Loading...
HomeMy WebLinkAbout20150793 Ver 1_J-015 Permit Drawings 760093_20150806l ll��li't c11;' �lc�i�iZ74vaf�r (Version 1.2; Released September2011) Project/TIP No.: 176P.8.R.58 - Project No.: NCDOT Contact: 17BP.8.R.58 - Br. 760093 Address: 1020 Birch Ridge Drive Raleigh, NC 27610 Phone: 919 707 6751 Email: City/Town: Ansonville, NC River Basin(s): Yadkin-Pee Dee Primary Receivin Water: Dr Creek NCDWQ Surface Water Classification for Primary Receiving Water Other Stream Classification: None 303(d) Impairments: None Buffer Rules in Effect IN/A Lenath Ilin. Miles or 0.07 Built-Upon Area (ac.) 0.19 Cross Section Description: Two 11-ft lanes w/ 1.5-ft shoulders � Daily Traffic (veh/hr/day): Desi n/Future: I Project Narrative: OADWAY DESCRIPTION North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR LINEAR ROADWAY PROJECTS General Proiect Information Land Use: ac. e Project Type: Brid e Replacement Date: 12/9/2014 Contractor / Designer: STV/Ralph Whitehead Associates, Inc. Address: g00 West Trade Street, Ste. 715 Charlotte. NC 28202 Phone: 704 372 1885 Email: Edward.Vance stvinc.com Count ies : Richmond CAMA County? No NCDWQ Stream Index No.: 13-23 Class C Two 9-ft lanes Rural and Agricultural Existing Site 0.16 ac. 340 (Year 2008): 290 per SIR ;•7�� e project l7BP.8.R.58 consists of constructing a new 55', single span bridge, 2T-0" out-to-out with 21" cored slab to replace the existing 28-9", single span dge. The project is in Ansonville, NC and is classified as a local road on SR-1148 (Grassy Island Road) over Dry Creek in Richinond County. The total projecY gth is 0.07 miles. The project does not create pennanent impacts Yo Dry Creek which is located in the Yadkin Pee-Dee River Basin. The project drainage ;tem consists of 2 drop inlets and 2 pipes (one each) that drain Co existing grade. A rip rap apron is located at the end of each pipe outfall and where sheet flow Il occur. The proposed bridge will require deck drains at all four quadrants of the deck. The proposed location of the deck drains is such so that there is no ect discharge into the surface water. AL DESCRiPTION he project is located in Richmond County in the Yadkin Pee Dee River Basin. The project does not create any permanent impacts to Yhe Dry Creek which i assified as a`Class C' water. The roadway approach work is minimized as much as possible to reduce the proposed project footprint. The rip rap apron at th pe outfall is installed to alleviate the potential for erosion. ReforesCation is planned to re-vegetate the environmentally sensitive area around the bridge site. References DO � • � . � � 0 � ., � V � O � � � � I O V • � � V � � O V � � BEGIN PROJECT 17BP.8.R.58 -L- STA.12 + 13.00 E T'O SR 1168 __ THIS PROJECT IS WITHIN A MUNICIPAL BOUIVDARY. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. ����� �� ����� �������� �������� �� �������� RICHM0I�D CO U1�TY LOCATI011t: BRIDGE #760093 OVER DRY CREEK 01V SR I148 (GRASSY ISLAND ROAD) TYPE OF WORK: GRADI11lG, PAVI11tG, DRAI11lAGE, £� STRUCTURE WETLAIVD � SURFACE WATER IMPACTS PERMIT BEGIN BRIDGE + ' -L- STA.13+63.9A,, /� SIT�E 1 � / - . - � , =END' BRIDGE • � , � • ' . . • ' , ' ' y . -L- $TA.e74+18.00 . • . � , • ' . , . . . . . . , f,,' - � __,,...____--- _e- � .-,,:__�._'_'_"'_ _x`_�A < ? m .� SR 7148 ISLAND ROAD) . - " ' � . • ` , . �w� , _ �' , • . , . � . . � �.,� �� ��. � eC, 7L ,�.,� �.a.� ..�..�.� �. 176P.8.R.58 P.E. 17BP.8.R.58 R /W & UTI PERMIT SUBMITTAL SUBMITTED: 5-27-15 SUBMITTAL #J-015 � � � �� END PROJECT 17BP.8.R.58 -L- STA.15 + 68.00 TO NC 109 � � SMITH-ROWE, LLC � STV/ Ralph Whitehead �ssuciates, Inc. Permit Drawing 960 West �r�de s., sre �,s �199t 1 Of 8 cr�arr.�� vc �azoz NC License Nurciber F-099i GRAPHIC SCALES DESIGN DATA PROJECT LENGTH I'1�AeYS PREPARED Fon THE NCDOT BY: �G NEER CS STU/RALPH WHITEHEAD ASSOCIATES, INC. 900 West Trade St., Ste. 775, Charlotte NC, 28202 2� �� 0 2� 40 ADT 2010 = 290 NC License Number F-0991 MOR LENGTH OF ROADWAY PROJECT 17BP.S.R.58 = 0.057 MILES 4�, �F N c� D H V = N/A 2072 STANDARD SPECIFICATlONS ;�' ,O� PLANS D= N/A �'HGTH OF STRUCTUR� PROJECT 17BP.8.R.58 = 0.010 MILES PE w ' 20 10 0 20 40 0* TOTAL LENGTH OF PROJECT 17BP.8.R.58 = 0.067 MILES sicNarune: � e T= 6/o RIGHT OF WAY DATE: GERALD H. McCAULEY, PE ROADWAY V= 55 MPH IVV1Y ZO� �LO�4 PROJECT F,NGINEER DESIGN Asp'bl �O' PROFILE (HORIZONTAL) ENGINEER °j' *��"' * TTST = 3% DUALS = 3% LETTING DATE: ETHAN P. WRIGHT, EI 4 2 0 4 8 NCDOT CONTACT: VIRGINIA MABRY FUNC. CLASSIFICATION: MAY 20, 2014 rno�scr nESrcxEn LOCAL-RURAL Transportation Program Management Unit PROFILE (VERTICAL) PE. SIGNAT(IRE: � PROJECT REFERENCE NO. SHEET NO. LEGEND STREAM & WETLAND PERMIT IMPACT � OBP9R58 4 SMITH-ROWE, LLC ILW SHEET NO. AREA (AC) LENGTH (FT) �� SITE 1 11 ROADWAY DESIGN Hvoa.4uuc5 �DENOTE$ IMPACT$ IN O ENGINEER ENGINEER SURFACE WATER PERMANENT 0.01 50 I 1' � SW IMPACTS �� � _ �� � STV/RalphWhitahaadAssociates,lnc. DENOTES TEMPORARY � soo west r�a�e s�., s�e. � IMPACTS IN SURFACE WATER TEMPORARY � � cna�io��e, Nc 2a2oz N SW IMPACTS 0.04 60 ^}f� Q Nc i..oe�se �un�b=r F-oea� � DENOTES FILL IN ;� � 5�� �^� �� FILL IN WETLAND WETLAND °�01 , ; '� SEE FIGURE �DENOTES HAND � CLEARING CLEARING 0�0z - ;� SITE 1 - - -eu- - _w�.s+- -- - � _. _ _ ... __. . .- - -"-B- - - .. - . . . - - ° ° - - - _ .'"��c,e v_ - - - - � � - - - - - -.e.e � - - - - - � DENOTES EXCAVATION ��� � � �� � y ... � � � * x � � EXCAVATION � 0.01 � IN WETLAND IN WETLAND I � ��-°'� �:�� : Y ~� BR/DGE '760093 � r JOk'PI MATHESON III �� � * : � � _ � , � DB T54 PG �1�- � � � � Y � � � � - � M � c� � * ` - * PB 12 PG N �� � * * r � � �p r �� � � �� '� � N A °� � * � c�� � � ' � x JORDAN 0 LLC. 0'� f * _ * � , i t` ; � �``J DB 1027 � I�0 ' '� �, Y _ � � ,� �6� . EXi�T:NG Riw � - ... - - - * --� _.