Loading...
HomeMy WebLinkAboutNCS000395_MS4 Annual Report (2022-23 FY)_20230824 Storm Water Management Program Assessment Report for Permit No. NCS000395 Reporting Period: July 1, 2022 through June 30, 2023 (FY2023) Co-Permittees: Mecklenburg County, Charlotte-Mecklenburg Schools, Central Piedmont Community College and the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill, and Pineville Report Date: August 2023 Report Prepared by: Charlotte-Mecklenburg Storm Water Services 2245 Suttle Avenue Charlotte, NC 28208-5237 / ' / Charlotte-Mecklenburg / / d STORM WATER Services / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�services — Table of Contents Section 1: Introduction 1 Section 2: Overview and Funding 3 Section 3: Stormwater Management Program Administration 4 3.1 Program Overview 4 3.2 Status of the Implementation of the Storm Water Plan in FY2023 4 Section 4: Public Education and Outreach Program 6 4.1 Program Overview 6 4.2 Status of the Implementation of the Storm Water Plan in FY2023 6 Section 5: Public Involvement and Participation Program 8 5.1 Program Overview 8 5.2 Status of the Implementation of the Storm Water Plan in FY2023 8 Section 6: Illicit Discharge Detection and Elimination Program 12 6.1 Program Overview 12 6.2 Status of the Implementation of the Storm Water Plan in FY2023 12 Section 7: Construction Site Storm Water Runoff Control Program 17 7.1 Program Overview 17 7.2 Status of the Implementation of the Storm Water Plan in FY2023 17 Section 8: Post-Construction Site Runoff Control Program 19 8.1 Program Overview 19 8.2 Status of the Implementation of the Storm Water Plan in FY2023 19 Section 9: Pollution Prevention/Good Housekeeping for Municipal Operations 21 9.1 Program Overview 21 9.2 Status of the Implementation of the Storm Water Plan in FY2023 21 Section 10: Total Maximum Daily Loads (TMDLs) 23 10.1 Program Overview 23 10.2 Status of the Implementation of the Storm Water Plan in FY2023 23 Section 11: Assessment of Storm Water Plan and Overall Program Effectiveness 25 Section 12: Program Enhancements 26 12.1 Status of Implementation of Work Plan Modifications for FY2023 26 12.2 Work Plan Modifications Identified for Implementation in FY2024 26 Tables Table 1: BMP Summary Table for Stormwater Management Program Administration 4 Table 2: BMP Summary Table for the Public Education and Outreach Program 6 Table 3: BMP Summary Table for the Public Involvement and Participation Program 8 Table 4: BMP Summary Table for the IDDE Program 12 Table 5: BMP Summary Table for the Construction Site Storm Water Control Program 17 Table 6: BMP Summary Table for the Post-Construction Site Runoff Control Program 19 Table 7: BMP Summary Table for the Pollution Prevention/Good Housekeeping Program 21 Table 8: BMP Summary Table for the TMDL Program 23 i / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�services Attachments Attachment 1: Data Countywide (FY22 and FY23) 27 Attachment 2: Data by Jurisdiction 34 Attachment 3: Modifications to the SWMP for FY2023 41 Attachment 4: Modifications to SWMP for FY2024 43 Attachment 5: Pollution Prevention Educational Information Distributed in FY2023 44 Attachment 6: Industrial/Commercial Educational Activities 46 Attachment 7: Media Outlets and Outreach Results for FY2023 Media Campaign 47 Attachment 8: Measure of Success for the Public Education and Outreach Program 48 Attachment 9: Measure of Success for the Public Education and Outreach Program 49 Attachment 10: Promotional Items in FY2023 50 Attachment 11: Volunteer Recognition Activities in FY2023 51 Attachment 12: Measure of Success for the Public Involvement and Participation Program 52 Attachment 13: Fixed Interval Monitoring (FIM) Sites for Phase II 53 Attachment 14: FY2023 Fixed Interval Monitoring (FIM) Results for Phase II 54 Attachment 15: FY2023 Stream Use-Support Index (SUSI) for Phase II 98 Attachment 16: Measure of Success for the IDDE Program 99 Attachment 17: Measure of Success for the IDDE Program 100 Attachment 18: Measure of Success for the Construction Site Runoff Control Program 101 Attachment 19: BMP Inspections Revealing Problems from 2007 through 2023 102 Attachment 20: Measure of Success for the Post-Construction Site Runoff Control Program 103 Attachment 21: Summary of Inspection Findings from FY2008 through FY2023 104 Attachment 22: Measure of Success for Pollution Prevention& Good Housekeeping Program 105 Attachment 23: Measures of Success Summary for FY2023 106 Attachment 24: Status of Work Plan Modifications Implemented in FY2023 107 Attachment 25: Work Plan Modifications Identified for Implementation in FY2024 110 Attachment 26: FY2023 TMDL Annual Report and Assessment 113 ii , , / Charlotte Mecklenburg I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Certification By my signature below I hereby certify,under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. I am also aware that the contents of this document shall become an enforceable Section of the NPDES MS4 Permit, and that both the Division and the Environmental Protection Agency have NPDES MS4 Permit compliance and enforcement authority. ❑ I am a ranking elected official. ❑ I am a principal executive officer for the permitted MS4. X I am a duly authorized representative for the permitted MS4 and have attached the authorization made in writing by a principal executive officer or ranking elected official which specifies me as (check one): X A specific individual having overall responsibility for stormwater matters. ❑ A specific position having overall responsibility for stormwater matters. Signature: tad . Print Name: Don Ceccarelli Title: Division Director, Storm Water Services Signed this 23rd day of August 2023. / , / Charlotte-Mecklenburg / / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services Section 1: Introduction This document satisfies the annual assessment and reporting requirement of Storm Water Permit No. NCS000395 as follows: • Evaluate program compliance, the appropriateness of best management practices (BMPs), and progress towards achieving measurable goals; and • Evaluate the performance and effectiveness of the Storm Water Quality Management Program Plan, herein referred to as the Storm Water Plan. Charlotte-Mecklenburg Storm Water Services (CMSWS) has developed and is maintaining the Storm Water Plan for Permit No. NCS000395 on behalf of all co-permittees, including Mecklenburg County, Charlotte-Mecklenburg Schools (CMS), Central Piedmont Community College (CPCC), and the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill, and Pineville. This Storm Water Plan is available on the following website: http://storm water.charmeck.org (select"Surface Water Quality," select"Program Overview," select "Current Storm Water Management Plan"under Phase II Permit at the bottom of the page). The purpose of the Storm Water Plan is to describe the actions undertaken by the Permittee to ensure compliance with Permit requirements. Each of the six (6) minimum measures contained in the Permit plus TMDL compliance (referred to as Programs) has a separate section in the Storm Water Plan. Each section includes a Summary Table that describes the Best Management Practices, referred to as BMPs, that will be undertaken to fulfill Permit requirements. These BMPs include specific Measurable Goals that must be completed in accordance with established schedules to ensure fulfillment of the BMP. Fulfillment of the BMPs equates to compliance with the Storm Water Plan and Permit. The BMPs and Measurable Goals are described in detail every year in a Work Plan with BMPs referred to as program elements and the Measurable Goals referred to as tasks. The Work Plan Program Element Documentation Log (Log) is completed by staff assigned the lead role in the fulfillment of program elements and assigned tasks. The Logs serve to document the who, what, when, where, and how regarding tasks as they are completed throughout the fiscal year. Various attachments, such as maps,presentations, data tables, etc., are added to the Logs as necessary to ensure complete documentation of all activities completed and data and information generated. These Logs and attachments are assessed and approved by supervisors before they are loaded into the Cityworks database attached to an Activity Report where they are available for access digitally. At the end of the fiscal year, established Measures of Success as described in the Storm Water Plan are calculated and assessed along with the assessment of Logs and associated attachments by the supervisors to determine compliance with the Storm Water Plan and Permit. These assessments also serve as the basis for identification of improvements to the Storm Water Plan, Work Plan and Measures of Success to enhance efforts for Permit compliance, which are implemented during the next fiscal year. Section 2 of the annual report contained herein provides background information regarding the implementation of the Storm Water Plan between July 1, 2022 and June 30, 2023 (FY2023), including a fiscal analysis. Sections 3 through 9 provide an overview of the programs implemented to fulfill Permit requirements, including BMP Summary Tables for the six (6) minimum measures and TMDLs with Work Plan Codes, BMP Descriptions, Measurable Goals, Schedules, and Activity Reports numbers from Cityworks that contain Logs with details 1 / , Charlotte-Mecklenburg / 'STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services -- — regarding Permit compliance activities as described above. The detailed Logs are not provided in this annual report but are available upon request to Mecklenburg County's Water Quality Program Manager at 980-314-3217 or rusty.rozzelle(a,mecklenburgcountync.gov. The BMP Summary Tables also contain the numbers for Attachments provided at the end of this annual report that include a summary of data and information accumulated throughout the reporting year as well as lists of changes to the Storm Water Plan. Attachment 1 provides data generated from countywide Phase II activities whereas Attachment 2 provides data from activities specific to each Phase II jurisdictions. The remainder of the attachments include more detailed information regarding specific countywide activities. Section 11 of this report provides an assessment of compliance with the Storm Water Plan and Permit requirements, as well as the status of attainment of the identified Measures of Success during FY2023. Section 12 concludes with a summary of the status of Work Plan modifications for improving Permit compliance during FY2023 and changes to be implemented in FY2024. 2 Charlotte-Mecklenburg II STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Section 2: Overview and Funding CMSWS is responsible for developing, implementing, managing and overseeing the Storm Water Plan under the direction of Mecklenburg County's Water Quality Program Manager. The specific tasks, deadlines and assigned staff for fulfillment of the Storm Water Plan are described in an annual Work Plan. A copy of this Work Plan is available upon request to Mecklenburg County's Water Quality Program Manager at 980-314-3217 or rusty.rozzelle@mecklenburgcountync.gov. As specified in the Permit, each co-permittee is responsible for compliance with the terms and conditions of the Permit for storm water activities and watershed specific requirements within their jurisdictional area. Appropriate legal authority has been established by each jurisdiction for implementation of the Storm Water Plan through the adoption of Surface Water Pollution Control Ordinances that prohibit illicit discharges to the MS4 as well as the adoption of post-construction and erosion control ordinances. Mecklenburg County is delegated authority by each jurisdiction to enforce these ordinances. The majority of Permit compliance activities are performed by the Water Quality and Permitting and Compliance Programs within CMSWS. Funding for implementation of these Programs is shared by each jurisdiction based on an adopted Funding Strategy. Implementation costs for the reporting period of July 1, 2022 through June 30, 2023 (FY2023) were $1,012,189.37, including $708,982.13 and $219,949.53 in labor costs for the Water Quality and Permitting and Compliance Programs, respectively, and $83,247.71 in operating costs for laboratory, equipment, and supplies for the Water Quality Program. For FY2024, costs are estimated at $996,410.38, including $892,014.24 in staff costs and $104,396.14 in operating costs. The Phase II jurisdictions in Mecklenburg County utilize the revenue they receive from their storm water and land development fees to fund the implementation of the Program with the exception of CMS and CPCC, which do not receive revenue from the storm water fee and therefore fund Phase II Program implementation through their general budget. 3 , , Charlotte-Mecklenburg II STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Section 3: Stormwater Management Program Administration 3.1 Program Overview A program has been developed and is currently being implemented for administering the Phase II Permit for Mecklenburg County's Phase II jurisdictions/entities for the purpose of ensuring that all Permit requirements are effectively and efficiently fulfilled by co-permittees in accordance with the Storm Water Plan and that the administration requirements specified in the Permit are being met. The Program includes 37 separate BMPs and 190 Measurable Goals as described in the eight(8) BMP Summary Tables contained in this document. The Program also includes specific Measures of Success that are described in Section 11 of this document. The goal of Program Administration is to implement, manage and oversee the provisions of the Storm Water Plan to control to the maximum extent practical the discharge of pollutants from the municipal storm sewer system associated with stormwater runoff and illicit discharges, including spills and illegal dumping and to ensure that all Phase II Permit requirements are effectively and efficiently fulfilled. 3.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 1 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 1: BMP Summary Table for Stormwater Management Program Administration Program Development(Permit Ref.Part II Section A.4,5 and 6;Part III Sections A,B,C,D;Part IV Sections A,B,D,E,F,G)Performing activities necessary to fulfill the administrative requirements for compliance with permit requirements,including coordinating with co- permittees,completing the annual assessment report,applying for permit renewal,and updating the Storm Water Management Program Plan as necessary. BMP# A B C D E & Annual Reporting Metric Activity Report Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) (AR)# Plan Code Implementation Completed Compliant Attachment# #1 Permit Development PD-1 Developing and a.Annual Report Annually Yes Yes AR#: 72426 submitting the beginning July 1 AR#: 76660 annual assessment b.Annual Assessment for Annually Yes Yes report required by Phase II Permit beginning July 1 Attachments 1 and the Phase II Permit Compliance 2 to document c.Discuss and Facilitate Annually Yes Yes compliance with the Work Plan Changes beginning July 1 Phase II Storm d.Implement Annually Yes Yes Water Management Recommendations for beginning July 1 Program. Improvement 4 / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services - — — — Table 1: BMP Summary Table for Stormwater Management Program Administration Program Development(Permit Ref.Part II Section A.4,5 and 6;Part III Sections A,B,C,D;Part IV Sections A,B,D,E,F,G)Performing activities necessary to fulfill the administrative requirements for compliance with permit requirements,including coordinating with co- permittees,completing the annual assessment report,applying for permit renewal,and updating the Storm Water Management Program Plan as necessary. BMP# A B C D E & Annual Reporting Metric Activity Report Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) (AR)# Plan Code Implementation Completed Compliant Attachment# e. Submit Quarterly 30 days of the Yes Yes Reports to Co-permittees end of the quarter f. Certify and Submit As scheduled by Yes Yes Stormwater Permit NCDEQ Renewal g.Participate in an NPDES As scheduled by Yes Yes MS4 Permit Compliance NCDEQ Audit #2 Evaluate Effectiveness of Storm Water Plan PD-3 Evaluating the a.Annual Report Annually Yes Yes AR#: 72427 effectiveness of the beginning July 1 AR#: 76661 Storm Water Quality b.Annual Assessment for Annually Yes Yes Management Storm Water Plan beginning July 1 Attachment 3 Program Plan and Compliance Attachment 4 updating as c.Discuss and Facilitate Annually Yes Yes necessary,including Work Plan Changes _ beginning July 1 all written policies d.Implement Annually Yes Yes and procedures. recommendations for beginning July 1 improvement 5 / Charlotte-Mecklenburg d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Section 4: Public Education and Outreach Program 4.1 Program Overview CMSWS has developed and implemented a Public Education and Outreach Program for Mecklenburg County's Phase II jurisdictions/entities. The Program includes two (2) separate BMPs and 13 Measurable Goals as described in Table 2 below. The Program also includes specific Measures of Success that are described in Section 11 of this document. Program activities are administered by an Environmental Supervisor working in cooperation with an Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The goals of the Public Education and Outreach Program are as follows: 1. Change public behaviors to reduce sources of water pollution and improve water quality. 2. Promote participation in activities aimed at restoring water quality conditions. 4.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 2 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 2: BMP Summary Table for the Public Education and Outreach Program Public Education and Outreach(Permit Ref.Part II Section B;Part III Sections A,B,C,D;Part IV Sections B,F):Distributing educational materials to the community or conducting equivalent outreach activities about the impacts of storm water discharges on water bodies and the steps that the public can take to reduce pollutants in storm water runoff. BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work Plan BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# #3 Community Education and Outreach PE-10 Performing public a.Annual Report Annually Yes Yes PE-10 PE-2 CMS education and beginning July 1 AR#: 70672 PE-2 outreach activities. b.Annual Assessment Annually Yes Yes AR#: 76633 CPCC beginning July 1 c.Coordinate with City Annually Yes Yes PE-2 CMS and Co-Permittees, beginning July 1 AR#: 70684 Review and Update AR#: 76643 SOPs,Review and Update Target PE-2 CPCC Pollutants,Audiences, AR#: 70686 Residential/ AR#: 76644 Commercial Issues d.Develop,Update, Annually Yes Yes Attachment 5 Distribute,and Make beginning July 1 Attachment 6 Available Educational Attachment 7 6 Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services — Table 2: BMP Summary Table for the Public Education and Outreach Program Public Education and Outreach(Permit Ref.Part II Section B;Part III Sections A,B,C,D;Part IV Sections B,F):Distributing educational materials to the community or conducting equivalent outreach activities about the impacts of storm water discharges on water bodies and the steps that the public can take to reduce pollutants in storm water runoff. BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work Plan BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# Materials e.Develop and Send Annually Yes Yes Newsletters beginning July 1 _ f. Develop and Annually Yes Yes Implement Public beginning July 1 Education Media Campaign _ g.Develop and Conduct Annually Yes Yes Outreach for Schools beginning July 1 _ h.Develop and Conduct Annually Yes Yes Outreach for beginning July 1 Industrial/Commercial Sector #4 Evaluate the public Education and Outreach Program - PE-9 Evaluating the a.Annual Report Annually Yes Yes AR#: 70674 effectiveness of the beginning July 1 AR#: 76635 Education& b.Annual Assessment Annually Yes Yes Outreach Program. beginning July 1 Attachment 8 c.Discuss and Facilitate Annually Yes Yes Attachment 9 Work Plan Changes beginning July 1 d.Implement Annually Yes Yes Recommendations for beginning July 1 Improvement e.Review Public Annually Yes Yes Opinion Survey beginning July 1 7 / Charlotte-Mecklenburg d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Section 5: Public Involvement and Participation Program 5.1 Program Overview CMSWS has developed and implemented a Public Involvement and Participation Program for Mecklenburg County's Phase II jurisdictions/entities. The Program includes nine (9) separate BMPs and 42 Measurable Goals as described in Table 3 below. The Program also includes specific Measures of Success that are described in Section 11 of this document. Program activities are administered by an Environmental Supervisor working in cooperation with an Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The goal of the Public Involvement and Participation Program is to create opportunities for the public to participate in Phase II program development and implementation, as well as to get involved in activities aimed at protecting and restoring water quality conditions. 5.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 3 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 3: BMP Summary Table for the Public Involvement and Participation Program Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these SOPs and performing training is contained under the Phase I program element.) BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# #5 Phase II Public Meeting Pi-1 Providing and a.Annual Report Annually Yes Yes AR#: 72422 promoting public beginning July 1 AR#: 76662 involvement. b.Annual Assessment Annually Yes Yes beginning July 1 c.Conduct Meeting Annually Yes Yes with SWAC beginning July 1 d.Update and Annually Yes Yes Implement the beginning July 1 Storm Water Plan #6 Adopt-A-Stream PI-2 Implementing the a. Annual Report Annually Yes Yes AR#: 70692 Adopt-A-Stream beginning July 1 AR#: 76650 Program. b.Annual Assessment Annually Yes Yes beginning July 1 Attachment 2 8 , , / Charlotte-Mecklenburg d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services — — — Table 3: BMP Summary Table for the Public Involvement and Participation Program Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these SOPs and performing training is contained under the Phase I program element.) BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# c.Review and Revise Annually Yes Yes SOPs beginning July 1 d.Conduct Daily Annually Yes Yes Operations of beginning July 1 Program e.Update Volunteer Annually Yes Yes Database beginning July 1 f. Ensure Related Annually Yes Yes Water Quality beginning July 1 Problems Are Investigated #7 Storm Drain Marker PI-3 Implementing the a.Annual Report Annually Yes Yes AR#: 70673 Storm Drain Marker beginning July 1 AR#: 76634 Program. b.Annual Assessment Annually Yes Yes beginning July 1 Attachment 2 c.Review and Revise Annually Yes Yes SOPs beginning July 1 d.Conduct Daily Annually Yes Yes Operations of beginning July 1 Program e.Update Volunteer Annually Yes Yes Database beginning July 1 f. Update Storm Annually Yes Yes Drain Marking beginning July 1 Feature g.Ensure Related Annually Yes Yes Water Quality beginning July 1 Problems Are Investigated #8 Volunteer Big Spring Clean PE-I(4) Conducting Annual a.Annual Report Annually Yes Yes AR#: 70666 Cleanup Event(Big beginning July 1 AR#: 76628 Spring Clean). b.Annual Assessment Annually Yes Yes beginning July 1 Attachment 2 c.Plan and Conduct Annually Yes Yes Annual Stream beginning July 1 Cleanup #9 Volunteer Monitoring VM-CO Implementing a.Annual Report Annually Yes Yes AR#: 70693 volunteer monitoring beginning July 1 AR#: 76651 program that b.Annual Assessment Annually Yes Yes involves the beginning July 1 Attachment 2 monitoring of stream c.Review and Revise Annually Yes Yes and lake conditions SOPs beginning July 1 9 , , / Charlotte-Mecklenburg d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services — — — Table 3: BMP Summary Table for the Public Involvement and Participation Program Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these SOPs and performing training is contained under the Phase I program element.) BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# by volunteers. d.Conduct Daily Annually Yes Yes Operations of beginning July 1 Program e.Update Volunteer Annually Yes Yes Database beginning July 1 _ _ f.Ensure Related Annually Yes Yes Water Quality beginning July 1 Problems Are Investigated #10 Educate Media Campaign PE-I(13) Developing and a.Annual Report Annually Yes Yes AR#: 70668 implementing the beginning July 1 AR#: 76630 Public Involvement b.Annual Assessment Annually Yes Yes Media Campaign. beginning July 1 Attachment 10 c.Develop Public Annually Yes Yes Involvement beginning July 1 Volunteer Education Campaign d.Implement Public Annually Yes Yes Involvement beginning July 1 Volunteer Education Campaign #11 Volunteer Recognition PE-I(14) Performing activities a.Annual Report Annually Yes Yes AR#: 70691 to recognize and beginning July 1 AR#: 76649 promote volunteers. b.Annual Assessment Annually Yes Yes beginning July 1 Attachment 11 c.Plan Volunteer Annually Yes Yes Recognition Events beginning July 1 d.Implement Annually Yes Yes Volunteer beginning July 1 Recognition Events #12 Creek Week PE-I(16) Performing annual a.Annual Report Annually Yes Yes AR#: 70670 Creek Week Events. beginning July 1 AR#: 76631 b.Annual Assessment Annually Yes Yes beginning July 1 c.Plan Creek Week Annually Yes Yes Events beginning July 1 d.Implement Creek Annually Yes Yes Week Events beginning July 1 #13 Evaluate Public Involvement Program PI-6 Evaluating the a.Annual Report Annually Yes Yes AR#: 70675 effectiveness of the beginning July 1 AR#: 76636 10 , , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services — — — Table 3: BMP Summary Table for the Public Involvement and Participation Program Public Involvement&Participation(Permit Ref.Part II Section C;Part III Sections A,B,C,D;Part IV Sections B,F):Developing and implementing a program to provide opportunities for the public,including major economic and ethnic groups,to participate in efforts to protect and restore surface water quality. (Note: SOPs are the same for Phases I and II.Documentation for revising these SOPs and performing training is contained under the Phase I program element.) BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# Public Involvement b.Annual Assessment Annually Yes Yes &Participation beginning July 1 Attachment 12 Program. c.Discuss and Annually Yes Yes Facilitate Work beginning July 1 Plan Changes d.Implement Annually Yes Yes Recommendations beginning July 1 for Improvement 11 / , Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Section 6: Illicit Discharge Detection and Elimination Program 6.1 Program Overview CMSWS has developed, implemented, and enforced an Illicit Discharge Detection and Elimination(IDDE) Program in Mecklenburg County's Phase II jurisdictions/entities. The Program includes 10 separate BMPs and 54 Measurable Goals as described in Table 4 below. The Program also includes specific Measures of Success that are described in Section 11 of this document. Program activities are administered by an Environmental Supervisor working in cooperation with an Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The goal of the IDDE Program is to detect and eliminate illicit discharges into the MS4, which are defined in 40 CFR 123.26(b)(2) as discharges that are not composed entirely of storm water except discharges pursuant to a NPDES Permit(other than the NPDES Permit for discharges from the municipal separate storm sewer) and discharges resulting from fire-fighting activities as well as incidental non-storm water discharges or flows that are not significant contributors of pollutants. 6.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 4 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 4: BMP Summary Table for the IDDE Program Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F): Develop and implement a program to detect and eliminate illicit discharges to the MS4.(Note: The IDDE Manual and SOPs are the same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program element.) BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work Plan BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# #14 Storm Sewer System Maps ID-1 Maintaining a a.Annual Report Annually Yes Yes AR#: 72526 current map beginning July 1 AR#: 76753 showing major b.Annual Assessment Annually Yes Yes outfalls and beginning July 1 Attachment 2 receiving streams. c.Review and Revise Annually Yes Yes SOPs beginning July 1 d.GIS to Report Newly Annually Yes Yes Collected Storm beginning July Sewer System 1 Features 12 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /V,..Services Table 4: BMP Summary Table for the IDDE Program Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F): Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program element.) BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work Plan Measurable Goal(s) (Yes or No) & Code BMP Implementation Completed Compliant Attachment# #15 Screen for Non-Stormwater Flows ID-2 Maintaining a a.Annual Report Annually Yes Yes AR#: 70313 program for _ beginning July 1 AR#: 76747 conducting dry b.Annual Assessment Annually Yes Yes weather flow field beginning July 1 Attachment 2 observations in c.Review and Revise Annually Yes Yes accordance with SOPs beginning July 1 written d.Develop and Annually Yes Yes procedures. Implement QA/QC beginning July 1 Procedures e.Assess and Eliminate Annually Yes Yes Problems in Areas beginning July 1 with High Potential for Illicit Discharges #16 Maintain an IDDE Program ID-3 Maintaining a a.Annual Report Annually Yes Yes AR#: 70314 written IDDE beginning July 1 AR#: 76748 Program,adequate b.Annual Assessment Annually Yes Yes legal authorities, beginning July 1 and written c.Review and Revise Annually Yes Yes Attachment 2 procedures for SOPs beginning July 1 conducting d.Train CMSWS Staff Annually Yes Yes investigations of beginning July 1 Illicit discharges. e.Prepare and Issue Annually Yes Yes NOVs beginning July 1 #17 Water Quality Monitoring Program ID-4.1 Maintaining a a.Annual Report Annually Yes Yes ID-4.1 ID-4.3 monitoring beginning July 1 AR#: 73146 ID-4.4 program to assess b.Annual Assessment Annually Yes Yes AR#: 76789 ID-4.7-CO water quality beginning July 1 ID-4.10 conditions for c.Review and Revise Annually Yes Yes ID-4.3 IC-S(1.6) identification and SOPs beginning July 1 AR#: 70822 (CMANN) elimination of d.Conduct Monitoring Annually Yes Yes AR#: 77172 QA/QC illicit discharges Activities Conduct beginning July 1 and other Monitoring Activities ID-4.4 pollution sources. e.Review Data for Annually Yes Yes AR#: 72468 Exceedances beginning July 1 AR#: 78798 f. Conduct Follow-Up Annually Yes Yes Actions beginning July 1 ID-4.7-00 AR#: 70316 AR#: 76750 ID-4.10 AR#: 70267 AR#: 78667 13 / , y C,a,h e-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /V",-Services Table 4: BMP Summary Table for the IDDE Program Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F): Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program element.) BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work Plan Measurable Goal(s) (Yes or No) & Code BMP Implementation Completed Compliant Attachment# IC-S(1.6) AR#: 71856 AR#: 78686 Attachment 2 Attachment 13 Attachment 14 Attachment 15 #18 Pollution Prevention Education ID-5 Developing and a.Annual Report Annually Yes Yes AR#: 70680 implementing a beginning July 1 AR#: 76639 public outreach b.Annual Assessment Annually Yes Yes program to inform beginning July 1 Attachment 6 public employees, c.Ensure Messages Once during 5- Yes Yes businesses and the Inform Citizens year permit term general public of d.Review 311 Annually Yes Yes illicit discharges Keywords beginning July 1 and improper e.Conduct Annually Yes Yes waste disposal and Presentations beginning July 1 how they threaten Regarding Illicit the environment Discharges and as well as provide Improper Waste instructions Disposal concerning proper f. Ensure Co-permittees Annually Yes Yes reporting. and County beginning July 1 Departments are Trained #19 Follow up Inspections and Responding to Citizen Requests and Emergencies ID-6 Responding to a.Annual Report Annually Yes Yes AR#: 70315 citizen requests beginning July 1 AR#: 76749 for service and b.Annual Assessment Annually Yes Yes emergency beginning July 1 Attachment 2 situations as well c.Review and Revise Annually Yes Yes as conduct follow SOPs beginning July 1 up inspections as d.Maintain Roster for Annually Yes Yes necessary to Emergency Response beginning July 1 identify and Program eliminate e.Receive,Respond, Annually Yes Yes pollution and Investigate beginning July 1 problems. Citizen Requests for Service #20 Stream Walk/Outfall Inventory&Inspection/Dry Weather Flow Analysis ID-8 Inspecting creeks a.Annual Report Annually Yes Yes AR#: 72261 for the purpose of beginning July 1 AR#: 76673 identifying and b.Annual Assessment Annually Yes Yes eliminating illicit beginning July 1 Attachment 2 14 / , / C,a,h e-Mecklenburg / / I"" Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /V -Services Table 4: BMP Summary Table for the IDDE Program Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F): Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program element.) BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work Plan Measurable Goal(s) (Yes or No) & Code BMP Implementation Completed Compliant _ Attachment# discharges and c.Revise and Annually Yes Yes collecting outfall Implement Program beginning July 1 and stream Plan channel data as d.Review and Revise Annually Yes Yes well as conducting SOPs beginning July 1 dry weather flow e.Train CMSWS Staff Annually Yes Yes field observations beginning July 1 in accordance with f. Conduct Assessments, Annually Yes Yes written Inventory,Inspections, beginning July 1 procedures. and Monitoring g.Review Data for Annually Yes Yes Exceedances beginning July 1 h.Create Outfall Annually Yes Yes Inspections beginning July 1 #21 Illicit Discharge Elimination Program(IDEP) ID-9 Investigating a.Annual Report Annually Yes Yes AR#: 70525 select locations on beginning July 1 AR#: 76751 a regular, b.Annual Assessment Annually Yes Yes recurring schedule beginning July 1 Attachment 2 for the c.Review and Revise Annually Yes Yes identification and SOPs beginning July 1 elimination of d.Complete Lift Station Annually Yes Yes illicit discharges Inspections and Fecal beginning July 1 and other Coliform Sampling at pollution CMANN Locations problems. e.Field Validate Outfall Annually Yes Yes Data and Input beginning July 1 Additional Attributes f. Reinspect facilities Annually Yes Yes that have been issued beginning July 1 a penalty within the last 3 fiscal years #22 Used Oil Inspection ID-U Conducting a.Annual Report Annually Yes Yes AR#: 72894 inspections of beginning July 1 AR#: 76755 vehicle b.Annual Assessment Annually Yes Yes maintenance beginning July 1 Attachment 2 facilities to c.Review and Revise Annually Yes Yes prevent the SOPs beginning July 1 discharge of d.Complete,Prepare, Annually Yes Yes pollutants. and Submit beginning July 1 Inspection Reports e.Maintain Database Annually Yes Yes beginning July 1 15 / , / Charlotte-Mecklenburg 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /V,..Services — Table 4: BMP Summary Table for the IDDE Program Illicit Discharge Detection and Elimination(IDDE)(Permit Ref.Part II Section D;Part III Sections A,B,C,D;Part IV Sections B,F): Develop and implement a program to detect and eliminate illicit discharges to the MS4. (Note:The IDDE Manual and SOPs are the same for Phases I and II.Documentation for revising these documents and performing training is contained under the Phase I program element.) BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work Plan Measurable Goal(s) (Yes or No) & Code BMP Implementation Completed Compliant Attachment# #23 Evaluate Effectiveness of the IDDE Program ID-10 Evaluating the a. Annual Report Annually Yes Yes AR#: 72111 effectiveness of beginning July 1 AR#: 76754 the IDDE b. Annual Assessment Annually Yes Yes Program. beginning July 1 Attachment 16 c. Discuss and Facilitate Annually Yes Yes Attachment 17 Work Plan Changes beginning July 1 d. Implement Annually Yes Yes improvements in the beginning July 1 next fiscal year. 16 / , / Charlotte-Mecklenburg / / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services Section 7: Construction Site Storm Water Runoff Control Program 7.1 Program Overview Construction Site Runoff Control Programs have been developed and are currently being implemented for addressing the discharge of sediment and other pollutants from construction sites in Mecklenburg County 's Phase II jurisdictions that disturb one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973. These are delegated programs under NCGS 113A-60. The Program includes 3 separate BMPs and 12 Measurable Goals as described in Table 5 below. The Program also includes specific Measures of Success that are described in Section 11 of this document. Program activities are administered by an Environmental Supervisor working in cooperation with an Environmental Manager and multiple key staff with CMSWS's Permitting and Compliance Program. In November 2019, the Town of Huntersville received delegated authority from the State to administer a local erosion control program in their jurisdiction. The Town of Huntersville coordinates with the County in the completion of the activities associated with the Construction Site Erosion Control Program described in this Section. Kevin Fox, Public Works Director, serves as the responsible party for compliance with the Permit requirements for the Construction Site Storm Water Runoff Control Program in the Town of Huntersville. His contact information is as follows: 704-766-2320 and kfox@huntersville.org. 7.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 5 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 5: BMP Summary Table for the Construction Site Storm Water Control Program Construction Site Runoff Control Program(Permit Ref.Part II Section E;Part III Sections A,B,C,D;Part IV Sections B,F): Enforce erosion and sedimentation control ordinances by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973. BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# #24 Enforce Erosion Control Ordinances CS-1 Enforcing erosion a.Annual Report Annually Yes Yes AR#: 78771 and sedimentation beginning July 1 AR#: 78773 control ordinances. b.Annual Assessment Annually Yes Yes beginning July 1 Attachment 2 17 Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /V .-Services — Table 5: BMP Summary Table for the Construction Site Storm Water Control Program Construction Site Runoff Control Program(Permit Ref.Part II Section E;Part III Sections A,B,C,D;Part IV Sections B,F): Enforce erosion and sedimentation control ordinances by permitting and controlling development activities disturbing one or more acres of land surface and those activities less than one acre that are part of a larger common plan of development as authorized under the Sediment Pollution Control Act of 1973. BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# c.Review and Revise Annually Yes Yes SOPs beginning July 1 d.Conduct Inspections Annually Yes Yes beginning July 1 e.Prepare and issue Annually Yes Yes NOVs and Initiate beginning July Enforcement Actions 1 #25 _Erosion Control Education CS-2 Developing and a.Annual Report Annually Yes Yes AR#: 78774 implementing a beginning July AR#: 78776 program to educate 1 those engaging in b.Annual Assessment Annually Yes Yes Attachment 2 land disturbing beginning July activities regarding 1 the applicable c.Distribute Educational Annually Yes Yes erosion control Materials beginning July requirements and 1 regulations. d.Implement Charlotte- Annually Yes Yes Mecklenburg Certified beginning July Site Inspector 1 (CMCSI)Training #26 Evaluate Effectiveness of the Erosion Control Program CS-3 Evaluating the a.Annual Report Annually Yes Yes AR#: 78777 effectiveness of the beginning July AR#: 78778 Erosion Control 1 Program. b.Annual Assessment Annually Yes Yes Attachment 18 beginning July 1 c.Implement Annually Yes Yes Recommendations for beginning July Improvement 1 18 , , Charlotte-Mecklenburg/I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Section 8: Post-Construction Site Runoff Control Program 8.1 Program Overview A Post-Construction Site Runoff Control Program has been developed and is currently being implemented for addressing post-construction stormwater runoff from new development and redevelopment projects in Mecklenburg County's Phase II jurisdictions. The Program includes 4 separate BMPs and 17 Measurable Goals as described in Table 6 below. The Program also includes specific Measures of Success that are described in Section 11 of this document. Program activities are administered by an Environmental Supervisor working in cooperation with an Environmental Manager and multiple key staff with CMSWS's Water Quality Program. rams except for in the Town of Huntersville and its ETJ where effective July 1, 2020 Town staff are responsible for plan reviews and issuing land development Permits as well as conducting inspections to confirm project completion in compliance with Permit requirements. 8.