HomeMy WebLinkAboutNCS000395_MS4 Annual Report (2022-23 FY)_20230824 Storm Water Management Program Assessment Report
for Permit No. NCS000395
Reporting Period:
July 1, 2022 through June 30, 2023 (FY2023)
Co-Permittees:
Mecklenburg County, Charlotte-Mecklenburg Schools, Central Piedmont
Community College and the Towns of Cornelius, Davidson, Huntersville,
Matthews, Mint Hill, and Pineville
Report Date: August 2023
Report Prepared by:
Charlotte-Mecklenburg Storm Water Services
2245 Suttle Avenue
Charlotte, NC 28208-5237
/ ' / Charlotte-Mecklenburg
/ / d STORM
WATER
Services
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�services
—
Table of Contents
Section 1: Introduction 1
Section 2: Overview and Funding 3
Section 3: Stormwater Management Program Administration 4
3.1 Program Overview 4
3.2 Status of the Implementation of the Storm Water Plan in FY2023 4
Section 4: Public Education and Outreach Program 6
4.1 Program Overview 6
4.2 Status of the Implementation of the Storm Water Plan in FY2023 6
Section 5: Public Involvement and Participation Program 8
5.1 Program Overview 8
5.2 Status of the Implementation of the Storm Water Plan in FY2023 8
Section 6: Illicit Discharge Detection and Elimination Program 12
6.1 Program Overview 12
6.2 Status of the Implementation of the Storm Water Plan in FY2023 12
Section 7: Construction Site Storm Water Runoff Control Program 17
7.1 Program Overview 17
7.2 Status of the Implementation of the Storm Water Plan in FY2023 17
Section 8: Post-Construction Site Runoff Control Program 19
8.1 Program Overview 19
8.2 Status of the Implementation of the Storm Water Plan in FY2023 19
Section 9: Pollution Prevention/Good Housekeeping for Municipal Operations 21
9.1 Program Overview 21
9.2 Status of the Implementation of the Storm Water Plan in FY2023 21
Section 10: Total Maximum Daily Loads (TMDLs) 23
10.1 Program Overview 23
10.2 Status of the Implementation of the Storm Water Plan in FY2023 23
Section 11: Assessment of Storm Water Plan and Overall Program Effectiveness 25
Section 12: Program Enhancements 26
12.1 Status of Implementation of Work Plan Modifications for FY2023 26
12.2 Work Plan Modifications Identified for Implementation in FY2024 26
Tables
Table 1: BMP Summary Table for Stormwater Management Program Administration 4
Table 2: BMP Summary Table for the Public Education and Outreach Program 6
Table 3: BMP Summary Table for the Public Involvement and Participation Program 8
Table 4: BMP Summary Table for the IDDE Program 12
Table 5: BMP Summary Table for the Construction Site Storm Water Control Program 17
Table 6: BMP Summary Table for the Post-Construction Site Runoff Control Program 19
Table 7: BMP Summary Table for the Pollution Prevention/Good Housekeeping Program 21
Table 8: BMP Summary Table for the TMDL Program 23
i
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�services
Attachments
Attachment 1: Data Countywide (FY22 and FY23) 27
Attachment 2: Data by Jurisdiction 34
Attachment 3: Modifications to the SWMP for FY2023 41
Attachment 4: Modifications to SWMP for FY2024 43
Attachment 5: Pollution Prevention Educational Information Distributed in FY2023 44
Attachment 6: Industrial/Commercial Educational Activities 46
Attachment 7: Media Outlets and Outreach Results for FY2023 Media Campaign 47
Attachment 8: Measure of Success for the Public Education and Outreach Program 48
Attachment 9: Measure of Success for the Public Education and Outreach Program 49
Attachment 10: Promotional Items in FY2023 50
Attachment 11: Volunteer Recognition Activities in FY2023 51
Attachment 12: Measure of Success for the Public Involvement and Participation Program 52
Attachment 13: Fixed Interval Monitoring (FIM) Sites for Phase II 53
Attachment 14: FY2023 Fixed Interval Monitoring (FIM) Results for Phase II 54
Attachment 15: FY2023 Stream Use-Support Index (SUSI) for Phase II 98
Attachment 16: Measure of Success for the IDDE Program 99
Attachment 17: Measure of Success for the IDDE Program 100
Attachment 18: Measure of Success for the Construction Site Runoff Control Program 101
Attachment 19: BMP Inspections Revealing Problems from 2007 through 2023 102
Attachment 20: Measure of Success for the Post-Construction Site Runoff Control Program 103
Attachment 21: Summary of Inspection Findings from FY2008 through FY2023 104
Attachment 22: Measure of Success for Pollution Prevention& Good Housekeeping Program 105
Attachment 23: Measures of Success Summary for FY2023 106
Attachment 24: Status of Work Plan Modifications Implemented in FY2023 107
Attachment 25: Work Plan Modifications Identified for Implementation in FY2024 110
Attachment 26: FY2023 TMDL Annual Report and Assessment 113
ii
, , / Charlotte Mecklenburg
I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Certification
By my signature below I hereby certify,under penalty of law, that this document and all
attachments were prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the information
submitted. Based on my inquiry of the person or persons who manage the system, or those
persons directly responsible for gathering the information, the information submitted is, to the
best of my knowledge and belief, true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the
possibility of fines and imprisonment for knowing violations.
I am also aware that the contents of this document shall become an enforceable Section of the
NPDES MS4 Permit, and that both the Division and the Environmental Protection Agency have
NPDES MS4 Permit compliance and enforcement authority.
❑ I am a ranking elected official.
❑ I am a principal executive officer for the permitted MS4.
X I am a duly authorized representative for the permitted MS4 and have attached the
authorization made in writing by a principal executive officer or ranking elected official
which specifies me as (check one):
X A specific individual having overall responsibility for stormwater matters.
❑ A specific position having overall responsibility for stormwater matters.
Signature: tad .
Print
Name: Don Ceccarelli
Title: Division Director, Storm Water Services
Signed this 23rd day of August 2023.
/ , / Charlotte-Mecklenburg
/ / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
Section 1: Introduction
This document satisfies the annual assessment and reporting requirement of Storm Water Permit
No. NCS000395 as follows:
• Evaluate program compliance, the appropriateness of best management practices
(BMPs), and progress towards achieving measurable goals; and
• Evaluate the performance and effectiveness of the Storm Water Quality Management
Program Plan, herein referred to as the Storm Water Plan.
Charlotte-Mecklenburg Storm Water Services (CMSWS) has developed and is maintaining the
Storm Water Plan for Permit No. NCS000395 on behalf of all co-permittees, including
Mecklenburg County, Charlotte-Mecklenburg Schools (CMS), Central Piedmont Community
College (CPCC), and the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill, and
Pineville. This Storm Water Plan is available on the following website: http://storm
water.charmeck.org (select"Surface Water Quality," select"Program Overview," select
"Current Storm Water Management Plan"under Phase II Permit at the bottom of the page). The
purpose of the Storm Water Plan is to describe the actions undertaken by the Permittee to ensure
compliance with Permit requirements. Each of the six (6) minimum measures contained in the
Permit plus TMDL compliance (referred to as Programs) has a separate section in the Storm
Water Plan. Each section includes a Summary Table that describes the Best Management
Practices, referred to as BMPs, that will be undertaken to fulfill Permit requirements. These
BMPs include specific Measurable Goals that must be completed in accordance with established
schedules to ensure fulfillment of the BMP. Fulfillment of the BMPs equates to compliance with
the Storm Water Plan and Permit. The BMPs and Measurable Goals are described in detail
every year in a Work Plan with BMPs referred to as program elements and the Measurable Goals
referred to as tasks. The Work Plan Program Element Documentation Log (Log) is completed
by staff assigned the lead role in the fulfillment of program elements and assigned tasks. The
Logs serve to document the who, what, when, where, and how regarding tasks as they are
completed throughout the fiscal year. Various attachments, such as maps,presentations, data
tables, etc., are added to the Logs as necessary to ensure complete documentation of all activities
completed and data and information generated. These Logs and attachments are assessed and
approved by supervisors before they are loaded into the Cityworks database attached to an
Activity Report where they are available for access digitally. At the end of the fiscal year,
established Measures of Success as described in the Storm Water Plan are calculated and
assessed along with the assessment of Logs and associated attachments by the supervisors to
determine compliance with the Storm Water Plan and Permit. These assessments also serve as
the basis for identification of improvements to the Storm Water Plan, Work Plan and Measures
of Success to enhance efforts for Permit compliance, which are implemented during the next
fiscal year.
Section 2 of the annual report contained herein provides background information regarding the
implementation of the Storm Water Plan between July 1, 2022 and June 30, 2023 (FY2023),
including a fiscal analysis. Sections 3 through 9 provide an overview of the programs
implemented to fulfill Permit requirements, including BMP Summary Tables for the six (6)
minimum measures and TMDLs with Work Plan Codes, BMP Descriptions, Measurable Goals,
Schedules, and Activity Reports numbers from Cityworks that contain Logs with details
1
/ , Charlotte-Mecklenburg
/ 'STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services -- —
regarding Permit compliance activities as described above. The detailed Logs are not provided
in this annual report but are available upon request to Mecklenburg County's Water Quality
Program Manager at 980-314-3217 or rusty.rozzelle(a,mecklenburgcountync.gov. The BMP
Summary Tables also contain the numbers for Attachments provided at the end of this annual
report that include a summary of data and information accumulated throughout the reporting year
as well as lists of changes to the Storm Water Plan. Attachment 1 provides data generated from
countywide Phase II activities whereas Attachment 2 provides data from activities specific to
each Phase II jurisdictions. The remainder of the attachments include more detailed information
regarding specific countywide activities. Section 11 of this report provides an assessment of
compliance with the Storm Water Plan and Permit requirements, as well as the status of
attainment of the identified Measures of Success during FY2023. Section 12 concludes with a
summary of the status of Work Plan modifications for improving Permit compliance during
FY2023 and changes to be implemented in FY2024.
2
Charlotte-Mecklenburg II
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Section 2: Overview and Funding
CMSWS is responsible for developing, implementing, managing and overseeing the Storm
Water Plan under the direction of Mecklenburg County's Water Quality Program Manager. The
specific tasks, deadlines and assigned staff for fulfillment of the Storm Water Plan are described
in an annual Work Plan. A copy of this Work Plan is available upon request to Mecklenburg
County's Water Quality Program Manager at 980-314-3217 or
rusty.rozzelle@mecklenburgcountync.gov. As specified in the Permit, each co-permittee is
responsible for compliance with the terms and conditions of the Permit for storm water activities
and watershed specific requirements within their jurisdictional area. Appropriate legal authority
has been established by each jurisdiction for implementation of the Storm Water Plan through
the adoption of Surface Water Pollution Control Ordinances that prohibit illicit discharges to the
MS4 as well as the adoption of post-construction and erosion control ordinances. Mecklenburg
County is delegated authority by each jurisdiction to enforce these ordinances. The majority of
Permit compliance activities are performed by the Water Quality and Permitting and Compliance
Programs within CMSWS. Funding for implementation of these Programs is shared by each
jurisdiction based on an adopted Funding Strategy. Implementation costs for the reporting
period of July 1, 2022 through June 30, 2023 (FY2023) were $1,012,189.37, including
$708,982.13 and $219,949.53 in labor costs for the Water Quality and Permitting and
Compliance Programs, respectively, and $83,247.71 in operating costs for laboratory, equipment,
and supplies for the Water Quality Program. For FY2024, costs are estimated at $996,410.38,
including $892,014.24 in staff costs and $104,396.14 in operating costs. The Phase II
jurisdictions in Mecklenburg County utilize the revenue they receive from their storm water and
land development fees to fund the implementation of the Program with the exception of CMS
and CPCC, which do not receive revenue from the storm water fee and therefore fund Phase II
Program implementation through their general budget.
3
, , Charlotte-Mecklenburg II
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Section 3: Stormwater Management Program Administration
3.1 Program Overview
A program has been developed and is currently being implemented for administering the Phase II
Permit for Mecklenburg County's Phase II jurisdictions/entities for the purpose of ensuring that
all Permit requirements are effectively and efficiently fulfilled by co-permittees in accordance
with the Storm Water Plan and that the administration requirements specified in the Permit are
being met. The Program includes 37 separate BMPs and 190 Measurable Goals as described in
the eight(8) BMP Summary Tables contained in this document. The Program also includes
specific Measures of Success that are described in Section 11 of this document. The goal of
Program Administration is to implement, manage and oversee the provisions of the Storm Water
Plan to control to the maximum extent practical the discharge of pollutants from the municipal
storm sewer system associated with stormwater runoff and illicit discharges, including spills and
illegal dumping and to ensure that all Phase II Permit requirements are effectively and efficiently
fulfilled.
3.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 1 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 1: BMP Summary Table for Stormwater Management Program Administration
Program Development(Permit Ref.Part II Section A.4,5 and 6;Part III Sections A,B,C,D;Part IV Sections A,B,D,E,F,G)Performing
activities necessary to fulfill the administrative requirements for compliance with permit requirements,including coordinating with co-
permittees,completing the annual assessment report,applying for permit renewal,and updating the Storm Water Management Program
Plan as necessary.
BMP# A B C D E
& Annual Reporting Metric Activity Report
Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) (AR)#
Plan Code Implementation Completed Compliant
Attachment#
#1 Permit Development
PD-1 Developing and a.Annual Report Annually Yes Yes AR#: 72426
submitting the beginning July 1 AR#: 76660
annual assessment b.Annual Assessment for Annually Yes Yes
report required by Phase II Permit beginning July 1 Attachments 1 and
the Phase II Permit Compliance 2
to document c.Discuss and Facilitate Annually Yes Yes
compliance with the Work Plan Changes beginning July 1
Phase II Storm d.Implement Annually Yes Yes
Water Management Recommendations for beginning July 1
Program. Improvement
4
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services - — — —
Table 1: BMP Summary Table for Stormwater Management Program Administration
Program Development(Permit Ref.Part II Section A.4,5 and 6;Part III Sections A,B,C,D;Part IV Sections A,B,D,E,F,G)Performing
activities necessary to fulfill the administrative requirements for compliance with permit requirements,including coordinating with co-
permittees,completing the annual assessment report,applying for permit renewal,and updating the Storm Water Management Program
Plan as necessary.
BMP# A B C D E
& Annual Reporting Metric Activity Report
Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) (AR)#
Plan Code Implementation Completed Compliant
Attachment#
e. Submit Quarterly 30 days of the Yes Yes
Reports to Co-permittees end of the
quarter
f. Certify and Submit As scheduled by Yes Yes
Stormwater Permit NCDEQ
Renewal
g.Participate in an NPDES As scheduled by Yes Yes
MS4 Permit Compliance NCDEQ
Audit
#2 Evaluate Effectiveness of Storm Water Plan
PD-3 Evaluating the a.Annual Report Annually Yes Yes AR#: 72427
effectiveness of the beginning July 1 AR#: 76661
Storm Water Quality b.Annual Assessment for Annually Yes Yes
Management Storm Water Plan beginning July 1 Attachment 3
Program Plan and Compliance Attachment 4
updating as c.Discuss and Facilitate Annually Yes Yes
necessary,including Work Plan Changes _ beginning July 1
all written policies d.Implement Annually Yes Yes
and procedures. recommendations for beginning July 1
improvement
5
/ Charlotte-Mecklenburg
d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Section 4: Public Education and Outreach Program
4.1 Program Overview
CMSWS has developed and implemented a Public Education and Outreach Program for
Mecklenburg County's Phase II jurisdictions/entities. The Program includes two (2) separate
BMPs and 13 Measurable Goals as described in Table 2 below. The Program also includes
specific Measures of Success that are described in Section 11 of this document. Program
activities are administered by an Environmental Supervisor working in cooperation with an
Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The
goals of the Public Education and Outreach Program are as follows:
1. Change public behaviors to reduce sources of water pollution and improve water quality.
2. Promote participation in activities aimed at restoring water quality conditions.
4.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 2 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 2: BMP Summary Table for the Public Education and Outreach Program
Public Education and Outreach(Permit Ref.Part II Section B;Part III Sections A,B,C,D;Part IV Sections B,F):Distributing
educational materials to the community or conducting equivalent outreach activities about the impacts of storm water discharges on
water bodies and the steps that the public can take to reduce pollutants in storm water runoff.
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work Plan BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
#3 Community Education and Outreach
PE-10 Performing public a.Annual Report Annually Yes Yes PE-10
PE-2 CMS education and beginning July 1 AR#: 70672
PE-2 outreach activities. b.Annual Assessment Annually Yes Yes AR#: 76633
CPCC beginning July 1
c.Coordinate with City Annually Yes Yes PE-2 CMS
and Co-Permittees, beginning July 1 AR#: 70684
Review and Update AR#: 76643
SOPs,Review and
Update Target PE-2 CPCC
Pollutants,Audiences, AR#: 70686
Residential/ AR#: 76644
Commercial Issues
d.Develop,Update, Annually Yes Yes Attachment 5
Distribute,and Make beginning July 1 Attachment 6
Available Educational Attachment 7
6
Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services —
Table 2: BMP Summary Table for the Public Education and Outreach Program
Public Education and Outreach(Permit Ref.Part II Section B;Part III Sections A,B,C,D;Part IV Sections B,F):Distributing
educational materials to the community or conducting equivalent outreach activities about the impacts of storm water discharges on
water bodies and the steps that the public can take to reduce pollutants in storm water runoff.
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work Plan BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
Materials
e.Develop and Send Annually Yes Yes
Newsletters beginning July 1 _
f. Develop and Annually Yes Yes
Implement Public beginning July 1
Education Media
Campaign _
g.Develop and Conduct Annually Yes Yes
Outreach for Schools beginning July 1 _
h.Develop and Conduct Annually Yes Yes
Outreach for beginning July 1
Industrial/Commercial
Sector
#4 Evaluate the public Education and Outreach Program -
PE-9 Evaluating the a.Annual Report Annually Yes Yes AR#: 70674
effectiveness of the beginning July 1 AR#: 76635
Education& b.Annual Assessment Annually Yes Yes
Outreach Program. beginning July 1 Attachment 8
c.Discuss and Facilitate Annually Yes Yes Attachment 9
Work Plan Changes beginning July 1
d.Implement Annually Yes Yes
Recommendations for beginning July 1
Improvement
e.Review Public Annually Yes Yes
Opinion Survey beginning July 1
7
/ Charlotte-Mecklenburg
d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Section 5: Public Involvement and Participation Program
5.1 Program Overview
CMSWS has developed and implemented a Public Involvement and Participation Program for
Mecklenburg County's Phase II jurisdictions/entities. The Program includes nine (9) separate
BMPs and 42 Measurable Goals as described in Table 3 below. The Program also includes
specific Measures of Success that are described in Section 11 of this document. Program
activities are administered by an Environmental Supervisor working in cooperation with an
Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The
goal of the Public Involvement and Participation Program is to create opportunities for the public
to participate in Phase II program development and implementation, as well as to get involved in
activities aimed at protecting and restoring water quality conditions.
5.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 3 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 3: BMP Summary Table for the Public Involvement and Participation Program
Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing
and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in
efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these
SOPs and performing training is contained under the Phase I program element.)
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
#5 Phase II Public Meeting
Pi-1 Providing and a.Annual Report Annually Yes Yes AR#: 72422
promoting public beginning July 1 AR#: 76662
involvement. b.Annual Assessment Annually Yes Yes
beginning July 1
c.Conduct Meeting Annually Yes Yes
with SWAC beginning July 1
d.Update and Annually Yes Yes
Implement the beginning July 1
Storm Water Plan
#6 Adopt-A-Stream
PI-2 Implementing the a. Annual Report Annually Yes Yes AR#: 70692
Adopt-A-Stream beginning July 1 AR#: 76650
Program. b.Annual Assessment Annually Yes Yes
beginning July 1 Attachment 2
8
, , / Charlotte-Mecklenburg
d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services — — —
Table 3: BMP Summary Table for the Public Involvement and Participation Program
Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing
and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in
efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these
SOPs and performing training is contained under the Phase I program element.)
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
c.Review and Revise Annually Yes Yes
SOPs beginning July 1
d.Conduct Daily Annually Yes Yes
Operations of beginning July 1
Program
e.Update Volunteer Annually Yes Yes
Database beginning July 1
f. Ensure Related Annually Yes Yes
Water Quality beginning July 1
Problems Are
Investigated
#7 Storm Drain Marker
PI-3 Implementing the a.Annual Report Annually Yes Yes AR#: 70673
Storm Drain Marker beginning July 1 AR#: 76634
Program. b.Annual Assessment Annually Yes Yes
beginning July 1 Attachment 2
c.Review and Revise Annually Yes Yes
SOPs beginning July 1
d.Conduct Daily Annually Yes Yes
Operations of beginning July 1
Program
e.Update Volunteer Annually Yes Yes
Database beginning July 1
f. Update Storm Annually Yes Yes
Drain Marking beginning July 1
Feature
g.Ensure Related Annually Yes Yes
Water Quality beginning July 1
Problems Are
Investigated
#8 Volunteer Big Spring Clean
PE-I(4) Conducting Annual a.Annual Report Annually Yes Yes AR#: 70666
Cleanup Event(Big beginning July 1 AR#: 76628
Spring Clean). b.Annual Assessment Annually Yes Yes
beginning July 1 Attachment 2
c.Plan and Conduct Annually Yes Yes
Annual Stream beginning July 1
Cleanup
#9 Volunteer Monitoring
VM-CO Implementing a.Annual Report Annually Yes Yes AR#: 70693
volunteer monitoring beginning July 1 AR#: 76651
program that b.Annual Assessment Annually Yes Yes
involves the beginning July 1 Attachment 2
monitoring of stream c.Review and Revise Annually Yes Yes
and lake conditions SOPs beginning July 1
9
, , / Charlotte-Mecklenburg
d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services — — —
Table 3: BMP Summary Table for the Public Involvement and Participation Program
Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing
and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in
efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these
SOPs and performing training is contained under the Phase I program element.)
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
by volunteers. d.Conduct Daily Annually Yes Yes
Operations of beginning July 1
Program
e.Update Volunteer Annually Yes Yes
Database beginning July 1 _ _
f.Ensure Related Annually Yes Yes
Water Quality beginning July 1
Problems Are
Investigated
#10 Educate Media Campaign
PE-I(13) Developing and a.Annual Report Annually Yes Yes AR#: 70668
implementing the beginning July 1 AR#: 76630
Public Involvement b.Annual Assessment Annually Yes Yes
Media Campaign. beginning July 1 Attachment 10
c.Develop Public Annually Yes Yes
Involvement beginning July 1
Volunteer
Education
Campaign
d.Implement Public Annually Yes Yes
Involvement beginning July 1
Volunteer
Education
Campaign
#11 Volunteer Recognition
PE-I(14) Performing activities a.Annual Report Annually Yes Yes AR#: 70691
to recognize and beginning July 1 AR#: 76649
promote volunteers. b.Annual Assessment Annually Yes Yes
beginning July 1 Attachment 11
c.Plan Volunteer Annually Yes Yes
Recognition Events beginning July 1
d.Implement Annually Yes Yes
Volunteer beginning July 1
Recognition Events
#12 Creek Week
PE-I(16) Performing annual a.Annual Report Annually Yes Yes AR#: 70670
Creek Week Events. beginning July 1 AR#: 76631
b.Annual Assessment Annually Yes Yes
beginning July 1
c.Plan Creek Week Annually Yes Yes
Events beginning July 1
d.Implement Creek Annually Yes Yes
Week Events beginning July 1
#13 Evaluate Public Involvement Program
PI-6 Evaluating the a.Annual Report Annually Yes Yes AR#: 70675
effectiveness of the beginning July 1 AR#: 76636
10
, , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services — — —
Table 3: BMP Summary Table for the Public Involvement and Participation Program
Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing
and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in
efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these
SOPs and performing training is contained under the Phase I program element.)
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
Public Involvement b.Annual Assessment Annually Yes Yes
&Participation beginning July 1 Attachment 12
Program. c.Discuss and Annually Yes Yes
Facilitate Work beginning July 1
Plan Changes
d.Implement Annually Yes Yes
Recommendations beginning July 1
for Improvement
11
/ , Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Section 6: Illicit Discharge Detection and Elimination Program
6.1 Program Overview
CMSWS has developed, implemented, and enforced an Illicit Discharge Detection and
Elimination(IDDE) Program in Mecklenburg County's Phase II jurisdictions/entities. The
Program includes 10 separate BMPs and 54 Measurable Goals as described in Table 4 below.
The Program also includes specific Measures of Success that are described in Section 11 of this
document. Program activities are administered by an Environmental Supervisor working in
cooperation with an Environmental Manager and multiple key staff with CMSWS's Water
Quality Program. The goal of the IDDE Program is to detect and eliminate illicit discharges into
the MS4, which are defined in 40 CFR 123.26(b)(2) as discharges that are not composed entirely
of storm water except discharges pursuant to a NPDES Permit(other than the NPDES Permit for
discharges from the municipal separate storm sewer) and discharges resulting from fire-fighting
activities as well as incidental non-storm water discharges or flows that are not significant
contributors of pollutants.
6.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 4 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 4: BMP Summary Table for the IDDE Program
Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F):
Develop and implement a program to detect and eliminate illicit discharges to the MS4.(Note: The IDDE Manual and SOPs are the
same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program
element.)
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work Plan BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
#14 Storm Sewer System Maps
ID-1 Maintaining a a.Annual Report Annually Yes Yes AR#: 72526
current map beginning July 1 AR#: 76753
showing major b.Annual Assessment Annually Yes Yes
outfalls and beginning July 1 Attachment 2
receiving streams. c.Review and Revise Annually Yes Yes
SOPs beginning July 1
d.GIS to Report Newly Annually Yes Yes
Collected Storm beginning July
Sewer System 1
Features
12
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/V,..Services
Table 4: BMP Summary Table for the IDDE Program
Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F):
Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the
same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program
element.)
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work Plan Measurable Goal(s) (Yes or No) &
Code BMP Implementation Completed Compliant Attachment#
#15 Screen for Non-Stormwater Flows
ID-2 Maintaining a a.Annual Report Annually Yes Yes AR#: 70313
program for _ beginning July 1 AR#: 76747
conducting dry b.Annual Assessment Annually Yes Yes
weather flow field beginning July 1 Attachment 2
observations in c.Review and Revise Annually Yes Yes
accordance with SOPs beginning July 1
written d.Develop and Annually Yes Yes
procedures. Implement QA/QC beginning July 1
Procedures
e.Assess and Eliminate Annually Yes Yes
Problems in Areas beginning July 1
with High Potential
for Illicit Discharges
#16 Maintain an IDDE Program
ID-3 Maintaining a a.Annual Report Annually Yes Yes AR#: 70314
written IDDE beginning July 1 AR#: 76748
Program,adequate b.Annual Assessment Annually Yes Yes
legal authorities, beginning July 1
and written c.Review and Revise Annually Yes Yes Attachment 2
procedures for SOPs beginning July 1
conducting d.Train CMSWS Staff Annually Yes Yes
investigations of beginning July 1
Illicit discharges. e.Prepare and Issue Annually Yes Yes
NOVs beginning July 1
#17 Water Quality Monitoring Program
ID-4.1 Maintaining a a.Annual Report Annually Yes Yes ID-4.1
ID-4.3 monitoring beginning July 1 AR#: 73146
ID-4.4 program to assess b.Annual Assessment Annually Yes Yes AR#: 76789
ID-4.7-CO water quality beginning July 1
ID-4.10 conditions for c.Review and Revise Annually Yes Yes ID-4.3
IC-S(1.6) identification and SOPs beginning July 1 AR#: 70822
(CMANN) elimination of d.Conduct Monitoring Annually Yes Yes AR#: 77172
QA/QC illicit discharges Activities Conduct beginning July 1
and other Monitoring Activities ID-4.4
pollution sources. e.Review Data for Annually Yes Yes AR#: 72468
Exceedances beginning July 1 AR#: 78798
f. Conduct Follow-Up Annually Yes Yes
Actions beginning July 1 ID-4.7-00
AR#: 70316
AR#: 76750
ID-4.10
AR#: 70267
AR#: 78667
13
/ , y C,a,h e-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/V",-Services
Table 4: BMP Summary Table for the IDDE Program
Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F):
Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the
same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program
element.)
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work Plan Measurable Goal(s) (Yes or No) &
Code BMP Implementation Completed Compliant Attachment#
IC-S(1.6)
AR#: 71856
AR#: 78686
Attachment 2
Attachment 13
Attachment 14
Attachment 15
#18 Pollution Prevention Education
ID-5 Developing and a.Annual Report Annually Yes Yes AR#: 70680
implementing a beginning July 1 AR#: 76639
public outreach b.Annual Assessment Annually Yes Yes
program to inform beginning July 1 Attachment 6
public employees, c.Ensure Messages Once during 5- Yes Yes
businesses and the Inform Citizens year permit term
general public of d.Review 311 Annually Yes Yes
illicit discharges Keywords beginning July 1
and improper e.Conduct Annually Yes Yes
waste disposal and Presentations beginning July 1
how they threaten Regarding Illicit
the environment Discharges and
as well as provide Improper Waste
instructions Disposal
concerning proper f. Ensure Co-permittees Annually Yes Yes
reporting. and County beginning July 1
Departments are
Trained
#19 Follow up Inspections and Responding to Citizen Requests and Emergencies
ID-6 Responding to a.Annual Report Annually Yes Yes AR#: 70315
citizen requests beginning July 1 AR#: 76749
for service and b.Annual Assessment Annually Yes Yes
emergency beginning July 1 Attachment 2
situations as well c.Review and Revise Annually Yes Yes
as conduct follow SOPs beginning July 1
up inspections as d.Maintain Roster for Annually Yes Yes
necessary to Emergency Response beginning July 1
identify and Program
eliminate e.Receive,Respond, Annually Yes Yes
pollution and Investigate beginning July 1
problems. Citizen Requests for
Service
#20 Stream Walk/Outfall Inventory&Inspection/Dry Weather Flow Analysis
ID-8 Inspecting creeks a.Annual Report Annually Yes Yes AR#: 72261
for the purpose of beginning July 1 AR#: 76673
identifying and b.Annual Assessment Annually Yes Yes
eliminating illicit beginning July 1 Attachment 2
14
/ , / C,a,h e-Mecklenburg
/ / I"" Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/V -Services
Table 4: BMP Summary Table for the IDDE Program
Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F):
Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the
same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program
element.)
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work Plan Measurable Goal(s) (Yes or No) &
Code BMP Implementation Completed Compliant _ Attachment#
discharges and c.Revise and Annually Yes Yes
collecting outfall Implement Program beginning July 1
and stream Plan
channel data as d.Review and Revise Annually Yes Yes
well as conducting SOPs beginning July 1
dry weather flow e.Train CMSWS Staff Annually Yes Yes
field observations beginning July 1
in accordance with f. Conduct Assessments, Annually Yes Yes
written Inventory,Inspections, beginning July 1
procedures. and Monitoring
g.Review Data for Annually Yes Yes
Exceedances beginning July 1
h.Create Outfall Annually Yes Yes
Inspections beginning July 1
#21 Illicit Discharge Elimination Program(IDEP)
ID-9 Investigating a.Annual Report Annually Yes Yes AR#: 70525
select locations on beginning July 1 AR#: 76751
a regular, b.Annual Assessment Annually Yes Yes
recurring schedule beginning July 1 Attachment 2
for the c.Review and Revise Annually Yes Yes
identification and SOPs beginning July 1
elimination of d.Complete Lift Station Annually Yes Yes
illicit discharges Inspections and Fecal beginning July 1
and other Coliform Sampling at
pollution CMANN Locations
problems. e.Field Validate Outfall Annually Yes Yes
Data and Input beginning July 1
Additional Attributes
f. Reinspect facilities Annually Yes Yes
that have been issued beginning July 1
a penalty within the
last 3 fiscal years
#22 Used Oil Inspection
ID-U Conducting a.Annual Report Annually Yes Yes AR#: 72894
inspections of beginning July 1 AR#: 76755
vehicle b.Annual Assessment Annually Yes Yes
maintenance beginning July 1 Attachment 2
facilities to c.Review and Revise Annually Yes Yes
prevent the SOPs beginning July 1
discharge of d.Complete,Prepare, Annually Yes Yes
pollutants. and Submit beginning July 1
Inspection Reports
e.Maintain Database Annually Yes Yes
beginning July 1
15
/ , / Charlotte-Mecklenburg
1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/V,..Services —
Table 4: BMP Summary Table for the IDDE Program
Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F):
Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the
same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program
element.)
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work Plan Measurable Goal(s) (Yes or No) &
Code BMP Implementation Completed Compliant Attachment#
#23 Evaluate Effectiveness of the IDDE Program
ID-10 Evaluating the a. Annual Report Annually Yes Yes AR#: 72111
effectiveness of beginning July 1 AR#: 76754
the IDDE b. Annual Assessment Annually Yes Yes
Program. beginning July 1 Attachment 16
c. Discuss and Facilitate Annually Yes Yes Attachment 17
Work Plan Changes beginning July 1
d. Implement Annually Yes Yes
improvements in the beginning July 1
next fiscal year.
16
/ , / Charlotte-Mecklenburg
/ / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
Section 7: Construction Site Storm Water Runoff Control Program
7.1 Program Overview
Construction Site Runoff Control Programs have been developed and are currently being
implemented for addressing the discharge of sediment and other pollutants from construction
sites in Mecklenburg County 's Phase II jurisdictions that disturb one or more acres of land
surface and those activities less than one acre that are part of a larger common plan of
development as authorized under the Sediment Pollution Control Act of 1973. These are
delegated programs under NCGS 113A-60. The Program includes 3 separate BMPs and 12
Measurable Goals as described in Table 5 below. The Program also includes specific Measures
of Success that are described in Section 11 of this document. Program activities are administered
by an Environmental Supervisor working in cooperation with an Environmental Manager and
multiple key staff with CMSWS's Permitting and Compliance Program. In November 2019, the
Town of Huntersville received delegated authority from the State to administer a local erosion
control program in their jurisdiction. The Town of Huntersville coordinates with the County in
the completion of the activities associated with the Construction Site Erosion Control Program
described in this Section. Kevin Fox, Public Works Director, serves as the responsible party for
compliance with the Permit requirements for the Construction Site Storm Water Runoff Control
Program in the Town of Huntersville. His contact information is as follows: 704-766-2320 and
kfox@huntersville.org.
7.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 5 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 5: BMP Summary Table for the Construction Site Storm Water Control Program
Construction Site Runoff Control Program(Permit Ref.Part II Section E;Part III Sections A,B,C,D;Part IV Sections B,F): Enforce
erosion and sedimentation control ordinances by permitting and controlling development activities disturbing one or more acres of land
surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment
Pollution Control Act of 1973.
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
#24 Enforce Erosion Control Ordinances
CS-1 Enforcing erosion a.Annual Report Annually Yes Yes AR#: 78771
and sedimentation beginning July 1 AR#: 78773
control ordinances. b.Annual Assessment Annually Yes Yes
beginning July 1 Attachment 2
17
Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/V .-Services —
Table 5: BMP Summary Table for the Construction Site Storm Water Control Program
Construction Site Runoff Control Program(Permit Ref.Part II Section E;Part III Sections A,B,C,D;Part IV Sections B,F): Enforce
erosion and sedimentation control ordinances by permitting and controlling development activities disturbing one or more acres of land
surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment
Pollution Control Act of 1973.
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
c.Review and Revise Annually Yes Yes
SOPs beginning July 1
d.Conduct Inspections Annually Yes Yes
beginning July 1
e.Prepare and issue Annually Yes Yes
NOVs and Initiate beginning July
Enforcement Actions 1
#25 _Erosion Control Education
CS-2 Developing and a.Annual Report Annually Yes Yes AR#: 78774
implementing a beginning July AR#: 78776
program to educate 1
those engaging in b.Annual Assessment Annually Yes Yes Attachment 2
land disturbing beginning July
activities regarding 1
the applicable c.Distribute Educational Annually Yes Yes
erosion control Materials beginning July
requirements and 1
regulations. d.Implement Charlotte- Annually Yes Yes
Mecklenburg Certified beginning July
Site Inspector 1
(CMCSI)Training
#26 Evaluate Effectiveness of the Erosion Control Program
CS-3 Evaluating the a.Annual Report Annually Yes Yes AR#: 78777
effectiveness of the beginning July AR#: 78778
Erosion Control 1
Program. b.Annual Assessment Annually Yes Yes Attachment 18
beginning July
1
c.Implement Annually Yes Yes
Recommendations for beginning July
Improvement 1
18
, , Charlotte-Mecklenburg/I
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Section 8: Post-Construction Site Runoff Control Program
8.1 Program Overview
A Post-Construction Site Runoff Control Program has been developed and is currently being
implemented for addressing post-construction stormwater runoff from new development and
redevelopment projects in Mecklenburg County's Phase II jurisdictions. The Program includes 4
separate BMPs and 17 Measurable Goals as described in Table 6 below. The Program also
includes specific Measures of Success that are described in Section 11 of this document.
Program activities are administered by an Environmental Supervisor working in cooperation
with an Environmental Manager and multiple key staff with CMSWS's Water Quality Program.
rams except for in the Town of Huntersville and its ETJ where effective July 1, 2020 Town staff
are responsible for plan reviews and issuing land development Permits as well as conducting
inspections to confirm project completion in compliance with Permit requirements.
8.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 6 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 6: BMP Summary Table for the Post-Construction Site Runoff Control Program
Post-Construction Site Runoff Control Program(Permit Ref.Part II Section F;Part III Sections A,B,C,D;Part IV Sections
B,F):Implement and enforce a program to address storm water runoff from new development and redevelopment projects,including
public transportation maintained by the permittee,that disturb greater than or equal to one acre,including projects less than one acre
that are part of a larger common plan of development or sale,that discharge into the small MS4.
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) &
Plan Code Implementation Completed Compliant Attachment#
#27 Implement Post-Construction Ordinances
PC-1 Developing, a.Annual Report Annually Yes Yes AR#: 71873
implementing,and beginning July 1 AR#: 76657
enforcing ordinances b.Annual Assessment Annually Yes Yes
that will minimize beginning July 1
negative water c.Ensure Effective Annually Yes Yes
quality impacts to Implementation beginning July 1
surface waters from d.Provide Annually Yes Yes
post-construction Interpretations of beginning July 1
discharges. Ordinance
Requirements
#28 Post-Construction Ordinance Inspections
PC-2 Conducting site a.Annual Report Annually Yes Yes AR#: 78779
19
/ , / Charlotte-Mecklenburg
/ / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/V�Services
Table 6: BMP Summary Table for the Post-Construction Site Runoff Control Program
Post-Construction Site Runoff Control Program(Permit Ref.Part II Section F;Part III Sections A,B,C,D;Part IV Sections
B,F):Implement and enforce a program to address storm water runoff from new development and redevelopment projects,including
public transportation maintained by the permittee,that disturb greater than or equal to one acre,including projects less than one acre
that are part of a larger common plan of development or sale,that discharge into the small MS4.
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) &
Plan Code Implementation Completed Compliant Attachment#
inspections of beginning July 1 AR#: 78780
stormwater controls b.Annual Assessment Annually Yes Yes
installed for beginning July 1 Attachment 2
compliance with c.Update Manual Annually Yes Yes
ordinance beginning July 1
requirements. d.Complete Inspections Annually Yes Yes
beginning July 1
e.Complete Inspection Annually Yes Yes
Reports. beginning July 1
#29 Post-Construction Ordinance Education
PC-3 Implementing a a.Annual Report Annually Yes Yes AR#: 72429
program to educate beginning July 1 AR#: 76658
the development b.Annual Assessment Annually Yes Yes
community regarding beginning July 1 _ Attachment 2
applicable post- c.Develop Post- Annually Yes Yes
construction Construction beginning July 1
requirements and Ordinance Training
regulations. d.Conduct Training Annually Yes Yes
beginning July 1
#30 Evaluate Effectiveness of the Post-Construction Controls Program
PC-5 Evaluating the a.Annual Report Annually Yes Yes AR#: 71901
effectiveness of the beginning July 1 AR#: 76659
Post-Construction b.Annual Assessment Annually Yes Yes
Controls Program. beginning July 1 Attachment 19
c.Discuss and Facilitate Annually Yes Yes Attachment 20
Work Plan Changes beginning July 1
d.Implement Annually Yes Yes
improvements in the beginning July 1
next fiscal year.
20
, , Charlotte-Mecklenburg/I
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
�`Services
Section 9: Pollution Prevention/Good Housekeeping for Municipal Operations
9.1 Program Overview
CMSWS has developed and implemented a Pollution Prevention/Good Housekeeping Program
for municipal facilities and operations. The Program includes four(4) separate BMPs and 20
Measurable Goals as described in Table 7 below. The Program also includes specific Measures
of Success that are described in Section 11 of this document. Program activities are administered
by an Environmental Supervisor working in cooperation with an Environmental Manager and
multiple key staff with CMSWS's Water Quality Program. The goal of the Pollution
Prevention/Good Housekeeping Program is to reduce pollutants in storm water runoff from
municipal operations.
9.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 7 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 7: BMP Summary Table for the Pollution Prevention/Good Housekeeping Program
Pollution Prevention&Good Housekeeping(Permit Ref.Part II Section G;Part III Sections A,B,C,D;Part IV Sections B,F):
Implement an operation and maintenance program that includes a training component and has the ultimate goal of preventing or reducing
pollutant runoff from municipal operations.Provide employee training to prevent and reduce storm water pollution from activities such as
park and open space maintenance,fleet and building maintenance,new construction and land disturbances,and storm water system
maintenance.
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work BMP Measurable Goal(s) Implementation (Yes or No) &
Plan Code Completed Compliant Attachment#
#31 Employee Training
PP-1 Implementing a a.Annual Report Annually Yes Yes PP-1
PP-1 CMS training program beginning July 1 AR#: 70681
PP-1 for employees b.Annual Assessment Annually Yes Yes AR#: 76640
CPCC involved in beginning July 1
implementing c.Develop Training Program Annually Yes Yes PP-1 CMS
pollution beginning July 1 AR#: 70687
prevention and d.Provide Training Materials Annually Yes Yes AR#: 76645
good housekeeping to Towns and County beginning July 1
practices. PP-1 CPCC
AR#: 70688
AR#: 76646
Attachment 2
21
/ , i Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/--_,.Services
Table 7: BMP Summary Table for the Pollution Prevention/Good Housekeeping Program
Pollution Prevention&Good Housekeeping(Permit Ref.Part II Section G;Part III Sections A,B,C,D;Part IV Sections B,F):
Implement an operation and maintenance program that includes a training component and has the ultimate goal of preventing or reducing
pollutant runoff from municipal operations.Provide employee training to prevent and reduce storm water pollution from activities such as
park and open space maintenance,fleet and building maintenance,new construction and land disturbances,and storm water system
maintenance. _
BMP# A B C D E
& Annual Reporting Metric Activity Report#
Description of Schedule for
Work BMP Measurable Goal(s) Implementation (Yes or No) &
Plan Code Completed Compliant Attachment#
#32 Inspections
PP-2 Implementing a.Annual Report Annually Yes Yes PP-2
PP-2 CMS inspection program beginning July 1 AR#: 69443
PP-2 for municipal b.Annual Assessment Annually Yes Yes AR#: 76488
CPCC facilities. beginning July 1
c.Review and Revise SOPs Annually Yes Yes PP-2 CMS
beginning July 1 AR#: 69441
d.Train CMSWS Staff Annually Yes Yes AR#: 76485
beginning July 1 _
e.Complete,Prepare,and Annually Yes Yes PP-2 CPCC
Submit Inspection Reports beginning July 1 AR#: 69442
f. Develop O&M Plans Annually Yes Yes AR#: 76489
beginning July 1
Attachment 21
#33 Municipal Facility Inventory
PP-5 Maintaining a a.Annual Report Annually Yes Yes AR#: 70255
current inventory beginning July 1 AR#: 76756
of co-permittee b.Annual Assessment Annually Yes Yes
facilities and beginning July 1
operations with a c.Review and Revise SOPs Annually Yes Yes
significant beginning July 1
potential for d.Update Municipal Annually Yes Yes
generating Inventory beginning July 1
pollution. e.Notify Co-Permittees of Annually Yes Yes
Changes beginning July 1
#34 Evaluate Effectiveness of the Pollution Prevention/Good Housekeeping Program
PP-9 Evaluating the a.Annual Report Annually Yes Yes AR#: 70728
effectiveness of the beginning July 1 AR#: 76687
Pollution b.Annual Assessment Annually Yes Yes
Prevention/Good beginning July 1 Attachment 22
Housekeeping c.Discuss and Facilitate Annually Yes Yes
Program. Work Plan Changes beginning July 1
d.Evaluate Effectiveness of Annually Yes Yes
O&M Plan beginning July 1
e.Implement Annually Yes Yes
Recommendations for beginning July 1
Improvement
22
, , / Charlotte-Mecklenburg
d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Section 10: Total Maximum Daily Loads (TMDLs)
10.1 Program Overview
CMSWS has developed and implemented a program for addressing non-point source pollutant
loading associated with the Total Maximum Daily Loads (TMDLs) approved by EPA for the
receiving waters of the Phase II MS4 storm water discharges and/or waters downstream of these
discharges. The Program includes three (3) separate BMPs and 21 Measurable Goals as
described in Table 8 below. The Program also includes specific Measures of Success that are
described in Section 11 of this document. Program activities are administered by an
Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The
goal of the TMDL Program is to reduce non-point source pollutant loading to the receiving
stream to the maximum extent practicable.