- .,-,. ' `Y. --- ` � �fl �--- - � . -. . � `• � -%K:;,��y;r�:�- J--s:;, ,srti, w � — �---aa, - - - - .. -.. _ ., . . <, ---- — �� �_ .. .. _ -t�r ��� -�''.. .i .; ry✓' „ �-, . _ . . . � . ,. �: �,-.: . . . - - � � � _ .Y ., �:-'w� . - . �. �;,.,-4- �' �,.� ., ` w�- � � ------- - - - '_ _ - - -e�.- - - „ �' ' � � � ____- .. ���.� - � � -�-� ��' �� . --- i F --� �� —> - F ------�-_.____ _-- � __ F � - � -- -L- y _ __ _ __ _ __ _ _ _ _ _ _ "; � �� ��, � �� � � SR 1148 (GRASSY ISLAND RDl � I — _ _ _ . _... _ , --� --- --- -- --- - ---- _ . _ - -- --- -- ------- - , - --- - . I_ r-- - — � _ F -- — - --- ------- i - - -- __-f - --- ---�-- — ---- 1 � -� _--� -� <. / - --_ --- -- F ---- � ------ �.�__ � _ _ - -- , �____-- -�_-- --�� _�F : F F F F i5 --�� � -'^e-- � .. --- -- — ------ � - -- , ' Exisrinr , i� - --- ------- � , ,. , , _-_ - - — — -- = - �,,,L - ' �- .. � � }� � Y v i . �_.� ��_� � �� —� x �� � �:, � ,� �� '�, — ��� e ? 4 � � * � ��. M� .� _ _ _ x — � � � � ,a �� � - ,� � � � � � � — , > ' ; ,1 '"'�" „:�„,�^'1``'1`" ,' ,. ;\ ,' � � . ,, ` x * � � � �. ,�� JORDAN OI�E. LLC. � � � y + � � % ° : : * � ' ! ; DB 102T PG NO i * �, kATHESON FAMILY TRUS� � � ' ' i i�� ,-�11D � = HAROLO T. & BETTY 5. Y r _ _ � - � _ . 40' 0' 40' -` e�.-'=°�---------�---� -eu � ---�r __ DBB93 F.G,1;145�e---- �------e�- \_ �� � Permit Drawing : Sheet 2 of e — — GRAPHIC SCALE 224 ,. _I; I::: ; �I �. . , - l:: I ! 1: : !:.: ',: �.: ',: _; :... �. �i.. :.:. ...�. �- i � 220 ,. .i.� ,,... .-�,_ - �: .-�_ _' ' : . � fi I-�, rF _ . � 216 BEGIN PROJECT srai2+ism EL = 2/092' - 212 � m � � % 208 S �n E: s � 204 � � �, � 200 � E C O � 196 w � � � � w � 192 �; o�. N� N� 11 �� _;_ ' I ! I . _r: _i I I : : : : : ! : : , . � � ' - - � - - - � j_ - �. - - - - }. :, . : . : ;, _{. ..; I , :, ,, :, ,: : : : . : � -�- _- - - � � _ _ �: _ _ � _ . -I -- .... .. r ,-r- - �� . .... .... .... .._. .... .:.: .. . .:.. , - -- - - - - - - _ .� :... .; , i ,i . ,_,. _ : .... .:.: ..:. .:.. :.:. .. . :.:. i ii. i..�i _...i .i i.__i r._. i._.. ii.... i._. .i ,� , ir'. i i ii i � lii il i li I il .:i i i.: i. i I i - _ �:-:, �.___ _-� __. . I �. � � ; � , j : : : i , ��. _ �.. ,. _ _, ,�_ T�„�_ I I � � 1 � � �I i , � _ ��,,__ T ,� I ; ,�- �' ,' „ � ,,. Pl= 12+60A0 ' TO/BEINREMOVED i -- EL = 2/027' , , Pl = 15-F08A0 VC = 94' BEGIN BRIDGE , i EL = 20947' , _ K_� END BRIDGE � i VC = l20' � STA/3+63A0 OS =480 MPH OS = 45 MPH STA/4+/8A0 i PROPOSED GRADE � 12 13 v�i ..... ...�: .aoa. .�..