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 6 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 6: BMP Summary Table for the Post-Construction Site Runoff Control Program Post-Construction Site Runoff Control Program(Permit Ref.Part II Section F;Part III Sections A,B,C,D;Part IV Sections B,F):Implement and enforce a program to address storm water runoff from new development and redevelopment projects,including public transportation maintained by the permittee,that disturb greater than or equal to one acre,including projects less than one acre that are part of a larger common plan of development or sale,that discharge into the small MS4. BMP# A B C D E & Annual Reporting Metric Activity Report# Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) & Plan Code Implementation Completed Compliant Attachment# #27 Implement Post-Construction Ordinances PC-1 Developing, a.Annual Report Annually Yes Yes AR#: 71873 implementing,and beginning July 1 AR#: 76657 enforcing ordinances b.Annual Assessment Annually Yes Yes that will minimize beginning July 1 negative water c.Ensure Effective Annually Yes Yes quality impacts to Implementation beginning July 1 surface waters from d.Provide Annually Yes Yes post-construction Interpretations of beginning July 1 discharges. Ordinance Requirements #28 Post-Construction Ordinance Inspections PC-2 Conducting site a.Annual Report Annually Yes Yes AR#: 78779 19 / , / Charlotte-Mecklenburg / / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /V�Services Table 6: BMP Summary Table for the Post-Construction Site Runoff Control Program Post-Construction Site Runoff Control Program(Permit Ref.Part II Section F;Part III Sections A,B,C,D;Part IV Sections B,F):Implement and enforce a program to address storm water runoff from new development and redevelopment projects,including public transportation maintained by the permittee,that disturb greater than or equal to one acre,including projects less than one acre that are part of a larger common plan of development or sale,that discharge into the small MS4. BMP# A B C D E & Annual Reporting Metric Activity Report# Work Description of BMP Measurable Goal(s) Schedule for (Yes or No) & Plan Code Implementation Completed Compliant Attachment# inspections of beginning July 1 AR#: 78780 stormwater controls b.Annual Assessment Annually Yes Yes installed for beginning July 1 Attachment 2 compliance with c.Update Manual Annually Yes Yes ordinance beginning July 1 requirements. d.Complete Inspections Annually Yes Yes beginning July 1 e.Complete Inspection Annually Yes Yes Reports. beginning July 1 #29 Post-Construction Ordinance Education PC-3 Implementing a a.Annual Report Annually Yes Yes AR#: 72429 program to educate beginning July 1 AR#: 76658 the development b.Annual Assessment Annually Yes Yes community regarding beginning July 1 _ Attachment 2 applicable post- c.Develop Post- Annually Yes Yes construction Construction beginning July 1 requirements and Ordinance Training regulations. d.Conduct Training Annually Yes Yes beginning July 1 #30 Evaluate Effectiveness of the Post-Construction Controls Program PC-5 Evaluating the a.Annual Report Annually Yes Yes AR#: 71901 effectiveness of the beginning July 1 AR#: 76659 Post-Construction b.Annual Assessment Annually Yes Yes Controls Program. beginning July 1 Attachment 19 c.Discuss and Facilitate Annually Yes Yes Attachment 20 Work Plan Changes beginning July 1 d.Implement Annually Yes Yes improvements in the beginning July 1 next fiscal year. 20 , , Charlotte-Mecklenburg/I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER �`Services Section 9: Pollution Prevention/Good Housekeeping for Municipal Operations 9.1 Program Overview CMSWS has developed and implemented a Pollution Prevention/Good Housekeeping Program for municipal facilities and operations. The Program includes four(4) separate BMPs and 20 Measurable Goals as described in Table 7 below. The Program also includes specific Measures of Success that are described in Section 11 of this document. Program activities are administered by an Environmental Supervisor working in cooperation with an Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The goal of the Pollution Prevention/Good Housekeeping Program is to reduce pollutants in storm water runoff from municipal operations. 9.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 7 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals) undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 7: BMP Summary Table for the Pollution Prevention/Good Housekeeping Program Pollution Prevention&Good Housekeeping(Permit Ref.Part II Section G;Part III Sections A,B,C,D;Part IV Sections B,F): Implement an operation and maintenance program that includes a training component and has the ultimate goal of preventing or reducing pollutant runoff from municipal operations.Provide employee training to prevent and reduce storm water pollution from activities such as park and open space maintenance,fleet and building maintenance,new construction and land disturbances,and storm water system maintenance. BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work BMP Measurable Goal(s) Implementation (Yes or No) & Plan Code Completed Compliant Attachment# #31 Employee Training PP-1 Implementing a a.Annual Report Annually Yes Yes PP-1 PP-1 CMS training program beginning July 1 AR#: 70681 PP-1 for employees b.Annual Assessment Annually Yes Yes AR#: 76640 CPCC involved in beginning July 1 implementing c.Develop Training Program Annually Yes Yes PP-1 CMS pollution beginning July 1 AR#: 70687 prevention and d.Provide Training Materials Annually Yes Yes AR#: 76645 good housekeeping to Towns and County beginning July 1 practices. PP-1 CPCC AR#: 70688 AR#: 76646 Attachment 2 21 / , i Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /--_,.Services Table 7: BMP Summary Table for the Pollution Prevention/Good Housekeeping Program Pollution Prevention&Good Housekeeping(Permit Ref.Part II Section G;Part III Sections A,B,C,D;Part IV Sections B,F): Implement an operation and maintenance program that includes a training component and has the ultimate goal of preventing or reducing pollutant runoff from municipal operations.Provide employee training to prevent and reduce storm water pollution from activities such as park and open space maintenance,fleet and building maintenance,new construction and land disturbances,and storm water system maintenance. _ BMP# A B C D E & Annual Reporting Metric Activity Report# Description of Schedule for Work BMP Measurable Goal(s) Implementation (Yes or No) & Plan Code Completed Compliant Attachment# #32 Inspections PP-2 Implementing a.Annual Report Annually Yes Yes PP-2 PP-2 CMS inspection program beginning July 1 AR#: 69443 PP-2 for municipal b.Annual Assessment Annually Yes Yes AR#: 76488 CPCC facilities. beginning July 1 c.Review and Revise SOPs Annually Yes Yes PP-2 CMS beginning July 1 AR#: 69441 d.Train CMSWS Staff Annually Yes Yes AR#: 76485 beginning July 1 _ e.Complete,Prepare,and Annually Yes Yes PP-2 CPCC Submit Inspection Reports beginning July 1 AR#: 69442 f. Develop O&M Plans Annually Yes Yes AR#: 76489 beginning July 1 Attachment 21 #33 Municipal Facility Inventory PP-5 Maintaining a a.Annual Report Annually Yes Yes AR#: 70255 current inventory beginning July 1 AR#: 76756 of co-permittee b.Annual Assessment Annually Yes Yes facilities and beginning July 1 operations with a c.Review and Revise SOPs Annually Yes Yes significant beginning July 1 potential for d.Update Municipal Annually Yes Yes generating Inventory beginning July 1 pollution. e.Notify Co-Permittees of Annually Yes Yes Changes beginning July 1 #34 Evaluate Effectiveness of the Pollution Prevention/Good Housekeeping Program PP-9 Evaluating the a.Annual Report Annually Yes Yes AR#: 70728 effectiveness of the beginning July 1 AR#: 76687 Pollution b.Annual Assessment Annually Yes Yes Prevention/Good beginning July 1 Attachment 22 Housekeeping c.Discuss and Facilitate Annually Yes Yes Program. Work Plan Changes beginning July 1 d.Evaluate Effectiveness of Annually Yes Yes O&M Plan beginning July 1 e.Implement Annually Yes Yes Recommendations for beginning July 1 Improvement 22 , , / Charlotte-Mecklenburg d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Section 10: Total Maximum Daily Loads (TMDLs) 10.1 Program Overview CMSWS has developed and implemented a program for addressing non-point source pollutant loading associated with the Total Maximum Daily Loads (TMDLs) approved by EPA for the receiving waters of the Phase II MS4 storm water discharges and/or waters downstream of these discharges. The Program includes three (3) separate BMPs and 21 Measurable Goals as described in Table 8 below. The Program also includes specific Measures of Success that are described in Section 11 of this document. Program activities are administered by an Environmental Manager and multiple key staff with CMSWS's Water Quality Program. The goal of the TMDL Program is to reduce non-point source pollutant loading to the receiving stream to the maximum extent practicable. 10.2 Status of the Implementation of the Storm Water Plan in FY2023 Table 8 describes in Column A the BMPs identified in the Storm Water Plan for Stormwater Management Program Administration. The specific actions (i.e., Measurable Goals)undertaken for implementation of these BMPs are described in Column B with the schedule provided in Column C. Column D includes the Annual Report Metrics, indicating whether the Measurable Goals were completed and whether compliance with the Storm Water Plan and Permit was achieved. Column E includes the Activity Report number from our Cityworks database that includes detailed documentation of completion of the BMPs and Measurable Goals as well as the Attachment#that contains data and information generated from the completion of the Measurable Goals. Table 8: BMP Summary Table for the TMDL Program Total Maximum Daily Load(TMDL)Program(Permit Ref. Section H;Part III Sections A,B,C,D;Part IV Sections B,F): Implement a program to reduce levels of the pollutant of concern in accordance with approved Waste Load Allocation(WLAs)assigned to stormwater in an approved TMDL. BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# #35 Evaluate Impaired Waters IW-1 Identifying those a.Annual Report Annually Yes Yes AR#: 71614 impaired waters with beginning July 1 AR#: 76655 an approved TMDL in b.Annual Assessment Annually Yes Yes Mecklenburg County beginning July 1 Attachment 26 that have a waste load c.Review TMDLs Approved Annually Yes Yes allocation assigned to by EPA beginning July 1 stormwater. d.Review Approved and Annually Yes Yes Draft Versions of N.C. beginning July 1 Integrated Report #36 Water Quality Recovery Plans for TMDLs IW-2 Developing and a.Annual Report Annually Yes Yes AR#: 70748 implementing Water beginning July 1 AR#: 76656 Quality Recovery b.Annual Assessment Annually Yes Yes Plans(WQRPs)for beginning July 1 Attachment 26 TMDL waters with a c.Evaluate Land Use and Annually Yes Yes 23 Charlotte-Mecklenburg / "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Table 8: BMP Summary Table for the TMDL Program Total Maximum Daily Load(TMDL)Program(Permit Ref. Section H;Part III Sections A,B,C,D;Part IV Sections B,F): Implement a program to reduce levels of the pollutant of concern in accordance with approved Waste Load Allocation(WLAs)assigned to stormwater in an approved TMDL. BMP# A B C D E & Schedule for Annual Reporting Metric Activity Report# Work Plan Description of BMP Measurable Goal(s) Implementation (Yes or No) & Code Completed Compliant Attachment# waste load allocation Development beginning July 1 assigned to d.Review BMPs or SCMs to Annually Yes Yes stormwater. Reduce Nonpoint Source beginning July 1 Pollution _ e.Determine Location of Annually Yes Yes Failed Septic Systems beginning July 1 _ f. Confirm Follow Up Annually Yes Yes Activities Are Conducted beginning July 1 g.Inspect Major Outfalls Annually Yes Yes beginning July 1 h.Conduct Follow Up Annually Yes Yes Activities beginning July 1 _ i. Analyze Monitoring Data Annually Yes Yes beginning July 1 j. Identify Additional Annually Yes Yes Measures to Achieve beginning July 1 TMDL WLA k.Implement Water Quality Annually Yes Yes Recovery Plans beginning July 1 1. Inspect Privately Owned Annually Yes Yes Lift Stations beginning July 1 m.Assess for Negative Water Annually Yes Yes Quality Impacts beginning July 1 #37 Assess Effectiveness of Water Quality Recovery Plans for TMDLs IW-4 Assessing the a.Annual Report Annually Yes Yes AR#: 71615 effectiveness of BMPs beginning July 1 AR#: 76663 at addressing TMDL b.Annual Assessment Annually Yes Yes waters. beginning July 1 Attachment 26 c.Discuss and Facilitate Annually Yes Yes Work Plan Changes beginning July 1 d.Implement improvements Annually Yes Yes in the next fiscal year. beginning July 1 24 / , Charlotte-Mecklenburg / 'STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services — Section 11: Assessment of Storm Water Plan and Overall Program Effectiveness During FY2023, the permittee has satisfactorily implemented the 37 BMPs and fulfilled the 190 Measurable Goals specified in Storm Water Plan developed and implemented for compliance with Permit No. NCS000395. The other provisions of the Permit have also been satisfactorily fulfilled; therefore, compliance with the Permit has been achieved. The permittee further finds that the implementation of the Storm Water Plan as well as the individual BMPs contained in the Plan has resulted in the satisfactory completion of seven (7) of the nine (9) or 78% of the identified Measures of Success as indicated in Attachment 23. This is a slight decrease from FY21 and FY22 when 87% completion was achieved. The implementation of the Work Plan enhancements described in Attachments 24 and 25 are meant to improve effectiveness at meeting these measures in FY2024 (see Section 12.2). 25 / , Charlotte-Mecklenburg / 'STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services Section 12: Program Enhancements Attachment 24 describes the status of the implementation of changes to the Work Plan in FY2023 resulting from the annual assessment completed for FY2022. Attachment 25 describes the changes planned for FY24 as a result of this year's annual assessment. The purpose of these changes is to improvement the effectiveness and efficiency of program activities for protecting and restoring surface water quality and complying with Permit requirements. 12.1 Status of Implementation of Work Plan Modifications for FY2023 For FY2023, a total of 27 Work Plan modifications were proposed. All but three (3) or 88% of these modifications were satisfactorily completed during FY2023 as described in Attachment 24. The three (3)not completed were due to a staff shortage in the Construction Site Runoff Control Program. 12.2 Work Plan Modifications Identified for Implementation in FY2024 For FY2024, a total of 22 Work Plan modifications are proposed for the purpose of improving the effectiveness and efficiency of Permit compliance activities. These modifications are described in Attachment 25, including the justification for the change,the desired result, assigned Work Plan program element, responsible staff, and schedule. The status of the implementation of these modifications will be described in the FY2024 annual report and assessment. 26 Cha6±4te-Mecklenburg / II STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services — Attachment 1: Data Countywide (FY22 and FY23) Indicates the data is used as a measure of success in the Stormwater Plan. # Question Responsible Staff Data Source FY22 FY23 1 Number of public events attended Ashley Smith One Drive City/County 15 16 shared public presentation spreadsheet 2 Number of presentations conducted Ashley Smith One Drive City/County 49 30 shared public presentation spreadsheet 3 Number and type of social media posts Ashley Smith Sprout Social Report 922 920 4 Results from resident survey Ashley Smith Resident Survey Report 400 501 5 Results from using mass media channels of Ashley Smith The Agency EOY Report 992,044 1,160,945 communication,including reach and frequency 6 %survey respondents indicating they are aware that Ashley Smith Resident Survey Report 81.5% 67.30% water flowing into storm drains goes directly to creeks and lakes 7 Extent of exposure for the media campaign Ashley Smith Media Campaign results 10,465, 19,798,16 127 8 8 Number of educational materials distributed to Ashley Smith One Drive City/County 1207 1,183 schools. shared school presentation spreadsheet 9 Number of schools that participate in municipal- Ashley Smith One Drive City/County 20 24 sponsored storm water workshops or activities. shared school presentation spreadsheet 10 Number of school presentations Ashley Smith One Drive City/County 103 120 shared school presentation spreadsheet 11 Number of students attending school presentations Ashley Smith One Drive City/County 2,239 3,222 shared school presentation spreadsheet 12 Number of workshops held for teachers. Ashley Smith One Drive City/County 0 1 shared Events and Presentations spreadsheet. 13 Number of certificates or other rewards given out to Ashley Smith Volunteer Appreciation 1 1 schools,classes,or students participating in storm water education. 14 Number of stormwater related displays at special Ashley Smith One Drive City/County 15 14 events or meetings. shared Events and Presentations spreadsheet. 15 Number of people at events who saw the display or Ashley Smith One Drive City/County 1773 2299 took a pamphlet/booklet. shared Events and Presentations spreadsheet 16 Number of signs and billboards with stormwater Ashley Smith Annual Advertising 2 5 related messages. Campaign Report 17 Number of stormwater related presentations at special Ashley Smith One Drive City/County 47 30 events or meetings. shared Events and Presentations spreadsheet 27 / , / C,a,h e-Mecklenburg / / I"" Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N.s.Services — — — Indicates the data is used as a measure of success in the Stormwater Plan. # Question Responsible Staff Data Source FY22 FY23 18 Number of educational materials that were distributed Ashley Smith One Drive City/County 5 41 to business owners and operators. shared Events and Presentations spreadsheet 19 Number of businesses trained under the stormwater Ashley Smith One Drive City/County 274 575 program. shared Events and Presentations spreadsheet 20 Number of"clean up after your pet" signs posted in Ashley Smith Scoop the Poop annual 1 0 parks and neighborhoods. report 21 Number of dog-walking designated areas in parks. Ashley Smith Parks and Recreation 7 7 Website 22 Number of posters/brochures put up in pet supply Ashley Smith NOT TRACKED NA NA stores. 23 Number of educational materials given out to pet Ashley Smith Cityworks 25 5 owners. 24 Number of items given out for promotional Ashley Smith One Drive City/County 1,068 1,365 giveaways. shared Events and Presentations spreadsheet 25 Number of events attended(to give out items). Ashley Smith One Drive City/County 15 16 shared Events and Presentations spreadsheet 26 Number of partnerships for promotions(radio,TV, Ashley Smith Annual Media Report 502 560 Businesses). 27 Number of educational materials distributed to Ashley Smith Cityworks 306 370 homeowners. 28 Number of partnerships established with businesses. Ashley Smith Volunteer Database 18 31 29 Number of brochures/posters created in non-English Ashley Smith Education Handouts folder 3 1 languages. in wqxfer 30 Number of educational materials distributed to low- Ashley Smith Cityworks 4 2 income neighborhoods. 31 Number of public service announcements made on Ashley Smith Annual Media Report 502 560 radio and TV. 32 Number of stormwater related press Ashley Smith Web Site Newsroom 29 22 releases/advertising. 33 Number of stormwater related articles published. Ashley Smith Articles in Newsroom 15 6 34 Number of partnerships established with local water Ashley Smith Regional STW Partnership 27 21 utilities. membership list 35 Number of water conservation or stormwater related Ashley Smith One Drive City/County 201,945 200,928 utility inserts that are distributed with utility bills shared UBI folder 36 Number volunteer programs conducted Taylor Mebane CMSWS Website 6 6 37 Number of volunteers participating in programs Taylor Mebane Volunteer Database 4,623 4,848 38 Number of public/stakeholder meetings held. Rusty Rozzelle SWAC meeting minutes 9 10 39 Number attending public meetings Rusty Rozzelle SWAC meeting minutes 183 172 28 / , / Cha6±4te-Meckienburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N...Services — — — Indicates the data is used as a measure of success in the Stormwater Plan. # Question Responsible Staff Data Source FY22 FY23 40 The quantity of trash and debris removed by Adopt-A- Angelica Volunteer Database 46.3415 40.574 Stream,Adopt-a-drain,Adopt-a-highway or Adopt-a- Moncada Tons Tons trail volunteers(in tons). 41 Number of completed surveys. Ashley Smith Resident Survey 530 501 42 Number of calls received by a hotline(s). Ashley Smith Cityworks 453 751 43 Number of problems/incidents remedied as a result of Ashley Smith Cityworks 453 751 hotline calls. 44 Number of volunteer tree planters. Ken Friday Volunteer Database and 150 135 annual report 45 Number of volunteer tree planting events Ken Friday Volunteer Database and 3 2 annual report 46 Number of trees planted. Ken Friday Volunteer Database and 450 395 annual report 47 Number of acres planted with trees. Ken Friday Trees Annual Report 1.6 1.39 48 Number of actions taken as a result of stakeholder Rusty Rozzelle SWAC meeting minutes 28 10 meetings. 49 The percent of drains marked Ashley Smith Volunteer Database 25% 22% 50 Number of storm drain marking volunteers Ashley Smith Volunteer Database 217 332 51 Number of storm drain marking volunteer hours Ashley Smith Volunteer Database 406 518 52 Number of drains marked. Ashley Smith Volunteer Database 1,415 2,137 53 Number of illicit discharges and/or connections Ashley Smith Volunteer Database 2 4 detected from storm drain marking 54 Number of Adopt A Stream groups participating Angelica ' Volunteer Database 179 224 Moncada _ 55 Number of Adopt A Stream cleanups conducted Angelica Volunteer Database 208 223 Moncada 56 Number of Adopt A Stream volunteers Angelica Volunteer Database 3,128 3,027 Moncada 57 Number of Adopt A Stream volunteer hours Angelica Volunteer Database 6885 6520 Moncada 58 The quantity of waste collected as a result of Adopt A Angelica Volunteer Database 46.3275 40.509 Stream cleanup efforts(in tons). Moncada& Tons Tons Taylor Mebane 59 Number of Adopt A Stream miles cleaned Angelica Volunteer Database 184.6 191.4 Moncada 60 Number of illicit discharges and/or connections Angelica Volunteer Database 2 7 detected from Adopt A Stream activities Moncada 61 Number of Big Spring Clean groups participating Taylor Mebane Not tracked NA NA 62 Number of Big Spring Clean cleanups conducted Taylor Mebane Volunteer Database 7 7 63 Number of Big Spring Clean volunteers Taylor Mebane Volunteer Database 313 213 64 Number of Big Spring Clean volunteer hours Taylor Mebane Volunteer Database 939 639 65 The quantity of waste collected as a result of Big Taylor Mebane Volunteer Database 5.46 3.305 Spring Clean efforts(in tons). Tons Tons 66 Number of Big Spring Clean miles cleaned Taylor Mebane Volunteer Database 12.04 6.84 29 / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N .Services — — Indicates the data is used as a measure of success in the Stormwater Plan. # Question Responsible Staff Data Source FY22 FY23 67 Number of illicit discharges and/or connections Taylor Mebane Volunteer Database 0 0 detected from Big Spring Clean activities 68 Number of promotional items given away during Big Taylor Mebane Volunteer Database Not 100 Spring Clean tracked 69 Number of volunteers participating in monitoring Angelica Volunteer Database 716 959 programs. Moncada 70 The frequency of monitoring in the watershed(D- Angelica VM Annual Report B B Daily,W-Weekly,B-Bimonthly,M-Monthly,Q- Moncada Quarterly 71 Number of volunteer monitoring sites Angelica Volunteer Database 26 18 Moncada 72 Number of volunteers trained in volunteer monitoring Angelica VM Annual Report 80 55 Moncada 73 Number of illicit discharges and/or connections Angelica VM Annual Report 19 12 detected as a result of the monitoring data collected by Moncada volunteers. 74 Number volunteer samples collected Angelica Volunteer Database 51 91 Moncada _ 75 Number of volunteer monitoring hours Angelica VM Annual Report 1262.25 1286 Moncada _ 76 Number of inlets and outlets identified Ryan Spidel GIS layers Inlets: Inlets:47, 33, Outlets: Outlets: 108 137 77 Number of water quality monitoring activities Robert Sowah EDMS/WQ 0 5 performed 78 Number of exceedances identified from water quality Robert Sowah EDMS/WQ 0 0 monitoring activities performed 79 Number of field screenings completed for non- John Thao Cityworks 0 4 stormwater flows 80 Number of illicit discharges detected and eliminated John Thao Cityworks 53 149 81 Ratio of average number of notices of violation issued John Thao Cityworks 12.37% 12.56% over the past 3 years to the average number of IDDE inspections conducted. 82 Percentage of number of notices of violation issued to John Thao Cityworks 15.17% 31.41% repeat violators averaged over the past 3 years. 83 Number of outfalls. Ryan Spidel GIS layers 8,849 8,957 84 Number of Major Outfalls Ryan Spidel GIS layers 452 670 85 Number of Industrial Outfalls Ryan Spidel GIS layers 11 342 86 Number of Inlets Ryan Spidel GIS layers 53,377 53,424 87 Number of structural BMPs Corey Priddy Cityworks 1,226 1,575 88 Percent of outfall mapping complete. Ryan Spidel GIS layers 100% 100% 89 Number of sites prioritized for inspection. John Thao IDEP 21 13 30 / , / Cha6±4te-Meckienburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N...Services — — — Indicates the data is used as a measure of success in the Stormwater Plan. # Question Responsible Staff Data Source FY22 FY23 _ 90 Number of illicit connections reported by citizens. John Thao Cityworks 0 0 91 Number of illicit connections found. John Thao Cityworks 0 0 92 Number of illicit connections repaired/replaced. John Thao Cityworks 0 0 93 Number of illicit connection referrals. John Thao 0 0 94 Number of illegal dumps reported by citizens. John Thao Cityworks 52 53 95 Number of penalties enforced upon the participants of John Thao Cityworks 1 2 illegal dumps. 96 Number of illegal dump or sit-out clean-ups John Thao Cityworks 52 53 completed. 97 Number of dry weather tests/inspections completed John Thao Industrial inspections-#of 2 19 for industry or business. outfalls checked during inspections(Cityworks) 98 Number of high-risk connections prioritized for John Thao IDEP 0 0 industry or business. 99 Number of illicit connections reported by employees John Thao Cityworks 0 0 or businesses for industry or business. 100 Number of illicit connections found for industry or John Thao Cityworks 0 0 business. 101 Number of illicit connections repaired/replaced for John Thao Cityworks 0 0 industry or business. 102 Number of citizen complaints made reporting illegal John Thao Cityworks 85 74 action. 103 Number of SSOs reported. John Thao 19 22 104 Number of overflow causes that were identified during John Thao Cityworks 0 0 inspections. 105 Number of outfall inspections John Thao Cityworks 133 177 106 Number of problems corrected as a result of outfall John Thao Cityworks 0 4 inspections 107 Number of dry weather monitoring activities John Thao Annual reports-Outfall 0 1 performed. inspections and streamwalks 108 Number of problems corrected as a result of dry John Thao Annual reports-Outfall 0 1 weather monitoring activities inspections and streamwalks 109 Number of new projects permitted Corey Priddy Excela 215 185 110 Number of acres disturbed Corey Priddy Excela 1,656.5 2,576.82 4 111 Number of erosion control inspections conducted Corey Priddy Cityworks 1549 1,433 112 Number of notices of violation issued Corey Priddy Cityworks 17 15 113 Number of penalties assessed Corey Priddy Cityworks 4 4 114 Number of CMCSI attendees Corey Priddy CMCSI Database 312 228 115 Ratio of number of notices of violation issued to Corey Priddy Cityworks 1.097% 1.05% number of erosion control inspections conducted. 31 / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services — — — - Indicates the data is used as a measure of success in the Stormwater Plan. # Question Responsible Staff Data Source FY22 FY23 I _ 116 Number of new projects permitted Corey Priddy Excela 215 185 117 Number of acres disturbed Corey Priddy Excela 1,656.5 2,576.82 4 118 Number of structural BMP inspections conducted Corey Priddy Cityworks 763 763 119 Number of notices of violation issued Corey Priddy Cityworks 6 26 120 Number of penalties assessed Corey Priddy Cityworks 0 0 121 Number of educational activities/brochures distributed Corey Priddy CMCSI Database 5 7 122 Ratio of number of deficiencies detected compared to Corey Priddy Cityworks 34.08% 37.48% number of BMP inspections conducted 123 Number of employees trained Ken Friday 1 Cityworks 1,379 1,314 124 Number of pounds of material removed from cleaning Julianna Hawley Data currently collected 1,214,2 1,542,200 streets and parking lots annually through year end 76 questionnaire to Towns 125 Number of pounds of material removed from inlet, Julianna Hawley Data currently collected 695,000 531,400 outlet and pipe cleaning annually through year end questionnaire to Towns 126 Number educational activities completed/brochures Ken Friday Phase I and Phase II Data 62 49 distributed 127 Ratio of number of deficiencies observed at municipal Julianna Hawley EDMS/Cityworks 7.69% 10.34% facilities to number of inspections conducted 128 Number of municipal inspections conducted. Julianna Hawley EDMS/Cityworks 52 58 129 Number of employees trained in preventing pollution Ken Friday MH-T and PP-1 annual 1,379 1,314 from automobile maintenance activities. reports 130 Number of educational materials distributed at Ken Friday Cityworks 0 0 garages,auto shops,and other automobile-related businesses. 131 Number of employees trained in hazardous material Ken Friday MH-T and PP-1 annual 1,3 79 1,314 storage and maintenance. reports 132 Number of educational materials distributed. Ken Friday Cityworks 432 739 133 Number of reports of illegal dumping received. John Thao City Works-Incident Type 52 53 =discharge/dump in General Inspection template 134 Number of IDEP inspection to eliminate illicit John Thao Cityworks 21 19 discharges 135 Number of NOVs issued in response to IDEP John Thao NOVs and enforcements 3 4 inspections are tracked in CityWorks 136 Number of landscape/garden stores participating in Ashley Smith NOT TRACKED but NA NA education programs. would fall under PE-I(7) and ID-5 Annual Reports 137 Number of residents trained by the permittee in safe Ashley Smith NOT TRACKED but NA NA landscaping,lawn care,and pest management would fall under PE-I(7) techniques. and ID-5 Annual Reports 138 Number of classes/seminars offered by the permittee Ashley Smith NOT TRACKED but NA NA in landscaping and lawn care. would fall under PE-I(7) and ID-5 Annual Reports 32 Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services — — — Indicates the data is used as a measure of success in the Stormwater Plan. # Question Responsible Staff Data Source FY22 FY23 139 Number of municipal employees trained in integrated Ken Friday MH-T and PP-1 annual 348 322 pest management. reports 140 Number of parking lots cleaned. Julianna Hawley Data currently collected 20 15 annually through year end questionnaire to Towns 141 Number of road cleanings/streets swept. Julianna Hawley Data currently collected 1003 2938 annually through year end streets streets+ questionnaire to Towns +421 124 miles miles 142 Number of dog parks. Ashley Smith Parks and Recreation 7 7 Website 143 Number of"pooper-scooper"stations installed Ashley Smith Not currently tracked NA NA 144 Number of pooper educational materials distributed. Ashley Smith Cityworks 25 15 145 Number of road salt storage facilities included in a Julianna Hawley Data currently collected 6 6 regular inspection and maintenance program. annually through year end questionnaire to Towns 146 Number of employees trained in road salt application. Julianna Hawley Data currently collected 348 6 annually through year end questionnaire to Towns 147 Number pounds of salt applied to roadways. Julianna Hawley Data currently collected 790,000 0 annually through year end questionnaire to Towns 148 Quantity of alternative deicing products used(in tons). Julianna Hawley Data currently collected 29,500 0 annually through year end gallons questionnaire to Towns brine, 25 tons of sand 149 Number of personnel trained in spill response. Ken Friday MH-T and PP-1 annual 1,379 1,314 reports 150 The number of high-risk facilities inspected Julianna Hawley Cityworks NA 0 (inspections to determine facilities to include in inventory). 151 Number of educational materials distributed to Ken Friday Cityworks 0 0 municipal employees. 152 Number of storm drain outfalls cleaned regularly. Julianna Hawley Data currently collected 193 163 annually through year end questionnaire to Towns 153 Number of storm drains cleaned regularly. Julianna Hawley Data currently collected 59,751 61,412 annually through year end questionnaire to Towns 154 Amount of trash,sediment,and other pollutants Julianna Hawley Data currently collected 955 1037 removed during cleaning(in tons). annually through year end questionnaire to Towns 33 / , / Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services w Attachment 2: Data by Jurisdiction School Presentations v oP-n .0 a�i �' —5 c' .) x c Date 10/26/2022 1/5/2023 4/24/2023 5/4/2023 4/17/2023 N/A N/A ..2 Number Attending 20 23 18 _ 40 38 N/A N/A G Date 10/26/2022 1/5/2023 4/24/2023 _ 5/4/2023 4/17/2023 N/A N/A Number Attending 20 22 18 38 41 N/A N/A g Date 10/26/2022 1/5/2023 4/24/2023 5/4/2023 4/17/2023 N/A N/A °o Number Attending 21 21 19 42 32 N/A N/A _ co Date 10/26/2022 1/5/2023 4/24/2023 4/21/2023 N/A N/A c Number Attending 19 23 20 40 N/A N/A W Date 10/26/2022 1/5/2023 4/27/2023 4/21/2023 N/A N/A ?' Number Attending 22 23 18 42 N/A N/A _ Q Date 10/26/2022 1/5/2023 4/27/2023 4/21/2023 N/A N/A Number Attending 18 22 16 43 N/A N/A _ Date 1/5/2023 4/27/2023 N/A N/A _ Number Attending 21 20 N/A N/A Date 1/5/2023 N/A N/A _ Number Attending 24 _ N/A N/A Total 6 0 8 7 0 3 c 29 Presentations Conducted cu 0 A 1 x A V F x Presentation Title/Topic Predictions of Waters of 'rN/A N/A 8 Fecal Pollution Huntersville i in Charlotte- ! Mecklenburg SISurface Waters u Date 11/4/2022 8/27/2022 N/A N/A 2 Group Name North Carolina Town of N/A N/A Lake Huntersville o Management Staff e• Society Q Number of Participants 50 25 N/A N/A Presentation Title/Topic Air Quality N/A N/A Teacher Workshop Date 3/27/2023 N/A N/A Group Name K-12 Teachers N/A N/A Number of Participants 17 N/A N/A Total 1 0 2 0 0 0 0 3 34 , , / Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services Events Attended .°..' 304 $ 5 e h Name of Event All American Water Week Matthew Mint Hill N/A N/A Dog Show Celebration Earth Day Middle School Career Day Date 10/9/2022 5/6/2023 4/15/2023 4/6/2023 N/A N/A Nmmber of Attendees 85 100 7/18/1900 100 N/A N/A Materials Displayed CMSWS table CMSWS table CMSWS CMSWS table N/A N/A set up,prize set up,plinko table set set up,Day in wheel up,plinko the Life of a Water Quality Video _ u Give-a-ways Used Pet waste Sunscreen,pens,Hand Hand N/A N/A holders,hand Stouny activity sanitizer, sanitizer, sanitizer booklet, straws, straws, o flashlights, sunscreen, sunscreen, ilt e. whistles magnifying magnifying ✓ glasses, glasses, stickers, stickers, keychains, keychains Stonrry coloring books Name of Event Cornelius N/A N/A Elementary School Career Day Date 5/10/2023 N/A N/A Number of Attendees 299 N/A N/A Materials Displayed CMSWS table N/A N/A set up Give-a-ways Used None N/A N/A Total 2 I 1 1 0 1 0 Adopt-A-Stream Activities 5 s x i m u o x 6 H Q uq x 5 a 1 Miles Adopted 0.7 5.6 10 4.8 332 0 1.1 N/A N/A 55.4 4 Volunteer Groups 1 5 7 5 2 1 3 N/A N/A 24 '1' Volunteers 5 39 118 75 189 0 25 N/A N/A 451 g. Volunteer Hours 5 112 290 165 412 0 50 N/A N/A 1034 R Pounds of trash Removed 30 250 1054 950 5305 0 1100 N/A N/A 8689 Problems Reported 0 0 1 0 0 0 0 1 CO Storm Drain Marking Activities g u o .N B a > 0U v74 r* U A U E. 5 Events 2 3 1 5 0 1 2 N/A N/A 14 to Volunteers 2 6 2 12 0 31 15 N/A _N/A 68 2 Volunteer Hours 2 9 2 15 0 93 15 N/A N/A 136 a Markers Applied 24 65 22 50 0 214 88 N/A N/A 463 4 Problems Reported 0 0 0 0 0 0 0 — Big Spring Clean Activities a 5' c s V 4 E a cy x _ v E. w a Pi ; g C Fs"o 59 is Miles Cleaned 0 0.3 2 1 0 0 0 N/A N/A 3.3 Volunteers 0 25 18 35 0 0 0 N/A N/A 78 " Volunteer Hom's 0 75 54 105 0 0 0 N/A N/A 234 e, Pounds of Trash Removed 0 200 390 745 0 0 0 N/A N/A 1335 V Problems Reported 0 0 0 0 0 0 0 0 35 , , / Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N .Services Volunteer Monitoring Activities in FY2023 t on o of, 1 1 ❑ - H o A tG W .1F AI Volunteer Groups 0 0 3 1 3 0 _ N/A N/A 9 Volunteers 6 2 36 21 77 1 2.5 N/A N/A 168 Volunteer Hours 1.5 1.25 76 17.25 90.5 0.':' 11 N/A N/A 200.75 Visual Assessments 0 1 0 0 0 0 0 N/A N/A 1 R Streamside Snapshots 6 1 0 5 0 1 0 N/A N/A 13 Chemical Assessments 0 0 3 1 10 0 N/A N/A 17 Problems Reported 0 0 2 0 1 0 0 3 Stormwater Inventory o co v o> c d a _ U 3'� A > y U CIn C _ a U E.L l rs x y Inlets 6,271 3,172 13,446 6,229 10,461 4,360 3,685 5.157 343 53,424 ,' Outlets 898 443 1,922 848 2,161 1,145 623 845 8,957 Q Major Outlets(>36") 41 59 190 51 170 79 44 32 1 670 `1 Industrial Outletstk 44 0 29 62 109 25 73 0 0 342 Total 7,254 3,674 15,587 7,190 12,901 5,609 4,425 6,334 419 63,393 Screening for Non-Stormwater Flows o so o v o e L _ og c v N, z L' C U H 4 U La ? ' fti Outfalls Inspected 14 49 14 15 _. 40 20 0 0 177 41 Problem Detected 1 0 1 0 I 0 1 0 0 4 Problem Corrected 1 0 1 0 I 0 1 0 0 4 N Total 16 49 16 15 27 40 22 0 A 185 Q Field Screening Activities Fecal Coliform Physical Physical Physical 4 "' Sampling! Inspection Inspection Inspection Physical Inspection Service Request No. 195662 178283 179760 1'?2.916 a. Service Requests,Emergency Response,and Notices of Violations g ai 44 o a G .:73v °' a `�+ •5 U `� W 4 E U A x 5 g1 . P4 a SR 17 4 25 30 49 17 7 N/A N/A 149 ' ER 6 2 3 3 3 4 9 N/A N/A 30 d NOVs Issued 1 1 8 6 10 3 2 N/A N/A 31 '9 o 'NOVs Resolved 0 1 8 6 7 3 2 N/A N/A 27 C,v a Problems Detected 8 2 15 13 27 10 6 N/A N/A 81 -. °' Problems Corrected 8 2 15 13 22 10 6 N/A N/A 76 4tS Total 40 12 74 71 118 47 32 394 Pollution Sources o .ri oo 1 € 3 R v ti) E 'u - m AU., o E. Accidental 3 0 2 3 5 _ 2 N/A N!A 17 S o, Algae 0 1 0 0 _ 0 0 N/A N/A 3 PT-' a Aquatic Life/Fish Kill 0 0 0 0 1 0 N/A N/A 1 '9 Q Buffer 1 0 0 2 i 1 0 N/A N/A S p m C.11 Discharge/dump 4 1 12 10 1'1 8 3 N/A N/A 53 o' G Erosion/sediment 1 0 1 0 1 0 N/A N/A 5 •'oo Monitoring Follow-up 0 0 0 0 2 0 0 N/A N/A 2 • :a Natural Condition 3 1 4 2 4 0 0 N/A N/A 14 'GGO 5 No Incident Identified 5 1 5 10 12 -I 2 N/A N/A 39 C. li Other 0 0 1 2 3 0 0 N/A N/A 6 'o at Unlatown 0 0 0 1 0 0 0 N/A N/A 1 Total 17 4 25 30 49 17 149 36 / , / Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N .Services Materials Discharged E I t C_ H � ,5 • o . Allowable Discharge 1 0 1 3 0 0 0 N/A N/A .-. v P-4' Buffer 1 0 0 2 4 1 0 N/A N/A s c W Cooking Oil/Grease 0 0 2 1 1 0 2 N/A N/A o a 0 Motor Oil 1 0 1 0 2 0 0 N/A N/A 4 m None 7 3 7 10 17 5 2 N/A N/A 51 o Other 0 0 3 0 4 1 1 N/A N/A 9 w ag Paint 0 0 1 1 0 2 0 N/A N/A 4 sQ g Petroleum Fuels 0 0 2 3 5 1 1 N/A N/A 12 .2 . Sediment 1 0 2 1 3 1 0 N/A N/A S a 'i"j Sewage-CMU 0 0 0 2 1 0 0 N/A N/A 3 b a Sewage-Private _ 0 0 2 6 0 0 N/A N/A 10 n .,Fa (commercial) _ _ C 2 Sewage-Private _ 1 2 0 0 0 0 N/A N/A 1 (residential) „`n, a Sewage-Septic 0 0 1 1 1 1 0 N/A N/A 4 Trash 0 0 0 1 0 0 0 N/A N/A 1 Unknown 1 0 0 1 3 0 1 N/A N/A ii Wash Water 0 0 .. 1 1 2 0 Yard Waste 1 0 1 1 1 3 0 N/A N/A Total 1? 4 25 30 49 17 7 149 Biological Macroinvertebrate and Habitat Assessment Monitoring •, U A x " a V Stream W.Br. McDowell Foumsile Clarke Creek Goose Creek Little Sugar Creek N/A N/A Rocky River Creek Creek MY10 MC49A Site MY1B MC2 MC40C 8/18/22 MY9 7/27/22 Date 8/25/22 7/13/22 7/27/22 9 7/27/22 10 EPT Taxa Ridmess 12 8 8 24 11 30 Total Taxa Richness 43 40 28 6.70 43 7.07 Oh NCBI 7.03 6.66 6.62 FAIR 6.56 FAIR _ Bioclassification FAIR FAIR FAIR FAIR $ Stream McDowell Duck Creek Sugar Creek N/A N/A _ Creek Site MC2A1 MY14 MC27 r Date 8/18/22 7/28/22 7/27/22 M EPT Taxa Richness 12 11 11 Q Total Taxa Riclmess 360 36 25 II NCBI 6.59 5.79 6.45 x Biodassification FAIR GOOD-FAIR FAIR t 0 Stream McDowell Clear Creek til Creek � Site MC4 MY8 > Date 7/12/22 7/28/22 's EPT Taxa Ricimess 14 14 m Total Taxa Richness 48 37 NCBI 6.04 5.65 v Biodassification GOOD-FAIR GOOD-FAIR 6 jfq" Stream Torrence Creek McKee Creek NiA N A r%, MY7B A' Site MC3E 8/03/22 Q Date 8/31/22 8 t' EPT Taxa Richness 11 24 Total Taxa Richness 38 6.41 NCBI 6.45 FAIR Biodassification _ FAIR _ Stream Gar Creek Reedy Creek NrA N%A Site MC50 MY13 Date 7/12/22 8/03/22 EPT Taxa Richness 16 11 Total Taxa Richness 50 31 NCBI 5.68 6.31 Biodassification GOOD-FAIR FAIR Total 1 Site 5 Sites 1 Site 5 Sites 1 Site 2 Sites 15 Sites 37 , , / Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N ..Services — _ Biological Fish and Habitat Assessment Monitoring t. $ 5 3 a 0 - w o U a x a c� co Stream McDowell N/A N/A Creek 1 Site MC4 Date 7/10/23 wNumber of Species 13 e Number of Fish 237 e NCIBI 34 Q Biodassifrcation POOR Stream Gar Creek N/A N/A Site MC50 Date 5/2/23 Number of Species 9 Number of Fish 148 NCIBI 36 Biodassirrcation FAIR Total 2 sites I 2 sites Observations mid Exceedances of NC State Standards per Parameter per Site and Number of Problems Detected v eb 1y 1 c u P. ca x West Branch McDowell Four Mile Clear Creek ' N/A N A Stream Rocky River Creek Creek MY1B Site 2,839;395 MCA MC4OD MY8 Turbidity:#Obs;# 6,644;1,196 5,264;602 3,218;316 Exceedances 2,806;0 Dissolved 02:#Obs;# 8,212;0 4,889;15 2,323;0 Exceedances 4,029:0 pH:#Obs;#Exceedances 8,543;0 5,794;0 3,210;1 Specific Conductance:# 3,891 Obs 8,202 5,804 3,378 Temperature:#Obs;# 4,029;0 Exceedances 8,640;0 6,332;0 3,380;0 #of Problems Detected 0 k 0 0 0 iStream Gar Creek Goose Creek N/A N:A 1 Site MC50 MY9 Turbidity:#Obs:# 7,418;359 29,888;1457 Aq Exceedances 8 Dissolved 02:#Obs:# 7,574;24 22,307;5 Q Exceedances e pH:#Obs;#Exceedances 8,058;27 31,205;0 QSpecific Conductance:# Obs 7,760 33,361 ✓ Temperature:#Obs;# Exceedances 8,722;0 33,922;0 #of Problems Detected 0 0 Stream Clarke Creek Site MY10 Turbidity:#Obs;# 5,921;1985 Exceedances Dissolved 02:#Obs;# 6,014;2 Exceedances pH:#Ohs;#Exceedances 7,774;0 Specific Conductance: Obs 7,399 Temperature:#Obs: Exceedances 8,032;0 #of Problems Detected 0 Total Sites 1 Site 3 Sites 1 Site 2 Sites 7 Sites Total Observations 17,594 114,913 28,083 166,192 326,782 Total Exceedances 395 3.593 617 1.779 6384 Total Problems Detected 0 0 0 0 0 38 , , / Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N.Services Stream Walk Activities and Problems Louged in ARCGIS J.y oA 3d a U H x A Stream Name(s) Ramsey Creek, South Prong Gar Creek& N/A WBRRTrib., Goose Creek Sugar Creek& N/A N/A N'A Hager Creek, WERR& Tribs.,Dixon South Prong &Tribs. Tubs.,McCullugh Gambles Creek, Trib.,WBRR Branch,and WBRR& Branch,Little South Prong Trib.,& other UTs Trib.,Six Sugar Creek& WERR Trib.,& other UTs Mile Creek, Tribs. other UTs Goose Creek, Gar Creek, Coffey Creek, &other UTs •g Stream Miles Walked 4.12 11.71 9.5 0 27.13 8.26 9.91 N/A N/A 70.63 I b C C New Outfalls 3 23 0 0 8 0 4 N/A N/A 38 c Existing Outfall Inspected 10 26 1 0 5 14 12 N/A N/A 68 Dry Weather Flows 2 12 0 0 3 0 _ N/A N/A 22 Observed Samples Collected 0 0 0 0 0 0 0 N/A N/A 0 Problems Detected and 0 2 0 0 0 0 1 N/A N/A 3 Corrected Buffer Violations 0 1 0 0 1 0 0 N/A N/A 2 Channel Problems Beaver Dams 0 Stream 0 Beaver Dams Beaver Dams Severe Bank N/A N/A 42 (2),Stream Blockages(4) (7),Severe (6),Severe Erosion(1)& Blockage(1) Bank Erosion Bank Erosion Stream Blockages (1),&Stream (1),&Stream (5) Blockages Blockages(3) (11) Total Features 18 64 5 0 36 24 28 175 Inventoried in ArcGIS IDEP Activities-Watershed Basin Inspections n744 a s 3 S 0' .22 .7:ffi v u C cj U LaMI • fsr 4.1 initial inspection Date 3/29/2023 3/29/2023 3/29/2023 4/10/2023 5/18/2023 3/30/2023 3/29/2023 N/A N/A 8 Completion Date _ 3/29/2023 3/29/2023 3/29/2023 4/10/2023 5/18/2023 4/3/2023 3/29/2023 N/A N/A _ c Activity ReportNo(s.) 75002 75002 75003 75170 75980 75028/75063 75011 N/A N/A SR Generated Based on 1 1 1 1 N/A N/A 4 B Inspection v — I SR No. 186738 188501 194054 186896 N/A N/A NOV Issued 1 0 1 1 3 G T.3' Initial Inspection Date 3/30/2023 N/A N/A p Completion Date 3/30/2023 N/A N/A Q, Activity Report No(s.) 75014 _ N/A N/A Q SR Generated Based on 1 N/A N/A 1 Inspection _ V SR No. 186-38 N/A N/A NOV Issued 1 N/A N/A 1 Total 0 1 2 1 1 1 1 N/A N/A 9 39 , , / Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N ..Services Used Oil Inspections f.r in o = .:S U `z E. wFacility Name Valvoline Speedee Oil O Change 1 Problem Detected _ 0 0 0 Problem Corrected 0 0 0 c� Status Satisfactory Satisfactory 2 Total 0 0 0 Field Screening Activities Physical Physical 2 N 4 Inspection Inspection Activity Number 75665 75815 Summary of Erosion Control Inspections al ' G m a A a v 't�•j c� W 11 8 A F . 