Loading...
HomeMy WebLinkAboutNCC232728_ESC Approval Submitted_20230912 4 srnnrE" tri ROY COOPER t.7 . ' Governor f7� �y ate: ... Y 4, ELIZABETH S.BISER �`4 ,,.,,a 4 4,� Secretary "`'" . ge DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality May 24, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Atlantic Telephone Membership Corporation ATTN: Keith Holden,General Manager/CEO P.O.Box 3198 Shallotte,NC 28459 RE: Project Name: FOCUS Broadband ReConnect#3 Robeson& Scotland County Acres Approved: 29.29 Project ID: SCOTL-2023-011 County: Scotland, City: N/A, Address: See Plans River Basin: Lumber Stream Classification: Other Submitted By: McGill Associates,P.A. Date Received by DEMLR: April 26, 2023 Plan Type: New-Utility Dear Mr. Holden: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required(G.S. 113A-54.1)(b). As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the$100 annual permit fee. After the fee is processed,you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Paul Clark at paul.clark a,ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.A$100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the future,the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the COC,once it is received. 3. Records of inspections made during the previous 12 months. sA J� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Fayetteville Regional Office I22S Green Street.Suite 714' Fayetteville.NorthMi Carolina 28301 WammemC4avh.memaiw+mvmnu f 910.433.3300 Letter of Approval with Modifications Atlantic Telephone Membership Corporation May 24,2023 Page 2 of 3 Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a)requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. 9S' ely, a. Evangelyn owe -Jacobs Environmental Engineer DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet ec: Alex D. Lapinsky,McGill Associates,P.A. Thomas Milligan, Scotland County Inspections Office Dixon Ivey, Robeson County Inspections Office cc: DEMLR-Fayetteville Regional Office Letter of Approval with Modifications Atlantic Telephone Membership Corporation May 24,2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: FOCUS Broadband ReConnect#3 Robeson& Scotland County Project Number: SCOTL-2023-011 County: SCOTLAND Provide one full-size copy of the revised plan sheet(EX-101)corresponding to the e-mail/PDF received in the NCDENR office on May 23,2023,prior to beginning any land disturbing activity. Please submit one reduced size 11X17 hard copy of the entire plan for our field use. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities