •----------- •----- - -_ —_— '192'_-- _— _— _— •— •------ - - -• -- ' —_ _ •— - - -- — ./ Z F— PROPOSED WIN LINE EXISTING WIN LINE 'B' • / _ C..3 - -- — — — — — ------ - - - - -- \_ - - --- -- - - - � ------ ----------------------------------- -------------•------- - - - - -- — —•— - - - - --- - - - - -- Q Lo 2W - EXISTING WIN LINE I. — B1' V'D' S0' 175' 125' � LO O Ih LL7 00 25' tOJ' + Q co LA co GENERAL NOTES: CONSTRUCTION LEGEND EROSION CONTROL LEGEND PROJECT SPECIFIC NOTES SOIL LEGEND EROSION CONTROL TYPICAL LAYOUT 1 THE IOPOGAAPN IC FEATURES SHOWN MERE COMPILED FROM FIELD SURVEY IEASUEYENIS AND ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DANA OF 1968 STAN - STAND MD CONSTRUCTION RIGHT OF MAY CLEARING AND GRADING CLEAR VEGETATION AND PERFORM GRADING ONLY WITHIN CERTIFICATED AND STAKED CONSTRUCTION LIMI7S DRY - WTERBNY CONSTRUCTION RIGHT-0E-0AT CLEARING AND GRADING. Cm VEGETATION OFF AT GROUT ® EROSION CONTROL MEASURE 1 EROSION CONTROL MEASURE AS DEPICTED IN THESE PLANS ARE INTENDED AS GUIDELINES AND MAY BE AAUS D BY WILLIAMS ENVIRONMENTAL INSPECTORS TO MEET ACTUAL FIELD CONDITIONS ECTOR S 2 COMPANY FNVIROMIENTA INSPECTOR LUl1 DETERMINE LOCATION WERE HYDROSTATIC DEWA7ERING COMPANYE CIB2 CLIFFORD SNOT CLAY LOAM. 2 TO 6 PERCENT SLOPES, MODERATELY OHM CIC2 LLIffWD SNOT COAT LOAM. 6 10 10 PERCENT SLOPES IOOAATFLT ERmEp put LOW LIMITS CE DISTURBAAE� of o 3337]]..���... ___ —_ - - -_ ti- 2 MILE POST. STATIONING AND DISTANCES SHOWN RANG THE PIPER IRE RIGHT-OF-WAY ARE BASED ON SURVEY IE/SI/REIEN75 MADE TO CONFORM 70 THE WTIRAL GROUND SURFACE PROFILE ON LEVEL. LEAVING ROUT SYSTEMS IN PLACE AND BERNE VEGETATION FOR DISPOSAL LIMIT PULING TREES. STARS AND WADING ACTIVITIES TO DIRECTLY OVER TRENCH LIME NET - WETLAND CDSTRULTION RIGHT CE WT CLEANING AND GRADING CUT VEGETATION OFF f SEDIMENT BARRIER —RSB� REINFORCED SEDIMENT BARRIER 105 21 IS TO ON 3 CONTRACTOR SHALL BE REWIRED TO KEEP PONS WERE CONSTRUCTION SPREAD HILL ENTER AND CAN RIVER D 10 L PERCENT AGES FIEOIE111LY fLOAND N0C HALIFAX SANDY LOW. 6 1D 10 PERCENT AO'FS SAT 7 AL MILE POSTS AND STATIONING ARE BASED ON WIN LINE 'A' STATIONING / BEATINGS PLANE ARE GRID SYSTEM. BEARINGS AID REFER TO TIRE NOTCH CAROLINA STATE PLANE COWDIWTE STSiN. WD 1983 AT GROUND LEVEL. LEAVING BODY SYSTEMS IN PLACE AND REMOVE VEGETATION FOR DISPOSAL LIMIT PULING TREE STUMPS AND GRADING ACTIVITIES DIRECTLY OVER TRENCH LINE RES - RESIDENTIAL CONSTRUCTION RIGHT CE NAT CLEARING A D WADING DO NOT CO WINCE �AF� SAFETY FENCE t SILT FENCE ' EXIT PROJECT CORRIDOR CLEAN OF CONSTRUCTION RELATED DEBRIS AT AL TIMES 1 AL VATERBODY CROSSINGS TO BE MS ED USING TIE FOLLOWING METHOIt E'EN CUT Ppp PWLAR FOREST SNOT LOW 6 TO 10 PERCENT AGES P.E P" FOREST SNOT LOW 15 TO 35 PERCENT SLOPES PPC2 OPLAR FOREST CLAY LOW, 6 TO 10 PERCENT SLOTS wOFUAIELT ERODED 1 UNLESS NOTED OTHERWISE. AL SAFETY FENCES. SEDIMENT BARRIERS AND/DR REINFOR CED SFDIIENT BARRIERS SHALL BE LOCATED ON THE LIMITS OF 5 ANY DISTURBANCE IN A WTFRBO Y W WETLANDS SHALL CONFIRM WITH THE WTERBOOY AND WETLAND CONSTRUCTION AND MITIGATION PROCEDURES CLEANING AND GRADING UNTIL AFTER PIPELINE IS READY TO BE INSTALLED BACAFILL AND RESTORE DISTURBED AREAS AS SOON AS POSSIBLE - -� SOWER SILT FENCE 1.'X % X % k a EROSION CONTROL BLANKET ! w ., y�� 5 PIP PAP TO BE IMSTALED IF WITHER LAKE IS WT PDE2 POPLAR OEST CLAY LOW, 15 10 25 PERCENT AGES, ERODED DISTURBANCE DNS rRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC SOIL EROSION AND SEDIMENT CONTROL PLAN � 6 CNSTRUCTIN AM RESTORATION SHALL CONFORM TO THE UPLAND EROSION CONTROL. PEVEGETATION AND MITIGATION PUN iS1 _ AND STRIP TOP MIXING LIRE AND SUBSOIL STORAGE AREAS PREVENT TOPSOIL T52 - STRIP TOPSOIL FROM THE ENTIRE CERTIFICATED CONSTRUCTION WORK CORRIDOR AN .L DIVERSION TERRACE —�— TRENCH PLUG NO DOE w p°°�"01 wD'N0 CK A, 1 2-07 -2014 A 01/3D/2015 W W ISSUED FOR REVIEW ISSUED FOR BID 165225 165225 w vY w w T CONTRACTOR SHALL LIMIT EQUIPMENT TRAVERSING THOM THE RESIDENTIAL 201E5 B RATER SHALL BE APPLIED TO WOE AREA SURFACE TO CONTROL DST AL ASSOCIATED ENS LOCATIONS RSV STANDING WATER W SATURATED S0� ARE PRESENT TRENCH LIRE, EXCEPT IM AREAS WERE ® WY R LES ACCESS ROADS - INGRESS /EGRESS 2015 DOT REPLACEMENT n/Il�m� MAIN LINE °AF THE APPLICATION LULL BE PERIODICALLY APPLIED AS MUM 9 TOTAL DISTURBED AREA THIS LEFT IS 16 52 ACRES) 1283.982 S0 Ft U — LIMITS OF DISTURBANCE - - -- -- WORK CORRIDOR LIMIT — — — 0 06/13/2015 13/2015 W C ISSUED FOR CONSTRUCTION REVISED PER N C 0 E N R 165225 1165225 AV Aw w NO M.P. 1356.99 TO M• P. 1358.21 GUILFORD COUNTY. NORTH CAROLINA 10 TOTAL LENGTH OF SEDIMENT BARRIER THIS SHEET IS 0 L F 71 TOTAL LENGTH OF REINFORCED SEDIMENT BARRIER TNIS SHEET IS 1.111 L F 0 100 200 300 — EXISTING ACCESS NOAOS TASTING PIPELINE WORN Br W pRE 07-21 -2016 OW® FOR ® BCNE SNOW TWO® of AvY 71 -70 -2011 ®.I® FOR N81R1CIODN °'°T PROPOSED PIPELINE 4 WATER WELL APPROVED B" w 11-30-2011 =6-0100--50-28—A-582611 m*sET3 MattcSUS OF 11 OWNERSHIP DAVIDSON. WILLIAM Y I'I , OONN. JON S JA 1 DORM JULIE M DAVIDSON. LANA 8 LLt 597 O 5' L L NO 59TA7 CLAYTON. TONY P I CLATTOI. PHILANI W LL 597 U CORSTRUCTION WINDOW BRIE OR RESTRICTION CONSTRUCTION METHOD SID i TOPSOIL SALVAGE gg T52 T DIVERSION TERRACES IBM BREAKERS II N d \ \�•- •// // _ `� \� — // / _' !l �� -" i / / / //i l�/ / =' I_�\ 1 J // l \ \NOTE Tlb SNAL\ !0 i \ BANAS AT A YINIWY l/ _: IWO 'N CID � ta e a E Z 1162' ` J PROP06ED 7D' -IN }TIE REPLACEMENT __ __•__- _______- _________________ _ _ __•_- ___11�____•______ _ • _ _ _ _ _ EXISTING 30' WIN LIME 'A' _ TQ U H ^ _•_ __- ______- _____- _- ________•____ `G'• EXISTING 36'WIN LIME 'B' 791' — — ------- - - - - -- EXISTING 76' WIN LINE 6 275' - co LP) GENERAL NOTES: CONSTRUCTION LEGEND EROSION CONTROL LEGEND PROJECT SPECIFIC NOTES SOIL LEGEND ERGSION CONTROL TYPICAL LAYOUT 1 THE TOPDGRAPXIC FEATURES SNOW WERE COMPILED FROM FIELD SURVEY DATUM MEASUR OF 1198 AND ARE RdFAEMCED ID THE NORTH AMERICAN VERTICAL OATUY OF 1988 STAN - STANDARD CONSTRUCTION RIGHT OF WAY CLEARING AND WADING CLEAR VEGETATION AND PERFORM WADING ONLY WITHIN CERTIFICATED AND STARER CONSTRUCTION LIMITS DRY - WATER CONSTRUCTION RIGHT-CF-WAY CLEAVING AND WADING. CUT VEGETATION OFF AT GRMD O EROSION CONTROL MEASURE 1 EROSION CONTROL MEASURE AS DEPICTED IN THESE PLANS ARE ]KID= AS GUIDELINES AND MAY BE ADJUSTED By WILLIAMS ENVIRONMENTAL INSPECTORS 70 MEET ACTUAL FIELD CONDITIONS CMC Cl lffvM qMj to ®e b 1D proof AloPie LIMITS -- - -o —I- DISTURBANCE1 1 2 MILE POST, STATIONING AND DISTANCES SHOWN ALONG THE PIPELINE RIWT-0Fa1AY ARE BASED ON SURVEY MEASUREMENTS MADE TO CONFORM TO THE NATURAL GROIN SURFACE PROFILE LEVEL. LEAVING ROPT SYSTEMS IN PLACE AND REMOVE VEGETATION FOR DISPOSAL LIMIT PALLING TREES. STROPS AND GRADING ACTIVITIES TO DIRECTLY OVER TRENCH LINE WET - GRW C FRUITION RIGHT OF WT CLEARING AM WAGING CUT VEGETATION SEDIMENT BARRIER RSB REINFORCED SEDIMENT BARRIER 2 COMPANY ENVIRONMENTAL INSPECTOR SHALL DETERMINE LOCATION WME HYDROSTATIC DEWTERIMG STRUCTURE IDS 2) IS TO BE LOCATED flMl IIO1NVn loos 0 b 2 prvk •I,pr. RWNn11Y flooBM PoD PcPW F~ may loos 10 b 15 WFCp1I ,lop„ � � ��� 7 ALL PILE POSTS AND STATIONING ARE BASED ON WIN LIME 'A' STATIONING AT LEVEL. R AT GROOD LIMIT LEAVING ROOT SYSTEMS IN PLACE AND REMOVE VEGETATION FOR DISPOSAL LIMIT PLLLIWG TREE STROPS AND GRADING ALTIYITIFS DIRECTLY OVER TRENCH LIME �AF� SAFETY FENCE 7 CONTRACTOR SHALL BE REQUIRED TO KEEP ROADS DEIE CONSTRUCTION SPREAD WILL ENTER AND EXIT PROJECT CORRIDOR CLEAN OF CONSTRUCTION RELATED DEBRIS AT ALL TIMES SIC 511e WXU lo® 4 b 10 WFC,pt ,lap„ I UNLESS NOTED OTHERWISE. ALL SAFETY FENCES, /OP SEDIMENT 4 BEARINGS SHOW ARE ARID BEARINGS AND REFER TO THE NORTH CAROLINA STATE PLANE COORDINATE SYSTEM. HAD 1987 RES - RESIDENTIAL CONSTRUCTION RIGHT OF WAY CLEANING AND WADING DD NOT COtENCE CLEARING Aw GRADING UNTIL AFTER PIPELINE 15 NEWT TO BE INSTALLED NACKFILL AND RESTORE SILT FENCE NSF -- SORER SILT FENCE ALL VATERBO)T CROSSINGS TO BE INSTALLED U51WG THE FOLLOWING METHOD OPEN CUT PoE POPLAR FOREST SANDY LOW 15 TO ffi PERCENT SLOPES SEDIIEIIi BARRIERS AW REINFORCED BARRIERS SHALL BE LOCATED ON THE LIMITS OF DISTURBANCE 5 ANY DISTURBANCE IN A WTERBOPY OR IETLAUK SHALL CONFIRM WITH THE WTERBOPT AND WETLAND CONSTRUCTION AND MITIGATION PRULFDUES 6 CONSTRUCTION AND RESTORATION SHALL CONFO W TO THE "AID EROSION CONTROL REVEGETATION AND MITIGATION PLAN CONTRACTOR SZONE LIMIT EQUIPMENT TNAYFASIxc TWOMRI THE DISTURBED AREAS AS SUCH AS POSSIBLE TS1 o SUBSOIL FROM MIXING THI TRENCH LIME AND SUBSOIL 57011AGE AREAS PREVENT TOPSOIL 752 - STRIP TOPSOIL FROM THE ENTIRE CERTIFICATED CONSTRUCTION WORK CORRIDOR AND ALL ASSOCIATED EARS LOCATIONS EROSION CONTROL BLANKET DIVERSION TERRACE TRENCH PLUG aEVaroMS rRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC SOIL EROSION AND SEDIMENT CONTROL PLAN ,ii � ND DoE BY DF&]X"DON wDND OWL MP 1 2-07 -2014 W ISSUED FOP REVIEW 165225 w w RESIDENTIAL znEs ® MAT DALES 2015 DOT REPLACEMENT n/1I�m�. 8 MAld SHALL BE APPLIED TO root ,lid SURFACE 10 CONTROL DUST TIME APPLICATION LOLL BE PERIODICALLY APPLIED AS NEEDED rn - SEGRE TE THE TOP WATER OR ONE-FCTT F TOPSOIL FROM THE TRENCH LONE. EXCEPT IN AREAS WHERE ACCESS ROADS - INGRESS / EGRESS - - -_ —_— LIMITS OF DISTURBANCE A 01/!0/2015 0 06/17/2015 W W ISSUED FOR BID ISSUED FOR CONSTRUCTION 185225 165225 W AVY w w MAIN LINE 'A" tip M.P. 1356.99 TO M. P. 1358.27 9 TOTAL DISTURBED AREA THIS SHEET 15 (2 27 ACRES) 197.220 Sq Ft ) 10 TOTAL LENGTH OF REINFORCED SEDIMENT BARRIER THIS 51EET IS 157! L F Q WORK CORRIDOR LIMIT — — — — EXISTING ACCESS ROADS 17/2015 REVISED PER N C D E M R 165225 w AM GUILFORD COUNTY. NORTH CAROLINA m.Mx BY W --TT-----.-14 -i01/ B4® FOR eD BOVE SNOW 11 TOTAL LENGTH OF SAFETY FENCE THIS SHEET IS 0 00' o l00 Y00 Soo EXISTING PIPELINE PROPOSED PIPELINE CH ®® Bf AvV 11- 70-20N ®.