63 ,i ,. Inspections 48 43 109 166 21 286 45 N/A N/A 718 V Notices of Violation Issued 0 1 0 �2 1 3 1 N/A N/A 8 v . Total 48 44 109 168 22 289 46 726 BMP Numbers by Type and Jurisdiction .5.' er. u r7 U m 0 0 b a I U F 3 U A x S 4 T Bioretention 39 28 306 4 29 25 7 59 5 502 1 Buffer 3 2 5 Dry Pond 15 - 170 43 29 44 30 92 3 433 p Enhanced Grass Swale 32 1 1 2 36 - I; Filter Strip 6 _ 7 15 Grassed Channel 24 12 5 1 42 4 Infiltration Trench 0 2 10 12 Level Spreader 2 2 Open Space 2 3 1 3 2 11 22 Fq Permeable Pavement 1 2 1 4 N Sand Filter 15 9 142 _)7 15 12 20 _ 249 U Underground Detention 18 8 1 4 1 32 co Underground Sand Filter 3 3 2 _8 Stream Restoration 1 6 7 Underground Detention 2 _2 4 Wet Pond 23 4 48 11 46 6 6 22 2 168 Wetland 7 5 11 I 1 2 34 Total 108 63 774 96 144 95 64 217 14 1575 Summary of BMP Insp ections and Education W ° eq Pw o a € E n Au 3" t . a FW S A x i` w 41abInspections _91 650 50 _283 59 40 127 21 1362 g o Notices of Violation Issued 0 0 11 1 I 0 0 0 0 20 •N U n. Corrective Action 0 0 10 0 8 0 0 0 0 18 m S Requests 4f Educational Notices 13 0 48 0 25 9 3 0 0 98 Total 104 41 719 51 324 68 43 12' 21 1498 Municipal Operations Staff Training o:a y =er, v h d d i m WO 0 t o�C U A Wx ITraining Date 5/26/2023 17/25/2023 6/6/2023 Selected dates 6/6,13/2023 5/30,31/2 5/11/2023 Oi between 5/25- 023 w 6/28/2023 L. Staff Trained 8 10 30 98 12 144 20 Total 8 10 Not Reported 30 98 12 Not Reported 144 20 322. 40 / , C aarl.tte fecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services Attachment 3: Modifications to the SWMP for FY2023 The modifications identified in the table below were completed to the October 2021 version of the Storm Water Quality Management Program Plan(SWMP) for implementation in FY2023 effective November 2022. Section&Page#from October 2021 Version Description of the Modification Section 2,page 2 Change authorized representative from Dave Canaan to Don Ceccarelli. Section 2,page 2 Added a table identifying the dates when annual reviews of the SWMP were completed and responsible staff. Section 3,page 3 Replaced Figure 1 with a map that more clearly delineates the different Phase II jurisdictions. Section 3.3,page 3 Added definitions at the bottom of Table 2. Section 3.4,page 10 Added definitions at the bottom of Table 3. Section 3.5,page 9 Updated Table 3 with most current TMDL information. Section 3.5,page 13 Replaced Figure 3 with an image that defined DO,TP,and TN. Section 3.7,page 15 Replaced Table 6 with updated list of facilities with NPDES Industrial Permits. Section 4,pages 18, 19,and 20 Updated the BMP summary table for Program Administration so that it would be consistent with the text in the annual Work Plan in Time Pro. Section 4.4,pages 22 and 23 Changed to differentiate between SOPs and SAPs for the SWMP that include an approval page and revision history and SOPs for inclusion in SWPPP that do not include these. Section 4.6,page 25,and Table Updated annual assessment process and changed Table 12 to include SWMP 12 changes made in FY2022. Section 5.4.1,page 36 Replaced Figure 4 with a utility bill insert from October 2022. Section 5.4.3,page 38 Rewrote this section around articles and newsletters instead of print ads Section 5.4.5,page 39 Replaced Figure 5 with a web Banner for 2022. Section 5.6 on pages 42 and 43 Change the measure of success for increasing awareness for the Public Education Program from 50%to 60%and removed the measure for increasing extent of exposure. Section 5.4.8,page 30 Changed the pollution prevention video locations from the website to You Tube. Section 5.5,page 41 Added the Underserved Communities Reach Plan developed in FY2023 to the information regarding efforts to reach our diverse community. Section 6.2,pages 45 and 45 Updated the BMP summary table for Public Involvement and Participation so that it would be consistent with the text in the annual Work Plan in Time Pro. Section 6.4.6,page 50 Updated the volunteer monitoring information to include the Streamside Snapshot are a third volunteer option available to participants. Section 6.6,page 51 Changed the measure of success for increasing the number of volunteers for the Public Involvement Program to an increase from the average for the past 3 years. Section 7.2,page 52,Table 18, Added#trained as an annual reporting metric for"c"under#21 and"a"under numbers 21,24,25 and 26 #24,25 and 26. Section 7.7.1,page 62 Added"total number and location of Notice of Violations issued"as a means of identifying priority areas with a high likelihood of illicit discharges. Section 7.7.1,page 62 and Changed time for responding to Category 1 service requests from within 4 hours to as soon as possible upon receipt.Also changed Category 2 from a 4- hour to a 2-hour response. Section 7.7.1.2,page 63 Changed samples for fixed interval monitoring collected on the second Tuesday and Thursday of each month to just the second Tuesday. Also, eliminated 1 monthly sampling during base flow to identify illicit discharges. Section 7.7.1.2,page 65 Replaced Figure 10 with the newest SUSI map for the 4th quarter of FY2022. 41 C,a,h e-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services Section&Page#from October 2021 Version Description of the Modification Section 7.7.5,page 73 Updated Figure 12 to include NOVs issued from 7-1-2020 to 6-30-2022. Section 7.8,page 73 Updated the last paragraph in this Section to describe IDDE municipal staff training completed for Permit term ending February 16,2022. Section 7.10,page 74 Changed the measure of success for increasing pollution problems identified for the IDDE Program to an increase from the average for the past 3 years. Also,changed the measure of success for repeat violators to a decrease from the average of the last 3 years. Sections 8.4 and 8.5,page 78 _ Expanded references to include erosion control ordinances for the Towns. Section 8.8,page 78 Removed reference to CMCSI being conducted twice a year. _ Section 8.11,page 80 Changed the measure of success for Construction Site Runoff Control Program to documenting inspection activities instead of documenting activities for completion of Work Plan program activities. Section 9.6,page 87 Added BMPs installed for compliance with Huntersville's LID Ordinance prior to June 30,2007 are not subject to these requirements. Section 9.11,page 90,#9 Changed the length of Maintenance Bond from not less than 2 years from the BMP approval date of the Storm Water Administrator to as-built approval date. Section 9.11,page 92 Added#11 to include actions taken to ensure maintenance of low-density projects. Section 9.13,page 93 Changed the measure of success for the Post-Construction Runoff Control Program to documenting inspection activities instead of documenting activities for completion of Work Plan program activities. Section 10.3,page 98 Changed the number of properties owned by co-permittees in CMSW's inventory from 3,052 to 3,208. Section 10.3,page 99,Table 24 Changed job titles from Sr.Environmental Specialist to Solid Waste Facility Manager. Section 10.3,page 100,Table In the footnote to the table,changed the date for discontinuing operations at 27 the Old Compost Central&Recycling Center from late 2021 to the spring of 2023. Section 10.4,page 103 Change the effective date for when CMS owns 176 schools from January 1, 2021 to January 1,2022. Section 10.8,page 105 In the second bullet,changes 8.6 to 10.7. Section 10.9,page 105 Updated for FY2022 numbers. Section 10.16,page 111 Changed the measure of success for Pollution Prevention and Good Housekeeping to a decrease from the average for the past 3 years. Section 10.16,page 111 Changed the measure of success for improving compliance for the Pollution Prevention and Good Housekeeping Program to a decrease from the average for the past 3 years. Section 11.91,page 134 Updated Table 36 with new data. Section 11.10,page 137 and Added the BMP measures implemented in the TMDL watersheds during 141 FY2022. Appendix A,page 144 Updated the BMP Summary Table Appendix B Updated the organizational chart for CMSWS. Appendix E,pages 187 through Replaced old municipal facility inspection form with the new one. 190 42 C,a,h e-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services Attachment 4: Modifications to SWMP for FY2024 The modifications identified in the table below were completed to the November 2022 version of the Storm Water Quality Management Program Plan(SWMP) for implementation in FY2024 effective September 2023. Section&Page#from November 2022 Version Description of the Modification Section 4.6 on page 24 Modified the description of the annual reports and assessments submitted to the State annually. Table 15 on page 32 Replaced Hazen Blodgett with Becky Hawke as the Matthews Town Manager. Section 5.8 on page 44 Added increase extent of exposure for the media campaign as a measure of success and modified the measure for increasing awareness to an increase from the average of the past 3 fiscal years. Section 7.10 on page 75 Modified the descriptions of the measures of success for the IDDE Program. Section 8.11 on page 82 Modified the descriptions of the measures of success for the Construction Site Runoff Control Program to a decrease in the percentage of notices of violation issued to the number of inspections conducted based on the average for the past 3 fiscal years. Section 9.14 on page 94 Modified the descriptions of the measures of success for the Post-Construction Site Runoff Control Program to a decrease in the deficiencies detected to the number of inspections conducted based the average for the past 3 fiscal years. Section 10.16 on page 112 Modified the descriptions of the measures of success for the Pollution Prevention and Good Housekeeping Program to a decrease in the percentage of deficiencies detected to the number of inspections conducted based on the average of the previous three(3)fiscal years. Table 10 on page 20 Updated the BMP Summary table to be consistent with the new annual report format. Table 16 on page 35 Updated the BMP Summary table to be consistent with the new annual report format. Table 17 on page 44 Updated the BMP Summary table to be consistent with the new annual report format. Table 19 on page 76 Updated the BMP Summary table to be consistent with the new annual report format. Table 20 on page 82 Updated the BMP Summary table to be consistent with the new annual report format. Table 23 on page 94 Updated the BMP Summary table to be consistent with the new annual report format. Table 10 on page 20 Updated the BMP Summary table to be consistent with the new annual report format. Appendix A on page 145 Updated the BMP Summary table to be consistent with the new annual report format. Appendix B on page 164 Updated the Phase II organizational charts as necessary. 43 , , Charlotte Mecklenburg fi II STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services — — Attachment 5: Pollution Prevention Educational Information Distributed in FY2023 During FY2023,the following pollution prevention educational information was distributed by staff with Charlotte-Mecklenburg Storm Water Services (CMSWS)when conducting inspections and responding to citizen requests for service. All Phase II Town Halls and libraries were supplied with residential pollution prevention brochures and information regarding volunteer opportunities. CMSWS also educates over 2,600 residents through their monthly volunteer newsletter. • A Guide to Used Oil Recycling • Scoop the Poop(proper handling of pet waste) • What Goes In Here Ends Up Here—postcard regarding neighborhood trash pollution • A Resident's Guide to Pollution Prevention • Volunteer Opportunities (English and Spanish) • A Brief Look at Charlotte-Mecklenburg Storm Water Services—Your Storm Water Fees at Work • Grease Free(proper disposal of grease from Charlotte-Mecklenburg Utilities) • Household Hazardous Waste—What do you do with left over chemicals • Environmental Notices for Homeowners—Disposal into the storm drain is against the law (English, Spanish, Chinese,Vietnamese,and Korean) • Environmental Notices for Businesses—Disposal into the storm drain is against the law (English, Spanish, Chinese,Vietnamese,and Korean) • Water Watchers door hanger • Household Hazardous Waste slider • Dispose of Leaves Properly postcard • Water Quality Buffers postcard • When Surface Waters Turn Colors(Pollen,Tannin,Iron Bacteria) • Automotive Facilities Pollution Prevention Poster(English and Spanish) • Clean Boating BMP • Fish Consumption Advisory • Invasive,Exotic Plants • NC Division of Natural Resources Fact Sheets: o Iron Bacteria o Surface Film o Water Foam • Non-Structural Best Management Practices Handout o Asphalt Sealing(English and Spanish) o Breweries o Carpet Cleaners(English and Spanish) o Commercial Property Management o Concrete Industry(English and Spanish) o Contractors o Equipment Repair o Food Service(Chinese,English, and Spanish) o Horizontal Directional Drilling o Landscapers o Mobile Detailer o Multi-Family Communities(English and Spanish) o Painters o Pool& Spa Maintenance (English and Spanish) o Pressure Washers (English and Spanish) o Realtors o Rooftop Workers 44 , , / Charlotte Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services o Stone Cutting&Fabrication Industry o Utility Contractors(English and Spanish) o Vehicle Service o Well Drillers(English and Spanish) • Structural Best Management Practices Handout o Dry Detention o Rain Garden o Sand Filter o Stormwater Wetland o Wet Pond 45 Charlotte-Mecklenburg/ STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services Attachment 6: Industrial/Commercial Educational Activities Educational Handouts/Events Target Audiences #of Businesses Dates Contacted Multi-Family Stormwater Pollution Multi-Family businesses 619 4/3/2023 Prevention and Pavement Sealant within Mecklenburg County Guidelines Mailer(Cover letter/flyer) Stormwater Pollution Prevention Bank of America Grp. 135 9/22/2023 Power Point presentation Charlotte My Environment Stormwater Pollution Prevention, Carolina Green Network- 150 1/24/2023 pesticide,herbicide information Workshop,Union County SWPP table with handouts for Costco Store#36-Matthews, 30 3/21/2023 Costco staff NC-"World Water Day" 46 , , Charlotte Mecklenburg fi II STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Attachment 7: Media Outlets and Outreach Results for FY2023 Media Campaign In FY2023, CMSWS has identified and implemented educational campaigns to meet the key objectives among four media campaigns: • Water Quality—Increase public awareness of surface water quality issues and how to report pollution problems (target pollutants: fecal coliform and sediment) • Volunteer—Increase public action/volunteer engagement to reduce surface water pollution • Flood Safety—Increase public awareness of flood risks and flood safety • Infrastructure—Increase public awareness of storm drainage infrastructure that carries rainwater to streams and the importance of improving infrastructure to support a thriving city. These objectives supported content produced for media outlets, social media, and the webpage with a target audience of adults ages 25-54. Media outlets included Social Media, Programmatic Display& CTV,YouTube, Charlotte Five,Axios Charlotte,Broadcast Television,Radio and the Webpage. Social Media—CMSWS staff maintain a Facebook,Instagram, and Twitter Page(@StormWaterCM). The page is maintained using Sprout Social. Paid social media ads for FY2023 saw 7,092,810 impressions; 1,160,945 reaches; 686,177 engagements, and 125,003 clicks. Organic social media content was as follows: • Facebook: 50 video posts; 299 photo posts; 27 link posts; 0 text posts • Instagram: 29 carousel posts; 69 video posts; 276 photo posts • Twitter: 43 video posts; 170 photo posts; 13 link posts; 14 text posts Programmatic Display&CTV—2,387,456 impressions; 4,190 clicks YouTube— 1,453,108 impressions; 996 clicks Charlotte Five—9,000 impressions; 2 articles Axios Charlotte—24,450 impressions; 11 calendar posts Broadcast Television—5,680,000 impressions; 63.2%reach; 2 frequency; 215 ads Radio—923,300 impressions; 26.9%reach; 2 frequency; 345 ads Webpage—CMSWS' webpage, StormWater.CharMeck.org contains information about stormwater projects, stormwater pollution reporting, flooding, surface water quality,volunteer opportunities,fees, and regulations. Edits to the webpage are made throughout the year,with staff performing webpage reviews at least twice per FY. During FY2023, Google Analytics showed CMSWS's webpages had 465,097page views and 191,600 unique page views,which is an increase from 38,642 page views in FY2022. 47 Charlotte-Mecklenburg 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services Attachment 8: Measure of Success for the Public Education and Outreach Program Increase the extent of exposure from the media campaign based on the average of last 3 fiscal years (serves as indicator of the success of outreach efforts). Extent of Exposure f Goal 25,000,000 .2 20,000,000 19,798,168 U s E 15,000,000 0 0 lr 0 0 0 10,000,000 6,063,651 6,063,651 6,446,186 6,214,776 6,329,781 vvs i ❑ u 5,000,000 6,063,651 6,828,720 —5,751,958 6,408,664 0 FY19 FY20 FY21 FY22 FY23 48 / , / Charlotte-Mecklenburg 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N ..services Attachment 9: Measure of Success for the Public Education and Outreach Program Increase the percentage of survey respondents indicating they are aware that water flowing into storm drains goes directly to creeks and lakes based on the average of last 3 fiscal years (serves as an indicator of the success of our messaging efforts). °o Respondents —Goal 90% 79.70% 77.47% 80% 83.00%— 80.40% 81.50% 3 79.20% 75.00% 75.67% 75.70% 0 70% w 69.00% 67.30% 0 60% —55.00% 61.67% 3 iin 50% —55.00% 55.00%liii - 50.00% $� 45.00% 47.00% 0 40% p4 41.00% = 30% w 0 20% i u ' 10% 0% FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 49 / , / Charlotte Mecklenburg d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�services Attachment 10: Promotional Items in FY2023 The following promotional items are available for distribution at events: • Color changing cups • Colored pencils • Flashlights • Golf/boat towels • Hand sanitizers • Ink pens • Keychains • Koozies • Lip balms • Magnets • Magnifying glasses • Pet waste bag dispensers • Rain gauges • Reusable bags • Reusable straws • Stormy coloring books • Stormy stickers • Stormy stuffed animals • Stormy temporary tattoos • Sunscreens • Water bottles • Whistles 50 / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER r`r�serures Attachment 11: Volunteer Recognition Activities in FY2023 Appreciation Campaign #Volunteers Method/Gift Date/s Recognized Volunteer Spotlight 62 T-Shirt/Social Media Post/ Monthly Website Post Volunteer(s) of the Year 18 Hoodie/Social Media Post 12/1/2023 Volunteer Thank You 894 Magnet, Stormy Pin, Year Round Sticker National Volunteer Week 7 Social Media Post 4/15/2023 Creek Week Thank You 873 Social media Post 3/27/2023 51 / , / Charlott e5./..lenburg / / 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N .Services Attachment 12: Measure of Success for the Public Involvement and Participation Program Increase the number of volunteers based on the average of last 3 fiscal years (serves as an indicator of the success of our efforts to increase volunteer participation). #Volunteers --Goal 6.000 — 5,000 4,848 4,622 4,623 4,464 UI 4,000 i 2,948 3,659 3,6593,824 3,825 c 3,479 2,948 3,488rt N92 /' 3,000 2,948 3 025r 3,117 3,120 3,192 P 2,846 2,744 2,744 A 2,000 1,000 0 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 52 Charlotte-Mecklenburg �/ / �j STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER ..."—....-0 Services Attachment 13: Fixed Interval Monitoring(FIM) Sites for Phase II •FY23 Fixed Interval Phase II Monitoring Sites .',Basins d hit 1!;?County Boundary " MY1 B Charlotte �Cornelius ► 1 r Davidson -` MC2- -" •Huntersville r - -- r Matthews Mint Hill M --= MY1 0 r Pineville MC50 - - J( 1 r i �� ,I/ '‘, MY14 ..„(-' ,.,''.'t.„ 5-1 re,-/ 4111. )111. , —, A/ / ) ) r - li -,`R • Ii ( 7 ( j MC40C cr F 5 V J- JrCharlotte-Mecklenburg f/ / /j STORM0 WATER .....,..,..Services 53 / , / Charlotte-Mecklenburg f / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER /V`Services Attachment 14: FY2023 Fixed Interval Monitoring (FIM) Results for Phase II (see site location map in Attachment 13 and SUSI map in Attachment 15) Collection Date MMI. Analyte Result Unit Site j Site Description MDL 7/19/2022 11:20:00 AM E.Coli 186 MPN/100 ml MC2 Birkdale Golf Course 1 No 7/19/2022 11:20:00 AM Turbidity 12 NTU MC2 Birkdale Golf Course 0.50 No 7/19/2022 11:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 7/19/2022 11:20:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 7/19/2022 11:20:00 AM Fecal Coliform 340 CFU/100 ml MC2 Birkdale Golf Course 10 No 7/19/2022 11:20:00 AM Nitrate/Nitrite 0.28 mg/L MC2 Birkdale Golf Course 0.05 No 7/19/2022 11:20:00 AM Total Phosphorus 0.034 mg/L MC2 Birkdale Golf Course 0.010 No 7/19/2022 11:20:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 No 7/19/2022 11:20:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 No 7/19/2022 11:20:00 AM TKN 0.31 mg/L MC2 Birkdale Golf Course 0.25 No 7/19/2022 11:20:00 AM Calcium 12000 ug/L MC2 Birkdale Golf Course 2000 No 7/19/2022 11:20:00 AM Magnesium 2500 ug/L MC2 Birkdale Golf Course 500 No 7/19/2022 11:20:00 AM Hardness 40 mg/L MC2 Birkdale Golf Course 1.0 No 7/19/2022 11:20:00 AM Suspended Sediment 4.3 mg/L MC2 Birkdale Golf Course < 4.3 No 7/19/2022 11:20:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 No 7/19/2022 11:20:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No 7/19/2022 11:20:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 No 8/16/2022 11:10:00 AM E.Coli 2330 MPN/100 ml MC2 Birkdale Golf Course 100 Yes 8/16/2022 11:10:00 AM Nitrate/Nitrite 0.19 mg/L MC2 Birkdale Golf Course 0.05 Yes 8/16/2022 11:10:00 AM Fecal Coliform 3000 CFU/100 ml MC2 Birkdale Golf Course 100 Yes 8/16/2022 11:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes 8/16/2022 11:10:00 AM Total Suspended Solids 13.2 mg/L MC2 Birkdale Golf Course 5.0 Yes 8/16/2022 11:10:00 AM TKN 0.44 mg/L MC2 Birkdale Golf Course 0.25 Yes 8/16/2022 11:10:00 AM Turbidity 20 NTU MC2 Birkdale Golf Course 0.50 Yes 8/16/2022 11:10:00 AM Suspended Sediment 9 mg/L MC2 Birkdale Golf Course 4.3 Yes 8/16/2022 11:10:00 AM Total Phosphorus 0.069 mg/L MC2 Birkdale Golf Course 0.010 Yes 8/16/2022 11:10:00 AM Calcium 7500 ug/L MC2 Birkdale Golf Course 1000 Yes 8/16/2022 11:10:00 AM Magnesium 1500 ug/L MC2 Birkdale Golf Course 1000 Yes 8/16/2022 11:10:00 AM Hardness 25 mg/L MC2 Birkdale Golf Course 1.0 Yes 8/16/2022 11:10:00 AM Copper 2.2 ug/L MC2 Birkdale Golf Course 2.0 Yes 9/20/2022 11:10:00 AM Nitrate/Nitrite 0.26 mg/L MC2 Birkdale Golf Course 0.05 No 9/20/2022 11:10:00 AM Fecal Coliform 188 CFU/100 ml MC2 Birkdale Golf Course 10 No 9/20/2022 11:10:00 AM E.Coli 291 MPN/100 ml MC2 Birkdale Golf Course 1 No 9/20/2022 11:10:00 AM Turbidity 2.8 NTU MC2 Birkdale Golf Course 0.50 No 9/20/2022 11:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 9/20/2022 11:10:00 AM Total Phosphorus 0.032 mg/L MC2 Birkdale Golf Course 0.010 No 9/20/2022 11:10:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course 0.25 No 9/20/2022 11:10:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 9/20/2022 11:10:00 AM Hardness 49 mg/L MC2 Birkdale Golf Course 1.0 No 9/20/2022 11:10:00 AM Magnesium 2900 ug/L MC2 Birkdale Golf Course 500 No 9/20/2022 11:10:00 AM Calcium 15000 ug/L MC2 Birkdale Golf Course 2000 No 9/20/2022 11:10:00 AM Suspended Sediment 4 mg/L MC2 Birkdale Golf Course < 4.0 No 54 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit _ Site Description MDL Storm 9/20/2022 11:10:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course 0.25 No 9/20/2022 11:10:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 9/20/2022 11:10:00 AM Hardness 49 mg/L MC2 Birkdale Golf Course 1.0 No 9/20/2022 11:10:00 AM Magnesium 2900 ug/L MC2 Birkdale Golf Course 500 No 9/20/2022 11:10:00 AM Calcium 15000 ug/L MC2 Birkdale Golf Course 2000 No 9/20/2022 11:10:00 AM Suspended Sediment 4 mg/L MC2 Birkdale Golf Course < 4.0 No 9/20/2022 11:10:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No 10/18/2022 11:15:00 AM E.Coli 308 MPN/100 ml MC2 Birkdale Golf Course 1 No 10/18/2022 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 10/18/2022 11:15:00 AM Fecal Coliform 370 CFU/100 ml MC2 Birkdale Golf Course 10 No 10/18/2022 11:15:00 AM Turbidity 3 NTU MC2 Birkdale Golf Course 0.50 No 10/18/2022 11:15:00 AM Nitrate/Nitrite 0.09 mg/L MC2 Birkdale Golf Course 0.05 No 10/18/2022 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 10/18/2022 11:15:00 AM Total Phosphorus 0.031 mg/L MC2 Birkdale Golf Course 0.010 No 10/18/2022 11:15:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No 10/18/2022 11:15:00 AM Suspended Sediment 3.9 mg/L MC2 Birkdale Golf Course < 3.9 No 10/18/2022 11:15:00 AM Zinc 20 ug/L MC2 Birkdale Golf Course < 20.0 No 10/18/2022 11:15:00 AM Nickel 0.5 ug/L MC2 Birkdale Golf Course < 0.500 No 10/18/2022 11:15:00 AM Copper 1.5 ug/L MC2 Birkdale Golf Course 0.500 No 10/18/2022 11:15:00 AM Chromium 1 ug/L MC2 Birkdale Golf Course < 1.00 No 10/18/2022 11:15:00 AM Calcium 16400 ug/L MC2 Birkdale Golf Course 100 No 10/18/2022 11:15:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.500 No 10/18/2022 11:15:00 AM Hardness 55.5 mg/L MC2 Birkdale Golf Course 0.100 No 10/18/2022 11:15:00 AM Magnesium 3540 ug/L MC2 Birkdale Golf Course 100 No 11/15/2022 11:15:00 AM Turbidity 6.8 NTU MC2 Birkdale Golf Course 0.50 Yes 11/15/2022 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes 11/15/2022 11:15:00 AM Fecal Coliform 440 CFU/100 ml MC2 Birkdale Golf Course 20 Yes 11/15/2022 11:15:00 AM Nitrate/Nitrite 0.17 mg/L MC2 Birkdale Golf Course 0.05 Yes 11/15/2022 11:15:00 AM E.Coli 480 MPN/100 ml MC2 Birkdale Golf Course 10 Yes 11/15/2022 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 Yes 11/15/2022 11:15:00 AM Total Phosphorus 0.046 mg/L MC2 Birkdale Golf Course 0.010 Yes 11/15/2022 11:15:00 AM Suspended Sediment 4.1 mg/L MC2 Birkdale Golf Course < 4.1 Yes 11/15/2022 11:15:00 AM TKN 0.31 mg/L MC2 Birkdale Golf Course 0.25 Yes 11/15/2022 11:15:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 1000 Yes 11/15/2022 11:15:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 1000 Yes 11/15/2022 11:15:00 AM Hardness 48 mg/L MC2 Birkdale Golf Course 1.0 Yes 11/15/2022 11:15:00 AM Copper 3.8 ug/L MC2 Birkdale Golf Course 2.0 Yes 12/20/2022 11:15:00 AM E.Coli 436 MPN/100 ml MC2 Birkdale Golf Course 1 No 12/20/2022 11:15:00 AM Fecal Coliform 260 CFU/100 ml MC2 Birkdale Golf Course 10 No 12/20/2022 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 12/20/2022 11:15:00 AM Total Phosphorus 0.032 mg/L MC2 Birkdale Golf Course 0.010 No 12/20/2022 11:15:00 AM Turbidity 9.2 NTU MC2 Birkdale Golf Course 0.50 No 12/20/2022 11:15:00 AM Nitrate/Nitrite 0.55 mg/L MC2 Birkdale Golf Course 0.05 No 12/20/2022 11:15:00 AM Suspended Sediment 4.1 mg/L MC2 Birkdale Golf Course < 4.1 No 12/20/2022 11:15:00 AM TKN 0.55 mg/L MC2 Birkdale Golf Course 0.25 No 55 / , / Charlotte-Mecklenburg f d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services 7 Collection Date Analyte Result Unit _ Site Description MDL Storm 12/20/2022 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 12/20/2022 11:15:00 AM Calcium 13000 ug/L MC2 Birkdale Golf Course 500 No 12/20/2022 11:15:00 AM Hardness 45 mg/L MC2 Birkdale Golf Course 1.0 No 12/20/2022 11:15:00 AM Magnesium 3000 ug/L MC2 Birkdale Golf Course 500 No 12/20/2022 11:15:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No 1/17/2023 11:15:00 AM Nitrate/Nitrite 0.6 mg/L MC2 Birkdale Golf Course 0.05 Yes 1/17/2023 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes 1/17/2023 11:15:00 AM E.Coli 326 MPN/100 ml MC2 Birkdale Golf Course 1 Yes 1/17/2023 11:15:00 AM Fecal Coliform 300 CFU/100 ml MC2 Birkdale Golf Course 10 Yes 1/17/2023 11:15:00 AM Turbidity 15 NTU MC2 Birkdale Golf Course 0.50 Yes 1/17/2023 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 Yes 1/17/2023 11:15:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 Yes 1/17/2023 11:15:00 AM Suspended Sediment 4.1 mg/L MC2 Birkdale Golf Course < 4.1 Yes 1/17/2023 11:15:00 AM Total Phosphorus 0.03 mg/L MC2 Birkdale Golf Course 0.010 Yes 1/17/2023 11:15:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 1000 Yes 1/17/2023 11:15:00 AM Hardness 45 mg/L MC2 Birkdale Golf Course 1.0 Yes 1/17/2023 11:15:00 AM Calcium 13000 ug/L MC2 Birkdale Golf Course 1000 Yes 1/17/2023 11:15:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 Yes 1/17/2023 11:15:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes 1/17/2023 11:15:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 Yes 1/17/2023 11:15:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes 1/17/2023 11:15:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 Yes 1/17/2023 11:25:00 AM Fecal Coliform 280 CFU/100 m1 MC2 Birkdale Golf Course 10 Yes (Replicate) 1/17/2023 11:25:00 AM E.Coli 411 MPN/100 ml MC2 Birkdale Golf Course 1 Yes (Replicate) 1/17/2023 11:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes (Replicate) 1/17/2023 11:25:00 AM Nitrate/Nitrite 0.6 mg/L 1 MC2 Birkdale Golf Course 0.05 Yes (Replicate) 1/17/2023 11:25:00 AM Turbidity 15 NTU MC2 Birkdale Golf Course 0.50 Yes (Replicate) 1/17/2023 11:25:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 Yes (Replicate) 1/17/2023 11:25:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 Yes (Replicate) 1/17/2023 11:25:00 AM Total Phosphorus 0.031 mg/L MC2 Birkdale Golf Course 0.010 Yes (Replicate) 1/17/2023 11:25:00 AM Suspended Sediment 4.2 mg/L MC2 Birkdale Golf Course < 4.2 Yes (Replicate) 1/17/2023 11:25:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes (Replicate) 1/17/2023 11:25:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 Yes (Replicate) 1/17/2023 11:25:00 AM Hardness 45 mg/L MC2 Birkdale Golf Course 1.0 Yes (Replicate) 1/17/2023 11:25:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 1000 Yes (Replicate) 1/17/2023 11:25:00 AM Calcium 13000 ug/L MC2 Birkdale Golf Course 1000 Yes (Replicate) 1/17/2023 11:25:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 Yes (Replicate) 56 / , / Charlotte-Mecklenburg fi / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services Collection Date ' AnalyteFli Result Unit Site Site Description MDL Storm 1/17/2023 11:25:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 Yes (Replicate) 1/17/2023 11:25:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 Yes (Replicate) 2/21/2023 10:50:00 AM Fecal Coliform 210 CFU/100 ml MC2 Birkdale Golf Course 10 No 2/21/2023 10:50:00 AM Total Phosphorus 0.025 mg/L MC2 Birkdale Golf Course 0.010 No 2/21/2023 10:50:00 AM Turbidity 10 NTU MC2 Birkdale Golf Course 0.5 No 2/21/2023 10:50:00 AM Nitrate/Nitrite 0.51 mg/L MC2 Birkdale Golf Course 0.05 No 2/21/2023 10:50:00 AM E.Coli 239 MPN/100 ml MC2 Birkdale Golf Course 1 No 2/21/2023 10:50:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 2/21/2023 10:50:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 2/21/2023 10:50:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No 2/21/2023 10:50:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No 2/21/2023 10:50:00 AM Magnesium 3100 ug/L MC2 Birkdale Golf Course 500 No 2/21/2023 10:50:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 500 No 2/21/2023 10:50:00 AM Hardness 48 mg/L MC2 Birkdale Golf Course 1.0 No 2/21/2023 10:50:00 AM Suspended Sediment 4 mg/L MC2 Birkdale Golf Course < 4.0 No 3/21/2023 11:05:00 AM Fecal Coliform 300 CFU/100 ml MC2 Birkdale Golf Course 10 No 3/21/2023 11:05:00 AM E.Coli 190 MPN/100 ml MC2 Birkdale Golf Course 1 No 3/21/2023 11:05:00 AM Turbidity 6 NTU MC2 Birkdale Golf Course 0.50 No 3/21/2023 11:05:00 AM Nitrate/Nitrite 0.49 mg/L MC2 Birkdale Golf Course 0.05 No 3/21/2023 11:05:00 AM Total Phosphorus 0.022 mg/L MC2 Birkdale Golf Course 0.010 No 3/21/2023 11:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 3/21/2023 11:05:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 3/21/2023 11:05:00 AM Hardness 48 mg/L MC2 Birkdale Golf Course 1.0 No 3/21/2023 11:05:00 AM Magnesium 3200 ug/L MC2 Birkdale Golf Course 1000 No 3/21/2023 11:05:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No 3/21/2023 11:05:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 1000 No 3/21/2023 11:05:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No 3/21/2023 11:05:00 AM Suspended Sediment 3.9 mg/L MC2 Birkdale Golf Course < 3.9 No 4/18/2023 11:05:00 AM Nitrate/Nitrite 0.54 mg/L MC2 Birkdale Golf Course 0.05 No 4/18/2023 11:05:00 AM Total Phosphorus 0.035 mg/L MC2 Birkdale Golf Course 0.010 No 4/18/2023 11:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 4/18/2023 11:05:00 AM Turbidity 9.3 NTU MC2 Birkdale Golf Course 0.50 No 4/18/2023 11:05:00 AM Fecal Coliform 425 CFU/100 ml MC2 Birkdale Golf Course 10 No 4/18/2023 11:05:00 AM E.Coli 614 MPN/100 ml MC2 Birkdale Golf Course 1 No 4/18/2023 11:05:00 AM Hardness 49 mg/L MC2 Birkdale Golf Course 1.0 No 4/18/2023 11:05:00 AM Calcium 14000 ug/L MC2 Birkdale Golf Course 1000 No 4/18/2023 11:05:00 AM Magnesium 3300 ug/L MC2 Birkdale Golf Course 1000 No 4/18/2023 11:05:00 AM Suspended Sediment 3.9 mg/L MC2 Birkdale Golf Course < 3.9 No 4/18/2023 11:05:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 4/18/2023 11:05:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No 4/18/2023 11:05:00 AM Nickel 2 ug/L MC2 Birkdale Golf Course < 2.0 No 4/18/2023 11:05:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No 4/18/2023 11:05:00 AM Lead 0.5 ug/L MC2 Birkdale Golf Course < 0.50 No 4/18/2023 11:05:00 AM Zinc 10 ug/L MC2 Birkdale Golf Course < 10 No 57 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services - Collection Date Analyte Result Unit _ Site Description MDL Storm 4/18/2023 11:05:00 AM Chromium 5 ug/L MC2 Birkdale Golf Course < 5.0 No 5/16/2023 11:15:00 AM Nitrate/Nitrite 0.44 mg/L MC2 Birkdale Golf Course 0.05 No 5/16/2023 11:15:00 AM Turbidity 3.9 NTU MC2 Birkdale Golf Course 0.50 No 5/16/2023 11:15:00 AM E.Coli 2420 MPN/100 ml MC2 Birkdale Golf Course > 1 No 5/16/2023 11:15:00 AM Fecal Coliform 1000 CFU/100 ml MC2 Birkdale Golf Course 10 No 5/16/2023 11:15:00 AM Suspended Sediment 4.2 mg/L MC2 Birkdale Golf Course < 4.2 No 5/16/2023 11:15:00 AM Total Phosphorus 0.03 mg/L MC2 Birkdale Golf Course 0.010 No 5/16/2023 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 No 5/16/2023 11:15:00 AM Total Suspended Solids 5 mg/L MC2 Birkdale Golf Course < 5.0 No 5/16/2023 11:15:00 AM Calcium 15000 ug/L MC2 Birkdale Golf Course 500 No 5/16/2023 11:15:00 AM Hardness 52 mg/L MC2 Birkdale Golf Course 1.0 No 5/16/2023 11:15:00 AM Magnesium 3500 ug/L MC2 Birkdale Golf Course 500 No 5/16/2023 11:15:00 AM TKN 0.25 mg/L MC2 Birkdale Golf Course < 0.25 No 5/16/2023 11:15:00 AM Copper 2 ug/L MC2 Birkdale Golf Course < 2.0 No 6/20/2023 11:15:00 AM Nitrate/Nitrite 0.28 mg/L MC2 Birkdale Golf Course 0.05 Yes 6/20/2023 11:15:00 AM E.Coli 6570 MPN/100 ml MC2 Birkdale Golf Course 100 Yes 6/20/2023 11:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC2 Birkdale Golf Course < 0.10 Yes 6/20/2023 11:15:00 AM Turbidity 120 NTU MC2 Birkdale Golf Course 0.50 Yes 6/20/2023 11:15:00 AM Total Suspended Solids 92.5 mg/L MC2 Birkdale Golf Course 12.5 Yes 6/20/2023 11:15:00 AM Fecal Coliform 14000 CFU/100 ml MC2 Birkdale Golf Course 100 Yes 6/20/2023 11:15:00 AM Suspended Sediment 94 mg/L MC2 Birkdale Golf Course 4.3 Yes 6/20/2023 11:15:00 AM Total Phosphorus 0.113 mg/L MC2 Birkdale Golf Course 0.010 Yes 6/20/2023 11:15:00 AM Hardness 22 mg/L MC2 Birkdale Golf Course 1.0 Yes 6/20/2023 11:15:00 AM Magnesium 1800 ug/L MC2 Birkdale Golf Course 1000 Yes 6/20/2023 11:15:00 AM Calcium 5700 ug/L MC2 Birkdale Golf Course 1000 Yes 6/20/2023 11:15:00 AM Copper 2.4 ug/L MC2 Birkdale Golf Course 2.0 Yes 6/20/2023 11:15:00 AM TKN 0.62 mg/L MC2 Birkdale Golf Course 0.25 Yes 7/19/2022 10:10:00 AM Fecal Coliform 1410 CFU/100 ml 1 MC36 Sam Newell Rd.at US 74 10 Yes 7/19/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes 7/19/2022 10:10:00 AM Total Suspended Solids 9.2 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes 7/19/2022 10:10:00 AM E.Coli 487 MPN/100 ml 1 MC36 Sam Newell Rd.at US 74 2 Yes 7/19/2022 10:10:00 AM Turbidity 11 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 7/19/2022 10:10:00 AM Nitrate/Nitrite 0.13 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes 7/19/2022 10:10:00 AM Nickel 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 7/19/2022 10:10:00 AM Chromium 5 ug/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes 7/19/2022 10:10:00 AM Total Phosphorus 0.071 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 7/19/2022 10:10:00 AM TKN 0.4 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 7/19/2022 10:10:00 AM Magnesium 4900 ug/L MC36 Sam Newell Rd.at US 74 500 Yes 7/19/2022 10:10:00 AM Calcium 13000 ug/L MC36 Sam Newell Rd.at US 74 500 Yes 7/19/2022 10:10:00 AM Hardness 53 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 7/19/2022 10:10:00 AM Suspended Sediment 6.8 mg/L MC36 Sam Newell Rd.at US 74 4.3 Yes 7/19/2022 10:10:00 AM Copper 2.5 ug/L MC36 Sam Newell Rd.at US 74 2.0 Yes 7/19/2022 10:10:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.50 Yes 7/19/2022 10:10:00 AM Zinc 10 ug/L MC36 Sam Newell Rd.at US 74 < 10 Yes 8/16/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes 58 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit _ Site Description _ MDL Storm 8/16/2022 9:45:00 AM Fecal Coliform 563 CFU/100 ml MC36 Sam Newell Rd.at US 74 100 Yes 8/16/2022 9:45:00 AM Nitrate/Nitrite 0.12 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes 8/16/2022 9:45:00 AM E.Coli 360 MPN/100 ml MC36 Sam Newell Rd.at US 74 100 Yes 8/16/2022 9:45:00 AM Turbidity 9.5 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 8/16/2022 9:45:00 AM TKN 0.36 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 8/16/2022 9:45:00 AM Total Suspended Solids 7.2 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes 8/16/2022 9:45:00 AM Total Phosphorus 0.065 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 8/16/2022 9:45:00 AM Suspended Sediment 4.2 mg/L MC36 Sam Newell Rd.at US 74 < 4.2 Yes 8/16/2022 9:45:00 AM Calcium 16000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 8/16/2022 9:45:00 AM Hardness 67 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 8/16/2022 9:45:00 AM Magnesium 6600 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 8/16/2022 9:45:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 9/20/2022 10:05:00 AM Nitrate/Nitrite 0.07 mg/L MC36 Sam Newell Rd.at US 74 0.05 No 9/20/2022 10:05:00 AM Fecal Coliform 150 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No 9/20/2022 10:05:00 AM E.Coli 140 MPN/100 ml MC36 Sam Newell Rd.at US 74 1 No 9/20/2022 10:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 0.10 No 9/20/2022 10:05:00 AM Total Phosphorus 0.16 mg/L MC36 Sam Newell Rd.at US 74 0.010 No 9/20/2022 10:05:00 AM Turbidity 11 NTU MC36 Sam Newell Rd.at US 74 0.50 No 9/20/2022 10:05:00 AM Magnesium 7300 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:05:00 AM Total Suspended Solids 13.6 mg/L MC36 Sam Newell Rd.at US 74 11.9 No 9/20/2022 10:05:00 AM Calcium 22000 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:05:00 AM Hardness 85 mg/L MC36 Sam Newell Rd.at US 74 1.0 No 9/20/2022 10:05:00 AM Suspended Sediment 7.4 mg/L MC36 Sam Newell Rd.at US 74 4.1 No 9/20/2022 10:05:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No 9/20/2022 10:05:00 AM Magnesium 7300 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:05:00 AM Total Suspended Solids 13.6 mg/L MC36 Sam Newell Rd.at US 74 11.9 No 9/20/2022 10:05:00 AM Calcium 22000 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:05:00 AM Hardness 85 mg/L MC36 Sam Newell Rd.at US 74 1.0 No 9/20/2022 10:05:00 AM Suspended Sediment 7.4 mg/L MC36 Sam Newell Rd.at US 74 4.1 No 9/20/2022 10:05:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No 9/20/2022 10:05:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 No 9/20/2022 10:10:00 AM Fecal Coliform 210 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No 9/20/2022 10:10:00 AM E.Coli 160 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No 9/20/2022 10:10:00 AM Nitrate/Nitrite 0.44 mg/L MC36 Sam Newell Rd.at US 74 0.05 No 9/20/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No 9/20/2022 10:10:00 AM Total Phosphorus 0.106 mg/L MC36 Sam Newell Rd.at US 74 0.010 No 9/20/2022 10:10:00 AM Turbidity 15 NTU MC36 Sam Newell Rd.at US 74 0.50 No 9/20/2022 10:10:00 AM Hardness 81 mg/L MC36 Sam Newell Rd.at US 74 1.0 No 9/20/2022 10:10:00 AM Suspended Sediment 7.1 mg/L MC36 Sam Newell Rd.at US 74 4.2 No 9/20/2022 10:10:00 AM Magnesium 6900 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:10:00 AM Total Suspended Solids 16 mg/L MC36 Sam Newell Rd.at US 74 5.0 No 9/20/2022 10:10:00 AM Calcium 21000 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:10:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No 9/20/2022 10:10:00 AM Hardness 81 mg/L MC36 Sam Newell Rd.at US 74 1.0 No 9/20/2022 10:10:00 AM Suspended Sediment 7.1 mg/L MC36 Sam Newell Rd.at US 74 4.2 No 59 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services -Collection Date Analyte Result Unit I Site Description _ MDL Storm 9/20/2022 10:10:00 AM Magnesium 6900 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:10:00 AM Total Suspended Solids 16 mg/L MC36 Sam Newell Rd.at US 74 5.0 No 9/20/2022 10:10:00 AM Calcium 21000 ug/L MC36 Sam Newell Rd.at US 74 500 No 9/20/2022 10:10:00 AM TKN 0.41 mg/L MC36 Sam Newell Rd.at US 74 0.25 No 9/20/2022 10:20:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 No 10/18/2022 9:35:00 AM Nitrate/Nitrite 0.05 mg/L MC36 Sam Newell Rd.at US 74 < 0.05 No 10/18/2022 9:35:00 AM E.Coli 594 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No 10/18/2022 9:35:00 AM Fecal Coliform 488 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No 10/18/2022 9:35:00 AM Turbidity 7.7 NTU MC36 Sam