10.2 Status of the Implementation of the Storm Water Plan in FY2023
Table 8 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater
Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken
for implementation of these BMPs are described in Column B with the schedule provided in
Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable
Goals were completed and whether compliance with the Storm Water Plan and Permit was
achieved. Column E includes the Activity Report number from our Cityworks database that
includes detailed documentation of completion of the BMPs and Measurable Goals as well as the
Attachment#that contains data and information generated from the completion of the
Measurable Goals.
Table 8: BMP Summary Table for the TMDL Program
Total Maximum Daily Load(TMDL)Program(Permit Ref. Section H;Part III Sections A,B,C,D;Part IV Sections B,F): Implement a
program to reduce levels of the pollutant of concern in accordance with approved Waste Load Allocation(WLAs)assigned to stormwater in
an approved TMDL.
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
#35 Evaluate Impaired Waters
IW-1 Identifying those a.Annual Report Annually Yes Yes AR#: 71614
impaired waters with beginning July 1 AR#: 76655
an approved TMDL in b.Annual Assessment Annually Yes Yes
Mecklenburg County beginning July 1 Attachment 26
that have a waste load c.Review TMDLs Approved Annually Yes Yes
allocation assigned to by EPA beginning July 1
stormwater. d.Review Approved and Annually Yes Yes
Draft Versions of N.C. beginning July 1
Integrated Report
#36 Water Quality Recovery Plans for TMDLs
IW-2 Developing and a.Annual Report Annually Yes Yes AR#: 70748
implementing Water beginning July 1 AR#: 76656
Quality Recovery b.Annual Assessment Annually Yes Yes
Plans(WQRPs)for beginning July 1 Attachment 26
TMDL waters with a c.Evaluate Land Use and Annually Yes Yes
23
Charlotte-Mecklenburg
/ "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Table 8: BMP Summary Table for the TMDL Program
Total Maximum Daily Load(TMDL)Program(Permit Ref. Section H;Part III Sections A,B,C,D;Part IV Sections B,F): Implement a
program to reduce levels of the pollutant of concern in accordance with approved Waste Load Allocation(WLAs)assigned to stormwater in
an approved TMDL.
BMP# A B C D E
& Schedule for Annual Reporting Metric Activity Report#
Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) &
Code Completed Compliant Attachment#
waste load allocation Development beginning July 1
assigned to d.Review BMPs or SCMs to Annually Yes Yes
stormwater. Reduce Nonpoint Source beginning July 1
Pollution _
e.Determine Location of Annually Yes Yes
Failed Septic Systems beginning July 1 _
f. Confirm Follow Up Annually Yes Yes
Activities Are Conducted beginning July 1
g.Inspect Major Outfalls Annually Yes Yes
beginning July 1
h.Conduct Follow Up Annually Yes Yes
Activities beginning July 1 _
i. Analyze Monitoring Data Annually Yes Yes
beginning July 1
j. Identify Additional Annually Yes Yes
Measures to Achieve beginning July 1
TMDL WLA
k.Implement Water Quality Annually Yes Yes
Recovery Plans beginning July 1
1. Inspect Privately Owned Annually Yes Yes
Lift Stations beginning July 1
m.Assess for Negative Water Annually Yes Yes
Quality Impacts beginning July 1
#37 Assess Effectiveness of Water Quality Recovery Plans for TMDLs
IW-4 Assessing the a.Annual Report Annually Yes Yes AR#: 71615
effectiveness of BMPs beginning July 1 AR#: 76663
at addressing TMDL b.Annual Assessment Annually Yes Yes
waters. beginning July 1 Attachment 26
c.Discuss and Facilitate Annually Yes Yes
Work Plan Changes beginning July 1
d.Implement improvements Annually Yes Yes
in the next fiscal year. beginning July 1
24
/ , Charlotte-Mecklenburg
/ 'STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services —
Section 11: Assessment of Storm Water Plan and Overall Program Effectiveness
During FY2023, the permittee has satisfactorily implemented the 37 BMPs and fulfilled the 190
Measurable Goals specified in Storm Water Plan developed and implemented for compliance
with Permit No. NCS000395. The other provisions of the Permit have also been satisfactorily
fulfilled; therefore, compliance with the Permit has been achieved. The permittee further finds
that the implementation of the Storm Water Plan as well as the individual BMPs contained in the
Plan has resulted in the satisfactory completion of seven (7) of the nine (9) or 78% of the
identified Measures of Success as indicated in Attachment 23. This is a slight decrease from
FY21 and FY22 when 87% completion was achieved. The implementation of the Work Plan
enhancements described in Attachments 24 and 25 are meant to improve effectiveness at meeting
these measures in FY2024 (see Section 12.2).
25
/ , Charlotte-Mecklenburg
/ 'STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
Section 12: Program Enhancements
Attachment 24 describes the status of the implementation of changes to the Work Plan in
FY2023 resulting from the annual assessment completed for FY2022. Attachment 25 describes
the changes planned for FY24 as a result of this year's annual assessment. The purpose of these
changes is to improvement the effectiveness and efficiency of program activities for protecting
and restoring surface water quality and complying with Permit requirements.
12.1 Status of Implementation of Work Plan Modifications for FY2023
For FY2023, a total of 27 Work Plan modifications were proposed. All but three (3) or 88% of
these modifications were satisfactorily completed during FY2023 as described in Attachment 24.
The three (3)not completed were due to a staff shortage in the Construction Site Runoff Control
Program.
12.2 Work Plan Modifications Identified for Implementation in FY2024
For FY2024, a total of 22 Work Plan modifications are proposed for the purpose of improving
the effectiveness and efficiency of Permit compliance activities. These modifications are
described in Attachment 25, including the justification for the change,the desired result,
assigned Work Plan program element, responsible staff, and schedule. The status of the
implementation of these modifications will be described in the FY2024 annual report and
assessment.
26
Cha6±4te-Mecklenburg
/ II
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services —
Attachment 1: Data Countywide (FY22 and FY23)
Indicates the data is used as a measure of success in the Stormwater Plan.
# Question Responsible Staff Data Source FY22 FY23
1 Number of public events attended Ashley Smith One Drive City/County 15 16
shared public presentation
spreadsheet
2 Number of presentations conducted Ashley Smith One Drive City/County 49 30
shared public presentation
spreadsheet
3 Number and type of social media posts Ashley Smith Sprout Social Report 922 920
4 Results from resident survey Ashley Smith Resident Survey Report 400 501
5 Results from using mass media channels of Ashley Smith The Agency EOY Report 992,044 1,160,945
communication,including reach and frequency
6 %survey respondents indicating they are aware that Ashley Smith Resident Survey Report 81.5% 67.30%
water flowing into storm drains goes directly to creeks
and lakes
7 Extent of exposure for the media campaign Ashley Smith Media Campaign results 10,465, 19,798,16
127 8
8 Number of educational materials distributed to Ashley Smith One Drive City/County 1207 1,183
schools. shared school presentation
spreadsheet
9 Number of schools that participate in municipal- Ashley Smith One Drive City/County 20 24
sponsored storm water workshops or activities. shared school presentation
spreadsheet
10 Number of school presentations Ashley Smith One Drive City/County 103 120
shared school presentation
spreadsheet
11 Number of students attending school presentations Ashley Smith One Drive City/County 2,239 3,222
shared school presentation
spreadsheet
12 Number of workshops held for teachers. Ashley Smith One Drive City/County 0 1
shared Events and
Presentations spreadsheet.
13 Number of certificates or other rewards given out to Ashley Smith Volunteer Appreciation 1 1
schools,classes,or students participating in storm
water education.
14 Number of stormwater related displays at special Ashley Smith One Drive City/County 15 14
events or meetings. shared Events and
Presentations spreadsheet.
15 Number of people at events who saw the display or Ashley Smith One Drive City/County 1773 2299
took a pamphlet/booklet. shared Events and
Presentations spreadsheet
16 Number of signs and billboards with stormwater Ashley Smith Annual Advertising 2 5
related messages. Campaign Report
17 Number of stormwater related presentations at special Ashley Smith One Drive City/County 47 30
events or meetings. shared Events and
Presentations spreadsheet
27
/ , / C,a,h e-Mecklenburg
/ / I"" Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N.s.Services — — —
Indicates the data is used as a measure of success in the Stormwater Plan.
# Question Responsible Staff Data Source FY22 FY23
18 Number of educational materials that were distributed Ashley Smith One Drive City/County 5 41
to business owners and operators. shared Events and
Presentations spreadsheet
19 Number of businesses trained under the stormwater Ashley Smith One Drive City/County 274 575
program. shared Events and
Presentations spreadsheet
20 Number of"clean up after your pet" signs posted in Ashley Smith Scoop the Poop annual 1 0
parks and neighborhoods. report
21 Number of dog-walking designated areas in parks. Ashley Smith Parks and Recreation 7 7
Website
22 Number of posters/brochures put up in pet supply Ashley Smith NOT TRACKED NA NA
stores.
23 Number of educational materials given out to pet Ashley Smith Cityworks 25 5
owners.
24 Number of items given out for promotional Ashley Smith One Drive City/County 1,068 1,365
giveaways. shared Events and
Presentations spreadsheet
25 Number of events attended(to give out items). Ashley Smith One Drive City/County 15 16
shared Events and
Presentations spreadsheet
26 Number of partnerships for promotions(radio,TV, Ashley Smith Annual Media Report 502 560
Businesses).
27 Number of educational materials distributed to Ashley Smith Cityworks 306 370
homeowners.
28 Number of partnerships established with businesses. Ashley Smith Volunteer Database 18 31
29 Number of brochures/posters created in non-English Ashley Smith Education Handouts folder 3 1
languages. in wqxfer
30 Number of educational materials distributed to low- Ashley Smith Cityworks 4 2
income neighborhoods.
31 Number of public service announcements made on Ashley Smith Annual Media Report 502 560
radio and TV.
32 Number of stormwater related press Ashley Smith Web Site Newsroom 29 22
releases/advertising.
33 Number of stormwater related articles published. Ashley Smith Articles in Newsroom 15 6
34 Number of partnerships established with local water Ashley Smith Regional STW Partnership 27 21
utilities. membership list
35 Number of water conservation or stormwater related Ashley Smith One Drive City/County 201,945 200,928
utility inserts that are distributed with utility bills shared UBI folder
36 Number volunteer programs conducted Taylor Mebane CMSWS Website 6 6
37 Number of volunteers participating in programs Taylor Mebane Volunteer Database 4,623 4,848
38 Number of public/stakeholder meetings held. Rusty Rozzelle SWAC meeting minutes 9 10
39 Number attending public meetings Rusty Rozzelle SWAC meeting minutes 183 172
28
/ , / Cha6±4te-Meckienburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N...Services — — —
Indicates the data is used as a measure of success in the Stormwater Plan.
# Question Responsible Staff Data Source FY22 FY23
40 The quantity of trash and debris removed by Adopt-A- Angelica Volunteer Database 46.3415 40.574
Stream,Adopt-a-drain,Adopt-a-highway or Adopt-a- Moncada Tons Tons
trail volunteers(in tons).
41 Number of completed surveys. Ashley Smith Resident Survey 530 501
42 Number of calls received by a hotline(s). Ashley Smith Cityworks 453 751
43 Number of problems/incidents remedied as a result of Ashley Smith Cityworks 453 751
hotline calls.
44 Number of volunteer tree planters. Ken Friday Volunteer Database and 150 135
annual report
45 Number of volunteer tree planting events Ken Friday Volunteer Database and 3 2
annual report
46 Number of trees planted. Ken Friday Volunteer Database and 450 395
annual report
47 Number of acres planted with trees. Ken Friday Trees Annual Report 1.6 1.39
48 Number of actions taken as a result of stakeholder Rusty Rozzelle SWAC meeting minutes 28 10
meetings.
49 The percent of drains marked Ashley Smith Volunteer Database 25% 22%
50 Number of storm drain marking volunteers Ashley Smith Volunteer Database 217 332
51 Number of storm drain marking volunteer hours Ashley Smith Volunteer Database 406 518
52 Number of drains marked. Ashley Smith Volunteer Database 1,415 2,137
53 Number of illicit discharges and/or connections Ashley Smith Volunteer Database 2 4
detected from storm drain marking
54 Number of Adopt A Stream groups participating Angelica ' Volunteer Database 179 224
Moncada _
55 Number of Adopt A Stream cleanups conducted Angelica Volunteer Database 208 223
Moncada
56 Number of Adopt A Stream volunteers Angelica Volunteer Database 3,128 3,027
Moncada
57 Number of Adopt A Stream volunteer hours Angelica Volunteer Database 6885 6520
Moncada
58 The quantity of waste collected as a result of Adopt A Angelica Volunteer Database 46.3275 40.509
Stream cleanup efforts(in tons). Moncada& Tons Tons
Taylor Mebane
59 Number of Adopt A Stream miles cleaned Angelica Volunteer Database 184.6 191.4
Moncada
60 Number of illicit discharges and/or connections Angelica Volunteer Database 2 7
detected from Adopt A Stream activities Moncada
61 Number of Big Spring Clean groups participating Taylor Mebane Not tracked NA NA
62 Number of Big Spring Clean cleanups conducted Taylor Mebane Volunteer Database 7 7
63 Number of Big Spring Clean volunteers Taylor Mebane Volunteer Database 313 213
64 Number of Big Spring Clean volunteer hours Taylor Mebane Volunteer Database 939 639
65 The quantity of waste collected as a result of Big Taylor Mebane Volunteer Database 5.46 3.305
Spring Clean efforts(in tons). Tons Tons
66 Number of Big Spring Clean miles cleaned Taylor Mebane Volunteer Database 12.04 6.84
29
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N .Services — —
Indicates the data is used as a measure of success in the Stormwater Plan.
# Question Responsible Staff Data Source FY22 FY23
67 Number of illicit discharges and/or connections Taylor Mebane Volunteer Database 0 0
detected from Big Spring Clean activities
68 Number of promotional items given away during Big Taylor Mebane Volunteer Database Not 100
Spring Clean tracked
69 Number of volunteers participating in monitoring Angelica Volunteer Database 716 959
programs. Moncada
70 The frequency of monitoring in the watershed(D- Angelica VM Annual Report B B
Daily,W-Weekly,B-Bimonthly,M-Monthly,Q- Moncada
Quarterly
71 Number of volunteer monitoring sites Angelica Volunteer Database 26 18
Moncada
72 Number of volunteers trained in volunteer monitoring Angelica VM Annual Report 80 55
Moncada
73 Number of illicit discharges and/or connections Angelica VM Annual Report 19 12
detected as a result of the monitoring data collected by Moncada
volunteers.
74 Number volunteer samples collected Angelica Volunteer Database 51 91
Moncada _
75 Number of volunteer monitoring hours Angelica VM Annual Report 1262.25 1286
Moncada _
76 Number of inlets and outlets identified Ryan Spidel GIS layers Inlets: Inlets:47,
33, Outlets:
Outlets: 108
137
77 Number of water quality monitoring activities Robert Sowah EDMS/WQ 0 5
performed
78 Number of exceedances identified from water quality Robert Sowah EDMS/WQ 0 0
monitoring activities performed
79 Number of field screenings completed for non- John Thao Cityworks 0 4
stormwater flows
80 Number of illicit discharges detected and eliminated John Thao Cityworks 53 149
81 Ratio of average number of notices of violation issued John Thao Cityworks 12.37% 12.56%
over the past 3 years to the average number of IDDE
inspections conducted.
82 Percentage of number of notices of violation issued to John Thao Cityworks 15.17% 31.41%
repeat violators averaged over the past 3 years.
83 Number of outfalls. Ryan Spidel GIS layers 8,849 8,957
84 Number of Major Outfalls Ryan Spidel GIS layers 452 670
85 Number of Industrial Outfalls Ryan Spidel GIS layers 11 342
86 Number of Inlets Ryan Spidel GIS layers 53,377 53,424
87 Number of structural BMPs Corey Priddy Cityworks 1,226 1,575
88 Percent of outfall mapping complete. Ryan Spidel GIS layers 100% 100%
89 Number of sites prioritized for inspection. John Thao IDEP 21 13
30
/ , / Cha6±4te-Meckienburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N...Services — — —
Indicates the data is used as a measure of success in the Stormwater Plan.
# Question Responsible Staff Data Source FY22 FY23 _
90 Number of illicit connections reported by citizens. John Thao Cityworks 0 0
91 Number of illicit connections found. John Thao Cityworks 0 0
92 Number of illicit connections repaired/replaced. John Thao Cityworks 0 0
93 Number of illicit connection referrals. John Thao 0 0
94 Number of illegal dumps reported by citizens. John Thao Cityworks 52 53
95 Number of penalties enforced upon the participants of John Thao Cityworks 1 2
illegal dumps.
96 Number of illegal dump or sit-out clean-ups John Thao Cityworks 52 53
completed.
97 Number of dry weather tests/inspections completed John Thao Industrial inspections-#of 2 19
for industry or business. outfalls checked during
inspections(Cityworks)
98 Number of high-risk connections prioritized for John Thao IDEP 0 0
industry or business.
99 Number of illicit connections reported by employees John Thao Cityworks 0 0
or businesses for industry or business.
100 Number of illicit connections found for industry or John Thao Cityworks 0 0
business.
101 Number of illicit connections repaired/replaced for John Thao Cityworks 0 0
industry or business.
102 Number of citizen complaints made reporting illegal John Thao Cityworks 85 74
action.
103 Number of SSOs reported. John Thao 19 22
104 Number of overflow causes that were identified during John Thao Cityworks 0 0
inspections.
105 Number of outfall inspections John Thao Cityworks 133 177
106 Number of problems corrected as a result of outfall John Thao Cityworks 0 4
inspections
107 Number of dry weather monitoring activities John Thao Annual reports-Outfall 0 1
performed. inspections and
streamwalks
108 Number of problems corrected as a result of dry John Thao Annual reports-Outfall 0 1
weather monitoring activities inspections and
streamwalks
109 Number of new projects permitted Corey Priddy Excela 215 185
110 Number of acres disturbed Corey Priddy Excela 1,656.5 2,576.82
4
111 Number of erosion control inspections conducted Corey Priddy Cityworks 1549 1,433
112 Number of notices of violation issued Corey Priddy Cityworks 17 15
113 Number of penalties assessed Corey Priddy Cityworks 4 4
114 Number of CMCSI attendees Corey Priddy CMCSI Database 312 228
115 Ratio of number of notices of violation issued to Corey Priddy Cityworks 1.097% 1.05%
number of erosion control inspections conducted.
31
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services — — — -
Indicates the data is used as a measure of success in the Stormwater Plan.
# Question Responsible Staff Data Source FY22 FY23 I _
116 Number of new projects permitted Corey Priddy Excela 215 185
117 Number of acres disturbed Corey Priddy Excela 1,656.5 2,576.82
4
118 Number of structural BMP inspections conducted Corey Priddy Cityworks 763 763
119 Number of notices of violation issued Corey Priddy Cityworks 6 26
120 Number of penalties assessed Corey Priddy Cityworks 0 0
121 Number of educational activities/brochures distributed Corey Priddy CMCSI Database 5 7
122 Ratio of number of deficiencies detected compared to Corey Priddy Cityworks 34.08% 37.48%
number of BMP inspections conducted
123 Number of employees trained Ken Friday 1 Cityworks 1,379 1,314
124 Number of pounds of material removed from cleaning Julianna Hawley Data currently collected 1,214,2 1,542,200
streets and parking lots annually through year end 76
questionnaire to Towns
125 Number of pounds of material removed from inlet, Julianna Hawley Data currently collected 695,000 531,400
outlet and pipe cleaning annually through year end
questionnaire to Towns
126 Number educational activities completed/brochures Ken Friday Phase I and Phase II Data 62 49
distributed
127 Ratio of number of deficiencies observed at municipal Julianna Hawley EDMS/Cityworks 7.69% 10.34%
facilities to number of inspections conducted
128 Number of municipal inspections conducted. Julianna Hawley EDMS/Cityworks 52 58
129 Number of employees trained in preventing pollution Ken Friday MH-T and PP-1 annual 1,379 1,314
from automobile maintenance activities. reports
130 Number of educational materials distributed at Ken Friday Cityworks 0 0
garages,auto shops,and other automobile-related
businesses.
131 Number of employees trained in hazardous material Ken Friday MH-T and PP-1 annual 1,3 79 1,314
storage and maintenance. reports
132 Number of educational materials distributed. Ken Friday Cityworks 432 739
133 Number of reports of illegal dumping received. John Thao City Works-Incident Type 52 53
=discharge/dump in
General Inspection
template
134 Number of IDEP inspection to eliminate illicit John Thao Cityworks 21 19
discharges
135 Number of NOVs issued in response to IDEP John Thao NOVs and enforcements 3 4
inspections are tracked in CityWorks
136 Number of landscape/garden stores participating in Ashley Smith NOT TRACKED but NA NA
education programs. would fall under PE-I(7)
and ID-5 Annual Reports
137 Number of residents trained by the permittee in safe Ashley Smith NOT TRACKED but NA NA
landscaping,lawn care,and pest management would fall under PE-I(7)
techniques. and ID-5 Annual Reports
138 Number of classes/seminars offered by the permittee Ashley Smith NOT TRACKED but NA NA
in landscaping and lawn care. would fall under PE-I(7)
and ID-5 Annual Reports
32
Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services — — —
Indicates the data is used as a measure of success in the Stormwater Plan.
# Question Responsible Staff Data Source FY22 FY23
139 Number of municipal employees trained in integrated Ken Friday MH-T and PP-1 annual 348 322
pest management. reports
140 Number of parking lots cleaned. Julianna Hawley Data currently collected 20 15
annually through year end
questionnaire to Towns
141 Number of road cleanings/streets swept. Julianna Hawley Data currently collected 1003 2938
annually through year end streets streets+
questionnaire to Towns +421 124 miles
miles
142 Number of dog parks. Ashley Smith Parks and Recreation 7 7
Website
143 Number of"pooper-scooper"stations installed Ashley Smith Not currently tracked NA NA
144 Number of pooper educational materials distributed. Ashley Smith Cityworks 25 15
145 Number of road salt storage facilities included in a Julianna Hawley Data currently collected 6 6
regular inspection and maintenance program. annually through year end
questionnaire to Towns
146 Number of employees trained in road salt application. Julianna Hawley Data currently collected 348 6
annually through year end
questionnaire to Towns
147 Number pounds of salt applied to roadways. Julianna Hawley Data currently collected 790,000 0
annually through year end
questionnaire to Towns
148 Quantity of alternative deicing products used(in tons). Julianna Hawley Data currently collected 29,500 0
annually through year end gallons
questionnaire to Towns brine,
25 tons
of sand
149 Number of personnel trained in spill response. Ken Friday MH-T and PP-1 annual 1,379 1,314
reports
150 The number of high-risk facilities inspected Julianna Hawley Cityworks NA 0
(inspections to determine facilities to include in
inventory).
151 Number of educational materials distributed to Ken Friday Cityworks 0 0
municipal employees.
152 Number of storm drain outfalls cleaned regularly. Julianna Hawley Data currently collected 193 163
annually through year end
questionnaire to Towns
153 Number of storm drains cleaned regularly. Julianna Hawley Data currently collected 59,751 61,412
annually through year end
questionnaire to Towns
154 Amount of trash,sediment,and other pollutants Julianna Hawley Data currently collected 955 1037
removed during cleaning(in tons). annually through year end
questionnaire to Towns
33
/ , / Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services w
Attachment 2: Data by Jurisdiction
School Presentations
v oP-n
.0 a�i �' —5 c' .)
x
c Date 10/26/2022 1/5/2023 4/24/2023 5/4/2023 4/17/2023 N/A N/A
..2 Number Attending 20 23 18 _ 40 38 N/A N/A
G Date 10/26/2022 1/5/2023 4/24/2023 _ 5/4/2023 4/17/2023 N/A N/A
Number Attending 20 22 18 38 41 N/A N/A
g Date 10/26/2022 1/5/2023 4/24/2023 5/4/2023 4/17/2023 N/A N/A
°o Number Attending 21 21 19 42 32 N/A N/A _
co
Date 10/26/2022 1/5/2023 4/24/2023 4/21/2023 N/A N/A
c Number Attending 19 23 20 40 N/A N/A
W Date 10/26/2022 1/5/2023 4/27/2023 4/21/2023 N/A N/A
?' Number Attending 22 23 18 42 N/A N/A _
Q Date 10/26/2022 1/5/2023 4/27/2023 4/21/2023 N/A N/A
Number Attending 18 22 16 43 N/A N/A _
Date 1/5/2023 4/27/2023 N/A N/A _
Number Attending 21 20 N/A N/A
Date 1/5/2023 N/A N/A _
Number Attending 24 _ N/A N/A
Total 6 0 8 7 0 3 c 29
Presentations Conducted
cu
0 A 1 x A V F
x
Presentation Title/Topic Predictions of Waters of 'rN/A N/A
8 Fecal Pollution Huntersville
i in Charlotte-
! Mecklenburg
SISurface Waters
u Date 11/4/2022 8/27/2022 N/A N/A
2 Group Name North Carolina Town of N/A N/A
Lake Huntersville
o Management Staff
e• Society
Q Number of Participants 50 25 N/A N/A
Presentation Title/Topic Air Quality N/A N/A
Teacher
Workshop
Date 3/27/2023 N/A N/A
Group Name K-12 Teachers N/A N/A
Number of Participants 17 N/A N/A
Total 1 0 2 0 0 0 0 3
34
, , / Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services
Events Attended
.°..' 304
$ 5
e h
Name of Event All American Water Week Matthew Mint Hill N/A N/A
Dog Show Celebration Earth Day Middle School
Career Day
Date 10/9/2022 5/6/2023 4/15/2023 4/6/2023 N/A N/A
Nmmber of Attendees 85 100 7/18/1900 100 N/A N/A
Materials Displayed CMSWS table CMSWS table CMSWS CMSWS table N/A N/A
set up,prize set up,plinko table set set up,Day in
wheel up,plinko the Life of
a Water Quality
Video _
u Give-a-ways Used Pet waste Sunscreen,pens,Hand Hand N/A N/A
holders,hand Stouny activity sanitizer, sanitizer,
sanitizer booklet, straws, straws,
o flashlights, sunscreen, sunscreen,
ilt
e. whistles magnifying magnifying
✓ glasses, glasses,
stickers, stickers,
keychains, keychains
Stonrry
coloring
books
Name of Event Cornelius N/A N/A
Elementary
School Career
Day
Date 5/10/2023 N/A N/A
Number of Attendees 299 N/A N/A
Materials Displayed CMSWS table N/A N/A
set up
Give-a-ways Used None N/A N/A
Total 2 I 1 1 0 1 0
Adopt-A-Stream Activities
5 s x i m u o
x 6 H
Q uq x 5 a
1 Miles Adopted 0.7 5.6 10 4.8 332 0 1.1 N/A N/A 55.4
4 Volunteer Groups 1 5 7 5 2 1 3 N/A N/A 24
'1' Volunteers 5 39 118 75 189 0 25 N/A N/A 451
g. Volunteer Hours 5 112 290 165 412 0 50 N/A N/A 1034
R Pounds of trash Removed 30 250 1054 950 5305 0 1100 N/A N/A 8689
Problems Reported 0 0 1 0 0 0 0 1
CO Storm Drain Marking Activities
g u
o
.N B a > 0U
v74
r* U A U E.
5 Events 2 3 1 5 0 1 2 N/A N/A 14
to Volunteers 2 6 2 12 0 31 15 N/A _N/A 68
2 Volunteer Hours 2 9 2 15 0 93 15 N/A N/A 136
a Markers Applied 24 65 22 50 0 214 88 N/A N/A 463
4 Problems Reported 0 0 0 0 0 0 0
—
Big Spring Clean Activities
a
5' c
s V 4
E a cy x _ v E.
w a Pi ; g C
Fs"o
59
is Miles Cleaned 0 0.3 2 1 0 0 0 N/A N/A 3.3
Volunteers 0 25 18 35 0 0 0 N/A N/A 78
" Volunteer Hom's 0 75 54 105 0 0 0 N/A N/A 234
e, Pounds of Trash Removed 0 200 390 745 0 0 0 N/A N/A 1335
V
Problems Reported 0 0 0 0 0 0 0 0
35
, , / Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N .Services
Volunteer Monitoring Activities in FY2023
t
on o of,
1 1 ❑ - H o
A tG W .1F
AI
Volunteer Groups 0 0 3 1 3 0 _ N/A N/A 9
Volunteers 6 2 36 21 77 1 2.5 N/A N/A 168
Volunteer Hours 1.5 1.25 76 17.25 90.5 0.':' 11 N/A N/A 200.75
Visual Assessments 0 1 0 0 0 0 0 N/A N/A 1
R Streamside Snapshots 6 1 0 5 0 1 0 N/A N/A 13
Chemical Assessments 0 0 3 1 10 0 N/A N/A 17
Problems Reported 0 0 2 0 1 0 0 3
Stormwater Inventory
o
co v o> c d a _ U 3'� A > y U CIn C _ a U E.L l
rs
x
y Inlets 6,271 3,172 13,446 6,229 10,461 4,360 3,685 5.157 343 53,424
,' Outlets 898 443 1,922 848 2,161 1,145 623 845 8,957
Q Major Outlets(>36") 41 59 190 51 170 79 44 32 1 670
`1 Industrial Outletstk 44 0 29 62 109 25 73 0 0 342
Total 7,254 3,674 15,587 7,190 12,901 5,609 4,425 6,334 419 63,393
Screening for Non-Stormwater Flows
o so
o
v
o e L _ og c v N, z L' C U H
4 U La ?
' fti
Outfalls Inspected 14 49 14 15 _. 40 20 0 0 177
41 Problem Detected 1 0 1 0 I 0 1 0 0 4
Problem Corrected 1 0 1 0 I 0 1 0 0 4
N Total 16 49 16 15 27 40 22 0 A 185
Q Field Screening Activities Fecal Coliform Physical Physical Physical 4
"' Sampling! Inspection Inspection Inspection
Physical
Inspection
Service Request No. 195662 178283 179760 1'?2.916
a. Service Requests,Emergency Response,and Notices of Violations
g ai 44
o a G .:73v °' a `�+ •5 U `�
W 4 E U A x 5 g1
.
P4 a SR 17 4 25 30 49 17 7 N/A N/A 149
' ER 6 2 3 3 3 4 9 N/A N/A 30
d NOVs Issued 1 1 8 6 10 3 2 N/A N/A 31
'9 o 'NOVs Resolved 0 1 8 6 7 3 2 N/A N/A 27
C,v a Problems Detected 8 2 15 13 27 10 6 N/A N/A 81
-. °' Problems Corrected 8 2 15 13 22 10 6 N/A N/A 76
4tS
Total 40 12 74 71 118 47 32 394
Pollution Sources
o
.ri oo
1 € 3
R
v ti) E 'u - m AU., o
E.
Accidental 3 0 2 3 5 _ 2 N/A N!A 17
S o, Algae 0 1 0 0 _ 0 0 N/A N/A 3
PT-' a Aquatic Life/Fish Kill 0 0 0 0 1 0 N/A N/A 1
'9 Q Buffer 1 0 0 2 i 1 0 N/A N/A S
p m
C.11 Discharge/dump 4 1 12 10 1'1 8 3 N/A N/A 53
o' G Erosion/sediment 1 0 1 0 1 0 N/A N/A 5
•'oo Monitoring Follow-up 0 0 0 0 2 0 0 N/A N/A 2
• :a Natural Condition 3 1 4 2 4 0 0 N/A N/A 14
'GGO 5 No Incident Identified 5 1 5 10 12 -I 2 N/A N/A 39
C. li Other 0 0 1 2 3 0 0 N/A N/A 6
'o at Unlatown 0 0 0 1 0 0 0 N/A N/A 1
Total 17 4 25 30 49 17 149
36
/ , / Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N .Services
Materials Discharged
E I t C_ H
� ,5 •
o . Allowable Discharge 1 0 1 3 0 0 0 N/A N/A .-.
v P-4' Buffer 1 0 0 2 4 1 0 N/A N/A s
c W Cooking Oil/Grease 0 0 2 1 1 0 2 N/A N/A o
a 0 Motor Oil 1 0 1 0 2 0 0 N/A N/A 4
m None 7 3 7 10 17 5 2 N/A N/A 51
o Other 0 0 3 0 4 1 1 N/A N/A 9
w ag Paint 0 0 1 1 0 2 0 N/A N/A 4
sQ g Petroleum Fuels 0 0 2 3 5 1 1 N/A N/A 12
.2 . Sediment 1 0 2 1 3 1 0 N/A N/A S
a 'i"j Sewage-CMU 0 0 0 2 1 0 0 N/A N/A 3
b a Sewage-Private _ 0 0 2 6 0 0 N/A N/A 10
n .,Fa (commercial) _ _
C 2 Sewage-Private _ 1 2 0 0 0 0 N/A N/A
1 (residential)
„`n, a Sewage-Septic 0 0 1 1 1 1 0 N/A N/A 4
Trash 0 0 0 1 0 0 0 N/A N/A 1
Unknown 1 0 0 1 3 0 1 N/A N/A ii
Wash Water 0 0 .. 1 1 2 0
Yard Waste 1 0 1 1 1 3 0 N/A N/A
Total 1? 4 25 30 49 17 7 149
Biological Macroinvertebrate and Habitat Assessment Monitoring
•,
U A x " a V
Stream W.Br. McDowell Foumsile Clarke Creek Goose Creek Little Sugar Creek N/A N/A
Rocky River Creek Creek MY10 MC49A
Site MY1B MC2 MC40C 8/18/22 MY9 7/27/22
Date 8/25/22 7/13/22 7/27/22 9 7/27/22 10
EPT Taxa Ridmess 12 8 8 24 11 30
Total Taxa Richness 43 40 28 6.70 43 7.07
Oh NCBI 7.03 6.66 6.62 FAIR 6.56 FAIR
_ Bioclassification FAIR FAIR FAIR FAIR
$ Stream McDowell Duck Creek Sugar Creek N/A N/A
_ Creek
Site MC2A1 MY14 MC27
r Date 8/18/22 7/28/22 7/27/22
M EPT Taxa Richness 12 11 11
Q Total Taxa Riclmess 360 36 25
II
NCBI 6.59 5.79 6.45
x Biodassification FAIR GOOD-FAIR FAIR
t
0 Stream McDowell Clear Creek
til Creek
� Site MC4 MY8
> Date 7/12/22 7/28/22
's EPT Taxa Ricimess 14 14
m Total Taxa Richness 48 37
NCBI 6.04 5.65
v
Biodassification GOOD-FAIR GOOD-FAIR
6
jfq" Stream Torrence Creek McKee Creek NiA N A
r%, MY7B
A' Site MC3E 8/03/22
Q Date 8/31/22 8
t' EPT Taxa Richness 11 24
Total Taxa Richness 38 6.41
NCBI 6.45 FAIR
Biodassification _ FAIR _
Stream Gar Creek Reedy Creek NrA N%A
Site MC50 MY13
Date 7/12/22 8/03/22
EPT Taxa Richness 16 11
Total Taxa Richness 50 31
NCBI 5.68 6.31
Biodassification GOOD-FAIR FAIR
Total 1 Site 5 Sites 1 Site 5 Sites 1 Site 2 Sites 15 Sites
37
, , / Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N ..Services — _
Biological Fish and Habitat Assessment Monitoring
t.
$ 5
3 a 0 - w o
U a x a c�
co Stream McDowell N/A N/A
Creek
1 Site MC4
Date 7/10/23
wNumber of Species 13
e Number of Fish 237
e NCIBI 34
Q Biodassifrcation POOR
Stream Gar Creek N/A N/A
Site MC50
Date 5/2/23
Number of Species 9
Number of Fish 148
NCIBI 36
Biodassirrcation FAIR
Total 2 sites I 2 sites
Observations mid Exceedances of NC State Standards per Parameter per Site and Number of Problems Detected
v eb
1y 1 c u P.
ca x
West Branch McDowell Four Mile Clear Creek ' N/A N A
Stream Rocky River Creek Creek
MY1B
Site 2,839;395 MCA MC4OD MY8
Turbidity:#Obs;# 6,644;1,196 5,264;602 3,218;316
Exceedances 2,806;0
Dissolved 02:#Obs;# 8,212;0 4,889;15 2,323;0
Exceedances 4,029:0
pH:#Obs;#Exceedances 8,543;0 5,794;0 3,210;1
Specific Conductance:# 3,891
Obs 8,202 5,804 3,378
Temperature:#Obs;# 4,029;0
Exceedances 8,640;0 6,332;0 3,380;0
#of Problems Detected 0
k 0 0 0
iStream Gar Creek Goose Creek N/A N:A
1 Site MC50 MY9
Turbidity:#Obs:# 7,418;359 29,888;1457
Aq
Exceedances
8 Dissolved 02:#Obs:# 7,574;24 22,307;5
Q Exceedances
e pH:#Obs;#Exceedances 8,058;27 31,205;0
QSpecific Conductance:#
Obs 7,760 33,361
✓ Temperature:#Obs;#
Exceedances 8,722;0 33,922;0
#of Problems Detected
0 0
Stream Clarke Creek
Site MY10
Turbidity:#Obs;# 5,921;1985
Exceedances
Dissolved 02:#Obs;# 6,014;2
Exceedances
pH:#Ohs;#Exceedances 7,774;0
Specific Conductance:
Obs 7,399
Temperature:#Obs:
Exceedances 8,032;0
#of Problems Detected
0
Total Sites 1 Site 3 Sites 1 Site 2 Sites 7 Sites
Total Observations 17,594 114,913 28,083 166,192 326,782
Total Exceedances 395 3.593 617 1.779 6384
Total Problems Detected 0 0 0 0 0
38
, , / Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N.Services
Stream Walk Activities and Problems Louged in ARCGIS
J.y oA
3d a U H
x A
Stream Name(s) Ramsey Creek, South Prong Gar Creek& N/A WBRRTrib., Goose Creek Sugar Creek& N/A N/A N'A
Hager Creek, WERR& Tribs.,Dixon South Prong &Tribs. Tubs.,McCullugh
Gambles Creek, Trib.,WBRR Branch,and WBRR& Branch,Little
South Prong Trib.,& other UTs Trib.,Six Sugar Creek&
WERR Trib.,& other UTs Mile Creek, Tribs.
other UTs Goose Creek,
Gar Creek,
Coffey Creek,
&other UTs
•g Stream Miles Walked 4.12 11.71 9.5 0 27.13 8.26 9.91 N/A N/A 70.63
I
b
C
C New Outfalls 3 23 0 0 8 0 4 N/A N/A 38
c Existing Outfall Inspected 10 26 1 0 5 14 12 N/A N/A 68
Dry Weather Flows 2 12 0 0 3 0 _ N/A N/A 22
Observed
Samples Collected 0 0 0 0 0 0 0 N/A N/A 0
Problems Detected and 0 2 0 0 0 0 1 N/A N/A 3
Corrected
Buffer Violations 0 1 0 0 1 0 0 N/A N/A 2
Channel Problems Beaver Dams 0 Stream 0 Beaver Dams Beaver Dams Severe Bank N/A N/A 42
(2),Stream Blockages(4) (7),Severe (6),Severe Erosion(1)&
Blockage(1) Bank Erosion Bank Erosion Stream Blockages
(1),&Stream (1),&Stream (5)
Blockages Blockages(3)
(11)
Total Features 18 64 5 0 36 24 28 175
Inventoried in ArcGIS
IDEP Activities-Watershed Basin Inspections
n744 a s 3 S 0' .22 .7:ffi v u
C cj
U LaMI • fsr
4.1 initial inspection Date 3/29/2023 3/29/2023 3/29/2023 4/10/2023 5/18/2023 3/30/2023 3/29/2023 N/A N/A
8 Completion Date _ 3/29/2023 3/29/2023 3/29/2023 4/10/2023 5/18/2023 4/3/2023 3/29/2023 N/A N/A _
c Activity ReportNo(s.) 75002 75002 75003 75170 75980 75028/75063 75011 N/A N/A
SR Generated Based on 1 1 1 1 N/A N/A 4
B Inspection
v —
I SR No. 186738 188501 194054 186896 N/A N/A
NOV Issued 1 0 1 1 3
G
T.3' Initial Inspection Date 3/30/2023 N/A N/A
p Completion Date 3/30/2023 N/A N/A
Q, Activity Report No(s.) 75014 _ N/A N/A
Q SR Generated Based on 1 N/A N/A 1
Inspection _
V SR No. 186-38 N/A N/A
NOV Issued 1 N/A N/A 1
Total 0 1 2 1 1 1 1 N/A N/A 9
39
, , / Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N ..Services
Used Oil Inspections
f.r in
o = .:S U
`z E.
wFacility Name Valvoline Speedee Oil
O Change
1 Problem Detected _ 0 0 0
Problem Corrected 0 0 0
c� Status Satisfactory Satisfactory
2 Total 0 0 0
Field Screening Activities Physical Physical 2
N
4 Inspection Inspection
Activity Number 75665 75815
Summary of Erosion Control Inspections
al
' G m a A a v 't�•j c�
W 11 8 A F
. 63
,i ,. Inspections 48 43 109 166 21 286 45 N/A N/A 718
V Notices of Violation Issued 0 1 0 �2 1 3 1 N/A N/A 8
v
. Total 48 44 109 168 22 289 46 726
BMP Numbers by Type and Jurisdiction
.5.' er.
u r7 U m
0 0 b a I
U F
3 U A x S 4
T
Bioretention 39 28 306 4 29 25 7 59 5 502
1 Buffer 3 2 5
Dry Pond 15 - 170 43 29 44 30 92 3 433
p Enhanced Grass Swale 32 1 1 2 36
-
I; Filter Strip 6 _ 7 15
Grassed Channel 24 12 5 1 42
4 Infiltration Trench 0 2 10 12
Level Spreader 2 2
Open Space 2 3 1 3 2 11 22
Fq Permeable Pavement 1 2 1 4
N Sand Filter 15 9 142 _)7 15 12 20 _ 249
U Underground Detention 18 8 1 4 1 32
co Underground Sand Filter 3 3 2 _8
Stream Restoration 1 6 7
Underground Detention 2 _2 4
Wet Pond 23 4 48 11 46 6 6 22 2 168
Wetland 7 5 11 I 1 2 34
Total 108 63 774 96 144 95 64 217 14 1575
Summary of BMP Insp ections and Education
W ° eq
Pw o a €
E n Au 3" t .
a FW S A x i` w
41abInspections _91 650 50 _283 59 40 127 21 1362
g o Notices of Violation Issued 0 0 11 1 I 0 0 0 0 20
•N U
n. Corrective Action 0 0 10 0 8 0 0 0 0 18
m S Requests
4f Educational Notices 13 0 48 0 25 9 3 0 0 98
Total 104 41 719 51 324 68 43 12' 21 1498
Municipal Operations Staff Training
o:a y =er,
v
h d d i
m
WO 0 t o�C U A Wx
ITraining Date 5/26/2023 17/25/2023 6/6/2023 Selected dates 6/6,13/2023 5/30,31/2 5/11/2023
Oi between 5/25- 023
w 6/28/2023
L.