® FOR GRbTRFIDW TALL a Tar WATER HELL Mnam Br w 11-70-2114 6 -0100-50 -28 -A -082611 �T4 ++ OF 11 UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN C I INTRODUCTION. CONSTRUCTION PHASE THE PURPOSE OF THE UPLAND EROSION CONTROL. REVEGETATION AND MAINENANCE PLAN IS TO ASSIST CONSTRUCTION PERSONNEL BY IDENTIFYING BASELINE MITIGATION MEASURES FOR MINIMIZING EROSION AND SEDIMENTATION AND ENHANCING REVEGETATION 1 SUPERVISION AND INSPECTION . A ENVIRONMENTAL INSPECTION 1 AT LEAST ONE ENVIRONMENTAL INSPECTOR IS REQUIRED FOR EACH CONSTRUCTION SPREAD DURING CONSTRUCTION AND ' RESTORATION THE NUMBER AND EXPERIENCE OF ' ENVIRONMENTAL INSPECTORS ASSIGNED TO EACH CONSTRUCTION SPREAD SHOULD BE APPROPRIATE FOR THE LENGTH OF THE CONSTRUCTION SPREAD AND THE NUMBER /SIGNIFICANCE OF RESOURCES AFFECTED 2 ENVIRONMENTAL INSPECTORS SHALL HAVE PEER STATUS WITH D ALL OTHER ACTIVITY INSPECTORS 3 ENVIRONMENTAL INSPECTORS SHALL HAVE THE AUTHORITY TO STOP ACTIVITIES THAT VIOLATE THE ENVIRONMENTAL CONDITIONS OF THE FERC CERTIFICATE. STATE AND t FEDERAL ENVIRONMENTAL PERMIT CONDITIONS, OR E LANDOWNER REQUIREMENTS, AND TO ORDER APPROPRIATE CORRECTIVE ACTION B RESPONSIBILITIES OF ENVIRONMENTAL INSPECTORS AT A MINIMUM, THE ENVIRONMENTAL INSPECTOR(S) SHALL BE RESPONSIBLE FOR F 1 ENSURING COMPLIANCE WITH THE REQUIREMENTS OF THIS PROJECT, OTHER ENVIRONMENTAL PERMITS AND APPROVALS. ' AND ENVIRONMENTAL REQUIREMENTS IN LANDOWNER EASEMENT AGREEMENTS ' 2 IDENTIFYING' DOCUMENTING, AND OVERSEEING CORRECTIVE ACTIONS. AS NECESSARY TO BRING AN ACTIVITY BACK INTO COMPLIANCE 3 VERIFYING THAT THE LIMITS OF AUTHORIZED CONSTRUCTION WORK AREAS AND LOCATIONS OF ACCESS ROADS ARE f PROPERLY MARKED BEFORE CLEARING OR USE 4 VERIFYING THE LOCATION OF SIGNS AND HIGHLY VISIBLE ' NSITIVE OR AREAS WITH UCTION WORK I B 9 10 11 12 13 14 15 0 III [RESERVED] IV INSTALLATION AND SOIL I STRUCTURES TER INTO KNDWN OF SENSITIVE AND /OR A APPROVED AREAS OF DISTURBANCE 1 PROJECT-{RELATED GROUND DISTURBANCE SHALL BE LIMITED TO THE CONSTRUCTION RIGHT-OF-WAY. EXTRA WORK SPACE AREAS. PIPE STORAGE YARDS, BORROW AND DISPOSAL AREAS. ACCESS ROADS, AND OTHER AREAS WHERE APPROVAL HAS BEEN OBTAINED FROM FEDERAL AND STATE AGENCIES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION 2 THE CONSTRUCTION RIGHT-OF-WAY WIDTH SHALL BE IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS OR AS MODIFIED IN CONSULTATION WITH ENGINEERING AND ENVIRONMENTAL B TOPSOIL SEGREGATION 1 UNLESS THE LANDOWNER OR LAND MANAGEMENT AGENCY SPECIFICALLY APPROVES OTHERWISE. PREVENT THE MIXING OF TOPSOIL WITH SUBSOIL BY STRIPPING TOPSOIL FROM EITHER THE FULL WORK AREA OR FROM THE TRENCH AND SUBSOIL STORAGE AREA (DITCH PLUS SPOIL SIDE METHOD) IN a ACTIVELY CULTIVATED OR ROTATED CROPLANDS AND IMPROVED PASTURES b RESIDENTIAL AREAS c HAYFIELDS (CULTIVATED AND FERTILIZED) d OTHER AREAS AT THE LANDOWNER'S OR LAND MANAGING AGENCY'S REQUEST 2 IN RESIDENTIAL AREAS, IMPORTATION OF TOPSOIL IS AN ACCEPTABLE ALTERNATIVE TO TOPSOIL SEGREGATION 3 IN DEEP SOILS (MORE THAN 12 INCHES OF TOPSOIL), SEGREGATE AT LEAST 12 INCHES OF TOPSOIL IN SOILS WITH LESS THAN 12 INCHES OF TOPSOIL MAKE EFFORT TO SEGREGATE THE ENTIRE TOPSOIL LAYER 4 WHERE TOPSOIL SEGREGATION IS REQUIRED. MAINTAIN SEPARATION OF TOPSOIL AND SUBSOIL THROUGHOUT ALL CONSTRUCTION ACTIVITIES 5 SEGREGATED TOPSOIL MAY NOT BE USED FOR PADDING THE PIPE OR FOR CONSTRUCTING TRENCH BREAKERS DRAIN TILES 1 MARK LOCATIONS OF DRAIN TILES DAMAGED DURING CONSTRUCTION 2 PROBE ALL DRAINAGE TILE SYSTEMS WITHIN THE AREA OF DISTURBANCE TO CHECK FOR DAMAGE 3 REPAIR DAMAGED DRAIN TILES TO THEIR ORIGINAL OR BETTER CONDITION DO NOT USE FILTER- COVERED DRAIN TILES UNLESS THE LOCAL SOIL CONSERVATION AUTHORITIES AND THE LANDOWNER AGREE USE QUALIFIED SPECIALISTS FOR TESTING AND REPAIRS 4 FOR NEW PIPELINES IN AREAS WHERE DRAIN TILES EXIST OR ARE PLANNED, ENSURE THAT THE DEPTH OF COVER OVER THE PIPELINE IS SUFFICIENT TO AVOID INTERFERENCE WITH DRAIN TILE SYSTEMS FOR ADJACENT PIPELINE LOOPS IN AGRICULTURAL AREAS. INSTALL THE NEW PIPELINE WITH AT LEAST THE SAME DEPTH OF COVER AS THE EXISTING PIPELINE(S) IRRIGATION 1 MAINTAIN WATER FLOW IN CROP IRRIGATION SYSTEMS. UNLESS SHUTOFF IS COORDINATED WITH AFFECTED PARTIES ROAD CROSSINGS AND ACCESS POINTS 1 MAINTAIN SAFE AND ACCESSIBLE CONDITIONS AT ALL ROAD CROSSINGS AND ACCESS POINTS DURING CONSTRUCTION 2 IF CRUSHED STONE ACCESS PADS ARE USED IN RESIDENTIAL OR ACTIVE AGRICULTURAL AREAS. PLACE THE STONE ON SYNTHETIC FABRIC TO FACILITATE REMOVAL TEMPORARY EROSION CONTROL INSTALL TEMPORARY EROSION CONTROLS IMMEDIATELY AFTER INITIAL DISTURBANCE OF THE SOIL TEMPORARY EROSION CONTROLS MUST BE PROPERLY MAINTAINED THROUGHOUT CONSTRUCTION IDN A DAILY BASIS) AND REINSTALLED AS NECESSARY (SUCH AS AFTER BACKFILLING OF THE TRENCH) UNTIL REPLACED BY PERMANENT EROSION CONTROLS OR RESTORATION IS COMPLETE 1 TEMPORARY SLOPE BREAKERS a TEMPORARY SLOPE BREAKERS ARE INTENDED TO REDUCE RUNOFF VELOCITY AND DIVERT WATER OFF THE CONSTRUCTION RIGHT-OF-WAY TEMPORARY SLOPE BREAKERS MAY BE CONSTRUCTED OF MATERIALS SUCH AS SOIL, SILT FENCE, STAKED HAY OR STRAW BALES, OR SAND BAGS b INSTALL TEMPORARY SLOPE BREAKERS ON ALL DISTURBED AREAS, AS NECESSARY TO AVOID EXCESSIVE EROSION TEMPORARY SLOPE BREAKERS MUST BE INSTALLED ON SLOPES GREATER THAN 5 PERCENT WHERE THE BASE OF THE SLOPE IS LESS THAN 50 FEET FROM WATERBODY, WETLAND. AND ROAD CROSSINGS USE THE FOLLOWING SPACING UNLESS CLOSER SPACING IS NECESSARY TO AVOID EXCESSIVE EROSION ON THE CONSTRUCTION RIGHT OF WAY SLOPE 1 %) SPACING (FEET) >15 - 30 200 >30 100 ALTERNATIVELY, TEMPORARY SLOPE BREAKERS MAY BE NSTALLED USING WRITTEN SPACING RECOMMENDATIONS OBTAINED FROM THE LOCAL SOIL CONSERVATION AUTHORITY OR LAND MANAGING AGENCY c DIRECT THE DUTFALL OF EACH TEMPORA Y SLOPE BREAKER TO A STABLE, WELL VEGETATED AREA OR CONSTRUCT AN ENERGY -DISSIPATING DEVICE AT THE END OF THE SLOPE BREAKER AND OFF THE CONSTRUCTION RIGHT-OF -NAY WHERE TEMPORARY SLOPE BREAKERS EXTEND BEYOND THE EDGE OF THE CONSTRUCTION RIGHT OF WAY, THEY ARE SUBJECT TO ALL APPLICABLE ENVIRONMENTAL SURVEY /CLEARANCE REQUIREMENTS d POSITION THE OUTFALL OF EACH TEMPORARY SLOPE BREAKER TO PREVENT SEDIMENT DISCHARGE INTO WETLANDS. WATERBODIES, OR OTHER SENSITIVE RESOURCES 2 SEDIMENT BARRIERS a SEDIMENT BARRIERS ARE INTENDED TO STOP THE FLOW OF SEDIMENTS AND TO PREVENT THE DEPOSITION OF SEDIMENTS INTO SENSITIVE RESOURCES THEY MAY BE CONSTRUCTED OF MATERIALS SUCH AS SILT FENCE. STAKED HAY OR STRAW BALES. COMPACTED EARTH (E G DRIVEABLE BERMS ACROSS TRAVELWAYS), SAND BAGS. OR OTHER APPROPRIATE MATERIALS b AT A MINIMUM. INSTALL AND MAINTAIN TEMPORARY SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION RIGHT-OF-WAY AT THE BASE OF SLOPES GREATER THAN 5 PERCENT WHERE THE BASE OF THE SLOPE IS LESS THAN 50 FEET FROM A WATERBODY, WETLAND, OR ROAD CROSSING UNTIL REVEGETATION IS SUCCESSFUL LEAVE ADEQUATE ROOM BETWEEN THE BASE OF THE SLOPE AND THE SEDIMENT BARRIER TO ACCOMMODATE PONDING OF WATER AND SEDIMENT DEPOSITION c WHERE WETLANDS OR WATERBODIES ARE ADJACENT TO AND DOWNSLOPE OF CONSTRUCTION WORK AREAS, INSTALL SEDIMENT BARRIERS ALONG THE EDGE OF THESE AREAS. AS NECESSARY TO PREVENT SEDIMENT FLOW INTO THE WETLAND OR WATERBODY 3 MULCH a APPLY MULCH ON ALL SLOPES (EXCEPT IN ACTIVELY CULTIVATED CROPLAND) CONCURRENT WITH OR b c m WILL 20 DAYS AREAS) 2 PERMANEN c b c d d IF MULCHING BEFORE SEEDING, INCREASE MULCH C SOIL COMPACTION MITIGATION APPLICATION ON ALL SLOPES WITHIN 100 FEET OF WATERBODIES AND WETLANDS TO A RATE OF 3 1 TEST TOPSOIL AND SUBSOIL FOR COMPACTION AT REGULAR TONS /ACRE OF STRAW OR EQUIVALENT INTERVALS IN AGRICULTURAL AND RESIDENTIAL AREAS 0 IF WOOD CHIPS ARE USED AS MULCH. DO NOT USE DISTURBED BY CONSTRUCTION ACTIVITIES CONDUCT TESTS MORE THAN 1 TON /ACRE AND ADD THE EQUIVALENT OF ON THE SAME SOIL TYPE UNDER SIMILAR MOISTURE 11 LBS /ACRE AVAILABLE NITROGEN (AT LEAST 50 CONDITIONS IN UNDISTURBED AREAS TO APPROXIMATE PERCENT OF WHICH IS SLOW RELEASE. 1 E , UREA) PRECONSTRUCTION CONDITIONS USE PENETROMETERS OR f ENSURE THAT MULCH IS ADEQUATELY ANCHORED TO OTHER APPROPRIATE DEVICES TO CONDUCT TESTS MINIMIZE LOSS DUE TO WIND AND WATER 2 PLOW SEVERELY COMPACTED AGRICULTURAL AREAS WITH A Q T LIQUID ER L IMPLEMENT I RATES RECOMENDEDBY THE MANUFACTURER DO NOT WHERETTOP TOPSOIL HAS BEEN SEGREGATED.PLOWTHESUBSOIL USE LIQUID MULCH BINDERS WITHIN 100 FEET OF BEFORE REPLACING THE SEGREGATED TOPSOIL WETLANDS OR WATERBODIES 3 PERFORM APPROPRIATE SOIL COMPACTION MITIGATION IN h INSTALL EROSION CONTROL FABRIC ON WATERBODY SEVERELY COMPACTED RESIDENTIAL AREAS BANKS AT THE TIME OF FINAL BANK RECDNTOURING ANCHOR THE EROSION CONTROL FABRIC WITH STAPLES D REVEGETATION OR OTHER APPROPRIATE DEVICES 1 GENERAL V RESTORATION a THE PROJECT SPONSOR IS RESPONSIBLE FOR ENSURING A CLEANUP SUCCESSFUL STABILIZATION OR REVEGETATION OF SOILS DISTURBED BY PROJECT - RELATED ACTIVITIES 1 COMMENCE CLEANUP OPERATIONS IMEDIATELY FOLLOWING b RESTORE ALL RESIDENTIAL TURF. ORNAMENTAL BACKFILL OPERATIONS COMPLETE FINAL GRADING. SHRUBS. AND SPECIALIZED LANDSPAPING IN TOPSOIL REPLACEMENT. AND INSTALLATION OF PERMANENT ACCORDANCE WITH THE LANDOWNER S REQUEST, OR EROSION CONTROL STRUCTURES WITHIN 20 DAYS AFTER COMPENSATE THE LANDOWNER RESTORATION WORK BACKFILLING THE TRENCH (10 DAYS IN RESIDENTIAL MUST BE PERFORMED BY PERSONNEL FAMILIAR WITH AREAS) IF SEASONAL OR OTHER WEATHER CONDITIONS LOCAL HORTICULTURAL AND TURF ESTABLISHMENT PREVENT COMPLIANCE WITH THESE TIME FRAMES. MAINTAIN PRACTICES TEMPORARY EROSION CONTROLS (TEMPORARY SLOPE BREAKERS AND SEDIMENT BARRIERS) UNTIL CONDITIONS ALLOW 2 SOIL ADDITIVES COMPLETION OF CLEANUP 2 A TRAVEL LANE MAY BE LEFT OPEN TEMPORARILY TO ALLOW' FERTILIZE AND ADD SOIL PH MODIFIERS IN ACCESS BY CONSTRUCTION TRAFFIC IF THE TEMPORARY ACCORDANCE WITH WRITTEN RECOMMENDATIONS EROSION CONTROL STRUCTURES ARE INSTALLED WHEN OBTAINED FROM THE LOCAL SOIL CONSERVATION ACCESS 15 NO LONGER REQUIRED THE TRAVEL 4ANE MUST BE AUTHORITY. LAND MANAGEMENT AGENCIES, OR REMOVED AND THE RIGHT-OF-WAY RESTORED `TEMPORARY LANDOWNER INCORPORATE RECOMMENDED SOIL PH BRIDGES MAY NOT BE LEFT OVER WINTER. SEE WETLAND AND MODIFIER AND FERTILIZER INTO THE TOP 2 INCHES WATERBODY CONSTRUCTION AND MITIGATION PROCEDURES V B 51 OF SO AS SOON AS POSSIBLE AFTER APPLICATION 3 ROCK EXCAVATED FROM THE TRENCH MAY BE USED TO BACKFILL THE TRENCH ONLY TO THE TOP OF THE EXISTING 3 SEEDING REQUIREMENTS BEDROCK PROFILE AND IN ACCORDANCE WITH COMPANY SPECIFICATIONS ROCK THAT IS NOT RETURNED TO THE c PREPARE A SEEDBED IN DISTURBED AREAS TO A DEPTH TRENCH SHOULD BE CONSIDERED CONSTRUCTION DEBRIS. OF 3 TO 4 INCHES USING APPROPRIATE EQUIPMENT TO UNLESS APPROVED FOR ON THE CONSTRUCTION WORK AREAS PROVIDE A FIRM SEEDBED WHEN HYDROSEEDING. BY THE LANDOWNER OR LAND MANAGING AGENCY SCARIFY THE SEEDBED TO FACILITATE LODGING AND 4 REMOVE EXCESS ROCK FROM TOPSOIL. TO DEPTH OF 12 GERMINATION OF SEED INCHES IN ALL ACTIVELY CULTIVATED OR ROTATED b SEED DISTURBED AREAS IN ACCORDANCE WITH WRITTEN CROPLAND AND PASTURES. HAYFIELDS. AND RESIDENTIAL RECOMMENDATIONS FOR SEED MIXES, HATES, AND AREAS. AS WELL AS OTHER AREAS AT THE LANDOWNER'S DATES OBTAINED FROM THE LOCAL SOIL CONSERVATION REQUEST THE SIZE. DENSITY. AND DISTRIBUTION OF AUTHORITY OR THE REQUEST OF THE LANDOWNER OR ROCK ON THE RESTORED CONSTRUCTION WORK AREA SHOULD LAND MANAGEMENT AGENCY SEEDING IS NOT BE SIMILAR TO ADJACENT AREAS NOT DISTURBED BY REQUIRED IN ACTIVELY CULTIVATED CROPLANDS CONSTRUCTION THE LANDOWNER MAY APPROVE OTHERWISE UNLESS REQUESTED BY THE LANDOWNER IN WHITING C PERFORM SEEDING OF PERMANENT VEGETATION WITHIN 5 GRADE THE CONSTRUCTION RIGHT-OF-WAY TO RESTORE PRE- THE RECOCENDED SEEDING DATES IF SEEDING CONSTRUCTION CONTOURS AND LEAVE THE SOIL IN THE CANNOT BE DONE WITHIN THOSE DATES. USE PROPER CONDITION FOR PLANTING APPROPRIATE TEMPORARY EROSION CONTROL MEASURES 6 REMOVE CONSTRUCTION DEBRIS FROM ALL CONSTRUCTION AND PERFORM SEEDING OF PERMANENT VEGETATION AT WORK AREAS UNLESS THE LANDOWNER OR LAND MANAGING THE BEGINNING OF THE NEXT RECOMMENDED SEEDING AGENCY APPROVES OTHERWISE. IN WRITING SEASON LAWNS MAY BE SEEDED ON A SCHEDULE 7 REMOVE TEMPORARY SEDIMENT BARRIERS WHEN REPLACED BY ESTABLISHED WITH THE LANDOWNER PERMANENT EROSION CONTROL MEASURES OR WHEN d IN THE ABSFNCE OF WRITTEN RECOMMENDATIONS FROM REVEGETATION IS SUCCESSFUL THE LOCAL SOIL CONSERVATION AUTHORITIES. SEED ALL DISTURBED SOILS WITHIN 6 WORKING DAYS OF B PERMANENT EROSION CONTROL DEVICES FINAL GRADING. WEATHER AND SOIL CONDITIONS PERMITTING 1 TRENCH BREAKERS a BASE SEEDING RATES ON PURE LIVE SEED USE SEED a TRENCH BREAKERS ARE INTENDED TO SLOW THE FLOW OF SUBSURFACE WATER ALONG THE TRENCH TRENCH WITHIN 12 MATHS OF SEED