HomeMy WebLinkAbout20150807 Ver 1_Permit_Request_Drawings_20150810�
�
�
m
SB�• SHOULDER BERM �UTTER
SBG —L— STA. 14 + 16 TO STA. 14 + 57 LT
o°
X
�
TERU�HIA 3o MCNAIR
DB 372 FG 183
o°
��✓ �i � I� �
� ��°`�� � I C
T� �TMCNT T�cvr R� ,
«�
z � � ����V T ���C, � �
_
O _ Nq JE
�' L !IV
W /3 /O 3�.9" �� �_ % � � � E
� � S�, 3 OPE� ; ROP
` ` = 2= S.T / E= 'q
�
� �
�
Zr�'l-L �� � �✓ �' —
—� —
--�`Z�/�a�
ExisTi�� R
BEGIN TRENCHLESS INSTAL_�T�ION
UG_WATER STA, 5+00,00 �,{
-L- STA, 12+15oO0 gEGIN PAVEMENT �7�K
-L- POC STA. 12+75.00
(TIE TO EXISTING)
��✓(JD�j
�
�
�
w
�
N
�
�
�
�
WETLAND AND SURF,ACE WATER IMPACTS PERMIT
CENTER BRIDGE STA.13+88.00 —L—
55' LENGTH; 1 SPAN
21" PCCS; 90° SKEW;
27'-10" CLEAR ROADWAY
BEGIN TRENCHLESS INSTALLATIOV
UG_DISCH STA, 5+OOo00
-L- STAe 12+15e00
PO�KET �
W �
0
� �,
\ � �
_�
�_
Fr �
BEGIN TEMPORARY BORE HOLE
W/ 8'X4'X9' SPLICE PIT
UG_POW STA, 5+00°00
—L— STAo 12+q0�00 24'RT
6" DISCHARGE LINE
10' BELOW BOTTOM OF CREEK
o°
�
M BEGIN APPRCACH Si_AB
-L- STA.13+qg,50
SITE 2�
��'_�1�G WATER���LI E-�
� _ �H-
�r SR l30/ �
2/.6' BST
� —
�P P OP U/G WATE
�� � �G P��
SITE I
�
TERPa CORPORATIOf�I
CB 290 PG 320
WET�AND IMPACTS
FILL IN TEMPo PERMANENT
WET�ANDS CLEARI�NG CLEARING
SITE I 86 SF 317 SF --
SITE 2 210 SF 408 SF --
SITE 3 q SF 223 SF 28 SF
SITE 4 III SF 540 SF �2 SF
R�i�i
CLASS II RIPRAP
�
!_� �
6" WATER LINE ��/
10' BELOW
BOTTOM OF CREFK�
�
�
_
BRIDGE #930012
30' LEI�GTH= 28' CLEAR WIDTH
I SPAN (I@30')
��
� �
�
� �
� �
O N
� w
5 w
� z
`
�
� o
0
+ 1V
�
SKEW
OUTLET DATA
Q10 = 0.4 CFS
V10 = 0.2 FPS
INV. EL. = 1.00'
a=
0
w �_
a= ��
ti O
�O
O
BET � Y Na STl;LLINGS
DB 283 PG 272
EST. 1 TON CL-B RIP R.4P
EST. 5 SY FILTER FABRIC
I� APPROACH SLAB
- STA.14+27.50 O
�
�
SITE 3
W�OD� �
END PAVEMENT CO
-L- POC STA.15+98.00
(TIE TO EXISTING)
�5� �OCK� T ,
PROIECT REFERENCE NO. SHEET NO.
SF-9300/2 /
MY SHEEf NO.