�. ua� oo� uu� 14 k�k�illi�lilijliil�lila�'ili EL = 209JY - EXIST (-J0.?Jll% EXISTING GROUND 15 16 224 220 216 212 208 204 200 196 192 PROJECT REFERENCE NO. SHEET NO. LEGEND STREAM & WETLAND PERMIT IMPACT � OBP9R58 9A SMITH-ROWE, LLC ILW SHEET NO. AREA (AC) LENGTH (FT) ��' �, ` S I T E � 11 ROADWAY DESIGN Hvoa.4uuc5 �DENOTE$ IMPACT$ IN � � O ENGINEER ENGINEER SURFACE WATER PERMANENT 0.01 50 �� 1' SW IMPACTS �� STV/RalphWhiteheadAssouates,lnc. DENOTES TEMPORARY � o0o w.si r�a�e s�. s�e. s � IMPACTS IN SURFACE WATER TEMPORARY 0.04 60 � `�� � � N_i�.e�se��uneerBF��ee= i SW IMPACTS � � ! i� �O DENOTES FILL IN � � ' �� � � FILL IN � / i � WETLAND WETLAND �'�� � �� � SEE FIGURE i � � . � � � DENOTES HAND �' t '� , � � � HAND � -._. � r _.u���,e m _ � ._ -.ee � -. CLEARING 0.02 - . _.. . _ _ e e �, CLEARI NG � - -%-�- . _ J i i � � 1 _ _ns- �.- - - - ._.. ... __. . . _. .- - -'�- - - " s m ;- �DENOTES EXCAVATION EXCAVATION _ �/ Y - � � ' � �I� � � y � �� �, � , :�.�,� , .- �� _ � � � � L � � * BR/DGE '760093 IN WETLAND IN WETLAND <0.01 � '� i , � �I�i .. * r "�.,,y JOk'PI MATHESON III � * : � � � � � , � DB T5� PG �14� � � � � � � � � � � � � - � � � �� � � � � � � < ��: - * . PB 12` PG N �„ � Y � (O � m �1. - _ _ -.. i, � � . - * \� � � , E N '�,q j 2� � , * � � < -' y Y � _ s� JORDAN 0 LLC. � � "° � � � � � , � * x � * - /-- `� DB 1027 � I�0 �� �'� - - , � � f � - �6� , , �. � � : - --txISTING r�/w = _ '� - -� -�, . -� ' - _- '__ .-'_. _"—_ . � ` , .,-�'.n:".ru.r�:,�_ .'�i-z .,,�' „ ,' � -__ EXISIIi� _ � _ _ . _ ,. .. .. . . ._. . - - � `" s._= - , _ ___._ __�� .. .. .. . . �,- .:�,.. . ... _` . __ __ `� .1 "_ .. �:�4 �u ;r � :. � ,_.. . C - . _ . F,��. - -_ - - � _ ' ----- ' ��.x*-'^- - -- _ -� --- .�.��� , � , ., �. ' _ - C - > . -� =� �� , _ F------- _�-- F . _ _ - . � , F-��_► �',, .. . `' ._--- -------...__. ------:�,-'--- -------.__.._ � , .. _ - -------F ��.I-- --- - _. , -.. __. . , ... . . . .. _. . . .. -- -- -.. . . -----.. . . . _ . . . _ __ _ ... � � -L- � : � � SR 1148 (GRASSY ISLAND RDl � ^ __- —, -- -- -- _. ._ - --,_ __ ', _ -- -- -- -- -- --------- --------- r -_ , -- � _ - T � F -------� �� - - �---p - -- ---- - ... - -- - - - --- EXISTING R/W — _ `. ` .. � .. .. � I I I I I � I i i i � � a� � � I / � i i __�__- � __._- � _ � %� \�.� JORDAN OI�E,LLC. DB 102T PG 140 224 ,. _I; I::: ; �I �. . , - l:: I':.: ',: �.: ',: _; :... �. �i.. :.:. ...�. �- 220 j � , : : : _�,_ ` ' ,� ' : . � fi I-�, rF 216 BEGIN PROJECT STA /2+/3.Ob EL = 2/092' - 212 � m � � % 208 S �n E: s � 204 � � �, � 200 � E C O � 196 w � � � � w � 192 �; o�. N� N� 11 �� � �� ��� ,__.�... . .. \. -�� _- F -- ------.__--�-----.._._..__-- ---- ..---- --� . -. ��---- - �- ` _�f � F.- F F � -- ---- ~�' -- ------ F� --� - . . - � -------- --"�e-------- � s � _ � � --. . . . - -- - . . _ - � . . _ ... � ', .. „ _.. . � . ��.,_,.",,.,.,: _ ^,�. .. �_ .Y � .. � � � � .. . EXISTING R/W , . . . y . . *. . � \ . � * � � r s` `� ���� ` � � � - � x - � � � * - _ � � �� � J m * � Y \ -. }.' � ... � ' � � Y � / ' ' .. - s � s 7 .. -� �' /, �' � "�+ . `1,�~ x � t / � � x _ �. � � t ,y ! � � �� � � � � � _�/ � * � �� � � kATHESON FAMILY TRUS� Y � � ' ' i � � . - � �� = HAROLO T. & ETTY 5. r i * � * " : . �' ��ev � ----`-°-- DB B93 F�45------ �------�- 4�� �� 4�� `_gm--..._----_'_-_'_._- � .