TESTING f TREAT LEGUME SEED WITH AN INOCULANT SPECIFIC TO BREAKERS MAY BE CONSTRUCTED OF MATERIALS SUCH THE SPECIES USING THE MANUFACTURER AS SAND BAGS OR POLYURETHANE FOAM DO NOT USE RECOMMENDED RATE OF INOCULANT APPROPRIATE FOR TOPSOIL IN TRENCH BREAKERS THE SEEDING METHOD (BROADCAST. DRILL, OR b AN ENGINEER OR SIMILARLY QUALIFIED PROFESSIONAL HYDRO) SHALL DETERMINE THE NEED FOR AND SPACING OF D IN THE ABSENCE OF WRITTEN RECOMMENDATIONS FROM TRENCH BREAKERS OTHERWISE. TRENCH BREAKERS THE LOCAL SOIL CONSERVATION AUTHORITIES, SHALL BE INSTALLED AT THE SAME SPACING AS AND LANDOWNER. OR LAND MANAGING AGENCY TO THE UPSLOPE OF PERMANENT SLOPE BREAKERS CONTRARY, A SEED DRILL EQUIPPED WITH A c IN AGRICULTURAL FIELDS AND RESIDENTIAL AREAS WHERE SLOPE BREAKERS ARE NOT TYPICALLY CULTIPACKER IS PREFERRED FOR SEED APPLICATION BROADCAST OR HYDROSEEDING CAN BE USED IN LIEU REQUIRED. INSTALL TRENCH BREAKERS AT THE SAME OF DRILLING AT DOUBLE THE RECOMMENDED SEEDING SPACING AS IF PERMANENT SLOPE BREAKERS WERE RATES WHERE SEED IS BROADCAST, FIRM THE REQUIRED SEEDBED WITH A CULTIPACKER OR ROLLER AFTER d AT A MINIMUM. INSTALL A TRENCH BREAKER AT THE BASE OF SLOPES GREATER THAN 5 PERCENT WHERE THE SEEDING IN ROCKY SOILS OR WHERE SITE CONDITIONS MAY LIMIT THE EFFECTIVENESS OF THIS BASE OF THE SLOPE IS LESS THAN 50 FEET FROM A EOUIPMENT. OTHER ALTERNATIVES MAY BE WATERBODY OR WETLAND AND WHERE NEEDED TO AVOID APPROPRIATE IE G USE OF A CHAIN DRAG) TO DRAINING A WATERBODY OR WETLAND LIGHTLY COVER SEED AFTER APPLICATION. AS APPROVED BY THE ENVIRONMENTAL INSPECTOR 2 PERMANEN c b c d WETLAND AND WATERBODY CONSTRUCTION AND MITIGATION PROCEDURES INTRODUCTION A THE PURPOSE OF THESE WETLAND AND WATERBODY CONSTRUCTION AND MITIGATION PROCEDURES IS TO DESCRIBE SCHEDULING, TECHNIQUES AND DEVICES REQUIRED WHEN CONSTRUCTION ACTIVITY DISTURBS WETLANDS OR WATERBODIES WATERBODIES INCLUDE LAKES. PONDS, TANKS. RIVERS, STREAMS OR DRAINAGE WITH PERCEPTIBLE FLOW AT THE TIME OF CONSTRUCTION B ALL WATERBDDIES SHALL BE TREATED AS STATE -DESIGNATED I WARM WATER FISHERES UNLESS SHOWN AS A COLD WATER FISHERY OR A SIGN FICANT WARMWATER OR COOLVATER FISHERY IN THE ENVIRONMENTAL PLANS OR DETERMINED OTHERWISE BY THE COMPANY'S ENVIRONMENTAL INSPECTOR IN CONSULTATION WITH ENGINEERING AND ENVIRONMENTAL C IN GENERAL, CONSTRUCTION SHALL BE PLANNED AND CONDUCTED TO MINIMIZE THE DISTURBANCE OF THE WATERBODY AND WETLAND ECOSYSTEMS CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL PROVISIONS AND CONDITIONS OF THE PERMITS ISSUED BY FEDERAL, STATE AND LOCAL AGENCIES. D FOR CASES WHERE PERMIT PROVISIONS CONFLICT WITH THE ENVIRONMENTAL PLANS. THE PERMIT PROVISIONS SHALL CONTROL II [RESERVED] III ENVIRONMENTAL INSPECTORS A AT LEAST ONE ENVIRONMENTAL INSPECTOR HAVING KNOWLEDGE OF THE WETLAND AND WATERBODY CONDITIONS IN THE PROJECT AREA IS REWIRED FOR EACH CONSTRUCTION SPREAD THE NUMBER AND EXPERIENCE OF ENVIRONMENTAL INSPECTORS ASSIGNED TO EACH CONSTRUCTION SPREAD SHOULD BE APPROPRIATE FOR THE LENGTH OF THE CONSTRUCTION SPREAD AND THE NUMBER /SIGNIFICANCE OF RESOURCES AFFECTED B THE ENVIRONMENTAL INSPECTORS SPECIFIC RESPONSIBILITIES ARE OUTLINED IN THE UPLAND EROSION CONTROL. REVEGETATION AND MAINTENANCE PLAN SHEET IV JOB PLANNING A LOGISTICS IT SHALL BE THE RESPONSIBILITY OF THE PROJECT SPONSOR AND ITS CONTRACTORS TO STRUCTURE THEIR OPERATIONS IN A MANNER THAT REDUCES THE RISK OF SPILLS OR THE ACCIDENTAL EXPOSURE OF FUELS OR HAZARDOUS MATERIALS TO WATERBODIES OR WETLANDS THE PROJECT SPONSOR AND ITS CONTRACTORS MUST, AT A MINIMUM. ENSURE THAT 1 ALL EMPLOYEES HANDLING FUELS AND OTHER HAZARDOUS MATERIALS ARE PROPERLY TRAINED 2 ALL EQUIPMENT IS IN GOOD OPERATING ORDER AND INSPECTED ON A REGULAR BASIS 3 FUEL TRUCKS TRANSPORTING FUEL TO ON -SITE EQUIPMENT TRAVEL ONLY ON APPROVED ACCESS ROADS 4 ALL EQUIPMENT IS PARKED OVERNIGHT AND /OR FUELED AT LEAST 100 FEET FROM A WATERBODY OR IN AN UPLAND AREA AT LEAST 100 FEET FROM A WETLAND BOUNDARY THESE ACTIVITIES CAN OCCUR CLOSER ONLY IF THE ENVIRONMENTAL INSPECTOR FINDS. IN ADVANCE. NO REASONABLE ALTERNATIVE AND THE PROJECT SPONSOR AND ITS CONTRACTORS HAVE TAKEN APPROPRIATE STEPS (INCLUDING SECONDARY CONTAINMENT STRUCTURES) TO PREVENT SPILLS AND PROVIDE FOR PROMPT CLEANUP IN THE EVENT OF A SPILL 5 HAZARDOUS MATERIALS, INCLUDING CHEMICALS. FUELS. AND LUBRCATING OILS. ARE NOT STORED WITHIN 100 FEET OF A WETLAND. WATERBODY, OR DESIGNATED MUNICIPAL WATERSHED AREA. UNLESS THE LOCATION IS DESIGNATED FOR SUCH USE BY AN APPROPRIATE GOVERNMENTAL AUTHORITY THIS APPLIES TO STORAGE OF THESE MATERIALS AND DOES NOT APPLY TO NORMAL OPERATION OR USE OF EQUIPMENT IN THESE AREAS 6 CONCRETE COATING ACTIVITIES ARE NOT PERFORMED WITHIN 100 FEET OF A WETLAND OR WATERBODY BOUNDARY. UNLESS THE LOCATION IS AN EXISTING INDUSTRIAL SITE DESIGNATED FOR SUCH USE SPILL RESPONSE THE PROJECT SPONSOR AND ITS CONTRACTORS MIST STRUCTURE THEIR OPERATIONS IN A MANNER THAT PROVIDES FOR THE PROMPT AND EFFECTIVE CLEANUP OF SPILLS O FUEL AND OTHER HAZARDOUS MATERIALS AT A MINIMUM, THE PROJECT SPONSOR AND ITS CONTRACTORS MUST 1 ENSURE THAT EACH CONSTRUCTION CREW (INCLUDING CLEANUP CREWS) HAS ON HAND SUFFICIENT SUPPLIES OF ABSORBENT AND BARRIER MATERIALS TO ALLOW THE RAPID CONTAINMENT AND RECOVERY OF SPILLED MATERIALS AND KNOWS THE PROCEDURE FOR REPORTING SPILLS 2 ENSURE THAT EACH CONSTRUCTION CREW HAS ON HAND SUFFICIENT TDOLS AND MATERIAL TO STOP LEAKS 3 KNOW THE CONTACT NAMES AND TELEPHONE NUMBERS FOR ALL LOCAL. STATE, AND FEDERAL AGENCIES (INCLUDING. IF NECESSARY. THE U 5 COAST GUARD AND THE NATIONAL RESPONSE CENTER) THAT MUST BE NOTIFIED OF A SPILL 4 FOLLOW THE REOUIREMENTS OF THOSE AGENCIES IN CLEANING UP THE SPILL, IN EXCAVATING AND DISPOSING OF SOILS DR OTHER MATERIALS CONTAMINATED BY A SPILL, AND IN COLLECTING AND DISPOSING OF WASTE GENERATED DURING SPILL CLEANUP WATERBODY CROSSINGS A PERMITS 1 REVIEW ALL PERMITS AND CONDITIONS APPLICABLE TO PROJECT INSTALLATION 2 MAKE NECESSARY CONTACTS AND NOTIFICATIONS 3 INSTALLATION 1 TIME WINDOW FOR CONSTRUCTION UNLESS EXPRESSLY PERMITTED OR FURTHER RESTRICTED BY THE APPROPRIATE STATE AGENCY IN WRITING ON A SITE - SPECIFIC BASIS. INSTREAM WORK. EXCEPT THAT REQUIRED TO INSTALL OR REMOVE EQUIPMENT BRIDGES, MUST OCCUR DURING THE FOLLOWING TIME WINDOWS a COLDWATER FISHERIES - JUNE 1 THROUGH SEPTEMBER 30 b COOLWATER AND WARMWATER FISHERIES - JUNE 1 THROUGH NOVEMBER 30 EXTRA WORK AREAS a LOCATE ALL EXTRA WORK AREAS (SUCH AS STAGING AREAS AND ADDITIONAL SPOIL STORAGE AREAS) AT LEAST 50 FEET AWAY FROM WATER'S EDGE. EXCEPT WHERE THE ADJACENT UPLAND CONSISTS OF ACTIVELY CULTIVATED OR ROTATED CROPLAND OR OTHER DISTURBED LAND b IF NOT DEPICTED OTHERWISE ON CONSTRUCTION DRAWINGS. ADJUSTING EXTRA WORK AREAS LIMITS TO LESS THAN 50 FOOT SETBACK CAN ONLY BE DONE IN CONSULTATION WITH ENGINEERING AND ENV IROO.ENTAL c LIMIT CLEARING OF VEGETATION BETWEEN EXTRA WORK AREAS AND THE EDGE OF THE WATERBODY TO THE CERTIFICATED CONSTRUCTION RIGHT -DF - WAY d LIMIT THE SIZE OF EXTRA WORK AREAS TO THE MINIMUM NEEDED TO CONSTRUCT THE WATERBODY CROSSING GENERAL CROSSING PROCEDURES a COMPLY WITH THE COE. OR ITS DELEGATED AGENCY. PERMIT TERMS AND CONDITIONS b IF THE PIPELINE PARALLELS A WATERBODY. AND MUST BE CLEARLY MARKED IN THE FIELD WI SIGNS AND /OR HIGHLY VISIBLE FLAGGING U CONSTRUCTION - RELATED GROUND DISTURBING ACTIVITIES ARE COMPLETE SPOIL PILE PLACEMENT AND CONTROL a ALL SPOIL FROM MINOR AND INTERMEDIATE WATERBDDY CROSSINGS, AND UPLAND SPOIL FROM IN THE CONSTRUCTION RIGHT -OF -WAY AT LEAST 10 FEET FROM THE WATER'S EDGE OR IN ADDITIONAL EXTRA WORK AREAS PREVIOUSLY APPROVED FOR SUCH USE b USE SEDIMENT BARRIERS TO PREVENT THE FLOW OF SPOIL OR HEAVILY SILT -LADEN WATER INTO ANY WATERBODY EQUIPMENT BRIDGES a d B PREVENT BANK EROSION AND STREAMBED SCOUR (Iv) DO NOT REMOVE FLUME PIPE DURING TRENCHING. PIPELAYING, OR BACKFILLING ACTIVITIES. OR INITIAL STREAMBED RESTORATION EFFORTS (V) REMOVE ALL FLUME PIPES AND DAMS THAT ARE NOT ALSO PART OF THE EQUIPMENT BRIDGE AS SOON AS FINAL CLEANUP OF THE STREAM BED AND BANK IS COMPLETE d HORIZONTAL DIRECTIONAL DRILL (HDD) IF THE HDD METHOD IS TO BE UTILIZED DURING THE COURSE OF CONSTRUCTION. THEN THE HDD METHOD SHALL BE PERFORMED IN ACCORDANCE WITH THE SITE SPECIFIC CONSTRUCTION DRAWINGS THAT SHOW THE LOCATION OF MUD PITS. PIPE ASSEMBLY AREAS, AND ALL AREAS TO BE DISTURBED OR CLEARED FOR CONSTRUCTION ANY VARIATION FROM SITE SPECIFIC CONSTRUCTION DRAWINGS MUST BE REVIEWED IN CONSULTATION WITH ENGINEERING AND ENVIRONMENTAL CROSSINGS OF MINOR WATERBDDIES A MINOR WATERBODY IS DEFINED AS ALL WATERBDDIES LESS THAN OR EQUAL TO 10 FEET AT WATERS EDGE AT THE TIME OF CONSTRUCTION WHERE A DRY -DITCH CROSSING IS NOT REQUIRED. MINOR WATERBODIES MAY BE CROSSED USING THE OPEN -CUT CROSSING METHOD, WITH THE FOLLOWING m 8 CROSSINGS OF INTERMEDIATE WATERBODIES AN INTERMEDIATE WATERBOUY CROSSING IS DEFINED AS ALL WATERBODIES GREATER THAN 10 FEET WIDE BUT LESS THAN OR EQUAL TO 100 FEET WIDE AT THE WATERS EDGE AT THE TIME OF CONSTRUCTION WHERE A DRY -DITCH CROSSING IS NOT REQUIRED. INTERMEDIATE WATERBODIES MAY BE CROSSED USING THE DPEN -DUT CROSSING METHOD. WITH THE FOLLOWING RESTRICTIONS a COMPLETE INSTREAM CONSTRUCTION ACTIVITIES (NOT INCLUDING BLASTING AND OTHER ROCK BREAKING MEASURES) WITHIN 48 HOURS. UNLESS SITE - SPECIFIC CONDITIONS MAKE COMPLETION WITHIN 48 HOURS INFEASIBLE b LIMIT USE OF EQUIPMENT OPERATING IN THE WATERBODY TO THAT NEEDED TO CONSTRUCT THE CROSSING THE C ALL OTHER CONSTRUCTION EQUIPMENT MUST DD CROSS ON AN EQUIPMENT BRIDGE AS SPECIFIED ZE IN SECTION 3E 9 CROSSINGS OF MAJOR WATERBODIES A MAJOR WATERBODY CROSSING IS DEFINED AS ALL WATERBDDIES GREATER THAN 100 FEET WIDE AT WATERS EDGE AT THE TIME OF CONSTRUCTION IF A MAJOR WATERBODY CROSSING IS TO BE PERFORMED. THEN SUCH CROSSING SHALL BE PERFORMED IN ACCORDANCE WITH A DETAILED. SITE SPECIFIC CONSTRUCTION PLAN AND SCALED DRAWINGS IDENTIFYING ALL AREAS TO BE DISTURBED BY CONSTRUCTION THIS PLAN IS REQUIRED TO BE DEVELOPED IN CONSULTATION WITH THE APPROPRIATE FEDERAL AND STATE AGENCIES AND SHOULD INCLUDE EXTRA WORK AREAS, SPOIL STORAGE AREAS, SEDIMENT CONTROL STRUCTURES. ETC . AS WELL AS MITIGATION FOR NAVIGATIONAL ISSUES 10 TEMPORARY EROSION AND SEDIMENT CONTROL DRY -DITCH CROSSING METHODS a UNLESS APPROVED OTHERWISE BY THE APPROPRIATE STATE AGENCY, INSTALL THE PIPELINE USING ONE OF THE DRY -DITCH METHODS OUTLINED BELOW FOR CROSSINGS OF WATERBODIES UP TO 30 FEET WIDE MAT THE WATER S EDGE AT THE TIME OF CONSTRUCTION) THAT ARE STATE -DESIGNATED AS EITHER COLDWATER OR SIGNIFICANT COOLWATER OR WARMWATER FISHERIES b DAM AND PUMP I I ) THE DAM -AND -PUMP METHOD MAY BE USED WITHOUT PRIOR APPROVAL FOR CROSSINGS OF WATERBODIES WHERE PUMPS CAN ADEOUATELY TRANSFER STREAMPLOW VOLUMES AROUND THE WORK AREA. AND THERE ARE NO CONCERNS ABOUT SENSITIVE SPECIES PASSAGE (I i ) IMPLEMENTATION OF THE DAM -AND -PUMP 871 0 AT PUMP S TO FLUME CROSSING THE FLUME CROSSING METHOD REQUIRES IMPLEMENTATION OF THE FOLLOWING STEPS 11) INSTALL FLUME PIPE AFTER BLASTING (IF NECESSARY). BUT BEFORE ANY TRENCHING 111) USE SAND BAG OR SAND BAG AND PLASTIC SHEETING DIVERSION STRUCTURE OR EQUIVALENT TO DEVELOP AN EFFECTIVE SEAL AND TO DIVERT STREAM FLOW THROUGH THE FLUME PIPE (SONS MODIFICATIONS TO THE STREAM BOTTOM MAY BE REQUIRED IN TO ACHIEVE AN EFFECTIVE SEAL) (111) PROPERLY ALIGN FLUME PIPETS) TO IMMINENT b WHERE WATERBODIES ARE ADJACENT TO THE CONSTRUCTION RIGHT-DF -WAY, INSTALL SEDIMENT BARRIERS ALONG THE EDGE OF THE CONSTRUCTION RIGHT-OF -WAY AS NECESSARY TO CONTAIN SPOIL AND SEDIMENT WITHIN THE CONSTRUCTION RIGHT-OF -WAY c USE TRENCH PLUGS AT ALL WATERBODY CROSSINGS, AS NECESSARY, TO PREVENT DIVERSION OF WATER INTO UPLAND PORTIONS OF THE PIPELINE TRENCH AND TO KEEP ANY ACCUMULATED TRENCH WATER OUT OF THE WATERBODY VI WETLAND A GENERAL IT WETLAND BOUNDARIES AND BUFFERS MAST BE CLEARLY MARKED IN THE FIELD WITH SIGNS AND /OR HIGHLY VISIBLE FLAGGING UNTIL C(INSTRUCTION-RELATED GROUND DISTURBING ACTIVITIES ARE COMPLETE 2 IMPLEMENT THE MEASURES OF SECTION V IWATERBDDY CROSSINGS) IN THE EVENT A WATERBODY CROSSING IS LOCATED WITHIN DR ADJACENT TO A WETLAND CROSSING 3 INSTALLATION 1 EXTRA WORK AREAS AND ACCESS ROADS 11 TRENCH DEWATERING DEWATER THE TRENCH (EITHER ON OR OFF THE CONSTRUCTION RIGHT-OF -WAY) IN A MANNER THAT DOES NOT CAUSE EROSION AND DOES NOT RESULT IN HEAVILY SILT -LADEN WATER FLOWING INTO ANY WATERBODY REMOVE THE DEWATERING STRUCTURES AS SOON AS POSSIBLE AFTER THE COMPLETION OF DEWATERING ACTIVITIES WATERBODY RESTORATION a CROSSING PROCEDURES a b d W Q LIMIT PULLING OF TREE STUMPS AND GRADING ACTIVITIES TO DIRECTLY OVER THE TRENCHLINE DO NOT GRADE OR REMOVE STUMPS OR ROOT SYSTEMS FROM THE REST OF THE CONSTRUCTION RIGHT-OF-WAY IN WETLANDS UNLESS THE CHIEF INSPECTOR AND ENVIRONMENTAL INSPECTOR DETERMINE THAT SAFETY - {RELATED CONSTRUCTION CONSTRAINTS REQUIRE GRADING OR THE REMOVAL OF TREE STUMPS FROM UNDER THE WORKING SIDE OF THE CONSTRUCTION RIGHT -OF -MAY TIME ND MBE BY DFS000— 1 12-03 -2014 M1 ISSUED FMR REVIEW A 01/10/2015 I Ml ISSUED FOR BID 0 06/11/2015 MI ISSUED FOR CONSTRUCTION 1 06/11/2015 MI REVISED PER N C D E N R h IMMEDIATELY AFTER BACKFILLING IS COMPLETE. RESTORE THE SEGREGATED TOPSOIL TO ITS ORIGINAL LOCATION i DO NOT USE ROCK, SOIL IMPORTED FROM OUTSIDE THE WETLAND. TREE STUMPS. OR BRUSH k DO NOT CUT TREES OUTSIDE OF THE APPROVED CONSTRUCTION WORK AREA I ATTEMPT TO USE ND_ MORE _THAN TWO LAYERS _01 III 3 TEMPORARY SEDIMENT CONTROL INSTALL SEDIMENT BARRIERS IMMEDIATELY AFTER INITIAL DISTURBANCE OF THE WETLAND OR ADJACENT UPLAND SEDIMENT BARRIERS MUST BE PROPERLY MAINTAINED THROUGHOUT CONSTRUCTION AND REINSTALLED AS NECESSARY (SUCH AS AFTER BACKFILLING OF THE TRENCH) EXCEPT AS NOTED BELOW IN SECTION VI B 3 C. MAINTAIN SEDIMENT BARRIERS UNTIL REPLACED BY PERMANENT EROSION CONTROLS OR RESTORATION OF ADJACENT UPLAND AREAS IS COMPLETE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE ADDRESSED IN MORE DETAIL IN THE UPLAND EROSION CONTROL. REVEGETATION AND MAINTENANCE PLAN a INSTALL SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION RIGHT-DF--WAY IMMEDIATELY UPSLOPE OF THE WETLAND BOUNDARY AT ALL WETLAND CROSSINGS WHERE NECESSARY TO PREVENT SEDIMENT FLOW INTO THE WETLAND b WHERE WETLANDS ARE ADJACENT TO THE CONSTRUCTION RIGHT-OF-WAY AND THE RIGHT - OF-WAY SLOPES TOWARD THE WETLAND. INSTALL SEDIMENT BARRIERS ALONG THE EDGE OF THE CONSTRUCTION RIGHT- HP-AAY AS NECESSARY TO PREVENT SEDIMENT FLOW INTO THE WETLAND c INSTALL SEDIMENT BARRIERS ALONG THE EDGE OF THE CONSTRUCTION RIGHT -OF -WAY AS NECESSARY TO CONTAIN SPOIL AND SEDIMENT WITHIN THE CONSTRUCTION RIGHT- OF-WAY THROUGH WETLANDS REMOVE THESE SEDIMENT BARRIERS DURING RIGHT -OF -WAY CLEANUP 4 TRENCH DEWATERING DEWATER THE TRENCH (EITHER ON OR OFF THE CONSTRUCTION RIGHT-OF17AY) IN A MANNER THAT DOES NOT CAUSE EROSION AND DOES NOT RESULT IN HEAVILY SILT -LADEN WATER FLOWING INTO ANY WETLAND REMOVE THE DEWATERING STRUCTURES AS SOON AS POSSIBLE AFTER TFE COMPLETION OF DEWATERING ACTIVITIES OFF RIGHT-0F_4AY DEWATERING STRUCTURES AN ACCESS IS SUBJECT TO EL ENVIRONMENTAL SURVEY /CLEARANCE WETLAND RESTORATION 1 WHERE THE PIPELINE TRENCH MAY DRAIN A WETLAND. CONSTRUCT TRENCH BREAKERS AND /OR SEAL THE TRENCH BOTTOM AS NECESSARY TO MAINTAIN THE ORIGINAL WETLAND HYDROLOGY 2 FOR EACH WETLAND CROSSED, INSTALL A TRENCH BREAKER AT THE BASE OF SLOPES NEAR THE BOUNDARY BETWEEN THE WETLAND AND ADJACENT UPLAND AREAS INSTALL A PERMANENT SLOPE BREAKER ACROSS THE CONSTRUCTION RIGHT -OF -WAY AT THE BASE OF A SLOPES GREATER THAN 5 PERCENT WHERE THE BASE OF THE SLOPE IS LESS THAN 50 FEET FROM THE WETLAND, OR AS NEEDED TO PREVENT SEDIMENT TRANSPORT INTO THE WETLAND IN ADDITION. INSTALL SEDIMENT BARRIERS AS OUTLINED IN THE UPLAND EROSION CONTROL. REVEGETATION AND MAINTENANCE PLAN IN SOME AREAS, WITH THE APPROVAL OF THE ENVIRONMENTAL INSPECTOR. AN EARTHEN BERM MAY BE SUITABLE AS A SEDIMENT BARRIER ADJACENT TO THE WETLAND 3 00 NOT USE FERTILIZER, LIME. OR MULCH UNLESS REQUIRED IN WRITING BY THE APPROPRIATE LAND MANAGEMENT OR STATE AGENCY 4 UTILIZE A PROJECT - SPECIFIC WETLAND RESTORATION PLAN DEVELOPED IN CONSULTATION WITH THE APPROPRIATE LAND MANAGEMENT DR STATE AGENCY. IF REQUIRED THE RESTORATION PLAN SHOULD INCLUDE MEASURES FOR RE- ESTABLISHING HERBACEOUS AND /OR WOODY SPECIES. CONTROLLING THE INVASION AND SPREAD OF UNDESIRABLE EXOTIC SPECIES IE G . PURPLE LOOSESTRIFE AND PHRAGNITES). AND MONITORING THE SUCCESS OF THE REVEGETATION AND WEED CONTROL EFFORTS 5 IF A PROJECT - SPECIFIC WETLAND RESTORATION PLAN IS NOT REQUIRED. REVEGETATE THE CONSTRUCTION RIGHT-OF -MAY WITH ANNUAL RYEGRASS AT A RATE OF 40 POUNDS /ACRE (UNLESS STANDING WATER IS PRESENT) 6 ENSURE THAT ALL DISTURBED AREAS SUCCESSFULLY REVEGETATE WITH WETLAND HERBACEOUS AND /OR WOODY PLANT SPECIES THE BOUNDARY BETWEEN WETLAND AND ADJACENT UPLAND AREAS AFTER UPLAND REVEGETATION AND STABILIZATION OF ADJACENT UPLAND AREAS ARE JUDGED TO BE SUCCESSFUL TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC aK SOIL EROSION AND SEDIMENT CONTROL PLAN i3 Aw M 2015 DOT REPLACEMENT WI��IN8/I1� Aw MW MAIN LINE 'A° AW w M.P. 1356.99 TO M.P. 1358.27 AVV MF GUILFORD COUNTY, NORTH CAROLINA DRWN W MU IDAM 07-24-2014 1 1 6GNE SNOW WAD BY w ] ATE. 11 -3D -2014 I 26 -0100 -50 -28 —A -582611 sNIET 6 1165225 = ...tea — OF 11 MAINTENANCE PLAN 7 ORING CONSIPUCTID TEE COPANY S R SOIL EED ICN REPRESENTATIVE SEGMENT WILL E FRANC 1ICES FOR sou EROSION AND SEDIIEMf tDTPOL PRACTICES ILL sou EON A D AND SEDIMENT CMAIp0. RED AND SMALL E INSPECTED ON A DAILY BASIS AND MAINTAINED AND REPAIRED AS FENDED N ASSUME CON REPA NS WILL BE AD lE1P INTENDED T FUNCTION ANY CEDED EPAINS WILL E MADE INEDIAIFLT 1D MAINTAIN ALL BE ES AS oFROM Sp SEDIMENT SHALL E EIUAED FROM SEDIMENT BARRIERS T WOI IT THEY AM TO 6 INCHES DEFT AND FROM SEDIMENT TRAPS WEN THEY AE AND SDTMAmT ON C FULL AL IUPBRALL SOIL ERSID AID SEDAN 301a CONFRL MEASURES SITE SNAL E DISPOSED IO WIS AC 70 EATS AA FINAL SITE ARY WAR TINS By ARE NO LI IGE IS EM TOR AFTER HE TEMPORARY EA9AE5 DIE NO EDDBR K THE TRAPPED SMAIMEO AD YEAS TEMPORARY DIMING S S REMOVAL ON ILIMIOMDE 6 TEMPIXIARY ENSUES SNAL E STABILIZED INEDZAIFlr 2 AFTER CONSTRUCTION ALL SOIL EROSION AND SEDIMENT IMENX WAR"' WILL E CHECKED FOR STABILITY AND D'ERATID FOLL"INC WILL PRODUCING RAINFALL BUT IN NO CASE LESS THAN OCHE EVERY WEEK ANY MENDED REPAIRS VILL EWE IMMEDIATELY TO MAINTAIN ALL EALIES AS DESIGED PERIODIC FOOT AND AIR PATROLS WILL E PEAFDBED BY COMPANY MAINTENANCE PERSONNEL TO IDENTIFY AREAS IF EXCESSIVE EROSED A D AMY EOTIRED (CORRECTIVE ACTION WILL E IMPLE ENIFD IN ACCORDANCE WITH THE SFSCP RESPONSIBILITY FOR MAINTENANCE O SOIL FIi45ID AND SEDIW F COMM WILL E WITH THE COPAD S DIVISION OFFICE LOCATED AT TRANSCONTINENTAL GAS PIPE LIE COP CHARLOTTESVILLE DIVISTION OFFICE 715 GREEBRIER OR CHARLDfiFSVILLE. VA 22901 (101) 973-4784 REVEGETATION PLAN I INrRDUCTION TRUE PIRPOSE OF THIS PLAN IS TO PROVIDE INSPRXTIDS FOR PLANTING A VE GETATIVE CORER TO MINIMIZE SOIL EROSION VEGETATION WILL E USED AS BON A TEMPORARY AND PENMENr EROSION CONFIRM PRACTICE THIS PAN APPLIES TD U9AD AREAS AND ET AREAS TONE CLASSIFIED AS EMA DS O LYI VE GETATION REQUIREMENTS FOR RIPARIAN ZOES. MATFIIBDT BANES AND EILADS ARE CONTAINED IN THE 'ETLAW AND MATFIBQUY CONSTRUCTION AND MITIUTID' SECTION OF THE ENVIRONMENTAL RAMS DISTDBED AREAS nLL E CONSIDERED ERWMY STABILIZED IRO THE ESIABL ILOERT E A UNIFORM AM EROSION RESISTANT PERENNIAL VEGETATIVE COVEN SIMILAR IM DENSITY TO THE ADJACENT UNDISTURBED AREAS. BASED D REPRESENTATIVE RANDOM SATING 2 SEEDBED PREPARATION A SEEDED PREPARATION IN AREAS ACCESSIBLE BY FAO) PRIOR I) TO TILLAGE, LIE AND FERTILIZER SHALL E APPLIED EVENLY AD UNIFORMLY APPLICATION RATES ARE ARM IN TABLE 1 21 INC0091ATE LIE AND FFAfILIZER [MID THE TOP 1 TO 6 INCHES O SDIL BY CHISEL PLOWING. DISKING. HARDVING. OR OTHER APPROVED ETD) ON TILLAGE WTI L A SIWIN UNIFORM SUM IS ACHIEVED 71 TILL OR SCARIFY AIDED WHEN THE SURFACE IS GLAZED. CRUS7E0 OR SEALED BY RAINFALL PRIOR TO HYDROSEEDING I) TILLAGE OR SCARIFICATION O SLOTS SMALL PARALLELL THE CDFOIM DE THE LAO WHENEVER PRACTICABLE B SEEDBED PEEPUUTION IN AREAS DT ACCESSIBLE BY FART MACHINERY 1) DUGOI SLOE FACE BY HAW, ID OPINES 7 INCHES DEEP AD 15 INCHES APART ACROSS THE PARAL LEL WITH THE CDIOFS) 21 APPLY LIE EVERY AND UNIFORMLY M THE AREAS TO E 5FEDED AT RATE SA IN TABLE I 71 IF NYOROSEED SAM AS IS TO E USED, FERTILIZER MAY E APPLIED WITH THE SEED SLIMY ] SEEDING A GENERAL 1) SEED SHALL ,BE PURCHASED IN ACCORDANCE WITH PURE LIVE SEED IPLS) SPECIFICATIONS AND PLANTED WITHIN 6 B C 2) UNLESS AN ALTERNATIVE SEED MIX IS SPECIFICALLY REOINS7FD BY THE LANDOWNER OR LAD MANAGING AGENCY. TE SEED SEINES IN TABLE I SHALL E USED ]I ANY SOIL DIliVYANCE THAT OCCUS OUTSIDE ON THE RECOMMENDED SEEDING SEASON ON ART BARE $OIL LEFT INSTABILIZED BY VEGETATION 9ALL E SEEDED VITE TE TE PORARY SEEDING MIX IN TABLE I AND SEED ING FOR PFEINIAL COVER SHALL E ACCOMPLISHED AT THE BEGINNING O THE )EDT RECOIODFD SEEDING SEASON A) SLOPES STEEPER THAN ! 1 $HULL E SEEPED IMMEDIATELY AFTER FINAL GNAWING. EATER PERM] INC S 5) THE RICH -CF-WAY 9ULL E SEEDED WITHIN 6 MMU ING DAYS OF FINAL OWING, EATEN PERMITTING 6) MFAE CRITICAL AREAS ARE LEFT EXPOSED BY CONSTRUC TION DELAYS O ION THAN PERRY DAYS ON MERE UFAVORABLE CDDITIONS PREVENT PLANT ING O THE SPECIFIED PERENNIAL SEED MIX. A TOFOHAR GROUND COVER IF QUICK GERMINATING GRASSES SHALL E ESTABLISHED )SID THE TEMPORARY IN SNOW IN TABLE I 7) IMMMIATELY FOLLOWING THE COMPLETION E EARTH MOVING ACTIVITIES AND THE INSTALLATION OF GIN BY ABLE 1 PL CORD G EITHER 1 i 5) SIIDRD W EQUIPMENT SHIFT DOWN DE 1/2 TO 2 TORS DCCIR AU 5U NONE SFFD M THE TANK BASED D THE PREaTICK OR SLURRY REMAINING AFTER 2 HOURS THE SLIMY SHALL E DISPOSED AND A NEW MIXTURE PREPARED 1 H WETLAND AND WATERBODY CONSTRUCTION AND MITIGATION PLAN 1 INTOILCTID 2 MA A TIE 17 2) ]) I) B 13 AL PLANS. 1) NO MATERIAL SHALL BE PLACED D YTERB DY BANKS SO AS TD IMPAIR SURFACE WATER FLOW INTO OR OR OF A WETLAND AREA AND FLOW RATES SHALL E MAINTAINED AT ALL TIES C MINOR WATEMY CROSSINGS II A MINOR WATERBODY IS NIIED AS HAVING A FLU WIDTH IWATER'S EDGE M WATERS EDGE) ON 10 FEET OR LESS AT THE TIE E CONSTDCTION 2) CONSTRUCTION EQUIPMENT. EXCEPT THAT USED BY CLEARING ORENS. MALL CROSS MINOR VAMOMIES CONTAINING COLD VATER ON MARK WATER FISHERIES ON A BRIDGE CONSISTING OF ONE OF THE FILMING IS EQUIPMENT PADS AND CLLVETTIS) III CLEAN ROCK FILL AND CLLVERTISI IIII FLEXIAGAT O POTABLE BRIDGE 71 WHEN CROSSING MINOR VATUMIE5 CONTAINING COLD I) INSTAU FLUE AIM BASTING, BIT PRIOR ID TRENCHING II) USE SAD BAG. PLASTIC DAM STRUCTURE. OR EQUIVALENT III) PROPERLY ALIGN ilNE PIE IYI DO NOT REMOVE FLUE DIMING TRENCHING. PIPE LAYING OR BACEFILLING ACTIVITIES YI DE-VA TER TRENCH TO PREVENT DISCHARGE OF SILT LADEN VA TFA INTO VATEIDaY DIMING CONSTRUCTION AND BACEILLING OPERATIONS VII REMOVE ALL FLUMES AND DAIS WON COMPLETION E COSTRUCTIa 11 THE DAN AND PIDP METHOD MAY E USED OMY WERE FUIYING IS PDT REQUIRED 5) COPLETE I"AIERBODY CONSTRUCTION. NOT INCLUDING BLASTING , VITHIM 21 DOS IN MATERBIDIES KEY CLASSIFIED AS COLD WATER FISHERIES AD MDT CLASSIFIED AS SIGNIFICANT COOL OR VAN MATER FISHERIES 6) AGRICULRDOL OR iramITTENT DRAINAGE DITCHES NOT CLASSIFIED AS STATE - MIGRATED FISHERIES DO NOT REQUIRE AN EQUIPMENT BRIDGE D INTERMEDIATE VATERBQUY CRDSSING$ 1) AN ITER EDIATE WATEIBQUT IS DEFINED AS HAVING A FLU WIDTH IVATER'5 EDGE TO HATER'S EDE1 GEATEA THAN 10 FEET WIDE. BUT LESS THAI IUD FEET VIDE. AT THE TIME IF COSTRDTION 2) THE APPROPRIATE STATE AUTHORITIES SHALL E NOTIFIED AT LEAST 11 HOURS PRIOR ID FRENCH NO OR BLASTING 71 CONSTRUCTION EQUIPMENT, EXCEPT THAT LSD 67 CLEARING CE1S. SHALL CROSS IMMEDIATE VATEREMIFS D A BRIM COSISTING ON ONE ON THE FOLDING III EQUIPMENT PADS NO CLLVFRT(S) CLEAN DU FILL AND CLLVERTIS ) IIII FLEXI_FLDAT OR PORTABLE BRIDGE 11 IN_NATEREGGY EQUIPMENT SMALL E LIMITED TO THAT NEEDED TO CONSTRUCT THE CRS SING 51 TEE STUDS AD Rms MAY E PULLED FROM THE AREA TD E EXCAVATED DR. 6) UPON COMPLETION IF CONSTRUCTION. THE VATEBQUY BANK SHALL BE RFSIIMED AS 90MN IN THE ENVIRONMENTAL PLANS OR 19 ITS ORIGINAL DONIOF BY USING THE ELEVATION IF THE `DJ ACEMf UDIS7W= AREAS AS A WIDE 7) IF NORMAL MATERBOOY FLU IS CONTAINABLE AD TEACHING EQUIPMENT CAN BERATE FROM THE VATEABU7 BANKS. THE FLU SHALL E RUED OVEN FE TENOR AREA PRIOR TO EXCAVATION THE ENVIRONMENTAL PLANS CONTAIN VATERBDr AND CULVERT SIX INFORMATION /> THE OW AND PIRP METHW SILL MDT E USED VITxOT SITE SPECIFIC PLAN APPROVAL BY COMPANY 9) ATRAP TO COMPLETE IN-VATERBQUY TENONING AND BACIFILL NOR [NOT IDLLDING BLASTING) VITHIN IB HORS E MAJOR MIER BOOT CROSSINGS IGRFATER THAN 1QU FEET IN WIDTH) CONSTRUCTION ACROSS MATERBODIES GREATER THAN 140 RTES IM WIDTH SHALL E IM ACCO7DADE VI IN THE CROSSING 5 SITE SPECIFIC EM'IROMWAL PLANS F TEMPORARY EROSION CO EROL 1) STONE IN OTEA FILL MATERIAL USED FOR TEMPORARY VATMMY CROSSINGS NULL MOT EXTEIA INTO ANY ADJACENT ETLAD BEY 1 W FEET ON EIDER SIDE IF THE ORDINARY HE VATER MAR ON THAT VATEPBODY. UNLESS SPECIFICALLY PERMITTED TO DO SO fl SEDIMENT BARRIER DEVICES SHALL E INSTALLED ALONG THE MATFRBOY BANKS AND AT THE BASE OF ALL SLOPE$ ADJACENT TO VATFRBODIES UNTIL THE RIGHT-OF -VAT REViGETATia IS COWL EIE ALL EROSION AND SEDIMENT CONTROL DEVICES SMALL E INSPECTED DAILY AND REPAIRED AS REQUIRED 3) SEDIIEMf BARRIER DEVICES SHALL E INSTALLED ALONG THE EDGE OF THE RIGHT-CF Ay WERE VATFRBDIFS ARE ADJACENT UNTL THE RIGHT-CF-VAY REVEGETATION 15 COUPLE ALL EROSION AD SEDIMENT CWM DEVICES SHALL E INSPECTED DAILY AND REPAIRED AS REQUIRED G CLEARING AND OWING t) POSTPONE OWING OF THE RICHT4 -4AY TRW THE VATFABDY ZONE UNTIL THE STAGING AREA IS COMPLETE AND THE IN-VATERM VUE IS READY TO COMMERCE TEE STOPS AND ROWS M7 E PULLED FROM THE AREA TO E IN VATED ONLY IN AREAS BEYOND All EXCAVATION. CUT VEGETATION RUSH WITH THE GROW TO ALLON REBROWN FROM STOPS 21 WHERE VATFABUIES ARE PARALLEL TO THE CONSTRUCTION IIIONT-0E-4AY. A DIFFER 15 FEET VIDE IF UNDISTURBED VE GETATION SHALL E MAINTAINED. WNrIEVER PRACTICABLE 71 CLEARING EQUIPMENT PAL NOT CROSS VATFRBQUIES MORE THAN ONCE PER PIECE DE EQUIPMENT PRIOR TO INSTALLATION IF EQUIPMENT BRIDGES H EXCAVATION _ I FNAL GRADING AND CLEAN-UP 1I RESIDE THE VATERBQUY BOTTOM CONTOURS AS WM IN THE ENVIRONMENTAL PLANS D TO THEIR PECONSTRICTION ELEVATIONS BASED D THE ADJACENT UNDISTURBED MATFRBQUY BOTTOM 21 IN ALL MINOR AND INTERMEDIATE VATFRBDIES THAT CONTAIN COLD WATER FISHERIES, RACE CLEAN GRAVEL OR NATIVE COBBLES FOR THE UPPER 1 EDT OF TRENCH RAEFILL 71 INEDIATU7 IRON COMPLETION E COSTRUCTION THE MABON TERT BANK E SHALL RESIGNED AS SHOWN IN THE ENVIRUENTAL PLANS OR TO ITS ORIGINAL ELEVATION BY USING THE ELEVATION IF THE ADJACENT UNDISTURBED ARE" AS A WIDE 11 IEIM FLUES. DAD AND EQUIPMENT BRIDGES AFTER FINAL CLEANUP AND SWING BIT PRIOR IS PERENNIAL SEEDING J STABILIZATION I BANK STABILIZATION OF DRY -0ITCH CROSSINGS SHALL E COMPLETED PRIOR TO RETW 11NG FLOW TO VATFRBODT CHANNEL REFO ENCE DRAWINGS M70 ND I 1TME Iml DVE Kr 1 12-Q7$071 W A 07/]0/2015 W 0 06/17/2015 W 1 06/13/2015 W A n F9 D ANY 2) STUDS WT E REMAINED FEN ORDER THE VOW PADS WEN COMPANY'S ENVIRONMENTAL IN$PECTOR DEMNI ES SAFE" RELATED TRUCTION CONSTRAINTS REQUIRE SUCH 7) CL VEGETATION SHAU E RENDER FROM THE BE FOR DISPOSAL AT AN APPROVED AREA IREW AM ALTUMTE DISPOSAL METHOD IS SPECIFIED TEES LOCATED ONSIDE O THE RIGHT-OF-WAY SHALL NOT E CU FOR USE IM EQUIPMENT PADS E EX VATION 1) EXCEPT IN AREAS E STANDING MATER M SATURATED SOIL. SEGREGATE AND REPLACE THE TOP 12 INCHES OF TOPSOIL REMOVED FROM THE EXCAVATION E THE TEND TOPSOIL 9MLL NOT E SEGREGATED ACROSS ENTIRE WOE AREA IM 2) WHE�EYFAMATER AND MITER SITE CONDITIONS ALLOW. PIPELINE SHALL E ASSEMBLED IN W IRAQ AREA AND INSTALLED BY PUSH-fEL OR FLOTATION TECHNIQUES F TRENCH DEVATERING THE TREICH SHALL E DEVATERED INTO A STABILISED )RAID AREA OR INTO A SEDIMENT REMOVAL STRUCTURE SO T 47 NO HEAVILY SILT LADEN WATER FLOWS INTO THE WETLANDS 6 PORMED EROSION CONTROL MFASIMIS PERMANENT DIVERSION AND TRENCH SWAM 91ALL E INSTALLED AS SHOWN IN THE EM IRNMAL PLANS OR AT THE BASE E SLOPES NEAR THE BQUMDARY BETWEEN THE EILAND AND ADJACENT UPLAND AREAS THE TRENCH BEARER SHALL BE INSTALLED IMMEDIATELY LMOPE E THE DIVERSION H FINAL CHANGING AD CLEANiR I) WHEN MUFILLING 15 COMPLETED. THE VET.ND AREA SHALL E RESTORED TO 1 ORIGINAL CONTOUR BY WATCHING THE ELEVATION E THE ADJACENT UNDISTURBED WEILAHD AREAS 2) ALL PREFABRICATED EQUIPMENT PADS AND GEDTEXTILE FABRIC OVERLAIN WITH GRAVEL FILL SHALL E IBM " THE COMP LLTICK E CONSTRUCTION I REVEGETATION I IN A EA$ BE MD STANDING WATER. RESTED TOPSOIL TO TIE DR GINAL ELEVATION AND S® AS SHOWN IN TABLE I THE AFFECTED AREA SHALL NOI E TREATED VIII LIE OR FERTILIZER. AND 51UL1 NOT E MULCHED. UNLESS OTHERWISE RE RED BY AN APPROPRIATE PERMITTING AGENCY 2) WITH NATIVE HERBACEOUSSAAD MOODY RANT SPECIES FREVISIONS TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC SOIL EROSION AND SEDIMENT CONTROL PLAN 2015 DOT REPLACEMENT WNW& MAIN LiNE 'A' M.P. 1356.99 TO M.P. 1358.27 GUILFORD COUNTY. NORTH CAROLINA ISSUED FOR REVIEW ISSUED FOR BID CONSTRUCTION FOR CTRUCTION REVISED PH M C 0 E N R 1165225 1165225 115522 1165 Aw Aw AW Aw w w w AN Br NJ )Mae 07-21 -2011 &CAE SHOWN IrnYM p ®® of AW CASE 11- 70-201 APRIO.ID" AM JDAM 1t-lo -m11 =26-0100-5D-284-582611 X77 — ....- 2� OF 11 WAX 1165225 I ------------------------09m� pp1NN,�IN;Wi.N� DD DIVERSION TERRACE I II .III I 1 ! 1 l REINFORCED SEDIMENT BARRIER TO BE INSTALLED FL RH TO 1��MFppC� DIVERSION TERRACE SFDIIENE BARRIER SIWL OCTAL IONf TIP O' RLN BE TRENOOD INTO SOIL (SEE DETAIL) " '�s " NNNNWNNNNHNWNNM NNNNA YHNHs ELEVATION SEDIMENT BAIBIER (ADCO C6 -2019) ON COPAMY APPROIED EBUL LOPACTFD BABIFILL AUDFF e 1 METAL POST TE AIlON01 iRENGI NOTES TRENCH DETAIL 1 SEDIMENT BARRIER NODS SRALL BE PLACED AT THE OIRE7 OF DIVERSION TERRACES AS SHOWN ON THE PLAN 2 ONCE 7NE DISTURBED AREA IS STABILIZED. TIE SEDIMENT BARRIER HOOK SMALL BE REMOVED AND ANY DISTURBED AREAS CASED BY REMOVAL SHALL BE RETURNED TO ORIGINAL CONDITION AND REVEGETATED 3 SEDIMENT SHALL BE REMOVED WHEN IT REACHES OE -THIRD THE HEIGHT O THE 50 WENT BARRIER SEDIMENT BARRIER AND ROCK FILTER OUTLET OUTLET STRUCTURE TINENTAL GAS PIPE LINE CORPORATION IANDARD ENVIRONMENTAL DETAIL SEDIMENT BARRIER HOOK TRENCH PLUG TO BE RE ED \\INTO 00 OF TRENCH Mop V' � 2, MI aDrInk D, SPACING AS SHOWN ON PLAN ;1 TREMOR TRENCH PLUG FORM TRENCH PLUG V IN BAGS OR FOAM 6, WIN I SEE NOTE 2) 6' WIN SEE NOTE It) NOTES ��• \\ \� \� CROSS-SECTION NORTH I TOP SOIL SHALL NOT BE USED IN TRENCH PLUGS I FRENCH PL SMALL BE 'EVED TO SIDES AND OTT" IF TRENCH , FRENCH FL S SHALL BE INSTALLED AT THE BANK OF ALL VATERBODIES AND THE BOUNDARIES OF ALL REILAND CROSSINGS AND INDICATED ON THE CONSTRUCTION DRAWINGS INMED ATELY AFTER TRENCH EXCAVATION THE PLUGS MY BE TEMPORMI I REHM DURING PIPE PLACEMENT. BUT THEN REPLACED 4 TRENCH PLUGS SHALL BE LEFT IN PLACE WEN THE TRENCH IS BACKFULLED TRENCH PLUGAREAKER TEMPORARY AND PERMANENT EROSION CONTROL REAM 1 eoom�o© ■� ■ -� ■■ TRANSCONTINENTAL ■ri ■��■■ N N l : • ■EllEll1■ —M■■ 71E1DB PDN TYPES PLA DESCRIPTION PLA WiW1AL SACK Z W PT SACKS 6 WALL SIF1ID SOIL 011 SAND FOAM N PCF ONE11MK IFOARED IM RACE) NOTES 1 WATER PULPED OUT OF TRENCH SHALL NOT BE DISCHARGED INTO WATERWAYS WATER SHALL BE DISCHARGED INTO A FILTER BAG OR DEWATERMIG STRUCTURE 2 PUP SMALL BE CONTROLLED SO THAT DISCHARGE DOES NOT OVERFLOW DEWATERWG STRUCTURE 3 PUMP SUCTION HOSE MUST NOT BE ALLOWED TO COME N CONTACT WITH TRENCH BOTTOM PROVLSDNS MUST BE MADE TO ELEVATE THE SUCTION HOSE TO AT LEAST ONE FOOT ABOVE THE BOTTOM OF THE PIPE TRENCH UNTO. BOTTOM DEWATERNG R NECESSARY 4 DEWATERNG SHALL HOT OCCUR DLF NG TOPS OF HEAVY RA0PN1 EICEPT AS REQUIRED TO PREVENT FLOODING OF CONSTRUCTION EMIPMENT LOCATED N BORE PITS AND TRENCHES 5 PULPS UTILIZED DINING DEWATERNG SHALL BE PLACED WRROI SECONDARY CONTAINMENT F POSITIONED WITHIN 100 FEET OF A WETLAND OR WATERBODY TRENCH DEWATERING TD TEMPORARY EROSION CONTROL MEASUR HOLE [ON —TOR PNALL 10.LDY CUNSiWCNpI 9RAlar AS NOTED a CONIAACI DRAW P, m P o 0116 Y. RYN4 s+NlNCra Pnr[mnd[ glelAlc a LAC[ A K TIOG- &6u N COFFER DAM DETAIL TEMPORARY EROSION CONTROL MEASURE INAN]CUNIIIRNIAL GAS PIPE LINE GWHSNAHM �� STANDARD ENVIRONMENTAL DETAIL i - -I I— - - CCW') COFFER DAN DETAIL Y.s n•euxe DISCHARGE HOSE 10' SEDIMENT IM ROPE SIDE' ITTP 1 SPOIL PILE '""� ` E YIN ITYP 1 _ \UIEABODY BAND �� iA I F4� I ITiPL)PILE TRENCH RUG Ifll I H H � 7ISEE NOTE 9717P1 (SEE NOTE 91 I r� 1= W IVERSION SEE NOTE i T) DIVERSION I SEE NOTE iTl INSTALL OR D .BEE SEDIMENT M PLASTICS WITH BARRIER ON DWAYFANE BEAN PLASTIC UPSTREAM TO ACCRO55 ROADWAY FORM UPSTRFDA 8 DOWSTNEAY DAMN TAKE NOSE I SEE NOTE 51 LTER/SCREEN WATERBODY PORARY STREW OSSING. (DEC) PER DETAIL (SEE NOTE i P) NOTES 1 SEDIMENT BARRIERS 91ALL BE INSTALLED AS DEPICTED AND ALOE DOWN GRADIENT SIDES IF WOK AREAS AND STAGING AREAS SUCH THAT ND HEAVY SILT LADEN WATER ENTERS THE VA79M OR LEAVES THE CONSTRUCTION RIGHT-0F -VAY 2 HARD DITCH PLUGS MUST fEU1M IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATEINWY CROSSING UNTIL THE VATERBWY CROSSING IS INSTALLED AND BACKFILLFII 3 EQUIPMENT OPERATING IN THE WATEANDY SMALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION IF OMEN TYPES 6 EQUIPMENT MUST CND6S THE VATFASONY. CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING IBEC) 4 STAGING A FAI S) TO U7FABWT CROSSINDI51. WEIR PEQUIPED. SHALL BE LOCATED AT LEAST 50 FEET iTiOY MATER'S EDGE AND SMALL GE O" A MINIMUM Siff NEEDED FOR CONVENIENT PREPARATION 5 IMPLEMERATION OF TIE DAIFAMO -PIMP CROSSING IBM WILT MEET THE FOLLONING PERFORMANCE CRITERIA IA) USE SUIT ENT PIMPS. INCLUDING ON-SITE BACKUP RAPS, TO MAINTAIN D005TIE.AM FLOWS IB) CONSTRUCT DAYS WITH MATERIALS THAT PREVENT SEDIMENT AND OTHER POLLUTANTS FROM ENTERING