Loading...
HomeMy WebLinkAboutNCC232721_ESC Approval Submitted_20230912 ROY COOPER Governor xa ELIZABETH S.BISER Secretary �gwi DOUGLAS R.ANSEL NORTH CAR0LINA Interim Director Environmental Quality August 31, 2023 LETTER OF APPROVAL WITH MODIFICATIONS Meritage Homes of the Carolinas, Inc. Attention: Tim Sheehy, Vice President of Land Development 13925 Ballantyne Corporate Place, Suite 300 Charlotte, North Carolina 28277 RE: Project Name: Seattle Crossing Project ID: CLEVE-2023-028 Acres Approved: 25 County: Cleveland City: Shelby Location: Seattle Street River Basin: Broad Stream Classification: Other Submitted By: Peeler Engineering Date Received by LQS: August 17, 2023 Plan Type: Revised Dear Mr. Sheehy: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. • As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deg.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: QNorth Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources DE ) Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville,North Carolina 28115 /�� 704-663-1699 Letter of Approval with Modifications Meritage Homes of the Carolinas, Inc August 31, 2023 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Mena Awad, Assistant Regional Engineer Land Quality Section MA Enclosure: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Peeler Engineering Attention: Caleb Peeler, PE 211 Patton Drive Shelby, North Carolina 28150 North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 Mooresville,North Carolina 28115 r. 704-663-1699 Letter of Approval with Modifications Meritage Homes of the Carolinas, Inc August 31, 2023 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Seattle Crossing Project ID: CLEVE-2023-028 County: Cleveland Reviewed by: Mena Awad, PE 1. A revision request was received to change the names of the landowner and the financially responsible party and adding10 ft of sidewalk along Seattle Street. It appears that the financial responsibility/ownership Form and Erosion and Sediment control plans have been revised to include those changes. However, the Limit of disturbance must remain under 25 acres as shown in the original financial responsibility form. 2. All modifications listed in the Letter of Approval with Modifications dated February 17, 2023, shall be followed. 3. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities North Carolina Department of Environmental Quality Division of Energy,Mineral,and Land Resources _ Mooresville Regional Office 1610 East Center Avenue,Suite 301 1 Mooresville,North Carolina 28115 w�.� 704-663-1699 ‘1141 z $:1, w .0 0 p 0 •tit 0d0zE• - 4 1 ai W r..i - .0 C O 0 0 W o 4N Cd .- cl ▪ 1 2 a,..4 .+,., „,:,,,_,:_,„ .., .,C ck„,,,..., , •l CC . .i. c I (..„) N Y �� 2 (Ni. 4.4: al I Z • vaAda In o W : ^ , = cu 111 w 4 09- Li �' p PZ +�•� Pi It V1 O L U t U �P, o F� 0" O 6 6 No Z N 6 al czt ti. • -412 �, N ° O ''0 et t� C en0 Li °' A„ " e'" '� 6 A el et U ct cV U Fact Sheet on the New NCGO1 Permit April 2019 p The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably,there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.Rov or(919)707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; e-NOI: Notice of Intent,application form for the NCG01 permit • Is clearly organized by topic; and e-NOT: Notice of Termination,form for closing out the NCG01 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1 Technical Updates • LW The new permit: • Requires that the E&SC Plan meet SWPPP requirements(p. 2); _ 4 ` ` pop 111' • Provides a list of items that must be • included in the SWPPP,such as the ,.. construction sequence, plans, calculations, etc. (p. 2-4);1 • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record-keeping and reporting in The NCGO1 Process "calendar days"for clarity and The new NCGO1 applies to permits approved on or after April 1,2019. consistency(p. 11-14);2 Permittees will no longer receive a copy of the NCG01 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm > 1.0 inch (previously 0.5 inch);3 and Under the new NCG01 process,construction sites will continue to • Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before. After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCG01 by place (p. 23). completing an a-NOI (available at deg.nc.gov;NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. 1 This list is based on website guidance by the DEMLR Sediment Program. Initially,there will be no charge associated with applying for an NCG01 2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a$100 selected to be as equivalent as annual general permit fee as required per§143-215.3D. possible with the previous permit: DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCGO1 to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at DEMLR.