Newell Rd.at US 74 0.50 No 10/18/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No 10/18/2022 9:35:00 AM Total Phosphorus 0.08 mg/L MC36 Sam Newell Rd.at US 74 0.010 No 10/18/2022 9:35:00 AM Total Suspended Solids 10.4 mg/L MC36 Sam Newell Rd.at US 74 5.0 No 10/18/2022 9:35:00 AM TKN 0.3 mg/L MC36 Sam Newell Rd.at US 74 0.25 No 10/18/2022 9:35:00 AM Suspended Sediment 11 mg/L MC36 Sam Newell Rd.at US 74 3.9 No 10/18/2022 9:35:00 AM Magnesium 7100 ug/L MC36 Sam Newell Rd.at US 74 100 No 10/18/2022 9:35:00 AM Nickel 0.664 ug/L MC36 Sam Newell Rd.at US 74 0.500 No 10/18/2022 9:35:00 AM Zinc 20 ug/L MC36 Sam Newell Rd.at US 74 < 20.0 No 10/18/2022 9:35:00 AM Calcium 20900 ug/L MC36 Sam Newell Rd.at US 74 100 No 10/18/2022 9:35:00 AM Copper 1.13 ug/L MC36 Sam Newell Rd.at US 74 0.500 No 10/18/2022 9:35:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.500 No 10/18/2022 9:35:00 AM Hardness 81.4 mg/L MC36 Sam Newell Rd.at US 74 0.100 No 10/18/2022 9:35:00 AM Chromium 1 ug/L MC36 Sam Newell Rd.at US 74 < 1.00 No 11/15/2022 10:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes 11/15/2022 10:15:00 AM Fecal Coliform 216 CFU/100 ml MC36 Sam Newell Rd.at US 74 20 Yes 11/15/2022 10:15:00 AM Nitrate/Nitrite 0.05 mg/L MC36 Sam Newell Rd.at US 74 < 0.05 Yes 11/15/2022 10:15:00 AM Turbidity 14 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 11/15/2022 10:15:00 AM E.Coli 348 MPN/100 ml MC36 Sam Newell Rd.at US 74 10 Yes 11/15/2022 10:15:00 AM TKN 0.36 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 11/15/2022 10:15:00 AM Total Suspended Solids 8.8 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes 11/15/2022 10:15:00 AM Total Phosphorus 0.087 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 11/15/2022 10:15:00 AM Suspended Sediment 4.4 mg/L MC36 Sam Newell Rd.at US 74 < 4.4 Yes 11/15/2022 10:15:00 AM Magnesium 4800 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 11/15/2022 10:15:00 AM Calcium 14000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 11/15/2022 10:15:00 AM Hardness 55 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 11/15/2022 10:15:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 12/20/2022 9:45:00 AM E.Coli 872 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No 12/20/2022 9:45:00 AM Turbidity 16 NTU MC36 Sam Newell Rd.at US 74 0.50 No 12/20/2022 9:45:00 AM Fecal Coliform 295 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No 12/20/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No 12/20/2022 9:45:00 AM Nitrate/Nitrite 0.18 mg/L MC36 Sam Newell Rd.at US 74 0.05 No 12/20/2022 9:45:00 AM Total Phosphorus 0.061 mg/L MC36 Sam Newell Rd.at US 74 0.010 No 12/20/2022 9:45:00 AM TKN 0.37 mg/L MC36 Sam Newell Rd.at US 74 0.25 No 12/20/2022 9:45:00 AM Suspended Sediment 8 mg/L MC36 Sam Newell Rd.at US 74 4.0 No 12/20/2022 9:45:00 AM Total Suspended Solids 9.6 mg/L MC36 Sam Newell Rd.at US 74 5.0 No 12/20/2022 9:45:00 AM Hardness 67 mg/L MC36 Sam Newell Rd.at US 74 1.0 No 60 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services 7 Collection Date Analyte Result Unit I Site Description _ MDL Storm 12/20/2022 9:45:00 AM Calcium 17000 ug/L MC36 Sam Newell Rd.at US 74 500 No 12/20/2022 9:45:00 AM Magnesium 5900 ug/L MC36 Sam Newell Rd.at US 74 500 No 12/20/2022 9:45:00 AM Copper 2.5 ug/L MC36 Sam Newell Rd.at US 74 2.0 No 1/17/2023 9:45:00 AM Nitrate/Nitrite 0.44 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes 1/17/2023 9:45:00 AM E.Coli 4840 MPN/100 ml MC36 Sam Newell Rd.at US 74 > 2 Yes 1/17/2023 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes 1/17/2023 9:45:00 AM Fecal Coliform 3950 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes 1/17/2023 9:45:00 AM Turbidity 14 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 1/17/2023 9:45:00 AM Total Suspended Solids 5 mg/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes 1/17/2023 9:45:00 AM TKN 0.36 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 1/17/2023 9:45:00 AM Total Phosphorus 0.049 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 1/17/2023 9:45:00 AM Suspended Sediment 4.1 mg/L MC36 Sam Newell Rd.at US 74 < 4.1 Yes 1/17/2023 9:45:00 AM Magnesium 6700 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 1/17/2023 9:45:00 AM Hardness 75 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 1/17/2023 9:45:00 AM Calcium 19000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 1/17/2023 9:45:00 AM Nickel 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 1/17/2023 9:45:00 AM Chromium 5 ug/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes 1/17/2023 9:45:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.50 Yes 1/17/2023 9:45:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 1/17/2023 9:45:00 AM Zinc 10 ug/L MC36 Sam Newell Rd.at US 74 < 10 Yes 2/21/2023 9:35:00 AM Turbidity 8.5 NTU MC36 Sam Newell Rd.at US 74 0.5 No 2/21/2023 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 No 2/21/2023 9:35:00 AM Nitrate/Nitrite 0.71 mg/L MC36 Sam Newell Rd.at US 74 0.05 No 2/21/2023 9:35:00 AM Fecal Coliform 390 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 No 2/21/2023 9:35:00 AM E.Coli 636 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 No 2/21/2023 9:35:00 AM Total Phosphorus 0.034 mg/L MC36 Sam Newell Rd.at US 74 0.010 No 2/21/2023 9:35:00 AM Total Suspended Solids 5 mg/L MC36 Sam Newell Rd.at US 74 < 5.0 No 2/21/2023 9:35:00 AM TKN 0.25 mg/L MC36 Sam Newell Rd.at US 74 < 0.25 No 2/21/2023 9:35:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 No 2/21/2023 9:35:00 AM Calcium 18000 ug/L MC36 Sam Newell Rd.at US 74 500 No 2/21/2023 9:35:00 AM Magnesium 6200 ug/L MC36 Sam Newell Rd.at US 74 500 No 2/21/2023 9:35:00 AM Hardness 70 mg/L MC36 Sam Newell Rd.at US 74 1.0 No 2/21/2023 9:35:00 AM Suspended Sediment 4.3 mg/L MC36 Sam Newell Rd.at US 74 < 4.3 No 3/21/2023 9:55:00 AM Turbidity 12 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 3/21/2023 9:55:00 AM Nitrate/Nitrite 0.12 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes 3/21/2023 9:55:00 AM E.Coli 382 MPN/100 ml MC36 Sam Newell Rd.at US 74 2 Yes 3/21/2023 9:55:00 AM Fecal Coliform 310 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes 3/21/2023 9:55:00 AM Total Phosphorus 0.048 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 3/21/2023 9:55:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes 3/21/2023 9:55:00 AM Total Suspended Solids 7.8 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes 3/21/2023 9:55:00 AM Calcium 15000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 3/21/2023 9:55:00 AM Hardness 58 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 3/21/2023 9:55:00 AM Magnesium 5100 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 3/21/2023 9:55:00 AM TKN 0.28 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 3/21/2023 9:55:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 61 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit _ Site Description MDL Storm 3/21/2023 9:55:00 AM Suspended Sediment 7.6 mg/L MC36 Sam Newell Rd.at US 74 4.0 Yes 4/18/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes 4/18/2023 10:00:00 AM Turbidity 19 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 4/18/2023 10:00:00 AM Total Phosphorus 0.069 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 4/18/2023 10:00:00 AM E.Coli 727 MPN/100 ml MC36 Sam Newell Rd.at US 74 1 Yes 4/18/2023 10:00:00 AM Nitrate/Nitrite 0.22 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes 4/18/2023 10:00:00 AM Fecal Coliform 455 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes 4/18/2023 10:00:00 AM Hardness 66 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 4/18/2023 10:00:00 AM Magnesium 5800 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 4/18/2023 10:00:00 AM Suspended Sediment 14 mg/L MC36 Sam Newell Rd.at US 74 4.3 Yes 4/18/2023 10:00:00 AM Calcium 17000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 4/18/2023 10:00:00 AM Nickel 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 4/18/2023 10:00:00 AM Chromium 5 ug/L MC36 Sam Newell Rd.at US 74 < 5.0 Yes 4/18/2023 10:00:00 AM Zinc 10 ug/L MC36 Sam Newell Rd.at US 74 < 10 Yes 4/18/2023 10:00:00 AM Total Suspended Solids 16.8 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes 4/18/2023 10:00:00 AM Lead 0.5 ug/L MC36 Sam Newell Rd.at US 74 < 0.50 Yes 4/18/2023 10:00:00 AM TKN 0.46 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 4/18/2023 10:00:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 5/16/2023 9:45:00 AM Fecal Coliform 780 CFU/100 ml MC36 Sam Newell Rd.at US 74 10 Yes 5/16/2023 9:45:00 AM E.Coli 981 MPN/100 ml MC36 Sam Newell Rd.at US 74 1 Yes 5/16/2023 9:45:00 AM Turbidity 18 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 5/16/2023 9:45:00 AM Nitrate/Nitrite 0.1 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes 5/16/2023 9:45:00 AM Suspended Sediment 12 mg/L MC36 Sam Newell Rd.at US 74 4.4 Yes 5/16/2023 9:45:00 AM Ammonia-Nitrogen 0.15 mg/L MC36 Sam Newell Rd.at US 74 0.10 Yes 5/16/2023 9:45:00 AM Total Phosphorus 0.086 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 5/16/2023 9:45:00 AM TKN 0.35 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 5/16/2023 9:45:00 AM Total Suspended Solids 14.2 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes 5/16/2023 9:45:00 AM Copper 2 ug/L MC36 Sam Newell Rd.at US 74 < 2.0 Yes 5/16/2023 9:45:00 AM Hardness 62 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 5/16/2023 9:45:00 AM Calcium 16000 ug/L MC36 Sam Newell Rd.at US 74 500 Yes 5/16/2023 9:45:00 AM Magnesium 5400 ug/L MC36 Sam Newell Rd.at US 74 100 Yes 6/20/2023 9:45:00 AM E.Coli 3640 MPN/100 ml MC36 Sam Newell Rd.at US 74 100 Yes 6/20/2023 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC36 Sam Newell Rd.at US 74 < 0.10 Yes 6/20/2023 9:45:00 AM Nitrate/Nitrite 0.28 mg/L MC36 Sam Newell Rd.at US 74 0.05 Yes 6/20/2023 9:45:00 AM Turbidity 32 NTU MC36 Sam Newell Rd.at US 74 0.50 Yes 6/20/2023 9:45:00 AM Fecal Coliform 5750 CFU/100 ml MC36 Sam Newell Rd.at US 74 100 Yes 6/20/2023 9:45:00 AM Suspended Sediment 20 mg/L MC36 Sam Newell Rd.at US 74 4.0 Yes 6/20/2023 9:45:00 AM Total Suspended Solids 19.6 mg/L MC36 Sam Newell Rd.at US 74 5.0 Yes 6/20/2023 9:45:00 AM TKN 0.51 mg/L MC36 Sam Newell Rd.at US 74 0.25 Yes 6/20/2023 9:45:00 AM Total Phosphorus 0.079 mg/L MC36 Sam Newell Rd.at US 74 0.010 Yes 6/20/2023 9:45:00 AM Hardness 19 mg/L MC36 Sam Newell Rd.at US 74 1.0 Yes 6/20/2023 9:45:00 AM Calcium 5000 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 6/20/2023 9:45:00 AM Magnesium 1700 ug/L MC36 Sam Newell Rd.at US 74 1000 Yes 6/20/2023 9:45:00 AM Copper 3.4 ug/L MC36 Sam Newell Rd.at US 74 2.0 Yes 7/19/2022 10:40:00 AM Turbidity 5.8 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 62 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit _ Site Description - MDL Storm 7/19/2022 10:40:00 AM E.Coli 207 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) I 1 No 7/19/2022 10:40:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 7/19/2022 10:40:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 7/19/2022 10:40:00 AM Fecal Coliform 270 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 7/19/2022 10:40:00 AM Nitrate/Nitrite 0.26 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No 7/19/2022 10:40:00 AM TKN 0.28 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 No 7/19/2022 10:40:00 AM Total Phosphorus 0.031 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 7/19/2022 10:40:00 AM Chromium 5 ug/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 7/19/2022 10:40:00 AM Nickel 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 7/19/2022 10:40:00 AM Hardness 41 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No 7/19/2022 10:40:00 AM Magnesium 3300 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 7/19/2022 10:40:00 AM Calcium 11000 ug/L MC4 Beatties Ford Rd.(Bridge) 2000 No 7/19/2022 10:40:00 AM Suspended Sediment 4.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.1 No 7/19/2022 10:40:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 7/19/2022 10:40:00 AM Zinc 10 ug/L MC4 Beatties Ford Rd.(Bridge) < 10 No 7/19/2022 10:40:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.50 No 8/16/2022 10:30:00 AM Fecal Coliform 4400 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes 8/16/2022 10:30:00 AM Nitrate/Nitrite 0.26 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes 8/16/2022 10:30:00 AM E.Coli 520 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes 8/16/2022 10:30:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes 8/16/2022 10:30:00 AM Total Suspended Solids 12.4 mg/L MC4 Beatties Ford Rd.(Bridge) 10.0 Yes 8/16/2022 10:30:00 AM Turbidity 35 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes 8/16/2022 10:30:00 AM TKN 0.35 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 Yes 8/16/2022 10:30:00 AM Suspended Sediment 12 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 Yes 8/16/2022 10:30:00 AM Total Phosphorus 0.069 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes 8/16/2022 10:30:00 AM Magnesium 2300 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 8/16/2022 10:30:00 AM Hardness 29 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes 8/16/2022 10:30:00 AM Calcium 7900 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 8/16/2022 10:30:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes 9/20/2022 10:25:00 AM E.Coli 185 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 9/20/2022 10:25:00 AM Nitrate/Nitrite 0.22 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No 9/20/2022 10:25:00 AM Fecal Coliform 200 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 9/20/2022 10:25:00 AM Total Phosphorus 0.026 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 9/20/2022 10:25:00 AM Turbidity 3.1 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 9/20/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 9/20/2022 10:25:00 AM Suspended Sediment 13 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 No 9/20/2022 10:25:00 AM Hardness 58 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No 9/20/2022 10:25:00 AM Magnesium 4400 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 9/20/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 9/20/2022 10:25:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 9/20/2022 10:25:00 AM Calcium 16000 ug/L MC4 Beatties Ford Rd.(Bridge) 2000 No 9/20/2022 10:25:00 AM Suspended Sediment 13 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 No 9/20/2022 10:25:00 AM Hardness 58 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No 9/20/2022 10:25:00 AM Magnesium 4400 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 9/20/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 63 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date Analyte Result Unit _ Site Description i MDL Storm 9/20/2022 10:25:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 9/20/2022 10:25:00 AM Calcium 16000 ug/L MC4 Beatties Ford Rd.(Bridge) 2000 No 9/20/2022 10:25:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 10/18/2022 10:30:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 10/18/2022 10:30:00 AM Turbidity 4 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 10/18/2022 10:30:00 AM E.Coli 173 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 10/18/2022 10:30:00 AM Nitrate/Nitrite 0.05 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.05 No 10/18/2022 10:30:00 AM Fecal Coliform 230 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 10/18/2022 10:30:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 10/18/2022 10:30:00 AM Total Phosphorus 0.037 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 10/18/2022 10:30:00 AM Suspended Sediment 4 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.0 No 10/18/2022 10:30:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 10/18/2022 10:30:00 AM Copper 1.16 ug/L MC4 Beatties Ford Rd.(Bridge) 0.500 No 10/18/2022 10:30:00 AM Zinc 20 ug/L MC4 Beatties Ford Rd.(Bridge) < 20.0 No 10/18/2022 10:30:00 AM Hardness 56 mg/L MC4 Beatties Ford Rd.(Bridge) 0.100 No 10/18/2022 10:30:00 AM Chromium 1 ug/L MC4 Beatties Ford Rd.(Bridge) < 1.00 No 10/18/2022 10:30:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No 10/18/2022 10:30:00 AM Calcium 15200 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No 10/18/2022 10:30:00 AM Magnesium 4390 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No 10/18/2022 10:30:00 AM Nickel 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No 10/18/2022 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 10/18/2022 10:35:00 AM Fecal Coliform 210 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 10/18/2022 10:35:00 AM Nitrate/Nitrite 0.05 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.05 No 10/18/2022 10:35:00 AM E.Coli 147 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 10/18/2022 10:35:00 AM Turbidity 4.8 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 10/18/2022 10:35:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 10/18/2022 10:35:00 AM Total Phosphorus 0.036 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 10/18/2022 10:35:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 No 10/18/2022 10:35:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 10/18/2022 10:35:00 AM Nickel 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No 10/18/2022 10:35:00 AM Chromium 1 ug/L MC4 Beatties Ford Rd.(Bridge) < 1.00 No 10/18/2022 10:35:00 AM Calcium 14900 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No 10/18/2022 10:35:00 AM Magnesium 4340 ug/L MC4 Beatties Ford Rd.(Bridge) 100 No 10/18/2022 10:35:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.500 No 10/18/2022 10:35:00 AM Zinc 20 ug/L MC4 Beatties Ford Rd.(Bridge) < 20.0 No 10/18/2022 10:35:00 AM Copper 1.84 ug/L MC4 Beatties Ford Rd.(Bridge) 0.500 No 10/18/2022 10:35:00 AM Hardness 55.1 mg/L MC4 Beatties Ford Rd.(Bridge) 0.100 No 11/15/2022 10:20:00 AM Fecal Coliform 154 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 20 Yes 11/15/2022 10:20:00 AM E.Coli 121 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 10 Yes 11/15/2022 10:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes 11/15/2022 10:20:00 AM Nitrate/Nitrite 0.16 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes 11/15/2022 10:20:00 AM Turbidity 7.1 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes 11/15/2022 10:20:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 Yes 11/15/2022 10:20:00 AM Total Phosphorus 0.033 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes 11/15/2022 10:20:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 Yes 64 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services -.Collection Date Analyte Result Unit I - Site Description i MDL Storm 11/15/2022 10:20:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 Yes 11/15/2022 10:20:00 AM Calcium 11000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 11/15/2022 10:20:00 AM Magnesium 3300 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 11/15/2022 10:20:00 AM Hardness 41 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes 11/15/2022 10:20:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes 12/20/2022 10:15:00 AM E.Coli 299 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 12/20/2022 10:15:00 AM Nitrate/Nitrite 0.51 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No 12/20/2022 10:15:00 AM Fecal Coliform 310 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 12/20/2022 10:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 12/20/2022 10:15:00 AM Turbidity 27 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 12/20/2022 10:15:00 AM Total Phosphorus 0.047 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 12/20/2022 10:15:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 No 12/20/2022 10:15:00 AM TKN 0.45 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 No 12/20/2022 10:15:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 12/20/2022 10:15:00 AM Copper 2.1 ug/L MC4 Beatties Ford Rd.(Bridge) 2.0 No 12/20/2022 10:15:00 AM Magnesium 3900 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 12/20/2022 10:15:00 AM Calcium 13000 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 12/20/2022 10:15:00 AM Hardness 49 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No 1/17/2023 10:20:00 AM Fecal Coliform 315 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 Yes 1/17/2023 10:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes 1/17/2023 10:20:00 AM Nitrate/Nitrite 0.5 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes 1/17/2023 10:20:00 AM E.Coli 161 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 Yes 1/17/2023 10:20:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 Yes 1/17/2023 10:20:00 AM Turbidity 23 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes 1/17/2023 10:20:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 Yes 1/17/2023 10:20:00 AM Suspended Sediment 4.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.1 Yes 1/17/2023 10:20:00 AM Total Phosphorus 0.039 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes 1/17/2023 10:20:00 AM Hardness 48 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes 1/17/2023 10:20:00 AM Magnesium 3800 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 1/17/2023 10:20:00 AM Chromium 5 ug/L MC4 Beatties Ford Rd.(Bridge) < 5.0 Yes 1/17/2023 10:20:00 AM Nickel 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes 1/17/2023 10:20:00 AM Calcium 13000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 1/17/2023 10:20:00 AM Zinc 10 ug/L MC4 Beatties Ford Rd.(Bridge) < 10 Yes 1/17/2023 10:20:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 Yes 1/17/2023 10:20:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.50 Yes 2/21/2023 10:10:00 AM Total Phosphorus 0.03 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 2/21/2023 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 2/21/2023 10:10:00 AM Fecal Coliform 150 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 2/21/2023 10:10:00 AM E.Coli 179 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 2/21/2023 10:10:00 AM Nitrate/Nitrite 0.39 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No 2/21/2023 10:10:00 AM Turbidity 13 NTU MC4 Beatties Ford Rd.(Bridge) 0.5 No 2/21/2023 10:10:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 2/21/2023 10:10:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 2/21/2023 10:10:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 2/21/2023 10:10:00 AM Magnesium 3700 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 65 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services -Collection Date Analyte Result Unit I - Site Description - MDL Storm 2/21/2023 10:10:00 AM Hardness 45 mg/L MC4 Beatties Ford Rd.(Bridge) I 1.0 No 2/21/2023 10:10:00 AM Calcium 12000 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 2/21/2023 10:10:00 AM Suspended Sediment 3.9 mg/L MC4 Beatties Ford Rd.(Bridge) < 3.9 No 3/21/2023 10:20:00 AM Nitrate/Nitrite 0.31 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No 3/21/2023 10:20:00 AM Turbidity 6.7 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 3/21/2023 10:20:00 AM Fecal Coliform 250 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 3/21/2023 10:20:00 AM E.Coli 185 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 3/21/2023 10:20:00 AM Total Phosphorus 0.028 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 3/21/2023 10:20:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 3/21/2023 10:20:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 3/21/2023 10:20:00 AM Hardness 49 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No 3/21/2023 10:20:00 AM Calcium 13000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No 3/21/2023 10:20:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 3/21/2023 10:20:00 AM Magnesium 4000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No 3/21/2023 10:20:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 3/21/2023 10:20:00 AM Suspended Sediment 3.9 mg/L MC4 Beatties Ford Rd.(Bridge) < 3.9 No 4/18/2023 10:25:00 AM Fecal Coliform 113 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 4/18/2023 10:25:00 AM Turbidity 15 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 4/18/2023 10:25:00 AM Nitrate/Nitrite 0.45 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No 4/18/2023 10:25:00 AM E.Coli 153 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 4/18/2023 10:25:00 AM Total Phosphorus 0.038 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 4/18/2023 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 4/18/2023 10:25:00 AM Suspended Sediment 4.2 mg/L MC4 Beatties Ford Rd.(Bridge) < 4.2 No 4/18/2023 10:25:00 AM Calcium 14000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No 4/18/2023 10:25:00 AM Magnesium 4100 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 No 4/18/2023 10:25:00 AM Hardness 52 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No 4/18/2023 10:25:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 4/18/2023 10:25:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 4/18/2023 10:25:00 AM Zinc 10 ug/L MC4 Beatties Ford Rd.(Bridge) < 10 No 4/18/2023 10:25:00 AM Chromium 5 ug/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 4/18/2023 10:25:00 AM Nickel 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 4/18/2023 10:25:00 AM Lead 0.5 ug/L MC4 Beatties Ford Rd.(Bridge) < 0.50 No 4/18/2023 10:25:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 5/16/2023 10:30:00 AM E.Coli 173 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 1 No 5/16/2023 10:30:00 AM Fecal Coliform 163 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 10 No 5/16/2023 10:30:00 AM Nitrate/Nitrite 0.4 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 No 5/16/2023 10:30:00 AM Turbidity 6.2 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 No 5/16/2023 10:30:00 AM Total Phosphorus 0.026 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 No 5/16/2023 10:30:00 AM Suspended Sediment 3.9 mg/L MC4 Beatties Ford Rd.(Bridge) < 3.9 No 5/16/2023 10:30:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 No 5/16/2023 10:30:00 AM TKN 0.25 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.25 No 5/16/2023 10:30:00 AM Total Suspended Solids 5 mg/L MC4 Beatties Ford Rd.(Bridge) < 5.0 No 5/16/2023 10:30:00 AM Hardness 63 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 No 5/16/2023 10:30:00 AM Calcium 17000 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 5/16/2023 10:30:00 AM Magnesium 4900 ug/L MC4 Beatties Ford Rd.(Bridge) 500 No 66 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit _ Site Description MDL Storm 5/16/2023 10:30:00 AM Copper 2 ug/L MC4 Beatties Ford Rd.(Bridge) < 2.0 No 6/20/2023 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC4 Beatties Ford Rd.(Bridge) < 0.10 Yes 6/20/2023 10:25:00 AM Turbidity 140 NTU MC4 Beatties Ford Rd.(Bridge) 0.50 Yes 6/20/2023 10:25:00 AM Nitrate/Nitrite 0.27 mg/L MC4 Beatties Ford Rd.(Bridge) 0.05 Yes 6/20/2023 10:25:00 AM E.Coli 7890 MPN/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes 6/20/2023 10:25:00 AM Total Suspended Solids 115 mg/L MC4 Beatties Ford Rd.(Bridge) 14.7 Yes 6/20/2023 10:25:00 AM Suspended Sediment 140 mg/L MC4 Beatties Ford Rd.(Bridge) 4.1 Yes 6/20/2023 10:25:00 AM Fecal Coliform 11900 CFU/100 ml MC4 Beatties Ford Rd.(Bridge) 100 Yes 6/20/2023 10:25:00 AM Total Phosphorus 0.147 mg/L MC4 Beatties Ford Rd.(Bridge) 0.010 Yes 6/20/2023 10:25:00 AM Magnesium 2000 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 6/20/2023 10:25:00 AM Hardness 23 mg/L MC4 Beatties Ford Rd.(Bridge) 1.0 Yes 6/20/2023 10:25:00 AM Calcium 5900 ug/L MC4 Beatties Ford Rd.(Bridge) 1000 Yes 6/20/2023 10:25:00 AM Copper 2.7 ug/L MC4 Beatties Ford Rd.(Bridge) 2.0 Yes 6/20/2023 10:25:00 AM TKN 0.77 mg/L MC4 Beatties Ford Rd.(Bridge) 0.25 Yes 7/19/2022 11:00:00 AM Turbidity 6.3 NTU MC40C Trade St.Matthews 0.50 Yes 7/19/2022 11:00:00 AM Fecal Coliform 1280 CFU/100 ml MC40C Trade St.Matthews 10 Yes 7/19/2022 11:00:00 AM E.Coli 771 MPN/100 ml MC40C Trade St.Matthews 1 Yes 7/19/2022 11:00:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 7/19/2022 11:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 7/19/2022 11:00:00 AM Nitrate/Nitrite 0.21 mg/L MC40C Trade St.Matthews 0.05 Yes 7/19/2022 11:00:00 AM Chromium 5 ug/L MC40C Trade St.Matthews < 5.0 Yes 7/19/2022 11:00:00 AM Total Phosphorus 0.041 mg/L MC40C Trade St.Matthews 0.010 Yes 7/19/2022 11:00:00 AM Nickel 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 7/19/2022 11:00:00 AM TKN 0.28 mg/L MC40C Trade St.Matthews 0.25 Yes 7/19/2022 11:00:00 AM Magnesium 3700 ug/L MC40C Trade St.Matthews 500 Yes 7/19/2022 11:00:00 AM Calcium 13000 ug/L MC40C Trade St.Matthews 500 Yes 7/19/2022 11:00:00 AM Hardness 48 mg/L MC40C Trade St.Matthews 1.0 Yes 7/19/2022 11:00:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 Yes 7/19/2022 11:00:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.50 Yes 7/19/2022 11:00:00 AM Copper 2.3 ug/L MC40C Trade St.Matthews 2.0 Yes 7/19/2022 11:00:00 AM Zinc 10 ug/L MC40C Trade St.Matthews < 10 Yes 8/16/2022 10:25:00 AM E.Coli 410 MPN/100 ml MC40C Trade St.Matthews 100 Yes 8/16/2022 10:25:00 AM Fecal Coliform 500 CFU/100 ml MC40C Trade St.Matthews 100 Yes 8/16/2022 10:25:00 AM Nitrate/Nitrite 0.24 mg/L MC40C Trade St.Matthews 0.05 Yes 8/16/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 8/16/2022 10:25:00 AM Turbidity 4.7 NTU MC40C Trade St.Matthews 0.50 Yes 8/16/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 8/16/2022 10:25:00 AM TKN 0.26 mg/L MC40C Trade St.Matthews 0.25 Yes 8/16/2022 10:25:00 AM Total Phosphorus 0.033 mg/L MC40C Trade St.Matthews 0.010 Yes 8/16/2022 10:25:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 Yes 8/16/2022 10:25:00 AM Magnesium 4500 ug/L MC40C Trade St.Matthews 1000 Yes 8/16/2022 10:25:00 AM Calcium 13000 ug/L MC40C Trade St.Matthews 1000 Yes 8/16/2022 10:25:00 AM Hardness 51 mg/L MC40C Trade St.Matthews 1.0 Yes 8/16/2022 10:25:00 AM Copper 2.2 ug/L MC40C Trade St.Matthews 2.0 Yes 9/20/2022 11:05:00 AM Fecal Coliform 355 CFU/100 ml MC40C Trade St.Matthews 10 No 67 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date AM Analyte Result Unit Site Description MDL Storm 9/20/2022 11:05:00 AM E.Coli 346 MPN/100 ml MC40C Trade St.Matthews 2 No 9/20/2022 11:05:00 AM Nitrate/Nitrite 0.1 mg/L MC40C Trade St.Matthews 0.05 No 9/20/2022 11:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No 9/20/2022 11:05:00 AM Turbidity 4.4 NTU MC40C Trade St.Matthews 0.50 No 9/20/2022 11:05:00 AM Total Phosphorus 0.029 mg/L MC40C Trade St.Matthews 0.010 No 9/20/2022 11:05:00 AM Magnesium 4800 ug/L MC40C Trade St.Matthews 500 No 9/20/2022 11:05:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 No 9/20/2022 11:05:00 AM Hardness 62 mg/L MC40C Trade St.Matthews 1.0 No 9/20/2022 11:05:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No 9/20/2022 11:05:00 AM Calcium 17000 ug/L MC40C Trade St.Matthews 500 No 9/20/2022 11:05:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 No 9/20/2022 11:05:00 AM Magnesium 4800 ug/L MC40C Trade St.Matthews 500 No 9/20/2022 11:05:00 AM Suspended Sediment 4.1 mg/L MC40C Trade St.Matthews < 4.1 No 9/20/2022 11:05:00 AM Hardness 62 mg/L MC40C Trade St.Matthews 1.0 No 9/20/2022 11:05:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No 9/20/2022 11:05:00 AM Calcium 17000 ug/L MC40C Trade St.Matthews 500 No 9/20/2022 11:05:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 No 9/20/2022 11:05:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 No 10/18/2022 10:25:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 No 10/18/2022 10:25:00 AM Fecal Coliform 600 CFU/100 ml MC40C Trade St.Matthews 10 No 10/18/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No 10/18/2022 10:25:00 AM E.Coli 833 MPN/100 ml MC40C Trade St.Matthews 2 No 10/18/2022 10:25:00 AM Turbidity 1.4 NTU MC40C Trade St.Matthews 0.50 No 10/18/2022 10:25:00 AM Total Phosphorus 0.048 mg/L MC40C Trade St.Matthews 0.010 No 10/18/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No 10/18/2022 10:25:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 No 10/18/2022 10:25:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 No 10/18/2022 10:25:00 AM Hardness 68.1 mg/L MC40C Trade St.Matthews 0.100 No 10/18/2022 10:25:00 AM Magnesium 5490 ug/L MC40C Trade St.Matthews 100 No 10/18/2022 10:25:00 AM Zinc 20 ug/L MC40C Trade St.Matthews < 20.0 No 10/18/2022 10:25:00 AM Chromium 1 ug/L MC40C Trade St.Matthews < 1.00 No 10/18/2022 10:25:00 AM Copper 1.47 ug/L MC40C Trade St.Matthews 0.500 No 10/18/2022 10:25:00 AM Calcium 18200 ug/L MC40C Trade St.Matthews 100 No 10/18/2022 10:25:00 AM Nickel 0.5 ug/L MC40C Trade St.Matthews < 0.500 No 10/18/2022 10:25:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.500 No 11/15/2022 10:55:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 Yes 11/15/2022 10:55:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 11/15/2022 10:55:00 AM Fecal Coliform 1930 CFU/100 ml MC40C Trade St.Matthews 20 Yes 11/15/2022 10:55:00 AM Turbidity 4.4 NTU MC40C Trade St.Matthews 0.50 Yes 11/15/2022 10:55:00 AM E.Coli 2098 MPN/100 ml MC40C Trade St.Matthews 10 Yes 11/15/2022 10:55:00 AM TKN 0.31 mg/L MC40C Trade St.Matthews 0.25 Yes 11/15/2022 10:55:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 11/15/2022 10:55:00 AM Total Phosphorus 0.043 mg/L MC40C Trade St.Matthews 0.010 Yes 11/15/2022 10:55:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 Yes 11/15/2022 10:55:00 AM Calcium 15000 ug/L MC40C Trade St.Matthews 1000 Yes 68 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services -.Collection Date ill Analyte Result Unit Site Description MDL Storm 11/15/2022 10:55:00 AM Magnesium 4600 ug/L MC40C Trade St.Matthews 1000 Yes 11/15/2022 10:55:00 AM Hardness 56 mg/L MC40C Trade St.Matthews 1.0 Yes 11/15/2022 10:55:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 11/15/2022 11:00:00 AM Turbidity 4.2 NTU MC40C Trade St.Matthews 0.50 Yes 11/15/2022 11:00:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 Yes 11/15/2022 11:00:00 AM E.Coli 1722 MPN/100 ml MC40C Trade St.Matthews 10 Yes 11/15/2022 11:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 11/15/2022 11:00:00 AM Fecal Coliform 1740 CFU/100 ml MC40C Trade St.Matthews 20 Yes 11/15/2022 11:00:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 11/15/2022 11:00:00 AM TKN 0.32 mg/L MC40C Trade St.Matthews 0.25 Yes 11/15/2022 11:00:00 AM Total Phosphorus 0.044 mg/L MC40C Trade St.Matthews 0.010 Yes 11/15/2022 11:00:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 Yes 11/15/2022 11:00:00 AM Magnesium 4000 ug/L MC40C Trade St.Matthews 1000 Yes 11/15/2022 11:00:00 AM Calcium 13000 ug/L MC40C Trade St.Matthews 1000 Yes 11/15/2022 11:00:00 AM Hardness 49 mg/L MC40C Trade St.Matthews 1.0 Yes 11/15/2022 11:10:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 12/20/2022 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No 12/20/2022 10:35:00 AM Fecal Coliform 910 CFU/100 ml MC40C Trade St.Matthews 10 No 12/20/2022 10:35:00 AM Turbidity 8.6 NTU MC40C Trade St.Matthews 0.50 No 12/20/2022 10:35:00 AM Total Phosphorus 0.034 mg/L MC40C Trade St.Matthews 0.010 No 12/20/2022 10:35:00 AM E.Coli 1544 MPN/100 ml MC40C Trade St.Matthews 2 No 12/20/2022 10:35:00 AM Nitrate/Nitrite 0.3 mg/L MC40C Trade St.Matthews 0.05 No 12/20/2022 10:35:00 AM Suspended Sediment 4 mg/L MC40C Trade St.Matthews < 4.0 No 12/20/2022 10:35:00 AM TKN 0.3 mg/L MC40C Trade St.Matthews 0.25 No 12/20/2022 10:35:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No 12/20/2022 10:35:00 AM Calcium 15000 ug/L MC40C Trade St.Matthews 500 No 12/20/2022 10:35:00 AM Magnesium 4400 ug/L MC40C Trade St.Matthews 500 No 12/20/2022 10:35:00 AM Hardness 56 mg/L MC40C Trade St.Matthews 1.0 No 12/20/2022 10:35:00 AM Copper 2.2 ug/L MC40C Trade St.Matthews 2.0 No 1/17/2023 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 1/17/2023 10:35:00 AM Nitrate/Nitrite 0.24 mg/L MC40C Trade St.Matthews 0.05 Yes 1/17/2023 10:35:00 AM E.Coli 337 MPN/100 ml MC40C Trade St.Matthews 2 Yes 1/17/2023 10:35:00 AM Fecal Coliform 295 CFU/100 ml MC40C Trade St.Matthews 10 Yes 1/17/2023 10:35:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 1/17/2023 10:35:00 AM Turbidity 12 NTU MC40C Trade St.Matthews 0.50 Yes 1/17/2023 10:35:00 AM TKN 0.25 mg/L MC40C Trade St.Matthews < 0.25 Yes 1/17/2023 10:35:00 AM Total Phosphorus 0.028 mg/L MC40C Trade St.Matthews 0.010 Yes 1/17/2023 10:35:00 AM Suspended Sediment 4.9 mg/L MC40C Trade St.Matthews < 4.9 Yes 1/17/2023 10:35:00 AM Hardness 61 mg/L MC40C Trade St.Matthews 1.0 Yes - 1/17/2023 10:35:00 AM Magnesium 5000 ug/L MC40C Trade St.Matthews 1000 Yes 1/17/2023 10:35:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 1000 Yes 1/17/2023 10:35:00 AM Chromium 5 ug/L MC40C Trade St.Matthews < 5.0 Yes 1/17/2023 10:35:00 AM Nickel 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 1/17/2023 10:35:00 AM Zinc 10 ug/L MC40C Trade St.Matthews < 10 Yes 1/17/2023 10:35:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.50 Yes 69 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services -.Collection Date Analyte Result Unit I Site Description MDL Storm 1/17/2023 10:35:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 2/21/2023 10:15:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 No 2/21/2023 10:15:00 AM E.Coli 388 MPN/100 ml MC40C Trade St.Matthews 1 No 2/21/2023 10:15:00 AM Turbidity 6.6 NTU MC40C Trade St.Matthews 0.5 No 2/21/2023 10:15:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 No 2/21/2023 10:15:00 AM Total Phosphorus 0.023 mg/L MC40C Trade St.Matthews 0.010 No 2/21/2023 10:15:00 AM Fecal Coliform 404 CFU/100 ml MC40C Trade St.Matthews 10 No 2/21/2023 10:15:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 No 2/21/2023 10:15:00 AM TKN 0.29 mg/L MC40C Trade St.Matthews 0.25 No 2/21/2023 10:15:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 No 2/21/2023 10:15:00 AM Hardness 60 mg/L MC40C Trade St.Matthews 1.0 No 2/21/2023 10:15:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 500 No 2/21/2023 10:15:00 AM Magnesium 4900 ug/L MC40C Trade St.Matthews 500 No 2/21/2023 10:15:00 AM Suspended Sediment 4.3 mg/L MC40C Trade St.Matthews < 4.3 No 3/21/2023 10:45:00 AM Turbidity 4.1 NTU MC40C Trade St.Matthews 0.50 Yes 3/21/2023 10:45:00 AM Fecal Coliform 430 CFU/100 ml MC40C Trade St.Matthews 10 Yes 3/21/2023 10:45:00 AM E.Coli 442 MPN/100 ml MC40C Trade St.Matthews 2 Yes 3/21/2023 10:45:00 AM Nitrate/Nitrite 0.05 mg/L MC40C Trade St.Matthews < 0.05 Yes 3/21/2023 10:45:00 AM Total Phosphorus 0.02 mg/L MC40C Trade St.Matthews 0.010 Yes 3/21/2023 10:45:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 3/21/2023 10:45:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 3/21/2023 10:45:00 AM Hardness 62 mg/L MC40C Trade St.Matthews 1.0 Yes 3/21/2023 10:45:00 AM Magnesium 5300 ug/L MC40C Trade St.Matthews 1000 Yes 3/21/2023 10:45:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 1000 Yes 3/21/2023 10:45:00 AM TKN 0.31 mg/L MC40C Trade St.Matthews 0.25 Yes 3/21/2023 10:45:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 3/21/2023 10:45:00 AM Suspended Sediment 4.3 mg/L MC40C Trade St.Matthews < 4.3 Yes 4/12/2023 1:00:00 PM E.Coli 614 MPN/100 ml MC40C Trade St.Matthews 1 No 4/18/2023 10:50:00 AM Turbidity 6.6 NTU MC40C Trade St.Matthews 0.50 Yes 4/18/2023 10:50:00 AM Fecal Coliform 800 CFU/100 ml MC40C Trade St.Matthews 10 Yes 4/18/2023 10:50:00 AM Total Phosphorus 0.038 mg/L MC40C Trade St.Matthews 0.010 Yes 4/18/2023 10:50:00 AM Nitrate/Nitrite 0.25 mg/L MC40C Trade St.Matthews 0.05 Yes 4/18/2023 10:50:00 AM E.Coli 1095 MPN/100 ml MC40C Trade St.Matthews 2 Yes 4/18/2023 10:50:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 4/18/2023 10:50:00 AM Magnesium 5000 ug/L MC40C Trade St.Matthews 1000 Yes 4/18/2023 10:50:00 AM Suspended Sediment 4.2 mg/L MC40C Trade St.Matthews < 4.2 Yes 4/18/2023 10:50:00 AM Calcium 16000 ug/L MC40C Trade St.Matthews 1000 Yes 4/18/2023 10:50:00 AM Hardness 61 mg/L MC40C Trade St.Matthews 1.0 Yes 4/18/2023 10:50:00 AM TKN 0.34 mg/L MC40C Trade St.Matthews 0.25 Yes 4/18/2023 10:50:00 AM Chromium 5 ug/L MC40C Trade St.Matthews < 5.0 Yes 4/18/2023 10:50:00 AM Zinc 10 ug/L MC40C Trade St.Matthews < 10 Yes 4/18/2023 10:50:00 AM Lead 0.5 ug/L MC40C Trade St.Matthews < 0.50 Yes 4/18/2023 10:50:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 4/18/2023 10:50:00 AM Nickel 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 4/18/2023 10:50:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 70 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services -Collection Date AM Analyte Result Unit 1. 1 Site Description MDL Storm 5/16/2023 10:55:00 AM Fecal Coliform 588 CFU/100 ml MC40C Trade St.Matthews 10 Yes 5/16/2023 10:55:00 AM E.Coli 634 MPN/100 ml MC40C Trade St.Matthews 2 Yes 5/16/2023 10:55:00 AM Turbidity 2.3 NTU MC40C Trade St.Matthews 0.50 Yes 5/16/2023 10:55:00 AM Nitrate/Nitrite 0.32 mg/L MC40C Trade St.Matthews 0.05 Yes 5/16/2023 10:55:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 5/16/2023 10:55:00 AM Suspended Sediment 4.3 mg/L MC40C Trade St.Matthews < 4.3 Yes 5/16/2023 10:55:00 AM Total Phosphorus 0.041 mg/L MC40C Trade St.Matthews 0.010 Yes 5/16/2023 10:55:00 AM TKN 0.5 mg/L MC40C Trade St.Matthews 0.25 Yes 5/16/2023 10:55:00 AM Total Suspended Solids 5 mg/L MC40C Trade St.Matthews < 5.0 Yes 5/16/2023 10:55:00 AM Copper 2 ug/L MC40C Trade St.Matthews < 2.0 Yes 5/16/2023 10:55:00 AM Hardness 76 mg/L MC40C Trade St.Matthews 1.0 Yes 5/16/2023 10:55:00 AM Magnesium 6400 ug/L MC40C Trade St.Matthews 500 Yes 5/16/2023 10:55:00 AM Calcium 20000 ug/L MC40C Trade St.Matthews 500 Yes 6/20/2023 10:35:00 AM E.Coli 9125 MPN/100 ml MC40C Trade St.Matthews 100 Yes 6/20/2023 10:35:00 AM Ammonia-Nitrogen 0.1 mg/L MC40C Trade St.Matthews < 0.10 Yes 6/20/2023 10:35:00 AM Turbidity 50 NTU MC40C Trade St.Matthews 0.50 Yes 6/20/2023 10:35:00 AM Nitrate/Nitrite 0.29 mg/L MC40C Trade St.Matthews 0.05 Yes 6/20/2023 10:35:00 AM Suspended Sediment 16 mg/L MC40C Trade St.Matthews 4.1 Yes 6/20/2023 10:35:00 AM Total Suspended Solids 15.6 mg/L MC40C Trade St.Matthews 5.0 Yes 6/20/2023 10:35:00 AM TKN 0.44 mg/L MC40C Trade St.Matthews 0.25 Yes 6/20/2023 10:35:00 AM Fecal Coliform 11800 CFU/100 ml MC40C Trade St.Matthews 100 Yes 6/20/2023 10:35:00 AM Total Phosphorus 0.072 mg/L MC40C Trade St.Matthews 0.010 Yes 6/20/2023 10:35:00 AM Hardness 25 mg/L MC40C Trade St.Matthews 1.0 Yes 6/20/2023 10:35:00 AM Magnesium 2100 ug/L MC40C Trade St.Matthews 1000 Yes 6/20/2023 10:35:00 AM Calcium 6600 ug/L MC40C Trade St.Matthews 1000 Yes 6/20/2023 10:35:00 AM Copper 2.7 ug/L MC40C Trade St.Matthews 2.0 Yes 7/19/2022 10:25:00 AM Turbidity 4.4 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 7/19/2022 10:25:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 7/19/2022 10:25:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 7/19/2022 10:25:00 AM Fecal Coliform 1200 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 7/19/2022 10:25:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 7/19/2022 10:25:00 AM Nitrate/Nitrite 0.4 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 7/19/2022 10:25:00 AM Total Phosphorus 0.104 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 7/19/2022 10:25:00 AM TKN 0.41 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No 7/19/2022 10:25:00 AM Nickel 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 7/19/2022 10:25:00 AM Chromium 5 ug/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 7/19/2022 10:25:00 AM Magnesium 9600 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 7/19/2022 10:25:00 AM Calcium 28000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No 7/19/2022 10:25:00 AM Hardness 110 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No - 7/19/2022 10:25:00 AM Suspended Sediment 4.3 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.3 No 7/19/2022 10:25:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.50 No 7/19/2022 10:25:00 AM Zinc 10 ug/L MC50 Gar Cr Beatties Ford Rd. < 10 No 7/19/2022 10:25:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 8/16/2022 10:10:00 AM Fecal Coliform 750 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes 8/16/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes 71 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit I _ Site Description MDL Storm 8/16/2022 10:10:00 AM Nitrate/Nitrite 0.23 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes 8/16/2022 10:10:00 AM E.Coli 850 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes 8/16/2022 10:10:00 AM Turbidity 7.1 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes 8/16/2022 10:10:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 Yes 8/16/2022 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes 8/16/2022 10:10:00 AM Suspended Sediment 4.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.1 Yes 8/16/2022 10:10:00 AM Total Phosphorus 0.105 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes 8/16/2022 10:10:00 AM Calcium 21000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 8/16/2022 10:10:00 AM Magnesium 9300 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 8/16/2022 10:10:00 AM Hardness 91 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes 8/16/2022 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes 9/20/2022 10:00:00 AM Fecal Coliform 2400 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 9/20/2022 10:00:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. > 1 No 9/20/2022 10:00:00 AM Nitrate/Nitrite 0.3 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 9/20/2022 10:00:00 AM Total Phosphorus 0.088 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 9/20/2022 10:00:00 AM Turbidity 3.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 9/20/2022 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 9/20/2022 10:00:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 9/20/2022 10:00:00 AM TKN 0.29 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No 9/20/2022 10:00:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 9/20/2022 10:00:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No 9/20/2022 10:00:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No 9/20/2022 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 9/20/2022 10:00:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 9/20/2022 10:00:00 AM TKN 0.29 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No 9/20/2022 10:00:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 9/20/2022 10:00:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No 9/20/2022 10:00:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No 9/20/2022 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 9/20/2022 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 9/20/2022 10:05:00 AM E.Coli 2020 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 2 No 9/20/2022 10:05:00 AM Nitrate/Nitrite 0.29 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 9/20/2022 10:05:00 AM Fecal Coliform 2100 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 9/20/2022 10:05:00 AM Total Phosphorus 0.09 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 9/20/2022 10:05:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 9/20/2022 10:05:00 AM Turbidity 3.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 9/20/2022 10:05:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No 9/20/2022 10:05:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No 9/20/2022 10:05:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 9/20/2022 10:05:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 9/20/2022 10:05:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 9/20/2022 10:05:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No 9/20/2022 10:05:00 AM Calcium 30000 ug/L MC50 Gar Cr Beatties Ford Rd. 2000 No 9/20/2022 10:05:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No 9/20/2022 10:05:00 AM Hardness 120 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 72 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services -Collection Date Analyte Result Unit I Site Description MDL Storm 9/20/2022 10:05:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 9/20/2022 10:05:00 AM Magnesium 11000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 9/20/2022 10:05:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No 9/20/2022 10:05:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 9/22/2022 12:50:00 PM Fecal Coliform 4900 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 9/22/2022 12:50:00 PM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. > 1 No 9/22/2022 12:50:00 PM Fecal Coliform 4900 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 9/22/2022 12:50:00 PM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. > 1 No 9/27/2022 9:15:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 9/27/2022 9:15:00 AM Fecal Coliform 3800 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 10/6/2022 11:39:00 AM Fecal Coliform 3500 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 10/6/2022 11:39:00 AM E.Coli 1860 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 10/18/2022 10:10:00 AM E.Coli 2420 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 10/18/2022 10:10:00 AM Turbidity 2.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 10/18/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 10/18/2022 10:10:00 AM Fecal Coliform 3100 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 10/18/2022 10:10:00 AM Nitrate/Nitrite 0.05 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.05 No 10/18/2022 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 10/18/2022 10:10:00 AM Total Phosphorus 0.069 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 10/18/2022 10:10:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No 10/18/2022 10:10:00 AM Suspended Sediment 4.4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.4 No 10/18/2022 10:10:00 AM Chromium 1 ug/L MC50 Gar Cr Beatties Ford Rd. < 1.00 No 10/18/2022 10:10:00 AM Magnesium 11300 ug/L MC50 Gar Cr Beatties Ford Rd. 100 No 10/18/2022 10:10:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.500 No 10/18/2022 10:10:00 AM Nickel 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.500 No 10/18/2022 10:10:00 AM Hardness 124 mg/L MC50 Gar Cr Beatties Ford Rd. 0.100 No 10/18/2022 10:10:00 AM Zinc 20 ug/L MC50 Gar Cr Beatties Ford Rd. < 20.0 No 10/18/2022 10:10:00 AM Calcium 30900 ug/L MC50 Gar Cr Beatties Ford Rd. 100 No 10/18/2022 10:10:00 AM Copper 1.27 ug/L MC50 Gar Cr Beatties Ford Rd. 0.500 No 10/25/2022 9:50:00 AM E.Coli 1162 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 10 10/25/2022 9:50:00 AM Fecal Coliform 819 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 11/15/2022 10:00:00 AM E.Coli 216 MPN/100 m1 MC50 Gar Cr Beatties Ford Rd. 10 Yes 11/15/2022 10:00:00 AM Nitrate/Nitrite 0.07 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes 11/15/2022 10:00:00 AM Fecal Coliform 262 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 20 Yes 11/15/2022 10:00:00 AM Turbidity 1.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes 11/15/2022 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes 11/15/2022 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes 11/15/2022 10:00:00 AM Total Phosphorus 0.071 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes - 11/15/2022 10:00:00 AM Suspended Sediment 4.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.1 Yes - 11/15/2022 10:00:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 Yes 11/15/2022 10:00:00 AM Magnesium 8500 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 11/15/2022 10:00:00 AM Calcium 24000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 11/15/2022 10:00:00 AM Hardness 95 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes 11/15/2022 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes 12/20/2022 10:10:00 AM Nitrate/Nitrite 0.5 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 73 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services 7 Collection Date Analyte Result Unit I _ Site Description MDL Storm 12/20/2022 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 12/20/2022 10:10:00 AM E.Coli 580 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 12/20/2022 10:10:00 AM Turbidity 6.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 12/20/2022 10:10:00 AM Fecal Coliform 515 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 12/20/2022 10:10:00 AM Total Phosphorus 0.062 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 12/20/2022 10:10:00 AM TKN 0.27 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No 12/20/2022 10:10:00 AM Suspended Sediment 4.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.1 No 12/20/2022 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 12/20/2022 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 12/20/2022 10:10:00 AM Magnesium 7700 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 12/20/2022 10:10:00 AM Hardness 84 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 12/20/2022 10:10:00 AM Calcium 21000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 1/17/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes 1/17/2023 10:00:00 AM Fecal Coliform 380 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 Yes 1/17/2023 10:00:00 AM Nitrate/Nitrite 0.47 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes 1/17/2023 10:00:00 AM E.Coli 411 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 Yes 1/17/2023 10:00:00 AM Turbidity 10 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes 1/17/2023 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes 1/17/2023 10:00:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 Yes 1/17/2023 10:00:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 Yes 1/17/2023 10:00:00 AM Total Phosphorus 0.053 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes 1/17/2023 10:00:00 AM Hardness 75 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes 1/17/2023 10:00:00 AM Nickel 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes 1/17/2023 10:00:00 AM Chromium 5 ug/L MC50 Gar Cr Beatties Ford Rd. < 5.0 Yes 1/17/2023 10:00:00 AM Magnesium 6700 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 1/17/2023 10:00:00 AM Calcium 19000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 1/17/2023 10:00:00 AM Zinc 10 ug/L MC50 Gar Cr Beatties Ford Rd. < 10 Yes 1/17/2023 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes 1/17/2023 10:00:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.50 Yes 2/21/2023 9:50:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 2/21/2023 9:50:00 AM Fecal Coliform 530 CFU/100 ml 1 MC50 Gar Cr Beatties Ford Rd. 10 No 2/21/2023 9:50:00 AM Turbidity 8.1 NTU MC50 Gar Cr Beatties Ford Rd. 0.5 No 2/21/2023 9:50:00 AM Total Phosphorus 0.043 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 2/21/2023 9:50:00 AM E.Coli 436 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 2/21/2023 9:50:00 AM Nitrate/Nitrite 0.3 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 2/21/2023 9:50:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 2/21/2023 9:50:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No 2/21/2023 9:50:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 2/21/2023 9:50:00 AM Calcium 17000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 2/21/2023 9:50:00 AM Magnesium 6200 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 2/21/2023 9:50:00 AM Hardness 68 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 2/21/2023 9:50:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No 3/21/2023 10:00:00 AM Fecal Coliform 920 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 3/21/2023 10:00:00 AM Turbidity 4.6 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 3/21/2023 10:00:00 AM E.Coli 817 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 74 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit _ Site Description MDL Storm 3/21/2023 10:00:00 AM Nitrate/Nitrite 0.07 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 3/21/2023 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 3/21/2023 10:00:00 AM Total Phosphorus 0.031 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 3/21/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 3/21/2023 10:00:00 AM Calcium 19000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No 3/21/2023 10:00:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No 3/21/2023 10:00:00 AM Hardness 76 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 3/21/2023 10:00:00 AM Magnesium 7000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No 3/21/2023 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 3/21/2023 10:00:00 AM Suspended Sediment 4 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.0 No 4/12/2023 11:10:00 AM Fecal Coliform 525 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 4/12/2023 11:10:00 AM E.Coli 366 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 4/18/2023 10:00:00 AM Fecal Coliform 460 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 4/18/2023 10:00:00 AM Total Phosphorus 0.048 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 4/18/2023 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 4/18/2023 10:00:00 AM E.Coli 687 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 4/18/2023 10:00:00 AM Nitrate/Nitrite 0.36 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 4/18/2023 10:00:00 AM Turbidity 4.5 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 4/18/2023 10:00:00 AM Magnesium 6700 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No 4/18/2023 10:00:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No 4/18/2023 10:00:00 AM Calcium 18000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 No 4/18/2023 10:00:00 AM Hardness 73 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 4/18/2023 10:00:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 4/18/2023 10:00:00 AM TKN 0.27 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 No 4/18/2023 10:00:00 AM Lead 0.5 ug/L MC50 Gar Cr Beatties Ford Rd. < 0.50 No 4/18/2023 10:00:00 AM Chromium 5 ug/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 4/18/2023 10:00:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 4/18/2023 10:00:00 AM Zinc 10 ug/L MC50 Gar Cr Beatties Ford Rd. < 10 No 4/18/2023 10:00:00 AM Nickel 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 5/16/2023 10:10:00 AM E.Coli 210 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 1 No 5/16/2023 10:10:00 AM Nitrate/Nitrite 0.52 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 No 5/16/2023 10:10:00 AM Fecal Coliform 225 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 10 No 5/16/2023 10:10:00 AM Turbidity 2.1 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 No 5/16/2023 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 No 5/16/2023 10:10:00 AM Total Phosphorus 0.051 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 No 5/16/2023 10:10:00 AM Suspended Sediment 4.2 mg/L MC50 Gar Cr Beatties Ford Rd. < 4.2 No 5/16/2023 10:10:00 AM Total Suspended Solids 5 mg/L MC50 Gar Cr Beatties Ford Rd. < 5.0 No 5/16/2023 10:10:00 AM TKN 0.25 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.25 No 5/16/2023 10:10:00 AM Magnesium 8200 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 5/16/2023 10:10:00 AM Calcium 23000 ug/L MC50 Gar Cr Beatties Ford Rd. 500 No 5/16/2023 10:10:00 AM Hardness 91 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 No 5/16/2023 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 No 6/20/2023 10:10:00 AM Ammonia-Nitrogen 0.1 mg/L MC50 Gar Cr Beatties Ford Rd. < 0.10 Yes 6/20/2023 10:10:00 AM Turbidity 21 NTU MC50 Gar Cr Beatties Ford Rd. 0.50 Yes 6/20/2023 10:10:00 AM Nitrate/Nitrite 0.39 mg/L MC50 Gar Cr Beatties Ford Rd. 0.05 Yes 75 , , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date Analyte Result Unit _ Site Description MDL Storm 6/20/2023 10:10:00 AM E.Coli 5630 MPN/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes 6/20/2023 10:10:00 AM Suspended Sediment 6.4 mg/L MC50 Gar Cr Beatties Ford Rd. 4.0 Yes 6/20/2023 10:10:00 AM Total Suspended Solids 6.2 mg/L MC50 Gar Cr Beatties Ford Rd. 5.0 Yes 6/20/2023 10:10:00 AM Fecal Coliform 5150 CFU/100 ml MC50 Gar Cr Beatties Ford Rd. 100 Yes 6/20/2023 10:10:00 AM Total Phosphorus 0.126 mg/L MC50 Gar Cr Beatties Ford Rd. 0.010 Yes 6/20/2023 10:10:00 AM Calcium 17000 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 6/20/2023 10:10:00 AM Magnesium 7800 ug/L MC50 Gar Cr Beatties Ford Rd. 1000 Yes 6/20/2023 10:10:00 AM Hardness 75 mg/L MC50 Gar Cr Beatties Ford Rd. 1.0 Yes 6/20/2023 10:10:00 AM Copper 2 ug/L MC50 Gar Cr Beatties Ford Rd. < 2.0 Yes 6/20/2023 10:10:00 AM TKN 0.43 mg/L MC50 Gar Cr Beatties Ford Rd. 0.25 Yes 7/19/2022 12:20:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Hams Road < 0.10 No 7/19/2022 12:20:00 PM Fecal Coliform 220 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 7/19/2022 12:20:00 PM Turbidity 8.3 NTU MY10 Clarke Creek,Harris Road 0.50 No 7/19/2022 12:20:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No 7/19/2022 12:20:00 PM E.Coli 112 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No 7/19/2022 12:20:00 PM Nitrate/Nitrite 0.7 mg/L MY10 Clarke Creek,Harris Road 0.25 No 7/19/2022 12:20:00 PM Total Phosphorus 0.099 mg/L MY10 Clarke Creek,Harris Road 0.010 No 7/19/2022 12:20:00 PM TKN 0.26 mg/L MY10 Clarke Creek,Harris Road 0.25 No 7/19/2022 12:20:00 PM Chromium 5 ug/L MY10 Clarke Creek,Harris Road < 5.0 No 7/19/2022 12:20:00 PM Nickel 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No 7/19/2022 12:20:00 PM Magnesium 5900 ug/L MY10 Clarke Creek,Harris Road 500 No 7/19/2022 12:20:00 PM Hardness 67 mg/L MY10 Clarke Creek,Harris Road 1.0 No 7/19/2022 12:20:00 PM Calcium 17000 ug/L MY10 Clarke Creek,Harris Road 2000 No 7/19/2022 12:20:00 PM Suspended Sediment 3.9 mg/L MY10 Clarke Creek,Harris Road < 3.9 No 7/19/2022 12:20:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.50 No 7/19/2022 12:20:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No 7/19/2022 12:20:00 PM Zinc 10 ug/L MY10 Clarke Creek,Harris Road < 10 No 8/16/2022 12:30:00 PM Ammonia-Nitrogen 0.14 mg/L MY10 Clarke Creek,Harris Road 0.10 Yes 8/16/2022 12:30:00 PM Nitrate/Nitrite 1.5 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes 8/16/2022 12:30:00 PM Fecal Coliform 375 CFU/100 ml MY10 Clarke Creek,Harris Road 100 Yes 8/16/2022 12:30:00 PM E.Coli 410 MPN/100 ml MY10 Clarke Creek,Harris Road 100 Yes 8/16/2022 12:30:00 PM TKN 0.58 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes 8/16/2022 12:30:00 PM Total Suspended Solids 10.8 mg/L MY10 Clarke Creek,Harris Road 5.0 Yes 8/16/2022 12:30:00 PM Turbidity 36 NTU MY10 Clarke Creek,Harris Road 0.50 Yes 8/16/2022 12:30:00 PM Suspended Sediment 11 mg/L MY10 Clarke Creek,Harris Road 4.2 Yes 8/16/2022 12:30:00 PM Total Phosphorus 0.572 mg/L MY10 Clarke Creek,Harris Road 0.050 Yes 8/16/2022 12:30:00 PM Calcium 14000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 8/16/2022 12:30:00 PM Hardness 56 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes 8/16/2022 12:30:00 PM Magnesium 5000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 8/16/2022 12:30:00 PM Copper 6.5 ug/L MY10 Clarke Creek,Harris Road 2.0 Yes 9/20/2022 12:10:00 PM Fecal Coliform 144 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 9/20/2022 12:10:00 PM Nitrate/Nitrite 1 mg/L MY10 Clarke Creek,Harris Road 0.25 No 9/20/2022 12:10:00 PM E.Coli 167 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No 9/20/2022 12:10:00 PM Total Phosphorus 0.112 mg/L MY10 Clarke Creek,Harris Road 0.020 No 9/20/2022 12:10:00 PM Turbidity 2.9 NTU MY10 Clarke Creek,Harris Road 0.50 No 76 , , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services -Collection Date Analyte Result Unit I Site Description i MDL Storm 9/20/2022 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No 9/20/2022 12:10:00 PM Magnesium 7500 ug/L MY10 Clarke Creek,Hams Road 500 No 9/20/2022 12:10:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No 9/20/2022 12:10:00 PM TKN 0.29 mg/L MY10 Clarke Creek,Harris Road 0.25 No 9/20/2022 12:10:00 PM Suspended Sediment 4.2 mg/L MY10 Clarke Creek,Harris Road < 4.2 No 9/20/2022 12:10:00 PM Hardness 88 mg/L MY10 Clarke Creek,Harris Road 1.0 No 9/20/2022 12:10:00 PM Calcium 23000 ug/L MY10 Clarke Creek,Harris Road 2000 No 9/20/2022 12:10:00 PM Magnesium 7500 ug/L MY10 Clarke Creek,Harris Road 500 No 9/20/2022 12:10:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No 9/20/2022 12:10:00 PM TKN 0.29 mg/L MY10 Clarke Creek,Harris Road 0.25 No 9/20/2022 12:10:00 PM Suspended Sediment 4.2 mg/L MY10 Clarke Creek,Harris Road < 4.2 No 9/20/2022 12:10:00 PM Hardness 88 mg/L MY10 Clarke Creek,Harris Road 1.0 No 9/20/2022 12:10:00 PM Calcium 23000 ug/L MY10 Clarke Creek,Harris Road 2000 No 9/20/2022 12:10:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No 10/18/2022 12:15:00 PM Turbidity 1.8 NTU MY10 Clarke Creek,Harris Road 0.50 No 10/18/2022 12:15:00 PM Fecal Coliform 75 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 10/18/2022 12:15:00 PM E.Coli 35 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No 10/18/2022 12:15:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No 10/18/2022 12:15:00 PM Nitrate/Nitrite 1.7 mg/L MY10 Clarke Creek,Harris Road 0.25 No 10/18/2022 12:15:00 PM Total Phosphorus 0.32 mg/L MY10 Clarke Creek,Harris Road 0.020 No 10/18/2022 12:15:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No 10/18/2022 12:15:00 PM TKN 0.29 mg/L MY10 Clarke Creek,Harris Road 0.25 No 10/18/2022 12:15:00 PM Suspended Sediment 3.8 mg/L MY10 Clarke Creek,Harris Road < 3.8 No 10/18/2022 12:15:00 PM Chromium 1 ug/L MY10 Clarke Creek,Harris Road < 1.00 No 10/18/2022 12:15:00 PM Zinc 20 ug/L MY10 Clarke Creek,Harris Road < 20.0 No 10/18/2022 12:15:00 PM Copper 3.09 ug/L MY10 Clarke Creek,Harris Road 0.500 No 10/18/2022 12:15:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.500 No 10/18/2022 12:15:00 PM Nickel 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.500 No 10/18/2022 12:15:00 PM Calcium 22700 ug/L MY10 Clarke Creek,Harris Road 100 No 10/18/2022 12:15:00 PM Hardness 88.2 mg/L MY10 Clarke Creek,Harris Road 0.100 No 10/18/2022 12:15:00 PM Magnesium 7650 ug/L MY10 Clarke Creek,Harris Road 100 No 11/15/2022 12:15:00 PM E.Coli 145 MPN/100 ml MY10 Clarke Creek,Harris Road 10 Yes 11/15/2022 12:15:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 Yes 11/15/2022 12:15:00 PM Turbidity 13 NTU MY10 Clarke Creek,Harris Road 0.50 Yes 11/15/2022 12:15:00 PM Fecal Coliform 170 CFU/100 ml 1 MY10 Clarke Creek,Harris Road 20 Yes 11/15/2022 12:15:00 PM Nitrate/Nitrite 0.36 mg/L MY10 Clarke Creek,Harris Road 0.05 Yes 11/15/2022 12:15:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 Yes 11/15/2022 12:15:00 PM Total Phosphorus 0.076 mg/L MY10 Clarke Creek,Harris Road 0.010 Yes 11/15/2022 12:15:00 PM Suspended Sediment 4.1 mg/L MY10 Clarke Creek,Harris Road < 4.1 Yes 11/15/2022 12:15:00 PM TKN 0.32 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes 11/15/2022 12:15:00 PM Magnesium 6500 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 11/15/2022 12:15:00 PM Calcium 20000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 11/15/2022 12:15:00 PM Hardness 77 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes 11/15/2022 12:15:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 Yes 12/20/2022 12:20:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No 77 , , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services 7 Collection Date Analyte Result Unit I Site Description _ MDL Storm 12/20/2022 12:20:00 PM Fecal Coliform 415 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 12/20/2022 12:20:00 PM Total Phosphorus 0.138 mg/L MY10 Clarke Creek,Harris Road 0.010 No 12/20/2022 12:20:00 PM Turbidity 50 NTU MY10 Clarke Creek,Harris Road 0.50 No 12/20/2022 12:20:00 PM Nitrate/Nitrite 1.2 mg/L MY10 Clarke Creek,Harris Road 0.25 No 12/20/2022 12:20:00 PM E.Coli 388 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No 12/20/2022 12:20:00 PM TKN 0.36 mg/L MY10 Clarke Creek,Harris Road 0.25 No 12/20/2022 12:20:00 PM Suspended Sediment 4.2 mg/L MY10 Clarke Creek,Harris Road 4.1 No 12/20/2022 12:20:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No 12/20/2022 12:20:00 PM Hardness 59 mg/L MY10 Clarke Creek,Harris Road 1.0 No 12/20/2022 12:20:00 PM Calcium 15000 ug/L MY10 Clarke Creek,Harris Road 500 No 12/20/2022 12:20:00 PM Magnesium 5300 ug/L MY10 Clarke Creek,Harris Road 500 No 12/20/2022 12:20:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No 1/17/2023 12:25:00 PM Nitrate/Nitrite 0.77 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes 1/17/2023 12:25:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 Yes 1/17/2023 12:25:00 PM Fecal Coliform 310 CFU/100 ml MY10 Clarke Creek,Harris Road 10 Yes 1/17/2023 12:25:00 PM E.Coli 239 MPN/100 ml MY10 Clarke Creek,Harris Road 1 Yes 1/17/2023 12:25:00 PM Turbidity 50 NTU MY10 Clarke Creek,Harris Road 0.50 Yes 1/17/2023 12:25:00 PM Total Suspended Solids 10.8 mg/L MY10 Clarke Creek,Harris Road 5.0 Yes 1/17/2023 12:25:00 PM TKN 0.32 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes 1/17/2023 12:25:00 PM Suspended Sediment 6.9 mg/L MY10 Clarke Creek,Harris Road 4.1 Yes 1/17/2023 12:25:00 PM Total Phosphorus 0.089 mg/L MY10 Clarke Creek,Harris Road 0.010 Yes 1/17/2023 12:25:00 PM Calcium 16000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 1/17/2023 12:25:00 PM Magnesium 5400 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 1/17/2023 12:25:00 PM Hardness 62 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes 1/17/2023 12:25:00 PM Chromium 5 ug/L MY10 Clarke Creek,Harris Road < 5.0 Yes 1/17/2023 12:25:00 PM Nickel 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 Yes 1/17/2023 12:25:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 Yes 1/17/2023 12:25:00 PM Zinc 10 ug/L MY10 Clarke Creek,Harris Road < 10 Yes 1/17/2023 12:25:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.50 Yes 2/21/2023 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No 2/21/2023 12:10:00 PM Fecal Coliform 200 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 2/21/2023 12:10:00 PM Total Phosphorus 0.07 mg/L MY10 Clarke Creek,Harris Road 0.010 No 2/21/2023 12:10:00 PM Turbidity 35 NTU MY10 Clarke Creek,Harris Road 0.5 No 2/21/2023 12:10:00 PM Nitrate/Nitrite 0.46 mg/L MY10 Clarke Creek,Harris Road 0.05 No 2/21/2023 12:10:00 PM E.Coli 215 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No 2/21/2023 12:10:00 PM Total Suspended Solids 7.8 mg/L MY10 Clarke Creek,Harris Road 5.0 No 2/21/2023 12:10:00 PM TKN 0.25 mg/L MY10 Clarke Creek,Harris Road < 0.25 No 2/21/2023 12:10:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No 2/21/2023 12:10:00 PM Calcium 15000 ug/L MY10 Clarke Creek,Harris Road 500 No 2/21/2023 12:10:00 PM Hardness 58 mg/L MY10 Clarke Creek,Harris Road 1.0 No 2/21/2023 12:10:00 PM Magnesium 4900 ug/L MY10 Clarke Creek,Harris Road 500 No 2/21/2023 12:10:00 PM Suspended Sediment 6.7 mg/L MY10 Clarke Creek,Harris Road 4.3 No 3/21/2023 12:05:00 PM Turbidity 21 NTU MY10 Clarke Creek,Harris Road 0.50 No 3/21/2023 12:05:00 PM Fecal Coliform 182 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 3/21/2023 12:05:00 PM Nitrate/Nitrite 2.4 mg/L MY10 Clarke Creek,Harris Road 0.25 No 78 , , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit Site Description _ MDL Storm 3/21/2023 12:05:00 PM E.Coli 142 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No 3/21/2023 12:05:00 PM Total Suspended Solids 13 mg/L MY10 Clarke Creek,Harris Road 5.0 No 3/21/2023 12:05:00 PM Total Phosphorus 0.51 mg/L MY10 Clarke Creek,Harris Road 0.050 No 3/21/2023 12:05:00 PM Ammonia-Nitrogen 0.11 mg/L MY10 Clarke Creek,Harris Road 0.10 No 3/21/2023 12:05:00 PM Hardness 63 mg/L MY10 Clarke Creek,Harris Road 1.0 No 3/21/2023 12:05:00 PM Magnesium 5700 ug/L MY10 Clarke Creek,Harris Road 1000 No 3/21/2023 12:05:00 PM Calcium 16000 ug/L MY10 Clarke Creek,Harris Road 1000 No 3/21/2023 12:05:00 PM TKN 0.57 mg/L MY10 Clarke Creek,Harris Road 0.25 No 3/21/2023 12:05:00 PM Copper 4.2 ug/L MY10 Clarke Creek,Harris Road 2.0 No 3/21/2023 12:05:00 PM Suspended Sediment 8.9 mg/L MY10 Clarke Creek,Harris Road 4.5 No 3/21/2023 12:10:00 PM Fecal Coliform 210 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 3/21/2023 12:10:00 PM Turbidity 21 NTU MY10 Clarke Creek,Harris Road 0.50 No 3/21/2023 12:10:00 PM Nitrate/Nitrite 2.8 mg/L MY10 Clarke Creek,Harris Road 0.25 No 3/21/2023 12:10:00 PM E.Coli 112 MPN/100 ml MY10 Clarke Creek,Harris Road 1 No 3/21/2023 12:10:00 PM Ammonia-Nitrogen 0.11 mg/L MY10 Clarke Creek,Harris Road 0.10 No 3/21/2023 12:10:00 PM Total Suspended Solids 13.4 mg/L MY10 Clarke Creek,Harris Road 5.0 No 3/21/2023 12:10:00 PM Total Phosphorus 0.493 mg/L MY10 Clarke Creek,Harris Road 0.050 No 3/21/2023 12:10:00 PM Magnesium 5700 ug/L MY10 Clarke Creek,Harris Road 1000 No 3/21/2023 12:10:00 PM Calcium 16000 ug/L MY10 Clarke Creek,Harris Road 1000 No 3/21/2023 12:10:00 PM Hardness 63 mg/L MY10 Clarke Creek,Harris Road 1.0 No 3/21/2023 12:10:00 PM TKN 0.53 mg/L MY10 Clarke Creek,Harris Road 0.25 No 3/21/2023 12:10:00 PM Copper 4.5 ug/L MY10 Clarke Creek,Harris Road 2.0 No 3/21/2023 12:10:00 PM Suspended Sediment 13 mg/L MY10 Clarke Creek,Harris Road 3.8 No 4/18/2023 12:00:00 PM Fecal Coliform 300 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 4/18/2023 12:00:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No 4/18/2023 12:00:00 PM Nitrate/Nitrite 0.65 mg/L MY10 Clarke Creek,Harris Road 0.25 No 4/18/2023 12:00:00 PM Turbidity 60 NTU MY10 Clarke Creek,Harris Road 0.50 No 4/18/2023 12:00:00 PM E.Coli 219 MPN/100 ml 1 MY10 Clarke Creek,Harris Road 1 No 4/18/2023 12:00:00 PM Total Phosphorus 0.103 mg/L MY10 Clarke Creek,Harris Road 0.010 No 4/18/2023 12:00:00 PM Magnesium 5200 ug/L MY10 Clarke Creek,Harris Road 1000 No 4/18/2023 12:00:00 PM Hardness 59 mg/L MY10 Clarke Creek,Harris Road 1.0 No 4/18/2023 12:00:00 PM Suspended Sediment 12 mg/L MY10 Clarke Creek,Harris Road 3.9 No 4/18/2023 12:00:00 PM Calcium 15000 ug/L MY10 Clarke Creek,Harris Road 1000 No 4/18/2023 12:00:00 PM TKN 0.33 mg/L MY10 Clarke Creek,Harris Road 0.25 No 4/18/2023 12:00:00 PM Total Suspended Solids 19.4 mg/L MY10 Clarke Creek,Harris Road 5.0 No 4/18/2023 12:00:00 PM Lead 0.5 ug/L MY10 Clarke Creek,Harris Road < 0.50 No 4/18/2023 12:00:00 PM Zinc 10 ug/L MY10 Clarke Creek,Harris Road < 10 No 4/18/2023 12:00:00 PM Chromium 5 ug/L MY10 Clarke Creek,Harris Road < 5.0 No 4/18/2023 12:00:00 PM Copper 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No 4/18/2023 12:00:00 PM Nickel 2 ug/L MY10 Clarke Creek,Harris Road < 2.0 No 5/16/2023 12:10:00 PM Nitrate/Nitrite 0.68 mg/L MY10 Clarke Creek,Harris Road 0.25 No 5/16/2023 12:10:00 PM Fecal Coliform 880 CFU/100 ml MY10 Clarke Creek,Harris Road 10 No 5/16/2023 12:10:00 PM E.Coli 1120 MPN/100 m1 MY10 Clarke Creek,Harris Road 1 No 5/16/2023 12:10:00 PM Turbidity 8.5 NTU MY10 Clarke Creek,Harris Road 0.50 No 5/16/2023 12:10:00 PM Suspended Sediment 4.3 mg/L MY10 Clarke Creek,Harris Road < 4.3 No 79 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services -Collection Date Analyte Result Unit I Site Description i MDL Storm 5/16/2023 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Harris Road < 0.10 No 5/16/2023 12:10:00 PM Total Phosphorus 0.046 mg/L MY10 Clarke Creek,Harris Road 0.010 No 5/16/2023 12:10:00 PM Total Suspended Solids 5 mg/L MY10 Clarke Creek,Harris Road < 5.0 No 5/16/2023 12:10:00 PM TKN 0.25 mg/L MY10 Clarke Creek,Harris Road < 0.25 No 5/16/2023 12:10:00 PM Calcium 19000 ug/L MY10 Clarke Creek,Hams Road 500 No 5/16/2023 12:10:00 PM Hardness 73 mg/L MY10 Clarke Creek,Harris Road 1.0 No 5/16/2023 12:10:00 PM Magnesium 6200 ug/L MY10 Clarke Creek,Harris Road 500 No 5/16/2023 12:10:00 PM Copper 2 ug/L MY10 Clarke Creek,Hams Road < 2.0 No 6/20/2023 12:10:00 PM Nitrate/Nitrite 0.66 mg/L MY10 Clarke Creek,Harris Road 0.05 Yes 6/20/2023 12:10:00 PM E.Coli 13540 MPN/100 ml MY10 Clarke Creek,Harris Road 100 Yes 6/20/2023 12:10:00 PM Ammonia-Nitrogen 0.1 mg/L MY10 Clarke Creek,Hams Road < 0.10 Yes 6/20/2023 12:10:00 PM Turbidity 450 NTU MY10 Clarke Creek,Harris Road 0.50 Yes 6/20/2023 12:10:00 PM Fecal Coliform 32000 CFU/100 ml MY10 Clarke Creek,Harris Road 100 Yes 6/20/2023 12:10:00 PM Total Suspended Solids 240 mg/L MY10 Clarke Creek,Harris Road 50.0 Yes 6/20/2023 12:10:00 PM Suspended Sediment 300 mg/L MY10 Clarke Creek,Harris Road 4.1 Yes 6/20/2023 12:10:00 PM TKN 1.2 mg/L MY10 Clarke Creek,Harris Road 0.25 Yes 6/20/2023 12:10:00 PM Total Phosphorus 0.413 mg/L MY10 Clarke Creek,Harris Road 0.050 Yes 6/20/2023 12:10:00 PM Hardness 24 mg/L MY10 Clarke Creek,Harris Road 1.0 Yes 6/20/2023 12:10:00 PM Calcium 4700 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 6/20/2023 12:10:00 PM Magnesium 3000 ug/L MY10 Clarke Creek,Harris Road 1000 Yes 6/20/2023 12:10:00 PM Copper 4 ug/L MY10 Clarke Creek,Harris Road 2.0 Yes 7/19/2022 9:45:00 AM E.Coli 210 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes 7/19/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 7/19/2022 9:45:00 AM Turbidity 15 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 7/19/2022 9:45:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 7/19/2022 9:45:00 AM Fecal Coliform 320 CFU/100 ml ' MY14 Duck Creek at Tara Oaks 10 Yes 7/19/2022 9:45:00 AM Nitrate/Nitrite 8.1 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 7/19/2022 9:45:00 AM Chromium 5 ug/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 7/19/2022 9:45:00 AM Nickel 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 7/19/2022 9:45:00 AM TKN 0.58 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes 7/19/2022 9:45:00 AM Calcium 18000 ug/L MY14 Duck Creek at Tara Oaks 2000 Yes 7/19/2022 9:45:00 AM Hardness 65 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 7/19/2022 9:45:00 AM Total Phosphorus 0.91 mg/L MY14 Duck Creek at Tara Oaks 0.10 Yes 7/19/2022 9:45:00 AM Magnesium 4800 ug/L MY14 Duck Creek at Tara Oaks 500 Yes 7/19/2022 9:45:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 Yes 7/19/2022 9:45:00 AM Copper 2.5 ug/L MY14 Duck Creek at Tara Oaks 2.0 Yes 7/19/2022 9:45:00 AM Zinc 10 ug/L MY14 Duck Creek at Tara Oaks < 10 Yes 7/19/2022 9:45:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.50 Yes 8/16/2022 9:30:00 AM E.Coli 630 MPN/100 ml MY14 Duck Creek at Tara Oaks 100 Yes 8/16/2022 9:30:00 AM Nitrate/Nitrite 23 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 8/16/2022 9:30:00 AM Fecal Coliform 938 CFU/100 ml MY14 Duck Creek at Tara Oaks 100 Yes 8/16/2022 9:30:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 8/16/2022 9:30:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 Yes 8/16/2022 9:30:00 AM Turbidity 1.4 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 8/16/2022 9:30:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 80 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services S Collection Date Analyte Result Unit I Site Description MDL Storm 8/16/2022 9:30:00 AM Suspended Sediment 4.5 mg/L MY14 Duck Creek at Tara Oaks < 4.5 Yes 8/16/2022 9:30:00 AM Total Phosphorus 2.3 mg/L MY14 Duck Creek at Tara Oaks 0.10 Yes 8/16/2022 9:30:00 AM Magnesium 6900 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 8/16/2022 9:30:00 AM Calcium 38000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 8/16/2022 9:30:00 AM Hardness 120 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 8/16/2022 9:30:00 AM Copper 2.5 ug/L MY14 Duck Creek at Tara Oaks 2.0 Yes 8/16/2022 9:35:00 AM Fecal Coliform 813 CFU/100 ml MY14 Duck Creek at Tara Oaks 100 Yes 8/16/2022 9:35:00 AM Nitrate/Nitrite 24 mg/L MY14 Duck Creek at Tara Oaks 1.2 Yes 8/16/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 8/16/2022 9:35:00 AM E.Coli 520 MPN/100 ml MY14 Duck Creek at Tara Oaks 100 Yes 8/16/2022 9:35:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 Yes 8/16/2022 9:35:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 8/16/2022 9:35:00 AM Turbidity 1.5 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 8/16/2022 9:35:00 AM Suspended Sediment 4 mg/L MY14 Duck Creek at Tara Oaks < 4.0 Yes 8/16/2022 9:35:00 AM Total Phosphorus 2.3 mg/L MY14 Duck Creek at Tara Oaks 0.10 Yes 8/16/2022 9:35:00 AM Calcium 39000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 8/16/2022 9:35:00 AM Magnesium 6300 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 8/16/2022 9:35:00 AM Hardness 120 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 8/16/2022 9:35:00 AM Copper 2.6 ug/L MY14 Duck Creek at Tara Oaks 2.0 Yes 9/20/2022 9:00:00 AM Fecal Coliform 410 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No 9/20/2022 9:00:00 AM Nitrate/Nitrite 23 mg/L MY14 Duck Creek at Tara Oaks 1.2 No 9/20/2022 9:00:00 AM E.Coli 140 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No 9/20/2022 9:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No 9/20/2022 9:00:00 AM Turbidity 1 NTU MY14 Duck Creek at Tara Oaks 0.50 No 9/20/2022 9:00:00 AM Total Phosphorus 2.3 mg/L MY14 Duck Creek at Tara Oaks 0.200 No 9/20/2022 9:00:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 No 9/20/2022 9:00:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No 9/20/2022 9:00:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 No 9/20/2022 9:00:00 AM Magnesium 6600 ug/L MY14 Duck Creek at Tara Oaks 1000 No 9/20/2022 9:00:00 AM Calcium 32000 ug/L MY14 Duck Creek at Tara Oaks 1000 No 9/20/2022 9:00:00 AM Hardness 110 mg/L MY14 Duck Creek at Tara Oaks 1.0 No 9/20/2022 9:00:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 No 9/20/2022 9:00:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No 9/20/2022 9:00:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 No 9/20/2022 9:00:00 AM Magnesium 6600 ug/L MY14 Duck Creek at Tara Oaks 1000 No 9/20/2022 9:00:00 AM Calcium 32000 ug/L MY14 Duck Creek at Tara Oaks 1000 No 9/20/2022 9:00:00 AM Hardness 110 mg/L MY14 Duck Creek at Tara Oaks 1.0 No 9/20/2022 9:00:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 No 10/18/2022 9:10:00 AM Fecal Coliform 188 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No 10/18/2022 9:10:00 AM E.Coli 128 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No 10/18/2022 9:10:00 AM Nitrate/Nitrite 15 mg/L MY14 Duck Creek at Tara Oaks 0.50 No 10/18/2022 9:10:00 AM Turbidity 1.1 NTU MY14 Duck Creek at Tara Oaks 0.50 No 10/18/2022 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No 10/18/2022 9:10:00 AM Total Phosphorus 1.85 mg/L MY14 Duck Creek at Tara Oaks 0.100 No 10/18/2022 9:10:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No 81 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services 7 Collection Date Analyte Result Unit I Site Description MDL Storm 10/18/2022 9:10:00 AM TKN 0.7 mg/L MY14 Duck Creek at Tara Oaks 0.25 No 10/18/2022 9:10:00 AM Suspended Sediment 4.3 mg/L MY14 Duck Creek at Tara Oaks < 4.3 No 10/18/2022 9:10:00 AM Hardness 120 mg/L MY14 Duck Creek at Tara Oaks 0.100 No 10/18/2022 9:10:00 AM Chromium 1 ug/L MY14 Duck Creek at Tara Oaks < 1.00 No 10/18/2022 9:10:00 AM Zinc 35.1 ug/L MY14 Duck Creek at Tara Oaks 20.0 No 10/18/2022 9:10:00 AM Calcium 36400 ug/L MY14 Duck Creek at Tara Oaks 100 No 10/18/2022 9:10:00 AM Magnesium 7170 ug/L MY14 Duck Creek at Tara Oaks 100 No 10/18/2022 9:10:00 AM Copper 12.9 ug/L MY14 Duck Creek at Tara Oaks 0.500 No 10/18/2022 9:10:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.500 No 10/18/2022 9:10:00 AM Nickel 0.77 ug/L MY14 Duck Creek at Tara Oaks 0.500 No 11/15/2022 9:45:00 AM Fecal Coliform 431 CFU/100 ml MY14 Duck Creek at Tara Oaks 20 Yes 11/15/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 11/15/2022 9:45:00 AM Turbidity 1.1 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 11/15/2022 9:45:00 AM Nitrate/Nitrite 9.2 mg/L MY14 Duck Creek at Tara Oaks 0.50 Yes 11/15/2022 9:45:00 AM E.Coli 285 MPN/100 ml MY14 Duck Creek at Tara Oaks 10 Yes 11/15/2022 9:45:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 11/15/2022 9:45:00 AM Total Phosphorus 1.2 mg/L MY14 Duck Creek at Tara Oaks 0.20 Yes 11/15/2022 9:45:00 AM Suspended Sediment 4.1 mg/L MY14 Duck Creek at Tara Oaks < 4.1 Yes 11/15/2022 9:45:00 AM TKN 0.63 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes 11/15/2022 9:45:00 AM Calcium 26000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 11/15/2022 9:45:00 AM Magnesium 6400 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 11/15/2022 9:45:00 AM Hardness 91 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 11/15/2022 9:45:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 12/20/2022 9:35:00 AM Nitrate/Nitrite 1.9 mg/L MY14 Duck Creek at Tara Oaks 0.50 No 12/20/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No 12/20/2022 9:35:00 AM Fecal Coliform 107 CFU/100 ml ' MY14 Duck Creek at Tara Oaks 10 No 12/20/2022 9:35:00 AM E.Coli 291 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No - 12/20/2022 9:35:00 AM Total Phosphorus 0.238 mg/L MY14 Duck Creek at Tara Oaks 0.020 No 12/20/2022 9:35:00 AM Turbidity 7.5 NTU MY14 Duck Creek at Tara Oaks 0.50 No 12/20/2022 9:35:00 AM TKN 0.27 mg/L MY14 Duck Creek at Tara Oaks 0.25 No 12/20/2022 9:35:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 No 12/20/2022 9:35:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No 12/20/2022 9:35:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 No 12/20/2022 9:35:00 AM Calcium 15000 ug/L MY14 Duck Creek at Tara Oaks 500 No 12/20/2022 9:35:00 AM Hardness 60 mg/L MY14 Duck Creek at Tara Oaks 1.0 No 12/20/2022 9:35:00 AM Magnesium 5500 ug/L MY14 Duck Creek at Tara Oaks 500 No 1/17/2023 9:15:00 AM Fecal Coliform 300 CFU/100 m1 MY14 Duck Creek at Tara Oaks 10 Yes 1/17/2023 9:15:00 AM E.Coli 489 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes 1/17/2023 9:15:00 AM Nitrate/Nitrite 1.1 mg/L MY14 Duck Creek at Tara Oaks 0.50 Yes 1/17/2023 9:15:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 1/17/2023 9:15:00 AM Turbidity 17 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 1/17/2023 9:15:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 1/17/2023 9:15:00 AM TKN 0.36 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes 1/17/2023 9:15:00 AM Total Phosphorus 0.11 mg/L MY14 Duck Creek at Tara Oaks 0.010 Yes 1/17/2023 9:15:00 AM Suspended Sediment 3.8 mg/L MY14 Duck Creek at Tara Oaks < 3.8 Yes 82 / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services -.Collection Date Analyte Result Unit I Site Description MDL Storm 1/17/2023 9:15:00 AM Hardness 54 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 1/17/2023 9:15:00 AM Magnesium 4700 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 1/17/2023 9:15:00 AM Calcium 14000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 1/17/2023 9:15:00 AM Chromium 5 ug/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 1/17/2023 9:15:00 AM Nickel 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 1/17/2023 9:15:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 1/17/2023 9:15:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.50 Yes 1/17/2023 9:15:00 AM Zinc 10 ug/L MY14 Duck Creek at Tara Oaks < 10 Yes 2/21/2023 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 No 2/21/2023 9:05:00 AM Turbidity 13 NTU MY14 Duck Creek at Tara Oaks 0.5 No 2/21/2023 9:05:00 AM Total Phosphorus 0.116 mg/L MY14 Duck Creek at Tara Oaks 0.010 No 2/21/2023 9:05:00 AM E.Coli 306 MPN/100 ml MY14 Duck Creek at Tara Oaks 2 No 2/21/2023 9:05:00 AM Fecal Coliform 270 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No 2/21/2023 9:05:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 No 2/21/2023 9:05:00 AM TKN 0.36 mg/L MY14 Duck Creek at Tara Oaks 0.25 No 2/21/2023 9:05:00 AM Nitrate/Nitrite 1.1 mg/L MY14 Duck Creek at Tara Oaks 0.05 No 2/21/2023 9:05:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 No 2/21/2023 9:05:00 AM Hardness 51 mg/L MY14 Duck Creek at Tara Oaks 1.0 No 2/21/2023 9:05:00 AM Calcium 13000 ug/L MY14 Duck Creek at Tara Oaks 500 No 2/21/2023 9:05:00 AM Magnesium 4500 ug/L MY14 Duck Creek at Tara Oaks 500 No 2/21/2023 9:05:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 No 3/21/2023 9:25:00 AM Fecal Coliform 530 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 Yes 3/21/2023 9:25:00 AM Nitrate/Nitrite 1.4 mg/L MY14 Duck Creek at Tara Oaks 0.05 Yes 3/21/2023 9:25:00 AM Turbidity 3.7 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 3/21/2023 9:25:00 AM E.Coli 771 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes 3/21/2023 9:25:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 3/21/2023 9:25:00 AM Total Phosphorus 0.15 mg/L MY14 Duck Creek at Tara Oaks 0.010 Yes 3/21/2023 9:25:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 3/21/2023 9:25:00 AM Hardness 58 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 3/21/2023 9:25:00 AM Calcium 15000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 3/21/2023 9:25:00 AM Magnesium 5000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 3/21/2023 9:25:00 AM TKN 0.34 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes 3/21/2023 9:25:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 3/21/2023 9:25:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 Yes 4/12/2023 1:40:00 PM Fecal Coliform 310 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 No 4/12/2023 1:40:00 PM E.Coli 215 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 No 4/18/2023 9:10:00 AM Total Phosphorus 0.183 mg/L MY14 Duck Creek at Tara Oaks 0.010 Yes 4/18/2023 9:10:00 AM Nitrate/Nitrite 1.4 mg/L MY14 Duck Creek at Tara Oaks 0.05 Yes 4/18/2023 9:10:00 AM Fecal Coliform 740 CFU/100 ml MY14 Duck Creek at Tara Oaks 10 Yes - 4/18/2023 9:10:00 AM Turbidity 9.4 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 4/18/2023 9:10:00 AM E.Coli 411 MPN/100 m1 MY14 Duck Creek at Tara Oaks 1 Yes 4/18/2023 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 4/18/2023 9:10:00 AM Hardness 53 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 4/18/2023 9:10:00 AM Calcium 14000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 4/18/2023 9:10:00 AM Suspended Sediment 4 mg/L MY14 Duck Creek at Tara Oaks < 4.0 Yes 83 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services - Collection Date Analyte Result Unit I Site Description MDL Storm 4/18/2023 9:10:00 AM Magnesium 4500 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 4/18/2023 9:10:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 4/18/2023 9:10:00 AM Lead 0.5 ug/L MY14 Duck Creek at Tara Oaks < 0.50 Yes 4/18/2023 9:10:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 4/18/2023 9:10:00 AM Chromium 5 ug/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 4/18/2023 9:10:00 AM Nickel 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 4/18/2023 9:10:00 AM TKN 0.46 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes 4/18/2023 9:10:00 AM Zinc 10 ug/L MY14 Duck Creek at Tara Oaks < 10 Yes 5/16/2023 9:15:00 AM Nitrate/Nitrite 3.4 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes 5/16/2023 9:15:00 AM E.Coli 649 MPN/100 ml MY14 Duck Creek at Tara Oaks 1 Yes 5/16/2023 9:15:00 AM Fecal Coliform 300 CFU/100 m1 MY14 Duck Creek at Tara Oaks 10 Yes 5/16/2023 9:15:00 AM Turbidity 3.8 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 5/16/2023 9:15:00 AM Total Phosphorus 0.462 mg/L MY14 Duck Creek at Tara Oaks 0.050 Yes 5/16/2023 9:15:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 5/16/2023 9:15:00 AM Suspended Sediment 3.9 mg/L MY14 Duck Creek at Tara Oaks < 3.9 Yes 5/16/2023 9:15:00 AM TKN 0.25 mg/L MY14 Duck Creek at Tara Oaks < 0.25 Yes 5/16/2023 9:15:00 AM Total Suspended Solids 5 mg/L MY14 Duck Creek at Tara Oaks < 5.0 Yes 5/16/2023 9:15:00 AM Magnesium 5000 ug/L MY14 Duck Creek at Tara Oaks 500 Yes 5/16/2023 9:15:00 AM Calcium 18000 ug/L MY14 Duck Creek at Tara Oaks 500 Yes 5/16/2023 9:15:00 AM Hardness 66 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 5/16/2023 9:15:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 6/20/2023 9:20:00 AM Nitrate/Nitrite 1.2 mg/L MY14 Duck Creek at Tara Oaks 0.05 Yes 6/20/2023 9:20:00 AM Ammonia-Nitrogen 0.1 mg/L MY14 Duck Creek at Tara Oaks < 0.10 Yes 6/20/2023 9:20:00 AM E.Coli 1550 MPN/100 ml MY14 Duck Creek at Tara Oaks 100 Yes 6/20/2023 9:20:00 AM Turbidity 30 NTU MY14 Duck Creek at Tara Oaks 0.50 Yes 6/20/2023 9:20:00 AM Total Suspended Solids 13.8 mg/L MY14 Duck Creek at Tara Oaks 5.0 Yes 6/20/2023 9:20:00 AM Suspended Sediment 11 mg/L MY14 Duck Creek at Tara Oaks 4.1 Yes 6/20/2023 9:20:00 AM Fecal Coliform 1320 CFU/100 ml 1 MY14 Duck Creek at Tara Oaks 100 Yes 6/20/2023 9:20:00 AM TKN 0.61 mg/L MY14 Duck Creek at Tara Oaks 0.25 Yes 6/20/2023 9:20:00 AM Total Phosphorus 0.22 mg/L MY14 Duck Creek at Tara Oaks 0.020 Yes 6/20/2023 9:20:00 AM Hardness 52 mg/L MY14 Duck Creek at Tara Oaks 1.0 Yes 6/20/2023 9:20:00 AM Calcium 13000 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 6/20/2023 9:20:00 AM Magnesium 4700 ug/L MY14 Duck Creek at Tara Oaks 1000 Yes 6/20/2023 9:20:00 AM Copper 2 ug/L MY14 Duck Creek at Tara Oaks < 2.0 Yes 7/19/2022 11:50:00 AM Fecal Coliform 250 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 7/19/2022 11:50:00 AM E.Coli 160 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 7/19/2022 11:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 7/19/2022 11:50:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No 7/19/2022 11:50:00 AM Turbidity 16 NTU MY1B River Ford Rd.(Bridge) 0.50 No 7/19/2022 11:50:00 AM Nitrate/Nitrite 0.35 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 7/19/2022 11:50:00 AM Nickel 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 7/19/2022 11:50:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 7/19/2022 11:50:00 AM Chromium 5 ug/L MY1B River Ford Rd.(Bridge) < 5.0 No 7/19/2022 11:50:00 AM Total Phosphorus 0.045 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 7/19/2022 11:50:00 AM Hardness 50 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 84 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date ill Analyte Result Unit _ Site MIK Site Description MDL Storm 7/19/2022 11:50:00 AM Magnesium 4200 ug/L MY1B River Ford Rd.(Bridge) 500 No 7/19/2022 11:50:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 2000 No 7/19/2022 11:50:00 AM Suspended Sediment 4.4 mg/L MY1B River Ford Rd.(Bridge) < 4.4 No 7/19/2022 11:50:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 7/19/2022 11:50:00 AM Zinc 10 ug/L MY1B River Ford Rd.(Bridge) < 10 No 7/19/2022 11:50:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.50 No 8/16/2022 11:55:00 AM E.Coli 2160 MPN/100 ml MY1B River Ford Rd.(Bridge) 100 Yes 8/16/2022 11:55:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes 8/16/2022 11:55:00 AM Nitrate/Nitrite 0.31 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes 8/16/2022 11:55:00 AM Fecal Coliform 4100 CFU/100 ml MY1B River Ford Rd.(Bridge) 100 Yes 8/16/2022 11:55:00 AM TKN 0.31 mg/L MY1B River Ford Rd.(Bridge) 0.25 Yes 8/16/2022 11:55:00 AM Total Suspended Solids 33 mg/L MY1B River Ford Rd.(Bridge) 5.3 Yes 8/16/2022 11:55:00 AM Turbidity 75 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes 8/16/2022 11:55:00 AM Suspended Sediment 15 mg/L MY1B River Ford Rd.(Bridge) 3.9 Yes 8/16/2022 11:55:00 AM Total Phosphorus 0.074 mg/L MY1B River Ford Rd.(Bridge) 0.010 Yes 8/16/2022 11:55:00 AM Magnesium 4100 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 8/16/2022 11:55:00 AM Calcium 14000 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 8/16/2022 11:55:00 AM Hardness 52 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes 8/16/2022 11:55:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes 9/20/2022 11:40:00 AM E.Coli 194 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 9/20/2022 11:40:00 AM Fecal Coliform 230 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 9/20/2022 11:40:00 AM Nitrate/Nitrite 0.31 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 9/20/2022 11:40:00 AM Total Phosphorus 0.026 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 9/20/2022 11:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 9/20/2022 11:40:00 AM Turbidity 4.3 NTU MY1B River Ford Rd.(Bridge) 0.50 No 9/20/2022 11:40:00 AM Hardness 71 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 9/20/2022 11:40:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No 9/20/2022 11:40:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 9/20/2022 11:40:00 AM Magnesium 5600 ug/L MY1B River Ford Rd.(Bridge) 500 No 9/20/2022 11:40:00 AM Calcium 19000 ug/L MY1B River Ford Rd.(Bridge) 2000 No 9/20/2022 11:40:00 AM Suspended Sediment 4.2 mg/L MY1B River Ford Rd.(Bridge) < 4.2 No 9/20/2022 11:40:00 AM Hardness 71 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 9/20/2022 11:40:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No 9/20/2022 11:40:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 9/20/2022 11:40:00 AM Magnesium 5600 ug/L MY1B River Ford Rd.(Bridge) 500 No 9/20/2022 11:40:00 AM Calcium 19000 ug/L MY1B River Ford Rd.(Bridge) 2000 No 9/20/2022 11:40:00 AM Suspended Sediment 4.2 mg/L MY1B River Ford Rd.(Bridge) < 4.2 No 9/20/2022 11:40:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 10/18/2022 11:45:00 AM Fecal Coliform 270 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 10/18/2022 11:45:00 AM Turbidity 2.1 NTU MY1B River Ford Rd.(Bridge) 0.50 No 10/18/2022 11:45:00 AM Nitrate/Nitrite 0.05 mg/L MY1B River Ford Rd.(Bridge) < 0.05 No 10/18/2022 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 10/18/2022 11:45:00 AM E.Coli 167 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 10/18/2022 11:45:00 AM Total Phosphorus 0.031 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 10/18/2022 11:45:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No 85 / , / Charlotte-Mecklenburg f / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services 7 Collection Date Analyte Result Unit I Site Description MDL Storm 10/18/2022 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 10/18/2022 11:45:00 AM Suspended Sediment 4.2 mg/L MY1B River Ford Rd.(Bridge) < 4.2 No 10/18/2022 11:45:00 AM Calcium 18200 ug/L MY1B River Ford Rd.(Bridge) 100 No 10/18/2022 11:45:00 AM Copper 1.57 ug/L MY1B River Ford Rd.(Bridge) 0.500 No 10/18/2022 11:45:00 AM Nickel 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.500 No 10/18/2022 11:45:00 AM Chromium 1 ug/L MY1B River Ford Rd.(Bridge) < 1.00 No 10/18/2022 11:45:00 AM Zinc 20 ug/L MY1B River Ford Rd.(Bridge) < 20.0 No 10/18/2022 11:45:00 AM Hardness 69.3 mg/L MY1B River Ford Rd.(Bridge) 0.100 No 10/18/2022 11:45:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.500 No 10/18/2022 11:45:00 AM Magnesium 5800 ug/L MY1B River Ford Rd.(Bridge) 100 No 11/15/2022 11:40:00 AM Fecal Coliform 480 CFU/100 ml MY1B River Ford Rd.(Bridge) 20 Yes 11/15/2022 11:40:00 AM Turbidity 8.6 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes 11/15/2022 11:40:00 AM E.Coli 369 MPN/100 ml MY1B River Ford Rd.(Bridge) 10 Yes 11/15/2022 11:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes 11/15/2022 11:40:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 Yes 11/15/2022 11:40:00 AM Nitrate/Nitrite 0.16 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes 11/15/2022 11:40:00 AM Total Phosphorus 0.044 mg/L MY1B River Ford Rd.(Bridge) 0.010 Yes 11/15/2022 11:40:00 AM Suspended Sediment 4.3 mg/L MY1B River Ford Rd.(Bridge) < 4.3 Yes 11/15/2022 11:40:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 Yes 11/15/2022 11:40:00 AM Magnesium 5100 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 11/15/2022 11:40:00 AM Calcium 16000 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 11/15/2022 11:40:00 AM Hardness 61 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes 11/15/2022 11:40:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes 12/20/2022 11:45:00 AM Fecal Coliform 200 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 12/20/2022 11:45:00 AM Nitrate/Nitrite 0.5 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 12/20/2022 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 12/20/2022 11:45:00 AM Total Phosphorus 0.041 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 12/20/2022 11:45:00 AM E.Coli 270 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 12/20/2022 11:45:00 AM Turbidity 20 NTU MY1B River Ford Rd.(Bridge) 0.50 No 12/20/2022 11:45:00 AM Suspended Sediment 4.3 mg/L MY1B River Ford Rd.(Bridge) < 4.3 No 12/20/2022 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 12/20/2022 11:45:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No 12/20/2022 11:45:00 AM Hardness 51 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 12/20/2022 11:45:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 12/20/2022 11:45:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 500 No 12/20/2022 11:45:00 AM Magnesium 4400 ug/L MY1B River Ford Rd.(Bridge) 500 No 1/17/2023 11:45:00 AM E.Coli 194 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 Yes 1/17/2023 11:45:00 AM Fecal Coliform 200 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 Yes 1/17/2023 11:45:00 AM Nitrate/Nitrite 0.48 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes 1/17/2023 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes 1/17/2023 11:45:00 AM Total Suspended Solids 10.8 mg/L MY1B River Ford Rd.(Bridge) 5.0 Yes 1/17/2023 11:45:00 AM Turbidity 25 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes 1/17/2023 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 Yes 1/17/2023 11:45:00 AM Suspended Sediment 8.6 mg/L MY1B River Ford Rd.(Bridge) 4.3 Yes 1/17/2023 11:45:00 AM Total Phosphorus 0.042 mg/L MY1B River Ford Rd.(Bridge) 0.010 Yes 86 / , / Charlotte-Mecklenburg f / d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services -.Collection Date Analyte Result Unit I Site Description MDL Storm 1/17/2023 11:45:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 1/17/2023 11:45:00 AM Magnesium 4300 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 1/17/2023 11:45:00 AM Hardness 50 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes 1/17/2023 11:45:00 AM Chromium 5 ug/L MY1B River Ford Rd.(Bridge) < 5.0 Yes 1/17/2023 11:45:00 AM Nickel 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes 1/17/2023 11:45:00 AM Zinc 10 ug/L MY1B River Ford Rd.(Bridge) < 10 Yes 1/17/2023 11:45:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 Yes 1/17/2023 11:45:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.50 Yes 2/21/2023 11:25:00 AM Nitrate/Nitrite 0.4 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 2/21/2023 11:25:00 AM Fecal Coliform 63 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 2/21/2023 11:25:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 2/21/2023 11:25:00 AM E.Coli 192 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 2/21/2023 11:25:00 AM Total Phosphorus 0.035 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 2/21/2023 11:25:00 AM Turbidity 18 NTU MY1B River Ford Rd.(Bridge) 0.5 No 2/21/2023 11:25:00 AM Total Suspended Solids 8.2 mg/L MY1B River Ford Rd.(Bridge) 5.0 No 2/21/2023 11:25:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 2/21/2023 11:25:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 2/21/2023 11:25:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 500 No 2/21/2023 11:25:00 AM Magnesium 4400 ug/L MY1B River Ford Rd.(Bridge) 500 No 2/21/2023 11:25:00 AM Hardness 51 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 2/21/2023 11:25:00 AM Suspended Sediment 8.4 mg/L MY1B River Ford Rd.(Bridge) 4.0 No 2/21/2023 11:35:00 AM Nitrate/Nitrite 0.41 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 2/21/2023 11:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 2/21/2023 11:35:00 AM Fecal Coliform 107 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 2/21/2023 11:35:00 AM Turbidity 18 NTU MY1B River Ford Rd.(Bridge) 0.5 No 2/21/2023 11:35:00 AM E.Coli 276 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 2/21/2023 11:35:00 AM Total Phosphorus 0.032 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 2/21/2023 11:35:00 AM Total Suspended Solids 9.6 mg/L MY1B River Ford Rd.(Bridge) 5.0 No 2/21/2023 11:35:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 2/21/2023 11:35:00 AM Magnesium 4700 ug/L MY1B River Ford Rd.(Bridge) 500 No 2/21/2023 11:35:00 AM Hardness 54 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 2/21/2023 11:35:00 AM Calcium 14000 ug/L MY1B River Ford Rd.(Bridge) 500 No 2/21/2023 11:35:00 AM Suspended Sediment 9.4 mg/L MY1B River Ford Rd.(Bridge) 3.9 No 2/21/2023 11:40:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 3/21/2023 11:35:00 AM Nitrate/Nitrite 0.3 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 3/21/2023 11:35:00 AM Turbidity 10 NTU MY1B River Ford Rd.(Bridge) 0.50 No 3/21/2023 11:35:00 AM Fecal Coliform 232 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 3/21/2023 11:35:00 AM E.Coli 299 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 3/21/2023 11:35:00 AM Total Suspended Solids 9.4 mg/L MY1B River Ford Rd.(Bridge) 5.0 No 3/21/2023 11:35:00 AM Total Phosphorus 0.031 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 3/21/2023 11:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 3/21/2023 11:35:00 AM Calcium 13000 ug/L MY1B River Ford Rd.(Bridge) 1000 No 3/21/2023 11:35:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 3/21/2023 11:35:00 AM Magnesium 4400 ug/L MY1B River Ford Rd.(Bridge) 1000 No 3/21/2023 11:35:00 AM Hardness 51 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 87 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date AM Analyte Result Unit _ Site MIK Site Description MDL Storm 3/21/2023 11:35:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 3/21/2023 11:35:00 AM Suspended Sediment 12 mg/L MY1B River Ford Rd.(Bridge) 4.0 No 4/18/2023 11:30:00 AM Fecal Coliform 300 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 4/18/2023 11:30:00 AM Turbidity 14 NTU MY1B River Ford Rd.(Bridge) 0.50 No 4/18/2023 11:30:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 4/18/2023 11:30:00 AM Total Phosphorus 0.034 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 4/18/2023 11:30:00 AM E.Coli 329 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 4/18/2023 11:30:00 AM Nitrate/Nitrite 0.44 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 4/18/2023 11:30:00 AM Magnesium 4600 ug/L MY1B River Ford Rd.(Bridge) 1000 No 4/18/2023 11:30:00 AM Suspended Sediment 7.3 mg/L MY1B River Ford Rd.(Bridge) 4.1 No 4/18/2023 11:30:00 AM Calcium 15000 ug/L MY1B River Ford Rd.(Bridge) 1000 No 4/18/2023 11:30:00 AM Hardness 56 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 4/18/2023 11:30:00 AM Total Suspended Solids 6.2 mg/L MY1B River Ford Rd.(Bridge) 5.0 No 4/18/2023 11:30:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 4/18/2023 11:30:00 AM Nickel 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 4/18/2023 11:30:00 AM Zinc 10 ug/L MY1B River Ford Rd.(Bridge) < 10 No 4/18/2023 11:30:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 4/18/2023 11:30:00 AM Lead 0.5 ug/L MY1B River Ford Rd.(Bridge) < 0.50 No 4/18/2023 11:30:00 AM Chromium 5 ug/L MY1B River Ford Rd.(Bridge) < 5.0 No 5/16/2023 11:45:00 AM Nitrate/Nitrite 0.37 mg/L MY1B River Ford Rd.(Bridge) 0.05 No 5/16/2023 11:45:00 AM Turbidity 4.9 NTU MY1B River Ford Rd.(Bridge) 0.50 No 5/16/2023 11:45:00 AM E.Coli 231 MPN/100 ml MY1B River Ford Rd.(Bridge) 1 No 5/16/2023 11:45:00 AM Fecal Coliform 270 CFU/100 ml MY1B River Ford Rd.(Bridge) 10 No 5/16/2023 11:45:00 AM Total Phosphorus 0.028 mg/L MY1B River Ford Rd.(Bridge) 0.010 No 5/16/2023 11:45:00 AM Suspended Sediment 4 mg/L MY1B River Ford Rd.(Bridge) < 4.0 No 5/16/2023 11:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 No 5/16/2023 11:45:00 AM Total Suspended Solids 5 mg/L MY1B River Ford Rd.(Bridge) < 5.0 No 5/16/2023 11:45:00 AM TKN 0.25 mg/L MY1B River Ford Rd.(Bridge) < 0.25 No 5/16/2023 11:45:00 AM Calcium 16000 ug/L MY1B River Ford Rd.(Bridge) 500 No 5/16/2023 11:45:00 AM Magnesium 4900 ug/L MY1B River Ford Rd.(Bridge) 500 No 5/16/2023 11:45:00 AM Hardness 60 mg/L MY1B River Ford Rd.(Bridge) 1.0 No 5/16/2023 11:45:00 AM Copper 2 ug/L MY1B River Ford Rd.(Bridge) < 2.0 No 6/20/2023 11:40:00 AM Turbidity 230 NTU MY1B River Ford Rd.(Bridge) 0.50 Yes 6/20/2023 11:40:00 AM Nitrate/Nitrite 0.59 mg/L MY1B River Ford Rd.(Bridge) 0.05 Yes 6/20/2023 11:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY1B River Ford Rd.(Bridge) < 0.10 Yes 6/20/2023 11:40:00 AM E.Coli 4800 MPN/100 ml MY1B River Ford Rd.(Bridge) 100 Yes 6/20/2023 11:40:00 AM Total Suspended Solids 225 mg/L MY1B River Ford Rd.(Bridge) 25.0 Yes 6/20/2023 11:40:00 AM Suspended Sediment 230 mg/L MY1B River Ford Rd.(Bridge) 4.1 Yes 6/20/2023 11:40:00 AM Fecal Coliform 4800 CFU/100 ml MY1B River Ford Rd.(Bridge) 100 Yes 6/20/2023 11:40:00 AM Total Phosphorus 0.214 mg/L MY1B River Ford Rd.(Bridge) 0.020 Yes 6/20/2023 11:40:00 AM Hardness 34 mg/L MY1B River Ford Rd.(Bridge) 1.0 Yes 6/20/2023 11:40:00 AM Calcium 7500 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 6/20/2023 11:40:00 AM Magnesium 3700 ug/L MY1B River Ford Rd.(Bridge) 1000 Yes 6/20/2023 11:40:00 AM Copper 2.2 ug/L MY1B River Ford Rd.(Bridge) 2.0 Yes 6/20/2023 11:40:00 AM TKN 0.84 mg/L MY1B River Ford Rd.(Bridge) 0.25 Yes 88 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date Analyte Result Unit 1 _ Site Description MDL Storm 7/19/2022 10:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 7/19/2022 10:00:00 AM E.Coli 345 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes 7/19/2022 10:00:00 AM Fecal Coliform 530 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes 7/19/2022 10:00:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 7/19/2022 10:00:00 AM Turbidity 45 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 7/19/2022 10:00:00 AM Nitrate/Nitrite 0.49 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 7/19/2022 10:00:00 AM Chromium 5 ug/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 7/19/2022 10:00:00 AM Total Phosphorus 0.044 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 7/19/2022 10:00:00 AM Nickel 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 7/19/2022 10:00:00 AM TKN 0.29 mg/L MY8 Clear Cr Ferguson Rd 0.25 Yes 7/19/2022 10:00:00 AM Magnesium 3300 ug/L MY8 Clear Cr Ferguson Rd 500 Yes 7/19/2022 10:00:00 AM Hardness 38 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 7/19/2022 10:00:00 AM Calcium 9700 ug/L MY8 Clear Cr Ferguson Rd 2000 Yes 7/19/2022 10:00:00 AM Suspended Sediment 3.9 mg/L MY8 Clear Cr Ferguson Rd < 3.9 Yes 7/19/2022 10:00:00 AM Zinc 10 ug/L MY8 Clear Cr Ferguson Rd < 10 Yes 7/19/2022 10:00:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.50 Yes 7/19/2022 10:00:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 8/16/2022 9:45:00 AM Fecal Coliform 938 CFU/100 ml MY8 Clear Cr Ferguson Rd 100 Yes 8/16/2022 9:45:00 AM Nitrate/Nitrite 0.47 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 8/16/2022 9:45:00 AM E.Coli 860 MPN/100 ml MY8 Clear Cr Ferguson Rd 100 Yes 8/16/2022 9:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 8/16/2022 9:45:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes 8/16/2022 9:45:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 8/16/2022 9:45:00 AM Turbidity 8 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 8/16/2022 9:45:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 Yes 8/16/2022 9:45:00 AM Total Phosphorus 0.018 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 8/16/2022 9:45:00 AM Magnesium 4300 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 8/16/2022 9:45:00 AM Calcium 12000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 8/16/2022 9:45:00 AM Hardness 48 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 8/16/2022 9:45:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 9/20/2022 9:15:00 AM Nitrate/Nitrite 0.32 mg/L MY8 Clear Cr Ferguson Rd 0.05 No 9/20/2022 9:15:00 AM Fecal Coliform 615 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No 9/20/2022 9:15:00 AM E.Coli 1204 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No 9/20/2022 9:15:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No 9/20/2022 9:15:00 AM Total Phosphorus 0.018 mg/L MY8 Clear Cr Ferguson Rd 0.010 No 9/20/2022 9:15:00 AM Turbidity 1.6 NTU MY8 Clear Cr Ferguson Rd 0.50 No 9/20/2022 9:15:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No 9/20/2022 9:15:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 No - 9/20/2022 9:15:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No - 9/20/2022 9:15:00 AM Hardness 57 mg/L MY8 Clear Cr Ferguson Rd 1.0 No 9/20/2022 9:15:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:15:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:15:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No 9/20/2022 9:15:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 No 9/20/2022 9:15:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No 89 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services -Collection Date Analyte Result Unit I _ Site Description MDL Storm 9/20/2022 9:15:00 AM Hardness 57 mg/L MY8 Clear Cr Ferguson Rd 1.0 No 9/20/2022 9:15:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:15:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:15:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No 9/20/2022 9:20:00 AM Nitrate/Nitrite 0.33 mg/L MY8 Clear Cr Ferguson Rd 0.05 No 9/20/2022 9:20:00 AM Fecal Coliform 620 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No 9/20/2022 9:20:00 AM E.Coli 580 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No 9/20/2022 9:20:00 AM Turbidity 2.9 NTU MY8 Clear Cr Ferguson Rd 0.50 No 9/20/2022 9:20:00 AM Total Phosphorus 0.019 mg/L MY8 Clear Cr Ferguson Rd 0.010 No 9/20/2022 9:20:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No 9/20/2022 9:20:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 No 9/20/2022 9:20:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No 9/20/2022 9:20:00 AM Calcium 12000 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:20:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No 9/20/2022 9:20:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:20:00 AM Hardness 54 mg/L MY8 Clear Cr Ferguson Rd 1.0 No 9/20/2022 9:20:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 No 9/20/2022 9:20:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No 9/20/2022 9:20:00 AM Calcium 12000 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:20:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No 9/20/2022 9:20:00 AM Magnesium 5900 ug/L MY8 Clear Cr Ferguson Rd 1000 No 9/20/2022 9:20:00 AM Hardness 54 mg/L MY8 Clear Cr Ferguson Rd 1.0 No 9/20/2022 9:20:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No 10/18/2022 9:35:00 AM Nitrate/Nitrite 0.13 mg/L MY8 Clear Cr Ferguson Rd 0.05 No 10/18/2022 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No 10/18/2022 9:35:00 AM Turbidity 1.3 NTU MY8 Clear Cr Ferguson Rd 0.50 No 10/18/2022 9:35:00 AM Total Phosphorus 0.019 mg/L MY8 Clear Cr Ferguson Rd 0.010 No 10/18/2022 9:35:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No 10/18/2022 9:35:00 AM E.Coli 436 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No 10/18/2022 9:35:00 AM Fecal Coliform 720 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No 10/18/2022 9:35:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No 10/18/2022 9:35:00 AM Suspended Sediment 3.9 mg/L MY8 Clear Cr Ferguson Rd < 3.9 No 10/18/2022 9:35:00 AM Chromium 1 ug/L MY8 Clear Cr Ferguson Rd < 1.00 No 10/18/2022 9:35:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.500 No 10/18/2022 9:35:00 AM Zinc 20 ug/L MY8 Clear Cr Ferguson Rd < 20.0 No 10/18/2022 9:35:00 AM Copper 1.07 ug/L MY8 Clear Cr Ferguson Rd 0.500 No 10/18/2022 9:35:00 AM Nickel 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.500 No 10/18/2022 9:35:00 AM Magnesium 5970 ug/L MY8 Clear Cr Ferguson Rd 100 No 10/18/2022 9:35:00 AM Calcium 17200 ug/L MY8 Clear Cr Ferguson Rd 100 No 10/18/2022 9:35:00 AM Hardness 67.5 mg/L MY8 Clear Cr Ferguson Rd 0.100 No 10/18/2022 10:20:00 AM Fecal Coliform 194 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No 10/18/2022 10:20:00 AM E.Coli 436 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No 11/15/2022 10:00:00 AM E.Coli 343 MPN/100 ml MY8 Clear Cr Ferguson Rd 10 Yes 11/15/2022 10:00:00 AM Fecal Coliform 354 CFU/100 ml MY8 Clear Cr Ferguson Rd 20 Yes 11/15/2022 10:05:00 AM Nitrate/Nitrite 0.2 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 90 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Nsi.Services -.Collection Date Analyte Result Unit _ Site Description MDL Storm 11/15/2022 10:05:00 AM Turbidity 10 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 11/15/2022 10:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 11/15/2022 10:05:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 11/15/2022 10:05:00 AM Total Phosphorus 0.024 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 11/15/2022 10:05:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 Yes 11/15/2022 10:05:00 AM TKN 0.28 mg/L MY8 Clear Cr Ferguson Rd 0.25 Yes 11/15/2022 10:05:00 AM Magnesium 4400 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 11/15/2022 10:05:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 11/15/2022 10:05:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 11/15/2022 10:05:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 12/20/2022 9:55:00 AM Nitrate/Nitrite 0.73 mg/L MY8 Clear Cr Ferguson Rd 0.05 No 12/20/2022 9:55:00 AM Total Phosphorus 0.026 mg/L MY8 Clear Cr Ferguson Rd 0.010 No 12/20/2022 9:55:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No 12/20/2022 9:55:00 AM E.Coli 817 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No 12/20/2022 9:55:00 AM Turbidity 20 NTU MY8 Clear Cr Ferguson Rd 0.50 No 12/20/2022 9:55:00 AM Fecal Coliform 425 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No 12/20/2022 9:55:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 No 12/20/2022 9:55:00 AM TKN 0.31 mg/L MY8 Clear Cr Ferguson Rd 0.25 No 12/20/2022 9:55:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No 12/20/2022 9:55:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 500 No 12/20/2022 9:55:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 500 No 12/20/2022 9:55:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 No 12/20/2022 9:55:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No 1/17/2023 9:35:00 AM Fecal Coliform 495 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes 1/17/2023 9:35:00 AM E.Coli 817 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes 1/17/2023 9:35:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 1/17/2023 9:35:00 AM Nitrate/Nitrite 0.69 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 1/17/2023 9:35:00 AM Turbidity 24 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 1/17/2023 9:35:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 1/17/2023 9:35:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes 1/17/2023 9:35:00 AM Total Phosphorus 0.026 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 1/17/2023 9:35:00 AM Suspended Sediment 4 mg/L MY8 Clear Cr Ferguson Rd < 4.0 Yes 1/17/2023 9:35:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 1/17/2023 9:35:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 1/17/2023 9:35:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 1/17/2023 9:35:00 AM Chromium 5 ug/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 1/17/2023 9:35:00 AM Nickel 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 1/17/2023 9:35:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 1/17/2023 9:35:00 AM Zinc 10 ug/L MY8 Clear Cr Ferguson Rd < 10 Yes 1/17/2023 9:35:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.50 Yes 2/21/2023 9:20:00 AM Nitrate/Nitrite 0.53 mg/L MY8 Clear Cr Ferguson Rd 0.05 No 2/21/2023 9:20:00 AM E.Coli 462 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 No 2/21/2023 9:20:00 AM Total Phosphorus 0.018 mg/L MY8 Clear Cr Ferguson Rd 0.010 No 2/21/2023 9:20:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 No 2/21/2023 9:20:00 AM Turbidity 16 NTU MY8 Clear Cr Ferguson Rd 0.5 No 91 / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date Analyte Result Unit I _ Site Description MDL Storm 2/21/2023 9:20:00 AM Fecal Coliform 435 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 No 2/21/2023 9:20:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 No 2/21/2023 9:20:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 No 2/21/2023 9:20:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 No 2/21/2023 9:20:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 500 No 2/21/2023 9:20:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 No 2/21/2023 9:20:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 500 No 2/21/2023 9:20:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 No 3/21/2023 9:40:00 AM Nitrate/Nitrite 0.49 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 3/21/2023 9:40:00 AM Turbidity 6.9 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 3/21/2023 9:40:00 AM Fecal Coliform 370 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes 3/21/2023 9:40:00 AM E.Coli 291 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes 3/21/2023 9:40:00 AM Total Phosphorus 0.014 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 3/21/2023 9:40:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 3/21/2023 9:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 3/21/2023 9:40:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes 3/21/2023 9:40:00 AM Hardness 51 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 3/21/2023 9:40:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 3/21/2023 9:40:00 AM Magnesium 4500 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 3/21/2023 9:40:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 3/21/2023 9:40:00 AM Suspended Sediment 4.2 mg/L MY8 Clear Cr Ferguson Rd < 4.2 Yes 4/18/2023 9:25:00 AM Fecal Coliform 410 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes 4/18/2023 9:25:00 AM Turbidity 10 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 4/18/2023 9:25:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 4/18/2023 9:25:00 AM Nitrate/Nitrite 0.6 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 4/18/2023 9:25:00 AM Total Phosphorus 0.023 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 4/18/2023 9:25:00 AM E.Coli 411 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes - 4/18/2023 9:25:00 AM Magnesium 4700 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 4/18/2023 9:25:00 AM Calcium 13000 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 4/18/2023 9:25:00 AM Hardness 52 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 4/18/2023 9:25:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 Yes 4/18/2023 9:25:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 4/18/2023 9:25:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes 4/18/2023 9:25:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 4/18/2023 9:25:00 AM Chromium 5 ug/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 4/18/2023 9:25:00 AM Nickel 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 4/18/2023 9:25:00 AM Lead 0.5 ug/L MY8 Clear Cr Ferguson Rd < 0.50 Yes 4/18/2023 9:25:00 AM Zinc 10 ug/L MY8 Clear Cr Ferguson Rd < 10 Yes 5/16/2023 9:30:00 AM E.Coli 411 MPN/100 ml MY8 Clear Cr Ferguson Rd 1 Yes 5/16/2023 9:30:00 AM Turbidity 6.1 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 5/16/2023 9:30:00 AM Nitrate/Nitrite 0.74 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 5/16/2023 9:30:00 AM Fecal Coliform 460 CFU/100 ml MY8 Clear Cr Ferguson Rd 10 Yes 5/16/2023 9:30:00 AM Suspended Sediment 3.8 mg/L MY8 Clear Cr Ferguson Rd < 3.8 Yes 5/16/2023 9:30:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 5/16/2023 9:30:00 AM Total Phosphorus 0.022 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 92 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date Analyte Result Unit _ Site Description MDL Storm 5/16/2023 9:30:00 AM Total Suspended Solids 5 mg/L MY8 Clear Cr Ferguson Rd < 5.0 Yes 5/16/2023 9:30:00 AM TKN 0.25 mg/L MY8 Clear Cr Ferguson Rd < 0.25 Yes 5/16/2023 9:30:00 AM Hardness 60 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 5/16/2023 9:30:00 AM Calcium 15000 ug/L MY8 Clear Cr Ferguson Rd 500 Yes 5/16/2023 9:30:00 AM Magnesium 5400 ug/L MY8 Clear Cr Ferguson Rd 500 Yes 5/16/2023 9:30:00 AM Copper 2 ug/L MY8 Clear Cr Ferguson Rd < 2.0 Yes 6/20/2023 9:40:00 AM Nitrate/Nitrite 0.28 mg/L MY8 Clear Cr Ferguson Rd 0.05 Yes 6/20/2023 9:40:00 AM E.Coli 4280 MPN/100 ml MY8 Clear Cr Ferguson Rd 100 Yes 6/20/2023 9:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY8 Clear Cr Ferguson Rd < 0.10 Yes 6/20/2023 9:40:00 AM Turbidity 190 NTU MY8 Clear Cr Ferguson Rd 0.50 Yes 6/20/2023 9:40:00 AM TKN 0.83 mg/L MY8 Clear Cr Ferguson Rd 0.25 Yes 6/20/2023 9:40:00 AM Fecal Coliform 5200 CFU/100 ml MY8 Clear Cr Ferguson Rd 100 Yes 6/20/2023 9:40:00 AM Total Suspended Solids 119 mg/L MY8 Clear Cr Ferguson Rd 16.7 Yes 6/20/2023 9:40:00 AM Suspended Sediment 130 mg/L MY8 Clear Cr Ferguson Rd 3.9 Yes 6/20/2023 9:40:00 AM Total Phosphorus 0.155 mg/L MY8 Clear Cr Ferguson Rd 0.010 Yes 6/20/2023 9:40:00 AM Magnesium 2200 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 6/20/2023 9:40:00 AM Hardness 23 mg/L MY8 Clear Cr Ferguson Rd 1.0 Yes 6/20/2023 9:40:00 AM Calcium 5700 ug/L MY8 Clear Cr Ferguson Rd 1000 Yes 6/20/2023 9:40:00 AM Copper 2.1 ug/L MY8 Clear Cr Ferguson Rd 2.0 Yes 7/19/2022 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 7/19/2022 9:05:00 AM Turbidity 7.1 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 7/19/2022 9:05:00 AM Fecal Coliform 360 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes 7/19/2022 9:05:00 AM E.Coli 246 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes 7/19/2022 9:05:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 7/19/2022 9:05:00 AM Nitrate/Nitrite 0.38 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 7/19/2022 9:05:00 AM Total Phosphorus 0.028 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 7/19/2022 9:05:00 AM TKN 0.34 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes 7/19/2022 9:05:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 7/19/2022 9:05:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 7/19/2022 9:05:00 AM Hardness 42 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 7/19/2022 9:05:00 AM Magnesium 4100 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes 7/19/2022 9:05:00 AM Calcium 10000 ug/L MY9 Goose Cr Stevens Mill Rd. 2000 Yes 7/19/2022 9:05:00 AM Suspended Sediment 4.2 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.2 Yes 7/19/2022 9:05:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes 7/19/2022 9:05:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes 7/19/2022 9:05:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 7/19/2022 9:10:00 AM E.Coli 308 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 1 Yes 7/19/2022 9:10:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 7/19/2022 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 7/19/2022 9:10:00 AM Turbidity 7.2 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 7/19/2022 9:10:00 AM Nitrate/Nitrite 0.39 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 7/19/2022 9:10:00 AM Fecal Coliform 430 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes 7/19/2022 9:10:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 7/19/2022 9:10:00 AM TKN 0.34 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes 7/19/2022 9:10:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 93 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services S Collection Date Analyte Result Unit _ Site Description _ MDL Storm 7/19/2022 9:10:00 AM Total Phosphorus 0.029 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 7/19/2022 9:10:00 AM Hardness 42 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 7/19/2022 9:10:00 AM Magnesium 4200 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes 7/19/2022 9:10:00 AM Calcium 10000 ug/L MY9 Goose Cr Stevens Mill Rd. 2000 Yes 7/19/2022 9:10:00 AM Suspended Sediment 4 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.0 Yes 7/19/2022 9:10:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes 7/19/2022 9:10:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 7/19/2022 9:10:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes 8/16/2022 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 8/16/2022 9:05:00 AM Fecal Coliform 313 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 100 Yes 8/16/2022 9:05:00 AM E.Coli 685 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 100 Yes 8/16/2022 9:05:00 AM Nitrate/Nitrite 0.47 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 8/16/2022 9:05:00 AM Turbidity 3 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 8/16/2022 9:05:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 8/16/2022 9:05:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes 8/16/2022 9:05:00 AM Suspended Sediment 3.9 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.9 Yes 8/16/2022 9:05:00 AM Total Phosphorus 0.026 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 8/16/2022 9:05:00 AM Magnesium 5400 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 8/16/2022 9:05:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 8/16/2022 9:05:00 AM Hardness 55 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 8/16/2022 9:05:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 9/20/2022 8:40:00 AM Nitrate/Nitrite 0.37 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No 9/20/2022 8:40:00 AM E.Coli 310 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 No 9/20/2022 8:40:00 AM Fecal Coliform 498 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No 9/20/2022 8:40:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No 9/20/2022 8:40:00 AM Total Phosphorus 0.019 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No 9/20/2022 8:40:00 AM Turbidity 1.9 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 No 9/20/2022 8:40:00 AM Suspended Sediment 4.2 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.2 No 9/20/2022 8:40:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No 9/20/2022 8:40:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No 9/20/2022 8:40:00 AM Hardness 54 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No 9/20/2022 8:40:00 AM Calcium 12000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No 9/20/2022 8:40:00 AM Magnesium 5900 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No 9/20/2022 8:40:00 AM Suspended Sediment 4.2 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.2 No 9/20/2022 8:40:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No 9/20/2022 8:40:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No 9/20/2022 8:40:00 AM Hardness 54 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No 9/20/2022 8:40:00 AM Calcium 12000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No 9/20/2022 8:40:00 AM Magnesium 5900 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 No 9/20/2022 8:40:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 No 10/18/2022 8:50:00 AM Fecal Coliform 280 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No 10/18/2022 8:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No 10/18/2022 8:50:00 AM Turbidity 1 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 No 10/18/2022 8:50:00 AM E.Coli 185 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 No 10/18/2022 8:50:00 AM Nitrate/Nitrite 0.07 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No 94 / , / Charlotte-Mecklenburg fi / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services 'Collection Date Analyte Result Unit _ Site Description i MDL Storm 10/18/2022 8:50:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No 10/18/2022 8:50:00 AM Total Phosphorus 0.017 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No 10/18/2022 8:50:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No 10/18/2022 8:50:00 AM Suspended Sediment 4.