THE UTEEMY IE G . SANDBAGS OR CLEAN GRAVEL WITH PLASTIC LINER) IC) SCREEN PULP STPEAINTAKES. FM ID) PREVMBED SCOUR AT POP DISCHARGE IE) MONITOR THE DAM AND POPS TO ENSURE PROPER OPERATION TNROUGNDIT THE UTERBODY CROSSING G EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED IF NECESSARY T INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT 70 THE WTEIBODY B CLERICALS. FUELS AND LUBRICATING OILS SHALL MDT BE STORED AND EQUIPMENT SHALL NDf BE REFUELED WITHIN 100 FEET OF THE UTFABODY 9 INSTALL TRENCH PLUS ON BOTH SIDES ON THE WATFRBQUT TO PREVENT DIVERSION ON WATERS INTO UPLAND PORTIONS ON THE PIPELINE TRENCH AND TO KEEP ANY """TED THE' WATER OUT ON THE UTTRBODT ID CONIRACTON SHALL POSTPONE GRADING OF RIGHT-OF-WAY ADJACENT TO UTERBODT UNTIL STAGING AREA IS PREPARED AND WORK IN THE WTEIBONY IS READY TO COMMENCE DAM AND PUMP CROSSING TEMPORARY EROSION CONTROL MEASURE SEA "' TRANSCONTINENTAL CAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL pp DAM AND PUMP CROSSING Nw PIPELINE REFERENCE DRAWINGS •• ITRANSCONTINENTAL GAS PIPE LINE CORPORATION MIA STANDARD ENVIRONMENTAL DETAIL A/I/i811�. TD TRENCH DEMATERING RAW TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC SOIL EROSION AND SEDIMENT CONTROL PLAN � 2015 DOT REPLACEMENT nll�� MAIN LINE 'A' M.P. 1356.99 TO M.P. 1358.27 GUILFORD COUNTY, NORTH CAROLINA 1111E NON ME BY DESCRIPTOR WDNo a¢ ALP 1 12-03 -2011 A 01/3D/M5 D OC/13/2IN5 1 D6/13/201S HOLE [ON —TOR PNALL 10.LDY CUNSiWCNpI 9RAlar AS NOTED a CONIAACI DRAW P, m P o 0116 Y. RYN4 s+NlNCra Pnr[mnd[ glelAlc a LAC[ A K TIOG- &6u N COFFER DAM DETAIL TEMPORARY EROSION CONTROL MEASURE INAN]CUNIIIRNIAL GAS PIPE LINE GWHSNAHM �� STANDARD ENVIRONMENTAL DETAIL i - -I I— - - CCW') COFFER DAN DETAIL Y.s n•euxe DISCHARGE HOSE 10' SEDIMENT IM ROPE SIDE' ITTP 1 SPOIL PILE '""� ` E YIN ITYP 1 _ \UIEABODY BAND �� iA I F4� I ITiPL)PILE TRENCH RUG Ifll I H H � 7ISEE NOTE 9717P1 (SEE NOTE 91 I r� 1= W IVERSION SEE NOTE i T) DIVERSION I SEE NOTE iTl INSTALL OR D .BEE SEDIMENT M PLASTICS WITH BARRIER ON DWAYFANE BEAN PLASTIC UPSTREAM TO ACCRO55 ROADWAY FORM UPSTRFDA 8 DOWSTNEAY DAMN TAKE NOSE I SEE NOTE 51 LTER/SCREEN WATERBODY PORARY STREW OSSING. (DEC) PER DETAIL (SEE NOTE i P) NOTES 1 SEDIMENT BARRIERS 91ALL BE INSTALLED AS DEPICTED AND ALOE DOWN GRADIENT SIDES IF WOK AREAS AND STAGING AREAS SUCH THAT ND HEAVY SILT LADEN WATER ENTERS THE VA79M OR LEAVES THE CONSTRUCTION RIGHT-0F -VAY 2 HARD DITCH PLUGS MUST fEU1M IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DITCH FROM THE WATEINWY CROSSING UNTIL THE VATERBWY CROSSING IS INSTALLED AND BACKFILLFII 3 EQUIPMENT OPERATING IN THE WATEANDY SMALL BE LIMITED TO THAT NEEDED TO PERFORM CONSTRUCTION IF OMEN TYPES 6 EQUIPMENT MUST CND6S THE VATFASONY. CONTRACTOR SHALL PROVIDE AND USE A TEMPORARY STREAM CROSSING IBEC) 4 STAGING A FAI S) TO U7FABWT CROSSINDI51. WEIR PEQUIPED. SHALL BE LOCATED AT LEAST 50 FEET iTiOY MATER'S EDGE AND SMALL GE O" A MINIMUM Siff NEEDED FOR CONVENIENT PREPARATION 5 IMPLEMERATION OF TIE DAIFAMO -PIMP CROSSING IBM WILT MEET THE FOLLONING PERFORMANCE CRITERIA IA) USE SUIT ENT PIMPS. INCLUDING ON-SITE BACKUP RAPS, TO MAINTAIN D005TIE.AM FLOWS IB) CONSTRUCT DAYS WITH MATERIALS THAT PREVENT SEDIMENT AND OTHER POLLUTANTS FROM ENTERING THE UTEEMY IE G . SANDBAGS OR CLEAN GRAVEL WITH PLASTIC LINER) IC) SCREEN PULP STPEAINTAKES. FM ID) PREVMBED SCOUR AT POP DISCHARGE IE) MONITOR THE DAM AND POPS TO ENSURE PROPER OPERATION TNROUGNDIT THE UTERBODY CROSSING G EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED DAILY AND REPAIRED IF NECESSARY T INSTALL DIVERSION TRENCHES AT THE BASE OF ALL SLOPES ADJACENT 70 THE WTEIBODY B CLERICALS. FUELS AND LUBRICATING OILS SHALL MDT BE STORED AND EQUIPMENT SHALL NDf BE REFUELED WITHIN 100 FEET OF THE UTFABODY 9 INSTALL TRENCH PLUS ON BOTH SIDES ON THE WATFRBQUT TO PREVENT DIVERSION ON WATERS INTO UPLAND PORTIONS ON THE PIPELINE TRENCH AND TO KEEP ANY """TED THE' WATER OUT ON THE UTTRBODT ID CONIRACTON SHALL POSTPONE GRADING OF RIGHT-OF-WAY ADJACENT TO UTERBODT UNTIL STAGING AREA IS PREPARED AND WORK IN THE WTEIBONY IS READY TO COMMENCE DAM AND PUMP CROSSING TEMPORARY EROSION CONTROL MEASURE SEA "' TRANSCONTINENTAL CAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL pp DAM AND PUMP CROSSING Nw PIPELINE REFERENCE DRAWINGS REMONS TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC SOIL EROSION AND SEDIMENT CONTROL PLAN � 2015 DOT REPLACEMENT nll�� MAIN LINE 'A' M.P. 1356.99 TO M.P. 1358.27 GUILFORD COUNTY, NORTH CAROLINA 1111E NON ME BY DESCRIPTOR WDNo a¢ ALP 1 12-03 -2011 A 01/3D/M5 D OC/13/2IN5 1 D6/13/201S W W W MU ISSUED FOR REVIEW ISM FOR BID ISSUED FOR CONSTRUCTION REVISED PER N C D E N R 1165225 1165225 11652 11652V AW AW AW AW w w W NO OVA, BY W MTE 01,214011 I&OALE SHORN EEO® Br AW M1E 11- 3 0 4 011 AP wM" w w Imm 11- 304011 1 � 26 -0100 -00 -28 —A -082611 sNEET B OF 11 WO liras I L EKISTNC DRAINAGE DITCH I I I � I I II I � I I � I I OI I G TO DIVERT RUN UP OF SEDIMENT BARRIE R 4 N ± 25' R 2" - 3" COARSE (TYP ) AGGREGATE I le p CEOTE%TLE FABRIC I � o I � I TEMP CULVERT,I (IF REQUIRED) T 50 FT I I I PLAN ROW LIMITS RGADWA �y �F -� ROADWAY an GEOTEXTLE FABRIC SEE NOTE 5 SECTION 'A -A' pp7m, 1 STABILIZED ENTRANCE SHALL BE INSTALLED WHERE EQUP1017 ENTERS ND EXITS CONSTRl1CTION SITES ONTO PAVED ROADWAY OR OTHER IMPROVED SURFACE 2 LOCATE ALL ROADWAY CROSSINGS AND ENTRANCES TO ENSURE SAFE AND ACCESSIBLE CONDITIONS THROUGHOUT THE CONSTRUCTION PHASE 3 THE ENTRANCE SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION IN A CONDITION WHICH WILL MINIMIZE TRACKING OF SEDIMENT ONTO A PUBLIC ROADWAY 4 ALL SEDIMENT TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING OR SCRAPING 5 TOP SOIL SHALL BE REMOVED TO A MINIMUM DEPTH OF 6 INCHES PRIOR TO PLACEMENT OF GEOTEXTIE FABRIC NO STONE 6 WHERE DRAINAGE I DITCH EXISTS. CONTRACTOR SHALL PROVIDE AND A FLUME PIPE N ORDER TO PREVENT IPEDEMENT OF WATER FLOW 7 THE CONSTRUCTION ENTRANCE SHALL BE REMOVED AND AREA RESTORED AS PART OF FINAL GRADING AND AN CLE UP REMOVAL IS NOT CONTN UPON ON ESTABLISHMENT OF PERMANENT VEGETATION CONSTRUCTION ENTRANCE TEMPORARY EROSION CONTROL MEASURE CE NORTH CAROLINA '^ TRANSCONTINENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL CE CONSTRUCTION ENTRANCE EZA DAe v� SEDIMENT BARRIER I DOWN SLOPE S[DEI ITYP 1 SPOIL PILE In? 1 MA7FABQUT _�� I I ! I I-1 / I ITYP l i i I (SEE , ISFE NOTE • 91 (SEE NOTE I I I I I F� ISFF NOTE t 91 J �I I TEMP Y STREAM CROSSING. IBECI PER DETAIL (SEE NDTE t 6) INSTALL REMOVABLE SEDIMENT I BARRIER OR DRIVEABLE BED, adI ACCROSS ROADVAY NGTS 1 THIS WTIIOD APPLIES TO MINOR VATERBODY CROSSINGS THAT ARE DEFINED AS VATMMIES THAT ARE LESS THAN OR EQUAL TO 10 FEET AT WATERS EDGE AT THE TIME W CROSSING 2 SEDIMENT BARRIERS SHALL BE IN57ALLED AS DEPICTED AND ALONG DONN GRADIENT SIDES OF WOE AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATFRBWY OR LEAVES THE CONSTRUCTION RIGHT W WAY 7 HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DI7CH FROM THE WAVABWY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BUKFILLED 1 EQUIPMENT OPERATING IN THE WATERBQUY L1.1LL BE LIMITED TO THAT NEEDED TO PERFOPA CONSTRICTION IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY. CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING IBEL) 5 STAGING AREAIS) FOR WATERBODY CROSSINGS). MEN REQUIRED. SHALL BE LOCATED AT LEAST 50 FEET FROM WATER'S EDGE AND SHALL BE W A MINIMA SIZE NEEDED FOR CONVENIENT PREPARATION 6 EROSION AND SEDIMENT CONTROL MEASURES LOLL BE INSPECTED DAILY AND REPAIRED IF NECESSARY 7 INSTAL DIVERSION TRENCHES AT THE BASE OF ALL LOPES ADJACENT TO THE WATERBODY 8 CHEMICALS. FUELS AND LUBRICATING OILS LULL NOT BE STIED AID EQUIPMENT SHALL NOT BE REFUELED WITHIN 10D FEET OF THE WATERBODY 9 INSTAL TRENCH RUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DIVERSION W WATER INTO UPLAND PORTIONS OF THE PIPER IRE TRENCH AND TO KEEP AMY ACCUMULATED TREND( WATER OR OF THE WATERODY 10 CONTRACTOR SHALL POSTPONE GRADING W RIGHT-01F-WAY IMMEDIATELY ADJACENT TO WATERBODY ,MIL STAGING AREA 15 PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE 11 EXCEPT FOR BLASTING AND OTHER HOCK BREAKING MEASURES, COMPLETE INSTRFAN CONSTRUCTION ACTIVITIES (INCLUDING THENLHING. PIPE INSTALLATION. BACKFILL . AND RESTORATION OF THE STREAM BED CONTOURS) WITHIN 21 HORS STREAM BANKS AND UNOQ50.IDATED STREAM BEDS MAY REQUIRE ADDITIONAL RESTORATION AFTER THIS PERIOD 12 CHANNEL WILL NOT BE DISTURBED ,INTEL DAY W PIPE INSTALLATION 13 CHANNEL WILL BE IMMEDIATELY STABILIZED WITH RIP RAP (RP) ACROSS ENTIRE 70PQUART WORKSPACE AND &OG CHANNEL BYES AFTER CHANNEL PIPE Q INSTALLATION IS COMPLETE AT THE EN) OF THE WORK DAY RIP RAP IRP) SMALL TEN HOT BE REMOVED AT ANY POINT DURING OR AFTER CONSTRUCTION VET MINOR VA7ER80DY CROSSING �\ TEMPORARY EROSION CONTROL MEASURE �� (APPLIES TO WARFI®OIIES 10' WIDE OR LESS AT WATERS EDGE AT TIME OF CROSSING) r PERCENT W LAID SLOPE SPACIAL I IN FEET) 0 -5% TRANSCONTINENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL ® WET MINOR WATERBODY CROSSING DNIysop- 5 - 102 AGO C E 2D% - 352 l i i I (SEE , ISFE NOTE • 91 (SEE NOTE I I I I I F� ISFF NOTE t 91 J �I I TEMP Y STREAM CROSSING. IBECI PER DETAIL (SEE NDTE t 6) INSTALL REMOVABLE SEDIMENT I BARRIER OR DRIVEABLE BED, adI ACCROSS ROADVAY NGTS 1 THIS WTIIOD APPLIES TO MINOR VATERBODY CROSSINGS THAT ARE DEFINED AS VATMMIES THAT ARE LESS THAN OR EQUAL TO 10 FEET AT WATERS EDGE AT THE TIME W CROSSING 2 SEDIMENT BARRIERS SHALL BE IN57ALLED AS DEPICTED AND ALONG DONN GRADIENT SIDES OF WOE AREAS AND STAGING AREAS SUCH THAT NO HEAVILY SILT LADEN WATER ENTERS THE WATFRBWY OR LEAVES THE CONSTRUCTION RIGHT W WAY 7 HARD DITCH PLUGS MUST REMAIN IN PLACE AT CONVENIENT LOCATIONS TO SEPARATE MAINLINE DI7CH FROM THE WAVABWY CROSSING UNTIL THE WATERBODY IS INSTALLED AND BUKFILLED 1 EQUIPMENT OPERATING IN THE WATERBQUY L1.1LL BE LIMITED TO THAT NEEDED TO PERFOPA CONSTRICTION IF OTHER TYPES OF EQUIPMENT MUST CROSS THE WATERBODY. CONTRACTOR SHALL PROVIDE AND USE TEMPORARY STREAM CROSSING IBEL) 5 STAGING AREAIS) FOR WATERBODY CROSSINGS). MEN REQUIRED. SHALL BE LOCATED AT LEAST 50 FEET FROM WATER'S EDGE AND SHALL BE W A MINIMA SIZE NEEDED FOR CONVENIENT PREPARATION 6 EROSION AND SEDIMENT CONTROL MEASURES LOLL BE INSPECTED DAILY AND REPAIRED IF NECESSARY 7 INSTAL DIVERSION TRENCHES AT THE BASE OF ALL LOPES ADJACENT TO THE WATERBODY 8 CHEMICALS. FUELS AND LUBRICATING OILS LULL NOT BE STIED AID EQUIPMENT SHALL NOT BE REFUELED WITHIN 10D FEET OF THE WATERBODY 9 INSTAL TRENCH RUGS ON BOTH SIDES OF THE WATERBODY TO PREVENT DIVERSION W WATER INTO UPLAND PORTIONS OF THE PIPER IRE TRENCH AND TO KEEP AMY ACCUMULATED TREND( WATER OR OF THE WATERODY 10 CONTRACTOR SHALL POSTPONE GRADING W RIGHT-01F-WAY IMMEDIATELY ADJACENT TO WATERBODY ,MIL STAGING AREA 15 PREPARED AND WORK IN THE WATERBODY IS READY TO COMMENCE 11 EXCEPT FOR BLASTING AND OTHER HOCK BREAKING MEASURES, COMPLETE INSTRFAN CONSTRUCTION ACTIVITIES (INCLUDING THENLHING. PIPE INSTALLATION. BACKFILL . AND RESTORATION OF THE STREAM BED CONTOURS) WITHIN 21 HORS STREAM BANKS AND UNOQ50.IDATED STREAM BEDS MAY REQUIRE ADDITIONAL RESTORATION AFTER THIS PERIOD 12 CHANNEL WILL NOT BE DISTURBED ,INTEL DAY W PIPE INSTALLATION 13 CHANNEL WILL BE IMMEDIATELY STABILIZED WITH RIP RAP (RP) ACROSS ENTIRE 70PQUART WORKSPACE AND &OG CHANNEL BYES AFTER CHANNEL PIPE Q INSTALLATION IS COMPLETE AT THE EN) OF THE WORK DAY RIP RAP IRP) SMALL TEN HOT BE REMOVED AT ANY POINT DURING OR AFTER CONSTRUCTION VET MINOR VA7ER80DY CROSSING �\ TEMPORARY EROSION CONTROL MEASURE �� (APPLIES TO WARFI®OIIES 10' WIDE OR LESS AT WATERS EDGE AT TIME OF CROSSING) r SURFACE RIN6F PLAN YI SLIM ALIm EARTH RIDGE GRADED RIGHT(F-YIY 4� 1' MIN 7 1 OP FUTIEA AWE 3 1 OR MITER SLOPES SECTION A - A 70P0URY AID MONKERY DIVERSION THWACKS PERCENT W LAID SLOPE SPACIAL I IN FEET) 0 -5% TRANSCONTINENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL ® WET MINOR WATERBODY CROSSING DNIysop- 5 - 102 AGO 75 2D% - 352 50 )352 25 — WY W — 07. 