Loading...
HomeMy WebLinkAboutSeptember 9 rain event and sediment loss -- before cleanup.pdfProject # Y-5500JC Action ID# SAW-2019-01336 NCDWR # 20201838 - Rainfall total from Saturday 9/9/2023 = 1.75" (Tory Path/Helms Road Connector Job) - No erosion measure failed on site. The contractor did every protection method they could to avoid silt loss, but the intensity of rainfall caused some basins to overflow, resulting in silt loss carried offsite. - Contractor is taking every measure to clean up silt loss immediately. - Bucket count for each jurisdictional permit site will be reported as soon as possible. - Photos of before clean up shown below PERMIT SITE 1 (BEFORE) i t .y _ - �' ., _.ems° � �i� <• , il.- � __ - .- r,_ .. tir . ;r N a r / 4a. 3E 2rC.. f 1% V- m x 9!' i - H. � aL� lz -r"' 4ki MOW Al AAL A4 ............. . . . . . . . . . . . ...... • - ----------- TIZrCr -44 PERMIT SITE 1 (AFTER) Total 5-Gallon Bucket Count = PERMIT SITE 2 (AFTER Total 5-Gallon Bucket Count = PERMIT SITE 3 (AFTER) Total 5-Gallon Bucket Count =