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.1 No 10/18/2022 8:50:00 AM Magnesium 5440 ug/L MY9 Goose Cr Stevens Mill Rd. 100 No 10/18/2022 8:50:00 AM Copper 1.01 ug/L MY9 Goose Cr Stevens Mill Rd. 0.500 No 10/18/2022 8:50:00 AM Calcium 15300 ug/L MY9 Goose Cr Stevens Mill Rd. 100 No 10/18/2022 8:50:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.500 No 10/18/2022 8:50:00 AM Chromium 1 ug/L MY9 Goose Cr Stevens Mill Rd. < 1.00 No 10/18/2022 8:50:00 AM Hardness 60.6 mg/L MY9 Goose Cr Stevens Mill Rd. 0.100 No 10/18/2022 8:50:00 AM Zinc 20 ug/L MY9 Goose Cr Stevens Mill Rd. < 20.0 No 10/18/2022 8:50:00 AM Nickel 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.500 No 11/15/2022 9:10:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 11/15/2022 9:10:00 AM E.Coli 229 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes 11/15/2022 9:10:00 AM Nitrate/Nitrite 0.86 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 11/15/2022 9:10:00 AM Fecal Coliform 339 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 20 Yes 11/15/2022 9:10:00 AM Turbidity 5.9 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 11/15/2022 9:10:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 11/15/2022 9:10:00 AM Total Phosphorus 0.031 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 11/15/2022 9:10:00 AM Suspended Sediment 4.4 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.4 Yes 11/15/2022 9:10:00 AM TKN 0.39 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes 11/15/2022 9:10:00 AM Calcium 14000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 11/15/2022 9:10:00 AM Magnesium 4800 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 11/15/2022 9:10:00 AM Hardness 55 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 11/15/2022 9:10:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 12/20/2022 9:05:00 AM Turbidity 6.3 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 No 12/20/2022 9:05:00 AM E.Coli 331 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 No 12/20/2022 9:05:00 AM Total Phosphorus 0.024 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No 12/20/2022 9:05:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No 12/20/2022 9:05:00 AM Fecal Coliform 240 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No 12/20/2022 9:05:00 AM Nitrate/Nitrite 0.66 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No 12/20/2022 9:05:00 AM Suspended Sediment 4.3 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.3 No 12/20/2022 9:05:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No 12/20/2022 9:05:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No 12/20/2022 9:05:00 AM Magnesium 4800 ug/L MY9 Goose Cr Stevens Mill Rd. 500 No 12/20/2022 9:05:00 AM Hardness 55 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No 12/20/2022 9:05:00 AM Calcium 14000 ug/L MY9 Goose Cr Stevens Mill Rd. 1 500 No 12/20/2022 9:05:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 No 1/17/2023 9:00:00 AM Nitrate/Nitrite 0.63 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes - 1/17/2023 9:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 1/17/2023 9:00:00 AM E.Coli 262 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 1 Yes 1/17/2023 9:00:00 AM Fecal Coliform 210 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes 1/17/2023 9:00:00 AM Turbidity 7.6 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 1/17/2023 9:00:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 1/17/2023 9:00:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes 95 / , / Charlotte-Mecklenburg / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N1 Services -.Collection Date Analyte Result Unit _ Site Description _ MDL Storm 1/17/2023 9:00:00 AM Total Phosphorus 0.023 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 1/17/2023 9:00:00 AM Suspended Sediment 3.9 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.9 Yes 1/17/2023 9:00:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 1/17/2023 9:00:00 AM Magnesium 4600 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 1/17/2023 9:00:00 AM Hardness 51 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 1/17/2023 9:00:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 1/17/2023 9:00:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 1/17/2023 9:00:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes 1/17/2023 9:00:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes 1/17/2023 9:00:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 2/21/2023 8:45:00 AM Fecal Coliform 220 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 No 2/21/2023 8:45:00 AM Turbidity 6.6 NTU MY9 Goose Cr Stevens Mill Rd. 0.5 No 2/21/2023 8:45:00 AM E.Coli 185 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 1 No 2/21/2023 8:45:00 AM Nitrate/Nitrite 0.58 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 No 2/21/2023 8:45:00 AM Total Phosphorus 0.019 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 No 2/21/2023 8:45:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 No 2/21/2023 8:45:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 No 2/21/2023 8:45:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 No 2/21/2023 8:45:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 No 2/21/2023 8:45:00 AM Calcium 12000 ug/L MY9 Goose Cr Stevens Mill Rd. 500 No 2/21/2023 8:45:00 AM Magnesium 4200 ug/L MY9 Goose Cr Stevens Mill Rd. 500 No 2/21/2023 8:45:00 AM Hardness 47 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 No 2/21/2023 8:45:00 AM Suspended Sediment 4.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.1 No 3/21/2023 8:55:00 AM Nitrate/Nitrite 0.55 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 3/21/2023 8:55:00 AM Fecal Coliform 160 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes 3/21/2023 8:55:00 AM Turbidity 3.6 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 3/21/2023 8:55:00 AM E.Coli 180 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes 3/21/2023 8:55:00 AM Total Phosphorus 1 0.151 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 3/21/2023 8:55:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 3/21/2023 8:55:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 3/21/2023 8:55:00 AM Magnesium 4800 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 3/21/2023 8:55:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes 3/21/2023 8:55:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 3/21/2023 8:55:00 AM Hardness 52 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 3/21/2023 8:55:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 3/21/2023 8:55:00 AM Suspended Sediment 3.9 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.9 Yes 4/18/2023 8:50:00 AM E.Coli 495 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes 4/18/2023 8:50:00 AM Total Phosphorus 0.026 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes - 4/18/2023 8:50:00 AM Turbidity 4.7 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes - 4/18/2023 8:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 4/18/2023 8:50:00 AM Fecal Coliform 410 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes 4/18/2023 8:50:00 AM Nitrate/Nitrite 0.66 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 4/18/2023 8:50:00 AM Suspended Sediment 4 mg/L MY9 Goose Cr Stevens Mill Rd. < 4.0 Yes 4/18/2023 8:50:00 AM Chromium 5 ug/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 4/18/2023 8:50:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 96 / , / Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N..services - Collection Date Analyte Result Unit Site Description _ MDL Storm 4/18/2023 8:50:00 AM TKN 0.26 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes 4/18/2023 8:50:00 AM Nickel 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 4/18/2023 8:50:00 AM Magnesium 4700 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 4/18/2023 8:50:00 AM Calcium 13000 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 4/18/2023 8:50:00 AM Hardness 52 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 4/18/2023 8:50:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 4/18/2023 8:50:00 AM Zinc 10 ug/L MY9 Goose Cr Stevens Mill Rd. < 10 Yes 4/18/2023 8:50:00 AM Lead 0.5 ug/L MY9 Goose Cr Stevens Mill Rd. < 0.50 Yes 5/16/2023 8:50:00 AM Fecal Coliform 487 CFU/100 ml MY9 Goose Cr Stevens Mill Rd. 10 Yes 5/16/2023 8:50:00 AM Nitrate/Nitrite 0.74 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 5/16/2023 8:50:00 AM E.Coli 568 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 2 Yes 5/16/2023 8:50:00 AM Turbidity 3.1 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 5/16/2023 8:50:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 5/16/2023 8:50:00 AM Suspended Sediment 3.8 mg/L MY9 Goose Cr Stevens Mill Rd. < 3.8 Yes 5/16/2023 8:50:00 AM Total Phosphorus 0.021 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 5/16/2023 8:50:00 AM Total Suspended Solids 5 mg/L MY9 Goose Cr Stevens Mill Rd. < 5.0 Yes 5/16/2023 8:50:00 AM TKN 0.25 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.25 Yes 5/16/2023 8:50:00 AM Magnesium 5100 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes 5/16/2023 8:50:00 AM Hardness 58 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 5/16/2023 8:50:00 AM Calcium 15000 ug/L MY9 Goose Cr Stevens Mill Rd. 500 Yes 5/16/2023 8:50:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 6/20/2023 9:00:00 AM Turbidity 60 NTU MY9 Goose Cr Stevens Mill Rd. 0.50 Yes 6/20/2023 9:00:00 AM Nitrate/Nitrite 0.62 mg/L MY9 Goose Cr Stevens Mill Rd. 0.05 Yes 6/20/2023 9:00:00 AM E.Coli 2990 MPN/100 ml MY9 Goose Cr Stevens Mill Rd. 100 Yes 6/20/2023 9:00:00 AM Ammonia-Nitrogen 0.1 mg/L MY9 Goose Cr Stevens Mill Rd. < 0.10 Yes 6/20/2023 9:00:00 AM Total Suspended Solids 24.2 mg/L MY9 Goose Cr Stevens Mill Rd. 5.0 Yes 6/20/2023 9:00:00 AM Suspended Sediment 21 mg/L MY9 Goose Cr Stevens Mill Rd. 3.8 Yes 6/20/2023 9:00:00 AM Fecal Coliform 4340 CFU/100 ml 1 MY9 Goose Cr Stevens Mill Rd. 100 Yes 6/20/2023 9:00:00 AM TKN 0.51 mg/L MY9 Goose Cr Stevens Mill Rd. 0.25 Yes 6/20/2023 9:00:00 AM Total Phosphorus 0.064 mg/L MY9 Goose Cr Stevens Mill Rd. 0.010 Yes 6/20/2023 9:00:00 AM Hardness 23 mg/L MY9 Goose Cr Stevens Mill Rd. 1.0 Yes 6/20/2023 9:00:00 AM Calcium 6100 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 6/20/2023 9:00:00 AM Magnesium 1900 ug/L MY9 Goose Cr Stevens Mill Rd. 1000 Yes 6/20/2023 9:00:00 AM Copper 2 ug/L MY9 Goose Cr Stevens Mill Rd. < 2.0 Yes 97 , , Charlotte-Mecklenburg 1/STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N .services Attachment 15: FY2023 Stream Use-Support Index (SUSI) for Phase II About This Map:The Stream Use Support Index(SUSI)is a customized tool used by .,*r Mecklenburg County to communicate vast • Monitoring Sites amounts of Fixed Interval Monitoring(FIM)data ❑ (see Attachment 14)that is collected from Phase II Jurisdictions streams throughout Mecklenburg County.The Partially Supporting Y1 B scores are updated quarterly and represent data collected 12 times a year from 24 monitoring sites(6 in Phase II jurisdictions).The SUSI, or score, is constructed around five(5)categories of surface water quality data that represent the j77 ,:?‘ir most important pollutants and indicators of i Y10 environmental health including: Bacteriological, Metals,Nutrients, Physical, and Biological/ �� 4 Habitat.Scores range from 0-100,with a score of 100 indicating the best water quality possible. Witil'' ' ilfr M 5 J - 7 r R,' 4 d i li. tillitle . \y,\, 9 1 ..• e ao Charlotte-Mecklenburg ill STORM _' se WATrvicesER 98 / , / Charlott e5.1..lenburg / / 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N .Services Attachment 16: Measure of Success for the IDDE Program Increase the percentage of NOVs issued to the number of IDDE inspections conducted based on the average of last 3 fiscal years (serves as an indicator of the success of our efforts to find and eliminate pollution sources). %of NOVs/Inspections . .Goal 14% .8 12% 12. %— 1 o 0 11.21% U 10% - 8.26%0,0o0 9.42% 04 8% 8.67% 8 I/o 9.06% O 7.14% 6% 6.50% 6.90% Z 6.07% w 4.58% 5.54% 0 • 4% 4.97% 4.89% R 3.83% 4.12% % °' 2.03% u 2 2I 7. o 2.03% 2.03% 0% • • FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 99 / , / Charlotte-Meclenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services Attachment 17: Measure of Success for the IDDE Program Decrease the percentage of repeat violators to the number of NOVs issued based on the average of last 3 fiscal years (serves as an indicator of the success of our efforts to reduce repeat offenses). %Repeat Violators (Goal 35% 30% 31.41% tn 25% w 0 0 20% 18.18% 15.80,0 17.33% 17.47% 17.66% 15% 15.17% 15.08% 0 12.61% 10% 5% 0% FY18 FY19 FY20 FY21 FY22 FY23 100 / , / Charlotte-Mecklenburg i STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 n WATER Services — Attachment 18: Measure of Success for the Construction Site Runoff Control Program Decrease the percentage of NOVs issued to the number of erosion control inspections conducted based on the average of last 3 fiscal years (serves as an indicator of improved compliance). %of NOVs/Inspections . .Goal 4.0% 3.5% —3.37%—3.37% o i o 3.37% 2 3.0% N 2.84% 2.51 I 2.5% o `.4%4%1%2.16% 2.31% 2.32% 1.96% O 2.0% Z 1.72% w O 1.86% a 1.5% 1.71% a 1.27% u 1.09% 1.12% 1.17% I - 5 1.0% 1.13% 1.19% 1.10%—1. o 0.95% 1.21% 0.5% 0.0% FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 101 / , / Charlotte-Mecklenburg i / I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�services Attachment 19: BMP Inspections Revealing Problems from 2007 through 2023 Fiscal Year #BMPs #Inspections #BMPs with % BMPs with Conducted Problems Problems 2010 355 510 206 58% 2011 418 - 238 57% 2012 497 443 256 58% 2013 630 453 248 55% 2014 664 668 244 36% 2015 713 555 286 51% 2016 926 691 247 36% 2017 1,020 640 408 64% 2018 1,032 610 496 81% 2019 *800 596 409 69% 2020 *789 709 322 45% 2021 *853 695 387 56% 2022 *929 763 260 34% 2023 *1344 763 286 37% *Number is the total number of BMP's located within the Phase 2 jurisdiction,CMS and CPCC that are regulated by Watershed,Post Construction and/or LID.The number is only for Fiscal Years 2019 and beyond. 102 / , / Charlotte-Mecklenburg i I STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Ns.services Attachment 20: Measure of Success for the Post-Construction Site Runoff Control Program Decrease the percentage of BMP deficiencies to the number of inspections conducted based on the average of last 3 fiscal years (serves as an indicator of improved compliance). %of Deficiencies/Inspections tGoal 90% 'B 80% 81.31% 1 U 70% 1....- 2 68.62%/71.23%***\,.4...... o a 60% 63.75% ❑ 65.12% 45.64% 60.274% 57.32/0 57.12% +? 50% —54 75%_54.75% 50.34% To 47.60% 6 40% 51.53% 45.42% 45.61% — A 41.27% ■ ■ ■ 36.53% 35. % 37.48% 30% 34.08% go 0 0 . 20% N it U q 10% 0% FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 103 Charlotte-Mecklenburg �� i/STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Attachment 21: Summary of Inspection Findings from FY2008 through FY2023 Number of Findings by Fiscal Year Inspection Findings Totals 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Storm Water System& 0 0 0 0 0 17 25 14 12 21 26 25 18 17 12 6 193 BMPsi Erosion 0 0 1 0 0 16 8 10 12 21 26 20 16 11 10 16 167 Illicit discharges/connections 3 5 3 0 0 3 4 6 8 3 4 7 2 0 0 0 48 Aboveground Storage Tanks2 - - - - - - - - - 5 7 3 5 12 9 5 46 Underground Storage Tanks' - - - - - - - - - 0 0 0 0 0 0 0 0 Material Storage Area(s) 0 2 2 0 0 2 7 7 0 15 11 11 14 7 6 9 93 Processing Area(s)2 - - - - - - - - - 2 2 4 1 1 0 1 11 Loading/Unloading Area(s)2 - - - - - - - - - 8 7 3 3 2 3 0 26 Vehicle/Equipment Areas(s) 0 0 0 0 0 0 4 1 2 11 10 11 6 2 6 2 55 Oil/Water Separator/ Pretreatment' - - - - - - - - - 7 2 2 1 0 0 1 13 Waste Storage/Disposal 1 5 5 0 0 7 8 16 26 31 26 26 26 25 18 25 245 Area(s) Food Service Area(s)2 - - - - - - - - - 2 1 2 0 1 1 2 9 Floor Drains' - - - - - - - - - 6 2 0 0 2 1 1 12 Spill Response Equipment' - - - - - - - - - 11 15 12 10 6 4 5 63 Equipment Maintenance 0 2 0 0 0 0 0 0 0 2 Needed3 Inadequate Housekeeping3 2 0 2 0 0 0 0 0 0 - - - - - - - 4 Not Operating in Accordance 7 5 4 0 0 10 5 4 5 11 13 9 30 21 4 6 134 with SWPPP Totals 13 19 17 0 0 55 61 58 65 154 152 135 132 107 74 71 1113 1. "Storm water System"and"BMPs"are separated on the current inspection checklist but are combined in this table for comparison to previous years. 2. These categories were not tracked in the annual report prior to FY17. 3. Starting with FY2017,these findings are tracked under other categories(e.g.,material storage areas,processing areas,etc.) 104 Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services Attachment 22: Measure of Success for Pollution Prevention & Good Housekeeping Program Decrease the percentage of deficiencies detected to the number of inspections conducted based on the average of last 3 fiscal years (serves as an indicator of improved compliance). of Deficiencies/Inspections —Goal 100% 90% 89.66% 0• 80% U • 70% • 60% o aa) 50% 52.22% 52.85% '� 40% 35.85% 47.50% i \28.72% 37.74% 30% -35.85% 3333%3 20% o20.00% 22.72/010% 1—il 15.09% 14.81% 15.24%— — 10.91% — 10.34% 0% I 7.69% FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 105 Charlotte-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services Attachment 23: Measures of Success Summary for FY2023 # Measures of Success FY2023 FY2023 Target Met Target Results (Yes or No) Complete Documentation—Document 100% of 100% of 1 Storm Water Program activities that Activities Activities Yes demonstrate successful fulfillment of Documented Documented BMPs. Increasing Awareness—Increase the percentage of survey respondents 2 indicating they are aware that water 79.20% 67.30% No flowing into storm drains goes directly to creeks and lakes based on the average of the last 3 fiscal years Increasing Awareness—Increase the 3 extent of exposure from the media 6,329,781 19,798,168 Yes campaign based on the average of the last 3 fiscal years. Increasing Number of Volunteers— 4 Increase in the number of volunteers 3,825 4 848 Yes based on the average of the last 3 fiscal ' years. Increasing IDDE—Increase the percentage of NOVs issued to the 5 number of IDDE inspections conducted 9.06% 12.56% Yes based on the average of the last 3 fiscal years. Decreasing Number of Repeat Violators—Decrease the percentage of 6 repeat violators to the number of NOVs 15.08% 31.41% No issued based on the average of the last 3 fiscal years. Improving Compliance—Decrease the percentage of NOVs issued to the 7 number of erosion control inspections 1.17% 1.05% Yes conducted based on the average of the last 3 fiscal years. Improving Compliance—Decrease the 8 percentage of BMP deficiencies to the 45.61% 37.48% Yes number of inspections conducted based on the average of the last 3 fiscal years. Improving Compliance—Decrease the percentage of deficiencies detected to 9 the number of municipal facility 11.14% 10.34% Yes inspections conducted based on the average of the last 3 fiscal years. 106 / Chrlot ate-Mecklenburg i d STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER r`r�serur�es Attachment 24: Status of Work Plan Modifications Implemented in FY2023 # Identified Improvement Desired Result Program Responsible Status Element Staff Public Education&Outreach Redesign the current water quality school Improve 1 education material for younger ages to be effectiveness of PE-10 Ashley Smith Completed more engaging and relevant to the school school age training curriculum. materials. Improve 2 Modify school education worksheets to effectiveness of PE-10 Ashley Smith Completed include Spanish. school age training materials. Implement the Safe Swim Communication Better inform 3 Campaign to provide education to lake users swimmers of health PE-10 Ashley Smith Completed regarding Best Management Practices issues related to related to swimming in lakes. swimming in lakes. Implement the public education components Increase volunteer 4 of the Underserved Communities Reach activity. PE-10 Ashley Smith Completed Plan. Develop video to educate residents on built Improve compliance 5 upon area(BUA)requirements for with BUA. PE-10 Ashley Smith Completed protection of water quality. Public Involvement&Participation Finalize the new design of the Adopt a Enhance 6 Stream sign. effectiveness of PI-2 Taylor Mebane Completed signage. Implement the Public Involvement components of the Underserved Increase volunteer Communities Reach Plan,including 7 researching potential events in underserved activity in PE-10 Taylor Mebane Completed underserved communities such as stream clean ups, communities. storm drain marking events and tree plantings. 8 Expand the Adopt a Drain program into Increase volunteer SBP Ashley Smith Completed another Phase II town. activity. Involvement 9 Investigate a Plogging event for Creek Increase volunteer pE-I(16) Taylor Mebane Completed Week. activity. Investigate a new public involvement Increase volunteer 10 competition for students. activity. PE 10 Ashley Smith Completed Illicit Discharge Detection&Elimination Help confirm 11 Install cameras at all of the Phase 2 possible pollution ID-4.10(c) Iva Barnes Completed CMANN sites. issues detected by the CMANN equipment. Identify and Use water quality modeling to identify ID-4.7- 12 problem areas for monitoring and follow up. eliminate pollution CO(1) Robert Sowah Completed sources. Review and update the CMANN fecal Identify and ID-4.7- 13 prediction model. eliminate pollution CO(c) Robert Sowah Completed sources. Update stormwater inventory attribute Ensure we have 14 information for inventory collected by GIS accurate inventory ID-1(c) Ryan Spidel Completed staff. data. Construction Site Storm Water Runoff Control 107 Charlotte-Mecklenburg 1 STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services # Identified Improvement Desired Result Program Responsible Status Element Staff Not enough Evaluate the usage of drones for site Improve inspection large 15 inspections. effectiveness. N/A Corey Priddy construction sites to justify. _ Complete#4 from last fiscal year: Not completed 16 Approval of changes in the Erosion Control Reduce offsite N/A Corey Priddy due to staff Ordinance and updates to the Enhanced sediment. shortage. Measures. Develop a plan for cross-training with the Improve inspection Not completed 17 City of Charlotte and the Town of effectiveness. N/A Corey Priddy due to staff Huntersville. shortage. Look into creating interactive hands-on training components to CMCSI.Will need Not completed 18 to have buy in from the City of Charlotte Improve training. N/A Corey Priddy due to staff shortage. and the Town of Huntersville. Post-Construction Site Runoff Control Continue#3 from last fiscal year,and work Significant increase from 19 with field staff to check for 3rd party Improve inspection N/A Corey Priddy last year with inspections and issue NOVs if they are not effectiveness. more emphasis being submitted. next year. Work with the Towns to determine if Watershed Ordinances can be changed so Efforts 20 that the BMPs would only have to be Improve inspection N/A Corey Priddy underway and inspected every 3 to 5 years.(Water Quality effectiveness. will continue would work on this task with help from in FY2024. Permitting and Compliance). Determine if an Environmental Specialist III,or similar position,is needed to manage A new position the BMP inspection program. Currently, was added to the program takes a significant amount of P&C this fiscal time for the Environmental Supervisor to Improve inspection year to help 21 N/A Corey Priddy with erosion perform,taking time away from other effectiveness. needed job duties. Since the number of control and BMPs increases every year,resource lead the BMP allocation needs to be periodically Inspection examined. Program. Pollution Prevention&Good House Keeping Program Ensure that permitted facilities are in 22 compliance with updated NPDES permit Ensure compliance. PP-2 Richard Farmer Completed requirements. Total Maximum Daily Loads Routine monitoring will continue to be performed in the TMDL watersheds by CMSWS.Exceedances of established water Identify and 23 quality watch and action levels will be eliminate sources of 1W-4(g) Julianna Completed identified and follow up actions conducted elevated fecal Hawley as necessary for the identification and coliform bacteria elimination of pollution sources By December 30,2022,CMSWS will complete a review of Health Depaitcnent Identify and 24 records to determine where failed septic eliminate sources of IW-2(c) John Thao Completed systems have been identified in both the elevated fecal Rocky River and Goose Creek TMDL coliform bacteria 108 , / C,a,h e-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER services # Identified Improvement Desired Result Program Responsible Status Element Staff watersheds. Follow up inspections and monitoring will be performed as necessary to ensure the elimination of sources of fecal coliform bacteria associated with failed septic systems thereby addressing impaired waters. By March 31,2023,major outfalls will be inspected in the Rocky River TMDL Identify and 25 watershed. Dry weather flows will be eliminate sources of IW-2(e) John Thao Completed identified,and pollution sources eliminated elevated fecal thereby addressing impaired waters. coliform bacteria Construction activities associated with the restoration of an additional 5,000-foot section of West Branch Rocky River are expected to begin in late FY2023 or early Improve stream 26 FY2024. Historically,West Branch Rocky stability and aquatic N/A Tim Trautman Completed River has been severely degraded by storm habitat water flows that erode the stream banks. The restoration project will stabilize the stream banks to reduce erosion and improve water quality. Conduct targeted surface water sampling in Identify and headwater areas of the Goose Creek eliminate sources of 27 IW-2(m) John Thao Completed watershed to further delineate sources of elevated fecal fecal coliform to the system. coliform bacteria 109 C,a,h e-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER N�Services Attachment 25: Work Plan Modifications Identified for Implementation in FY2024 Justification for Change& Program Responsible # Identified Improvement Schedule Desired Result Element Staff Public Education and Outreach Program 1 Continue to grow our social media Improve educational outreach PE-10 Ashley FY24 platforms(Facebook,Twitter, Smith Instagram,and YouTube)to spread water quality education messaging and volunteer opportunities. 2 Continue bilingual engagement efforts Improve educational outreach PE-10 Ashley FY24 such as exploring bilingual content on Smith/ social media channels and translating Taylor handouts and implement Mebane recommendations from the Underserved Communities Reach Plan(UCRP). _ 3 Continue the Safe Swim Education Improve educational outreach PE-10 Ashley FY24 Campaign and investigate the addition Smith of bilingual content. 4 Reach students at schools in all six of Improve educational outreach PE-10 Ashley FY24 the phase II municipalities. Smith Public Involvement and Participation Program 5 Promote Adopt A Stream segments that Increase public involvement PI-2 Angelica FY24 have not been adopted in last 5 years. Moncada Investigate potential ad campaigns. _ 6 Promote Volunteer Monitoring Program Increase engagement with local VM-CO Angelica FY24 with local colleges. colleges while gathering valuable Moncada data to improve our programs. 7 Investigate increasing engagement with Increase volunteers and engage with VM-CO Taylor FY24 residents on coves for Volunteer residents that live on coves. Mebane Monitoring program.Identify potential sampling methods and data needs. 8 Review Big Spring Clean site locations Increase overall reach throughout PE-I(4) Taylor FY24 to reach new areas of the county with county. Mebane the program. 9 Investigate Storm Drain Marking high Increase volunteers and increase PI-3 Ashley FY24 school competition. engagement with schools. Smith Illicit Discharge Detection and Elimination(IDDE)Program 10 Using the Fecal Bacteria Watershed Identification and elimination of ID-4.7 Robert FY24 Prioritization Matrix,implement fecal pollution sources. Sowah identified strategies to reduce fecal pollution. Construction Site Storm Water Runoff Control Program 11 Continue working on updating the Enhance protection. CS-2 Corey FY24 Erosion Control Ordinances. Priddy 12 Have all Erosion and Sedimentation Comply with State law. CS-2 Corey FY24 Control Penalties routed to NCDEQ as Priddy the law now requires. (Monies are currently being held in a fund to be sent to NCDEQ.) 13 Complete the updates to the Enhanced Enhance protection. CS-2 Corey FY24 Erosion Control Measures. Priddy 110 / , / C,a,h e-Mecklenburg STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Justification for Change& Program Responsible Identified Improvement Schedule Desired Result Element Staff Post-Construction Site Storm Water Runoff Control Program 14 Continue working on obtaining 3rd Increase number of inspections. PC-2 Corey FY24 party inspection reports.Increase the Priddy number received from the 260 received in FY2023. 15 Continue working with the Towns to Increase inspections of problem PC-1 Rusty FY24 see about changing the Watershed BMPs. Rozzelle Ordinance. Pollution Prevention&Good House Keeping Program _ 16 Inspect one(1)golf course located on To have less inspection deficiencies. PP-2 Julianna FY24 County property per year as opposed to Hawley doing all five(5)during the same fiscal year. Total Maximum Daily Loads(TMDL) 17 Routine fixed interval monitoring will Comply with TMDL by identifying IC-S(1.1) John Thao FY24 continue to be performed in the TMDL and eliminate sources of elevated watersheds by CMSWS.Exceedances fecal coliform bacteria. of established water quality watch and action levels will be identified and follow up actions conducted as necessary for the identification and elimination of pollution sources 18 CMSWS will complete a review of Comply with TMDL by identifying IW-2(e) John Thao FY24 Health Department records to determine and eliminate sources of elevated where failed septic systems have been fecal coliform bacteria. identified in both the Rocky River and Goose Creek TMDL watersheds. Follow up inspections and monitoring will be performed as necessary to ensure the elimination of sources of fecal coliform bacteria associated with failed septic systems thereby addressing impaired waters. 19 Major outfalls will be inspected in the Comply with TMDL by identifying IW-2(g) John Thao FY24 Rocky River TMDL watershed.Dry and eliminate sources of elevated weather flows will be identified,and fecal coliform bacteria. pollution sources eliminated thereby addressing impaired waters. 20 Comply with TMDL by identifying IW-2(1) John Thao FY24 Privately owned and permitted sewer and eliminate sources of elevated lift stations in the Goose Creek fecal coliform bacteria. watershed will be inspected. 21 Targeted surface water sampling will be Comply with TMDL by identifying IW-2(m) John Thao FY24 performed in headwater areas of the and eliminate sources of elevated Goose Creek watershed to further fecal coliform bacteria. delineate sources of fecal coliform to the system. 111 Charlotte-Mecklenburg "STORM Assessment Report for July 1,2022 through June 30,2023 (FY2023)-Permit No.NCS000395 WATER Services Justification for Change& Program Responsible # Identified Improvement Schedule Desired Result Element Staff 22 An evaluation of the McDowell Creek Identify watershed management SWIM Robert FY24 Watershed Management Plan will be strategies that are success in Phase II- Sowah performed which will include a review restoring watershed health and make McDowell of plan goals and objectives, recommendations for improvement implementation of these objectives, to existing watershed management goal attainment,plan gaps,limitations, plans. and challenges.A summary of the findings from this evaluation will be created. 112 Attachment 26: FY2023 TMDL Annual Report and Assessment For Compliance With: NPDES Phase II Storm Water Permit Number NCS000395 " , 4.,, F w�yy'{ f 47 k d'lii r 1• y *• L' r _;O 1 :1 il . �!�ir� .. .; w • + ' IFS' yF � J s . 91 ' f _ ��in Mint, Reporting Period: July 1, 2022 through June 30, 2023 Submitted By: Charlotte-Mecklenburg Storm Water Services Submittal Date: August 2023 113 Table of Contents Section 1: TMDLs in Mecklenburg County 1 2.1 BMPs and Associated Measurable Goals 5 2.2 Description of Existing BMPs and Their Effectiveness 7 2.2.1 Public Education& Outreach (Section 3 of SWMP) 7 2.2.2 Public Involvement and Participation(Section 4 of SWMP) 8 2.2.3 Illicit Discharge Detection and Elimination(IDDE) (Section 5 of SWMP) 9 2.2.4 Charlotte Water Program 11 2.2.5 Sewer Use Ordinance 11 2.2.6 Sanitary Sewer System Inspections and Maintenance 12 2.2.7 SSO Rapid Response 12 2.2.8 Construction Site Runoff Control (Section 6 of SWMP) 12 2.2.9 Post-Construction Site Runoff Control (Section 7 of SWMP) 13 2.2.10 Pollution Prevention and Good Housekeeping (Section 8 of SWMP) 14 Section 3: Current TMDL Monitoring Strategies 15 3.1 Rocky River Fecal Coliform Monitoring and Land Use Evaluation 17 3.2 Goose Creek Fecal Coliform Monitoring 19 3.3 Lake Wylie Chlorophyll-A Monitoring 21 3.4 Mercury Monitoring Statewide 22 3.5 Effectiveness of BMPs Based on Data Analysis 22 Section 4: Additional BMP Measures 22 4.1 Additional BMPs Implemented in FY2023 22 4.3 Additional BMPs to be Implemented in FY2024 24 Section 5: Tracking and Reporting Success 25 Section 6: TMDL Reporting 25 Tables: Table 1: Approved TMDLs for Mecklenburg County's Phase I and Phase II Jurisdictions 2 Table 2: BMP Summary Table for Impaired Waters with TMDLs 5 Table 3: FY2023 Public Education and Outreach Activities in TMDL Watersheds 8 Table 4: FY2023 Public Involvement&Participation Activities in TMDL Watersheds 8 i Table 5: FY2023 IDDE Activities in TMDL Watersheds 10 Table 6: FY2023 Construction Site Runoff Control Activities in TMDL Watersheds 13 Table 7: FY2023 Post-Construction Site Runoff Control Activities in TMDL Watersheds 13 Table 8: FY2023 Pollution Prevention& Good Housekeeping Activities in TMDL Watersheds 15 Table 9: Annual Analysis of the Rocky River Watershed for the Monitoring Plan 17 Table 10: NCDWQ Fecal Coliform Data for Site Q7330000 on the Rocky River 18 Table 11: CMSWS Fecal Coliform Data for Site#MY9 on the Goose Creek 20 Figures Figure 1: Surface Waters in Mecklenburg County with Approved TMDLs 4 Figure 2: Water Quality Monitoring Locations in Mecklenburg County 16 Figure 3: Geometric Mean for Fecal Coliform on Rocky River Site Q7330000 19 Figure 4: Compliance with Fecal Coliform Standard on Rocky River Site Q7330000 19 Figure 5: Geometric Mean for Fecal Coliform on Goose Creek Site MY9 20 Figure 6: Compliance with Fecal Coliform Standard on Goose Creek Site MY9 20 Figure 7: Annual Average Chlorophyll-a Concentration(mg/1) on Lake Wylie 21 Figure 8: Annual Average Chlorophyll-a on Lake Wylie Coves, Main Stem and Tributaries 21 Figure 9: NOVs Issued for Septic System Failures in Phase II TMDL Watersheds 23 Appendices Appendix A: FY2023 TMDL Data for Mecklenburg County's Phase II Jurisdictions 26 ii NI Charlotte-Mecklenburg /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 ter`Services Section 1: TMDLs in Mecklenburg County The purpose of this document is to satisfy the Total Maximum Daily Load (TMDL)reporting and assessment requirements for the period July 1, 2022 through June 30, 2023 (FY2023) as specified in Section H of NPDES Phase II Storm Water Permit Number NCS000395. Several of the TMDL watersheds in Mecklenburg County span both Phase I and Phase II jurisdictions. All Phase I and Phase II TMDL compliance efforts are administered by Charlotte- Mecklenburg Storm Water Services (CMSWS), which includes both City of Charlotte (City) and Mecklenburg County (County)programs. The City's program is responsible for compliance with its Phase I storm water permit and Mecklenburg County's program is responsible for Phase II permit compliance for the County, Charlotte-Mecklenburg Schools, Central Piedmont Community College and the Towns of Cornelius, Davidson, Huntersville, Matthews, Mint Hill, and Pineville. To ensure effective coordination, the City and County have agreed that the City will serve as the lead jurisdiction for compliance with TMDL requirements when the majority of the TMDL watershed lies within the Phase I jurisdiction. When most of the watershed lies within Phase II, the County will serve as the lead. The lead jurisdiction is responsible for coordinating and implementing all required TMDL compliance efforts and submitting all the required plans and reports to the State. They are also responsible for coordinating with the other jurisdictions as necessary in the implementation of compliance efforts. Table 1 indicates the lead jurisdiction for all the approved TMDLs in Charlotte-Mecklenburg. Charlotte-Mecklenburg Storm Water Services (CMSWS) has reviewed the 2022 303(d) list and integrated 305(b) and 303(d)reports and determined that no new TMDLs were approved in Mecklenburg County in FY2023; therefore, no changes were made to the TMDL Water Quality Recovery Program described in Section 11 of the November 2022 version of the Storm Water Management Plan(SWMP) developed for compliance with NPDES NCS000395. Section H of NPDES Permit Number NCS000395 identifies the objective of a Water Quality Recovery Program for TMDLs as reducing levels of the pollutant of concern in accordance with approved Waste Load Allocation (WLAs) assigned to stormwater in an approved TMDL. The Permit includes the following requirements for TMDL watersheds in the Phase II jurisdictions of Mecklenburg County: 1. Within 12 months of the final approval of a TMDL, the permittee's annual reports shall include a description of existing programs, controls,partnerships,projects, and strategies to address impaired waters and a brief explanation as to how the programs, controls, partnerships,projects, and strategies address impaired waters. 2. Within 24 months of the final approval of a TMDL, the permittee's annual reports shall include an assessment of whether additional structural and/or non-structural BMPs are necessary to address impaired waters and a brief explanation as to how the programs, controls,partnerships,projects, and strategies address impaired waters 3. Within 36 months of the final approval of a TMDL, the permittee's annual reports shall include a description of activities expected to occur and when the activities are expected to occur. 