�� Permit Drawing Sheet s of e — — GRAPHIC SCALE � , , � .._ ,- , , , .: ,. _;_ � ! � . _�. _� I � : . � . . � I - - I , , _I. ..; � : ; � -�= , ..} . __ , „- -��. ,,.. _: .... .:.: , _ .� :... .; , i ,i . ,_,. _ : .... .:.: ..:. .:.. :.:. .. . :.:. i ii. i..� _ � ,. ,.. ; ! � T� i, i'_� � lm_ � � I �._: �-._ _, �_. I' f ',�. �' :;- I I: :: i, �._ � � � , 1 EL =l2/ �m �TO/BEINREMOVED VC = 94' BEGIN BRIDGE K = 90 STA/3+63A0 OS = 45 MPH PROPOSED GRADE � 12 13 v�i ..... ...�: .aoa. .�..�. ua� oo� uu� 14 STA/4+/8A0 I + i !-F-�-t-i i + Pl = 15-F08A0 EL = 20947' VC = l20' K = 43/ OS = 80 MPH k�k�illi�lilijliil�lila�'ili EL = 209JY - EXIST (-J0.?Jll% EXISTING GROUND 15 16 224 220 216 212 208 204 200 196 192 � ,; �< ��'�. r '� � ' JORDAN ONE.LLC � OB 102T PG NO � �_ HAND CLEARING � �� ���—� �� EXCAVATION � IN WETLAND ���i.��.�r���.r.. � a m -, �,. � ���. � � PER�1! NENT IMPA�'rTS � �= IN Sl�'tFACE WAT�R� � �' �� � Y '� �' 3 HAND CLEARING � '��' � .i, \✓y� JOHN MATHE�ON III � ` � � � � D8 75� PG� 414 � TEM�ORARY _IMPACTS PB 12 PG 14 - �- � IN SURFA��E�WATER � � :1 ` � i; �.`� - ._ Y _ . _ � - __ ' � . �� - - _ -1 " " _ _ _ ' " ' y.. . ) J �. - __ . .— a� � - „ � _ _ ` , , . �T� `'i�' L. ; v _ .� �.. �T�.. ��rC�}.� �� rJ ��l.�U "�J� .1' � �' --------F �\-= ---�'F T5 S ' _ \ s �-� �_ �_ _ _ _ -� �'_- _. T PERMANENTIMPACTS � � ���} IN SURFACE WATER ` JORDAN ONE, LIC. ��" DB W2T PG 140 TEMPORARy IMPACTS � IN SURFA�E WATER � ' � `�� �l� � �� ,�. , � � _ - � 'f � LEGEND �DENOTES IMPACTS IN SURFACE WATER �DENOTES TEMPORARY IMPACTS IN SURFACE WATER �DENOTES FILL IN WETLAND �DENOTES HAND CLEARING �DENOTES EXCAVATION IN WETLAND � \ � m "� ` �i /F F � �- ��—.�.,� .. < . _ .. . _ HJ ._.. � — -_ . C _ _ �- '-- _ _' �i '! �Pt'_' _ � F F C C H H —' .-_ -�_ F F iC F__ F__------- F F__ ` --- --- FILL W WETLAND ------___F .a �a ia 6t ISA 6a �\_ � ----- i /� ' i'__— PERMANENT IMPACT\ IN ?�SURFACE WATER � �a �t _ �� , i —L— ISSY ISLAND RO1 f_---___� -- ------------- F �— , • � HAND CLEA -v-,_("�—r!� �` � �. - LL IN VG�ETLAND G� STREAM & WETLAND PERMIT IMPACT AREA (AC) LENGTH (FT) PERMANENT 0.01 50 SW IMPACTS TEMPORARY 0.04 60 SW IMPACTS FILL IN 0.01 - WETLAND HAND 0.02 - CLEARING EXGAVATION <0.01 - IN WETLAND � � � � � C H __— H � C .� — HC �, � �, f�.,._ �d� �^�.--�.'1-.. ����- �f = �� � JAATHESON FAMILY TRUST NAROLD T.A BETTY S. , -- DB 893 PG 145 Permit Dr8Wing Sheet a of e 2�� �� 2�� GRAPHIC SCALE WETLAND PERMIT IMPACT SUMMARY WETLANDIMPACTS SURFACE WATERIMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 13+63 to 14+18 55' Single Span Bridge 0.01 0.04 50 60 -L- 13+40 to 15+28 0.01 0.01 0.02 TOTALS: 0.01 0.01 0.02 0.01 0.04 50 60 NOTE: 0.02 Acres of Temporary Fill in Wetlands in the Hand Clearing areas for erosion control measures Re��sea arairos