ROADWAY DESIGN HYDRAU4CS
ENGINEER ENGINEER
PRELIMIN Y PLf�NS
no Har oee eo con5rnvcr�oN
END TRENCHLESS INSTALLATION
UG_DISCH STA.8+81�23
-L- STA, 15+98,00
- a /
—'I EY;S I ING R/W
N �
N 25 57' S2.8" V✓ � � Q �
� °o 0 0 0 � o 0
i P / T R L N� -- —�—
,--
� �s. ��°'
-- - �� -
rOCKET g �
o°
+
;
'�� �''—�-j- —�,�_r-� `� . �
-- _ _� — — �"
>�A GE LIf�E��1�2E A �>� ��� m =
° w Ncr.°3o8 `'� N��� s.3° w
o � T�-�+t� 308 —�
_ `;
— — —�V— — -- — —�� —
��,�6"PVC I —' Fo-
� �
— �
--�k S � ING P,/'N
� CLASS II RIPRAP S I T E q � �
� END TEMNORARY BORE HOLE
W/ 8'X4'X4' SPUCE PIT O
UG_POIN STAo 8+03002
-L- STA, 15+40,00 24"��T JAMES INo HA�/I�TON
TEMPCRARY I-8° COILAB�E CONDUIT ����OCDS DB �21 PG �02
10' BFLOW BOTTOM OF CREEK
UTILITY OWNERS ON THIS PROJECTe
WRSHINGTON COUNTY PUBLIC UTILITIES DONINION NORTH CAROLINR POWER
UTILITYo WATER UTILITYo ELECTRIC
CONTACT; LOUIS MqNRING PHONEo 866-366-4357
PHONEe252-793-7545
-- - -- � CAMA JURISDICTIONAL
IN-WATER MORATORIUM FROM
FEBRUARY 15 THROUGH JUNE 30
METHOD II MODIFIED CLEARING
PERMIT DRAWING
SHEET OF
END TRENCF�LFSS WSTALLATION
UG_WATER S' a 8+86v08
-L- STA, 15+g��00
� DENOTES FILL IN WETLAND
DENOTES TEMPORARY HAND
T C H CLEARING IN WETLAND
TEMPORARY IMPACT
�DENOTES PERMANENT HAND
CLEARING IN WETLAND
PERMANENT IMPACT
ALL WETLAND AREAS DETERMINED BY CLAY WILLIS
DIVISION ENVIRONMENTAL OFFICER AS WETLANDS A,B,CyD
40' 20' 0' 40' 80'
�
m
:
m
SB�• SHOULDER BERM �l1TTER
S BG —L— STA. 14 + 16 TO STA. 14 + 5 7 LT
0
x
�)
TERU �HIA �� MCNAIR
DB 3 �2 FG IR3
o°
���ODS
�R � T �I/�� \ � � �'� _ �C r � R/ �, -
NT
� == P� �+I %U� ` --_ � �
0 3 0 <=\_ �C=� \�vE _
� "37g>W � %�� / � ��
` S� �3�� �� ',� ROPER
-� � 2/,6� � _,_,
�-��� �ST � �
� _ I -�— �
-- — � --- �-_ - _
(,� - - � -
- - r�✓ � �
_ =' � � � ' _ _
�
�
�
�
�
>
�
�
�
�
�
EXISTIh� R ��
BEGIN TRENCHLESS INSTAL-A�'10�1_- --.
UG_WATER STA, 5_+_IlC1e80-- - F
-L- STAe 12+15oOC gEGIN PAVEMENT
-L- POC STA. 12+15.00
(TIE TO EXISTING)
WO���
WETLAND AND SURFACE WATER IMPACTS PERMIT
CENTER BRIDGE STA. 13 + 8�
55' LENGTH; 1 SPAN
21" PCCS; 90° SKEW;
27'-10" CLEAR ROADWAY
BE�IN TRENCHLESS INSTALLATIOU
UG_DISCH STAo 5+00,00
-L- STA, 12+15,00
25'
- PocKET o
�
—L-
6" DISCHARGE LINE
10' BELOW BOTTOM OF CREEK
o°
+
� f3EGIN APPROACH S�._AB
-L- STA. 13+qg.50
SITE 2,
��G WATEF
� --- rr SR 13D�
� - e-- -
� � -- 2/.6' BST
� —
� � --- �UP U/(
_ � �
- ���-
r� r*
SITE I
w �
�,
� �
�
� �
� w
O N
y W
� W
�� �
`
� o
, � �t o
T
� � 1 ` \1F�
,) , p
SKEW ;
�
+49 j � � :
CLASS II RIPRAP � i ; �
, � : '�
OUTLET DATA
Q10 = 0.4 CFS
V10 = 0.2 FPS
INV. EL. = 1.00'
a=
0
w ��
a� ��
ti O
�O
�
BET � Y No ST�LLINGS
DB 283 FG 272
EST. 1 TON CL-B RIP RAP
EST.S SY FILTER FABRIC
°o
+
��
�SITE 3
N 25° 57'
WOOD� �
END PAVEMENT �°
-L- POC STA.15+98AQ
(TIE TO EXISTING)
/5' `'���t7 q
PROIECT REFERENCE NO. SHEEf NO.
