HomeMy WebLinkAboutSeptember 9 rain event and sediment loss -- before cleanup.pdfProject # Y-5500JC
Action ID# SAW-2019-01336
NCDWR # 20201838
- Rainfall total from Saturday 9/9/2023 = 1.75" (Tory Path/Helms Road
Connector Job)
- No erosion measure failed on site. The contractor did every protection
method they could to avoid silt loss, but the intensity of rainfall caused
some basins to overflow, resulting in silt loss carried offsite.
- Contractor is taking every measure to clean up silt loss immediately.
- Bucket count for each jurisdictional permit site will be reported as soon as
possible.
- Photos of before clean up shown below
PERMIT SITE 1 (BEFORE)
i t
.y _ - �' ., _.ems° � �i� <• , il.- � __ - .-
r,_ .. tir . ;r
N a r
/ 4a.
3E 2rC.. f
1% V- m x 9!' i - H. � aL�
lz
-r"' 4ki
MOW
Al
AAL
A4
............. . . . . . . . . . . . ......
•
- -----------
TIZrCr
-44
PERMIT SITE 1 (AFTER)
Total 5-Gallon Bucket Count =
PERMIT SITE 2 (AFTER
Total 5-Gallon Bucket Count =
PERMIT SITE 3 (AFTER)
Total 5-Gallon Bucket Count =