Staff Trained 8 10 30 98 12 144 20
Total 8 10 Not Reported 30 98 12 Not Reported 144 20 322.
40
/ , C aarl.tte fecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services
Attachment 3: Modifications to the SWMP for FY2023
The modifications identified in the table below were completed to the October 2021 version of
the Storm Water Quality Management Program Plan(SWMP) for implementation in FY2023
effective November 2022.
Section&Page#from
October 2021 Version Description of the Modification
Section 2,page 2 Change authorized representative from Dave Canaan to Don Ceccarelli.
Section 2,page 2 Added a table identifying the dates when annual reviews of the SWMP were
completed and responsible staff.
Section 3,page 3 Replaced Figure 1 with a map that more clearly delineates the different Phase
II jurisdictions.
Section 3.3,page 3 Added definitions at the bottom of Table 2.
Section 3.4,page 10 Added definitions at the bottom of Table 3.
Section 3.5,page 9 Updated Table 3 with most current TMDL information.
Section 3.5,page 13 Replaced Figure 3 with an image that defined DO,TP,and TN.
Section 3.7,page 15 Replaced Table 6 with updated list of facilities with NPDES Industrial
Permits.
Section 4,pages 18, 19,and 20 Updated the BMP summary table for Program Administration so that it would
be consistent with the text in the annual Work Plan in Time Pro.
Section 4.4,pages 22 and 23 Changed to differentiate between SOPs and SAPs for the SWMP that include
an approval page and revision history and SOPs for inclusion in SWPPP that
do not include these.
Section 4.6,page 25,and Table Updated annual assessment process and changed Table 12 to include SWMP
12 changes made in FY2022.
Section 5.4.1,page 36 Replaced Figure 4 with a utility bill insert from October 2022.
Section 5.4.3,page 38 Rewrote this section around articles and newsletters instead of print ads
Section 5.4.5,page 39 Replaced Figure 5 with a web Banner for 2022.
Section 5.6 on pages 42 and 43 Change the measure of success for increasing awareness for the Public
Education Program from 50%to 60%and removed the measure for increasing
extent of exposure.
Section 5.4.8,page 30 Changed the pollution prevention video locations from the website to You
Tube.
Section 5.5,page 41 Added the Underserved Communities Reach Plan developed in FY2023 to the
information regarding efforts to reach our diverse community.
Section 6.2,pages 45 and 45 Updated the BMP summary table for Public Involvement and Participation so
that it would be consistent with the text in the annual Work Plan in Time Pro.
Section 6.4.6,page 50 Updated the volunteer monitoring information to include the Streamside
Snapshot are a third volunteer option available to participants.
Section 6.6,page 51 Changed the measure of success for increasing the number of volunteers for
the Public Involvement Program to an increase from the average for the past 3
years.
Section 7.2,page 52,Table 18, Added#trained as an annual reporting metric for"c"under#21 and"a"under
numbers 21,24,25 and 26 #24,25 and 26.
Section 7.7.1,page 62 Added"total number and location of Notice of Violations issued"as a means
of identifying priority areas with a high likelihood of illicit discharges.
Section 7.7.1,page 62 and Changed time for responding to Category 1 service requests from within 4
hours to as soon as possible upon receipt.Also changed Category 2 from a 4-
hour to a 2-hour response.
Section 7.7.1.2,page 63 Changed samples for fixed interval monitoring collected on the second
Tuesday and Thursday of each month to just the second Tuesday. Also,
eliminated 1 monthly sampling during base flow to identify illicit discharges.
Section 7.7.1.2,page 65 Replaced Figure 10 with the newest SUSI map for the 4th quarter of FY2022.
41
C,a,h e-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services
Section&Page#from
October 2021 Version Description of the Modification
Section 7.7.5,page 73 Updated Figure 12 to include NOVs issued from 7-1-2020 to 6-30-2022.
Section 7.8,page 73 Updated the last paragraph in this Section to describe IDDE municipal staff
training completed for Permit term ending February 16,2022.
Section 7.10,page 74 Changed the measure of success for increasing pollution problems identified
for the IDDE Program to an increase from the average for the past 3 years.
Also,changed the measure of success for repeat violators to a decrease from
the average of the last 3 years.
Sections 8.4 and 8.5,page 78 _ Expanded references to include erosion control ordinances for the Towns.
Section 8.8,page 78 Removed reference to CMCSI being conducted twice a year. _
Section 8.11,page 80 Changed the measure of success for Construction Site Runoff Control Program
to documenting inspection activities instead of documenting activities for
completion of Work Plan program activities.
Section 9.6,page 87 Added BMPs installed for compliance with Huntersville's LID Ordinance
prior to June 30,2007 are not subject to these requirements.
Section 9.11,page 90,#9 Changed the length of Maintenance Bond from not less than 2 years from the
BMP approval date of the Storm Water Administrator to as-built approval
date.
Section 9.11,page 92 Added#11 to include actions taken to ensure maintenance of low-density
projects.
Section 9.13,page 93 Changed the measure of success for the Post-Construction Runoff Control
Program to documenting inspection activities instead of documenting activities
for completion of Work Plan program activities.
Section 10.3,page 98 Changed the number of properties owned by co-permittees in CMSW's
inventory from 3,052 to 3,208.
Section 10.3,page 99,Table 24 Changed job titles from Sr.Environmental Specialist to Solid Waste Facility
Manager.
Section 10.3,page 100,Table In the footnote to the table,changed the date for discontinuing operations at
27 the Old Compost Central&Recycling Center from late 2021 to the spring of
2023.
Section 10.4,page 103 Change the effective date for when CMS owns 176 schools from January 1,
2021 to January 1,2022.
Section 10.8,page 105 In the second bullet,changes 8.6 to 10.7.
Section 10.9,page 105 Updated for FY2022 numbers.
Section 10.16,page 111 Changed the measure of success for Pollution Prevention and Good
Housekeeping to a decrease from the average for the past 3 years.
Section 10.16,page 111 Changed the measure of success for improving compliance for the Pollution
Prevention and Good Housekeeping Program to a decrease from the average
for the past 3 years.
Section 11.91,page 134 Updated Table 36 with new data.
Section 11.10,page 137 and Added the BMP measures implemented in the TMDL watersheds during
141 FY2022.
Appendix A,page 144 Updated the BMP Summary Table
Appendix B Updated the organizational chart for CMSWS.
Appendix E,pages 187 through Replaced old municipal facility inspection form with the new one.
190
42
C,a,h e-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
Attachment 4: Modifications to SWMP for FY2024
The modifications identified in the table below were completed to the November 2022 version of
the Storm Water Quality Management Program Plan(SWMP) for implementation in FY2024
effective September 2023.
Section&Page#from
November 2022 Version Description of the Modification
Section 4.6 on page 24 Modified the description of the annual reports and assessments submitted to
the State annually.
Table 15 on page 32 Replaced Hazen Blodgett with Becky Hawke as the Matthews Town Manager.
Section 5.8 on page 44 Added increase extent of exposure for the media campaign as a measure of
success and modified the measure for increasing awareness to an increase from
the average of the past 3 fiscal years.
Section 7.10 on page 75 Modified the descriptions of the measures of success for the IDDE Program.
Section 8.11 on page 82 Modified the descriptions of the measures of success for the Construction Site
Runoff Control Program to a decrease in the percentage of notices of violation
issued to the number of inspections conducted based on the average for the
past 3 fiscal years.
Section 9.14 on page 94 Modified the descriptions of the measures of success for the Post-Construction
Site Runoff Control Program to a decrease in the deficiencies detected to the
number of inspections conducted based the average for the past 3 fiscal years.
Section 10.16 on page 112 Modified the descriptions of the measures of success for the Pollution
Prevention and Good Housekeeping Program to a decrease in the percentage of
deficiencies detected to the number of inspections conducted based on the
average of the previous three(3)fiscal years.
Table 10 on page 20 Updated the BMP Summary table to be consistent with the new annual report
format.
Table 16 on page 35 Updated the BMP Summary table to be consistent with the new annual report
format.
Table 17 on page 44 Updated the BMP Summary table to be consistent with the new annual report
format.
Table 19 on page 76 Updated the BMP Summary table to be consistent with the new annual report
format.
Table 20 on page 82 Updated the BMP Summary table to be consistent with the new annual report
format.
Table 23 on page 94 Updated the BMP Summary table to be consistent with the new annual report
format.
Table 10 on page 20 Updated the BMP Summary table to be consistent with the new annual report
format.
Appendix A on page 145 Updated the BMP Summary table to be consistent with the new annual report
format.
Appendix B on page 164 Updated the Phase II organizational charts as necessary.
43
, , Charlotte Mecklenburg fi II
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services — —
Attachment 5: Pollution Prevention Educational Information Distributed in FY2023
During FY2023,the following pollution prevention educational information was distributed by staff with
Charlotte-Mecklenburg Storm Water Services (CMSWS)when conducting inspections and responding to
citizen requests for service. All Phase II Town Halls and libraries were supplied with residential pollution
prevention brochures and information regarding volunteer opportunities. CMSWS also educates over
2,600 residents through their monthly volunteer newsletter.
• A Guide to Used Oil Recycling
• Scoop the Poop(proper handling of pet waste)
• What Goes In Here Ends Up Here—postcard regarding neighborhood trash pollution
• A Resident's Guide to Pollution Prevention
• Volunteer Opportunities (English and Spanish)
• A Brief Look at Charlotte-Mecklenburg Storm Water Services—Your Storm Water Fees at
Work
• Grease Free(proper disposal of grease from Charlotte-Mecklenburg Utilities)
• Household Hazardous Waste—What do you do with left over chemicals
• Environmental Notices for Homeowners—Disposal into the storm drain is against the law
(English, Spanish, Chinese,Vietnamese,and Korean)
• Environmental Notices for Businesses—Disposal into the storm drain is against the law
(English, Spanish, Chinese,Vietnamese,and Korean)
• Water Watchers door hanger
• Household Hazardous Waste slider
• Dispose of Leaves Properly postcard
• Water Quality Buffers postcard
• When Surface Waters Turn Colors(Pollen,Tannin,Iron Bacteria)
• Automotive Facilities Pollution Prevention Poster(English and Spanish)
• Clean Boating BMP
• Fish Consumption Advisory
• Invasive,Exotic Plants
• NC Division of Natural Resources Fact Sheets:
o Iron Bacteria
o Surface Film
o Water Foam
• Non-Structural Best Management Practices Handout
o Asphalt Sealing(English and Spanish)
o Breweries
o Carpet Cleaners(English and Spanish)
o Commercial Property Management
o Concrete Industry(English and Spanish)
o Contractors
o Equipment Repair
o Food Service(Chinese,English, and Spanish)
o Horizontal Directional Drilling
o Landscapers
o Mobile Detailer
o Multi-Family Communities(English and Spanish)
o Painters
o Pool& Spa Maintenance (English and Spanish)
o Pressure Washers (English and Spanish)
o Realtors
o Rooftop Workers
44
, , / Charlotte Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
o Stone Cutting&Fabrication Industry
o Utility Contractors(English and Spanish)
o Vehicle Service
o Well Drillers(English and Spanish)
• Structural Best Management Practices Handout
o Dry Detention
o Rain Garden
o Sand Filter
o Stormwater Wetland
o Wet Pond
45
Charlotte-Mecklenburg/
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
Attachment 6: Industrial/Commercial Educational Activities
Educational Handouts/Events Target Audiences #of Businesses Dates
Contacted
Multi-Family Stormwater Pollution Multi-Family businesses 619 4/3/2023
Prevention and Pavement Sealant within Mecklenburg County
Guidelines Mailer(Cover
letter/flyer)
Stormwater Pollution Prevention Bank of America Grp. 135 9/22/2023
Power Point presentation Charlotte My Environment
Stormwater Pollution Prevention, Carolina Green Network- 150 1/24/2023
pesticide,herbicide information Workshop,Union County
SWPP table with handouts for Costco Store#36-Matthews, 30 3/21/2023
Costco staff NC-"World Water Day"
46
, , Charlotte Mecklenburg fi II
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Attachment 7: Media Outlets and Outreach Results for FY2023 Media Campaign
In FY2023, CMSWS has identified and implemented educational campaigns to meet the key objectives
among four media campaigns:
• Water Quality—Increase public awareness of surface water quality issues and how to report
pollution problems (target pollutants: fecal coliform and sediment)
• Volunteer—Increase public action/volunteer engagement to reduce surface water pollution
• Flood Safety—Increase public awareness of flood risks and flood safety
• Infrastructure—Increase public awareness of storm drainage infrastructure that carries rainwater
to streams and the importance of improving infrastructure to support a thriving city.
These objectives supported content produced for media outlets, social media, and the webpage with a
target audience of adults ages 25-54. Media outlets included Social Media, Programmatic Display&
CTV,YouTube, Charlotte Five,Axios Charlotte,Broadcast Television,Radio and the Webpage.
Social Media—CMSWS staff maintain a Facebook,Instagram, and Twitter Page(@StormWaterCM).
The page is maintained using Sprout Social. Paid social media ads for FY2023 saw 7,092,810
impressions; 1,160,945 reaches; 686,177 engagements, and 125,003 clicks. Organic social media content
was as follows:
• Facebook: 50 video posts; 299 photo posts; 27 link posts; 0 text posts
• Instagram: 29 carousel posts; 69 video posts; 276 photo posts
• Twitter: 43 video posts; 170 photo posts; 13 link posts; 14 text posts
Programmatic Display&CTV—2,387,456 impressions; 4,190 clicks
YouTube— 1,453,108 impressions; 996 clicks
Charlotte Five—9,000 impressions; 2 articles
Axios Charlotte—24,450 impressions; 11 calendar posts
Broadcast Television—5,680,000 impressions; 63.2%reach; 2 frequency; 215 ads
Radio—923,300 impressions; 26.9%reach; 2 frequency; 345 ads
Webpage—CMSWS' webpage, StormWater.CharMeck.org contains information about stormwater
projects, stormwater pollution reporting, flooding, surface water quality,volunteer opportunities,fees,
and regulations. Edits to the webpage are made throughout the year,with staff performing webpage
reviews at least twice per FY. During FY2023, Google Analytics showed CMSWS's webpages had
465,097page views and 191,600 unique page views,which is an increase from 38,642 page views in
FY2022.
47
Charlotte-Mecklenburg
1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services
Attachment 8: Measure of Success for the Public Education and Outreach Program
Increase the extent of exposure from the media campaign based on the average of last 3 fiscal
years (serves as indicator of the success of outreach efforts).
Extent of Exposure f Goal
25,000,000
.2 20,000,000
19,798,168
U
s
E 15,000,000
0
0
lr
0
0
0 10,000,000
6,063,651 6,063,651 6,446,186 6,214,776 6,329,781
vvs i ❑
u 5,000,000 6,063,651 6,828,720 —5,751,958
6,408,664
0
FY19 FY20 FY21 FY22 FY23
48
/ , / Charlotte-Mecklenburg
1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N ..services
Attachment 9: Measure of Success for the Public Education and Outreach Program
Increase the percentage of survey respondents indicating they are aware that water flowing into
storm drains goes directly to creeks and lakes based on the average of last 3 fiscal years (serves
as an indicator of the success of our messaging efforts).
°o Respondents —Goal
90%
79.70%
77.47%
80% 83.00%—
80.40% 81.50%
3 79.20%
75.00% 75.67% 75.70%
0 70%
w 69.00% 67.30%
0
60% —55.00% 61.67%
3 iin
50% —55.00% 55.00%liii
- 50.00%
$� 45.00% 47.00%
0 40%
p4 41.00%
= 30%
w
0
20%
i
u
' 10%
0%
FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
49
/ , / Charlotte Mecklenburg
d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�services
Attachment 10: Promotional Items in FY2023
The following promotional items are available for distribution at events:
• Color changing cups
• Colored pencils
• Flashlights
• Golf/boat towels
• Hand sanitizers
• Ink pens
• Keychains
• Koozies
• Lip balms
• Magnets
• Magnifying glasses
• Pet waste bag dispensers
• Rain gauges
• Reusable bags
• Reusable straws
• Stormy coloring books
• Stormy stickers
• Stormy stuffed animals
• Stormy temporary tattoos
• Sunscreens
• Water bottles
• Whistles
50
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
r`r�serures
Attachment 11: Volunteer Recognition Activities in FY2023
Appreciation Campaign #Volunteers Method/Gift Date/s
Recognized
Volunteer Spotlight 62 T-Shirt/Social Media Post/ Monthly
Website Post
Volunteer(s) of the Year 18 Hoodie/Social Media Post 12/1/2023
Volunteer Thank You 894 Magnet, Stormy Pin, Year Round
Sticker
National Volunteer Week 7 Social Media Post 4/15/2023
Creek Week Thank You 873 Social media Post 3/27/2023
51
/ , / Charlott e5./..lenburg
/ / 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N .Services
Attachment 12: Measure of Success for the Public Involvement and Participation Program
Increase the number of volunteers based on the average of last 3 fiscal years (serves as an
indicator of the success of our efforts to increase volunteer participation).
#Volunteers --Goal
6.000 —
5,000
4,848
4,622 4,623
4,464 UI
4,000
i
2,948 3,659 3,6593,824 3,825
c 3,479 2,948 3,488rt N92 /'
3,000 2,948 3 025r 3,117 3,120 3,192
P 2,846 2,744 2,744
A
2,000
1,000
0
FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
52
Charlotte-Mecklenburg
�/ / �j STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
..."—....-0 Services
Attachment 13: Fixed Interval Monitoring(FIM) Sites for Phase II
•FY23 Fixed Interval Phase II Monitoring Sites
.',Basins
d hit
1!;?County Boundary
" MY1 B Charlotte
�Cornelius
► 1 r Davidson
-` MC2- -" •Huntersville
r - -- r Matthews
Mint Hill
M --= MY1 0 r Pineville
MC50 - -
J( 1
r
i
�� ,I/ '‘, MY14
..„(-' ,.,''.'t.„
5-1
re,-/
4111. )111. ,
—, A/ /
) ) r
- li -,`R •
Ii ( 7
( j MC40C
cr F
5 V
J-
JrCharlotte-Mecklenburg
f/ / /j STORM0
WATER
.....,..,..Services
53
/ , / Charlotte-Mecklenburg
f / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
/V`Services
Attachment 14: FY2023 Fixed Interval Monitoring (FIM) Results for Phase II
(see site location map in Attachment 13 and SUSI map in Attachment 15)
Collection Date MMI. Analyte Result Unit Site j Site Description MDL
7/19/2022 11:20:00 AM E.Coli 186 MPN/100 ml MC2 Birkdale Golf Course 1 No
7/19/2022 11:20:00 AM Turbidity 12 NTU MC2 Birkdale Golf Course 0.50 No
7/19/2022 11:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
7/19/2022 11:20:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
7/19/2022 11:20:00 AM Fecal Coliform 340 CFU/100 ml MC2 Birkdale Golf Course 10 No
7/19/2022 11:20:00 AM Nitrate/Nitrite 0.28 mg/L MC2 Birkdale Golf Course 0.05 No
7/19/2022 11:20:00 AM Total Phosphorus 0.034 mg/L MC2 Birkdale Golf Course 0.010 No
7/19/2022 11:20:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 No
7/19/2022 11:20:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 No
7/19/2022 11:20:00 AM TKN 0.31 mg/L MC2 Birkdale Golf Course 0.25 No
7/19/2022 11:20:00 AM Calcium 12000 ug/L MC2 Birkdale Golf Course 2000 No
7/19/2022 11:20:00 AM Magnesium 2500 ug/L MC2 Birkdale Golf Course 500 No
7/19/2022 11:20:00 AM Hardness 40 mg/L MC2 Birkdale Golf Course 1.0 No
7/19/2022 11:20:00 AM Suspended Sediment 4.3 mg/L MC2 Birkdale Golf Course < 4.3 No
7/19/2022 11:20:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 No
7/19/2022 11:20:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No
7/19/2022 11:20:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 No
8/16/2022 11:10:00 AM E.Coli 2330 MPN/100 ml MC2 Birkdale Golf Course 100 Yes
8/16/2022 11:10:00 AM Nitrate/Nitrite 0.19 mg/L MC2 Birkdale Golf Course 0.05 Yes
8/16/2022 11:10:00 AM Fecal Coliform 3000 CFU/100 ml MC2 Birkdale Golf Course 100 Yes
8/16/2022 11:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes
8/16/2022 11:10:00 AM Total Suspended Solids 13.2 mg/L MC2 Birkdale Golf Course 5.0 Yes
8/16/2022 11:10:00 AM TKN 0.44 mg/L MC2 Birkdale Golf Course 0.25 Yes
8/16/2022 11:10:00 AM Turbidity 20 NTU MC2 Birkdale Golf Course 0.50 Yes
8/16/2022 11:10:00 AM Suspended Sediment 9 mg/L MC2 Birkdale Golf Course 4.3 Yes
8/16/2022 11:10:00 AM Total Phosphorus 0.069 mg/L MC2 Birkdale Golf Course 0.010 Yes
8/16/2022 11:10:00 AM Calcium 7500 ug/L MC2 Birkdale Golf Course 1000 Yes
8/16/2022 11:10:00 AM Magnesium 1500 ug/L MC2 Birkdale Golf Course 1000 Yes
8/16/2022 11:10:00 AM Hardness 25 mg/L MC2 Birkdale Golf Course 1.0 Yes
8/16/2022 11:10:00 AM Copper 2.2 ug/L MC2 Birkdale Golf Course 2.0 Yes
9/20/2022 11:10:00 AM Nitrate/Nitrite 0.26 mg/L MC2 Birkdale Golf Course 0.05 No
9/20/2022 11:10:00 AM Fecal Coliform 188 CFU/100 ml MC2 Birkdale Golf Course 10 No
9/20/2022 11:10:00 AM E.Coli 291 MPN/100 ml MC2 Birkdale Golf Course 1 No
9/20/2022 11:10:00 AM Turbidity 2.8 NTU MC2 Birkdale Golf Course 0.50 No
9/20/2022 11:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
9/20/2022 11:10:00 AM Total Phosphorus 0.032 mg/L MC2 Birkdale Golf Course 0.010 No
9/20/2022 11:10:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course 0.25 No
9/20/2022 11:10:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
9/20/2022 11:10:00 AM Hardness 49 mg/L MC2 Birkdale Golf Course 1.0 No
9/20/2022 11:10:00 AM Magnesium 2900 ug/L MC2 Birkdale Golf Course 500 No
9/20/2022 11:10:00 AM Calcium 15000 ug/L MC2 Birkdale Golf Course 2000 No
9/20/2022 11:10:00 AM Suspended Sediment 4 mg/L MC2 Birkdale Golf Course < 4.0 No
54
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit _ Site Description MDL Storm
9/20/2022 11:10:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course 0.25 No
9/20/2022 11:10:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
9/20/2022 11:10:00 AM Hardness 49 mg/L MC2 Birkdale Golf Course 1.0 No
9/20/2022 11:10:00 AM Magnesium 2900 ug/L MC2 Birkdale Golf Course 500 No
9/20/2022 11:10:00 AM Calcium 15000 ug/L MC2 Birkdale Golf Course 2000 No
9/20/2022 11:10:00 AM Suspended Sediment 4 mg/L MC2 Birkdale Golf Course < 4.0 No
9/20/2022 11:10:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No
10/18/2022 11:15:00 AM E.Coli 308 MPN/100 ml MC2 Birkdale Golf Course 1 No
10/18/2022 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
10/18/2022 11:15:00 AM Fecal Coliform 370 CFU/100 ml MC2 Birkdale Golf Course 10 No
10/18/2022 11:15:00 AM Turbidity 3 NTU MC2 Birkdale Golf Course 0.50 No
10/18/2022 11:15:00 AM Nitrate/Nitrite 0.09 mg/L MC2 Birkdale Golf Course 0.05 No
10/18/2022 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
10/18/2022 11:15:00 AM Total Phosphorus 0.031 mg/L MC2 Birkdale Golf Course 0.010 No
10/18/2022 11:15:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No
10/18/2022 11:15:00 AM Suspended Sediment 3.9 mg/L MC2 Birkdale Golf Course < 3.9 No
10/18/2022 11:15:00 AM Zinc 20 ug/L MC2 Birkdale Golf Course < 20.0 No
10/18/2022 11:15:00 AM Nickel 0.5 ug/L MC2 Birkdale Golf Course < 0.500 No
10/18/2022 11:15:00 AM Copper 1.5 ug/L MC2 Birkdale Golf Course 0.500 No
10/18/2022 11:15:00 AM Chromium 1 ug/L MC2 Birkdale Golf Course < 1.00 No
10/18/2022 11:15:00 AM Calcium 16400 ug/L MC2 Birkdale Golf Course 100 No
10/18/2022 11:15:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.500 No
10/18/2022 11:15:00 AM Hardness 55.5 mg/L MC2 Birkdale Golf Course 0.100 No
10/18/2022 11:15:00 AM Magnesium 3540 ug/L MC2 Birkdale Golf Course 100 No
11/15/2022 11:15:00 AM Turbidity 6.8 NTU MC2 Birkdale Golf Course 0.50 Yes
11/15/2022 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes
11/15/2022 11:15:00 AM Fecal Coliform 440 CFU/100 ml MC2 Birkdale Golf Course 20 Yes
11/15/2022 11:15:00 AM Nitrate/Nitrite 0.17 mg/L MC2 Birkdale Golf Course 0.05 Yes
11/15/2022 11:15:00 AM E.Coli 480 MPN/100 ml MC2 Birkdale Golf Course 10 Yes
11/15/2022 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 Yes
11/15/2022 11:15:00 AM Total Phosphorus 0.046 mg/L MC2 Birkdale Golf Course 0.010 Yes
11/15/2022 11:15:00 AM Suspended Sediment 4.1 mg/L MC2 Birkdale Golf Course < 4.1 Yes
11/15/2022 11:15:00 AM TKN 0.31 mg/L MC2 Birkdale Golf Course 0.25 Yes
11/15/2022 11:15:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 1000 Yes
11/15/2022 11:15:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 1000 Yes
11/15/2022 11:15:00 AM Hardness 48 mg/L MC2 Birkdale Golf Course 1.0 Yes
11/15/2022 11:15:00 AM Copper 3.8 ug/L MC2 Birkdale Golf Course 2.0 Yes
12/20/2022 11:15:00 AM E.Coli 436 MPN/100 ml MC2 Birkdale Golf Course 1 No
12/20/2022 11:15:00 AM Fecal Coliform 260 CFU/100 ml MC2 Birkdale Golf Course 10 No
12/20/2022 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
12/20/2022 11:15:00 AM Total Phosphorus 0.032 mg/L MC2 Birkdale Golf Course 0.010 No
12/20/2022 11:15:00 AM Turbidity 9.2 NTU MC2 Birkdale Golf Course 0.50 No
12/20/2022 11:15:00 AM Nitrate/Nitrite 0.55 mg/L MC2 Birkdale Golf Course 0.05 No
12/20/2022 11:15:00 AM Suspended Sediment 4.1 mg/L MC2 Birkdale Golf Course < 4.1 No
12/20/2022 11:15:00 AM TKN 0.55 mg/L MC2 Birkdale Golf Course 0.25 No
55
/ , / Charlotte-Mecklenburg
f d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
7 Collection Date Analyte Result Unit _ Site Description MDL Storm
12/20/2022 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
12/20/2022 11:15:00 AM Calcium 13000 ug/L MC2 Birkdale Golf Course 500 No
12/20/2022 11:15:00 AM Hardness 45 mg/L MC2 Birkdale Golf Course 1.0 No
12/20/2022 11:15:00 AM Magnesium 3000 ug/L MC2 Birkdale Golf Course 500 No
12/20/2022 11:15:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No
1/17/2023 11:15:00 AM Nitrate/Nitrite 0.6 mg/L MC2 Birkdale Golf Course 0.05 Yes
1/17/2023 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes
1/17/2023 11:15:00 AM E.Coli 326 MPN/100 ml MC2 Birkdale Golf Course 1 Yes
1/17/2023 11:15:00 AM Fecal Coliform 300 CFU/100 ml MC2 Birkdale Golf Course 10 Yes
1/17/2023 11:15:00 AM Turbidity 15 NTU MC2 Birkdale Golf Course 0.50 Yes
1/17/2023 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 Yes
1/17/2023 11:15:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 Yes
1/17/2023 11:15:00 AM Suspended Sediment 4.1 mg/L MC2 Birkdale Golf Course < 4.1 Yes
1/17/2023 11:15:00 AM Total Phosphorus 0.03 mg/L MC2 Birkdale Golf Course 0.010 Yes
1/17/2023 11:15:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 1000 Yes
1/17/2023 11:15:00 AM Hardness 45 mg/L MC2 Birkdale Golf Course 1.0 Yes
1/17/2023 11:15:00 AM Calcium 13000 ug/L MC2 Birkdale Golf Course 1000 Yes
1/17/2023 11:15:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 Yes
1/17/2023 11:15:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes
1/17/2023 11:15:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 Yes
1/17/2023 11:15:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes
1/17/2023 11:15:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 Yes
1/17/2023 11:25:00 AM Fecal Coliform 280 CFU/100 m1 MC2 Birkdale Golf Course 10 Yes
(Replicate)
1/17/2023 11:25:00 AM E.Coli 411 MPN/100 ml MC2 Birkdale Golf Course 1 Yes
(Replicate)
1/17/2023 11:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes
(Replicate)
1/17/2023 11:25:00 AM Nitrate/Nitrite 0.6 mg/L 1 MC2 Birkdale Golf Course 0.05 Yes
(Replicate)
1/17/2023 11:25:00 AM Turbidity 15 NTU MC2 Birkdale Golf Course 0.50 Yes
(Replicate)
1/17/2023 11:25:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 Yes
(Replicate)
1/17/2023 11:25:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 Yes
(Replicate)
1/17/2023 11:25:00 AM Total Phosphorus 0.031 mg/L MC2 Birkdale Golf Course 0.010 Yes
(Replicate)
1/17/2023 11:25:00 AM Suspended Sediment 4.2 mg/L MC2 Birkdale Golf Course < 4.2 Yes
(Replicate)
1/17/2023 11:25:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes
(Replicate)
1/17/2023 11:25:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 Yes
(Replicate)
1/17/2023 11:25:00 AM Hardness 45 mg/L MC2 Birkdale Golf Course 1.0 Yes
(Replicate)
1/17/2023 11:25:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 1000 Yes
(Replicate)
1/17/2023 11:25:00 AM Calcium 13000 ug/L MC2 Birkdale Golf Course 1000 Yes
(Replicate)
1/17/2023 11:25:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 Yes
(Replicate)
56
/ , / Charlotte-Mecklenburg
fi / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
Collection Date ' AnalyteFli
Result Unit Site Site Description MDL Storm
1/17/2023 11:25:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 Yes
(Replicate)
1/17/2023 11:25:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes
(Replicate)
2/21/2023 10:50:00 AM Fecal Coliform 210 CFU/100 ml MC2 Birkdale Golf Course 10 No
2/21/2023 10:50:00 AM Total Phosphorus 0.025 mg/L MC2 Birkdale Golf Course 0.010 No
2/21/2023 10:50:00 AM Turbidity 10 NTU MC2 Birkdale Golf Course 0.5 No
2/21/2023 10:50:00 AM Nitrate/Nitrite 0.51 mg/L MC2 Birkdale Golf Course 0.05 No
2/21/2023 10:50:00 AM E.Coli 239 MPN/100 ml MC2 Birkdale Golf Course 1 No
2/21/2023 10:50:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
2/21/2023 10:50:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
2/21/2023 10:50:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No
2/21/2023 10:50:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No
2/21/2023 10:50:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 500 No
2/21/2023 10:50:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 500 No
2/21/2023 10:50:00 AM Hardness 48 mg/L MC2 Birkdale Golf Course 1.0 No
2/21/2023 10:50:00 AM Suspended Sediment 4 mg/L MC2 Birkdale Golf Course < 4.0 No
3/21/2023 11:05:00 AM Fecal Coliform 300 CFU/100 ml MC2 Birkdale Golf Course 10 No
3/21/2023 11:05:00 AM E.Coli 190 MPN/100 ml MC2 Birkdale Golf Course 1 No
3/21/2023 11:05:00 AM Turbidity 6 NTU MC2 Birkdale Golf Course 0.50 No
3/21/2023 11:05:00 AM Nitrate/Nitrite 0.49 mg/L MC2 Birkdale Golf Course 0.05 No
3/21/2023 11:05:00 AM Total Phosphorus 0.022 mg/L MC2 Birkdale Golf Course 0.010 No
3/21/2023 11:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
3/21/2023 11:05:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
3/21/2023 11:05:00 AM Hardness 48 mg/L MC2 Birkdale Golf Course 1.0 No
3/21/2023 11:05:00 AM Magnesium 3200 ug/L MC2 Birkdale Golf Course 1000 No
3/21/2023 11:05:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No
3/21/2023 11:05:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 1000 No
3/21/2023 11:05:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No
3/21/2023 11:05:00 AM Suspended Sediment 3.9 mg/L MC2 Birkdale Golf Course < 3.9 No
4/18/2023 11:05:00 AM Nitrate/Nitrite 0.54 mg/L MC2 Birkdale Golf Course 0.05 No
4/18/2023 11:05:00 AM Total Phosphorus 0.035 mg/L MC2 Birkdale Golf Course 0.010 No
4/18/2023 11:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
4/18/2023 11:05:00 AM Turbidity 9.3 NTU MC2 Birkdale Golf Course 0.50 No
4/18/2023 11:05:00 AM Fecal Coliform 425 CFU/100 ml MC2 Birkdale Golf Course 10 No
4/18/2023 11:05:00 AM E.Coli 614 MPN/100 ml MC2 Birkdale Golf Course 1 No
4/18/2023 11:05:00 AM Hardness 49 mg/L MC2 Birkdale Golf Course 1.0 No
4/18/2023 11:05:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 1000 No
4/18/2023 11:05:00 AM Magnesium 3300 ug/L MC2 Birkdale Golf Course 1000 No
4/18/2023 11:05:00 AM Suspended Sediment 3.9 mg/L MC2 Birkdale Golf Course < 3.9 No
4/18/2023 11:05:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
4/18/2023 11:05:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No
4/18/2023 11:05:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 No
4/18/2023 11:05:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No
4/18/2023 11:05:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 No
4/18/2023 11:05:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 No
57
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
- Collection Date Analyte Result Unit _ Site Description MDL Storm
4/18/2023 11:05:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 No
5/16/2023 11:15:00 AM Nitrate/Nitrite 0.44 mg/L MC2 Birkdale Golf Course 0.05 No
5/16/2023 11:15:00 AM Turbidity 3.9 NTU MC2 Birkdale Golf Course 0.50 No
5/16/2023 11:15:00 AM E.Coli 2420 MPN/100 ml MC2 Birkdale Golf Course > 1 No
5/16/2023 11:15:00 AM Fecal Coliform 1000 CFU/100 ml MC2 Birkdale Golf Course 10 No
5/16/2023 11:15:00 AM Suspended Sediment 4.2 mg/L MC2 Birkdale Golf Course < 4.2 No
5/16/2023 11:15:00 AM Total Phosphorus 0.03 mg/L MC2 Birkdale Golf Course 0.010 No
5/16/2023 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No
5/16/2023 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No
5/16/2023 11:15:00 AM Calcium 15000 ug/L MC2 Birkdale Golf Course 500 No
5/16/2023 11:15:00 AM Hardness 52 mg/L MC2 Birkdale Golf Course 1.0 No
5/16/2023 11:15:00 AM Magnesium 3500 ug/L MC2 Birkdale Golf Course 500 No
5/16/2023 11:15:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No
5/16/2023 11:15:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No
6/20/2023 11:15:00 AM Nitrate/Nitrite 0.28 mg/L MC2 Birkdale Golf Course 0.05 Yes
6/20/2023 11:15:00 AM E.Coli 6570 MPN/100 ml MC2 Birkdale Golf Course 100 Yes
6/20/2023 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes
6/20/2023 11:15:00 AM Turbidity 120 NTU MC2 Birkdale Golf Course 0.50 Yes
6/20/2023 11:15:00 AM Total Suspended Solids 92.5 mg/L MC2 Birkdale Golf Course 12.5 Yes
6/20/2023 11:15:00 AM Fecal Coliform 14000 CFU/100 ml MC2 Birkdale Golf Course 100 Yes
6/20/2023 11:15:00 AM Suspended Sediment 94 mg/L MC2 Birkdale Golf Course 4.3 Yes
6/20/2023 11:15:00 AM Total Phosphorus 0.113 mg/L MC2 Birkdale Golf Course 0.010 Yes
6/20/2023 11:15:00 AM Hardness 22 mg/L MC2 Birkdale Golf Course 1.0 Yes
6/20/2023 11:15:00 AM Magnesium 1800 ug/L MC2 Birkdale Golf Course 1000 Yes
6/20/2023 11:15:00 AM Calcium 5700 ug/L MC2 Birkdale Golf Course 1000 Yes
6/20/2023 11:15:00 AM Copper 2.4 ug/L MC2 Birkdale Golf Course 2.0 Yes
6/20/2023 11:15:00 AM TKN 0.62 mg/L MC2 Birkdale Golf Course 0.25 Yes
7/19/2022 10:10:00 AM Fecal Coliform 1410 CFU/100 ml 1 MC36 Sam Newell Rd.at US 74 10 Yes
7/19/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes
7/19/2022 10:10:00 AM Total Suspended Solids 9.2 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes
7/19/2022 10:10:00 AM E.Coli 487 MPN/100 ml 1 MC36 Sam Newell Rd.at US 74 2 Yes
7/19/2022 10:10:00 AM Turbidity 11 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
7/19/2022 10:10:00 AM Nitrate/Nitrite 0.13 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes
7/19/2022 10:10:00 AM Nickel 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
7/19/2022 10:10:00 AM Chromium 5 ug/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes
7/19/2022 10:10:00 AM Total Phosphorus 0.071 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
7/19/2022 10:10:00 AM TKN 0.4 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
7/19/2022 10:10:00 AM Magnesium 4900 ug/L MC36 Sam Newell Rd.at US 74 500 Yes
7/19/2022 10:10:00 AM Calcium 13000 ug/L MC36 Sam Newell Rd.at US 74 500 Yes
7/19/2022 10:10:00 AM Hardness 53 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
7/19/2022 10:10:00 AM Suspended Sediment 6.8 mg/L MC36 Sam Newell Rd.at US 74 4.3 Yes
7/19/2022 10:10:00 AM Copper 2.5 ug/L MC36 Sam Newell Rd.at US 74 2.0 Yes
7/19/2022 10:10:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.50 Yes
7/19/2022 10:10:00 AM Zinc 10 ug/L MC36 Sam Newell Rd.at US 74 < 10 Yes
8/16/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes
58
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit _ Site Description _ MDL Storm
8/16/2022 9:45:00 AM Fecal Coliform 563 CFU/100 ml MC36 Sam Newell Rd.at US 74 100 Yes
8/16/2022 9:45:00 AM Nitrate/Nitrite 0.12 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes
8/16/2022 9:45:00 AM E.Coli 360 MPN/100 ml MC36 Sam Newell Rd.at US 74 100 Yes
8/16/2022 9:45:00 AM Turbidity 9.5 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
8/16/2022 9:45:00 AM TKN 0.36 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
8/16/2022 9:45:00 AM Total Suspended Solids 7.2 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes
8/16/2022 9:45:00 AM Total Phosphorus 0.065 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
8/16/2022 9:45:00 AM Suspended Sediment 4.2 mg/L MC36 Sam Newell Rd.at US 74 < 4.2 Yes
8/16/2022 9:45:00 AM Calcium 16000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
8/16/2022 9:45:00 AM Hardness 67 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
8/16/2022 9:45:00 AM Magnesium 6600 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
8/16/2022 9:45:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
9/20/2022 10:05:00 AM Nitrate/Nitrite 0.07 mg/L MC36 Sam Newell Rd.at US 74 0.05 No
9/20/2022 10:05:00 AM Fecal Coliform 150 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No
9/20/2022 10:05:00 AM E.Coli 140 MPN/100 ml MC36 Sam Newell Rd.at US 74 1 No
9/20/2022 10:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 0.10 No
9/20/2022 10:05:00 AM Total Phosphorus 0.16 mg/L MC36 Sam Newell Rd.at US 74 0.010 No
9/20/2022 10:05:00 AM Turbidity 11 NTU MC36 Sam Newell Rd.at US 74 0.50 No
9/20/2022 10:05:00 AM Magnesium 7300 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:05:00 AM Total Suspended Solids 13.6 mg/L MC36 Sam Newell Rd.at US 74 11.9 No
9/20/2022 10:05:00 AM Calcium 22000 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:05:00 AM Hardness 85 mg/L MC36 Sam Newell Rd.at US 74 1.0 No
9/20/2022 10:05:00 AM Suspended Sediment 7.4 mg/L MC36 Sam Newell Rd.at US 74 4.1 No
9/20/2022 10:05:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No
9/20/2022 10:05:00 AM Magnesium 7300 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:05:00 AM Total Suspended Solids 13.6 mg/L MC36 Sam Newell Rd.at US 74 11.9 No
9/20/2022 10:05:00 AM Calcium 22000 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:05:00 AM Hardness 85 mg/L MC36 Sam Newell Rd.at US 74 1.0 No
9/20/2022 10:05:00 AM Suspended Sediment 7.4 mg/L MC36 Sam Newell Rd.at US 74 4.1 No
9/20/2022 10:05:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No
9/20/2022 10:05:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 No
9/20/2022 10:10:00 AM Fecal Coliform 210 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No
9/20/2022 10:10:00 AM E.Coli 160 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No
9/20/2022 10:10:00 AM Nitrate/Nitrite 0.44 mg/L MC36 Sam Newell Rd.at US 74 0.05 No
9/20/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No
9/20/2022 10:10:00 AM Total Phosphorus 0.106 mg/L MC36 Sam Newell Rd.at US 74 0.010 No
9/20/2022 10:10:00 AM Turbidity 15 NTU MC36 Sam Newell Rd.at US 74 0.50 No
9/20/2022 10:10:00 AM Hardness 81 mg/L MC36 Sam Newell Rd.at US 74 1.0 No
9/20/2022 10:10:00 AM Suspended Sediment 7.1 mg/L MC36 Sam Newell Rd.at US 74 4.2 No
9/20/2022 10:10:00 AM Magnesium 6900 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:10:00 AM Total Suspended Solids 16 mg/L MC36 Sam Newell Rd.at US 74 5.0 No
9/20/2022 10:10:00 AM Calcium 21000 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:10:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No
9/20/2022 10:10:00 AM Hardness 81 mg/L MC36 Sam Newell Rd.at US 74 1.0 No
9/20/2022 10:10:00 AM Suspended Sediment 7.1 mg/L MC36 Sam Newell Rd.at US 74 4.2 No
59
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
-Collection Date Analyte Result Unit I Site Description _ MDL Storm
9/20/2022 10:10:00 AM Magnesium 6900 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:10:00 AM Total Suspended Solids 16 mg/L MC36 Sam Newell Rd.at US 74 5.0 No
9/20/2022 10:10:00 AM Calcium 21000 ug/L MC36 Sam Newell Rd.at US 74 500 No
9/20/2022 10:10:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No
9/20/2022 10:20:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 No
10/18/2022 9:35:00 AM Nitrate/Nitrite 0.05 mg/L MC36 Sam Newell Rd.at US 74 < 0.05 No
10/18/2022 9:35:00 AM E.Coli 594 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No
10/18/2022 9:35:00 AM Fecal Coliform 488 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No
10/18/2022 9:35:00 AM Turbidity 7.7 NTU MC36 Sam Newell Rd.at US 74 0.50 No
10/18/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No
10/18/2022 9:35:00 AM Total Phosphorus 0.08 mg/L MC36 Sam Newell Rd.at US 74 0.010 No
10/18/2022 9:35:00 AM Total Suspended Solids 10.4 mg/L MC36 Sam Newell Rd.at US 74 5.0 No
10/18/2022 9:35:00 AM TKN 0.3 mg/L MC36 Sam Newell Rd.at US 74 0.25 No
10/18/2022 9:35:00 AM Suspended Sediment 11 mg/L MC36 Sam Newell Rd.at US 74 3.9 No
10/18/2022 9:35:00 AM Magnesium 7100 ug/L MC36 Sam Newell Rd.at US 74 100 No
10/18/2022 9:35:00 AM Nickel 0.664 ug/L MC36 Sam Newell Rd.at US 74 0.500 No
10/18/2022 9:35:00 AM Zinc 20 ug/L MC36 Sam Newell Rd.at US 74 < 20.0 No
10/18/2022 9:35:00 AM Calcium 20900 ug/L MC36 Sam Newell Rd.at US 74 100 No
10/18/2022 9:35:00 AM Copper 1.13 ug/L MC36 Sam Newell Rd.at US 74 0.500 No
10/18/2022 9:35:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.500 No
10/18/2022 9:35:00 AM Hardness 81.4 mg/L MC36 Sam Newell Rd.at US 74 0.100 No
10/18/2022 9:35:00 AM Chromium 1 ug/L MC36 Sam Newell Rd.at US 74 < 1.00 No
11/15/2022 10:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes
11/15/2022 10:15:00 AM Fecal Coliform 216 CFU/100 ml MC36 Sam Newell Rd.at US 74 20 Yes
11/15/2022 10:15:00 AM Nitrate/Nitrite 0.05 mg/L MC36 Sam Newell Rd.at US 74 < 0.05 Yes
11/15/2022 10:15:00 AM Turbidity 14 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
11/15/2022 10:15:00 AM E.Coli 348 MPN/100 ml MC36 Sam Newell Rd.at US 74 10 Yes
11/15/2022 10:15:00 AM TKN 0.36 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
11/15/2022 10:15:00 AM Total Suspended Solids 8.8 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes
11/15/2022 10:15:00 AM Total Phosphorus 0.087 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
11/15/2022 10:15:00 AM Suspended Sediment 4.4 mg/L MC36 Sam Newell Rd.at US 74 < 4.4 Yes
11/15/2022 10:15:00 AM Magnesium 4800 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
11/15/2022 10:15:00 AM Calcium 14000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
11/15/2022 10:15:00 AM Hardness 55 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
11/15/2022 10:15:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
12/20/2022 9:45:00 AM E.Coli 872 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No
12/20/2022 9:45:00 AM Turbidity 16 NTU MC36 Sam Newell Rd.at US 74 0.50 No
12/20/2022 9:45:00 AM Fecal Coliform 295 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No
12/20/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No
12/20/2022 9:45:00 AM Nitrate/Nitrite 0.18 mg/L MC36 Sam Newell Rd.at US 74 0.05 No
12/20/2022 9:45:00 AM Total Phosphorus 0.061 mg/L MC36 Sam Newell Rd.at US 74 0.010 No
12/20/2022 9:45:00 AM TKN 0.37 mg/L MC36 Sam Newell Rd.at US 74 0.25 No
12/20/2022 9:45:00 AM Suspended Sediment 8 mg/L MC36 Sam Newell Rd.at US 74 4.0 No
12/20/2022 9:45:00 AM Total Suspended Solids 9.6 mg/L MC36 Sam Newell Rd.at US 74 5.0 No
12/20/2022 9:45:00 AM Hardness 67 mg/L MC36 Sam Newell Rd.at US 74 1.0 No
60
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
7 Collection Date Analyte Result Unit I Site Description _ MDL Storm
12/20/2022 9:45:00 AM Calcium 17000 ug/L MC36 Sam Newell Rd.at US 74 500 No
12/20/2022 9:45:00 AM Magnesium 5900 ug/L MC36 Sam Newell Rd.at US 74 500 No
12/20/2022 9:45:00 AM Copper 2.5 ug/L MC36 Sam Newell Rd.at US 74 2.0 No
1/17/2023 9:45:00 AM Nitrate/Nitrite 0.44 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes
1/17/2023 9:45:00 AM E.Coli 4840 MPN/100 ml MC36 Sam Newell Rd.at US 74 > 2 Yes
1/17/2023 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes
1/17/2023 9:45:00 AM Fecal Coliform 3950 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes
1/17/2023 9:45:00 AM Turbidity 14 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
1/17/2023 9:45:00 AM Total Suspended Solids 5 mg/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes
1/17/2023 9:45:00 AM TKN 0.36 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
1/17/2023 9:45:00 AM Total Phosphorus 0.049 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
1/17/2023 9:45:00 AM Suspended Sediment 4.1 mg/L MC36 Sam Newell Rd.at US 74 < 4.1 Yes
1/17/2023 9:45:00 AM Magnesium 6700 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
1/17/2023 9:45:00 AM Hardness 75 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
1/17/2023 9:45:00 AM Calcium 19000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
1/17/2023 9:45:00 AM Nickel 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
1/17/2023 9:45:00 AM Chromium 5 ug/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes
1/17/2023 9:45:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.50 Yes
1/17/2023 9:45:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
1/17/2023 9:45:00 AM Zinc 10 ug/L MC36 Sam Newell Rd.at US 74 < 10 Yes
2/21/2023 9:35:00 AM Turbidity 8.5 NTU MC36 Sam Newell Rd.at US 74 0.5 No
2/21/2023 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No
2/21/2023 9:35:00 AM Nitrate/Nitrite 0.71 mg/L MC36 Sam Newell Rd.at US 74 0.05 No
2/21/2023 9:35:00 AM Fecal Coliform 390 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No
2/21/2023 9:35:00 AM E.Coli 636 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No
2/21/2023 9:35:00 AM Total Phosphorus 0.034 mg/L MC36 Sam Newell Rd.at US 74 0.010 No