SF -9300/2 I
WrV SHEEf NO.
ROADWAY DESIGN HYDRAU4C5
ENGINEER ENGINEER
PRELID'IIN Y PL.4NS
no war ues eo coNSra�cr�ou
END TRENCHLESS INSTALLATION
UG_DISCH STA� 8+81�23
-L- STAo 15+98,00
°o
�
�
EX�STING R/W � ,
�- -_ "t7-�_� �-i. `
V�&TEf�IiVE = � _ _ — _ _ _-�- -`_ _ -�_y-� � � r ,
—F— - t
' � T �� � �'� � ��� ��f�L�r--j�tPE— � ���— � � -
T , ir �� \� _
, ,
N - o x TO �
�' - - � � � �-- W NC 308 N � 5�� I�:3�
� o 0 0 0 o ro '` T 8—�+tE 308
-- —
- -- — - � - - � ;- -; � —
f ��v — -
--
--- --- �- — - — — — �'— —
�R L NE- — - - -- � �-�V � - ` -i� FL1
_ � " ��s'���°`� � . ��-��� — —
--� _
- - -
- - --
_ - -- —r" � ' �X S T1i�G R/'N
�OCKE T g ' -
�� �c�a,ss u RiPRa,P SITE 9' ,��
� END TEMPORARY BORE H . END TRENC',LESS 1NSTALLATION
UG_WATER S'�4, 8+86a08,' _
W/ 8'X4'X4' SPLICE PIT--� IdE> 5� �.� � -L- STAo 15+9�.b0--- -
BEGIN TEMPORA'�Y BORE HOLE � /<<� � UG_POW STAo 8+03002 Ye� , w�.r�tiuU r�+sAY
W/ 8'X4'X4' SPLICE PIT j � -L- STA, 15+40.00 24"��T JAMES No HAMILTON
UG_POW STA, 5+00,00 J 6" WATr R LINE — n� �NOC�D�
-L- STAo 12+40�00 24'RT TERRa CORPOPATI01�1 10' BELOW � TEMPORARY I-8" COILABLE CONDUIT DB 421 PG 702
GB 290 PG ?20 BOTTOM OF CREEK� 10' BELOW BOTTOM OF CREEK
� �
2�
WET�AND IMPACTS
FILL IN TEMPo PERMANENT
�
WET�ANDS A� HAN
CLEARING CLEARING
SITE I 86 �F 317 SF —
SITE 2 210 SF q08 SF --
SITE 3 4 SF 223 SF 28 SF
SITE 4 III SF 540 SF 32 SF
_
BRIDGE #930012
30' LENGTHv 28' CLEAR WIDTH
UTILITY OWNERS ON THIS PROJECTo
WASHINGTON COUNTY PUBLIC UTILITIES DOMINION NORTH CAROLINA POWER
UTILITYe WATER UTILITYo ELECTRIC
CONTACTeLOUIS MANRING PHONEe866-366-4357
PHONEo252-793-7545
� CAMA JURISDICTIONAL
IN—WATER MORATORIUM FROM
FEBRUARY 15 THROUGH JUNE 30
METHOD II MODIFIED CLEARING
PERMIT DRAWING
SHEET OF
I SPAN (I@30 )
� DENOTES FILL IN WETLAND
DENOTES TEMPORARY HAND
T C H CLEARING IN WETLAND
TEMPORARY IMPACT
�DENOTES PERMANENT HAND
CLEARING IN WETLAND
PERMANENT IMPACT
ALL WETLAND AREAS DETERMINED BY CLRY WILLIS
DIVISION ENVIRONMENTAL OFFICER AS WETLRNDS A,B,C,D
q 0' 2 0' 0' q 0' 8 0'
Pl = 12+43.00 p� - 12f90.00 Pl = l3+15.00
EL = 4.06' EL = 5.l1' EL = 5.54'
Pl = l2f15.00 Pl = 12f65.00 Pl = 13f45.00
EL = 3.86' EL = 4.44' EL = 5.75'
BEGIN GRADE
� � STA. 12 +15.00 BEGIN BRIDGE
CI CV _ ? 4L�
CENTER BRIDGE STA.13+88.00 -L-
55' LENGTH; 1 SPAN
21" PCCS; 90° SKEW; Pl = 15+30.00
� GRADE ELEV. = 5.50' EL = 4.25'
Pl = 14+30.00
EL = 5.49'
., .. .-. � ........
