Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2020-1723 project completion formDocuSign Envelope ID: 3FB92AD8-AOOE-4OC2-A31 F-EC175EB634E6
ROY COOPER
Governor
MICHAEL S. REGAN
serrermy
S. DANIEL SMITH
onector
NORTH CAROLINA
Environmental Quality
NCDWR Project No.: *"U "or ` l �✓ County: 's ( _i
Applicant:
Project Name:
)O 1
'DLt.l'VA, Pd�
Date of Issuance of 401 Water Quality Certification: J Z. f 2 t2
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
Applica{it's Certification
1, ✓"\ t / ( " fir l ` E ) , hereby state that, to the best of my abilities, due care and diligence
was used in the(observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, aryd-otheer supportin materials.
Signature: Date: �0
1
Agent's Certification
1, _ , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Engineer's Certification
Partial Final
1, , as a duly registered Professional Engineer in the State of North
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Penuittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
DEQ�� Not thCarat naDepartment ofEnvlronmentaIQuality I DlvlsioaofWaterResources
512 North Salisbury Street 1 1617 Mail Service Center I Raleigh, North Carolina 27699-1617
919.707,9000