2/21/2023 9:35:00 AM Total Suspended Solids 5 mg/L MC36 Sam Newell Rd.at US 74 < 5.0 No
2/21/2023 9:35:00 AM TKN 0.25 mg/L MC36 Sam Newell Rd.at US 74 < 0.25 No
2/21/2023 9:35:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 No
2/21/2023 9:35:00 AM Calcium 18000 ug/L MC36 Sam Newell Rd.at US 74 500 No
2/21/2023 9:35:00 AM Magnesium 6200 ug/L MC36 Sam Newell Rd.at US 74 500 No
2/21/2023 9:35:00 AM Hardness 70 mg/L MC36 Sam Newell Rd.at US 74 1.0 No
2/21/2023 9:35:00 AM Suspended Sediment 4.3 mg/L MC36 Sam Newell Rd.at US 74 < 4.3 No
3/21/2023 9:55:00 AM Turbidity 12 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
3/21/2023 9:55:00 AM Nitrate/Nitrite 0.12 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes
3/21/2023 9:55:00 AM E.Coli 382 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 Yes
3/21/2023 9:55:00 AM Fecal Coliform 310 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes
3/21/2023 9:55:00 AM Total Phosphorus 0.048 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
3/21/2023 9:55:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes
3/21/2023 9:55:00 AM Total Suspended Solids 7.8 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes
3/21/2023 9:55:00 AM Calcium 15000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
3/21/2023 9:55:00 AM Hardness 58 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
3/21/2023 9:55:00 AM Magnesium 5100 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
3/21/2023 9:55:00 AM TKN 0.28 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
3/21/2023 9:55:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
61
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit _ Site Description MDL Storm
3/21/2023 9:55:00 AM Suspended Sediment 7.6 mg/L MC36 Sam Newell Rd.at US 74 4.0 Yes
4/18/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes
4/18/2023 10:00:00 AM Turbidity 19 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
4/18/2023 10:00:00 AM Total Phosphorus 0.069 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
4/18/2023 10:00:00 AM E.Coli 727 MPN/100 ml MC36 Sam Newell Rd.at US 74 1 Yes
4/18/2023 10:00:00 AM Nitrate/Nitrite 0.22 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes
4/18/2023 10:00:00 AM Fecal Coliform 455 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes
4/18/2023 10:00:00 AM Hardness 66 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
4/18/2023 10:00:00 AM Magnesium 5800 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
4/18/2023 10:00:00 AM Suspended Sediment 14 mg/L MC36 Sam Newell Rd.at US 74 4.3 Yes
4/18/2023 10:00:00 AM Calcium 17000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
4/18/2023 10:00:00 AM Nickel 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
4/18/2023 10:00:00 AM Chromium 5 ug/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes
4/18/2023 10:00:00 AM Zinc 10 ug/L MC36 Sam Newell Rd.at US 74 < 10 Yes
4/18/2023 10:00:00 AM Total Suspended Solids 16.8 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes
4/18/2023 10:00:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.50 Yes
4/18/2023 10:00:00 AM TKN 0.46 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
4/18/2023 10:00:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
5/16/2023 9:45:00 AM Fecal Coliform 780 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes
5/16/2023 9:45:00 AM E.Coli 981 MPN/100 ml MC36 Sam Newell Rd.at US 74 1 Yes
5/16/2023 9:45:00 AM Turbidity 18 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
5/16/2023 9:45:00 AM Nitrate/Nitrite 0.1 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes
5/16/2023 9:45:00 AM Suspended Sediment 12 mg/L MC36 Sam Newell Rd.at US 74 4.4 Yes
5/16/2023 9:45:00 AM Ammonia-Nitrogen 0.15 mg/L MC36 Sam Newell Rd.at US 74 0.10 Yes
5/16/2023 9:45:00 AM Total Phosphorus 0.086 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
5/16/2023 9:45:00 AM TKN 0.35 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
5/16/2023 9:45:00 AM Total Suspended Solids 14.2 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes
5/16/2023 9:45:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes
5/16/2023 9:45:00 AM Hardness 62 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
5/16/2023 9:45:00 AM Calcium 16000 ug/L MC36 Sam Newell Rd.at US 74 500 Yes
5/16/2023 9:45:00 AM Magnesium 5400 ug/L MC36 Sam Newell Rd.at US 74 100 Yes
6/20/2023 9:45:00 AM E.Coli 3640 MPN/100 ml MC36 Sam Newell Rd.at US 74 100 Yes
6/20/2023 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes
6/20/2023 9:45:00 AM Nitrate/Nitrite 0.28 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes
6/20/2023 9:45:00 AM Turbidity 32 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes
6/20/2023 9:45:00 AM Fecal Coliform 5750 CFU/100 ml MC36 Sam Newell Rd.at US 74 100 Yes
6/20/2023 9:45:00 AM Suspended Sediment 20 mg/L MC36 Sam Newell Rd.at US 74 4.0 Yes
6/20/2023 9:45:00 AM Total Suspended Solids 19.6 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes
6/20/2023 9:45:00 AM TKN 0.51 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes
6/20/2023 9:45:00 AM Total Phosphorus 0.079 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes
6/20/2023 9:45:00 AM Hardness 19 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes
6/20/2023 9:45:00 AM Calcium 5000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
6/20/2023 9:45:00 AM Magnesium 1700 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes
6/20/2023 9:45:00 AM Copper 3.4 ug/L MC36 Sam Newell Rd.at US 74 2.0 Yes
7/19/2022 10:40:00 AM Turbidity 5.8 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
62
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit _ Site Description - MDL Storm
7/19/2022 10:40:00 AM E.Coli 207 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) I 1 No
7/19/2022 10:40:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
7/19/2022 10:40:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
7/19/2022 10:40:00 AM Fecal Coliform 270 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
7/19/2022 10:40:00 AM Nitrate/Nitrite 0.26 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No
7/19/2022 10:40:00 AM TKN 0.28 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 No
7/19/2022 10:40:00 AM Total Phosphorus 0.031 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
7/19/2022 10:40:00 AM Chromium 5 ug/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
7/19/2022 10:40:00 AM Nickel 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
7/19/2022 10:40:00 AM Hardness 41 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No
7/19/2022 10:40:00 AM Magnesium 3300 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
7/19/2022 10:40:00 AM Calcium 11000 ug/L MC4 Beatties Ford Rd.(Bridge) 2000 No
7/19/2022 10:40:00 AM Suspended Sediment 4.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.1 No
7/19/2022 10:40:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
7/19/2022 10:40:00 AM Zinc 10 ug/L MC4 Beatties Ford Rd.(Bridge) < 10 No
7/19/2022 10:40:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.50 No
8/16/2022 10:30:00 AM Fecal Coliform 4400 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes
8/16/2022 10:30:00 AM Nitrate/Nitrite 0.26 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes
8/16/2022 10:30:00 AM E.Coli 520 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes
8/16/2022 10:30:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes
8/16/2022 10:30:00 AM Total Suspended Solids 12.4 mg/L MC4 Beatties Ford Rd.(Bridge) 10.0 Yes
8/16/2022 10:30:00 AM Turbidity 35 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes
8/16/2022 10:30:00 AM TKN 0.35 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 Yes
8/16/2022 10:30:00 AM Suspended Sediment 12 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 Yes
8/16/2022 10:30:00 AM Total Phosphorus 0.069 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes
8/16/2022 10:30:00 AM Magnesium 2300 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
8/16/2022 10:30:00 AM Hardness 29 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes
8/16/2022 10:30:00 AM Calcium 7900 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
8/16/2022 10:30:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes
9/20/2022 10:25:00 AM E.Coli 185 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
9/20/2022 10:25:00 AM Nitrate/Nitrite 0.22 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No
9/20/2022 10:25:00 AM Fecal Coliform 200 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
9/20/2022 10:25:00 AM Total Phosphorus 0.026 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
9/20/2022 10:25:00 AM Turbidity 3.1 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
9/20/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
9/20/2022 10:25:00 AM Suspended Sediment 13 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 No
9/20/2022 10:25:00 AM Hardness 58 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No
9/20/2022 10:25:00 AM Magnesium 4400 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
9/20/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
9/20/2022 10:25:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
9/20/2022 10:25:00 AM Calcium 16000 ug/L MC4 Beatties Ford Rd.(Bridge) 2000 No
9/20/2022 10:25:00 AM Suspended Sediment 13 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 No
9/20/2022 10:25:00 AM Hardness 58 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No
9/20/2022 10:25:00 AM Magnesium 4400 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
9/20/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
63
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date Analyte Result Unit _ Site Description i MDL Storm
9/20/2022 10:25:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
9/20/2022 10:25:00 AM Calcium 16000 ug/L MC4 Beatties Ford Rd.(Bridge) 2000 No
9/20/2022 10:25:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
10/18/2022 10:30:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
10/18/2022 10:30:00 AM Turbidity 4 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
10/18/2022 10:30:00 AM E.Coli 173 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
10/18/2022 10:30:00 AM Nitrate/Nitrite 0.05 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.05 No
10/18/2022 10:30:00 AM Fecal Coliform 230 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
10/18/2022 10:30:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
10/18/2022 10:30:00 AM Total Phosphorus 0.037 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
10/18/2022 10:30:00 AM Suspended Sediment 4 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.0 No
10/18/2022 10:30:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
10/18/2022 10:30:00 AM Copper 1.16 ug/L MC4 Beatties Ford Rd.(Bridge) 0.500 No
10/18/2022 10:30:00 AM Zinc 20 ug/L MC4 Beatties Ford Rd.(Bridge) < 20.0 No
10/18/2022 10:30:00 AM Hardness 56 mg/L MC4 Beatties Ford Rd.(Bridge) 0.100 No
10/18/2022 10:30:00 AM Chromium 1 ug/L MC4 Beatties Ford Rd.(Bridge) < 1.00 No
10/18/2022 10:30:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No
10/18/2022 10:30:00 AM Calcium 15200 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No
10/18/2022 10:30:00 AM Magnesium 4390 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No
10/18/2022 10:30:00 AM Nickel 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No
10/18/2022 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
10/18/2022 10:35:00 AM Fecal Coliform 210 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
10/18/2022 10:35:00 AM Nitrate/Nitrite 0.05 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.05 No
10/18/2022 10:35:00 AM E.Coli 147 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
10/18/2022 10:35:00 AM Turbidity 4.8 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
10/18/2022 10:35:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
10/18/2022 10:35:00 AM Total Phosphorus 0.036 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
10/18/2022 10:35:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 No
10/18/2022 10:35:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
10/18/2022 10:35:00 AM Nickel 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No
10/18/2022 10:35:00 AM Chromium 1 ug/L MC4 Beatties Ford Rd.(Bridge) < 1.00 No
10/18/2022 10:35:00 AM Calcium 14900 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No
10/18/2022 10:35:00 AM Magnesium 4340 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No
10/18/2022 10:35:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No
10/18/2022 10:35:00 AM Zinc 20 ug/L MC4 Beatties Ford Rd.(Bridge) < 20.0 No
10/18/2022 10:35:00 AM Copper 1.84 ug/L MC4 Beatties Ford Rd.(Bridge) 0.500 No
10/18/2022 10:35:00 AM Hardness 55.1 mg/L MC4 Beatties Ford Rd.(Bridge) 0.100 No
11/15/2022 10:20:00 AM Fecal Coliform 154 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 20 Yes
11/15/2022 10:20:00 AM E.Coli 121 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 10 Yes
11/15/2022 10:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes
11/15/2022 10:20:00 AM Nitrate/Nitrite 0.16 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes
11/15/2022 10:20:00 AM Turbidity 7.1 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes
11/15/2022 10:20:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 Yes
11/15/2022 10:20:00 AM Total Phosphorus 0.033 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes
11/15/2022 10:20:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 Yes
64
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
-.Collection Date Analyte Result Unit I - Site Description i MDL Storm
11/15/2022 10:20:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 Yes
11/15/2022 10:20:00 AM Calcium 11000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
11/15/2022 10:20:00 AM Magnesium 3300 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
11/15/2022 10:20:00 AM Hardness 41 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes
11/15/2022 10:20:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes
12/20/2022 10:15:00 AM E.Coli 299 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
12/20/2022 10:15:00 AM Nitrate/Nitrite 0.51 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No
12/20/2022 10:15:00 AM Fecal Coliform 310 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
12/20/2022 10:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
12/20/2022 10:15:00 AM Turbidity 27 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
12/20/2022 10:15:00 AM Total Phosphorus 0.047 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
12/20/2022 10:15:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 No
12/20/2022 10:15:00 AM TKN 0.45 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 No
12/20/2022 10:15:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
12/20/2022 10:15:00 AM Copper 2.1 ug/L MC4 Beatties Ford Rd.(Bridge) 2.0 No
12/20/2022 10:15:00 AM Magnesium 3900 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
12/20/2022 10:15:00 AM Calcium 13000 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
12/20/2022 10:15:00 AM Hardness 49 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No
1/17/2023 10:20:00 AM Fecal Coliform 315 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 Yes
1/17/2023 10:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes
1/17/2023 10:20:00 AM Nitrate/Nitrite 0.5 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes
1/17/2023 10:20:00 AM E.Coli 161 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 Yes
1/17/2023 10:20:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 Yes
1/17/2023 10:20:00 AM Turbidity 23 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes
1/17/2023 10:20:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 Yes
1/17/2023 10:20:00 AM Suspended Sediment 4.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.1 Yes
1/17/2023 10:20:00 AM Total Phosphorus 0.039 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes
1/17/2023 10:20:00 AM Hardness 48 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes
1/17/2023 10:20:00 AM Magnesium 3800 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
1/17/2023 10:20:00 AM Chromium 5 ug/L MC4 Beatties Ford Rd.(Bridge) < 5.0 Yes
1/17/2023 10:20:00 AM Nickel 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes
1/17/2023 10:20:00 AM Calcium 13000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
1/17/2023 10:20:00 AM Zinc 10 ug/L MC4 Beatties Ford Rd.(Bridge) < 10 Yes
1/17/2023 10:20:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes
1/17/2023 10:20:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.50 Yes
2/21/2023 10:10:00 AM Total Phosphorus 0.03 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
2/21/2023 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
2/21/2023 10:10:00 AM Fecal Coliform 150 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
2/21/2023 10:10:00 AM E.Coli 179 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
2/21/2023 10:10:00 AM Nitrate/Nitrite 0.39 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No
2/21/2023 10:10:00 AM Turbidity 13 NTU MC4 Beatties Ford Rd.(Bridge) 0.5 No
2/21/2023 10:10:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
2/21/2023 10:10:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
2/21/2023 10:10:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
2/21/2023 10:10:00 AM Magnesium 3700 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
65
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
-Collection Date Analyte Result Unit I - Site Description - MDL Storm
2/21/2023 10:10:00 AM Hardness 45 mg/L MC4 Beatties Ford Rd.(Bridge) I 1.0 No
2/21/2023 10:10:00 AM Calcium 12000 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
2/21/2023 10:10:00 AM Suspended Sediment 3.9 mg/L MC4 Beatties Ford Rd.(Bridge) < 3.9 No
3/21/2023 10:20:00 AM Nitrate/Nitrite 0.31 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No
3/21/2023 10:20:00 AM Turbidity 6.7 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
3/21/2023 10:20:00 AM Fecal Coliform 250 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
3/21/2023 10:20:00 AM E.Coli 185 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
3/21/2023 10:20:00 AM Total Phosphorus 0.028 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
3/21/2023 10:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
3/21/2023 10:20:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
3/21/2023 10:20:00 AM Hardness 49 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No
3/21/2023 10:20:00 AM Calcium 13000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No
3/21/2023 10:20:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
3/21/2023 10:20:00 AM Magnesium 4000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No
3/21/2023 10:20:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
3/21/2023 10:20:00 AM Suspended Sediment 3.9 mg/L MC4 Beatties Ford Rd.(Bridge) < 3.9 No
4/18/2023 10:25:00 AM Fecal Coliform 113 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
4/18/2023 10:25:00 AM Turbidity 15 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
4/18/2023 10:25:00 AM Nitrate/Nitrite 0.45 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No
4/18/2023 10:25:00 AM E.Coli 153 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
4/18/2023 10:25:00 AM Total Phosphorus 0.038 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
4/18/2023 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
4/18/2023 10:25:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 No
4/18/2023 10:25:00 AM Calcium 14000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No
4/18/2023 10:25:00 AM Magnesium 4100 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No
4/18/2023 10:25:00 AM Hardness 52 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No
4/18/2023 10:25:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
4/18/2023 10:25:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
4/18/2023 10:25:00 AM Zinc 10 ug/L MC4 Beatties Ford Rd.(Bridge) < 10 No
4/18/2023 10:25:00 AM Chromium 5 ug/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
4/18/2023 10:25:00 AM Nickel 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
4/18/2023 10:25:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.50 No
4/18/2023 10:25:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
5/16/2023 10:30:00 AM E.Coli 173 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No
5/16/2023 10:30:00 AM Fecal Coliform 163 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No
5/16/2023 10:30:00 AM Nitrate/Nitrite 0.4 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No
5/16/2023 10:30:00 AM Turbidity 6.2 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No
5/16/2023 10:30:00 AM Total Phosphorus 0.026 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No
5/16/2023 10:30:00 AM Suspended Sediment 3.9 mg/L MC4 Beatties Ford Rd.(Bridge) < 3.9 No
5/16/2023 10:30:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No
5/16/2023 10:30:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No
5/16/2023 10:30:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No
5/16/2023 10:30:00 AM Hardness 63 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No
5/16/2023 10:30:00 AM Calcium 17000 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
5/16/2023 10:30:00 AM Magnesium 4900 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No
66
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit _ Site Description MDL Storm
5/16/2023 10:30:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No
6/20/2023 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes
6/20/2023 10:25:00 AM Turbidity 140 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes
6/20/2023 10:25:00 AM Nitrate/Nitrite 0.27 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes
6/20/2023 10:25:00 AM E.Coli 7890 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes
6/20/2023 10:25:00 AM Total Suspended Solids 115 mg/L MC4 Beatties Ford Rd.(Bridge) 14.7 Yes
6/20/2023 10:25:00 AM Suspended Sediment 140 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 Yes
6/20/2023 10:25:00 AM Fecal Coliform 11900 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes
6/20/2023 10:25:00 AM Total Phosphorus 0.147 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes
6/20/2023 10:25:00 AM Magnesium 2000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
6/20/2023 10:25:00 AM Hardness 23 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes
6/20/2023 10:25:00 AM Calcium 5900 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes
6/20/2023 10:25:00 AM Copper 2.7 ug/L MC4 Beatties Ford Rd.(Bridge) 2.0 Yes
6/20/2023 10:25:00 AM TKN 0.77 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 Yes
7/19/2022 11:00:00 AM Turbidity 6.3 NTU MC40C Trade St.Matthews 0.50 Yes
7/19/2022 11:00:00 AM Fecal Coliform 1280 CFU/100 ml MC40C Trade St.Matthews 10 Yes
7/19/2022 11:00:00 AM E.Coli 771 MPN/100 ml MC40C Trade St.Matthews 1 Yes
7/19/2022 11:00:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
7/19/2022 11:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
7/19/2022 11:00:00 AM Nitrate/Nitrite 0.21 mg/L MC40C Trade St.Matthews 0.05 Yes
7/19/2022 11:00:00 AM Chromium 5 ug/L MC40C Trade St.Matthews < 5.0 Yes
7/19/2022 11:00:00 AM Total Phosphorus 0.041 mg/L MC40C Trade St.Matthews 0.010 Yes
7/19/2022 11:00:00 AM Nickel 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
7/19/2022 11:00:00 AM TKN 0.28 mg/L MC40C Trade St.Matthews 0.25 Yes
7/19/2022 11:00:00 AM Magnesium 3700 ug/L MC40C Trade St.Matthews 500 Yes
7/19/2022 11:00:00 AM Calcium 13000 ug/L MC40C Trade St.Matthews 500 Yes
7/19/2022 11:00:00 AM Hardness 48 mg/L MC40C Trade St.Matthews 1.0 Yes
7/19/2022 11:00:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 Yes
7/19/2022 11:00:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.50 Yes
7/19/2022 11:00:00 AM Copper 2.3 ug/L MC40C Trade St.Matthews 2.0 Yes
7/19/2022 11:00:00 AM Zinc 10 ug/L MC40C Trade St.Matthews < 10 Yes
8/16/2022 10:25:00 AM E.Coli 410 MPN/100 ml MC40C Trade St.Matthews 100 Yes
8/16/2022 10:25:00 AM Fecal Coliform 500 CFU/100 ml MC40C Trade St.Matthews 100 Yes
8/16/2022 10:25:00 AM Nitrate/Nitrite 0.24 mg/L MC40C Trade St.Matthews 0.05 Yes
8/16/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
8/16/2022 10:25:00 AM Turbidity 4.7 NTU MC40C Trade St.Matthews 0.50 Yes
8/16/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
8/16/2022 10:25:00 AM TKN 0.26 mg/L MC40C Trade St.Matthews 0.25 Yes
8/16/2022 10:25:00 AM Total Phosphorus 0.033 mg/L MC40C Trade St.Matthews 0.010 Yes
8/16/2022 10:25:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 Yes
8/16/2022 10:25:00 AM Magnesium 4500 ug/L MC40C Trade St.Matthews 1000 Yes
8/16/2022 10:25:00 AM Calcium 13000 ug/L MC40C Trade St.Matthews 1000 Yes
8/16/2022 10:25:00 AM Hardness 51 mg/L MC40C Trade St.Matthews 1.0 Yes
8/16/2022 10:25:00 AM Copper 2.2 ug/L MC40C Trade St.Matthews 2.0 Yes
9/20/2022 11:05:00 AM Fecal Coliform 355 CFU/100 ml MC40C Trade St.Matthews 10 No
67
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date AM Analyte Result Unit Site Description MDL Storm
9/20/2022 11:05:00 AM E.Coli 346 MPN/100 ml MC40C Trade St.Matthews 2 No
9/20/2022 11:05:00 AM Nitrate/Nitrite 0.1 mg/L MC40C Trade St.Matthews 0.05 No
9/20/2022 11:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No
9/20/2022 11:05:00 AM Turbidity 4.4 NTU MC40C Trade St.Matthews 0.50 No
9/20/2022 11:05:00 AM Total Phosphorus 0.029 mg/L MC40C Trade St.Matthews 0.010 No
9/20/2022 11:05:00 AM Magnesium 4800 ug/L MC40C Trade St.Matthews 500 No
9/20/2022 11:05:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 No
9/20/2022 11:05:00 AM Hardness 62 mg/L MC40C Trade St.Matthews 1.0 No
9/20/2022 11:05:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No
9/20/2022 11:05:00 AM Calcium 17000 ug/L MC40C Trade St.Matthews 500 No
9/20/2022 11:05:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 No
9/20/2022 11:05:00 AM Magnesium 4800 ug/L MC40C Trade St.Matthews 500 No
9/20/2022 11:05:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 No
9/20/2022 11:05:00 AM Hardness 62 mg/L MC40C Trade St.Matthews 1.0 No
9/20/2022 11:05:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No
9/20/2022 11:05:00 AM Calcium 17000 ug/L MC40C Trade St.Matthews 500 No
9/20/2022 11:05:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 No
9/20/2022 11:05:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 No
10/18/2022 10:25:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 No
10/18/2022 10:25:00 AM Fecal Coliform 600 CFU/100 ml MC40C Trade St.Matthews 10 No
10/18/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No
10/18/2022 10:25:00 AM E.Coli 833 MPN/100 ml MC40C Trade St.Matthews 2 No
10/18/2022 10:25:00 AM Turbidity 1.4 NTU MC40C Trade St.Matthews 0.50 No
10/18/2022 10:25:00 AM Total Phosphorus 0.048 mg/L MC40C Trade St.Matthews 0.010 No
10/18/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No
10/18/2022 10:25:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 No
10/18/2022 10:25:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 No
10/18/2022 10:25:00 AM Hardness 68.1 mg/L MC40C Trade St.Matthews 0.100 No
10/18/2022 10:25:00 AM Magnesium 5490 ug/L MC40C Trade St.Matthews 100 No
10/18/2022 10:25:00 AM Zinc 20 ug/L MC40C Trade St.Matthews < 20.0 No
10/18/2022 10:25:00 AM Chromium 1 ug/L MC40C Trade St.Matthews < 1.00 No
10/18/2022 10:25:00 AM Copper 1.47 ug/L MC40C Trade St.Matthews 0.500 No
10/18/2022 10:25:00 AM Calcium 18200 ug/L MC40C Trade St.Matthews 100 No
10/18/2022 10:25:00 AM Nickel 0.5 ug/L MC40C Trade St.Matthews < 0.500 No
10/18/2022 10:25:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.500 No
11/15/2022 10:55:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 Yes
11/15/2022 10:55:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
11/15/2022 10:55:00 AM Fecal Coliform 1930 CFU/100 ml MC40C Trade St.Matthews 20 Yes
11/15/2022 10:55:00 AM Turbidity 4.4 NTU MC40C Trade St.Matthews 0.50 Yes
11/15/2022 10:55:00 AM E.Coli 2098 MPN/100 ml MC40C Trade St.Matthews 10 Yes
11/15/2022 10:55:00 AM TKN 0.31 mg/L MC40C Trade St.Matthews 0.25 Yes
11/15/2022 10:55:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
11/15/2022 10:55:00 AM Total Phosphorus 0.043 mg/L MC40C Trade St.Matthews 0.010 Yes
11/15/2022 10:55:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 Yes
11/15/2022 10:55:00 AM Calcium 15000 ug/L MC40C Trade St.Matthews 1000 Yes
68
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
-.Collection Date ill Analyte Result Unit Site Description MDL Storm
11/15/2022 10:55:00 AM Magnesium 4600 ug/L MC40C Trade St.Matthews 1000 Yes
11/15/2022 10:55:00 AM Hardness 56 mg/L MC40C Trade St.Matthews 1.0 Yes
11/15/2022 10:55:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
11/15/2022 11:00:00 AM Turbidity 4.2 NTU MC40C Trade St.Matthews 0.50 Yes
11/15/2022 11:00:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 Yes
11/15/2022 11:00:00 AM E.Coli 1722 MPN/100 ml MC40C Trade St.Matthews 10 Yes
11/15/2022 11:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
11/15/2022 11:00:00 AM Fecal Coliform 1740 CFU/100 ml MC40C Trade St.Matthews 20 Yes
11/15/2022 11:00:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
11/15/2022 11:00:00 AM TKN 0.32 mg/L MC40C Trade St.Matthews 0.25 Yes
11/15/2022 11:00:00 AM Total Phosphorus 0.044 mg/L MC40C Trade St.Matthews 0.010 Yes
11/15/2022 11:00:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 Yes
11/15/2022 11:00:00 AM Magnesium 4000 ug/L MC40C Trade St.Matthews 1000 Yes
11/15/2022 11:00:00 AM Calcium 13000 ug/L MC40C Trade St.Matthews 1000 Yes
11/15/2022 11:00:00 AM Hardness 49 mg/L MC40C Trade St.Matthews 1.0 Yes
11/15/2022 11:10:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
12/20/2022 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No
12/20/2022 10:35:00 AM Fecal Coliform 910 CFU/100 ml MC40C Trade St.Matthews 10 No
12/20/2022 10:35:00 AM Turbidity 8.6 NTU MC40C Trade St.Matthews 0.50 No
12/20/2022 10:35:00 AM Total Phosphorus 0.034 mg/L MC40C Trade St.Matthews 0.010 No
12/20/2022 10:35:00 AM E.Coli 1544 MPN/100 ml MC40C Trade St.Matthews 2 No
12/20/2022 10:35:00 AM Nitrate/Nitrite 0.3 mg/L MC40C Trade St.Matthews 0.05 No
12/20/2022 10:35:00 AM Suspended Sediment 4 mg/L MC40C Trade St.Matthews < 4.0 No
12/20/2022 10:35:00 AM TKN 0.3 mg/L MC40C Trade St.Matthews 0.25 No
12/20/2022 10:35:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No
12/20/2022 10:35:00 AM Calcium 15000 ug/L MC40C Trade St.Matthews 500 No
12/20/2022 10:35:00 AM Magnesium 4400 ug/L MC40C Trade St.Matthews 500 No
12/20/2022 10:35:00 AM Hardness 56 mg/L MC40C Trade St.Matthews 1.0 No
12/20/2022 10:35:00 AM Copper 2.2 ug/L MC40C Trade St.Matthews 2.0 No
1/17/2023 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
1/17/2023 10:35:00 AM Nitrate/Nitrite 0.24 mg/L MC40C Trade St.Matthews 0.05 Yes
1/17/2023 10:35:00 AM E.Coli 337 MPN/100 ml MC40C Trade St.Matthews 2 Yes
1/17/2023 10:35:00 AM Fecal Coliform 295 CFU/100 ml MC40C Trade St.Matthews 10 Yes
1/17/2023 10:35:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
1/17/2023 10:35:00 AM Turbidity 12 NTU MC40C Trade St.Matthews 0.50 Yes
1/17/2023 10:35:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 Yes
1/17/2023 10:35:00 AM Total Phosphorus 0.028 mg/L MC40C Trade St.Matthews 0.010 Yes
1/17/2023 10:35:00 AM Suspended Sediment 4.9 mg/L MC40C Trade St.Matthews < 4.9 Yes
1/17/2023 10:35:00 AM Hardness 61 mg/L MC40C Trade St.Matthews 1.0 Yes
-
1/17/2023 10:35:00 AM Magnesium 5000 ug/L MC40C Trade St.Matthews 1000 Yes
1/17/2023 10:35:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 1000 Yes
1/17/2023 10:35:00 AM Chromium 5 ug/L MC40C Trade St.Matthews < 5.0 Yes
1/17/2023 10:35:00 AM Nickel 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
1/17/2023 10:35:00 AM Zinc 10 ug/L MC40C Trade St.Matthews < 10 Yes
1/17/2023 10:35:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.50 Yes
69
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
-.Collection Date Analyte Result Unit I Site Description MDL Storm
1/17/2023 10:35:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
2/21/2023 10:15:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 No
2/21/2023 10:15:00 AM E.Coli 388 MPN/100 ml MC40C Trade St.Matthews 1 No
2/21/2023 10:15:00 AM Turbidity 6.6 NTU MC40C Trade St.Matthews 0.5 No
2/21/2023 10:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No
2/21/2023 10:15:00 AM Total Phosphorus 0.023 mg/L MC40C Trade St.Matthews 0.010 No
2/21/2023 10:15:00 AM Fecal Coliform 404 CFU/100 ml MC40C Trade St.Matthews 10 No
2/21/2023 10:15:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No
2/21/2023 10:15:00 AM TKN 0.29 mg/L MC40C Trade St.Matthews 0.25 No
2/21/2023 10:15:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 No
2/21/2023 10:15:00 AM Hardness 60 mg/L MC40C Trade St.Matthews 1.0 No
2/21/2023 10:15:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 500 No
2/21/2023 10:15:00 AM Magnesium 4900 ug/L MC40C Trade St.Matthews 500 No
2/21/2023 10:15:00 AM Suspended Sediment 4.3 mg/L MC40C Trade St.Matthews < 4.3 No
3/21/2023 10:45:00 AM Turbidity 4.1 NTU MC40C Trade St.Matthews 0.50 Yes
3/21/2023 10:45:00 AM Fecal Coliform 430 CFU/100 ml MC40C Trade St.Matthews 10 Yes
3/21/2023 10:45:00 AM E.Coli 442 MPN/100 ml MC40C Trade St.Matthews 2 Yes
3/21/2023 10:45:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 Yes
3/21/2023 10:45:00 AM Total Phosphorus 0.02 mg/L MC40C Trade St.Matthews 0.010 Yes
3/21/2023 10:45:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
3/21/2023 10:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
3/21/2023 10:45:00 AM Hardness 62 mg/L MC40C Trade St.Matthews 1.0 Yes
3/21/2023 10:45:00 AM Magnesium 5300 ug/L MC40C Trade St.Matthews 1000 Yes
3/21/2023 10:45:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 1000 Yes
3/21/2023 10:45:00 AM TKN 0.31 mg/L MC40C Trade St.Matthews 0.25 Yes
3/21/2023 10:45:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
3/21/2023 10:45:00 AM Suspended Sediment 4.3 mg/L MC40C Trade St.Matthews < 4.3 Yes
4/12/2023 1:00:00 PM E.Coli 614 MPN/100 ml MC40C Trade St.Matthews 1 No
4/18/2023 10:50:00 AM Turbidity 6.6 NTU MC40C Trade St.Matthews 0.50 Yes
4/18/2023 10:50:00 AM Fecal Coliform 800 CFU/100 ml MC40C Trade St.Matthews 10 Yes
4/18/2023 10:50:00 AM Total Phosphorus 0.038 mg/L MC40C Trade St.Matthews 0.010 Yes
4/18/2023 10:50:00 AM Nitrate/Nitrite 0.25 mg/L MC40C Trade St.Matthews 0.05 Yes
4/18/2023 10:50:00 AM E.Coli 1095 MPN/100 ml MC40C Trade St.Matthews 2 Yes
4/18/2023 10:50:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
4/18/2023 10:50:00 AM Magnesium 5000 ug/L MC40C Trade St.Matthews 1000 Yes
4/18/2023 10:50:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 Yes
4/18/2023 10:50:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 1000 Yes
4/18/2023 10:50:00 AM Hardness 61 mg/L MC40C Trade St.Matthews 1.0 Yes
4/18/2023 10:50:00 AM TKN 0.34 mg/L MC40C Trade St.Matthews 0.25 Yes
4/18/2023 10:50:00 AM Chromium 5 ug/L MC40C Trade St.Matthews < 5.0 Yes
4/18/2023 10:50:00 AM Zinc 10 ug/L MC40C Trade St.Matthews < 10 Yes
4/18/2023 10:50:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.50 Yes
4/18/2023 10:50:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
4/18/2023 10:50:00 AM Nickel 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
4/18/2023 10:50:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
70
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
-Collection Date AM Analyte Result Unit 1. 1 Site Description MDL Storm
5/16/2023 10:55:00 AM Fecal Coliform 588 CFU/100 ml MC40C Trade St.Matthews 10 Yes
5/16/2023 10:55:00 AM E.Coli 634 MPN/100 ml MC40C Trade St.Matthews 2 Yes
5/16/2023 10:55:00 AM Turbidity 2.3 NTU MC40C Trade St.Matthews 0.50 Yes
5/16/2023 10:55:00 AM Nitrate/Nitrite 0.32 mg/L MC40C Trade St.Matthews 0.05 Yes
5/16/2023 10:55:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
5/16/2023 10:55:00 AM Suspended Sediment 4.3 mg/L MC40C Trade St.Matthews < 4.3 Yes
5/16/2023 10:55:00 AM Total Phosphorus 0.041 mg/L MC40C Trade St.Matthews 0.010 Yes
5/16/2023 10:55:00 AM TKN 0.5 mg/L MC40C Trade St.Matthews 0.25 Yes
5/16/2023 10:55:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes
5/16/2023 10:55:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes
5/16/2023 10:55:00 AM Hardness 76 mg/L MC40C Trade St.Matthews 1.0 Yes
5/16/2023 10:55:00 AM Magnesium 6400 ug/L MC40C Trade St.Matthews 500 Yes
5/16/2023 10:55:00 AM Calcium 20000 ug/L MC40C Trade St.Matthews 500 Yes
6/20/2023 10:35:00 AM E.Coli 9125 MPN/100 ml MC40C Trade St.Matthews 100 Yes
6/20/2023 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes
6/20/2023 10:35:00 AM Turbidity 50 NTU MC40C Trade St.Matthews 0.50 Yes
6/20/2023 10:35:00 AM Nitrate/Nitrite 0.29 mg/L MC40C Trade St.Matthews 0.05 Yes
6/20/2023 10:35:00 AM Suspended Sediment 16 mg/L MC40C Trade St.Matthews 4.1 Yes
6/20/2023 10:35:00 AM Total Suspended Solids 15.6 mg/L MC40C Trade St.Matthews 5.0 Yes
6/20/2023 10:35:00 AM TKN 0.44 mg/L MC40C Trade St.Matthews 0.25 Yes
6/20/2023 10:35:00 AM Fecal Coliform 11800 CFU/100 ml MC40C Trade St.Matthews 100 Yes
6/20/2023 10:35:00 AM Total Phosphorus 0.072 mg/L MC40C Trade St.Matthews 0.010 Yes
6/20/2023 10:35:00 AM Hardness 25 mg/L MC40C Trade St.Matthews 1.0 Yes
6/20/2023 10:35:00 AM Magnesium 2100 ug/L MC40C Trade St.Matthews 1000 Yes
6/20/2023 10:35:00 AM Calcium 6600 ug/L MC40C Trade St.Matthews 1000 Yes
6/20/2023 10:35:00 AM Copper 2.7 ug/L MC40C Trade St.Matthews 2.0 Yes
7/19/2022 10:25:00 AM Turbidity 4.4 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
7/19/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
7/19/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
7/19/2022 10:25:00 AM Fecal Coliform 1200 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
7/19/2022 10:25:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
7/19/2022 10:25:00 AM Nitrate/Nitrite 0.4 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
7/19/2022 10:25:00 AM Total Phosphorus 0.104 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
7/19/2022 10:25:00 AM TKN 0.41 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No
7/19/2022 10:25:00 AM Nickel 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
7/19/2022 10:25:00 AM Chromium 5 ug/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
7/19/2022 10:25:00 AM Magnesium 9600 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
7/19/2022 10:25:00 AM Calcium 28000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No
7/19/2022 10:25:00 AM Hardness 110 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
-
7/19/2022 10:25:00 AM Suspended Sediment 4.3 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.3 No
7/19/2022 10:25:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.50 No
7/19/2022 10:25:00 AM Zinc 10 ug/L MC50 Gar Cr Beatties Ford Rd. < 10 No
7/19/2022 10:25:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
8/16/2022 10:10:00 AM Fecal Coliform 750 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes
8/16/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes
71
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit I _ Site Description MDL Storm
8/16/2022 10:10:00 AM Nitrate/Nitrite 0.23 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes
8/16/2022 10:10:00 AM E.Coli 850 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes
8/16/2022 10:10:00 AM Turbidity 7.1 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes
8/16/2022 10:10:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 Yes
8/16/2022 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes
8/16/2022 10:10:00 AM Suspended Sediment 4.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.1 Yes
8/16/2022 10:10:00 AM Total Phosphorus 0.105 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes
8/16/2022 10:10:00 AM Calcium 21000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
8/16/2022 10:10:00 AM Magnesium 9300 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
8/16/2022 10:10:00 AM Hardness 91 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes
8/16/2022 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes
9/20/2022 10:00:00 AM Fecal Coliform 2400 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
9/20/2022 10:00:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. > 1 No
9/20/2022 10:00:00 AM Nitrate/Nitrite 0.3 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
9/20/2022 10:00:00 AM Total Phosphorus 0.088 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
9/20/2022 10:00:00 AM Turbidity 3.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
9/20/2022 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
9/20/2022 10:00:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
9/20/2022 10:00:00 AM TKN 0.29 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No
9/20/2022 10:00:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
9/20/2022 10:00:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No
9/20/2022 10:00:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No
9/20/2022 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
9/20/2022 10:00:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
9/20/2022 10:00:00 AM TKN 0.29 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No
9/20/2022 10:00:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
9/20/2022 10:00:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No
9/20/2022 10:00:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No
9/20/2022 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
9/20/2022 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
9/20/2022 10:05:00 AM E.Coli 2020 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 2 No
9/20/2022 10:05:00 AM Nitrate/Nitrite 0.29 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
9/20/2022 10:05:00 AM Fecal Coliform 2100 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
9/20/2022 10:05:00 AM Total Phosphorus 0.09 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
9/20/2022 10:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
9/20/2022 10:05:00 AM Turbidity 3.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
9/20/2022 10:05:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No
9/20/2022 10:05:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No
9/20/2022 10:05:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
9/20/2022 10:05:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
9/20/2022 10:05:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
9/20/2022 10:05:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No
9/20/2022 10:05:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No
9/20/2022 10:05:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No
9/20/2022 10:05:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
72
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
-Collection Date Analyte Result Unit I Site Description MDL Storm
9/20/2022 10:05:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
9/20/2022 10:05:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
9/20/2022 10:05:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No
9/20/2022 10:05:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
9/22/2022 12:50:00 PM Fecal Coliform 4900 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
9/22/2022 12:50:00 PM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. > 1 No
9/22/2022 12:50:00 PM Fecal Coliform 4900 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
9/22/2022 12:50:00 PM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. > 1 No
9/27/2022 9:15:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1
9/27/2022 9:15:00 AM Fecal Coliform 3800 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10
10/6/2022 11:39:00 AM Fecal Coliform 3500 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
10/6/2022 11:39:00 AM E.Coli 1860 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
10/18/2022 10:10:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
10/18/2022 10:10:00 AM Turbidity 2.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
10/18/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
10/18/2022 10:10:00 AM Fecal Coliform 3100 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
10/18/2022 10:10:00 AM Nitrate/Nitrite 0.05 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.05 No
10/18/2022 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
10/18/2022 10:10:00 AM Total Phosphorus 0.069 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
10/18/2022 10:10:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No
10/18/2022 10:10:00 AM Suspended Sediment 4.4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.4 No
10/18/2022 10:10:00 AM Chromium 1 ug/L MC50 Gar Cr Beatties Ford Rd. < 1.00 No
10/18/2022 10:10:00 AM Magnesium 11300 ug/L MC50 Gar Cr Beatties Ford Rd. 100 No
10/18/2022 10:10:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.500 No
10/18/2022 10:10:00 AM Nickel 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.500 No
10/18/2022 10:10:00 AM Hardness 124 mg/L MC50 Gar Cr Beatties Ford Rd. 0.100 No
10/18/2022 10:10:00 AM Zinc 20 ug/L MC50 Gar Cr Beatties Ford Rd. < 20.0 No
10/18/2022 10:10:00 AM Calcium 30900 ug/L MC50 Gar Cr Beatties Ford Rd. 100 No
10/18/2022 10:10:00 AM Copper 1.27 ug/L MC50 Gar Cr Beatties Ford Rd. 0.500 No
10/25/2022 9:50:00 AM E.Coli 1162 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 10
10/25/2022 9:50:00 AM Fecal Coliform 819 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10
11/15/2022 10:00:00 AM E.Coli 216 MPN/100 m1 MC50 Gar Cr Beatties Ford Rd. 10 Yes
11/15/2022 10:00:00 AM Nitrate/Nitrite 0.07 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes
11/15/2022 10:00:00 AM Fecal Coliform 262 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 20 Yes
11/15/2022 10:00:00 AM Turbidity 1.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes
11/15/2022 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes
11/15/2022 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes
11/15/2022 10:00:00 AM Total Phosphorus 0.071 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes
-
11/15/2022 10:00:00 AM Suspended Sediment 4.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.1 Yes
-
11/15/2022 10:00:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 Yes
11/15/2022 10:00:00 AM Magnesium 8500 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
11/15/2022 10:00:00 AM Calcium 24000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
11/15/2022 10:00:00 AM Hardness 95 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes
11/15/2022 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes
12/20/2022 10:10:00 AM Nitrate/Nitrite 0.5 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
73
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
7 Collection Date Analyte Result Unit I _ Site Description MDL Storm
12/20/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
12/20/2022 10:10:00 AM E.Coli 580 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
12/20/2022 10:10:00 AM Turbidity 6.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
12/20/2022 10:10:00 AM Fecal Coliform 515 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
12/20/2022 10:10:00 AM Total Phosphorus 0.062 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
12/20/2022 10:10:00 AM TKN 0.27 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No
12/20/2022 10:10:00 AM Suspended Sediment 4.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.1 No
12/20/2022 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
12/20/2022 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
12/20/2022 10:10:00 AM Magnesium 7700 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
12/20/2022 10:10:00 AM Hardness 84 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
12/20/2022 10:10:00 AM Calcium 21000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
1/17/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes
1/17/2023 10:00:00 AM Fecal Coliform 380 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 Yes
1/17/2023 10:00:00 AM Nitrate/Nitrite 0.47 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes
1/17/2023 10:00:00 AM E.Coli 411 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 Yes
1/17/2023 10:00:00 AM Turbidity 10 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes
1/17/2023 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes
1/17/2023 10:00:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 Yes
1/17/2023 10:00:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 Yes
1/17/2023 10:00:00 AM Total Phosphorus 0.053 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes
1/17/2023 10:00:00 AM Hardness 75 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes
1/17/2023 10:00:00 AM Nickel 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes
1/17/2023 10:00:00 AM Chromium 5 ug/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes
1/17/2023 10:00:00 AM Magnesium 6700 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
1/17/2023 10:00:00 AM Calcium 19000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
1/17/2023 10:00:00 AM Zinc 10 ug/L MC50 Gar Cr Beatties Ford Rd. < 10 Yes
1/17/2023 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes
1/17/2023 10:00:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.50 Yes
2/21/2023 9:50:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
2/21/2023 9:50:00 AM Fecal Coliform 530 CFU/100 ml 1 MC50 Gar Cr Beatties Ford Rd. 10 No
2/21/2023 9:50:00 AM Turbidity 8.1 NTU MC50 Gar Cr Beatties Ford Rd. 0.5 No
2/21/2023 9:50:00 AM Total Phosphorus 0.043 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
2/21/2023 9:50:00 AM E.Coli 436 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
2/21/2023 9:50:00 AM Nitrate/Nitrite 0.3 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
2/21/2023 9:50:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
2/21/2023 9:50:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No
2/21/2023 9:50:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
2/21/2023 9:50:00 AM Calcium 17000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
2/21/2023 9:50:00 AM Magnesium 6200 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
2/21/2023 9:50:00 AM Hardness 68 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
2/21/2023 9:50:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No
3/21/2023 10:00:00 AM Fecal Coliform 920 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
3/21/2023 10:00:00 AM Turbidity 4.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
3/21/2023 10:00:00 AM E.Coli 817 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
74
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit _ Site Description MDL Storm
3/21/2023 10:00:00 AM Nitrate/Nitrite 0.07 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
3/21/2023 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
3/21/2023 10:00:00 AM Total Phosphorus 0.031 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
3/21/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
3/21/2023 10:00:00 AM Calcium 19000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No
3/21/2023 10:00:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No
3/21/2023 10:00:00 AM Hardness 76 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
3/21/2023 10:00:00 AM Magnesium 7000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No
3/21/2023 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
3/21/2023 10:00:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No
4/12/2023 11:10:00 AM Fecal Coliform 525 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
4/12/2023 11:10:00 AM E.Coli 366 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
4/18/2023 10:00:00 AM Fecal Coliform 460 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
4/18/2023 10:00:00 AM Total Phosphorus 0.048 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
4/18/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
4/18/2023 10:00:00 AM E.Coli 687 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
4/18/2023 10:00:00 AM Nitrate/Nitrite 0.36 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
4/18/2023 10:00:00 AM Turbidity 4.5 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
4/18/2023 10:00:00 AM Magnesium 6700 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No
4/18/2023 10:00:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No
4/18/2023 10:00:00 AM Calcium 18000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No
4/18/2023 10:00:00 AM Hardness 73 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
4/18/2023 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
4/18/2023 10:00:00 AM TKN 0.27 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No
4/18/2023 10:00:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.50 No
4/18/2023 10:00:00 AM Chromium 5 ug/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
4/18/2023 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
4/18/2023 10:00:00 AM Zinc 10 ug/L MC50 Gar Cr Beatties Ford Rd. < 10 No
4/18/2023 10:00:00 AM Nickel 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
5/16/2023 10:10:00 AM E.Coli 210 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No
5/16/2023 10:10:00 AM Nitrate/Nitrite 0.52 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No
5/16/2023 10:10:00 AM Fecal Coliform 225 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No
5/16/2023 10:10:00 AM Turbidity 2.1 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No
5/16/2023 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No
5/16/2023 10:10:00 AM Total Phosphorus 0.051 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No
5/16/2023 10:10:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No
5/16/2023 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No
5/16/2023 10:10:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No
5/16/2023 10:10:00 AM Magnesium 8200 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
5/16/2023 10:10:00 AM Calcium 23000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No
5/16/2023 10:10:00 AM Hardness 91 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No
5/16/2023 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No
6/20/2023 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes
6/20/2023 10:10:00 AM Turbidity 21 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes
6/20/2023 10:10:00 AM Nitrate/Nitrite 0.39 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes
75
, , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date Analyte Result Unit _ Site Description MDL Storm
6/20/2023 10:10:00 AM E.Coli 5630 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes
6/20/2023 10:10:00 AM Suspended Sediment 6.4 mg/L MC50 Gar Cr Beatties Ford Rd. 4.0 Yes
6/20/2023 10:10:00 AM Total Suspended Solids 6.2 mg/L MC50 Gar Cr Beatties Ford Rd. 5.0 Yes
6/20/2023 10:10:00 AM Fecal Coliform 5150 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes
6/20/2023 10:10:00 AM Total Phosphorus 0.126 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes
6/20/2023 10:10:00 AM Calcium 17000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
6/20/2023 10:10:00 AM Magnesium 7800 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes
6/20/2023 10:10:00 AM Hardness 75 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes
6/20/2023 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes
6/20/2023 10:10:00 AM TKN 0.43 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 Yes
7/19/2022 12:20:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Hams Road < 0.10 No
7/19/2022 12:20:00 PM Fecal Coliform 220 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
7/19/2022 12:20:00 PM Turbidity 8.3 NTU MY10 Clarke Creek,Harris Road 0.50 No
7/19/2022 12:20:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No
7/19/2022 12:20:00 PM E.Coli 112 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No
7/19/2022 12:20:00 PM Nitrate/Nitrite 0.7 mg/L MY10 Clarke Creek,Harris Road 0.25 No
7/19/2022 12:20:00 PM Total Phosphorus 0.099 mg/L MY10 Clarke Creek,Harris Road 0.010 No
7/19/2022 12:20:00 PM TKN 0.26 mg/L MY10 Clarke Creek,Harris Road 0.25 No
7/19/2022 12:20:00 PM Chromium 5 ug/L MY10 Clarke Creek,Harris Road < 5.0 No
7/19/2022 12:20:00 PM Nickel 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No
7/19/2022 12:20:00 PM Magnesium 5900 ug/L MY10 Clarke Creek,Harris Road 500 No
7/19/2022 12:20:00 PM Hardness 67 mg/L MY10 Clarke Creek,Harris Road 1.0 No
7/19/2022 12:20:00 PM Calcium 17000 ug/L MY10 Clarke Creek,Harris Road 2000 No
7/19/2022 12:20:00 PM Suspended Sediment 3.9 mg/L MY10 Clarke Creek,Harris Road < 3.9 No
7/19/2022 12:20:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.50 No
7/19/2022 12:20:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No
7/19/2022 12:20:00 PM Zinc 10 ug/L MY10 Clarke Creek,Harris Road < 10 No
8/16/2022 12:30:00 PM Ammonia-Nitrogen 0.14 mg/L MY10 Clarke Creek,Harris Road 0.10 Yes
8/16/2022 12:30:00 PM Nitrate/Nitrite 1.5 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes
8/16/2022 12:30:00 PM Fecal Coliform 375 CFU/100 ml MY10 Clarke Creek,Harris Road 100 Yes
8/16/2022 12:30:00 PM E.Coli 410 MPN/100 ml MY10 Clarke Creek,Harris Road 100 Yes
8/16/2022 12:30:00 PM TKN 0.58 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes
8/16/2022 12:30:00 PM Total Suspended Solids 10.8 mg/L MY10 Clarke Creek,Harris Road 5.0 Yes
8/16/2022 12:30:00 PM Turbidity 36 NTU MY10 Clarke Creek,Harris Road 0.50 Yes
8/16/2022 12:30:00 PM Suspended Sediment 11 mg/L MY10 Clarke Creek,Harris Road 4.2 Yes
8/16/2022 12:30:00 PM Total Phosphorus 0.572 mg/L MY10 Clarke Creek,Harris Road 0.050 Yes
8/16/2022 12:30:00 PM Calcium 14000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
8/16/2022 12:30:00 PM Hardness 56 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes
8/16/2022 12:30:00 PM Magnesium 5000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
8/16/2022 12:30:00 PM Copper 6.5 ug/L MY10 Clarke Creek,Harris Road 2.0 Yes
9/20/2022 12:10:00 PM Fecal Coliform 144 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
9/20/2022 12:10:00 PM Nitrate/Nitrite 1 mg/L MY10 Clarke Creek,Harris Road 0.25 No
9/20/2022 12:10:00 PM E.Coli 167 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No
9/20/2022 12:10:00 PM Total Phosphorus 0.112 mg/L MY10 Clarke Creek,Harris Road 0.020 No
9/20/2022 12:10:00 PM Turbidity 2.9 NTU MY10 Clarke Creek,Harris Road 0.50 No
76
, , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
-Collection Date Analyte Result Unit I Site Description i MDL Storm
9/20/2022 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No
9/20/2022 12:10:00 PM Magnesium 7500 ug/L MY10 Clarke Creek,Hams Road 500 No
9/20/2022 12:10:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No
9/20/2022 12:10:00 PM TKN 0.29 mg/L MY10 Clarke Creek,Harris Road 0.25 No
9/20/2022 12:10:00 PM Suspended Sediment 4.2 mg/L MY10 Clarke Creek,Harris Road < 4.2 No
9/20/2022 12:10:00 PM Hardness 88 mg/L MY10 Clarke Creek,Harris Road 1.0 No
9/20/2022 12:10:00 PM Calcium 23000 ug/L MY10 Clarke Creek,Harris Road 2000 No
9/20/2022 12:10:00 PM Magnesium 7500 ug/L MY10 Clarke Creek,Harris Road 500 No
9/20/2022 12:10:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No
9/20/2022 12:10:00 PM TKN 0.29 mg/L MY10 Clarke Creek,Harris Road 0.25 No
9/20/2022 12:10:00 PM Suspended Sediment 4.2 mg/L MY10 Clarke Creek,Harris Road < 4.2 No
9/20/2022 12:10:00 PM Hardness 88 mg/L MY10 Clarke Creek,Harris Road 1.0 No
9/20/2022 12:10:00 PM Calcium 23000 ug/L MY10 Clarke Creek,Harris Road 2000 No
9/20/2022 12:10:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No
10/18/2022 12:15:00 PM Turbidity 1.8 NTU MY10 Clarke Creek,Harris Road 0.50 No
10/18/2022 12:15:00 PM Fecal Coliform 75 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
10/18/2022 12:15:00 PM E.Coli 35 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No
10/18/2022 12:15:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No
10/18/2022 12:15:00 PM Nitrate/Nitrite 1.7 mg/L MY10 Clarke Creek,Harris Road 0.25 No
10/18/2022 12:15:00 PM Total Phosphorus 0.32 mg/L MY10 Clarke Creek,Harris Road 0.020 No
10/18/2022 12:15:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No
10/18/2022 12:15:00 PM TKN 0.29 mg/L MY10 Clarke Creek,Harris Road 0.25 No
10/18/2022 12:15:00 PM Suspended Sediment 3.8 mg/L MY10 Clarke Creek,Harris Road < 3.8 No
10/18/2022 12:15:00 PM Chromium 1 ug/L MY10 Clarke Creek,Harris Road < 1.00 No
10/18/2022 12:15:00 PM Zinc 20 ug/L MY10 Clarke Creek,Harris Road < 20.0 No
10/18/2022 12:15:00 PM Copper 3.09 ug/L MY10 Clarke Creek,Harris Road 0.500 No
10/18/2022 12:15:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.500 No
10/18/2022 12:15:00 PM Nickel 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.500 No
10/18/2022 12:15:00 PM Calcium 22700 ug/L MY10 Clarke Creek,Harris Road 100 No
10/18/2022 12:15:00 PM Hardness 88.2 mg/L MY10 Clarke Creek,Harris Road 0.100 No
10/18/2022 12:15:00 PM Magnesium 7650 ug/L MY10 Clarke Creek,Harris Road 100 No
11/15/2022 12:15:00 PM E.Coli 145 MPN/100 ml MY10 Clarke Creek,Harris Road 10 Yes
11/15/2022 12:15:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 Yes
11/15/2022 12:15:00 PM Turbidity 13 NTU MY10 Clarke Creek,Harris Road 0.50 Yes
11/15/2022 12:15:00 PM Fecal Coliform 170 CFU/100 ml 1 MY10 Clarke Creek,Harris Road 20 Yes
11/15/2022 12:15:00 PM Nitrate/Nitrite 0.36 mg/L MY10 Clarke Creek,Harris Road 0.05 Yes
11/15/2022 12:15:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 Yes
11/15/2022 12:15:00 PM Total Phosphorus 0.076 mg/L MY10 Clarke Creek,Harris Road 0.010 Yes
11/15/2022 12:15:00 PM Suspended Sediment 4.1 mg/L MY10 Clarke Creek,Harris Road < 4.1 Yes
11/15/2022 12:15:00 PM TKN 0.32 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes
11/15/2022 12:15:00 PM Magnesium 6500 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
11/15/2022 12:15:00 PM Calcium 20000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
11/15/2022 12:15:00 PM Hardness 77 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes
11/15/2022 12:15:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 Yes
12/20/2022 12:20:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No
77
, , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
7 Collection Date Analyte Result Unit I Site Description _ MDL Storm
12/20/2022 12:20:00 PM Fecal Coliform 415 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
12/20/2022 12:20:00 PM Total Phosphorus 0.138 mg/L MY10 Clarke Creek,Harris Road 0.010 No
12/20/2022 12:20:00 PM Turbidity 50 NTU MY10 Clarke Creek,Harris Road 0.50 No
12/20/2022 12:20:00 PM Nitrate/Nitrite 1.2 mg/L MY10 Clarke Creek,Harris Road 0.25 No
12/20/2022 12:20:00 PM E.Coli 388 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No
12/20/2022 12:20:00 PM TKN 0.36 mg/L MY10 Clarke Creek,Harris Road 0.25 No
12/20/2022 12:20:00 PM Suspended Sediment 4.2 mg/L MY10 Clarke Creek,Harris Road 4.1 No
12/20/2022 12:20:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No
12/20/2022 12:20:00 PM Hardness 59 mg/L MY10 Clarke Creek,Harris Road 1.0 No
12/20/2022 12:20:00 PM Calcium 15000 ug/L MY10 Clarke Creek,Harris Road 500 No
12/20/2022 12:20:00 PM Magnesium 5300 ug/L MY10 Clarke Creek,Harris Road 500 No
12/20/2022 12:20:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No
1/17/2023 12:25:00 PM Nitrate/Nitrite 0.77 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes
1/17/2023 12:25:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 Yes
1/17/2023 12:25:00 PM Fecal Coliform 310 CFU/100 ml MY10 Clarke Creek,Harris Road 10 Yes
1/17/2023 12:25:00 PM E.Coli 239 MPN/100 ml MY10 Clarke Creek,Harris Road 1 Yes
1/17/2023 12:25:00 PM Turbidity 50 NTU MY10 Clarke Creek,Harris Road 0.50 Yes
1/17/2023 12:25:00 PM Total Suspended Solids 10.8 mg/L MY10 Clarke Creek,Harris Road 5.0 Yes
1/17/2023 12:25:00 PM TKN 0.32 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes
1/17/2023 12:25:00 PM Suspended Sediment 6.9 mg/L MY10 Clarke Creek,Harris Road 4.1 Yes
1/17/2023 12:25:00 PM Total Phosphorus 0.089 mg/L MY10 Clarke Creek,Harris Road 0.010 Yes
1/17/2023 12:25:00 PM Calcium 16000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
1/17/2023 12:25:00 PM Magnesium 5400 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
1/17/2023 12:25:00 PM Hardness 62 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes
1/17/2023 12:25:00 PM Chromium 5 ug/L MY10 Clarke Creek,Harris Road < 5.0 Yes
1/17/2023 12:25:00 PM Nickel 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 Yes
1/17/2023 12:25:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 Yes
1/17/2023 12:25:00 PM Zinc 10 ug/L MY10 Clarke Creek,Harris Road < 10 Yes
1/17/2023 12:25:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.50 Yes
2/21/2023 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No
2/21/2023 12:10:00 PM Fecal Coliform 200 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
2/21/2023 12:10:00 PM Total Phosphorus 0.07 mg/L MY10 Clarke Creek,Harris Road 0.010 No
2/21/2023 12:10:00 PM Turbidity 35 NTU MY10 Clarke Creek,Harris Road 0.5 No
2/21/2023 12:10:00 PM Nitrate/Nitrite 0.46 mg/L MY10 Clarke Creek,Harris Road 0.05 No
2/21/2023 12:10:00 PM E.Coli 215 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No
2/21/2023 12:10:00 PM Total Suspended Solids 7.8 mg/L MY10 Clarke Creek,Harris Road 5.0 No
2/21/2023 12:10:00 PM TKN 0.25 mg/L MY10 Clarke Creek,Harris Road < 0.25 No
2/21/2023 12:10:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No
2/21/2023 12:10:00 PM Calcium 15000 ug/L MY10 Clarke Creek,Harris Road 500 No
2/21/2023 12:10:00 PM Hardness 58 mg/L MY10 Clarke Creek,Harris Road 1.0 No
2/21/2023 12:10:00 PM Magnesium 4900 ug/L MY10 Clarke Creek,Harris Road 500 No
2/21/2023 12:10:00 PM Suspended Sediment 6.7 mg/L MY10 Clarke Creek,Harris Road 4.3 No
3/21/2023 12:05:00 PM Turbidity 21 NTU MY10 Clarke Creek,Harris Road 0.50 No
3/21/2023 12:05:00 PM Fecal Coliform 182 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
3/21/2023 12:05:00 PM Nitrate/Nitrite 2.4 mg/L MY10 Clarke Creek,Harris Road 0.25 No
78
, , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit Site Description _ MDL Storm
3/21/2023 12:05:00 PM E.Coli 142 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No
3/21/2023 12:05:00 PM Total Suspended Solids 13 mg/L MY10 Clarke Creek,Harris Road 5.0 No
3/21/2023 12:05:00 PM Total Phosphorus 0.51 mg/L MY10 Clarke Creek,Harris Road 0.050 No
3/21/2023 12:05:00 PM Ammonia-Nitrogen 0.11 mg/L MY10 Clarke Creek,Harris Road 0.10 No
3/21/2023 12:05:00 PM Hardness 63 mg/L MY10 Clarke Creek,Harris Road 1.0 No
3/21/2023 12:05:00 PM Magnesium 5700 ug/L MY10 Clarke Creek,Harris Road 1000 No
3/21/2023 12:05:00 PM Calcium 16000 ug/L MY10 Clarke Creek,Harris Road 1000 No
3/21/2023 12:05:00 PM TKN 0.57 mg/L MY10 Clarke Creek,Harris Road 0.25 No
3/21/2023 12:05:00 PM Copper 4.2 ug/L MY10 Clarke Creek,Harris Road 2.0 No
3/21/2023 12:05:00 PM Suspended Sediment 8.9 mg/L MY10 Clarke Creek,Harris Road 4.5 No
3/21/2023 12:10:00 PM Fecal Coliform 210 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
3/21/2023 12:10:00 PM Turbidity 21 NTU MY10 Clarke Creek,Harris Road 0.50 No
3/21/2023 12:10:00 PM Nitrate/Nitrite 2.8 mg/L MY10 Clarke Creek,Harris Road 0.25 No
3/21/2023 12:10:00 PM E.Coli 112 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No
3/21/2023 12:10:00 PM Ammonia-Nitrogen 0.11 mg/L MY10 Clarke Creek,Harris Road 0.10 No
3/21/2023 12:10:00 PM Total Suspended Solids 13.4 mg/L MY10 Clarke Creek,Harris Road 5.0 No
3/21/2023 12:10:00 PM Total Phosphorus 0.493 mg/L MY10 Clarke Creek,Harris Road 0.050 No
3/21/2023 12:10:00 PM Magnesium 5700 ug/L MY10 Clarke Creek,Harris Road 1000 No
3/21/2023 12:10:00 PM Calcium 16000 ug/L MY10 Clarke Creek,Harris Road 1000 No
3/21/2023 12:10:00 PM Hardness 63 mg/L MY10 Clarke Creek,Harris Road 1.0 No
3/21/2023 12:10:00 PM TKN 0.53 mg/L MY10 Clarke Creek,Harris Road 0.25 No
3/21/2023 12:10:00 PM Copper 4.5 ug/L MY10 Clarke Creek,Harris Road 2.0 No
3/21/2023 12:10:00 PM Suspended Sediment 13 mg/L MY10 Clarke Creek,Harris Road 3.8 No
4/18/2023 12:00:00 PM Fecal Coliform 300 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
4/18/2023 12:00:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No
4/18/2023 12:00:00 PM Nitrate/Nitrite 0.65 mg/L MY10 Clarke Creek,Harris Road 0.25 No
4/18/2023 12:00:00 PM Turbidity 60 NTU MY10 Clarke Creek,Harris Road 0.50 No
4/18/2023 12:00:00 PM E.Coli 219 MPN/100 ml 1 MY10 Clarke Creek,Harris Road 1 No
4/18/2023 12:00:00 PM Total Phosphorus 0.103 mg/L MY10 Clarke Creek,Harris Road 0.010 No
4/18/2023 12:00:00 PM Magnesium 5200 ug/L MY10 Clarke Creek,Harris Road 1000 No
4/18/2023 12:00:00 PM Hardness 59 mg/L MY10 Clarke Creek,Harris Road 1.0 No
4/18/2023 12:00:00 PM Suspended Sediment 12 mg/L MY10 Clarke Creek,Harris Road 3.9 No
4/18/2023 12:00:00 PM Calcium 15000 ug/L MY10 Clarke Creek,Harris Road 1000 No
4/18/2023 12:00:00 PM TKN 0.33 mg/L MY10 Clarke Creek,Harris Road 0.25 No
4/18/2023 12:00:00 PM Total Suspended Solids 19.4 mg/L MY10 Clarke Creek,Harris Road 5.0 No
4/18/2023 12:00:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.50 No
4/18/2023 12:00:00 PM Zinc 10 ug/L MY10 Clarke Creek,Harris Road < 10 No
4/18/2023 12:00:00 PM Chromium 5 ug/L MY10 Clarke Creek,Harris Road < 5.0 No
4/18/2023 12:00:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No
4/18/2023 12:00:00 PM Nickel 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No
5/16/2023 12:10:00 PM Nitrate/Nitrite 0.68 mg/L MY10 Clarke Creek,Harris Road 0.25 No
5/16/2023 12:10:00 PM Fecal Coliform 880 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No
5/16/2023 12:10:00 PM E.Coli 1120 MPN/100 m1 MY10 Clarke Creek,Harris Road 1 No
5/16/2023 12:10:00 PM Turbidity 8.5 NTU MY10 Clarke Creek,Harris Road 0.50 No
5/16/2023 12:10:00 PM Suspended Sediment 4.3 mg/L MY10 Clarke Creek,Harris Road < 4.3 No
79
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
-Collection Date Analyte Result Unit I Site Description i MDL Storm
5/16/2023 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No
5/16/2023 12:10:00 PM Total Phosphorus 0.046 mg/L MY10 Clarke Creek,Harris Road 0.010 No
5/16/2023 12:10:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No
5/16/2023 12:10:00 PM TKN 0.25 mg/L MY10 Clarke Creek,Harris Road < 0.25 No
5/16/2023 12:10:00 PM Calcium 19000 ug/L MY10 Clarke Creek,Hams Road 500 No
5/16/2023 12:10:00 PM Hardness 73 mg/L MY10 Clarke Creek,Harris Road 1.0 No
5/16/2023 12:10:00 PM Magnesium 6200 ug/L MY10 Clarke Creek,Harris Road 500 No
5/16/2023 12:10:00 PM Copper 2 ug/L MY10 Clarke Creek,Hams Road < 2.0 No
6/20/2023 12:10:00 PM Nitrate/Nitrite 0.66 mg/L MY10 Clarke Creek,Harris Road 0.05 Yes
6/20/2023 12:10:00 PM E.Coli 13540 MPN/100 ml MY10 Clarke Creek,Harris Road 100 Yes
6/20/2023 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Hams Road < 0.10 Yes
6/20/2023 12:10:00 PM Turbidity 450 NTU MY10 Clarke Creek,Harris Road 0.50 Yes
6/20/2023 12:10:00 PM Fecal Coliform 32000 CFU/100 ml MY10 Clarke Creek,Harris Road 100 Yes
6/20/2023 12:10:00 PM Total Suspended Solids 240 mg/L MY10 Clarke Creek,Harris Road 50.0 Yes
6/20/2023 12:10:00 PM Suspended Sediment 300 mg/L MY10 Clarke Creek,Harris Road 4.1 Yes
6/20/2023 12:10:00 PM TKN 1.2 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes
6/20/2023 12:10:00 PM Total Phosphorus 0.413 mg/L MY10 Clarke Creek,Harris Road 0.050 Yes
6/20/2023 12:10:00 PM Hardness 24 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes
6/20/2023 12:10:00 PM Calcium 4700 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
6/20/2023 12:10:00 PM Magnesium 3000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes
6/20/2023 12:10:00 PM Copper 4 ug/L MY10 Clarke Creek,Harris Road 2.0 Yes
7/19/2022 9:45:00 AM E.Coli 210 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes
7/19/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
7/19/2022 9:45:00 AM Turbidity 15 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
7/19/2022 9:45:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
7/19/2022 9:45:00 AM Fecal Coliform 320 CFU/100 ml ' MY14 Duck Creek at Tara Oaks 10 Yes
7/19/2022 9:45:00 AM Nitrate/Nitrite 8.1 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
7/19/2022 9:45:00 AM Chromium 5 ug/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
7/19/2022 9:45:00 AM Nickel 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
7/19/2022 9:45:00 AM TKN 0.58 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes
7/19/2022 9:45:00 AM Calcium 18000 ug/L MY14 Duck Creek at Tara Oaks 2000 Yes
7/19/2022 9:45:00 AM Hardness 65 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
7/19/2022 9:45:00 AM Total Phosphorus 0.91 mg/L MY14 Duck Creek at Tara Oaks 0.10 Yes
7/19/2022 9:45:00 AM Magnesium 4800 ug/L MY14 Duck Creek at Tara Oaks 500 Yes
7/19/2022 9:45:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 Yes
7/19/2022 9:45:00 AM Copper 2.5 ug/L MY14 Duck Creek at Tara Oaks 2.0 Yes
7/19/2022 9:45:00 AM Zinc 10 ug/L MY14 Duck Creek at Tara Oaks < 10 Yes
7/19/2022 9:45:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.50 Yes
8/16/2022 9:30:00 AM E.Coli 630 MPN/100 ml MY14 Duck Creek at Tara Oaks 100 Yes
8/16/2022 9:30:00 AM Nitrate/Nitrite 23 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
8/16/2022 9:30:00 AM Fecal Coliform 938 CFU/100 ml MY14 Duck Creek at Tara Oaks 100 Yes
8/16/2022 9:30:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
8/16/2022 9:30:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 Yes
8/16/2022 9:30:00 AM Turbidity 1.4 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
8/16/2022 9:30:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
80
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
S Collection Date Analyte Result Unit I Site Description MDL Storm
8/16/2022 9:30:00 AM Suspended Sediment 4.5 mg/L MY14 Duck Creek at Tara Oaks < 4.5 Yes
8/16/2022 9:30:00 AM Total Phosphorus 2.3 mg/L MY14 Duck Creek at Tara Oaks 0.10 Yes
8/16/2022 9:30:00 AM Magnesium 6900 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
8/16/2022 9:30:00 AM Calcium 38000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
8/16/2022 9:30:00 AM Hardness 120 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
8/16/2022 9:30:00 AM Copper 2.5 ug/L MY14 Duck Creek at Tara Oaks 2.0 Yes
8/16/2022 9:35:00 AM Fecal Coliform 813 CFU/100 ml MY14 Duck Creek at Tara Oaks 100 Yes
8/16/2022 9:35:00 AM Nitrate/Nitrite 24 mg/L MY14 Duck Creek at Tara Oaks 1.2 Yes
8/16/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
8/16/2022 9:35:00 AM E.Coli 520 MPN/100 ml MY14 Duck Creek at Tara Oaks 100 Yes
8/16/2022 9:35:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 Yes
8/16/2022 9:35:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
8/16/2022 9:35:00 AM Turbidity 1.5 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
8/16/2022 9:35:00 AM Suspended Sediment 4 mg/L MY14 Duck Creek at Tara Oaks < 4.0 Yes
8/16/2022 9:35:00 AM Total Phosphorus 2.3 mg/L MY14 Duck Creek at Tara Oaks 0.10 Yes
8/16/2022 9:35:00 AM Calcium 39000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
8/16/2022 9:35:00 AM Magnesium 6300 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
8/16/2022 9:35:00 AM Hardness 120 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
8/16/2022 9:35:00 AM Copper 2.6 ug/L MY14 Duck Creek at Tara Oaks 2.0 Yes
9/20/2022 9:00:00 AM Fecal Coliform 410 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No
9/20/2022 9:00:00 AM Nitrate/Nitrite 23 mg/L MY14 Duck Creek at Tara Oaks 1.2 No
9/20/2022 9:00:00 AM E.Coli 140 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No
9/20/2022 9:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No
9/20/2022 9:00:00 AM Turbidity 1 NTU MY14 Duck Creek at Tara Oaks 0.50 No
9/20/2022 9:00:00 AM Total Phosphorus 2.3 mg/L MY14 Duck Creek at Tara Oaks 0.200 No
9/20/2022 9:00:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 No
9/20/2022 9:00:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No
9/20/2022 9:00:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 No
9/20/2022 9:00:00 AM Magnesium 6600 ug/L MY14 Duck Creek at Tara Oaks 1000 No
9/20/2022 9:00:00 AM Calcium 32000 ug/L MY14 Duck Creek at Tara Oaks 1000 No
9/20/2022 9:00:00 AM Hardness 110 mg/L MY14 Duck Creek at Tara Oaks 1.0 No
9/20/2022 9:00:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 No
9/20/2022 9:00:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No
9/20/2022 9:00:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 No
9/20/2022 9:00:00 AM Magnesium 6600 ug/L MY14 Duck Creek at Tara Oaks 1000 No
9/20/2022 9:00:00 AM Calcium 32000 ug/L MY14 Duck Creek at Tara Oaks 1000 No
9/20/2022 9:00:00 AM Hardness 110 mg/L MY14 Duck Creek at Tara Oaks 1.0 No
9/20/2022 9:00:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 No
10/18/2022 9:10:00 AM Fecal Coliform 188 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No
10/18/2022 9:10:00 AM E.Coli 128 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No
10/18/2022 9:10:00 AM Nitrate/Nitrite 15 mg/L MY14 Duck Creek at Tara Oaks 0.50 No
10/18/2022 9:10:00 AM Turbidity 1.1 NTU MY14 Duck Creek at Tara Oaks 0.50 No
10/18/2022 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No
10/18/2022 9:10:00 AM Total Phosphorus 1.85 mg/L MY14 Duck Creek at Tara Oaks 0.100 No
10/18/2022 9:10:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No
81
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
7 Collection Date Analyte Result Unit I Site Description MDL Storm
10/18/2022 9:10:00 AM TKN 0.7 mg/L MY14 Duck Creek at Tara Oaks 0.25 No
10/18/2022 9:10:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 No
10/18/2022 9:10:00 AM Hardness 120 mg/L MY14 Duck Creek at Tara Oaks 0.100 No
10/18/2022 9:10:00 AM Chromium 1 ug/L MY14 Duck Creek at Tara Oaks < 1.00 No
10/18/2022 9:10:00 AM Zinc 35.1 ug/L MY14 Duck Creek at Tara Oaks 20.0 No
10/18/2022 9:10:00 AM Calcium 36400 ug/L MY14 Duck Creek at Tara Oaks 100 No
10/18/2022 9:10:00 AM Magnesium 7170 ug/L MY14 Duck Creek at Tara Oaks 100 No
10/18/2022 9:10:00 AM Copper 12.9 ug/L MY14 Duck Creek at Tara Oaks 0.500 No
10/18/2022 9:10:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.500 No
10/18/2022 9:10:00 AM Nickel 0.77 ug/L MY14 Duck Creek at Tara Oaks 0.500 No
11/15/2022 9:45:00 AM Fecal Coliform 431 CFU/100 ml MY14 Duck Creek at Tara Oaks 20 Yes
11/15/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
11/15/2022 9:45:00 AM Turbidity 1.1 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
11/15/2022 9:45:00 AM Nitrate/Nitrite 9.2 mg/L MY14 Duck Creek at Tara Oaks 0.50 Yes
11/15/2022 9:45:00 AM E.Coli 285 MPN/100 ml MY14 Duck Creek at Tara Oaks 10 Yes
11/15/2022 9:45:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
11/15/2022 9:45:00 AM Total Phosphorus 1.2 mg/L MY14 Duck Creek at Tara Oaks 0.20 Yes
11/15/2022 9:45:00 AM Suspended Sediment 4.1 mg/L MY14 Duck Creek at Tara Oaks < 4.1 Yes
11/15/2022 9:45:00 AM TKN 0.63 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes
11/15/2022 9:45:00 AM Calcium 26000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
11/15/2022 9:45:00 AM Magnesium 6400 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
11/15/2022 9:45:00 AM Hardness 91 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
11/15/2022 9:45:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
12/20/2022 9:35:00 AM Nitrate/Nitrite 1.9 mg/L MY14 Duck Creek at Tara Oaks 0.50 No
12/20/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No
12/20/2022 9:35:00 AM Fecal Coliform 107 CFU/100 ml ' MY14 Duck Creek at Tara Oaks 10 No
12/20/2022 9:35:00 AM E.Coli 291 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No
-
12/20/2022 9:35:00 AM Total Phosphorus 0.238 mg/L MY14 Duck Creek at Tara Oaks 0.020 No
12/20/2022 9:35:00 AM Turbidity 7.5 NTU MY14 Duck Creek at Tara Oaks 0.50 No
12/20/2022 9:35:00 AM TKN 0.27 mg/L MY14 Duck Creek at Tara Oaks 0.25 No
12/20/2022 9:35:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 No
12/20/2022 9:35:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No
12/20/2022 9:35:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 No
12/20/2022 9:35:00 AM Calcium 15000 ug/L MY14 Duck Creek at Tara Oaks 500 No
12/20/2022 9:35:00 AM Hardness 60 mg/L MY14 Duck Creek at Tara Oaks 1.0 No
12/20/2022 9:35:00 AM Magnesium 5500 ug/L MY14 Duck Creek at Tara Oaks 500 No
1/17/2023 9:15:00 AM Fecal Coliform 300 CFU/100 m1 MY14 Duck Creek at Tara Oaks 10 Yes
1/17/2023 9:15:00 AM E.Coli 489 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes
1/17/2023 9:15:00 AM Nitrate/Nitrite 1.1 mg/L MY14 Duck Creek at Tara Oaks 0.50 Yes
1/17/2023 9:15:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
1/17/2023 9:15:00 AM Turbidity 17 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
1/17/2023 9:15:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
1/17/2023 9:15:00 AM TKN 0.36 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes
1/17/2023 9:15:00 AM Total Phosphorus 0.11 mg/L MY14 Duck Creek at Tara Oaks 0.010 Yes
1/17/2023 9:15:00 AM Suspended Sediment 3.8 mg/L MY14 Duck Creek at Tara Oaks < 3.8 Yes
82
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
-.Collection Date Analyte Result Unit I Site Description MDL Storm
1/17/2023 9:15:00 AM Hardness 54 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
1/17/2023 9:15:00 AM Magnesium 4700 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
1/17/2023 9:15:00 AM Calcium 14000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
1/17/2023 9:15:00 AM Chromium 5 ug/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
1/17/2023 9:15:00 AM Nickel 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
1/17/2023 9:15:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
1/17/2023 9:15:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.50 Yes
1/17/2023 9:15:00 AM Zinc 10 ug/L MY14 Duck Creek at Tara Oaks < 10 Yes
2/21/2023 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No
2/21/2023 9:05:00 AM Turbidity 13 NTU MY14 Duck Creek at Tara Oaks 0.5 No
2/21/2023 9:05:00 AM Total Phosphorus 0.116 mg/L MY14 Duck Creek at Tara Oaks 0.010 No
2/21/2023 9:05:00 AM E.Coli 306 MPN/100 ml MY14 Duck Creek at Tara Oaks 2 No
2/21/2023 9:05:00 AM Fecal Coliform 270 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No
2/21/2023 9:05:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No
2/21/2023 9:05:00 AM TKN 0.36 mg/L MY14 Duck Creek at Tara Oaks 0.25 No
2/21/2023 9:05:00 AM Nitrate/Nitrite 1.1 mg/L MY14 Duck Creek at Tara Oaks 0.05 No
2/21/2023 9:05:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 No
2/21/2023 9:05:00 AM Hardness 51 mg/L MY14 Duck Creek at Tara Oaks 1.0 No
2/21/2023 9:05:00 AM Calcium 13000 ug/L MY14 Duck Creek at Tara Oaks 500 No
2/21/2023 9:05:00 AM Magnesium 4500 ug/L MY14 Duck Creek at Tara Oaks 500 No
2/21/2023 9:05:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 No
3/21/2023 9:25:00 AM Fecal Coliform 530 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 Yes
3/21/2023 9:25:00 AM Nitrate/Nitrite 1.4 mg/L MY14 Duck Creek at Tara Oaks 0.05 Yes
3/21/2023 9:25:00 AM Turbidity 3.7 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
3/21/2023 9:25:00 AM E.Coli 771 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes
3/21/2023 9:25:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
3/21/2023 9:25:00 AM Total Phosphorus 0.15 mg/L MY14 Duck Creek at Tara Oaks 0.010 Yes
3/21/2023 9:25:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
3/21/2023 9:25:00 AM Hardness 58 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
3/21/2023 9:25:00 AM Calcium 15000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
3/21/2023 9:25:00 AM Magnesium 5000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
3/21/2023 9:25:00 AM TKN 0.34 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes
3/21/2023 9:25:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
3/21/2023 9:25:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 Yes
4/12/2023 1:40:00 PM Fecal Coliform 310 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No
4/12/2023 1:40:00 PM E.Coli 215 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No
4/18/2023 9:10:00 AM Total Phosphorus 0.183 mg/L MY14 Duck Creek at Tara Oaks 0.010 Yes
4/18/2023 9:10:00 AM Nitrate/Nitrite 1.4 mg/L MY14 Duck Creek at Tara Oaks 0.05 Yes
4/18/2023 9:10:00 AM Fecal Coliform 740 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 Yes
-
4/18/2023 9:10:00 AM Turbidity 9.4 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
4/18/2023 9:10:00 AM E.Coli 411 MPN/100 m1 MY14 Duck Creek at Tara Oaks 1 Yes
4/18/2023 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
4/18/2023 9:10:00 AM Hardness 53 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
4/18/2023 9:10:00 AM Calcium 14000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
4/18/2023 9:10:00 AM Suspended Sediment 4 mg/L MY14 Duck Creek at Tara Oaks < 4.0 Yes
83
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
- Collection Date Analyte Result Unit I Site Description MDL Storm
4/18/2023 9:10:00 AM Magnesium 4500 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
4/18/2023 9:10:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
4/18/2023 9:10:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.50 Yes
4/18/2023 9:10:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
4/18/2023 9:10:00 AM Chromium 5 ug/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
4/18/2023 9:10:00 AM Nickel 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
4/18/2023 9:10:00 AM TKN 0.46 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes
4/18/2023 9:10:00 AM Zinc 10 ug/L MY14 Duck Creek at Tara Oaks < 10 Yes
5/16/2023 9:15:00 AM Nitrate/Nitrite 3.4 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes
5/16/2023 9:15:00 AM E.Coli 649 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes
5/16/2023 9:15:00 AM Fecal Coliform 300 CFU/100 m1 MY14 Duck Creek at Tara Oaks 10 Yes
5/16/2023 9:15:00 AM Turbidity 3.8 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
5/16/2023 9:15:00 AM Total Phosphorus 0.462 mg/L MY14 Duck Creek at Tara Oaks 0.050 Yes
5/16/2023 9:15:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
5/16/2023 9:15:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 Yes
5/16/2023 9:15:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 Yes
5/16/2023 9:15:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes
5/16/2023 9:15:00 AM Magnesium 5000 ug/L MY14 Duck Creek at Tara Oaks 500 Yes
5/16/2023 9:15:00 AM Calcium 18000 ug/L MY14 Duck Creek at Tara Oaks 500 Yes
5/16/2023 9:15:00 AM Hardness 66 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
5/16/2023 9:15:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
6/20/2023 9:20:00 AM Nitrate/Nitrite 1.2 mg/L MY14 Duck Creek at Tara Oaks 0.05 Yes
6/20/2023 9:20:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes
6/20/2023 9:20:00 AM E.Coli 1550 MPN/100 ml MY14 Duck Creek at Tara Oaks 100 Yes
6/20/2023 9:20:00 AM Turbidity 30 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes
6/20/2023 9:20:00 AM Total Suspended Solids 13.8 mg/L MY14 Duck Creek at Tara Oaks 5.0 Yes
6/20/2023 9:20:00 AM Suspended Sediment 11 mg/L MY14 Duck Creek at Tara Oaks 4.1 Yes
6/20/2023 9:20:00 AM Fecal Coliform 1320 CFU/100 ml 1 MY14 Duck Creek at Tara Oaks 100 Yes
6/20/2023 9:20:00 AM TKN 0.61 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes
6/20/2023 9:20:00 AM Total Phosphorus 0.22 mg/L MY14 Duck Creek at Tara Oaks 0.020 Yes
6/20/2023 9:20:00 AM Hardness 52 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes
6/20/2023 9:20:00 AM Calcium 13000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
6/20/2023 9:20:00 AM Magnesium 4700 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes
6/20/2023 9:20:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes
7/19/2022 11:50:00 AM Fecal Coliform 250 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
7/19/2022 11:50:00 AM E.Coli 160 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
7/19/2022 11:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
7/19/2022 11:50:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No
7/19/2022 11:50:00 AM Turbidity 16 NTU MY1B River Ford Rd.(Bridge) 0.50 No
7/19/2022 11:50:00 AM Nitrate/Nitrite 0.35 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
7/19/2022 11:50:00 AM Nickel 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
7/19/2022 11:50:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
7/19/2022 11:50:00 AM Chromium 5 ug/L MY1B River Ford Rd.(Bridge) < 5.0 No
7/19/2022 11:50:00 AM Total Phosphorus 0.045 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
7/19/2022 11:50:00 AM Hardness 50 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
84
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date ill Analyte Result Unit _ Site MIK Site Description MDL Storm
7/19/2022 11:50:00 AM Magnesium 4200 ug/L MY1B River Ford Rd.(Bridge) 500 No
7/19/2022 11:50:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 2000 No
7/19/2022 11:50:00 AM Suspended Sediment 4.4 mg/L MY1B River Ford Rd.(Bridge) < 4.4 No
7/19/2022 11:50:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
7/19/2022 11:50:00 AM Zinc 10 ug/L MY1B River Ford Rd.(Bridge) < 10 No
7/19/2022 11:50:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.50 No
8/16/2022 11:55:00 AM E.Coli 2160 MPN/100 ml MY1B River Ford Rd.(Bridge) 100 Yes
8/16/2022 11:55:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes
8/16/2022 11:55:00 AM Nitrate/Nitrite 0.31 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes
8/16/2022 11:55:00 AM Fecal Coliform 4100 CFU/100 ml MY1B River Ford Rd.(Bridge) 100 Yes
8/16/2022 11:55:00 AM TKN 0.31 mg/L MY1B River Ford Rd.(Bridge) 0.25 Yes
8/16/2022 11:55:00 AM Total Suspended Solids 33 mg/L MY1B River Ford Rd.(Bridge) 5.3 Yes
8/16/2022 11:55:00 AM Turbidity 75 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes
8/16/2022 11:55:00 AM Suspended Sediment 15 mg/L MY1B River Ford Rd.(Bridge) 3.9 Yes
8/16/2022 11:55:00 AM Total Phosphorus 0.074 mg/L MY1B River Ford Rd.(Bridge) 0.010 Yes
8/16/2022 11:55:00 AM Magnesium 4100 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
8/16/2022 11:55:00 AM Calcium 14000 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
8/16/2022 11:55:00 AM Hardness 52 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes
8/16/2022 11:55:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes
9/20/2022 11:40:00 AM E.Coli 194 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
9/20/2022 11:40:00 AM Fecal Coliform 230 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
9/20/2022 11:40:00 AM Nitrate/Nitrite 0.31 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
9/20/2022 11:40:00 AM Total Phosphorus 0.026 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
9/20/2022 11:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
9/20/2022 11:40:00 AM Turbidity 4.3 NTU MY1B River Ford Rd.(Bridge) 0.50 No
9/20/2022 11:40:00 AM Hardness 71 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
9/20/2022 11:40:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No
9/20/2022 11:40:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
9/20/2022 11:40:00 AM Magnesium 5600 ug/L MY1B River Ford Rd.(Bridge) 500 No
9/20/2022 11:40:00 AM Calcium 19000 ug/L MY1B River Ford Rd.(Bridge) 2000 No
9/20/2022 11:40:00 AM Suspended Sediment 4.2 mg/L MY1B River Ford Rd.(Bridge) < 4.2 No
9/20/2022 11:40:00 AM Hardness 71 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
9/20/2022 11:40:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No
9/20/2022 11:40:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
9/20/2022 11:40:00 AM Magnesium 5600 ug/L MY1B River Ford Rd.(Bridge) 500 No
9/20/2022 11:40:00 AM Calcium 19000 ug/L MY1B River Ford Rd.(Bridge) 2000 No
9/20/2022 11:40:00 AM Suspended Sediment 4.2 mg/L MY1B River Ford Rd.(Bridge) < 4.2 No
9/20/2022 11:40:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
10/18/2022 11:45:00 AM Fecal Coliform 270 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
10/18/2022 11:45:00 AM Turbidity 2.1 NTU MY1B River Ford Rd.(Bridge) 0.50 No
10/18/2022 11:45:00 AM Nitrate/Nitrite 0.05 mg/L MY1B River Ford Rd.(Bridge) < 0.05 No