--------�- _-_ -----...-----
���� .�� � _ ---...----- -
(
- 4/5%
__._..._....._..._._. .._.._ _..._._..____.___ � .._
—
_.__......_......__ _�_._._...... :....__...... :.. __�--,._.__._..
_.._ ........................ ..........._............................................................................... ........�
T.Q. S..wSE__�...,�` �..-
___ _ . _ ___
--�-- - �— — --- .� .�
_._...____.__._._..____�._.___.__ ____._..____._._._____ _.__.
�_ _._ _ __ _ i
- -�R . o�---c-�toRb--
12 +00 12 +50 13 +00 13 +50 14+00 14+50
�II��IEIE��]I$��T�T� ����]H[AL]f$�]E ]I���TIE
ST RUCT URE HYDRAULIC DAT A ��� IF � 11s �Es
DESIGN DISCHARGE = 660
DESI�N FRE�UENCY = 25
DESIGN WS ELEVATION = 2.2
BASE DISCHARGE _ 1185
BASE FREQUENCY = l00
BASE WS ELEVATION = 2.56
OT DISCHARGE _ 1750
OT FREQUENCY = �500
OT WS ELEVATION = 4.3
xROADWAY LOW POINT
CFS
YRS
FT
CFS
YRS
FT
CFS
YRS
FT
15 +00
TRENCHLESS DRILL NOTES:
- Al?ENTION IS DIRECTED TO SECTIONS 102, 107, AND 1550 OF THE
STANDARD SPECIFICATIONS CONCERNING TRENCHLESS INSTALLATION.
NO DAMAGE IS ALLOWED TO THE WETLANDOR STREAM BY THE
TRENCHLESS INSTALLATION. THE CONTRACTOR'S ENGINEER SHALL DESIGN
THE INSTALLATION METHOD AND ON-SITE OVERSIGHT.
- THE INSTALLATION AND VERTICAL BORE PATHS SHOWN ARE BASED ON
INFORMATION AVAILABLE AT THIS TIME AND ARE FOR PERMITTING
REASONS ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
DESIGNiENGINEER THE PROPOSED ALIGNMENTS.
— - i �- --�
15 +50
Pl = 15f98.00
EL = 4.00'
• END GRADE
STA. 15 + 98.00
Fi Fv — d nn�
�
16+00
I � � I I> (�� . � .
DIVISION OF HIGHWAYS
WA5HINGTON COUNTY
PROJECT:I7BP.1.R.61 (SF-930012)
REPLACEMENT OF BRIDGE
N0.930012 ON SR1301
OVER BEAVER DAM BRANCH
SHEET OF
06i 10/
Pl = 12+43.00 Pl = 12+90.00 Pl = l3f15.00
EL = 4.06' EL = 5.l1' EL = 5.54'
Pl = l2+15.00 P� -�2+65.00 Pl = 13f45.00
EL = 3.86' EL = 4.44' EL = 5.75'
BEGIN GRADE
� � STA. 12 +15.00 BEGIN BRIDGE
CI CV - ? 4L�
0
CENTER BRIDGE STA. 13 + 88.00 -L-
55' LENGTH; 1 SPAN
21" PCCS; 90° SKEW; PI = 15+30.00
� GRADE ELEV. = 5.50' EL = 4.25'
P! _ 14+30.00
EL = 5.49'
_E>/ =-�-5=-5�-'-----------�---
-{---- -- �—
T =77-.�4/5%_..._.� _..__
_.....__._.._..___ ___ ____.
�
_ .... _.. _ _ __..... .. _....._....._._.........._._........-��. ..
�
___. .............._...._..._..._._.__......................__.................._... ___1,........�
,� � 5 �,5�=�_�,_ � -
__ __._ __ �T _�� . .
_ �
.�. - -�--.- ------
12+00 12+50 13+00 13+50 14+00 14+50 15+00
�T�T�IE1I��1E$��.TI�T� �A�.�IEIE$ IG�I�TIE
ST RUCT URE HYDRAULIC DAT A ��� IF� � �Ie IEis
DESIGN DISCHARGE = 660
DESIGN FRECIUENCY = 25
DESIGN WS ELEVATION = 2.2
BASE DISCHARGE _ 1185
BASE FRECIUENCY = lDO
BASE WS ELEVATION = 2.56
OT DISCHARGE _ 1750
OT FREQUENCY = �500
OT WS ELEVATION = 4.3
=ROADWAY LOW POINT
CFS
YRS
FT
CFS
YRS
FT
CFS
YRS
FT
TRENCHLESS DRILL NOTES:
- ATTENTION IS DIRECTED TO SECTIONS 102, 107, AND 1550 OF THE
STANDARD SPECIFICATIONS CONCERNING TRENCHLESS INSTALLATION.
NO DAMAGE (S ALLOWED TO THE WETLANDOR STREAM BY THE
TRENCHLESS INSTALLATION. THE CONTRACTOR'S ENGINEER SHALL DESIGN
THE INSTALLATION METHOD AND ON-SITE OVERSIGHT.
- THE INSTALLATION AND VERTICAL BORE PATHS SHOWN ARE BASED ON
INFORMATION AVAILABLE AT THIS TIME AND ARE FOR PERMITTING
REASONS ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
DESIGN�ENGINEER THE PROPOSED ALIGNMENTS.
15+50
Pl = 15f98.00
EL = 4.00'
- END GRADE
STA. 15 + 98.00
Fi Fv — d nn�
�
16+00
�� I1�(��.�.
DIVISION OF HIGHWAYS
WASHINGTON COUNTY
PROJECT:I7BP.1.R.61 (SF-930012)
REPLACEMENT OF BRIDGE
N0.930012 ON SR1301
OVER BEAVER DAM BRANCH
SHEET OF
06 ,/' 10 /
Pl = 12f43.00 P� - 12+90.00 Pl = l3+15.00
EL = 4.06' EL = 5.l1' EL = 5.54'
Pl = l2+15.00 P� - 12+65.00 Pl = 13+45.00
EL = 4.44' EL = 5.75'
EL = 3.86' gEGIN GRADE
� � STA. 12 +15.00 BEGIN BRIDGE
CI CV - O OL/
�
CENTER BRIDGE STA.13+88.00 —L—
55' LENGTH; 1 SPAN
21" PCCS; 90° SKEW; PI = 15+30.00
� GRADE ELEV. = 5.50' EL = 4.25'
Pl = 14+30.00
EL = 5.49'
�� - ..__-��'-
r-
� ��
- lit � VVJC= I./
12 +00 12 +50 13 +00 13 +50 14+00 14+50
�TI�T�IEIE$�IE$�gT1�T� IElC�1E��1E��� II��I�TIE
ST RUCT URE HYDRAULIC DAT A ������ 1Fe
DESIGN DISCHAR�E = 660
DESIGN FRE�UENCY = 25
DESIGN WS ELEVAT/ON = 22
BASE 0/SCHARGE _ 1185
BASE FREQUENCY = l00
BASE WS ELEVATION = 2.56
OT DISCHARGE _ 1750
OT FREQUENCY = �500
OT WS ELEVATION = 4.3
=ROADWAY LOW POINT
CFS
YRS
FT
CFS
YRS
FT
CFS
YRS
FT
._._._. _ •�-_-Y ------
15+00
TRENCHLESS DRILL NOTES:
- ATTENTION IS DIRECTED TO SECTIONS 102, 107, AND 1550 OF THE
STANDARD SPECIFICATIONS CONCERNING TRENCHLESS INSTALLATION.
NO DAMAGE IS ALLOWED TO THE WETLANDOR STREAM BY THE
TRENCHLESS INSTALLATION. THE CONTRACTOR'S ENGINEER SHALL DESIGN
THE INSTALLATION METHOD AND ON-SITE OVERSIGHT.
- THE INSTALLATION AND VERTICAL BORE PATHS SHOWN ARE BASED ON
INFORMATION AVAILABLE AT THIS TIME AND ARE FOR PERMITI'ING
REASONS ONLY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
DESIGN�ENGINEER THE PROPOSED ALIGNMENTS.
15+50
Pl = l5 +98.00
EL = 4.00'
� END GRADE
STA. 15 + 98.00
FI FV — 4._n0'
16+00
�
1�T����
DIVISION OF HIGHWAYS
WASHINGTON COUNTY
PROJECT:I7BP.1.R.61 (SF-930012)
REPLACEMENT OF BRIDGE
N0.930012 ON SR1301
OVER BEAVER DAM BRANCH
SHEET OF
06/ 10/