Loading...
HomeMy WebLinkAboutNCG060182_DMR Upload Review_20230919 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 9/18/2023 3:18:25 PM (DMR Submittal) Submit by Brittany.Cook 9/19/2023 10:21:00 AM(DMR Submittal Review) • The task was assigned to DEMLR SW Admin for DMRs 9/18/2023 3:18:26 PM • Brittany.Cook assigned the task to Brittany.Cook 9/19/2023 10:20:11 AM [rftDQ DMR Submittal from 9/18/2023 Permit and Facility Information: .............................................................................................................................................. Permit Number* Enter COC or Individual Permit Number NCG060182 Must begin with NCS or NCG Facility Name:* Pilgrims Pride-Marshville Complex Owner/Operator Pilgrim's Pride Corporation Name:* County:* Union Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments. Reason for not yet If applicable: reporting data After numerous requests to change current Company's owner, name,and relevant through eDMR for information submitted by PPC, NCDEQ failed to respond and correct Company's this permit: profile;therefore, it's impossible to complete the eDMR registration process. Monitoring Period Information: .............................................................................................................................................................................................................................................................................................................................................................................................. Monitoring Period What is the YEAR of the sample date(s)? Year:* 2023 DMR Upload* Click the upload button or drag and drop files here to attach document. Signed 3rd Quarter 2023 SW DMR.pdf 95.13KB Only PDFs are accepted. Comments: For your review and approval! * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; d I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66, Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); d I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act"); o I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit this DMR Upload form. Full Name:* Yin-Pong George Chang, P. E. Name of person submitting this form Email Address:* yin-pong.chang@pilgrims.com Phone Number:* 17046244317 Signature: Date:* 09/18/2023 Review Review Date: 09/19/2023 Confirm Permit No.* Correct the permit ID number if needed. NCG060182 Confirm DMR Year* 2023 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be Yes accepted?* No(Explain why below) Do Central Office No staff need to be Yes alerted?* Do Regional Office No staff need to be Yes alerted? Type of Permit* General Ensures DMR(s)filed correctly.