214011 ,(NNE SHORN SURFACE RIN6F PLAN YI SLIM ALIm EARTH RIDGE GRADED RIGHT(F-YIY 4� 1' MIN 7 1 OP FUTIEA AWE 3 1 OR MITER SLOPES SECTION A - A 70P0URY AID MONKERY DIVERSION THWACKS PERCENT W LAID SLOPE SPACIAL I IN FEET) 0 -5% 125 5 - 102 AGO 75 2D% - 352 50 )352 25 14IIS- 1 �N�CONSTR CTIOI. DIVERSION TERRACES SHALL BE PREPARED AT THE END W EACH 2 WHERE AWE W CONSTRUCTION AREA EXCEEDS THAT FOR SAFE INSTALATIOH. TFIRAES LAL BE INSTALLED AT BASE W SLOPE (PLY 7 AFTER EARN DISTURBING 100111 HAS BEON DIVBISIOI TERRACES LULL BE INSTALLED AS SOON AS IS PRACT CABLE AT THE SPACING SHUN IN THE ABOVE TABLE W AS SHUN ON THE DRAWINGS 1 TEMPORARY AND PERMANENT DIVERSION TERRACES AE REOUHED AT AL EATEABODY CROSSINGS AND UPSLWE FROM ALL WTLAD ROUNDUP ES 5 THE DILEASIOH TEMUCE CUTLET SHALL BE LOCATED WERE RINWF WILL BE REFASED ONTO AN EXISTING ELL- VEGETATED AREA IN THE ABSENCE W A VEL- VEGETATED AREA, AN OUTLET STRUCTURE (OSI) MUST BE INSTALLED AT THE DIVERSION TERRACE CUTLET 6 POOADIT DIVERSION TERRACES SIMU. BE REVEGETATED WITH TIE RIOIT W MY STABILIZATION CHANNEL LINERS MAY BE REQUIRED FOR VELOCITIES GRATER THAN 2 5 GPS DIVERSION TERRACE DT TEMPORARY AND PERMANENT EROSION CONTROL MEASURE THE TRANSCONTINENTAL GAS PIPE STANDARD ENVIRONMEN CDT )DIVERSION TERRACE 1 12-034011 W A 01/70/2015 W 0 06/13/2015 W 06/15/2015 W I STAKE THROUGH CONSTRUCTION FENCE TO RESTRAIN. IF SLOPE IS GREATER THAN 5 PERCENT p 5' 2• K IN STAKES SFE KOTES FOR MINEC"I" \s O' HOSE TD FILTER BAG (ALONE 61 15' STAKE AT 2 5' C C CONSTRICTION SAFETY FENCE TO HOD ON SLOPES FOR RESTRAINT AND AID IN LIFTING USED RAG 0 TO 102 SLOPE t WATER AND SEDIMENT s' SECTION NOTES, 1 FILTER BAG SHALL BE PLACED ON A SLOPING OR LEVEL. KELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM DEVICE AND ANT WOE AREAS 2 TIE FILTER BAG MST BE STAKED IN PLACE IF THE FILTER BAG 15 PLACED ON A SLOPE GREATER THAN 5 PERCENT 3 FILTER BAG SHALL NOT BE USED FOR DISCHARGE FLOWS GREATER THAN 300 GPM 1 CONTACTR WALL PROPERLY ROM AND PROPEEYY DISPOSE W USED FILTER BAS IMMEDIATELY IPA COMPLETION OF DEWATERING OPERATIONS UNDER NO CIRCUMST.WCES SHALL USED FILTER BAGS BE LEFT IN PLACE FOR A PERIOD W TIME GREATER THAN 15 HORS AFTER DEMATERING OPERATIONS ARE COMPLETE 5 SEDIMENT FROM BAG SHALL BE SPREAD IN AN UPLAND AREA WITHIN THE CONSTRUCTION CORRIDOR AND THE AREA SHALL BE STABILIZED AND REVEGETATED 6 TO AFT 01 ROSE. CA OPEN CORER OP FILTER 84. GATHER LIP MATERIAL AND CLAW TO A SHORT SECTION OF STEEL PIPE CLAW HOSE TO OTHER END W PIPE BOTH CONNECTIONS SHALL BE WATERTIGHT T CONTRACTOR SHALL ONLY INSTALL ONE DEWATERING HOSE PER FILTER BAG FILTER BAG FB TEMPORARY EROSION CONIRO MEASURE NORTH CAROLINA TRANSCONTINENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL '^ FB FILTER BAG D p" REVISIONS TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC SOIL EROSION AND SEDIMENT CONTROL PLAN ii 2015 DOT REPLACEMENT Will" MAIN LINE 'A' �� M.P. 1356.99 TO M.P. 1358.27 GUILFORD COUNTY, NORTH CAROLINA IfE90P110N WD ND ISSUED FOR REVIEW ISSUED FOR BID ISSUED FOR CONSTRUCTION REVISED PER N C D E N R 1166225 1165225 1165z 1165 JAW NN M r N — WY W — 07. 214011 ,(NNE SHORN OCD® BY AW DARE 11- 3D-2011 NRO.® BY MM DYE 11- 30 -p01/ H � 26 -0100 -50 -28 —A -582611 9 .� ......e -.rte O 11 YD 1165225 irVIRE ZQ AT lON A BWRON WITH VIE AT 3 FOOL INTERVALS AM 1 REINFORCED SEDIMENT BARRIER HALL E INSTALLED TO FILTER SEDIMENT IN AREAS WHERE EXCESSIVE HONE ROGERS STANDARD SEDIMENT BARTER INEFFECTIVE 2 INSTALLATIONS AWL E PERIODICALLY CHECKED. THE SEDIMENT AWL E REMOVED WHEN IT REAM 0 5 FEET IN EIAR AT SEDIMENT BARRIER 5 REINFORCED SEDIMENT BARRIER SHALL E LEFT IN PLACE UNTIL PERMANENT VEGETATIVE COVER IS ESTABLISHED 1 REINFORCED SEDIMENT BARRIER AWL E EPLACED WHENEVER IT HAS DETERIORATED TO SUCH AM EXTENT THAT IT REDUCES THE EFFECTIVENESS ODE REINFORCED SEDIMENT BARRIER 5 AREA DIWT RBED AS A REACT O REZONING ME REIEO DED SEDIMENT BARRIER SHALL E RESTABn[ZED BY SEEDING IN ACCORDANCE WITH THE EVEGETATION PLAN 6 REINFORCED SEDIMENT BARRIER SHALL E PLACID TO FOMLUN (RUN PARALLEL TO) THE CONTOURS T ON UPS LOPE INSTALLATIONS. BOTH ENDS O THE REINFORCED SEDIMENT BARRIER SHALL E 7=0 AND EXTENDED UPRO'E Z LAYERS BY Y z 2' 1' 2' z 2' VOIDEN STALE INSTALL ENTIRE DEN FABRIC CRREIIIT SECURELY TIED RULES O RTP ) BENEATH EAS OEVATO RAY OR STRAM STRUCTURE AS AIORI 1D PREVENT SCOURING GHICREN VIRE FENCFV WOOFED TO 2' x 2 WOMEN POSH MIRE - - - - to EXIE70 RETFAtx BALES ;;7", T;r1 NATURAL GRADE — gM INSTALL A LATER O 'NIGH EFFICIENCY 865 AIR FILTER NEDIA' BETWEEN RUNS OF BAY UN STRUM BALES SECTION IM STAKES SECURING 'HIGH EFFICIENCY 865 AIR FILTER MEDIA' AM CHICKEN VIRE FENCE ARE ROT SHOW FOR CLARIFY PLOWES Hm 1 STRUCTURE SHALL BE PLACED ON A LEVEL WELL VEGETATED SITE SUCH THAT MATER MILL FLOW AWAY FROM STRUCTURE AND ANY VOA AREAS 2 FLOW RATES TE016N DISCHARGE AND DIV" PIPES SHALL BE SUCH THAT STRLC116E MILL HOT OAORELUN 5 WEE CONDITIONS VA = A 50' x 50' ECTAELLNI STAILTIE MAY E SUBSTITUTED FOR THE CIRCULAR CONFIGURATION SWIM 1 DIMENSIONS $BONN ARE lE MINIMA ACCEPTABLE VALUES AND NAY E VARIED DEFEND MG UPON SPECIFIC LOCATION 5 CONTRACTOR SHILL PROPOILY FUN AND DISPOSE OF EIIATERIM6 STRICTURE IMMEDIATELY UPON COMPLETION O DEVATWING GFIMTIOM6 UNDER NO CIRCUMSTANCES SHALL USED DENATFAING STRII(TIAFS E LEFT IN PLACE FOR A KRIM O TIME TREATER THAN 19 HOURS AFTER DEVATERING OPERATIONS ARE COMPLETE 6 'HIGH EFFICIENCT 065 AIR FILTER MEDIA' CAN E PURCHASED FROM THE FOLLOWING UNITED AIR FILTER COMPANY 1DDD VEST PALMER STREET CHUNK 1E. NORTH CAROLINA 211231 1701) 551-6511 HYDROSTATIC DEWATERING STRUCTURE TEMPORARY EROSION CONTROL MEASURE 1RTwiE'. m FILTER — FABRIC FILTER — FASTENERS ITYP I NATIVE SOIL 19 1 33MIM FOUT S EEL POST ITYP 1 Y Y �E 4 1' SECTION END O SEDIMENT BARRIER TIE COS OF SEDIMENT ROW 4'-0. BARRIER TOGETHER MIN FLAW POST +I TTP 1 Ea1N11NG O SEDIMENT BARRIER OVERLAP DETAIL REINFORCED SEDIMENT BARRIER TEMPORARY EROSION CONTROL MEASURE JO TRENCH DETAIL "'NO DO O SEDIMENT BARRIER TIE ENDS O IOW SEDIMENT BARRIER / TOGETHER RON WN POST I Tv 1 BEGINNING O SEDIMENT BARRIER OVERLAP DETAIL NOTES 1 SEDIMENT MEIER SHALL E INSTALLED TO FILTER SEDIMENT FROM SIWACE RN6F 2 INSTALLATIONS HALL E PERIODICALLY CHECKED. THE SEDIMENT SHALL E ROM VREII IT RUM C E -THIRD THE EIGHT OF THE SEDIMENT BARRIER 5 SEDIMENT BARRIER MALL E LEFT IN PLACE UNTIL PERMAENI VEGETATIVE CUM IS ESTABLISHED 1 SEDHERT BARRIER MALL E REPLACED 10104111 IT HAS DETERIORATED TO RD AN EXTENT THAT IT REDUCES THE EFFECTIVENESS O THE SEDIMENT BARRIER 5 AREA DISTURBED AS A RESULT O REMOVING THE SEDIMENT BARRIER SHALL E RESTABIL IZED BY BARFILLING. COMPACTING. AND SEEDING IN ACCORDANCE WITH THE REVFLETATION PLAN 6 SEDIMENT BARRIER NOLL E PLACED TO FOLLOW IRA PARALLEL TD) THE CWTMM I ON UPSLOPE INSTALLATIONS BORE ENDS O THE SEDIMENT BARRIER SHALL E IOIIED AND EXTENDED MPSLOWE 6 SEDIMENT BARRIER SHAT E CONSTRUCTED OF AMOCO CEFi019 FABRIC OR A SIMILAR COMPANY APPROVED FABRIC WITH A TENSILE STRENGTH O E.A 50 LB AIR INCH AT 20S IMO 1 ELONGATION EXTRA 5 I FABRIC 9 ONLY STEEL POSTS AND VIE BARING SHALL E USED FOR THE INSTALLATION O SEDIMENT BARRIERS SEDIMENT BARRIER TEMPORARY EROSION CONTROL MEASURE GAS YIYt LINt UUNYUNAI HUN 5Ab 4VIRDNMENTAL DETAIL BARRIER —109 �e9 SEDIMENT BARRIER INSTAL MT VIEW AT OUTET MBAMAP (6' - 12p) ELEVATION REOOT 6 d 61 WAGING SIOEHI2 1 O p IMEWT MURDER NSA R2 FIL ST I1E FACE 6' VIDE 2 1 P 1pp166 I AN P'&VFIIM WHETS SHALL E PLACID APING SEDIMENT BARRIERS AS MINN d THE RAN THE ROOM FILM WUET IS Im IMTOED TO E FARED IM STEALS. MINAS CREFAS OR OITLIES MACH NORMALLY HAVE TIMM HATER 2 010 TIE CIST6UND AREA IS STMLLIZED. THE m FILM OUTLET MALL E REMOVED AND ANY DISTURBED AREAS CASED O REMOVAL SMALL E RETNED TD d1CINA MITid ARO ENEESATED S THE ROCK WILIO➢ O THE NGO FILM OUTLET SMALL E CLEARED OR REPLACED MEN THE ACCML1TId O SEDIWBIT IS SINN THAT THE ROCK FILTER QUIET CAN NOT EFFECTIVELY FILM DISCHARGE WATER 1 INSTAL MM-2 MR ATM QUIET SIGE O TE SFDIMEMf BARRIO AS SIDMI IN lE DETAIL KIEV INTMLOE 105-01 M. INSTAL EAi2 MOCK AT THE INLET 51E O THE SED IMENT BARRIO TO CREATE Al ADEQUATE FILM STORE FARE FOR THE QLET SiWC11NE S (STALL 12' O NmUT e d UST RAMROD STILE d IPSmAM SIE O DYILET ROCK FILTER OUTLET RFO TEMPORARY EROSION CONTROL MEASURE NORTH CAROLINA TRANSCONTINENTAL PIPE OAS IPE LINE ORATION STANDARD ENVNTAI DETAIL ROCK FILTER OUTLET ® RINFN¢N1e BANGS REVISIONS TRANSCONTINENTAL GAS PIPE LINE COMPANY. LLC SOIL EROSION AND SEDIMENT CONTROL PLAN 2015 DOT REPLACEMENT II a MAIN LINE 'A' M.P. 1356.99 TO M.P. 1358.27 GUILFORD COUNTY, NORTH CAROLINA TITS ml BATE 1 12-05 -2014 A 01/50/2015 0 06/15/2o15 1 06/S5/2D15 M, W NG W IssEO FOR REVIEN ISSUED FOR BID ISSUED FOR CONSTRUCTION REVISED PER N C D E N R 1165 1165225 1165225 11652r. AW AW AW AW r. MW MM MW pMYAI BY W MME 07- 2 4-M HOVE SHOWN O ®SID Bf AW ppE 11- 70 -2D11 APRIO.HI BP 'M BATE 11221=26-0100-50-28-A-582611 � 10 �^ °:,... a 11 w ilm's 9 b� N, 2LAU NATIONAL ASSOCIATION NUMBER EXISTING STREAM BAR OF ROCKS ILTER FABRIC _ e IDCO 06-209) 1¢ —� OCK 04DATIONHICKNESS T SECTION SEE TABLE SNI�GAM BAR RIPRAP GRADATION TABLE NATIONAL ASSOCIATION NUMBER SIZE OF ROCKS (INCHES) MIN FEET MA)(INUN d5o AVERAGE # MINIMUM ## THICKNESS LAYER I R -1 11'2 34 NO 8 6 1 R -2 3 11.2 1 6 1 25 R -3 6 3 2 9 1 5 R-4 12 6 3 18 2 5 R3 18 9 5 27 4 Rfi 24 12 7 36 4 R -7 30 15 12 45 5 R� 48 24 15 72 6 A THE 'AVERAGE SIZE'. DD A50. IS CEFINED AS A SIZE THAT 15 EXCEEDED BY AT LEAST 50% OF THE TOTAL EIGHT SNIPPED II E SOX ff THE IOMIGE SHIPPED CONSISTS OP PIECES L.ARGF11 TNAII THE 'AVERAGE 517E SUN IN MISTS g PIECES SMVLER THAN THE 'NININM SIZE' SIGN SHALL wT EXCEED 15% OF THE TOM6E SHIPPED NM I RDCL UTILIZED FOR RIPRAP SHALL CONSIST OF SOUND. DURABLE ROCK. INSOLUBLE IN HATER AND RESISTANT TO WEATHERING 2 All MATERIAL SHALL BE FREE OF STRUCTURAL DEFECTS. SHALE SEAMS AND UR6AIIIC UTTER 3 IIOIVIOUL PIECES SNOLD BE SHARPLY ANGULAR. BLUR SHAPED AND HAVE A MINIMUM SPECIFIC GRAVITY OF 2 5 4 AD PIECE SHALL HAVE A LENGTH EXCEEDING TREE 13) TIMES ITS WIDTH N DEPTH 5 EACH LOAD OP ROCX SHALL BE ff ELL- CRAADED NIXTRE A E1L-CRADFD MIXTURE AS RED HEREIN. IS DEFINED AS A MIXTURE COMPOSED PRIMARILY ff LARGER STORE BUT WITH A SUFFICIENT MIXTURE OF SMALLER SIZES TO FILL THE VOIDS G MATERIAL SELL MEET NSA SPECIFICATIONS N NG OUT SPECIFICATIONS- SEE TABLE T IF STREW WIDTH IS EDAL TO W LESS THAN 2 TIMES THE TIRE WIDTH. RIPRAP BOLL BE PLACED ACHES THE ENTIRE STREW WIDTH WJW BE PLACED TO THE FELL COHSE THICKNESS IN ONE CNTIIIAR6 OPERA HIM OPERATIONS WHICH CAUSE SEGREGATION OF THE MATERIALS SHALL NOT BE PERMITTED INOIVIONL ROCKS MAY BE EANANOD AND THE VOIDS FILLED WITH HANG RACED SMALLER ROCK IN OTHER TO ACHIEVE THE DESIRED LA I= ARIA PLAN TONNE B�AC[,4'-B' EROSION MCNTND. A CE CE FORT SECTION A -A SIZES FOR RIPRAP AND EROSION CONTROL STONE SPECIFIED BY THE N.C. DEPARTMENT OF TRANSPORTATION RIPRAP EROSION CONTROL CLASS 1 CLASS 2 CLASS A CLASS 8 5 TO 20D LB 25 TO 250 LB 2' TO 6' 5' TO 15' 30% SHALL WEIGH A 60% SHALL WEIGH A BLAWET/WT STARES SHALL BE BALLAST MIN OF 60 LBS EA MIN OF 1DD LOS EA SECTION B� L� THAN 112�LENGTH ISSUED FOR REVIEW NO MORE THAN 1D% NO MORE THAN 5% NO MORE THAN 5% SHALL WEIGH LESS SHALL WEIGH LESS SHALL WEIGH LESS MEN DOE TIE THE EM,S OF THE BANNER FABRHC WIT FVIENG THAN 15 LBS EACH THAN 50 LBS EACH THAN 50 LBS EACH 0 06/13/205 W EQUALLY DIS- EQUALLY DIS- Aw w TRIBUTED. NO TRIBUTED. NO 1 06/13/205 w GRADATION GRADATION Aw w SPECIFIED SPECIFIED RIPRAP RP PERMANENT EROSION CONTROL MEASURE MATERIAL AMf1�ASN / GEOIVIF E M30 AMERICAN GREEN C12W E BELTON INDUSTRIES TRANSCONTINENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL ® RIP RAP AwnA.BLRe PLAN EMBANKMENT INSTALLATION ANCHOR IN ACCOD ED SIWl COVER CHANEL WITH NEFACTIAEA 5 BOTTOM WEE REVEGETATIN INSTRUCTIONS OF CHANNEL BOTTOM IS SQUIRED NATURAL GROUND L _XIS x IxI L �i 20��x A x x x x x x ' C SECTION C-C B x x xD x x x x 1 STARE PER SO TO I C STAPLES PER SO TO 2 m PER N 7 CHANNEL INSTALLATION 3N 275 25D 6 225 20D d 175 B 150 125 1N 75 So FT L TOP 6 AWE C B B C C A A B B BEADLE PATTERN R90E ML 1 EIZIW CONTROL EAEETS SHALL EXTEND COMPLETELY ACROSS DISTURBED AREA TO PROTECT ERODIBLE SURFACES THE SOIL PULL BE PROPERLY PREPARED, SEEDED AND NACIED PRIM TO INSTALLATION 2 INSTALL EROSION CONTAIN. BLANKETS N FRESHLY GRADED ENBAJU EMITS N SLOPES IN EXCESS OF 311 (H V) TO SUPPORT VEGETATION 3 INSTALL BLANKETS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS 4 1 7 1 2 1 1 1 4 MANK SMALL BE LOOSELY INSTALLED AND TARED N ROLLED IN PLACE AFTER IMSOLLATIN TOE OF SLOPE STARES SHALL BE MIEN RUSH WITH THE GROIN FIBYKEIR TIERN ME - STAPLE PATIFIE TAME EROSION CONTROL BLANKET ISEE STAPLE PATTERN RIIEI fe PERMANENT EROSION CONTROL MEASURE fA lilla W, 4' ro 15' SSBE (NG 001 CROSS SECTION EXI ILL CONTRA. STOE, 1 5' 12. OF WWI t5 ON 57 2 VASED STBE 1 GEOFE"TiLL PROFILE FABRIC JDQSI_ 1 CECA DVS ARE APPLICABLE FOR SMALL DIMES AND SWALES AND ARE NOT TO BE USED 0 LIVE FLOWING STREAMS 2 SEC( NS SMALL BE INSTALLED MAW THAT COMPLETE CDIERARE OF THE PORE WImH OF THE °ITCH W SMILE 15 ACHIEVED O1EID 1 5' BEYOND BANK S THE CENTER OF THE CHECK DAN MAT BE COSTRUCiFD SUCH THAT IT IS 9 INDIES LOWP THAN THE ONES 6 THE CEO GYM. 4 SEDIMENT SMALL E RENEWED KEIU IT Am1YAA16 TO A DEPTH 6 OE -KALF THE ORIGINAL BAY MIGHT 5 ADANGMSMA L E REMOVED WHEN THE DITCH OR SMILE HAS BEEN aM�• I Y E SPACING AR SIGN N DETAIL ABOVE ENSURE DRAINAGE AREA ADDLE THE CHECK DAN DOES NOT EXCEED 2 AM CHECK DAM TEMPORARY EROSION CONTROL MEASURE ■_ ■ —_ ■■ ■� ■�� ■■ � � I I � A ALh: 4 N ff BARK N POST /LARGE 1 FLOAT LDAO L,� �ROTATON DI POGET LOAD LDE ANCHOR IN ACCODANCE SEWN OR MEAT WITH M WACTIPFR s INSTRUCTIONS STARE TED TO HIGH PER FIAOTI FIND BACK UTIKAL CAROM INSN BEY STAPLE Mal ONE BLANKET BLANKET IMsTALL STAPLES TM °° na T W.aND BLAWET/WT STARES SHALL BE BALLAST 14-CAM COD DRAW STEEL WIRE CMl 1 ,2-03 -2014 SECTION B� L� THAN 112�LENGTH TRANSCONTINENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL ® RIP RAP AwnA.BLRe PLAN EMBANKMENT INSTALLATION ANCHOR IN ACCOD ED SIWl COVER CHANEL WITH NEFACTIAEA 5 BOTTOM WEE REVEGETATIN INSTRUCTIONS OF CHANNEL BOTTOM IS SQUIRED NATURAL GROUND L _XIS x IxI L �i 20��x A x x x x x x ' C SECTION C-C B x x xD x x x x 1 STARE PER SO TO I C STAPLES PER SO TO 2 m PER N 7 CHANNEL INSTALLATION 3N 275 25D 6 225 20D d 175 B 150 125 1N 75 So FT L TOP 6 AWE C B B C C A A B B BEADLE PATTERN R90E ML 1 EIZIW CONTROL EAEETS SHALL EXTEND COMPLETELY ACROSS DISTURBED AREA TO PROTECT ERODIBLE SURFACES THE SOIL PULL BE PROPERLY PREPARED, SEEDED AND NACIED PRIM TO INSTALLATION 2 INSTALL EROSION CONTAIN. BLANKETS N FRESHLY GRADED ENBAJU EMITS N SLOPES IN EXCESS OF 311 (H V) TO SUPPORT VEGETATION 3 INSTALL BLANKETS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS 4 1 7 1 2 1 1 1 4 MANK SMALL BE LOOSELY INSTALLED AND TARED N ROLLED IN PLACE AFTER IMSOLLATIN TOE OF SLOPE STARES SHALL BE MIEN RUSH WITH THE GROIN FIBYKEIR TIERN ME - STAPLE PATIFIE TAME EROSION CONTROL BLANKET ISEE STAPLE PATTERN RIIEI fe PERMANENT EROSION CONTROL MEASURE fA lilla W, 4' ro 15' SSBE (NG 001 CROSS SECTION EXI ILL CONTRA. STOE, 1 5' 12. OF WWI t5 ON 57 2 VASED STBE 1 GEOFE"TiLL PROFILE FABRIC JDQSI_ 1 CECA DVS ARE APPLICABLE FOR SMALL DIMES AND SWALES AND ARE NOT TO BE USED 0 LIVE FLOWING STREAMS 2 SEC( NS SMALL BE INSTALLED MAW THAT COMPLETE CDIERARE OF THE PORE WImH OF THE °ITCH W SMILE 15 ACHIEVED O1EID 1 5' BEYOND BANK S THE CENTER OF THE CHECK DAN MAT BE COSTRUCiFD SUCH THAT IT IS 9 INDIES LOWP THAN THE ONES 6 THE CEO GYM. 4 SEDIMENT SMALL E RENEWED KEIU IT Am1YAA16 TO A DEPTH 6 OE -KALF THE ORIGINAL BAY MIGHT 5 ADANGMSMA L E REMOVED WHEN THE DITCH OR SMILE HAS BEEN aM�• I Y E SPACING AR SIGN N DETAIL ABOVE ENSURE DRAINAGE AREA ADDLE THE CHECK DAN DOES NOT EXCEED 2 AM CHECK DAM TEMPORARY EROSION CONTROL MEASURE ■_ ■ —_ ■■ ■� ■�� ■■ � � I I � A ALh: 4 N ff BARK N POST /LARGE 1 FLOAT LDAO L,� �ROTATON DI POGET LOAD LDE FLOW STARE PATTERN TYPE SEWN OR MEAT IN Gahm ET TED TO HIGH SEALED SE'W VELOCITY TRANSCONTINENTAL GAS PIPE LINE COMPANY. LLC SOIL EROSION AND SEDIMENT CONTROL PLAN y/� t. 2015 DOT REPLACEMENT willAi C (BARRIER Mal ONE E FABRIC \ SEWN SLEIV CHURN J W.aND OK BALLAST 1 ,2-03 -2014 BOTTOM SEIXW N— TAPER EHD OF BARREN FABRIC ISSUED FOR REVIEW „ss TO SLOPE OF SHORELINE FOR GENERIC TYPE BARPoERS WHERE w TAPERING OF THE ENDS IRIS NOT W LASED FOR BID MEN DOE TIE THE EM,S OF THE BANNER FABRHC WIT FVIENG Aw w STRAPS TO A T THE DEPTH OF THE BMPoEIC FABRIC TO THE SHORELNE. FLOW STARE PATTERN TYPE LOW VELNITY C TED TO HIGH D VELOCITY TRANSCONTINENTAL GAS PIPE LINE COMPANY. LLC SOIL EROSION AND SEDIMENT CONTROL PLAN y/� t. 2015 DOT REPLACEMENT willAi "'I'll INSTDIAT7N STAPLE PAT TERx TXE - (SEE STARE PATTERN WIDE) N F N T 6' I � -6' y GROG D I Fj I FIN0.0RUOEEO TI FS ANG SECI N STARE IM RACE OALE�FNT�MKABTO SECTION D-D TRANSCONTINENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL CDEROSION CONTROL BLANKET �'vV` asPLPELNF tlGICS! 4 TURBIDITY CLVtTAN IS TO BE USED ONLY WHERE SPECIFIED ON THE CONSTRI1CT10N DRAW14S OR AS DIRECTED BY COMPANY REPRESENTATIVE 2 TURBIDITY CURTAIN S HOT TO BE USED TO FILTER STEADY STEMN ROW TURBIDITY CONTAIN PIPE CORPORATION PORACORPORATION 'I LINE RNNEN I DETAIL CURTAIN ENiI1ry11 Qrprlp F-9 rphLAq �iitimB fA645T 0 p uD NMr ELAN IE BRIDGE EQUIPMENT CROSSING E OS TE A CUNTROL ASU Ulm mERGS: D0141P r PL.NI. —I. SMALL E AHDED BTP NB_NW n _ ?%. Ii, . MU GIS 1 E .AANXIII-1 AIG® AT mM DR. 2 YKA. ILLLLT aWIR rrmE OSTAWTW AG mANF r9av R sFDDm r ®nrND ] riDR ARIWMEL 9441 E TIiA FWPIdf WR 4 YIYPIALS PLACED ANON snEW aAYn SIML E IDNXTILY 1OEP — LnF N. IF EII G ■gYIYD2AL IE�NEf 19FKNFTGpEfi�nT TE�ECE�INryIE�u�TpmE�m5T11 F@AELYIDppTWI B DL NTRI TF TIWG TIDE AMA ®DSr15DFn. FMNIC SMALL REWII ALm{,E9 THE YIP SITAR FIAYATI. AT ALL TI . gF�r ` iui "iLYGif'It"E10IikFl°Ixldid`Sd", mD2 "ffd{ m tE rD IEmR FmI IQw�ESM1Tr5rSnW� ptTSp T Bn115II. 6111E W�Fig m EIIIIDA nI11W�6 To FFEf ��AI NORTH CAROLIN TRANSCDNT INENTAL GAS PIPE LINE CORPORATION STANDARD ENVIRONMENTAL DETAIL wm 7_39E) BRIDGE EQUIPMENT CROSSING —000— PINGS REVISIONS TRANSCONTINENTAL GAS PIPE LINE COMPANY. LLC SOIL EROSION AND SEDIMENT CONTROL PLAN y/� t. 2015 DOT REPLACEMENT willAi TITLE Mal ONE E I W.aND OK Aw 1 ,2-03 -2014 W ISSUED FOR REVIEW „ss Aw w A otnD/zms W LASED FOR BID t165z Aw w MAIN LINE °A° 0 06/13/205 W ISSUED FOR CONSTRUCTION 11 65225 Aw w M.P. 1356.99 TO M.P. 1358.27 1 06/13/205 w REVISED PH N C D E N R 1165W. Aw w GUILFORD COUNTY. NORTH CAROLINA w1AW1 BY NO J.M 07-24 -2014 1 s^..va SHUB D. w w IDaB 11 =26-0100-50-28—A-582611 1765225 NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R van der Vaart Governor Secretary July 29, 2015 LETTER OF APPROVAL WITH MODIFICATIONS Transcontinental Gas Pipe Line Company, LLC Attn: Tim Powell 2800 Post Oak Blvd - Level 17 Houston, TX 77056 RE: Project Name: DOT TRANSCO GAS LINE REPLACEMENT MP 1357 Acres Approved: 14.39 Project 1D: GUILF- 2015 -031 County: Guilford, City: Stokesdale Address: Eversfield Rd. River Basin: Cape Fear Stream Classification: Other Submitted By: Michael Naeger, Williams Gas Pipeline- Transco Date Received by LQS: July 24, 2015 Plan Type: Utilities Dear Mr. Powell This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCGO10000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A- 61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Division of Energy, Mineral, and Land Resources Energy Section - Geological Survey Section • Land Quality Section 450 West Hanes Milt Road, Suite 300, Winston - Salem, NC 27105 Phone. 336 -776 -9800 - FAX- 336 - 776 -9798 Internet http pportal ncdenr orglwebllrl An Equal opportunity 1 Affirmative Action Employer — 50% Recycled 110% Post Consumer Paper Letter of Approval July 29, 2015 Page 2 of 3 North Carolina's Sedimentation Pollution Control Act is performance- oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A -51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Shannon Leonard Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES Permit cc: Transcontinental Gas Pipe Line Company, LLC Attn: Michael Naeger 2800 Post Oak Blvd -Level 17 Houston, TX 77056 MI"D]ME4 Letter of Approval July 29, 2015 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: DOT TRANSCO GAS LINE REPLACEMENT MP 1357 Project ID: GUILF- 2015 -031 County: Guilford Per G.S. 1 13A- 57(3): 1. The natural drainage channel from the southeast side of R/W near STA 5850 +57 (Sheet 2) shall be treated as a "MWC ". Adequate measures (e.g. silt fence, diversion berms, etc.) shall be provided on either side of the channel to contain sediment The channel may not be disturbed until day of pipe installation. The channel shall be stabilized with rip -rap at the end of each work day. 2. Equipment crossing streams /channels must use a bridge mat at all times. Temporary culverts are not allowed under bridge mats. 3. Rip -Rap Stabilization of streams /channels shall use Class B Stone (9" dia) with a minimum thickness of 18" at a minimum. 4. Erosion control measures shall not be removed until approval has been received from NCDENR. CERTIFICATE OF PLAN APPROVAL, The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for thi's project by the North Carolina Department of Envirorunent and Natural Resources in accordance with North Carolina General Statute 1 l_3A — 57 (4) ,and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must_ be posted at the primary entrance of the job site before construction begins -and until establishment of permanent groundeover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). 'r T iwNS� GI►� G'wf �+t�Ewd�r IMI /1r7 /CUXJUd l�wV�. -7,614 uK Date of Plan Approval W1W A0904 ~4 Project Name and Location e�t� NCDENR &ca'tf 20Me.03I ,m� - �- e4p�wj Regional Engineer:4 o