10/18/2022 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
10/18/2022 11:45:00 AM E.Coli 167 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
10/18/2022 11:45:00 AM Total Phosphorus 0.031 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
10/18/2022 11:45:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No
85
/ , / Charlotte-Mecklenburg
f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
7 Collection Date Analyte Result Unit I Site Description MDL Storm
10/18/2022 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
10/18/2022 11:45:00 AM Suspended Sediment 4.2 mg/L MY1B River Ford Rd.(Bridge) < 4.2 No
10/18/2022 11:45:00 AM Calcium 18200 ug/L MY1B River Ford Rd.(Bridge) 100 No
10/18/2022 11:45:00 AM Copper 1.57 ug/L MY1B River Ford Rd.(Bridge) 0.500 No
10/18/2022 11:45:00 AM Nickel 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.500 No
10/18/2022 11:45:00 AM Chromium 1 ug/L MY1B River Ford Rd.(Bridge) < 1.00 No
10/18/2022 11:45:00 AM Zinc 20 ug/L MY1B River Ford Rd.(Bridge) < 20.0 No
10/18/2022 11:45:00 AM Hardness 69.3 mg/L MY1B River Ford Rd.(Bridge) 0.100 No
10/18/2022 11:45:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.500 No
10/18/2022 11:45:00 AM Magnesium 5800 ug/L MY1B River Ford Rd.(Bridge) 100 No
11/15/2022 11:40:00 AM Fecal Coliform 480 CFU/100 ml MY1B River Ford Rd.(Bridge) 20 Yes
11/15/2022 11:40:00 AM Turbidity 8.6 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes
11/15/2022 11:40:00 AM E.Coli 369 MPN/100 ml MY1B River Ford Rd.(Bridge) 10 Yes
11/15/2022 11:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes
11/15/2022 11:40:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 Yes
11/15/2022 11:40:00 AM Nitrate/Nitrite 0.16 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes
11/15/2022 11:40:00 AM Total Phosphorus 0.044 mg/L MY1B River Ford Rd.(Bridge) 0.010 Yes
11/15/2022 11:40:00 AM Suspended Sediment 4.3 mg/L MY1B River Ford Rd.(Bridge) < 4.3 Yes
11/15/2022 11:40:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 Yes
11/15/2022 11:40:00 AM Magnesium 5100 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
11/15/2022 11:40:00 AM Calcium 16000 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
11/15/2022 11:40:00 AM Hardness 61 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes
11/15/2022 11:40:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes
12/20/2022 11:45:00 AM Fecal Coliform 200 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
12/20/2022 11:45:00 AM Nitrate/Nitrite 0.5 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
12/20/2022 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
12/20/2022 11:45:00 AM Total Phosphorus 0.041 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
12/20/2022 11:45:00 AM E.Coli 270 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
12/20/2022 11:45:00 AM Turbidity 20 NTU MY1B River Ford Rd.(Bridge) 0.50 No
12/20/2022 11:45:00 AM Suspended Sediment 4.3 mg/L MY1B River Ford Rd.(Bridge) < 4.3 No
12/20/2022 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
12/20/2022 11:45:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No
12/20/2022 11:45:00 AM Hardness 51 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
12/20/2022 11:45:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
12/20/2022 11:45:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 500 No
12/20/2022 11:45:00 AM Magnesium 4400 ug/L MY1B River Ford Rd.(Bridge) 500 No
1/17/2023 11:45:00 AM E.Coli 194 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 Yes
1/17/2023 11:45:00 AM Fecal Coliform 200 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 Yes
1/17/2023 11:45:00 AM Nitrate/Nitrite 0.48 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes
1/17/2023 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes
1/17/2023 11:45:00 AM Total Suspended Solids 10.8 mg/L MY1B River Ford Rd.(Bridge) 5.0 Yes
1/17/2023 11:45:00 AM Turbidity 25 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes
1/17/2023 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 Yes
1/17/2023 11:45:00 AM Suspended Sediment 8.6 mg/L MY1B River Ford Rd.(Bridge) 4.3 Yes
1/17/2023 11:45:00 AM Total Phosphorus 0.042 mg/L MY1B River Ford Rd.(Bridge) 0.010 Yes
86
/ , / Charlotte-Mecklenburg
f / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
-.Collection Date Analyte Result Unit I Site Description MDL Storm
1/17/2023 11:45:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
1/17/2023 11:45:00 AM Magnesium 4300 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
1/17/2023 11:45:00 AM Hardness 50 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes
1/17/2023 11:45:00 AM Chromium 5 ug/L MY1B River Ford Rd.(Bridge) < 5.0 Yes
1/17/2023 11:45:00 AM Nickel 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes
1/17/2023 11:45:00 AM Zinc 10 ug/L MY1B River Ford Rd.(Bridge) < 10 Yes
1/17/2023 11:45:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes
1/17/2023 11:45:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.50 Yes
2/21/2023 11:25:00 AM Nitrate/Nitrite 0.4 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
2/21/2023 11:25:00 AM Fecal Coliform 63 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
2/21/2023 11:25:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
2/21/2023 11:25:00 AM E.Coli 192 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
2/21/2023 11:25:00 AM Total Phosphorus 0.035 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
2/21/2023 11:25:00 AM Turbidity 18 NTU MY1B River Ford Rd.(Bridge) 0.5 No
2/21/2023 11:25:00 AM Total Suspended Solids 8.2 mg/L MY1B River Ford Rd.(Bridge) 5.0 No
2/21/2023 11:25:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
2/21/2023 11:25:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
2/21/2023 11:25:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 500 No
2/21/2023 11:25:00 AM Magnesium 4400 ug/L MY1B River Ford Rd.(Bridge) 500 No
2/21/2023 11:25:00 AM Hardness 51 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
2/21/2023 11:25:00 AM Suspended Sediment 8.4 mg/L MY1B River Ford Rd.(Bridge) 4.0 No
2/21/2023 11:35:00 AM Nitrate/Nitrite 0.41 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
2/21/2023 11:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
2/21/2023 11:35:00 AM Fecal Coliform 107 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
2/21/2023 11:35:00 AM Turbidity 18 NTU MY1B River Ford Rd.(Bridge) 0.5 No
2/21/2023 11:35:00 AM E.Coli 276 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
2/21/2023 11:35:00 AM Total Phosphorus 0.032 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
2/21/2023 11:35:00 AM Total Suspended Solids 9.6 mg/L MY1B River Ford Rd.(Bridge) 5.0 No
2/21/2023 11:35:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
2/21/2023 11:35:00 AM Magnesium 4700 ug/L MY1B River Ford Rd.(Bridge) 500 No
2/21/2023 11:35:00 AM Hardness 54 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
2/21/2023 11:35:00 AM Calcium 14000 ug/L MY1B River Ford Rd.(Bridge) 500 No
2/21/2023 11:35:00 AM Suspended Sediment 9.4 mg/L MY1B River Ford Rd.(Bridge) 3.9 No
2/21/2023 11:40:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
3/21/2023 11:35:00 AM Nitrate/Nitrite 0.3 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
3/21/2023 11:35:00 AM Turbidity 10 NTU MY1B River Ford Rd.(Bridge) 0.50 No
3/21/2023 11:35:00 AM Fecal Coliform 232 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
3/21/2023 11:35:00 AM E.Coli 299 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
3/21/2023 11:35:00 AM Total Suspended Solids 9.4 mg/L MY1B River Ford Rd.(Bridge) 5.0 No
3/21/2023 11:35:00 AM Total Phosphorus 0.031 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
3/21/2023 11:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
3/21/2023 11:35:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 1000 No
3/21/2023 11:35:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
3/21/2023 11:35:00 AM Magnesium 4400 ug/L MY1B River Ford Rd.(Bridge) 1000 No
3/21/2023 11:35:00 AM Hardness 51 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
87
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date AM Analyte Result Unit _ Site MIK Site Description MDL Storm
3/21/2023 11:35:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
3/21/2023 11:35:00 AM Suspended Sediment 12 mg/L MY1B River Ford Rd.(Bridge) 4.0 No
4/18/2023 11:30:00 AM Fecal Coliform 300 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
4/18/2023 11:30:00 AM Turbidity 14 NTU MY1B River Ford Rd.(Bridge) 0.50 No
4/18/2023 11:30:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
4/18/2023 11:30:00 AM Total Phosphorus 0.034 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
4/18/2023 11:30:00 AM E.Coli 329 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
4/18/2023 11:30:00 AM Nitrate/Nitrite 0.44 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
4/18/2023 11:30:00 AM Magnesium 4600 ug/L MY1B River Ford Rd.(Bridge) 1000 No
4/18/2023 11:30:00 AM Suspended Sediment 7.3 mg/L MY1B River Ford Rd.(Bridge) 4.1 No
4/18/2023 11:30:00 AM Calcium 15000 ug/L MY1B River Ford Rd.(Bridge) 1000 No
4/18/2023 11:30:00 AM Hardness 56 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
4/18/2023 11:30:00 AM Total Suspended Solids 6.2 mg/L MY1B River Ford Rd.(Bridge) 5.0 No
4/18/2023 11:30:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
4/18/2023 11:30:00 AM Nickel 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
4/18/2023 11:30:00 AM Zinc 10 ug/L MY1B River Ford Rd.(Bridge) < 10 No
4/18/2023 11:30:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
4/18/2023 11:30:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.50 No
4/18/2023 11:30:00 AM Chromium 5 ug/L MY1B River Ford Rd.(Bridge) < 5.0 No
5/16/2023 11:45:00 AM Nitrate/Nitrite 0.37 mg/L MY1B River Ford Rd.(Bridge) 0.05 No
5/16/2023 11:45:00 AM Turbidity 4.9 NTU MY1B River Ford Rd.(Bridge) 0.50 No
5/16/2023 11:45:00 AM E.Coli 231 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No
5/16/2023 11:45:00 AM Fecal Coliform 270 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No
5/16/2023 11:45:00 AM Total Phosphorus 0.028 mg/L MY1B River Ford Rd.(Bridge) 0.010 No
5/16/2023 11:45:00 AM Suspended Sediment 4 mg/L MY1B River Ford Rd.(Bridge) < 4.0 No
5/16/2023 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No
5/16/2023 11:45:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No
5/16/2023 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No
5/16/2023 11:45:00 AM Calcium 16000 ug/L MY1B River Ford Rd.(Bridge) 500 No
5/16/2023 11:45:00 AM Magnesium 4900 ug/L MY1B River Ford Rd.(Bridge) 500 No
5/16/2023 11:45:00 AM Hardness 60 mg/L MY1B River Ford Rd.(Bridge) 1.0 No
5/16/2023 11:45:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No
6/20/2023 11:40:00 AM Turbidity 230 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes
6/20/2023 11:40:00 AM Nitrate/Nitrite 0.59 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes
6/20/2023 11:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes
6/20/2023 11:40:00 AM E.Coli 4800 MPN/100 ml MY1B River Ford Rd.(Bridge) 100 Yes
6/20/2023 11:40:00 AM Total Suspended Solids 225 mg/L MY1B River Ford Rd.(Bridge) 25.0 Yes
6/20/2023 11:40:00 AM Suspended Sediment 230 mg/L MY1B River Ford Rd.(Bridge) 4.1 Yes
6/20/2023 11:40:00 AM Fecal Coliform 4800 CFU/100 ml MY1B River Ford Rd.(Bridge) 100 Yes
6/20/2023 11:40:00 AM Total Phosphorus 0.214 mg/L MY1B River Ford Rd.(Bridge) 0.020 Yes
6/20/2023 11:40:00 AM Hardness 34 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes
6/20/2023 11:40:00 AM Calcium 7500 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
6/20/2023 11:40:00 AM Magnesium 3700 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes
6/20/2023 11:40:00 AM Copper 2.2 ug/L MY1B River Ford Rd.(Bridge) 2.0 Yes
6/20/2023 11:40:00 AM TKN 0.84 mg/L MY1B River Ford Rd.(Bridge) 0.25 Yes
88
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date Analyte Result Unit 1 _ Site Description MDL Storm
7/19/2022 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
7/19/2022 10:00:00 AM E.Coli 345 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes
7/19/2022 10:00:00 AM Fecal Coliform 530 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes
7/19/2022 10:00:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
7/19/2022 10:00:00 AM Turbidity 45 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
7/19/2022 10:00:00 AM Nitrate/Nitrite 0.49 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
7/19/2022 10:00:00 AM Chromium 5 ug/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
7/19/2022 10:00:00 AM Total Phosphorus 0.044 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
7/19/2022 10:00:00 AM Nickel 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
7/19/2022 10:00:00 AM TKN 0.29 mg/L MY8 Clear Cr Ferguson Rd 0.25 Yes
7/19/2022 10:00:00 AM Magnesium 3300 ug/L MY8 Clear Cr Ferguson Rd 500 Yes
7/19/2022 10:00:00 AM Hardness 38 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
7/19/2022 10:00:00 AM Calcium 9700 ug/L MY8 Clear Cr Ferguson Rd 2000 Yes
7/19/2022 10:00:00 AM Suspended Sediment 3.9 mg/L MY8 Clear Cr Ferguson Rd < 3.9 Yes
7/19/2022 10:00:00 AM Zinc 10 ug/L MY8 Clear Cr Ferguson Rd < 10 Yes
7/19/2022 10:00:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.50 Yes
7/19/2022 10:00:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
8/16/2022 9:45:00 AM Fecal Coliform 938 CFU/100 ml MY8 Clear Cr Ferguson Rd 100 Yes
8/16/2022 9:45:00 AM Nitrate/Nitrite 0.47 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
8/16/2022 9:45:00 AM E.Coli 860 MPN/100 ml MY8 Clear Cr Ferguson Rd 100 Yes
8/16/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
8/16/2022 9:45:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes
8/16/2022 9:45:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
8/16/2022 9:45:00 AM Turbidity 8 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
8/16/2022 9:45:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 Yes
8/16/2022 9:45:00 AM Total Phosphorus 0.018 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
8/16/2022 9:45:00 AM Magnesium 4300 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
8/16/2022 9:45:00 AM Calcium 12000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
8/16/2022 9:45:00 AM Hardness 48 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
8/16/2022 9:45:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
9/20/2022 9:15:00 AM Nitrate/Nitrite 0.32 mg/L MY8 Clear Cr Ferguson Rd 0.05 No
9/20/2022 9:15:00 AM Fecal Coliform 615 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No
9/20/2022 9:15:00 AM E.Coli 1204 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No
9/20/2022 9:15:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No
9/20/2022 9:15:00 AM Total Phosphorus 0.018 mg/L MY8 Clear Cr Ferguson Rd 0.010 No
9/20/2022 9:15:00 AM Turbidity 1.6 NTU MY8 Clear Cr Ferguson Rd 0.50 No
9/20/2022 9:15:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No
9/20/2022 9:15:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 No
-
9/20/2022 9:15:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No
-
9/20/2022 9:15:00 AM Hardness 57 mg/L MY8 Clear Cr Ferguson Rd 1.0 No
9/20/2022 9:15:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:15:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:15:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No
9/20/2022 9:15:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 No
9/20/2022 9:15:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No
89
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
-Collection Date Analyte Result Unit I _ Site Description MDL Storm
9/20/2022 9:15:00 AM Hardness 57 mg/L MY8 Clear Cr Ferguson Rd 1.0 No
9/20/2022 9:15:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:15:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:15:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No
9/20/2022 9:20:00 AM Nitrate/Nitrite 0.33 mg/L MY8 Clear Cr Ferguson Rd 0.05 No
9/20/2022 9:20:00 AM Fecal Coliform 620 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No
9/20/2022 9:20:00 AM E.Coli 580 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No
9/20/2022 9:20:00 AM Turbidity 2.9 NTU MY8 Clear Cr Ferguson Rd 0.50 No
9/20/2022 9:20:00 AM Total Phosphorus 0.019 mg/L MY8 Clear Cr Ferguson Rd 0.010 No
9/20/2022 9:20:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No
9/20/2022 9:20:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 No
9/20/2022 9:20:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No
9/20/2022 9:20:00 AM Calcium 12000 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:20:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No
9/20/2022 9:20:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:20:00 AM Hardness 54 mg/L MY8 Clear Cr Ferguson Rd 1.0 No
9/20/2022 9:20:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 No
9/20/2022 9:20:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No
9/20/2022 9:20:00 AM Calcium 12000 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:20:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No
9/20/2022 9:20:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No
9/20/2022 9:20:00 AM Hardness 54 mg/L MY8 Clear Cr Ferguson Rd 1.0 No
9/20/2022 9:20:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No
10/18/2022 9:35:00 AM Nitrate/Nitrite 0.13 mg/L MY8 Clear Cr Ferguson Rd 0.05 No
10/18/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No
10/18/2022 9:35:00 AM Turbidity 1.3 NTU MY8 Clear Cr Ferguson Rd 0.50 No
10/18/2022 9:35:00 AM Total Phosphorus 0.019 mg/L MY8 Clear Cr Ferguson Rd 0.010 No
10/18/2022 9:35:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No
10/18/2022 9:35:00 AM E.Coli 436 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No
10/18/2022 9:35:00 AM Fecal Coliform 720 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No
10/18/2022 9:35:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No
10/18/2022 9:35:00 AM Suspended Sediment 3.9 mg/L MY8 Clear Cr Ferguson Rd < 3.9 No
10/18/2022 9:35:00 AM Chromium 1 ug/L MY8 Clear Cr Ferguson Rd < 1.00 No
10/18/2022 9:35:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.500 No
10/18/2022 9:35:00 AM Zinc 20 ug/L MY8 Clear Cr Ferguson Rd < 20.0 No
10/18/2022 9:35:00 AM Copper 1.07 ug/L MY8 Clear Cr Ferguson Rd 0.500 No
10/18/2022 9:35:00 AM Nickel 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.500 No
10/18/2022 9:35:00 AM Magnesium 5970 ug/L MY8 Clear Cr Ferguson Rd 100 No
10/18/2022 9:35:00 AM Calcium 17200 ug/L MY8 Clear Cr Ferguson Rd 100 No
10/18/2022 9:35:00 AM Hardness 67.5 mg/L MY8 Clear Cr Ferguson Rd 0.100 No
10/18/2022 10:20:00 AM Fecal Coliform 194 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No
10/18/2022 10:20:00 AM E.Coli 436 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No
11/15/2022 10:00:00 AM E.Coli 343 MPN/100 ml MY8 Clear Cr Ferguson Rd 10 Yes
11/15/2022 10:00:00 AM Fecal Coliform 354 CFU/100 ml MY8 Clear Cr Ferguson Rd 20 Yes
11/15/2022 10:05:00 AM Nitrate/Nitrite 0.2 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
90
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Nsi.Services
-.Collection Date Analyte Result Unit _ Site Description MDL Storm
11/15/2022 10:05:00 AM Turbidity 10 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
11/15/2022 10:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
11/15/2022 10:05:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
11/15/2022 10:05:00 AM Total Phosphorus 0.024 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
11/15/2022 10:05:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 Yes
11/15/2022 10:05:00 AM TKN 0.28 mg/L MY8 Clear Cr Ferguson Rd 0.25 Yes
11/15/2022 10:05:00 AM Magnesium 4400 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
11/15/2022 10:05:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
11/15/2022 10:05:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
11/15/2022 10:05:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
12/20/2022 9:55:00 AM Nitrate/Nitrite 0.73 mg/L MY8 Clear Cr Ferguson Rd 0.05 No
12/20/2022 9:55:00 AM Total Phosphorus 0.026 mg/L MY8 Clear Cr Ferguson Rd 0.010 No
12/20/2022 9:55:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No
12/20/2022 9:55:00 AM E.Coli 817 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No
12/20/2022 9:55:00 AM Turbidity 20 NTU MY8 Clear Cr Ferguson Rd 0.50 No
12/20/2022 9:55:00 AM Fecal Coliform 425 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No
12/20/2022 9:55:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 No
12/20/2022 9:55:00 AM TKN 0.31 mg/L MY8 Clear Cr Ferguson Rd 0.25 No
12/20/2022 9:55:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No
12/20/2022 9:55:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 500 No
12/20/2022 9:55:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 500 No
12/20/2022 9:55:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 No
12/20/2022 9:55:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No
1/17/2023 9:35:00 AM Fecal Coliform 495 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes
1/17/2023 9:35:00 AM E.Coli 817 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes
1/17/2023 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
1/17/2023 9:35:00 AM Nitrate/Nitrite 0.69 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
1/17/2023 9:35:00 AM Turbidity 24 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
1/17/2023 9:35:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
1/17/2023 9:35:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes
1/17/2023 9:35:00 AM Total Phosphorus 0.026 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
1/17/2023 9:35:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 Yes
1/17/2023 9:35:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
1/17/2023 9:35:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
1/17/2023 9:35:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
1/17/2023 9:35:00 AM Chromium 5 ug/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
1/17/2023 9:35:00 AM Nickel 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
1/17/2023 9:35:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
1/17/2023 9:35:00 AM Zinc 10 ug/L MY8 Clear Cr Ferguson Rd < 10 Yes
1/17/2023 9:35:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.50 Yes
2/21/2023 9:20:00 AM Nitrate/Nitrite 0.53 mg/L MY8 Clear Cr Ferguson Rd 0.05 No
2/21/2023 9:20:00 AM E.Coli 462 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No
2/21/2023 9:20:00 AM Total Phosphorus 0.018 mg/L MY8 Clear Cr Ferguson Rd 0.010 No
2/21/2023 9:20:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No
2/21/2023 9:20:00 AM Turbidity 16 NTU MY8 Clear Cr Ferguson Rd 0.5 No
91
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date Analyte Result Unit I _ Site Description MDL Storm
2/21/2023 9:20:00 AM Fecal Coliform 435 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No
2/21/2023 9:20:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No
2/21/2023 9:20:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No
2/21/2023 9:20:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No
2/21/2023 9:20:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 500 No
2/21/2023 9:20:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 No
2/21/2023 9:20:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 500 No
2/21/2023 9:20:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 No
3/21/2023 9:40:00 AM Nitrate/Nitrite 0.49 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
3/21/2023 9:40:00 AM Turbidity 6.9 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
3/21/2023 9:40:00 AM Fecal Coliform 370 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes
3/21/2023 9:40:00 AM E.Coli 291 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes
3/21/2023 9:40:00 AM Total Phosphorus 0.014 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
3/21/2023 9:40:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
3/21/2023 9:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
3/21/2023 9:40:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes
3/21/2023 9:40:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
3/21/2023 9:40:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
3/21/2023 9:40:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
3/21/2023 9:40:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
3/21/2023 9:40:00 AM Suspended Sediment 4.2 mg/L MY8 Clear Cr Ferguson Rd < 4.2 Yes
4/18/2023 9:25:00 AM Fecal Coliform 410 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes
4/18/2023 9:25:00 AM Turbidity 10 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
4/18/2023 9:25:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
4/18/2023 9:25:00 AM Nitrate/Nitrite 0.6 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
4/18/2023 9:25:00 AM Total Phosphorus 0.023 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
4/18/2023 9:25:00 AM E.Coli 411 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes
-
4/18/2023 9:25:00 AM Magnesium 4700 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
4/18/2023 9:25:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
4/18/2023 9:25:00 AM Hardness 52 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
4/18/2023 9:25:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 Yes
4/18/2023 9:25:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
4/18/2023 9:25:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes
4/18/2023 9:25:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
4/18/2023 9:25:00 AM Chromium 5 ug/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
4/18/2023 9:25:00 AM Nickel 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
4/18/2023 9:25:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.50 Yes
4/18/2023 9:25:00 AM Zinc 10 ug/L MY8 Clear Cr Ferguson Rd < 10 Yes
5/16/2023 9:30:00 AM E.Coli 411 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes
5/16/2023 9:30:00 AM Turbidity 6.1 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
5/16/2023 9:30:00 AM Nitrate/Nitrite 0.74 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
5/16/2023 9:30:00 AM Fecal Coliform 460 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes
5/16/2023 9:30:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 Yes
5/16/2023 9:30:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
5/16/2023 9:30:00 AM Total Phosphorus 0.022 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
92
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date Analyte Result Unit _ Site Description MDL Storm
5/16/2023 9:30:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes
5/16/2023 9:30:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes
5/16/2023 9:30:00 AM Hardness 60 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
5/16/2023 9:30:00 AM Calcium 15000 ug/L MY8 Clear Cr Ferguson Rd 500 Yes
5/16/2023 9:30:00 AM Magnesium 5400 ug/L MY8 Clear Cr Ferguson Rd 500 Yes
5/16/2023 9:30:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes
6/20/2023 9:40:00 AM Nitrate/Nitrite 0.28 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes
6/20/2023 9:40:00 AM E.Coli 4280 MPN/100 ml MY8 Clear Cr Ferguson Rd 100 Yes
6/20/2023 9:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes
6/20/2023 9:40:00 AM Turbidity 190 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes
6/20/2023 9:40:00 AM TKN 0.83 mg/L MY8 Clear Cr Ferguson Rd 0.25 Yes
6/20/2023 9:40:00 AM Fecal Coliform 5200 CFU/100 ml MY8 Clear Cr Ferguson Rd 100 Yes
6/20/2023 9:40:00 AM Total Suspended Solids 119 mg/L MY8 Clear Cr Ferguson Rd 16.7 Yes
6/20/2023 9:40:00 AM Suspended Sediment 130 mg/L MY8 Clear Cr Ferguson Rd 3.9 Yes
6/20/2023 9:40:00 AM Total Phosphorus 0.155 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes
6/20/2023 9:40:00 AM Magnesium 2200 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
6/20/2023 9:40:00 AM Hardness 23 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes
6/20/2023 9:40:00 AM Calcium 5700 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes
6/20/2023 9:40:00 AM Copper 2.1 ug/L MY8 Clear Cr Ferguson Rd 2.0 Yes
7/19/2022 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
7/19/2022 9:05:00 AM Turbidity 7.1 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
7/19/2022 9:05:00 AM Fecal Coliform 360 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes
7/19/2022 9:05:00 AM E.Coli 246 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes
7/19/2022 9:05:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
7/19/2022 9:05:00 AM Nitrate/Nitrite 0.38 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
7/19/2022 9:05:00 AM Total Phosphorus 0.028 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
7/19/2022 9:05:00 AM TKN 0.34 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes
7/19/2022 9:05:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
7/19/2022 9:05:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
7/19/2022 9:05:00 AM Hardness 42 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
7/19/2022 9:05:00 AM Magnesium 4100 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes
7/19/2022 9:05:00 AM Calcium 10000 ug/L MY9 Goose Cr Stevens Mill Rd. 2000 Yes
7/19/2022 9:05:00 AM Suspended Sediment 4.2 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.2 Yes
7/19/2022 9:05:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes
7/19/2022 9:05:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes
7/19/2022 9:05:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
7/19/2022 9:10:00 AM E.Coli 308 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 1 Yes
7/19/2022 9:10:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
7/19/2022 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
7/19/2022 9:10:00 AM Turbidity 7.2 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
7/19/2022 9:10:00 AM Nitrate/Nitrite 0.39 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
7/19/2022 9:10:00 AM Fecal Coliform 430 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes
7/19/2022 9:10:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
7/19/2022 9:10:00 AM TKN 0.34 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes
7/19/2022 9:10:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
93
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
S Collection Date Analyte Result Unit _ Site Description _ MDL Storm
7/19/2022 9:10:00 AM Total Phosphorus 0.029 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
7/19/2022 9:10:00 AM Hardness 42 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
7/19/2022 9:10:00 AM Magnesium 4200 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes
7/19/2022 9:10:00 AM Calcium 10000 ug/L MY9 Goose Cr Stevens Mill Rd. 2000 Yes
7/19/2022 9:10:00 AM Suspended Sediment 4 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.0 Yes
7/19/2022 9:10:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes
7/19/2022 9:10:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
7/19/2022 9:10:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes
8/16/2022 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
8/16/2022 9:05:00 AM Fecal Coliform 313 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 100 Yes
8/16/2022 9:05:00 AM E.Coli 685 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 100 Yes
8/16/2022 9:05:00 AM Nitrate/Nitrite 0.47 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
8/16/2022 9:05:00 AM Turbidity 3 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
8/16/2022 9:05:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
8/16/2022 9:05:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes
8/16/2022 9:05:00 AM Suspended Sediment 3.9 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.9 Yes
8/16/2022 9:05:00 AM Total Phosphorus 0.026 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
8/16/2022 9:05:00 AM Magnesium 5400 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
8/16/2022 9:05:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
8/16/2022 9:05:00 AM Hardness 55 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
8/16/2022 9:05:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
9/20/2022 8:40:00 AM Nitrate/Nitrite 0.37 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No
9/20/2022 8:40:00 AM E.Coli 310 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 No
9/20/2022 8:40:00 AM Fecal Coliform 498 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No
9/20/2022 8:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No
9/20/2022 8:40:00 AM Total Phosphorus 0.019 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No
9/20/2022 8:40:00 AM Turbidity 1.9 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 No
9/20/2022 8:40:00 AM Suspended Sediment 4.2 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.2 No
9/20/2022 8:40:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No
9/20/2022 8:40:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No
9/20/2022 8:40:00 AM Hardness 54 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No
9/20/2022 8:40:00 AM Calcium 12000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No
9/20/2022 8:40:00 AM Magnesium 5900 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No
9/20/2022 8:40:00 AM Suspended Sediment 4.2 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.2 No
9/20/2022 8:40:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No
9/20/2022 8:40:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No
9/20/2022 8:40:00 AM Hardness 54 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No
9/20/2022 8:40:00 AM Calcium 12000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No
9/20/2022 8:40:00 AM Magnesium 5900 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No
9/20/2022 8:40:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 No
10/18/2022 8:50:00 AM Fecal Coliform 280 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No
10/18/2022 8:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No
10/18/2022 8:50:00 AM Turbidity 1 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 No
10/18/2022 8:50:00 AM E.Coli 185 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 No
10/18/2022 8:50:00 AM Nitrate/Nitrite 0.07 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No
94
/ , / Charlotte-Mecklenburg
fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
'Collection Date Analyte Result Unit _ Site Description i MDL Storm
10/18/2022 8:50:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No
10/18/2022 8:50:00 AM Total Phosphorus 0.017 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No
10/18/2022 8:50:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No
10/18/2022 8:50:00 AM Suspended Sediment 4.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.1 No
10/18/2022 8:50:00 AM Magnesium 5440 ug/L MY9 Goose Cr Stevens Mill Rd. 100 No
10/18/2022 8:50:00 AM Copper 1.01 ug/L MY9 Goose Cr Stevens Mill Rd. 0.500 No
10/18/2022 8:50:00 AM Calcium 15300 ug/L MY9 Goose Cr Stevens Mill Rd. 100 No
10/18/2022 8:50:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.500 No
10/18/2022 8:50:00 AM Chromium 1 ug/L MY9 Goose Cr Stevens Mill Rd. < 1.00 No
10/18/2022 8:50:00 AM Hardness 60.6 mg/L MY9 Goose Cr Stevens Mill Rd. 0.100 No
10/18/2022 8:50:00 AM Zinc 20 ug/L MY9 Goose Cr Stevens Mill Rd. < 20.0 No
10/18/2022 8:50:00 AM Nickel 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.500 No
11/15/2022 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
11/15/2022 9:10:00 AM E.Coli 229 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes
11/15/2022 9:10:00 AM Nitrate/Nitrite 0.86 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
11/15/2022 9:10:00 AM Fecal Coliform 339 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 20 Yes
11/15/2022 9:10:00 AM Turbidity 5.9 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
11/15/2022 9:10:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
11/15/2022 9:10:00 AM Total Phosphorus 0.031 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
11/15/2022 9:10:00 AM Suspended Sediment 4.4 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.4 Yes
11/15/2022 9:10:00 AM TKN 0.39 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes
11/15/2022 9:10:00 AM Calcium 14000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
11/15/2022 9:10:00 AM Magnesium 4800 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
11/15/2022 9:10:00 AM Hardness 55 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
11/15/2022 9:10:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
12/20/2022 9:05:00 AM Turbidity 6.3 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 No
12/20/2022 9:05:00 AM E.Coli 331 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 No
12/20/2022 9:05:00 AM Total Phosphorus 0.024 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No
12/20/2022 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No
12/20/2022 9:05:00 AM Fecal Coliform 240 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No
12/20/2022 9:05:00 AM Nitrate/Nitrite 0.66 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No
12/20/2022 9:05:00 AM Suspended Sediment 4.3 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.3 No
12/20/2022 9:05:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No
12/20/2022 9:05:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No
12/20/2022 9:05:00 AM Magnesium 4800 ug/L MY9 Goose Cr Stevens Mill Rd. 500 No
12/20/2022 9:05:00 AM Hardness 55 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No
12/20/2022 9:05:00 AM Calcium 14000 ug/L MY9 Goose Cr Stevens Mill Rd. 1 500 No
12/20/2022 9:05:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 No
1/17/2023 9:00:00 AM Nitrate/Nitrite 0.63 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
-
1/17/2023 9:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
1/17/2023 9:00:00 AM E.Coli 262 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 1 Yes
1/17/2023 9:00:00 AM Fecal Coliform 210 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes
1/17/2023 9:00:00 AM Turbidity 7.6 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
1/17/2023 9:00:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
1/17/2023 9:00:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes
95
/ , / Charlotte-Mecklenburg
/ I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N1 Services
-.Collection Date Analyte Result Unit _ Site Description _ MDL Storm
1/17/2023 9:00:00 AM Total Phosphorus 0.023 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
1/17/2023 9:00:00 AM Suspended Sediment 3.9 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.9 Yes
1/17/2023 9:00:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
1/17/2023 9:00:00 AM Magnesium 4600 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
1/17/2023 9:00:00 AM Hardness 51 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
1/17/2023 9:00:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
1/17/2023 9:00:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
1/17/2023 9:00:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes
1/17/2023 9:00:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes
1/17/2023 9:00:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
2/21/2023 8:45:00 AM Fecal Coliform 220 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No
2/21/2023 8:45:00 AM Turbidity 6.6 NTU MY9 Goose Cr Stevens Mill Rd. 0.5 No
2/21/2023 8:45:00 AM E.Coli 185 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 1 No
2/21/2023 8:45:00 AM Nitrate/Nitrite 0.58 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No
2/21/2023 8:45:00 AM Total Phosphorus 0.019 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No
2/21/2023 8:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No
2/21/2023 8:45:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No
2/21/2023 8:45:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No
2/21/2023 8:45:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 No
2/21/2023 8:45:00 AM Calcium 12000 ug/L MY9 Goose Cr Stevens Mill Rd. 500 No
2/21/2023 8:45:00 AM Magnesium 4200 ug/L MY9 Goose Cr Stevens Mill Rd. 500 No
2/21/2023 8:45:00 AM Hardness 47 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No
2/21/2023 8:45:00 AM Suspended Sediment 4.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.1 No
3/21/2023 8:55:00 AM Nitrate/Nitrite 0.55 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
3/21/2023 8:55:00 AM Fecal Coliform 160 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes
3/21/2023 8:55:00 AM Turbidity 3.6 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
3/21/2023 8:55:00 AM E.Coli 180 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes
3/21/2023 8:55:00 AM Total Phosphorus 1 0.151 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
3/21/2023 8:55:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
3/21/2023 8:55:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
3/21/2023 8:55:00 AM Magnesium 4800 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
3/21/2023 8:55:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes
3/21/2023 8:55:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
3/21/2023 8:55:00 AM Hardness 52 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
3/21/2023 8:55:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
3/21/2023 8:55:00 AM Suspended Sediment 3.9 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.9 Yes
4/18/2023 8:50:00 AM E.Coli 495 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes
4/18/2023 8:50:00 AM Total Phosphorus 0.026 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
-
4/18/2023 8:50:00 AM Turbidity 4.7 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
-
4/18/2023 8:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
4/18/2023 8:50:00 AM Fecal Coliform 410 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes
4/18/2023 8:50:00 AM Nitrate/Nitrite 0.66 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
4/18/2023 8:50:00 AM Suspended Sediment 4 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.0 Yes
4/18/2023 8:50:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
4/18/2023 8:50:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
96
/ , / Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N..services
- Collection Date Analyte Result Unit Site Description _ MDL Storm
4/18/2023 8:50:00 AM TKN 0.26 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes
4/18/2023 8:50:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
4/18/2023 8:50:00 AM Magnesium 4700 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
4/18/2023 8:50:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
4/18/2023 8:50:00 AM Hardness 52 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
4/18/2023 8:50:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
4/18/2023 8:50:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes
4/18/2023 8:50:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes
5/16/2023 8:50:00 AM Fecal Coliform 487 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes
5/16/2023 8:50:00 AM Nitrate/Nitrite 0.74 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
5/16/2023 8:50:00 AM E.Coli 568 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes
5/16/2023 8:50:00 AM Turbidity 3.1 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
5/16/2023 8:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
5/16/2023 8:50:00 AM Suspended Sediment 3.8 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.8 Yes
5/16/2023 8:50:00 AM Total Phosphorus 0.021 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
5/16/2023 8:50:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes
5/16/2023 8:50:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes
5/16/2023 8:50:00 AM Magnesium 5100 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes
5/16/2023 8:50:00 AM Hardness 58 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
5/16/2023 8:50:00 AM Calcium 15000 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes
5/16/2023 8:50:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
6/20/2023 9:00:00 AM Turbidity 60 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes
6/20/2023 9:00:00 AM Nitrate/Nitrite 0.62 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes
6/20/2023 9:00:00 AM E.Coli 2990 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 100 Yes
6/20/2023 9:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes
6/20/2023 9:00:00 AM Total Suspended Solids 24.2 mg/L MY9 Goose Cr Stevens Mill Rd. 5.0 Yes
6/20/2023 9:00:00 AM Suspended Sediment 21 mg/L MY9 Goose Cr Stevens Mill Rd. 3.8 Yes
6/20/2023 9:00:00 AM Fecal Coliform 4340 CFU/100 ml 1 MY9 Goose Cr Stevens Mill Rd. 100 Yes
6/20/2023 9:00:00 AM TKN 0.51 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes
6/20/2023 9:00:00 AM Total Phosphorus 0.064 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes
6/20/2023 9:00:00 AM Hardness 23 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes
6/20/2023 9:00:00 AM Calcium 6100 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
6/20/2023 9:00:00 AM Magnesium 1900 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes
6/20/2023 9:00:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes
97
, , Charlotte-Mecklenburg
1/STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N .services
Attachment 15: FY2023 Stream Use-Support Index (SUSI) for Phase II
About This Map:The Stream Use Support
Index(SUSI)is a customized tool used by
.,*r Mecklenburg County to communicate vast
• Monitoring Sites amounts of Fixed Interval Monitoring(FIM)data
❑ (see Attachment 14)that is collected from
Phase II Jurisdictions streams throughout Mecklenburg County.The
Partially Supporting Y1 B scores are updated quarterly and represent data
collected 12 times a year from 24 monitoring
sites(6 in Phase II jurisdictions).The SUSI, or
score, is constructed around five(5)categories
of surface water quality data that represent the
j77 ,:?‘ir
most important pollutants and indicators of
i Y10 environmental health including: Bacteriological,
Metals,Nutrients, Physical, and Biological/
�� 4 Habitat.Scores range from 0-100,with a score
of 100 indicating the best water quality possible.
Witil'' ' ilfr
M 5 J - 7
r
R,' 4
d
i li.
tillitle . \y,\,
9
1
..•
e
ao
Charlotte-Mecklenburg
ill STORM
_' se
WATrvicesER
98
/ , / Charlott e5.1..lenburg
/ / 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N .Services
Attachment 16: Measure of Success for the IDDE Program
Increase the percentage of NOVs issued to the number of IDDE inspections conducted based on
the average of last 3 fiscal years (serves as an indicator of the success of our efforts to find and
eliminate pollution sources).
%of NOVs/Inspections . .Goal
14%
.8 12% 12. %—
1
o
0 11.21%
U 10% -
8.26%0,0o0 9.42%
04
8% 8.67% 8 I/o
9.06%
O 7.14%
6% 6.50% 6.90%
Z 6.07%
w 4.58% 5.54%
0
• 4% 4.97% 4.89%
R 3.83% 4.12%
%
°' 2.03%
u 2 2I 7. o
2.03% 2.03%
0% • •
FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
99
/ , / Charlotte-Meclenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
Attachment 17: Measure of Success for the IDDE Program
Decrease the percentage of repeat violators to the number of NOVs issued based on the average
of last 3 fiscal years (serves as an indicator of the success of our efforts to reduce repeat
offenses).
%Repeat Violators (Goal
35%
30% 31.41%
tn
25%
w
0
0
20%
18.18% 15.80,0
17.33% 17.47% 17.66%
15%
15.17% 15.08%
0
12.61%
10%
5%
0%
FY18 FY19 FY20 FY21 FY22 FY23
100
/ , / Charlotte-Mecklenburg
i STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
n WATER
Services
—
Attachment 18: Measure of Success for the Construction Site Runoff Control Program
Decrease the percentage of NOVs issued to the number of erosion control inspections conducted
based on the average of last 3 fiscal years (serves as an indicator of improved compliance).
%of NOVs/Inspections . .Goal
4.0%
3.5% —3.37%—3.37%
o i
o 3.37%
2 3.0% N 2.84%
2.51
I 2.5%
o
`.4%4%1%2.16%
2.31% 2.32% 1.96%
O 2.0%
Z 1.72%
w
O 1.86%
a 1.5% 1.71%
a 1.27%
u 1.09% 1.12% 1.17%
I -
5
1.0% 1.13% 1.19% 1.10%—1. o
0.95% 1.21%
0.5%
0.0%
FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
101
/ , / Charlotte-Mecklenburg
i / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�services
Attachment 19: BMP Inspections Revealing Problems from 2007 through 2023
Fiscal Year #BMPs #Inspections #BMPs with % BMPs with
Conducted Problems Problems
2010 355 510 206 58%
2011 418 - 238 57%
2012 497 443 256 58%
2013 630 453 248 55%
2014 664 668 244 36%
2015 713 555 286 51%
2016 926 691 247 36%
2017 1,020 640 408 64%
2018 1,032 610 496 81%
2019 *800 596 409 69%
2020 *789 709 322 45%
2021 *853 695 387 56%
2022 *929 763 260 34%
2023 *1344 763 286 37%
*Number is the total number of BMP's located within the Phase 2 jurisdiction,CMS and CPCC that are regulated by Watershed,Post
Construction and/or LID.The number is only for Fiscal Years 2019 and beyond.
102
/ , / Charlotte-Mecklenburg
i I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Ns.services
Attachment 20: Measure of Success for the Post-Construction Site Runoff Control
Program
Decrease the percentage of BMP deficiencies to the number of inspections conducted based on
the average of last 3 fiscal years (serves as an indicator of improved compliance).
%of Deficiencies/Inspections tGoal
90%
'B 80%
81.31%
1
U 70% 1....-
2 68.62%/71.23%***\,.4......
o
a 60% 63.75% ❑ 65.12%
45.64% 60.274%
57.32/0 57.12%
+? 50% —54 75%_54.75%
50.34%
To
47.60%
6 40% 51.53% 45.42% 45.61%
—
A 41.27% ■ ■ ■
36.53% 35. % 37.48%
30% 34.08%
go
0
0
. 20%
N
it
U
q 10%
0%
FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
103
Charlotte-Mecklenburg
�� i/STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Attachment 21: Summary of Inspection Findings from FY2008 through FY2023
Number of Findings by Fiscal Year
Inspection Findings Totals
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Storm Water System& 0 0 0 0 0 17 25 14 12 21 26 25 18 17 12 6 193
BMPsi
Erosion 0 0 1 0 0 16 8 10 12 21 26 20 16 11 10 16 167
Illicit discharges/connections 3 5 3 0 0 3 4 6 8 3 4 7 2 0 0 0 48
Aboveground Storage Tanks2 - - - - - - - - - 5 7 3 5 12 9 5 46
Underground Storage Tanks' - - - - - - - - - 0 0 0 0 0 0 0 0
Material Storage Area(s) 0 2 2 0 0 2 7 7 0 15 11 11 14 7 6 9 93
Processing Area(s)2 - - - - - - - - - 2 2 4 1 1 0 1 11
Loading/Unloading Area(s)2 - - - - - - - - - 8 7 3 3 2 3 0 26
Vehicle/Equipment Areas(s) 0 0 0 0 0 0 4 1 2 11 10 11 6 2 6 2 55
Oil/Water Separator/
Pretreatment' - - - - - - - - - 7 2 2 1 0 0 1 13
Waste Storage/Disposal 1 5 5 0 0 7 8 16 26 31 26 26 26 25 18 25 245
Area(s)
Food Service Area(s)2 - - - - - - - - - 2 1 2 0 1 1 2 9
Floor Drains' - - - - - - - - - 6 2 0 0 2 1 1 12
Spill Response Equipment' - - - - - - - - - 11 15 12 10 6 4 5 63
Equipment Maintenance 0 2 0 0 0 0 0 0 0 2
Needed3
Inadequate Housekeeping3 2 0 2 0 0 0 0 0 0 - - - - - - - 4
Not Operating in Accordance 7 5 4 0 0 10 5 4 5 11 13 9 30 21 4 6 134
with SWPPP
Totals 13 19 17 0 0 55 61 58 65 154 152 135 132 107 74 71 1113
1. "Storm water System"and"BMPs"are separated on the current inspection checklist but are combined in this table for
comparison to previous years.
2. These categories were not tracked in the annual report prior to FY17.
3. Starting with FY2017,these findings are tracked under other categories(e.g.,material storage areas,processing areas,etc.)
104
Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services Attachment 22: Measure of Success for Pollution Prevention & Good Housekeeping
Program
Decrease the percentage of deficiencies detected to the number of inspections conducted based
on the average of last 3 fiscal years (serves as an indicator of improved compliance).
of Deficiencies/Inspections —Goal
100%
90%
89.66%
0• 80%
U
• 70%
• 60%
o
aa) 50% 52.22% 52.85%
'� 40%
35.85% 47.50%
i \28.72%
37.74%
30% -35.85% 3333%3 20% o20.00% 22.72/010% 1—il
15.09% 14.81% 15.24%— —
10.91% — 10.34%
0%
I 7.69%
FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23
105
Charlotte-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services
Attachment 23: Measures of Success Summary for FY2023
# Measures of Success FY2023 FY2023 Target Met
Target Results (Yes or No)
Complete Documentation—Document 100% of 100% of
1 Storm Water Program activities that Activities Activities Yes
demonstrate successful fulfillment of Documented Documented
BMPs.
Increasing Awareness—Increase the
percentage of survey respondents
2 indicating they are aware that water 79.20% 67.30% No
flowing into storm drains goes directly
to creeks and lakes based on the
average of the last 3 fiscal years
Increasing Awareness—Increase the
3 extent of exposure from the media 6,329,781 19,798,168 Yes
campaign based on the average of the
last 3 fiscal years.
Increasing Number of Volunteers—
4 Increase in the number of volunteers 3,825 4 848 Yes
based on the average of the last 3 fiscal '
years.
Increasing IDDE—Increase the
percentage of NOVs issued to the
5 number of IDDE inspections conducted 9.06% 12.56% Yes
based on the average of the last 3 fiscal
years.
Decreasing Number of Repeat
Violators—Decrease the percentage of
6 repeat violators to the number of NOVs 15.08% 31.41% No
issued based on the average of the last
3 fiscal years.
Improving Compliance—Decrease the
percentage of NOVs issued to the
7 number of erosion control inspections 1.17% 1.05% Yes
conducted based on the average of the
last 3 fiscal years.
Improving Compliance—Decrease the
8 percentage of BMP deficiencies to the 45.61% 37.48% Yes
number of inspections conducted based
on the average of the last 3 fiscal years.
Improving Compliance—Decrease the
percentage of deficiencies detected to
9 the number of municipal facility 11.14% 10.34% Yes
inspections conducted based on the
average of the last 3 fiscal years.
106
/ Chrlot ate-Mecklenburg
i d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
r`r�serur�es
Attachment 24: Status of Work Plan Modifications Implemented in FY2023
# Identified Improvement Desired Result Program Responsible Status
Element Staff
Public Education&Outreach
Redesign the current water quality school Improve
1 education material for younger ages to be effectiveness of PE-10 Ashley Smith Completed
more engaging and relevant to the school school age training
curriculum. materials.
Improve
2 Modify school education worksheets to effectiveness of PE-10 Ashley Smith Completed
include Spanish. school age training
materials.
Implement the Safe Swim Communication Better inform
3 Campaign to provide education to lake users swimmers of health PE-10 Ashley Smith Completed
regarding Best Management Practices issues related to
related to swimming in lakes. swimming in lakes.
Implement the public education components Increase volunteer
4 of the Underserved Communities Reach activity. PE-10 Ashley Smith Completed
Plan.
Develop video to educate residents on built Improve compliance
5 upon area(BUA)requirements for with BUA. PE-10 Ashley Smith Completed
protection of water quality.
Public Involvement&Participation
Finalize the new design of the Adopt a Enhance
6 Stream sign. effectiveness of PI-2 Taylor Mebane Completed
signage.
Implement the Public Involvement
components of the Underserved Increase volunteer
Communities Reach Plan,including
7 researching potential events in underserved activity in PE-10 Taylor Mebane Completed
underserved
communities such as stream clean ups, communities.
storm drain marking events and tree
plantings.
8 Expand the Adopt a Drain program into Increase volunteer SBP Ashley Smith Completed
another Phase II town. activity. Involvement
9 Investigate a Plogging event for Creek Increase volunteer pE-I(16) Taylor Mebane Completed
Week. activity.
Investigate a new public involvement Increase volunteer
10 competition for students. activity. PE 10 Ashley Smith Completed
Illicit Discharge Detection&Elimination
Help confirm
11 Install cameras at all of the Phase 2 possible pollution ID-4.10(c) Iva Barnes Completed
CMANN sites. issues detected by the
CMANN equipment.
Identify and
Use water quality modeling to identify ID-4.7-
12 problem areas for monitoring and follow up. eliminate pollution CO(1) Robert Sowah Completed
sources.
Review and update the CMANN fecal Identify and ID-4.7-
13 prediction model. eliminate pollution CO(c) Robert Sowah Completed
sources.
Update stormwater inventory attribute Ensure we have
14 information for inventory collected by GIS accurate inventory ID-1(c) Ryan Spidel Completed
staff. data.
Construction Site Storm Water Runoff Control
107
Charlotte-Mecklenburg
1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
# Identified Improvement Desired Result Program Responsible Status
Element Staff
Not enough
Evaluate the usage of drones for site Improve inspection large
15 inspections. effectiveness. N/A Corey Priddy construction
sites to justify. _
Complete#4 from last fiscal year: Not completed
16 Approval of changes in the Erosion Control Reduce offsite N/A Corey Priddy due to staff
Ordinance and updates to the Enhanced sediment. shortage.
Measures.
Develop a plan for cross-training with the Improve inspection Not completed
17 City of Charlotte and the Town of effectiveness. N/A Corey Priddy due to staff
Huntersville. shortage.
Look into creating interactive hands-on
training components to CMCSI.Will need Not completed
18 to have buy in from the City of Charlotte Improve training. N/A Corey Priddy due to staff
shortage.
and the Town of Huntersville.
Post-Construction Site Runoff Control
Continue#3 from last fiscal year,and work Significant
increase from
19 with field staff to check for 3rd party Improve inspection N/A Corey Priddy last year with
inspections and issue NOVs if they are not effectiveness. more emphasis
being submitted.
next year.
Work with the Towns to determine if
Watershed Ordinances can be changed so Efforts
20 that the BMPs would only have to be Improve inspection N/A Corey Priddy underway and
inspected every 3 to 5 years.(Water Quality effectiveness. will continue
would work on this task with help from in FY2024.
Permitting and Compliance).
Determine if an Environmental Specialist
III,or similar position,is needed to manage A new position
the BMP inspection program. Currently, was added to
the program takes a significant amount of P&C this fiscal
time for the Environmental Supervisor to Improve inspection year to help
21 N/A Corey Priddy with erosion
perform,taking time away from other effectiveness.
needed job duties. Since the number of control and
BMPs increases every year,resource lead the BMP
allocation needs to be periodically Inspection
examined. Program.
Pollution Prevention&Good House Keeping Program
Ensure that permitted facilities are in
22 compliance with updated NPDES permit Ensure compliance. PP-2 Richard Farmer Completed
requirements.
Total Maximum Daily Loads
Routine monitoring will continue to be
performed in the TMDL watersheds by
CMSWS.Exceedances of established water Identify and
23 quality watch and action levels will be eliminate sources of 1W-4(g) Julianna Completed
identified and follow up actions conducted elevated fecal Hawley
as necessary for the identification and coliform bacteria
elimination of pollution sources
By December 30,2022,CMSWS will
complete a review of Health Depaitcnent Identify and
24 records to determine where failed septic eliminate sources of IW-2(c) John Thao Completed
systems have been identified in both the elevated fecal
Rocky River and Goose Creek TMDL coliform bacteria
108
, / C,a,h e-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
services
# Identified Improvement Desired Result Program Responsible Status
Element Staff
watersheds. Follow up inspections and
monitoring will be performed as necessary
to ensure the elimination of sources of fecal
coliform bacteria associated with failed
septic systems thereby addressing impaired
waters.
By March 31,2023,major outfalls will be
inspected in the Rocky River TMDL Identify and
25 watershed. Dry weather flows will be eliminate sources of IW-2(e) John Thao Completed
identified,and pollution sources eliminated elevated fecal
thereby addressing impaired waters. coliform bacteria
Construction activities associated with the
restoration of an additional 5,000-foot
section of West Branch Rocky River are
expected to begin in late FY2023 or early Improve stream
26 FY2024. Historically,West Branch Rocky stability and aquatic N/A Tim Trautman Completed
River has been severely degraded by storm habitat
water flows that erode the stream banks.
The restoration project will stabilize the
stream banks to reduce erosion and improve
water quality.
Conduct targeted surface water sampling in Identify and
headwater areas of the Goose Creek eliminate sources of 27 IW-2(m) John Thao Completed
watershed to further delineate sources of elevated fecal
fecal coliform to the system. coliform bacteria
109
C,a,h e-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
N�Services
Attachment 25: Work Plan Modifications Identified for Implementation in FY2024
Justification for Change& Program Responsible
# Identified Improvement Schedule
Desired Result Element Staff
Public Education and Outreach Program
1 Continue to grow our social media Improve educational outreach PE-10 Ashley FY24
platforms(Facebook,Twitter, Smith
Instagram,and YouTube)to spread
water quality education messaging and
volunteer opportunities.
2 Continue bilingual engagement efforts Improve educational outreach PE-10 Ashley FY24
such as exploring bilingual content on Smith/
social media channels and translating Taylor
handouts and implement Mebane
recommendations from the Underserved
Communities Reach Plan(UCRP). _
3 Continue the Safe Swim Education Improve educational outreach PE-10 Ashley FY24
Campaign and investigate the addition Smith
of bilingual content.
4 Reach students at schools in all six of Improve educational outreach PE-10 Ashley FY24
the phase II municipalities. Smith
Public Involvement and Participation Program
5 Promote Adopt A Stream segments that Increase public involvement PI-2 Angelica FY24
have not been adopted in last 5 years. Moncada
Investigate potential ad campaigns. _
6 Promote Volunteer Monitoring Program Increase engagement with local VM-CO Angelica FY24
with local colleges. colleges while gathering valuable Moncada
data to improve our programs.
7 Investigate increasing engagement with Increase volunteers and engage with VM-CO Taylor FY24
residents on coves for Volunteer residents that live on coves. Mebane
Monitoring program.Identify potential
sampling methods and data needs.
8 Review Big Spring Clean site locations Increase overall reach throughout PE-I(4) Taylor FY24
to reach new areas of the county with county. Mebane
the program.
9 Investigate Storm Drain Marking high Increase volunteers and increase PI-3 Ashley FY24
school competition. engagement with schools. Smith
Illicit Discharge Detection and Elimination(IDDE)Program
10 Using the Fecal Bacteria Watershed Identification and elimination of ID-4.7 Robert FY24
Prioritization Matrix,implement fecal pollution sources. Sowah
identified strategies to reduce fecal
pollution.
Construction Site Storm Water Runoff Control Program
11 Continue working on updating the Enhance protection. CS-2 Corey FY24
Erosion Control Ordinances. Priddy
12 Have all Erosion and Sedimentation Comply with State law. CS-2 Corey FY24
Control Penalties routed to NCDEQ as Priddy
the law now requires. (Monies are
currently being held in a fund to be sent
to NCDEQ.)
13 Complete the updates to the Enhanced Enhance protection. CS-2 Corey FY24
Erosion Control Measures. Priddy
110
/ , / C,a,h e-Mecklenburg
STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Justification for Change& Program Responsible
Identified Improvement Schedule
Desired Result Element Staff
Post-Construction Site Storm Water Runoff Control Program
14 Continue working on obtaining 3rd Increase number of inspections. PC-2 Corey FY24
party inspection reports.Increase the Priddy
number received from the 260 received
in FY2023.
15 Continue working with the Towns to Increase inspections of problem PC-1 Rusty FY24
see about changing the Watershed BMPs. Rozzelle
Ordinance.
Pollution Prevention&Good House Keeping Program _
16 Inspect one(1)golf course located on To have less inspection deficiencies. PP-2 Julianna FY24
County property per year as opposed to Hawley
doing all five(5)during the same fiscal
year.
Total Maximum Daily Loads(TMDL)
17 Routine fixed interval monitoring will Comply with TMDL by identifying IC-S(1.1) John Thao FY24
continue to be performed in the TMDL and eliminate sources of elevated
watersheds by CMSWS.Exceedances fecal coliform bacteria.
of established water quality watch and
action levels will be identified and
follow up actions conducted as
necessary for the identification and
elimination of pollution sources
18 CMSWS will complete a review of Comply with TMDL by identifying IW-2(e) John Thao FY24
Health Department records to determine and eliminate sources of elevated
where failed septic systems have been fecal coliform bacteria.
identified in both the Rocky River and
Goose Creek TMDL watersheds.
Follow up inspections and monitoring
will be performed as necessary to
ensure the elimination of sources of
fecal coliform bacteria associated with
failed septic systems thereby addressing
impaired waters.
19 Major outfalls will be inspected in the Comply with TMDL by identifying IW-2(g) John Thao FY24
Rocky River TMDL watershed.Dry and eliminate sources of elevated
weather flows will be identified,and fecal coliform bacteria.
pollution sources eliminated thereby
addressing impaired waters.
20 Comply with TMDL by identifying IW-2(1) John Thao FY24
Privately owned and permitted sewer and eliminate sources of elevated
lift stations in the Goose Creek fecal coliform bacteria.
watershed will be inspected.
21 Targeted surface water sampling will be Comply with TMDL by identifying IW-2(m) John Thao FY24
performed in headwater areas of the and eliminate sources of elevated
Goose Creek watershed to further fecal coliform bacteria.
delineate sources of fecal coliform to
the system.
111
Charlotte-Mecklenburg
"STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395
WATER
Services
Justification for Change& Program Responsible
# Identified Improvement Schedule
Desired Result Element Staff
22 An evaluation of the McDowell Creek Identify watershed management SWIM Robert FY24
Watershed Management Plan will be strategies that are success in Phase II- Sowah
performed which will include a review restoring watershed health and make McDowell
of plan goals and objectives, recommendations for improvement
implementation of these objectives, to existing watershed management
goal attainment,plan gaps,limitations, plans.
and challenges.A summary of the
findings from this evaluation will be
created.
112
Attachment 26: FY2023 TMDL Annual Report and Assessment
For Compliance With:
NPDES Phase II Storm Water Permit Number NCS000395
" , 4.,, F
w�yy'{ f
47
k d'lii r 1• y *• L'
r _;O 1 :1 il . �!�ir� ..
.; w • +
' IFS'
yF � J s .
91 ' f
_ ��in Mint,
Reporting Period:
July 1, 2022 through June 30, 2023
Submitted By:
Charlotte-Mecklenburg Storm Water Services
Submittal Date: August 2023
113
Table of Contents
Section 1: TMDLs in Mecklenburg County 1
2.1 BMPs and Associated Measurable Goals 5
2.2 Description of Existing BMPs and Their Effectiveness 7
2.2.1 Public Education& Outreach (Section 3 of SWMP) 7
2.2.2 Public Involvement and Participation(Section 4 of SWMP) 8
2.2.3 Illicit Discharge Detection and Elimination(IDDE) (Section 5 of SWMP) 9
2.2.4 Charlotte Water Program 11
2.2.5 Sewer Use Ordinance 11
2.2.6 Sanitary Sewer System Inspections and Maintenance 12
2.2.7 SSO Rapid Response 12
2.2.8 Construction Site Runoff Control (Section 6 of SWMP) 12
2.2.9 Post-Construction Site Runoff Control (Section 7 of SWMP) 13
2.2.10 Pollution Prevention and Good Housekeeping (Section 8 of SWMP) 14
Section 3: Current TMDL Monitoring Strategies 15
3.1 Rocky River Fecal Coliform Monitoring and Land Use Evaluation 17
3.2 Goose Creek Fecal Coliform Monitoring 19
3.3 Lake Wylie Chlorophyll-A Monitoring 21
3.4 Mercury Monitoring Statewide 22
3.5 Effectiveness of BMPs Based on Data Analysis 22
Section 4: Additional BMP Measures 22
4.1 Additional BMPs Implemented in FY2023 22
4.3 Additional BMPs to be Implemented in FY2024 24
Section 5: Tracking and Reporting Success 25
Section 6: TMDL Reporting 25
Tables:
Table 1: Approved TMDLs for Mecklenburg County's Phase I and Phase II Jurisdictions 2
Table 2: BMP Summary Table for Impaired Waters with TMDLs 5
Table 3: FY2023 Public Education and Outreach Activities in TMDL Watersheds 8
Table 4: FY2023 Public Involvement&Participation Activities in TMDL Watersheds 8
i
Table 5: FY2023 IDDE Activities in TMDL Watersheds 10
Table 6: FY2023 Construction Site Runoff Control Activities in TMDL Watersheds 13
Table 7: FY2023 Post-Construction Site Runoff Control Activities in TMDL Watersheds 13
Table 8: FY2023 Pollution Prevention& Good Housekeeping Activities in TMDL Watersheds 15
Table 9: Annual Analysis of the Rocky River Watershed for the Monitoring Plan 17
Table 10: NCDWQ Fecal Coliform Data for Site Q7330000 on the Rocky River 18
Table 11: CMSWS Fecal Coliform Data for Site#MY9 on the Goose Creek 20
Figures
Figure 1: Surface Waters in Mecklenburg County with Approved TMDLs 4
Figure 2: Water Quality Monitoring Locations in Mecklenburg County 16
Figure 3: Geometric Mean for Fecal Coliform on Rocky River Site Q7330000 19
Figure 4: Compliance with Fecal Coliform Standard on Rocky River Site Q7330000 19
Figure 5: Geometric Mean for Fecal Coliform on Goose Creek Site MY9 20
Figure 6: Compliance with Fecal Coliform Standard on Goose Creek Site MY9 20
Figure 7: Annual Average Chlorophyll-a Concentration(mg/1) on Lake Wylie 21
Figure 8: Annual Average Chlorophyll-a on Lake Wylie Coves, Main Stem and Tributaries 21
Figure 9: NOVs Issued for Septic System Failures in Phase II TMDL Watersheds 23
Appendices
Appendix A: FY2023 TMDL Data for Mecklenburg County's Phase II Jurisdictions 26
ii
NI
Charlotte-Mecklenburg
/STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
ter`Services
Section 1: TMDLs in Mecklenburg County
The purpose of this document is to satisfy the Total Maximum Daily Load (TMDL)reporting
and assessment requirements for the period July 1, 2022 through June 30, 2023 (FY2023) as
specified in Section H of NPDES Phase II Storm Water Permit Number NCS000395.
Several of the TMDL watersheds in Mecklenburg County span both Phase I and Phase II
jurisdictions. All Phase I and Phase II TMDL compliance efforts are administered by Charlotte-
Mecklenburg Storm Water Services (CMSWS), which includes both City of Charlotte (City) and
Mecklenburg County (County)programs. The City's program is responsible for compliance
with its Phase I storm water permit and Mecklenburg County's program is responsible for Phase
II permit compliance for the County, Charlotte-Mecklenburg Schools, Central Piedmont
Community College and the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill,
and Pineville. To ensure effective coordination, the City and County have agreed that the City
will serve as the lead jurisdiction for compliance with TMDL requirements when the majority of
the TMDL watershed lies within the Phase I jurisdiction. When most of the watershed lies
within Phase II, the County will serve as the lead. The lead jurisdiction is responsible for
coordinating and implementing all required TMDL compliance efforts and submitting all the
required plans and reports to the State. They are also responsible for coordinating with the other
jurisdictions as necessary in the implementation of compliance efforts. Table 1 indicates the lead
jurisdiction for all the approved TMDLs in Charlotte-Mecklenburg.
Charlotte-Mecklenburg Storm Water Services (CMSWS) has reviewed the 2022 303(d) list and
integrated 305(b) and 303(d)reports and determined that no new TMDLs were approved in
Mecklenburg County in FY2023; therefore, no changes were made to the TMDL Water Quality
Recovery Program described in Section 11 of the November 2022 version of the Storm Water
Management Plan(SWMP) developed for compliance with NPDES NCS000395.
Section H of NPDES Permit Number NCS000395 identifies the objective of a Water Quality
Recovery Program for TMDLs as reducing levels of the pollutant of concern in accordance with
approved Waste Load Allocation (WLAs) assigned to stormwater in an approved TMDL. The
Permit includes the following requirements for TMDL watersheds in the Phase II jurisdictions of
Mecklenburg County:
1. Within 12 months of the final approval of a TMDL, the permittee's annual reports shall
include a description of existing programs, controls,partnerships,projects, and strategies
to address impaired waters and a brief explanation as to how the programs, controls,
partnerships,projects, and strategies address impaired waters.
2. Within 24 months of the final approval of a TMDL, the permittee's annual reports shall
include an assessment of whether additional structural and/or non-structural BMPs are
necessary to address impaired waters and a brief explanation as to how the programs,
controls,partnerships,projects, and strategies address impaired waters
3. Within 36 months of the final approval of a TMDL, the permittee's annual reports shall
include a description of activities expected to occur and when the activities are expected
to occur.
1
/N Charlotte-Mecklenburg
/STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
. — -Services
Section H of NPDES Permit Number NCS000395 further specifies that if subject to an approved
TMDL, the Permittee is in compliance with the TMDL if the permittee complies with the
conditions of this permit, including developing and implementing appropriate BMPs to reduce
non-point source pollutant loading to the maximum extent practicable (MEP). While improved
water quality is the expected outcome, the NPDES MS4 permit obligation is to reduce non-point
source pollutant loading to the maximum extent practicable (MEP). The MS4 Permittee is not
responsible for attaining water quality standards (WQS) at the ambient monitoring stations. The
Division expects attaining WQS will only be achieved through reduction from the MS4, along
with reductions from other nonpoint source contributors.
The purpose of the annual report and assessment contained herein is to describe how the above
permit requirements have been satisfied for the approved TMDLs applicable to Mecklenburg
County as described in Table 1. Figure 1 shows the locations of these receiving waters in
relation to the Phase I and Phase II jurisdictions in Mecklenburg County.
Table 1: Approved TMDLs for Mecklenburg County's Phase I and Phase II Jurisdictions
IR
AU Name AU EPA MS4 Lead
Class TMDL Category
Number Pollutant (2022) Approved WLA? Jurisdiction
DO 1 2/5/1996 No Charlotte
Irwin Creek 11-137-1 C Fecal Coliform 4t 3/28/2002 No Charlotte
Turbidity 4i 2/8/2005 Yes Charlotte
Long Creek 11-120-(0.5) C Turbidity [3i 2/8/2005 Yes Charlotte
Long Creek 11-120-(2.5) WS-IV Turbidity 1 3i 2/8/2005 Yes Charlotte
DO 1 2/5/1996 No Charlotte
Little Sugar 11-137-8a C -
Fecal Coliform 4t 3/28/2002 No Charlotte
DO 1 2/5/1996 No Charlotte
Little Sugar 11-137-8b C Fecal Coliform 4t 3/28/2002 No Charlotte
DO 1 2/5/1996 No Charlotte
Little Sugar 11-137-8c C Fecal Coliform 4t 3/28/2002 No Charlotte
Turbidity 4i 2/8/2005 Yes Charlotte
DO 1 2/5/1996 No Charlotte
McAlpine 11-137-9a C Fecal Coliform 4t 3/28/2002 No Charlotte
Creek
Turbidity li 2/8/2005 Yes Charlotte
DO 1 2/5/1996 No Charlotte
McAlpine 11-137-9b C Fecal Coliform 4t 3/28/2002 No Charlotte
Creek
Turbidity li 2/8/2005 Yes Charlotte
DO 1 2/5/96 No Charlotte
McAlpine 11-137-9c C Fecal Coliform 4t 3/28/2002 No Charlotte
Creek -
Turbidity li 2/8/2005 Yes Charlotte
DO 1 2/5/1996 No Charlotte
McAlpine 11-137-9d C Fecal Coliform 4t 3/28/2002 No Charlotte
Creek
Turbidity li 2/8/2005 Yes Charlotte
Sugar Creek 11-137b C Fecal Coliform 4t 3/28/2002 No Charlotte
2
/ Charlotte-Mecklenburg
� / /j STORM FY2023 TMDL Annual Re ort and Assessment for NPDES NCS000395
WATER p
Services
IR
AU Name AU Class TMDL Category EPA MS4 Lead
Number Pollutant (2022) Approved WLA? Jurisdiction
Turbidity 4i 2/8/2005 Yes Charlotte
Fecal Coliform 4t 3/28/2002 No Charlotte
Sugar Creek 11-137c C —
Turbidity 4i 2/8/2005 Yes Charlotte
McKee Creek 13-17-8-4 C Fecal Coliform 4t 8/1/2003 Yes Charlotte
Rocky River 13-17a C Fecal Coliform 4t 9/19/2002 Yes Mecklenburg
Steele Creek 11-137-10 C Fecal Coliform SC TMDL 5/2007 Yes Charlotte
Lake Wylie 11-122 C Chlorophyll-a 1 2/5/1996 No Mecklenburg
Lake Wylie 11-(123.5)a C Chlorophyll-a 1 2/5/1996 No Mecklenburg
Goose Creek 13-17-18a C Fecal Coliform 4t 7/8/2005 Yes Mecklenburg
Definitions applicable to Table 1 above are provided below. Other definitions for the table are provided on page vi
of the Table of Contents.
• AU Number:NCDEQ identifies waters by index numbers and assessment unit numbers(AU#)that are used to
track defined stream segments or waterbodies.
• Class(Water Quality Classification):Designations applied to surface water bodies by NCDEQ that define the
best uses to be protected within these waters as required by the Clean Water Act,including water supply use
(WS),recreation activities(B),and aquatic life(C).
• TMDL:Acronym for Total Maximum Daily Load.A TMDL is the calculation of the maximum amount of a
pollutant allowed to enter a waterbody so that the waterbody will meet and continue to meet water quality
standards for that particular pollutant.A TMDL identifies pollutant reduction targets and allocates load
reductions necessary to the source(s)of the pollutant to restore waterbodies where water quality criteria are
exceeded.
• IR(Integrated Report)Category:Levels of water quality criteria attainment as defined in the NCDEQ
Integrated Report as follows:
o 1 -Meeting Criteria.
o lb Meeting Criteria-A management strategy in place for parameter lt:Parameter is meeting criteria and
there is an approved TMDL in place for that parameter.The TMDL remains in place to ensure that criteria
are maintained.
o l f Meeting Criteria-Fish tissue collected in Assessment Unit with no advisories other than statewide
Mercury advice.
o li Meeting Criteria-Parameter assessed is addressed by a TMDL for a different parameter.
o lnc Meeting Criteria-Parameter assessed was exceeding criteria but due to natural conditions
(documentation required).
o lr Meeting Criteria-Parameter assessed as part of restoration project.
o It Meeting Criteria-Parameter assessed has an approved TMDL.
o 3a Data Inconclusive.
o 3b Data Inconclusive-Management strategy in place for parameter.
o 3c Data Inconclusive-Parameter is a non-pollutant-TMDL not required.
o 3i Data Inconclusive-Parameter assessed is addressed by a TMDL for a different parameter.
o 3r Data Inconclusive-Parameter assessed as part of restoration project.
o 3t Data Inconclusive-Parameter assessed has an approved TMDL.
o 3v Data Inconclusive-Parameter is part of permit variance.
o 3z1 Data Inconclusive-Data not assessed against a NC water quality standard.
o 4i Exceeding Criteria-Parameter assessed is addressed by a TMDL for a different parameter.
o 4t Exceeding Criteria-Parameter assessed has an approved TMDL.
o 4b Exceeding Criteria-a management strategy in place for parameter.
o 4c Exceeding Criteria-Parameter is a non-pollutant-TMDL not required.
o 4cr Exceeding Criteria-recreational advisory postings greater than 61 days in the assessment period.
o 4cs Exceeding Criteria- Shellfish growing area-not approved.Approved fecal coliform bacteria TMDL
assessed in category 4t.
3
NCbarlotte•Mecklenburg
/STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
WATER
Services
o 4r Exceeding Criteria-Ongoing restoration activities in place to address parameter.Also,for restoration
parameters without water quality standards.
o 4v Exceeding Criteria-Parameter is part of permit variance.
o 5 Exceeding Criteria-TMDL or other management strategy required.
o 5r Exceeding Criteria-Ongoing restoration activities in place to address parameter.
o S.C. TMDL:Waterbody is subject a TMDL in S.C.
TMDL Pollutant,Lead Jurisdiction
/S Turbidity—Charlotte
/\./ FecalColiform—Charlotte
1317a Fecal Coliform,Turbidity—Charlotte
/\/ Dissolved Oxygen(DO),Fecal Coliform—Charlotte
/%/ DO,Fecal Coliform,Turbidity—Charlotte
/\/ Fecal Coliform—County
•
s 0, /\/ Total Phosphorus,Total Nitrogen—County
Mecklenburg County Lakes
Mecklenburg County Streams
City of Charlotte Boundary(Phase I)
Li' Mecklenburg County Boundary(Phase II)
+1 +?oao si
1;
•
+ttt>♦i`
11d•
11 137 1
13.1744
114122)[
J111137 da
1r ��
11 137 9a
',I 13-17-162
11-137.10 11-I37b C
11-+17 d0
11 123-4i 111.37 90
11-137t
•
1/43,470,•137 9c
11.1374041
:*Yr
e
Figure 1: Surface Waters in Mecklenburg County with Approved TMDLs
4
N/ Charlotte-Mecklenburg
STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
N`WATER
ram`Services
Section 2: Efforts to Address Impaired Waters in Mecklenburg County
The efforts undertaken to address impaired waters in Mecklenburg County, including programs,
controls,partnerships,projects, and strategies, are performed by CMSWS. As described in
Section 1, Mecklenburg County staff with CMSWS lead these efforts in the Phase II jurisdictions
and the City of Charlotte in Phase I partnering with the County. This Section discusses these
efforts in the Phase II jurisdictions only, including all data that is reported (see Appendix A). It
is important to note that Mecklenburg County is only responsible for compliance efforts in Phase
II, which includes the TMDLs for Goose Creek, Rocky River, and Lake Wylie. Mecklenburg
County's efforts are described in detail in its TMDL Water Quality Recovery Program contained
in Section 11 of the SWMP developed for compliance with NPDES NCS000395.
2.1 BMPs and Associated Measurable Goals
During FY2023, all the BMPs and measurable goals identified in the Phase II Permit
NCS000395 and the associated SWMP were effectively fulfilled as described in Table 2. The
table also provides the Activity Report number from the County's Cityworks database that
includes documentation of the work completed for each BMP. The subsections following Table
2 describe the existing programs, controls, partnerships, projects, and strategies to address
impaired waters (herein referred to as BMPs) and a brief explanation as to how these BMPs
function. These subsections also describe the specific activities completed in FY2023 through
the implementation of these BMPs. Section 3 provides an assessment of current BMP
effectiveness, including an analysis of applicable monitoring data. Section 4 provides a
description of additional BMPs implemented in FY2023, as well as those planned for
implementation in FY2024 along with an implementation timeline, and a brief explanation as to
how these additional BMPs will address impaired waters.
Table 2: BMP Summary Table for Impaired Waters with TMDLs
County A B C D E
BMP County Activities
Work Co-Permittee
No. Plan Code Description Measurable Goal(s) Schedule for Annual Responsibilities
of BMP Implementation Reporting Metric
Total Maximum Daily Load(TMDL)Program(Permit Ref. Section H.1 through 6;Part II Section A.4,5 and 7):Implement a
program to reduce levels of the pollutant of concern in accordance with approved Waste Load Allocation(WLAs)assigned to
stormwater in an approved TMDL.
#40 IW-1 Evaluate Impaired Waters
(Evaluate Identify a. Complete an evaluation of the Annually Completed None.
Impaired those latest version of the 303(d)list beginning July (Activity Report
Waters) impaired and the integrated 305(b)and 1 #71614)
waters with 303(d)reports.Identify all
an approved changes to designations in
TMDL in Mecklenburg County.
Mecklenburg b.Identify and review all TMDLs Annually Completed
County that that have been developed and beginning July (Activity Report
have a waste approved by EPA for receiving 1 #71614)
load waters in Mecklenburg County.
allocation c. Complete annual report Annually Completed
assigned to detailing activities completed beginning July (Activity Report
stormwater. and summarizing findings. 1 #71614)
Include in report for PD-1.
5
/ Charlotte-Mecklenburg
f/ / /j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
M WATER p
N\Services
County A B C I D E
BMP County Activities
Work - Co-Permittee
No. Plan Code Description Measurable Goal(s) Schedule for Annual Responsibilities
of BMP Implementation Reporting Metric
#41 IW-2 Water Quality Recovery Plans for TMDLs
(WQRPs Develop and a.Based on the results from IW-1 Annually Completed None.
for implement above,identify those TMDL beginning July (Activity Report
TMDLs) Water waters in Mecklenburg County 1 #70748)
Quality with a waste load allocation
Recovery assigned to stormwater.Work
Plans with Charlotte Stormwater on a
(WQRPs)to compliance strategy for these
reduce non- waters.
point source b.Develop WQRPs for the waters Annually Completed
pollutant from"a"above that are the beginning July (Activity Report
loading to responsibility of Mecklenburg 1 #70748)
the County,including structural
maximum and/or non-structural BMPs and
extent a brief explanation as to how
practicable the programs,controls,
(MEP)for partnerships,projects and
TMDL strategies address impaired
waters with a waters.
waste load c.Incorporate BMPs from"b" Annually Completed
allocation above into Work Plans for beginning July (Activity Report
assigned to implementation. 1 #70748)
stormwater. d.Complete annual report Annually Completed
detailing activities completed beginning July (Activity Report
and summarizing findings. 1 #70748)
Include in report for PD-1.
#42 IW-4 Assess Effectiveness of Water Quality Recovery Plans for TMDLs
(WQRPs Assess the a.Identify and assess the Annually Completed None.
for effectiveness effectiveness of existing beginning July (Activity Report
TMDLs) of structural programs,controls, 1 #71615)
and non- partnerships,projects,and
structural strategies for all TMDL waters
BMPs at identified in IW-2 above.
addressing b.Based on the results from"a" Annually Completed
TMDL develop additional structural beginning July (Activity Report
waters with a and non-structural BMPs as 1 #71615)
waste load necessary to reduce non-point
allocation source pollutant loading to the
assigned to maximum extent practicable
stormwater (MEP).
and c.Incorporate BMPs from"b" Annually Completed
modifying as above into Work Plans for beginning July (Activity Report
necessary. implementation. 1 #71615)
d.Complete annual report Annually Completed
detailing activities completed beginning July 1 (Activity Report
and summarizing findings, #71615)
including a description of the
effectiveness of existing
structural and/or non-structural
BMPs and a brief explanation
as to how the existing
6
Charlotte•Mecklenburg
/ j STORM p
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
M
N\Services
County A B
BMP County Activities
Work - Co-Permittee
No. Plan Code Description Measurable Goal(s) Schedule for Annual Responsibilities
of BMP Implementation Reporting Metric_
programs,controls,
partnerships,projects and
strategies address impaired
waters as well as whether
additional BMPs are necessary
and when they will be
implemented.Include in report
for PD-1.
2.2 Description of Existing BMPs and Their Effectiveness
The pollutants of concern for the TMDL watersheds in Mecklenburg County are dissolved
oxygen, fecal coliform bacteria, turbidity, and chlorophyll-a, which is associated with elevated
nutrients (see Table 1). CMSWS has identified the existing BMPs described in the following
subsections as effective for addressing these pollutants of concern. These subsections include a
description of the specific activities completed during FY2023 through the implementation of
these BMPs in the Phase II jurisdictions. Appendix A provides all data collected through the
implementation of these activities. The data contained in Appendix A is broken out in the
following applicable subsections. For data applicable to Phase I, contact Charlotte Storm Water
Services. Details regarding BMP implementation are provided in the SWMP.
2.2.1 Public Education & Outreach (Section 3 of SWMP)
Public education and outreach activities work to improve impaired water quality by informing
the community of the impacts of the pollutants of concern on the quality and usability of water
bodies and the steps that the public can take to reduce these pollutants. During FY2023, the
following existing public education and outreach activities were implemented in Mecklenburg
County, including all the TMDL watersheds:
1. Utility Bill Inserts
2. Brochures, Environmental Notices and Newsletters
3. Print Ads
4. Media Campaign
5. Social Media
6. Workshops and Video Taped Messages
7. Web Pages
8. School and other Educational Presentations as well as Public Events
9. Storm Water Helpline
Table 3 below provides data related to public education and outreach activities completed in the
TMDL watersheds in Mecklenburg County's Phase II jurisdictions during FY2023.
7
NCharlotte-Mecklenburg
(/ /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
/V`Services
Table 3: FY2023 Public Education and Outreach Activities in TMDL Watersheds
4.
0
0 vs = �= et
Description �°�j . 4-1 uo x v, r�
school 0 0 0 3 0 10 0 0 0 0 27
presentations
Students
attending 0 0 0 236 0 249 0 0 0 0 784
presentations
During FY2023, the BMPs implemented for the Public Education and Outreach Program were
evaluated and found to be effective at reducing non-point source pollutant loading to the
receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these
BMPs will continue to be used in FY2024 to comply with TMDL requirements.
2.2.2 Public Involvement and Participation (Section 4 of SWMP)
Public Involvement and Participation Program activities work to improve impaired water quality
by involving the public in efforts to reduce the pollutants of concern. During FY2023, the
following existing Public Involvement and Participation Program activities were implemented in
Mecklenburg County, including all the TMDL watersheds:
1. Adopt-A-Stream
2. Annual Surface Water Clean Up Event (The Big Spring Clean)
3. Volunteer Monitoring
4. Storm Drain Marking
Table 4 below provides data relating to Public Involvement and Participation Program activities
completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during
FY2023.
Table 4: FY2023 Public Involvement& Participation Activities in TMDL Watersheds
# °' a OE
CO Cle
4.
CA 0
Description 3 4.
y a t x �,
o
o F
a
a 4
Adopt-A-
Stream miles 0.00 0.00 0.51 0.00 0.25 4.80 0.00 15.25 0.00 11.28 39.83
cleaned
pounds of
trash
removed 0 0 2,000 0 350 950 0 295 0 0 4530
through
Adopt-A-
Stream
8
/ Charlotte•Mecklenburg
/j STORM p
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
n
Nt Services
y F..
aJ
a) 0 7, 0 bA O y y s.
0ct
Description j 1 . o
F-1
Big Spring
Clean
streams 0 0 0 0 0 1 0 0 0 0 3
miles
cleaned
pounds of
trash
removed 0 0 0 0 0 745 0 0 0 0 1135
through Big
Spring Clean
volunteer
monitoring 1 0 5 0 0 29 0 2 0 0 42
reports
submitted
volunteer
samples 0 0 0 2 1 1 0 8 0 1 13
collected
storm drains 18 64 43 19 0 182 0 53 0 60 461
marked
During FY2023, the BMPs implemented for the Public Involvement and Participation Program
were evaluated and found to be effective at reducing non-point source pollutant loading to the
receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these
BMPs will continue to be used in FY2024 to comply with TMDL requirements.
2.2.3 Illicit Discharge Detection and Elimination(IDDE) (Section 5 of SWMP)
Illicit Discharge Detection and Elimination (IDDE)Program activities work to improve impaired
water quality by identifying and eliminating sources of the pollutants of concern. During
FY2023, the following existing IDDE Program activities were implemented in Mecklenburg
County, including the TMDL watersheds:
1. Responding to Citizen Requests for Service
2. Enforcement of Pollution Control Ordinances
3. Conducting Facility Inspections
4. Performing Water Quality Monitoring Activities
5. Implementing the Illicit Discharge Elimination Program(IDEP)
6. Conducting Stream Walks & Dry Weather Flow Investigations
Table 5 below provides data relating to IDDE Program activities completed in the TMDL
watersheds in Mecklenburg County's Phase II jurisdictions during FY2023.
9
N/ Charlotte-Mecklenburg
/STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
N`WATER
/V`services
Table 5: FY2023 IDDE Activities in TMDL Watersheds
00
# 7' CO a 44
3 x
Description : a u C V) F
continuous
monitoring 52,002 63,017 43,579 158,117 21,634 115,347 20,099 5,599 13,589 73,219 589,976
data points
service 2 3 22 2 5 41 1 2 1 3 101
requests
service
request 2 2 30 6 7 65 6 5 3 3 156
inspections
inspections
conducted 1 4 0 2 0 0 0 1 0 0 18
for illicit
discharges
problems
corrected
through 0 3 0 0 0 0 0 0 0 0 9
illicit
discharge
inspections
industrial
facilities 0 0 2 0 0 0 0 0 0 3 5
inspected
problems
corrected
through 0 0 0 0 0 0 0 0 0 0 0
industrial
facility
inspections
industrial
facilities 0 0 2 0 0 0 0 0 0 3 5
monitored
problems
corrected
through 0 0 0 0 0 0 0 0 0 0 0
industrial
facility
monitoring
samples
collected
through 52 52 52 208 51 366 53 51 52 104 1193
fixed
interval
monitoring
notices of 0 2 6 1 1 10 0 2 0 0 22
violation
enforcement 0 0 1 0 0 0 0 0 0 0 1
actions
10
/ Charlotte•Mecklenburg
/j STORM p
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
n
Nt Services
y
d
a) 0 > 0 bA a a? x"
et Ct
Description ; ,.a C4 Ed
a At
a a
septic
systems 2 1 2 0 2 13 1 1 1 1 25
repaired
miles of
stream 8.75 11.26 0 65.17 0 0 0 23.31 0 101.89 210.38
walked
outfalls
inspected 14 70 0 349 0 0 0 57 0 356 846
during
stream walks
dry weather
flows
detected 0 11 0 48 0 0 0 13 0 67 139
during
stream walks
water quality
problems
corrected 0 0 0 3 0 0 0 0 0 21 24
during
stream walks
During FY2023, the BMPs implemented for the Illicit Discharge Detection and Elimination
Program were evaluated and found to be effective at reducing non-point source pollutant loading
to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore,
these BMPs will continue to be used in FY2024 to comply with TMDL requirements.
2.2.4 Charlotte Water Program
The City's water and sewer utility department (Charlotte Water)maintains a public education
program focused on keeping food related fats, oils, and grease from being discharged to the
sanitary sewer system in the Phase I and Phase II jurisdictions. In recent years, the focus of this
program has been expanded to include wipes and paper towels that can be flushed down the
toilet. The program is referred to as "Flow Free." This effort helps to reduce clogging and
blockages in the system and prevent S SOs,which can introduce fecal coliform and other
pollutants to water bodies. The program has proven to be effective and will continue to be
implemented in FY2024.
2.2.5 Sewer Use Ordinance
Implementation and enforcement of the Sewer Use Ordinance by Charlotte Water in the Phase I
and Phase II jurisdictions provides the legal mechanism to ensure proper use and connection to
the sanitary sewer system and correction of problems and illegal practices. Ensuring that the
system is used properly will help prevent leaks and overflows as well as upsets at wastewater
11
N/ Charlotte-Mecklenburg
STORM
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
Services
treatment plants thus helping control the TMDL pollutants of concern. This ordinance has
proven to be effective and will continue to be implemented in FY2024.
2.2.6 Sanitary Sewer System Inspections and Maintenance
Charlotte Water conducts inspections and maintenance of various components of
the sanitary sewer system in the Phase I and Phase II jurisdictions to ensure proper operating
function and prevent leaks and overflows. These include food service grease trap inspections,
commercial oil/water separator inspections, sanitary sewer line root control and cleaning, sewer
line right-of-way clearing and maintenance, and lift station inspection and maintenance.
Ensuring that the system is used properly, inspected, and maintained helps prevent leaks and
overflows as well as upsets at wastewater treatment plants thus helping control the TMDL
pollutants of concern. These inspection and maintenance efforts have proven to be effective and
will continue to be implemented in FY2024.
2.2.7 SSO Rapid Response
Charlotte Water maintains a rapid response program designed to quickly and efficiently respond
to sanitary sewer overflows, thus reducing the discharge of pollutants to the MEP and helping
control the TMDL pollutants of concern in the Phase I and Phase II jurisdictions. These
programs have proven to be effective and will continue to be implemented in FY2024.
2.2.8 Construction Site Runoff Control (Section 6 of SWMP)
The following existing construction site storm water runoff control activities have been identified
as suitable for addressing the pollutants of concern in the TMDL watersheds. These BMPs
address impaired waters by reducing discharges of pollutants of concern from construction sites.
During FY2023, these BMPs were effectively implemented in the TMDL watersheds in
Charlotte-Mecklenburg.
1. Erosion Control Plan Reviews
2. Erosion Control Inspections
3. Enforcement of Erosion Control Ordinance—Enhanced erosion control measures are
required in all TMDL watersheds.
4. Erosion Control Hotline
5. Erosion Control Education
6. Erosion Control at Government Projects
Table 6 below provides data relating to Construction Site Runoff Control Program activities
completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during
FY2023.
12
/N Cl2rlotte-Mecklenburg
/STORM
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
/V`Services
Table 6: FY2023 Construction Site Runoff Control Activities in TMDL Watersheds
# cf) c. x �"14
04 wo
Description 1.0 a u u CAA 0
CA F
Erosion
Control 94 0 0 15 3 231 0 49 0 30 422
Inspections
NOVs 1 0 0 0 0 3 0 1 0 1 6
Issued
During FY2023, the BMPs implemented for the Construction Site Runoff Control Program were
evaluated and found to be effective at reducing non-point source pollutant loading to the
receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these
BMPs will continue to be used in FY2024 to comply with TMDL requirements.
2.2.9 Post-Construction Site Runoff Control (Section 7 of SWMP)
The following existing post-construction site runoff control activities have been identified as
suitable for addressing the pollutants of concern in the TMDL watersheds. These BMPs address
impaired waters by reducing discharges of pollutants of concern from new development and
redevelopment projects. During FY2023, these BMPs were effectively implemented in the
Phase I and Phase II jurisdictions in Mecklenburg County.
1. Enforcement of the Post-Construction Storm Water Ordinances
2. Compliance by Co-Permittees with Post-Construction Ordinance Requirements
3. Ensuring Compliance with Requirements for Non-Structural BMPs
4. Ensuring Compliance with Requirements for Structural BMPs
5. Ensuring Compliance with Natural Resource Protection
6. Ensuring Compliance with Open Space Protection
7. Ensuring Compliance with Buffer Requirements
8. Ensuring Compliance with Redevelopment
9. Ensuring Compliance with Green Infrastructure Practices
10. Ensuring Compliance with Operation and Maintenance Requirements
Table 7 below provides data relating to Post-Construction Site Runoff Control Program activities
completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during
FY2023.
Table 7: FY2023 Post-Construction Site Runoff Control Activities in TMDL Watersheds
y L
CA 0
CIA
Description ;.0 C .aGA CA F
a a At
a
BMP 28 1 98 14 85 73 2 18 1 18 338
Inspections
13
/ Charlotte•Mecklenburg
/j STORM p
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
n
Nt Services
y F..
aJ
a) 0 bA O y y s.
04
14 0
ct
Description j x c, o
F-1
NOVs 0 0 2 0 4 2 0 0 0 0 8
Issued
Corrective
Action 0 0 2 0 4 1 0 0 0 0 7
Requests
Issued
Educational
Notices 4 0 3 3 31 1 0 13 0 0 55
Provided
During FY2023, the BMPs implemented for the Post-Construction Site Runoff Control Program
were evaluated and found to be effective at reducing non-point source pollutant loading to the
receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these
BMPs will continue to be used in FY2024 to comply with TMDL requirements.
2.2.10 Pollution Prevention and Good Housekeeping (Section 8 of SWMP)
The following existing pollution prevention and good housekeeping activities for municipally
owned/operated facilities have been identified as suitable for addressing the pollutants of concern
in the TMDL watersheds. These BMPs address impaired waters by reducing discharges of
pollutants of concern from municipal facilities and operations. During FY2023, these BMPs
were effectively implemented in the Phase I and Phase II jurisdictions in Mecklenburg County.
1. Maintaining an Inventory of Municipal Operations
2. Providing Employee Training
3. Implementing Operation and Maintenance Programs, Spill Prevention and Spill Response
4. Minimizing Pollution from Municipally Owned Streets, Roads and Parking Lots
5. Implementing Operation and Maintenance of Municipally Owned Storm Sewer System
6. Management of Pesticide, Herbicide and Fertilizer Application
7. Preventing or Minimizing Pollution from Vehicle and Equipment Cleaning Areas
8. Implementing Proper Waste Disposal Practices
9. Completing Flood Management Projects
Table 8 below provides data relating to Pollution Prevention and Good Housekeeping Program
activities completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions
during FY2023.
14
Charlotte-Mecklenburg/N STORM
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
/V`Services
Table 8: FY2023 Pollution Prevention& Good Housekeeping Activities in TMDL Watersheds
G) 7, bA C y 6
# p C C% 0 O CIJ
x . y 0
Description C7 tA
04 a 6 P x� F
municipal
facilities 0 0 0 0 2 2 0 0 0 1 9
inspected
outfalls
inspected
during 0 0 0 0 8 5 0 0 0 5 34
municipal
facility
inspections
municipal
facilities 0 0 0 0 2 2 0 0 0 1 9
monitored
problems
corrected
through 0 0 0 0 0 0 0 0 0 0 0
municipal
facility
monitoring
During FY2023, the BMPs implemented for the Pollution Prevention and Good Housekeeping
Program were evaluated and found to be effective at reducing non-point source pollutant loading
to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore,
these BMPs will continue to be used in FY2024 to comply with TMDL requirements.
Section 3: Current TMDL Monitoring Strategies
CMSWS conducts fixed interval stream monitoring every month at 33 locations across the
county in the Phase I and Phase II jurisdictions (see Figure 3). Many of these locations are
within, or immediately downstream of, the TMDL watersheds that are shown in Figure 1. At
each site, samples are collected and analyzed for 16 water quality parameters as follows:
ammonia-nitrogen, fecal coliform bacteria, total Kjeldahl nitrogen, nitrate/nitrite, total suspended
solids, total phosphorus, E. coli, turbidity, suspended sediment, magnesium, calcium, hardness,
and copper(dissolved). Lead(dissolved), chromium(total), and zinc (dissolved) are collected in
the first month of each quarter. CMSWS also performs annual or bi-annual monitoring for
benthic macroinvertebrates in the Phase I and Phase II jurisdictions at the 33 stream monitoring
locations shown in Figure 3.
15
NCbarlotte-Mecklenburg
/STORM
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
Services
Iredell Rowan
•
Lincoln 1B
• 2 Cabarrus
MS3 MY10
M
E
Gaston
MY B
4A MY12B
Y13A 3 Y7B
C17
2A MC29 r MC30• " o
66 • 33 14 am
M 25 Y15
C42 •
8 MC36
MY9
•C47A
• MC'OC
MC'7
C '•A MC40'
C,-
45B
•
51 Union
York
Lancaster
Figure 2: Water Quality Monitoring Locations in Mecklenburg County
CMSWS maintains a Continuous Monitoring and Alert Notification Network or CMANN at 34
locations, including 27 of the fixed interval monitoring locations shown in Figure 3. The
CMANN network collects data hourly for turbidity, dissolved oxygen, temperature, conductivity,
and pH. CMSWS conducts routine lake monitoring at 27 locations on Lake Norman, Mountain
Island Lake and Lake Wylie, including seven locations in the TMDL area identified in Figure 1
for Lake Wylie. This monitoring is performed every other month for the following 12
16
Charlotte Mecklenburg
id STORM,,_WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
ram`Services
parameters: secchi depth, temperature, dissolved oxygen, conductivity,pH, fecal coliform
bacteria, ammonia nitrogen, nitrate+nitrite, total Kjeldahl nitrogen, total phosphorus, turbidity,
and Chlorophyll-a. Monitoring for the following 11 parameters is performed twice a year:
copper, chromium, lead, zinc, mercury, manganese, arsenic, cadmium, nickel, selenium, and
iron. Additionally, semi-annual monitoring is performed at 10 locations in eight coves on Lake
Wylie to monitor potential impacts associated with a long-term residential development project.
These semi-annual samples are analyzed for the same 12 parameters measured during bi-monthly
routine monitoring. All monitoring results that exceed threshold values are referred for follow-up
under the Illicit Discharge Detection and Elimination(IDDE) Program. Long-term assessment
for trends is performed on a non-fixed frequency (as needed). Provided below is an assessment
of the data collected for the identified parameters in the three (3) TMDL watersheds where
Mecklenburg County is assigned as the lead, including the Rocky River and Goose Creek
impaired for fecal coliform bacteria and Lake Wylie impaired for nutrients (see Table 1). For
data applicable to the other TMDL watersheds in the Phase I jurisdiction, contact Charlotte
Storm Water Services. The discussions in the following subsections are limited to data collected
up to the end of 2022 as the Federal TMDL Program operates on a calendar year basis as
opposed to the fiscal year basis utilized by CMSWS.
3.1 Rocky River Fecal Coliform Monitoring and Land Use Evaluation
A section of the Rocky River in Mecklenburg County (AU Number 13-17a) is subject to a fecal
coliform TMDL with a WLA assigned to storm water that was approved on September 19, 2002.
According to the final NC 2022 305(b)report, the Rocky River is currently not meeting the fecal
coliform criteria. Mecklenburg County has been assigned responsibility for this TMDL on
behalf of the Phase I and Phase II jurisdictions in Charlotte-Mecklenburg. Phase II Permit
conditions required that a monitoring plan be developed for the Fecal Coliform TMDL in the
Rocky River Watershed unless a waiver is obtained from NCDEQ. Such a waiver was obtained
on June 26, 2014, based on the condition that Mecklenburg County continue to evaluate the land
use and development within the watershed on an annual basis and if additional storm water
infrastructure is installed or higher intensity land uses are constructed a Monitoring Plan would
be reconsidered. In response to this condition, CMSWS has obtained impervious area and land
use data from the County GIS Department back to 2011 and continues to update this data
annually(see Table 19). Between 2021 and 2022, the residential impervious cover increased
0.06 acres to a total of 16.09 acres. However, the commercial impervious cover remained
unchanged at 0.33 acres during the same time. The total amount of impervious cover in the
watershed(residential+ commercial) is approximately 16.42 acres as of 2022. Compared to the
total area of the watershed at 747 acres, the amount of impervious cover is at 2.2%,which is an
increase of 0.25% since 2011. The number of outfalls is unchanged from 2020 at four(4), which
has increased by three (3) outfalls since 2011. To date, changes in the watershed are not
significant enough to warrant the establishment of a Monitoring Plan.
Table 9: Annual Analysis of the Rocky River Watershed for the Monitoring Plan
Residential Commercial Total Storm Water
Calendar Year Impervious Cover Impervious Cover Impervious Outfalls
(acres) (acres) Cover(acres) (number)
2011 14.22 0.33 14.55 1
17
/ Cbarlotte•Mecklenburg
�/ / /j STORM p
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
�".•••Services
Residential Commercial Total Storm Water
Calendar Year Impervious Cover Impervious Cover Impervious Outfalls
(acres) (acres) Cover(acres) (number)
2012 14.22 0.33 14.55 1
2013 14.55 0.33 14.88 3
2014 14.88 0.33 15.21 3
2015 15 0.33 15.33 4
2016 15.1 0.33 15.43 4
2017 15.2 0.33 15.53 4
2018 15.69 0.33 16.02 4
2019 15.72 0.33 16.05 4
2020 15.72 0.33 16.05 4
2021 16.03 0.33 16.36 4
2022 16.09 0.33 16.42 4
#Increase from 2011 1.87 0.00 1.87 3
% Increase from 2011 13.15% 0.00% 12.85% 300%
Although CMSWS does not perform monitoring in the Rocky River TMDL watershed, it obtains
monthly monitoring data collected by the NCDEQ, Division of Water Quality at Q7330000,
which is the specific monitoring location for this TMDL. CMSWS performed an analysis of the
fecal coliform data collected by the State in calendar year 2022, which is the most current data
available. The geometric mean concentration of fecal coliform samples collected in 2022 was
602.704 CFU/100 ml. This represents an approximately 23% increase from the geometric mean
concentration(491 CFU/100 ml) observed in calendar year 2021. Out of the 11 samples
collected in 2022, seven (27%) exhibited concentrations below 400 CFU/100 ml. The remaining
five samples (73%) exceeded the 400 CFU/100 ml threshold. The North Carolina
Administrative Code (NCAC) 02B Fresh Surface Water Quality Standards dictate that fecal
coliform"shall not exceed a geometric mean of 200 (CFU)/100 ml...nor exceed 400 [CFU]/100
ml in more than 20 percent of the samples examined...". The data from site Q7330000 suggest
an increase in mean fecal coliform concentration over the past four(4)years; however, mean
fecal coliform concentrations and compliance percentages have improved overall since the 1970s
(Table 20, Figure 4, and Figure 5).
Table 10: NCDWQ Fecal Coliform Data for Site Q7330000 on the Rocky River
Year Geometric # #Non- Total % %Non-
Mean Compliant Compliant Samples Compliant Compliant
2017 488.70 5 7 12 42% 58%
2018 663.46 5 7 12 42% 58%
2019 357.17 8 4 12 67% 33%
2020 432.40 3 3 6 50% 50%
2021 491.22 7 5 12 58% 42%
2022 602.704 3 8 11 27% 73%
18
/ Charlotte•Mecklenburg
r/ / /j STORM p
WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
N`Services
Rocky River - Fecal Coliform Geometric Mean
l00000
0 n000
0
1000 602.704
LL
100
AQ' 1L 1 � 1`b 4'° 4;1' � 4O oii° oi4' °O 01' Ok 06 CP y0 titi ti N(') ti`P ,19 1L
N N• ti� ,°i ye ti� N• ti0 ,� ti0 10 10 .10 LO 10 10 10 10 ,1, 10 'V LO
Calendar Year
Geometric Mean
Figure 3: Geometric Mean for Fecal Coliform on Rocky River Site Q7330000
Rocky River- Fecal Coliform % Compliance (400 CFU/100 ml)
80 100%
a) 70
E 60 80%
n 50 60% I
40%
10 1 I � � � � � II � � � � � � � � � � IIII . 11 � � � � � �7°moo°i°
0 0/°
4° Al, At. �O �`b 'b° (� 4'�` 4'0 .O 0)% 00 Oti Qt. 00 O`b y0 ,y'L Nt. y'a Nci, 10 't
N. ti� N. ti° N. N. N. N. tie tie N. 1, yo yo yo yo yo yo yo yo yo yo yo
Compliant Non-Compliant . 11 %Compliant
Figure 4: Compliance with Fecal Coliform Standard on Rocky River Site Q7330000
3.2 Goose Creek Fecal Coliform Monitoring
As identified in Table 1, two (2) sections of Goose Creek in Mecklenburg County(AU Numbers
13-17-18a and 13-17-18b) are subject to a fecal coliform TMDL with a WLA assigned to storm
water that was approved on July 8, 2005. According to the NC final 2022 305(b) report, fecal
coliform concentrations in Goose Creek are currently not meeting state water quality standards.
Mecklenburg County has been assigned responsibility for compliance with this TMDL on behalf
of the Phase I and Phase II jurisdictions in Charlotte-Mecklenburg. CMSWS maintains a fixed
interval monitoring site (MY9) located where Stevens Mill Road crosses Goose Creek in Union
County. In calendar year 2022, fecal coliform counts at this station ranged from 207 Colony-
Forming Units per 100 milliliters of water(CFU/100 ml) to 2,380 CFU/100 ml with a geometric
mean of 372.08 CFU/ 100 ml. Eleven(11) of the 17 samples collected in 2022 (64.71%)
exhibited concentrations at or below 400 CFU/100 ml. The remaining 6 samples (35.29%)
exhibited concentrations above this threshold. No pollution sources were identified as a result of
the water quality monitoring in the Goose Creek TMDL watershed in 2022. Table 21 provides a
summary of this data from 2017 through 2022. Figures 6 and 7 provide a comparison of fecal
coliform data indicating overall improvements in mean fecal coliform concentrations and
19
' Cbarlotte-Mecklenburg
ST�R WATER R FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
N\Services
compliance percentages. In general, data indicates a significant improvement in compliance in
2022.
Table 11: CMSWS Fecal Coliform Data for Site # MY9 on the Goose Creek
Year Geometric # #Non- Total % %Non-
Mean Compliant Compliant Samples Compliant Compliant
2017 607.12 10 9 19 53% 47%
2018 678.67 11 8 19 58% 42%
2019 427.19 11 8 19 58% 42%
2020 404.11 8 7 15 53% 47%
2021 513.89 8 10 18 44% 56%
2022 372.08 11 6 17 65% 35%
Goose Creek- Fecal Coliform Geometric Mean
900
800
700 zievy
600
0 500
0
.a
400
u
300
200
100 —
0 —
UI .o w m o N m a o N m a .n a n Cl o CO N m a of CO N oo m S S N
.i .i .�I .-I .i .i .i .i .4 .4 .4 .4 ei .1 e1 N N N N N N N N N N N N N N N N N N N N N N N
tGeometric Mean
Figure 5: Geometric Mean for Fecal Coliform on Goose Creek Site MY9
Goose Creek- Fecal Coliform %Compliance (400 CFU/100 ml)
80 90%
70 80%
60 70%
01 60%
50 E
SG% —
5 40 E
`1 4 0% ,
E 30 e
30
Z
%
20 0%
10 1 I I I 1 1 1111111111111
:0%
0 0%
o .o n co m o N CO a Ln .o n co of o .i N m a Ln .o n oo m o .y N m a o .n n co m o .y N
m W mG mo m mf m Ol N m En" mf 01 En"
Ol O O O O O O O O O o 8 8 8 8 8 8 8 8 8 8 N N N
. - . - . - . . - . . . e . - NNNN NNNNNN NNNNNNNNNNNN N Com pliant Non-Compliant t%Compliant
Figure 6: Compliance with Fecal Coliform Standard on Goose Creek Site MY9
20
NCharlotte-Mecklenburg
/STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
- — Services
3.3 Lake Wylie Chlorophyll-A Monitoring
Two (2) sections of Lake Wylie in Mecklenburg County(AU Numbers 11-(122) and 11-
(123.5)a) were previously subject to a nutrient(nitrogen and phosphorus) TMDL that was
approved on February 5, 1996. However, according to the 2022 Integrated Report these sections
are included in Category 1 indicating they are meeting the Criteria without any
acknowledgement of a TMDL, which would be Category lt. All 82 Chlorophyll-a samples
collected by CMSWS in Lake Wylie in 2021 were below the standard of 40 µg/1 as illustrated in
Figures 8 and 9 below.
25.00
20.00
hA
15.00
t
10.00
0
5.00
0.00
01 01 01 01 0, 0, 0 0 0 0 0 0 0 0 0 0 —1 �--� �-1 �-1 �-1 �-1 N i-1 N NN N Na)
01 01 01 0, 0, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
N N N N N N N N N N N N N N N N N N N N N N N
Figure 7: Annual Average Chlorophyll-a Concentration (mg/1) on Lake Wylie
40
35
30
25
E
20 -
15
° 10 -
U
01111 1111 d d hd kb h h I ho lo i i
0
v1 �O N 00 C O N 00 a, O —4 N _n V1 ‘,0C N 00 C1
C
C� C� � _
0 O O O O O O O O O N N N 0
Cr, IT IT 01 01 01 O O O O O O O O O O O O O O O O O O O O O O O CO
N N N N N N N N N N N N N N N N N N N N N N N
■Cove ■Main ■Trib ■Grand Total
Figure 8: Annual Average Chlorophyll-a on Lake Wylie Coves, Main Stem and Tributaries
21
N/ Charlotte-Mecklenburg
STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
N`WATER
Services
3.4 Mercury Monitoring Statewide
As stated in sub-section 9.5.3 of the Storm Water Plan, the State did not include an MS4 NPDES
WLA for mercury in their statewide TMDL. Therefore, this document does not discuss
compliance measures or data analysis for this TMDL.
3.5 Effectiveness of BMPs Based on Data Analysis
The mean fecal coliform concentration observed in Rocky River in 2022 increased from 2021;
however, mean fecal coliform concentrations and compliance percentages have remained
relatively consistent over the past five (5)years. In Goose Creek, the mean fecal coliform
concentration exhibited a moderate increase between 2021 and 2022. The percentage of samples
complying with applicable fecal coliform standards decreased slightly over the same time.
However, fecal coliform concentrations and compliance percentages have exhibited overall
improvements since the mid-2000s when Mecklenburg County initiated its TMDL compliance
efforts. The existing BMPs for both the Rocky River and Goose Creek watersheds appear to be
effective at identifying and eliminating pollution sources in compliance with TMDL
requirements. Therefore, these BMPs, along with the additional BMPs identified below, will
continue to be implemented in FY2024.
Based on the above-described assessments of data collected in the TMDL watersheds, a general
improvement in Chlorophyll-a has been observed in Lake Wylie over the past several decades.
In 2022, none of the Chlorophyll-a samples collected from Lake Wylie by CMSWS exceeded the
state standard of 40 µg/L. Therefore, it is determined that no additional BMP measures will be
implemented in the Lake Wylie TMDL watershed other than those currently implemented
countywide as part of the SWMP.
Section 4: Additional BMP Measures
As required by Permit No. NCS000395, CMSWS is continuing to evaluate the effectiveness of
the existing structural and/or non-structural BMPs described in the previous sections and identify
and implement additional BMPs as necessary to effectively address impaired waters. The
following subsections describe the additional BMPs implemented in FY2023, as well as those
planned for implementation in FY2024 along with an implementation timeline, and a brief
explanation as to how these additional BMPs will address impaired waters.
4.1 Additional BMPs Implemented in FY2023
During FY2023, the following additional activities were completed to reduce fecal coliform
bacteria levels and enhance water quality in the Rocky River watershed:
1. NCDEQ, Division of Water Quality continued to conduct water quality monitoring,
including sampling for fecal coliform bacteria, at site Q7330000 on the Rocky River.
Monitoring results will be analyzed and described in the FY2024 annual report.
2. During FY2023, two (2)notices of violation were issued by the Mecklenburg County
Health Department for septic system failures in the Goose Creek Watershed and one (1)
22
Charlotte•Mecklenburg'N/STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
N`Services
in the Rocky River Watershed as shown in Figure 10. System repairs were completed
with no negative impacts to surface water quality documented.
Phase II NPDES MS4 Program — FY2023
Septic NOVs Within Goose Creek
and Rocky River Watershed Basins
ci Re- YRI .R
N
r
411161111111kK
.40,111
1%$ "OO•E
CITY,r CHARLOTTE 0 Septic NOV Issued by Public Health
-Streams
( '/ 11STORM/ I I Watershed Basin
MWATER
/�/�Services_-M1
Figure 9: NOVs Issued for Septic System Failures in Phase II TMDL Watersheds
3. On August 10, 2022, the four(4)major outfalls in the Rocky River TMDL watershed in
Mecklenburg County were inspected. No dry weather flows or pollution sources were
detected.
4. During FY2023,there were three (3) sewer pump stations in operation in the Goose
Creek and none in the Rocky River TMDL watersheds. The Goose Creek pump stations
23
NCharlotte-Mecklenburg
/STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
N`WATER
lam\Services
were inspected as follows: Philadelphia Presbyterian Church Lift Station(Activity Report
#75990), Mint Lake Village Lift Station(Activity Report#75991), and Bain Elementary
School Lift Station (Activity Report#76125). All pumps at the lift stations were present
and operable, the wet wells were free of excessive debris, and all floats/controls for
pumps were operable along with their corresponding audio and visual alarms. In
addition, the facilities were properly secured with a 24-hour notification signage posted.
However, the telemetry systems that provide automated notification when a pump failure
occurs were not operable during the inspection. Following the inspections,
recommendations were made to the owners of these systems to correct the problems with
these telemetry systems. Follow-up inspections conducted by CMSWS in July 2023
revealed that all the telemetry systems were repaired and were fully operational. Isiah
Glover with Charlotte-Mecklenburg Schools confirmed that the Bain Elementary School
lift station telemetry is now connected to a 24hr local police dispatch which will alert the
appropriate CMS service contractors that there is an issue at the lift station. This was
previously connected to a CMS office which was not a 24 hour line. The Mint Lake
Village and Philadelphia Presbyterian Church lift stations are now serviced by McCall
Brothers and confirmed the telemetry systems are now connected directly to McCall
Brothers 24hr phone line. These lift stations were previously serviced by Aqua-Trol but
they are no longer in business.
5. Routine fixed interval monitoring was conducted monthly at site MY9 (Goose Creek—
Stevens Mill Road) for 16 parameters including fecal coliform and E. coli. Monitoring
results are described in Section 3.2.
4.3 Additional BMPs to be Implemented in FY2024
During FY2024, the following additional BMPs will be implemented in the Rocky River and
Goose Creek watersheds to reduce fecal coliform bacteria levels and enhance water quality:
1. By June 30, 2024, CMSWS will complete a review of Health Department records to
determine where failed septic systems have been identified in both the Rocky River and
Goose Creek TMDL watersheds. Follow up inspections and monitoring will be
performed as necessary to ensure the elimination of sources of fecal coliform bacteria
associated with failed septic systems thereby addressing impaired waters.
2. By June 30, 2024, major outfalls will be inspected in the Rocky River TMDL watershed.
Dry weather flows will be identified, and pollution sources eliminated thereby addressing
impaired waters.
3. In April 2024, the three (3) sewer pump stations located in the Goose Creek watershed
will be inspected and the necessary corrective actions implemented to ensure proper
operation and maintenance. Currently, there are no sewer pump stations in operation in
the Rocky River TMDL watershed. If any are added in FY2024, they will be inspected
as well.
4. Routine monitoring will continue to be performed monthly by CMSWS at MY9 on
Goose Creek at Stevens Mill Road and by NCDEQ, Division of Water Quality at site
Q7330000 on Rocky River at SR 2420. Exceedances of established water quality watch
and action levels will be identified and follow up actions conducted as necessary for the
identification and elimination of pollution sources.
24
NI
Charlotte-Mecklenburg
/STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
ram`Services
5. Targeted surface water sampling in headwater areas of the Goose Creek watershed will
continue in FY2024. Based on the results of FY2024 activities, additional surface water
quality and watershed data is needed to further delineate sources of fecal coliform to the
system. Watershed modeling and septic system assessments will be utilized to inform
decision making and identify potential problem areas.
Section 5: Tracking and Reporting Success
CMSWS will document all activities completed for the identification and elimination of
pollution sources in the TMDL watersheds, including all inspections conducted and corrective
actions implemented. All confirmed pollution sources will be mapped in GIS and, where
possible,pollutant loads will be estimated. This data will be tracked over time as a measure of
the success of program activities.
Section 6: TMDL Reporting
This report fulfills the SWMP TMDL reporting requirement by providing a summary of the
following:
1. Description of water quality restoration activities completed during the past fiscal year.
2. Description of water quality restoration activities expected to occur next fiscal year.
25
'/ Charlotte-Mecklenburg
/STORM N`WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
lam\Services
Appendix A: FY2023 TMDL Data for Mecklenburg County's Phase II Jurisdictions
03 C
# 3 CD
x aCI
4.0
Description ° u�
E.
stream
restoration 0 2 0 0 1 0 0 0 0 0 3
projects
stream
restoration
projects 0 0 0 1 1 0 0 0 0 0 2
expected to
occur next
fiscal year
buffer
mitigations 2 0 3 1 3 1 0 3 0 2 15
approved
continuous
monitoring 52,002 63,017 43,579 158,117 21,634 115,347 20,099 5,599 13,589 73,219 566,202
data points
collected
school
presentations 0 0 0 3 0 10 0 0 0 0 13
conducted
students
attending 0 0 0 236 0 249 0 0 0 0 485
school
presentations
service
requests 2 3 22 2 5 41 1 2 1 3 82
responded to
service
request 2 2 30 6 7 65 6 5 3 3 129
inspections
conducted
inspections
conducted 1 4 0 2 0 0 0 1 0 0 8
for illicit
discharges
problems
corrected
through 0 3 0 0 0 0 0 0 0 0 3
illicit
discharge
inspections
industrial
facilities 0 0 2 0 0 0 0 0 0 3 5
inspected
26
/ Charlotte•Mecklenburg
f/ / �j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
n WATER p
Nt Services
ae 14
Q C � = bA bk C Cle .Qe i. v
-
C • C ~ x btt et
y O
Description ; .a x
c F
problems
corrected
through 0 0 0 0 0 0 0 0 0 0 0
industrial
facility
inspections
industrial
facilities 0 0 2 0 0 0 0 0 0 3 5
monitored
problems
corrected
through 0 0 0 0 0 0 0 0 0 0 0
industrial
facility
monitoring
samples
collected
through 52 52 52 208 51 366 53 51 52 104 1041
fixed
interval
monitoring
municipal
facilities 0 0 0 0 2 2 0 0 0 1 5
inspected
outfalls
inspected
during 0 0 0 0 8 5 0 0 0 5 18
municipal
facility
inspections
municipal
facilities 0 0 0 0 2 2 0 0 0 1 5
monitored
problems
corrected
through 0 0 0 0 0 0 0 0 0 0 0
municipal
facility
monitoring
NOVs by
TMDL 0 2 6 1 1 10 0 2 0 0 22
watershed.
enforcement 0 0 1 0 0 0 0 0 0 0 1
actions
27
/ Char!otte•Mecklenburg
r/ / /j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
n WATER p
Nt Services
ae 14
Q C � = bA bk C Cle .Qe i. v
C • C ~ x btt
y O
Description ; .a x
c F
septic
systems
repaired or 2 1 2 0 2 13 1 1 1 1 24
connected to
municipal
sewer
miles of
stream 8.75 11.26 0 65.17 0 0 0 23.31 0 101.89 210.38
walked
outfalls
inspected 14 70 0 349 0 0 0 57 0 356 846
during
stream walks
dry weather
flows
detected 0 11 0 48 0 0 0 13 0 67 139
during
stream walks
water quality
problems
corrected 0 0 0 3 0 0 0 0 0 21 24
during
stream walks
Adopt-A-
Stream miles 0 0 0.51 0 0.25 4.8 0 15.25 0 11.28 32.09
cleaned
pounds of
trash
removed 0 0 2,000 0 350 950 0 295 0 0 3595
through
Adopt-A-
Stream
Big Spring
Clean
streams 0 0 0 0 0 1 0 0 0 0 1
miles
cleaned
pounds of
trash
removed 0 0 0 0 0 745 0 0 0 0 745
through Big
Spring Clean
28
/ CAarlotte•Mecklenburg
�/ / /j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395
n WATER p
Nt Services
a4 i.
C 7' = bA C �. i. v
o •3 C x O
Description C ; .a x
c F
volunteer
monitoring 1 0 5 0 0 29 0 2 0 0 37
reports
submitted
volunteer
samples 0 0 0 2 1 1 0 8 0 1 13
collected
storm drains 18 64 43 19 0 182 0 53 0 60 439
marked
Erosion
Control 94 0 0 15 3 231 0 49 0 30 422
Inspections
NOVs 1 0 0 0 0 3 0 1 0 1 6
Issued
BMP 28 1 98 14 85 73 2 18 1 18 338
Inspections
NOVs 0 0 2 0 4 2 0 0 0 0 8
Issued
Corrective
Action 0 0 2 0 4 1 0 0 0 0 7
Requests
Issued
Educational
Notices 4 0 3 3 31 1 0 13 0 0 55
Provided
Totals 52,232 63,243 45,853 159,095 22,195 118,335 20,162 6,212 13,647 74,012 574,985
29