1 /N Charlotte-Mecklenburg /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 . — -Services Section H of NPDES Permit Number NCS000395 further specifies that if subject to an approved TMDL, the Permittee is in compliance with the TMDL if the permittee complies with the conditions of this permit, including developing and implementing appropriate BMPs to reduce non-point source pollutant loading to the maximum extent practicable (MEP). While improved water quality is the expected outcome, the NPDES MS4 permit obligation is to reduce non-point source pollutant loading to the maximum extent practicable (MEP). The MS4 Permittee is not responsible for attaining water quality standards (WQS) at the ambient monitoring stations. The Division expects attaining WQS will only be achieved through reduction from the MS4, along with reductions from other nonpoint source contributors. The purpose of the annual report and assessment contained herein is to describe how the above permit requirements have been satisfied for the approved TMDLs applicable to Mecklenburg County as described in Table 1. Figure 1 shows the locations of these receiving waters in relation to the Phase I and Phase II jurisdictions in Mecklenburg County. Table 1: Approved TMDLs for Mecklenburg County's Phase I and Phase II Jurisdictions IR AU Name AU EPA MS4 Lead Class TMDL Category Number Pollutant (2022) Approved WLA? Jurisdiction DO 1 2/5/1996 No Charlotte Irwin Creek 11-137-1 C Fecal Coliform 4t 3/28/2002 No Charlotte Turbidity 4i 2/8/2005 Yes Charlotte Long Creek 11-120-(0.5) C Turbidity [3i 2/8/2005 Yes Charlotte Long Creek 11-120-(2.5) WS-IV Turbidity 1 3i 2/8/2005 Yes Charlotte DO 1 2/5/1996 No Charlotte Little Sugar 11-137-8a C - Fecal Coliform 4t 3/28/2002 No Charlotte DO 1 2/5/1996 No Charlotte Little Sugar 11-137-8b C Fecal Coliform 4t 3/28/2002 No Charlotte DO 1 2/5/1996 No Charlotte Little Sugar 11-137-8c C Fecal Coliform 4t 3/28/2002 No Charlotte Turbidity 4i 2/8/2005 Yes Charlotte DO 1 2/5/1996 No Charlotte McAlpine 11-137-9a C Fecal Coliform 4t 3/28/2002 No Charlotte Creek Turbidity li 2/8/2005 Yes Charlotte DO 1 2/5/1996 No Charlotte McAlpine 11-137-9b C Fecal Coliform 4t 3/28/2002 No Charlotte Creek Turbidity li 2/8/2005 Yes Charlotte DO 1 2/5/96 No Charlotte McAlpine 11-137-9c C Fecal Coliform 4t 3/28/2002 No Charlotte Creek - Turbidity li 2/8/2005 Yes Charlotte DO 1 2/5/1996 No Charlotte McAlpine 11-137-9d C Fecal Coliform 4t 3/28/2002 No Charlotte Creek Turbidity li 2/8/2005 Yes Charlotte Sugar Creek 11-137b C Fecal Coliform 4t 3/28/2002 No Charlotte 2 / Charlotte-Mecklenburg � / /j STORM FY2023 TMDL Annual Re ort and Assessment for NPDES NCS000395 WATER p Services IR AU Name AU Class TMDL Category EPA MS4 Lead Number Pollutant (2022) Approved WLA? Jurisdiction Turbidity 4i 2/8/2005 Yes Charlotte Fecal Coliform 4t 3/28/2002 No Charlotte Sugar Creek 11-137c C — Turbidity 4i 2/8/2005 Yes Charlotte McKee Creek 13-17-8-4 C Fecal Coliform 4t 8/1/2003 Yes Charlotte Rocky River 13-17a C Fecal Coliform 4t 9/19/2002 Yes Mecklenburg Steele Creek 11-137-10 C Fecal Coliform SC TMDL 5/2007 Yes Charlotte Lake Wylie 11-122 C Chlorophyll-a 1 2/5/1996 No Mecklenburg Lake Wylie 11-(123.5)a C Chlorophyll-a 1 2/5/1996 No Mecklenburg Goose Creek 13-17-18a C Fecal Coliform 4t 7/8/2005 Yes Mecklenburg Definitions applicable to Table 1 above are provided below. Other definitions for the table are provided on page vi of the Table of Contents. • AU Number:NCDEQ identifies waters by index numbers and assessment unit numbers(AU#)that are used to track defined stream segments or waterbodies. • Class(Water Quality Classification):Designations applied to surface water bodies by NCDEQ that define the best uses to be protected within these waters as required by the Clean Water Act,including water supply use (WS),recreation activities(B),and aquatic life(C). • TMDL:Acronym for Total Maximum Daily Load.A TMDL is the calculation of the maximum amount of a pollutant allowed to enter a waterbody so that the waterbody will meet and continue to meet water quality standards for that particular pollutant.A TMDL identifies pollutant reduction targets and allocates load reductions necessary to the source(s)of the pollutant to restore waterbodies where water quality criteria are exceeded. • IR(Integrated Report)Category:Levels of water quality criteria attainment as defined in the NCDEQ Integrated Report as follows: o 1 -Meeting Criteria. o lb Meeting Criteria-A management strategy in place for parameter lt:Parameter is meeting criteria and there is an approved TMDL in place for that parameter.The TMDL remains in place to ensure that criteria are maintained. o l f Meeting Criteria-Fish tissue collected in Assessment Unit with no advisories other than statewide Mercury advice. o li Meeting Criteria-Parameter assessed is addressed by a TMDL for a different parameter. o lnc Meeting Criteria-Parameter assessed was exceeding criteria but due to natural conditions (documentation required). o lr Meeting Criteria-Parameter assessed as part of restoration project. o It Meeting Criteria-Parameter assessed has an approved TMDL. o 3a Data Inconclusive. o 3b Data Inconclusive-Management strategy in place for parameter. o 3c Data Inconclusive-Parameter is a non-pollutant-TMDL not required. o 3i Data Inconclusive-Parameter assessed is addressed by a TMDL for a different parameter. o 3r Data Inconclusive-Parameter assessed as part of restoration project. o 3t Data Inconclusive-Parameter assessed has an approved TMDL. o 3v Data Inconclusive-Parameter is part of permit variance. o 3z1 Data Inconclusive-Data not assessed against a NC water quality standard. o 4i Exceeding Criteria-Parameter assessed is addressed by a TMDL for a different parameter. o 4t Exceeding Criteria-Parameter assessed has an approved TMDL. o 4b Exceeding Criteria-a management strategy in place for parameter. o 4c Exceeding Criteria-Parameter is a non-pollutant-TMDL not required. o 4cr Exceeding Criteria-recreational advisory postings greater than 61 days in the assessment period. o 4cs Exceeding Criteria- Shellfish growing area-not approved.Approved fecal coliform bacteria TMDL assessed in category 4t. 3 NCbarlotte•Mecklenburg /STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 WATER Services o 4r Exceeding Criteria-Ongoing restoration activities in place to address parameter.Also,for restoration parameters without water quality standards. o 4v Exceeding Criteria-Parameter is part of permit variance. o 5 Exceeding Criteria-TMDL or other management strategy required. o 5r Exceeding Criteria-Ongoing restoration activities in place to address parameter. o S.C. TMDL:Waterbody is subject a TMDL in S.C. TMDL Pollutant,Lead Jurisdiction /S Turbidity—Charlotte /\./ FecalColiform—Charlotte 1317a Fecal Coliform,Turbidity—Charlotte /\/ Dissolved Oxygen(DO),Fecal Coliform—Charlotte /%/ DO,Fecal Coliform,Turbidity—Charlotte /\/ Fecal Coliform—County • s 0, /\/ Total Phosphorus,Total Nitrogen—County Mecklenburg County Lakes Mecklenburg County Streams City of Charlotte Boundary(Phase I) Li' Mecklenburg County Boundary(Phase II) +1 +?oao si 1; • +ttt>♦i` 11d• 11 137 1 13.1744 114122)[ J111137 da 1r �� 11 137 9a ',I 13-17-162 11-137.10 11-I37b C 11-+17 d0 11 123-4i 111.37 90 11-137t • 1/43,470,•137 9c 11.1374041 :*Yr e Figure 1: Surface Waters in Mecklenburg County with Approved TMDLs 4 N/ Charlotte-Mecklenburg STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 N`WATER ram`Services Section 2: Efforts to Address Impaired Waters in Mecklenburg County The efforts undertaken to address impaired waters in Mecklenburg County, including programs, controls,partnerships,projects, and strategies, are performed by CMSWS. As described in Section 1, Mecklenburg County staff with CMSWS lead these efforts in the Phase II jurisdictions and the City of Charlotte in Phase I partnering with the County. This Section discusses these efforts in the Phase II jurisdictions only, including all data that is reported (see Appendix A). It is important to note that Mecklenburg County is only responsible for compliance efforts in Phase II, which includes the TMDLs for Goose Creek, Rocky River, and Lake Wylie. Mecklenburg County's efforts are described in detail in its TMDL Water Quality Recovery Program contained in Section 11 of the SWMP developed for compliance with NPDES NCS000395. 2.1 BMPs and Associated Measurable Goals During FY2023, all the BMPs and measurable goals identified in the Phase II Permit NCS000395 and the associated SWMP were effectively fulfilled as described in Table 2. The table also provides the Activity Report number from the County's Cityworks database that includes documentation of the work completed for each BMP. The subsections following Table 2 describe the existing programs, controls, partnerships, projects, and strategies to address impaired waters (herein referred to as BMPs) and a brief explanation as to how these BMPs function. These subsections also describe the specific activities completed in FY2023 through the implementation of these BMPs. Section 3 provides an assessment of current BMP effectiveness, including an analysis of applicable monitoring data. Section 4 provides a description of additional BMPs implemented in FY2023, as well as those planned for implementation in FY2024 along with an implementation timeline, and a brief explanation as to how these additional BMPs will address impaired waters. Table 2: BMP Summary Table for Impaired Waters with TMDLs County A B C D E BMP County Activities Work Co-Permittee No. Plan Code Description Measurable Goal(s) Schedule for Annual Responsibilities of BMP Implementation Reporting Metric Total Maximum Daily Load(TMDL)Program(Permit Ref. Section H.1 through 6;Part II Section A.4,5 and 7):Implement a program to reduce levels of the pollutant of concern in accordance with approved Waste Load Allocation(WLAs)assigned to stormwater in an approved TMDL. #40 IW-1 Evaluate Impaired Waters (Evaluate Identify a. Complete an evaluation of the Annually Completed None. Impaired those latest version of the 303(d)list beginning July (Activity Report Waters) impaired and the integrated 305(b)and 1 #71614) waters with 303(d)reports.Identify all an approved changes to designations in TMDL in Mecklenburg County. Mecklenburg b.Identify and review all TMDLs Annually Completed County that that have been developed and beginning July (Activity Report have a waste approved by EPA for receiving 1 #71614) load waters in Mecklenburg County. allocation c. Complete annual report Annually Completed assigned to detailing activities completed beginning July (Activity Report stormwater. and summarizing findings. 1 #71614) Include in report for PD-1. 5 / Charlotte-Mecklenburg f/ / /j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 M WATER p N\Services County A B C I D E BMP County Activities Work - Co-Permittee No. Plan Code Description Measurable Goal(s) Schedule for Annual Responsibilities of BMP Implementation Reporting Metric #41 IW-2 Water Quality Recovery Plans for TMDLs (WQRPs Develop and a.Based on the results from IW-1 Annually Completed None. for implement above,identify those TMDL beginning July (Activity Report TMDLs) Water waters in Mecklenburg County 1 #70748) Quality with a waste load allocation Recovery assigned to stormwater.Work Plans with Charlotte Stormwater on a (WQRPs)to compliance strategy for these reduce non- waters. point source b.Develop WQRPs for the waters Annually Completed pollutant from"a"above that are the beginning July (Activity Report loading to responsibility of Mecklenburg 1 #70748) the County,including structural maximum and/or non-structural BMPs and extent a brief explanation as to how practicable the programs,controls, (MEP)for partnerships,projects and TMDL strategies address impaired waters with a waters. waste load c.Incorporate BMPs from"b" Annually Completed allocation above into Work Plans for beginning July (Activity Report assigned to implementation. 1 #70748) stormwater. d.Complete annual report Annually Completed detailing activities completed beginning July (Activity Report and summarizing findings. 1 #70748) Include in report for PD-1. #42 IW-4 Assess Effectiveness of Water Quality Recovery Plans for TMDLs (WQRPs Assess the a.Identify and assess the Annually Completed None. for effectiveness effectiveness of existing beginning July (Activity Report TMDLs) of structural programs,controls, 1 #71615) and non- partnerships,projects,and structural strategies for all TMDL waters BMPs at identified in IW-2 above. addressing b.Based on the results from"a" Annually Completed TMDL develop additional structural beginning July (Activity Report waters with a and non-structural BMPs as 1 #71615) waste load necessary to reduce non-point allocation source pollutant loading to the assigned to maximum extent practicable stormwater (MEP). and c.Incorporate BMPs from"b" Annually Completed modifying as above into Work Plans for beginning July (Activity Report necessary. implementation. 1 #71615) d.Complete annual report Annually Completed detailing activities completed beginning July 1 (Activity Report and summarizing findings, #71615) including a description of the effectiveness of existing structural and/or non-structural BMPs and a brief explanation as to how the existing 6 Charlotte•Mecklenburg / j STORM p WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 M N\Services County A B BMP County Activities Work - Co-Permittee No. Plan Code Description Measurable Goal(s) Schedule for Annual Responsibilities of BMP Implementation Reporting Metric_ programs,controls, partnerships,projects and strategies address impaired waters as well as whether additional BMPs are necessary and when they will be implemented.Include in report for PD-1. 2.2 Description of Existing BMPs and Their Effectiveness The pollutants of concern for the TMDL watersheds in Mecklenburg County are dissolved oxygen, fecal coliform bacteria, turbidity, and chlorophyll-a, which is associated with elevated nutrients (see Table 1). CMSWS has identified the existing BMPs described in the following subsections as effective for addressing these pollutants of concern. These subsections include a description of the specific activities completed during FY2023 through the implementation of these BMPs in the Phase II jurisdictions. Appendix A provides all data collected through the implementation of these activities. The data contained in Appendix A is broken out in the following applicable subsections. For data applicable to Phase I, contact Charlotte Storm Water Services. Details regarding BMP implementation are provided in the SWMP. 2.2.1 Public Education & Outreach (Section 3 of SWMP) Public education and outreach activities work to improve impaired water quality by informing the community of the impacts of the pollutants of concern on the quality and usability of water bodies and the steps that the public can take to reduce these pollutants. During FY2023, the following existing public education and outreach activities were implemented in Mecklenburg County, including all the TMDL watersheds: 1. Utility Bill Inserts 2. Brochures, Environmental Notices and Newsletters 3. Print Ads 4. Media Campaign 5. Social Media 6. Workshops and Video Taped Messages 7. Web Pages 8. School and other Educational Presentations as well as Public Events 9. Storm Water Helpline Table 3 below provides data related to public education and outreach activities completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during FY2023. 7 NCharlotte-Mecklenburg (/ /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 /V`Services Table 3: FY2023 Public Education and Outreach Activities in TMDL Watersheds 4. 0 0 vs = �= et Description �°�j . 4-1 uo x v, r� school 0 0 0 3 0 10 0 0 0 0 27 presentations Students attending 0 0 0 236 0 249 0 0 0 0 784 presentations During FY2023, the BMPs implemented for the Public Education and Outreach Program were evaluated and found to be effective at reducing non-point source pollutant loading to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these BMPs will continue to be used in FY2024 to comply with TMDL requirements. 2.2.2 Public Involvement and Participation (Section 4 of SWMP) Public Involvement and Participation Program activities work to improve impaired water quality by involving the public in efforts to reduce the pollutants of concern. During FY2023, the following existing Public Involvement and Participation Program activities were implemented in Mecklenburg County, including all the TMDL watersheds: 1. Adopt-A-Stream 2. Annual Surface Water Clean Up Event (The Big Spring Clean) 3. Volunteer Monitoring 4. Storm Drain Marking Table 4 below provides data relating to Public Involvement and Participation Program activities completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during FY2023. Table 4: FY2023 Public Involvement& Participation Activities in TMDL Watersheds # °' a OE CO Cle 4. CA 0 Description 3 4. y a t x �, o o F a a 4 Adopt-A- Stream miles 0.00 0.00 0.51 0.00 0.25 4.80 0.00 15.25 0.00 11.28 39.83 cleaned pounds of trash removed 0 0 2,000 0 350 950 0 295 0 0 4530 through Adopt-A- Stream 8 / Charlotte•Mecklenburg /j STORM p WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 n Nt Services y F.. aJ a) 0 7, 0 bA O y y s. 0ct Description j 1 . o F-1 Big Spring Clean streams 0 0 0 0 0 1 0 0 0 0 3 miles cleaned pounds of trash removed 0 0 0 0 0 745 0 0 0 0 1135 through Big Spring Clean volunteer monitoring 1 0 5 0 0 29 0 2 0 0 42 reports submitted volunteer samples 0 0 0 2 1 1 0 8 0 1 13 collected storm drains 18 64 43 19 0 182 0 53 0 60 461 marked During FY2023, the BMPs implemented for the Public Involvement and Participation Program were evaluated and found to be effective at reducing non-point source pollutant loading to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these BMPs will continue to be used in FY2024 to comply with TMDL requirements. 2.2.3 Illicit Discharge Detection and Elimination(IDDE) (Section 5 of SWMP) Illicit Discharge Detection and Elimination (IDDE)Program activities work to improve impaired water quality by identifying and eliminating sources of the pollutants of concern. During FY2023, the following existing IDDE Program activities were implemented in Mecklenburg County, including the TMDL watersheds: 1. Responding to Citizen Requests for Service 2. Enforcement of Pollution Control Ordinances 3. Conducting Facility Inspections 4. Performing Water Quality Monitoring Activities 5. Implementing the Illicit Discharge Elimination Program(IDEP) 6. Conducting Stream Walks & Dry Weather Flow Investigations Table 5 below provides data relating to IDDE Program activities completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during FY2023. 9 N/ Charlotte-Mecklenburg /STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 N`WATER /V`services Table 5: FY2023 IDDE Activities in TMDL Watersheds 00 # 7' CO a 44 3 x Description : a u C V) F continuous monitoring 52,002 63,017 43,579 158,117 21,634 115,347 20,099 5,599 13,589 73,219 589,976 data points service 2 3 22 2 5 41 1 2 1 3 101 requests service request 2 2 30 6 7 65 6 5 3 3 156 inspections inspections conducted 1 4 0 2 0 0 0 1 0 0 18 for illicit discharges problems corrected through 0 3 0 0 0 0 0 0 0 0 9 illicit discharge inspections industrial facilities 0 0 2 0 0 0 0 0 0 3 5 inspected problems corrected through 0 0 0 0 0 0 0 0 0 0 0 industrial facility inspections industrial facilities 0 0 2 0 0 0 0 0 0 3 5 monitored problems corrected through 0 0 0 0 0 0 0 0 0 0 0 industrial facility monitoring samples collected through 52 52 52 208 51 366 53 51 52 104 1193 fixed interval monitoring notices of 0 2 6 1 1 10 0 2 0 0 22 violation enforcement 0 0 1 0 0 0 0 0 0 0 1 actions 10 / Charlotte•Mecklenburg /j STORM p WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 n Nt Services y d a) 0 > 0 bA a a? x" et Ct Description ; ,.a C4 Ed a At a a septic systems 2 1 2 0 2 13 1 1 1 1 25 repaired miles of stream 8.75 11.26 0 65.17 0 0 0 23.31 0 101.89 210.38 walked outfalls inspected 14 70 0 349 0 0 0 57 0 356 846 during stream walks dry weather flows detected 0 11 0 48 0 0 0 13 0 67 139 during stream walks water quality problems corrected 0 0 0 3 0 0 0 0 0 21 24 during stream walks During FY2023, the BMPs implemented for the Illicit Discharge Detection and Elimination Program were evaluated and found to be effective at reducing non-point source pollutant loading to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these BMPs will continue to be used in FY2024 to comply with TMDL requirements. 2.2.4 Charlotte Water Program The City's water and sewer utility department (Charlotte Water)maintains a public education program focused on keeping food related fats, oils, and grease from being discharged to the sanitary sewer system in the Phase I and Phase II jurisdictions. In recent years, the focus of this program has been expanded to include wipes and paper towels that can be flushed down the toilet. The program is referred to as "Flow Free." This effort helps to reduce clogging and blockages in the system and prevent S SOs,which can introduce fecal coliform and other pollutants to water bodies. The program has proven to be effective and will continue to be implemented in FY2024. 2.2.5 Sewer Use Ordinance Implementation and enforcement of the Sewer Use Ordinance by Charlotte Water in the Phase I and Phase II jurisdictions provides the legal mechanism to ensure proper use and connection to the sanitary sewer system and correction of problems and illegal practices. Ensuring that the system is used properly will help prevent leaks and overflows as well as upsets at wastewater 11 N/ Charlotte-Mecklenburg STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 Services treatment plants thus helping control the TMDL pollutants of concern. This ordinance has proven to be effective and will continue to be implemented in FY2024. 2.2.6 Sanitary Sewer System Inspections and Maintenance Charlotte Water conducts inspections and maintenance of various components of the sanitary sewer system in the Phase I and Phase II jurisdictions to ensure proper operating function and prevent leaks and overflows. These include food service grease trap inspections, commercial oil/water separator inspections, sanitary sewer line root control and cleaning, sewer line right-of-way clearing and maintenance, and lift station inspection and maintenance. Ensuring that the system is used properly, inspected, and maintained helps prevent leaks and overflows as well as upsets at wastewater treatment plants thus helping control the TMDL pollutants of concern. These inspection and maintenance efforts have proven to be effective and will continue to be implemented in FY2024. 2.2.7 SSO Rapid Response Charlotte Water maintains a rapid response program designed to quickly and efficiently respond to sanitary sewer overflows, thus reducing the discharge of pollutants to the MEP and helping control the TMDL pollutants of concern in the Phase I and Phase II jurisdictions. These programs have proven to be effective and will continue to be implemented in FY2024. 2.2.8 Construction Site Runoff Control (Section 6 of SWMP) The following existing construction site storm water runoff control activities have been identified as suitable for addressing the pollutants of concern in the TMDL watersheds. These BMPs address impaired waters by reducing discharges of pollutants of concern from construction sites. During FY2023, these BMPs were effectively implemented in the TMDL watersheds in Charlotte-Mecklenburg. 1. Erosion Control Plan Reviews 2. Erosion Control Inspections 3. Enforcement of Erosion Control Ordinance—Enhanced erosion control measures are required in all TMDL watersheds. 4. Erosion Control Hotline 5. Erosion Control Education 6. Erosion Control at Government Projects Table 6 below provides data relating to Construction Site Runoff Control Program activities completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during FY2023. 12 /N Cl2rlotte-Mecklenburg /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 /V`Services Table 6: FY2023 Construction Site Runoff Control Activities in TMDL Watersheds # cf) c. x �"14 04 wo Description 1.0 a u u CAA 0 CA F Erosion Control 94 0 0 15 3 231 0 49 0 30 422 Inspections NOVs 1 0 0 0 0 3 0 1 0 1 6 Issued During FY2023, the BMPs implemented for the Construction Site Runoff Control Program were evaluated and found to be effective at reducing non-point source pollutant loading to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these BMPs will continue to be used in FY2024 to comply with TMDL requirements. 2.2.9 Post-Construction Site Runoff Control (Section 7 of SWMP) The following existing post-construction site runoff control activities have been identified as suitable for addressing the pollutants of concern in the TMDL watersheds. These BMPs address impaired waters by reducing discharges of pollutants of concern from new development and redevelopment projects. During FY2023, these BMPs were effectively implemented in the Phase I and Phase II jurisdictions in Mecklenburg County. 1. Enforcement of the Post-Construction Storm Water Ordinances 2. Compliance by Co-Permittees with Post-Construction Ordinance Requirements 3. Ensuring Compliance with Requirements for Non-Structural BMPs 4. Ensuring Compliance with Requirements for Structural BMPs 5. Ensuring Compliance with Natural Resource Protection 6. Ensuring Compliance with Open Space Protection 7. Ensuring Compliance with Buffer Requirements 8. Ensuring Compliance with Redevelopment 9. Ensuring Compliance with Green Infrastructure Practices 10. Ensuring Compliance with Operation and Maintenance Requirements Table 7 below provides data relating to Post-Construction Site Runoff Control Program activities completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during FY2023. Table 7: FY2023 Post-Construction Site Runoff Control Activities in TMDL Watersheds y L CA 0 CIA Description ;.0 C .aGA CA F a a At a BMP 28 1 98 14 85 73 2 18 1 18 338 Inspections 13 / Charlotte•Mecklenburg /j STORM p WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 n Nt Services y F.. aJ a) 0 bA O y y s. 04 14 0 ct Description j x c, o F-1 NOVs 0 0 2 0 4 2 0 0 0 0 8 Issued Corrective Action 0 0 2 0 4 1 0 0 0 0 7 Requests Issued Educational Notices 4 0 3 3 31 1 0 13 0 0 55 Provided During FY2023, the BMPs implemented for the Post-Construction Site Runoff Control Program were evaluated and found to be effective at reducing non-point source pollutant loading to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these BMPs will continue to be used in FY2024 to comply with TMDL requirements. 2.2.10 Pollution Prevention and Good Housekeeping (Section 8 of SWMP) The following existing pollution prevention and good housekeeping activities for municipally owned/operated facilities have been identified as suitable for addressing the pollutants of concern in the TMDL watersheds. These BMPs address impaired waters by reducing discharges of pollutants of concern from municipal facilities and operations. During FY2023, these BMPs were effectively implemented in the Phase I and Phase II jurisdictions in Mecklenburg County. 1. Maintaining an Inventory of Municipal Operations 2. Providing Employee Training 3. Implementing Operation and Maintenance Programs, Spill Prevention and Spill Response 4. Minimizing Pollution from Municipally Owned Streets, Roads and Parking Lots 5. Implementing Operation and Maintenance of Municipally Owned Storm Sewer System 6. Management of Pesticide, Herbicide and Fertilizer Application 7. Preventing or Minimizing Pollution from Vehicle and Equipment Cleaning Areas 8. Implementing Proper Waste Disposal Practices 9. Completing Flood Management Projects Table 8 below provides data relating to Pollution Prevention and Good Housekeeping Program activities completed in the TMDL watersheds in Mecklenburg County's Phase II jurisdictions during FY2023. 14 Charlotte-Mecklenburg/N STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 /V`Services Table 8: FY2023 Pollution Prevention& Good Housekeeping Activities in TMDL Watersheds G) 7, bA C y 6 # p C C% 0 O CIJ x . y 0 Description C7 tA 04 a 6 P x� F municipal facilities 0 0 0 0 2 2 0 0 0 1 9 inspected outfalls inspected during 0 0 0 0 8 5 0 0 0 5 34 municipal facility inspections municipal facilities 0 0 0 0 2 2 0 0 0 1 9 monitored problems corrected through 0 0 0 0 0 0 0 0 0 0 0 municipal facility monitoring During FY2023, the BMPs implemented for the Pollution Prevention and Good Housekeeping Program were evaluated and found to be effective at reducing non-point source pollutant loading to the receiving streams of TMDL watersheds to the maximum extent practicable. Therefore, these BMPs will continue to be used in FY2024 to comply with TMDL requirements. Section 3: Current TMDL Monitoring Strategies CMSWS conducts fixed interval stream monitoring every month at 33 locations across the county in the Phase I and Phase II jurisdictions (see Figure 3). Many of these locations are within, or immediately downstream of, the TMDL watersheds that are shown in Figure 1. At each site, samples are collected and analyzed for 16 water quality parameters as follows: ammonia-nitrogen, fecal coliform bacteria, total Kjeldahl nitrogen, nitrate/nitrite, total suspended solids, total phosphorus, E. coli, turbidity, suspended sediment, magnesium, calcium, hardness, and copper(dissolved). Lead(dissolved), chromium(total), and zinc (dissolved) are collected in the first month of each quarter. CMSWS also performs annual or bi-annual monitoring for benthic macroinvertebrates in the Phase I and Phase II jurisdictions at the 33 stream monitoring locations shown in Figure 3. 15 NCbarlotte-Mecklenburg /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 Services Iredell Rowan • Lincoln 1B • 2 Cabarrus MS3 MY10 M E Gaston MY B 4A MY12B Y13A 3 Y7B C17 2A MC29 r MC30• " o 66 • 33 14 am M 25 Y15 C42 • 8 MC36 MY9 •C47A • MC'OC MC'7 C '•A MC40' C,- 45B • 51 Union York Lancaster Figure 2: Water Quality Monitoring Locations in Mecklenburg County CMSWS maintains a Continuous Monitoring and Alert Notification Network or CMANN at 34 locations, including 27 of the fixed interval monitoring locations shown in Figure 3. The CMANN network collects data hourly for turbidity, dissolved oxygen, temperature, conductivity, and pH. CMSWS conducts routine lake monitoring at 27 locations on Lake Norman, Mountain Island Lake and Lake Wylie, including seven locations in the TMDL area identified in Figure 1 for Lake Wylie. This monitoring is performed every other month for the following 12 16 Charlotte Mecklenburg id STORM,,_WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 ram`Services parameters: secchi depth, temperature, dissolved oxygen, conductivity,pH, fecal coliform bacteria, ammonia nitrogen, nitrate+nitrite, total Kjeldahl nitrogen, total phosphorus, turbidity, and Chlorophyll-a. Monitoring for the following 11 parameters is performed twice a year: copper, chromium, lead, zinc, mercury, manganese, arsenic, cadmium, nickel, selenium, and iron. Additionally, semi-annual monitoring is performed at 10 locations in eight coves on Lake Wylie to monitor potential impacts associated with a long-term residential development project. These semi-annual samples are analyzed for the same 12 parameters measured during bi-monthly routine monitoring. All monitoring results that exceed threshold values are referred for follow-up under the Illicit Discharge Detection and Elimination(IDDE) Program. Long-term assessment for trends is performed on a non-fixed frequency (as needed). Provided below is an assessment of the data collected for the identified parameters in the three (3) TMDL watersheds where Mecklenburg County is assigned as the lead, including the Rocky River and Goose Creek impaired for fecal coliform bacteria and Lake Wylie impaired for nutrients (see Table 1). For data applicable to the other TMDL watersheds in the Phase I jurisdiction, contact Charlotte Storm Water Services. The discussions in the following subsections are limited to data collected up to the end of 2022 as the Federal TMDL Program operates on a calendar year basis as opposed to the fiscal year basis utilized by CMSWS. 3.1 Rocky River Fecal Coliform Monitoring and Land Use Evaluation A section of the Rocky River in Mecklenburg County (AU Number 13-17a) is subject to a fecal coliform TMDL with a WLA assigned to storm water that was approved on September 19, 2002. According to the final NC 2022 305(b)report, the Rocky River is currently not meeting the fecal coliform criteria. Mecklenburg County has been assigned responsibility for this TMDL on behalf of the Phase I and Phase II jurisdictions in Charlotte-Mecklenburg. Phase II Permit conditions required that a monitoring plan be developed for the Fecal Coliform TMDL in the Rocky River Watershed unless a waiver is obtained from NCDEQ. Such a waiver was obtained on June 26, 2014, based on the condition that Mecklenburg County continue to evaluate the land use and development within the watershed on an annual basis and if additional storm water infrastructure is installed or higher intensity land uses are constructed a Monitoring Plan would be reconsidered. In response to this condition, CMSWS has obtained impervious area and land use data from the County GIS Department back to 2011 and continues to update this data annually(see Table 19). Between 2021 and 2022, the residential impervious cover increased 0.06 acres to a total of 16.09 acres. However, the commercial impervious cover remained unchanged at 0.33 acres during the same time. The total amount of impervious cover in the watershed(residential+ commercial) is approximately 16.42 acres as of 2022. Compared to the total area of the watershed at 747 acres, the amount of impervious cover is at 2.2%,which is an increase of 0.25% since 2011. The number of outfalls is unchanged from 2020 at four(4), which has increased by three (3) outfalls since 2011. To date, changes in the watershed are not significant enough to warrant the establishment of a Monitoring Plan. Table 9: Annual Analysis of the Rocky River Watershed for the Monitoring Plan Residential Commercial Total Storm Water Calendar Year Impervious Cover Impervious Cover Impervious Outfalls (acres) (acres) Cover(acres) (number) 2011 14.22 0.33 14.55 1 17 / Cbarlotte•Mecklenburg �/ / /j STORM p WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 �".•••Services Residential Commercial Total Storm Water Calendar Year Impervious Cover Impervious Cover Impervious Outfalls (acres) (acres) Cover(acres) (number) 2012 14.22 0.33 14.55 1 2013 14.55 0.33 14.88 3 2014 14.88 0.33 15.21 3 2015 15 0.33 15.33 4 2016 15.1 0.33 15.43 4 2017 15.2 0.33 15.53 4 2018 15.69 0.33 16.02 4 2019 15.72 0.33 16.05 4 2020 15.72 0.33 16.05 4 2021 16.03 0.33 16.36 4 2022 16.09 0.33 16.42 4 #Increase from 2011 1.87 0.00 1.87 3 % Increase from 2011 13.15% 0.00% 12.85% 300% Although CMSWS does not perform monitoring in the Rocky River TMDL watershed, it obtains monthly monitoring data collected by the NCDEQ, Division of Water Quality at Q7330000, which is the specific monitoring location for this TMDL. CMSWS performed an analysis of the fecal coliform data collected by the State in calendar year 2022, which is the most current data available. The geometric mean concentration of fecal coliform samples collected in 2022 was 602.704 CFU/100 ml. This represents an approximately 23% increase from the geometric mean concentration(491 CFU/100 ml) observed in calendar year 2021. Out of the 11 samples collected in 2022, seven (27%) exhibited concentrations below 400 CFU/100 ml. The remaining five samples (73%) exceeded the 400 CFU/100 ml threshold. The North Carolina Administrative Code (NCAC) 02B Fresh Surface Water Quality Standards dictate that fecal coliform"shall not exceed a geometric mean of 200 (CFU)/100 ml...nor exceed 400 [CFU]/100 ml in more than 20 percent of the samples examined...". The data from site Q7330000 suggest an increase in mean fecal coliform concentration over the past four(4)years; however, mean fecal coliform concentrations and compliance percentages have improved overall since the 1970s (Table 20, Figure 4, and Figure 5). Table 10: NCDWQ Fecal Coliform Data for Site Q7330000 on the Rocky River Year Geometric # #Non- Total % %Non- Mean Compliant Compliant Samples Compliant Compliant 2017 488.70 5 7 12 42% 58% 2018 663.46 5 7 12 42% 58% 2019 357.17 8 4 12 67% 33% 2020 432.40 3 3 6 50% 50% 2021 491.22 7 5 12 58% 42% 2022 602.704 3 8 11 27% 73% 18 / Charlotte•Mecklenburg r/ / /j STORM p WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 N`Services Rocky River - Fecal Coliform Geometric Mean l00000 0 n000 0 1000 602.704 LL 100 AQ' 1L 1 � 1`b 4'° 4;1' � 4O oii° oi4' °O 01' Ok 06 CP y0 titi ti N(') ti`P ,19 1L N N• ti� ,°i ye ti� N• ti0 ,� ti0 10 10 .10 LO 10 10 10 10 ,1, 10 'V LO Calendar Year Geometric Mean Figure 3: Geometric Mean for Fecal Coliform on Rocky River Site Q7330000 Rocky River- Fecal Coliform % Compliance (400 CFU/100 ml) 80 100% a) 70 E 60 80% n 50 60% I 40% 10 1 I � � � � � II � � � � � � � � � � IIII . 11 � � � � � �7°moo°i° 0 0/° 4° Al, At. �O �`b 'b° (� 4'�` 4'0 .O 0)% 00 Oti Qt. 00 O`b y0 ,y'L Nt. y'a Nci, 10 't N. ti� N. ti° N. N. N. N. tie tie N. 1, yo yo yo yo yo yo yo yo yo yo yo Compliant Non-Compliant . 11 %Compliant Figure 4: Compliance with Fecal Coliform Standard on Rocky River Site Q7330000 3.2 Goose Creek Fecal Coliform Monitoring As identified in Table 1, two (2) sections of Goose Creek in Mecklenburg County(AU Numbers 13-17-18a and 13-17-18b) are subject to a fecal coliform TMDL with a WLA assigned to storm water that was approved on July 8, 2005. According to the NC final 2022 305(b) report, fecal coliform concentrations in Goose Creek are currently not meeting state water quality standards. Mecklenburg County has been assigned responsibility for compliance with this TMDL on behalf of the Phase I and Phase II jurisdictions in Charlotte-Mecklenburg. CMSWS maintains a fixed interval monitoring site (MY9) located where Stevens Mill Road crosses Goose Creek in Union County. In calendar year 2022, fecal coliform counts at this station ranged from 207 Colony- Forming Units per 100 milliliters of water(CFU/100 ml) to 2,380 CFU/100 ml with a geometric mean of 372.08 CFU/ 100 ml. Eleven(11) of the 17 samples collected in 2022 (64.71%) exhibited concentrations at or below 400 CFU/100 ml. The remaining 6 samples (35.29%) exhibited concentrations above this threshold. No pollution sources were identified as a result of the water quality monitoring in the Goose Creek TMDL watershed in 2022. Table 21 provides a summary of this data from 2017 through 2022. Figures 6 and 7 provide a comparison of fecal coliform data indicating overall improvements in mean fecal coliform concentrations and 19 ' Cbarlotte-Mecklenburg ST�R WATER R FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 N\Services compliance percentages. In general, data indicates a significant improvement in compliance in 2022. Table 11: CMSWS Fecal Coliform Data for Site # MY9 on the Goose Creek Year Geometric # #Non- Total % %Non- Mean Compliant Compliant Samples Compliant Compliant 2017 607.12 10 9 19 53% 47% 2018 678.67 11 8 19 58% 42% 2019 427.19 11 8 19 58% 42% 2020 404.11 8 7 15 53% 47% 2021 513.89 8 10 18 44% 56% 2022 372.08 11 6 17 65% 35% Goose Creek- Fecal Coliform Geometric Mean 900 800 700 zievy 600 0 500 0 .a 400 u 300 200 100 — 0 — UI .o w m o N m a o N m a .n a n Cl o CO N m a of CO N oo m S S N .i .i .�I .-I .i .i .i .i .4 .4 .4 .4 ei .1 e1 N N N N N N N N N N N N N N N N N N N N N N N tGeometric Mean Figure 5: Geometric Mean for Fecal Coliform on Goose Creek Site MY9 Goose Creek- Fecal Coliform %Compliance (400 CFU/100 ml) 80 90% 70 80% 60 70% 01 60% 50 E SG% — 5 40 E `1 4 0% , E 30 e 30 Z % 20 0% 10 1 I I I 1 1 1111111111111 :0% 0 0% o .o n co m o N CO a Ln .o n co of o .i N m a Ln .o n oo m o .y N m a o .n n co m o .y N m W mG mo m mf m Ol N m En" mf 01 En" Ol O O O O O O O O O o 8 8 8 8 8 8 8 8 8 8 N N N . - . - . - . . - . . . e . - NNNN NNNNNN NNNNNNNNNNNN N Com pliant Non-Compliant t%Compliant Figure 6: Compliance with Fecal Coliform Standard on Goose Creek Site MY9 20 NCharlotte-Mecklenburg /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 - — Services 3.3 Lake Wylie Chlorophyll-A Monitoring Two (2) sections of Lake Wylie in Mecklenburg County(AU Numbers 11-(122) and 11- (123.5)a) were previously subject to a nutrient(nitrogen and phosphorus) TMDL that was approved on February 5, 1996. However, according to the 2022 Integrated Report these sections are included in Category 1 indicating they are meeting the Criteria without any acknowledgement of a TMDL, which would be Category lt. All 82 Chlorophyll-a samples collected by CMSWS in Lake Wylie in 2021 were below the standard of 40 µg/1 as illustrated in Figures 8 and 9 below. 25.00 20.00 hA 15.00 t 10.00 0 5.00 0.00 01 01 01 01 0, 0, 0 0 0 0 0 0 0 0 0 0 —1 �--� �-1 �-1 �-1 �-1 N i-1 N NN N Na) 01 01 01 0, 0, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N N N N N N N N N N N N N N N N N N N N N N Figure 7: Annual Average Chlorophyll-a Concentration (mg/1) on Lake Wylie 40 35 30 25 E 20 - 15 ° 10 - U 01111 1111 d d hd kb h h I ho lo i i 0 v1 �O N 00 C O N 00 a, O —4 N _n V1 ‘,0C N 00 C1 C C� C� � _ 0 O O O O O O O O O N N N 0 Cr, IT IT 01 01 01 O O O O O O O O O O O O O O O O O O O O O O O CO N N N N N N N N N N N N N N N N N N N N N N N ■Cove ■Main ■Trib ■Grand Total Figure 8: Annual Average Chlorophyll-a on Lake Wylie Coves, Main Stem and Tributaries 21 N/ Charlotte-Mecklenburg STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 N`WATER Services 3.4 Mercury Monitoring Statewide As stated in sub-section 9.5.3 of the Storm Water Plan, the State did not include an MS4 NPDES WLA for mercury in their statewide TMDL. Therefore, this document does not discuss compliance measures or data analysis for this TMDL. 3.5 Effectiveness of BMPs Based on Data Analysis The mean fecal coliform concentration observed in Rocky River in 2022 increased from 2021; however, mean fecal coliform concentrations and compliance percentages have remained relatively consistent over the past five (5)years. In Goose Creek, the mean fecal coliform concentration exhibited a moderate increase between 2021 and 2022. The percentage of samples complying with applicable fecal coliform standards decreased slightly over the same time. However, fecal coliform concentrations and compliance percentages have exhibited overall improvements since the mid-2000s when Mecklenburg County initiated its TMDL compliance efforts. The existing BMPs for both the Rocky River and Goose Creek watersheds appear to be effective at identifying and eliminating pollution sources in compliance with TMDL requirements. Therefore, these BMPs, along with the additional BMPs identified below, will continue to be implemented in FY2024. Based on the above-described assessments of data collected in the TMDL watersheds, a general improvement in Chlorophyll-a has been observed in Lake Wylie over the past several decades. In 2022, none of the Chlorophyll-a samples collected from Lake Wylie by CMSWS exceeded the state standard of 40 µg/L. Therefore, it is determined that no additional BMP measures will be implemented in the Lake Wylie TMDL watershed other than those currently implemented countywide as part of the SWMP. Section 4: Additional BMP Measures As required by Permit No. NCS000395, CMSWS is continuing to evaluate the effectiveness of the existing structural and/or non-structural BMPs described in the previous sections and identify and implement additional BMPs as necessary to effectively address impaired waters. The following subsections describe the additional BMPs implemented in FY2023, as well as those planned for implementation in FY2024 along with an implementation timeline, and a brief explanation as to how these additional BMPs will address impaired waters. 4.1 Additional BMPs Implemented in FY2023 During FY2023, the following additional activities were completed to reduce fecal coliform bacteria levels and enhance water quality in the Rocky River watershed: 1. NCDEQ, Division of Water Quality continued to conduct water quality monitoring, including sampling for fecal coliform bacteria, at site Q7330000 on the Rocky River. Monitoring results will be analyzed and described in the FY2024 annual report. 2. During FY2023, two (2)notices of violation were issued by the Mecklenburg County Health Department for septic system failures in the Goose Creek Watershed and one (1) 22 Charlotte•Mecklenburg'N/STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 N`Services in the Rocky River Watershed as shown in Figure 10. System repairs were completed with no negative impacts to surface water quality documented. Phase II NPDES MS4 Program — FY2023 Septic NOVs Within Goose Creek and Rocky River Watershed Basins ci Re- YRI .R N r 411161111111kK .40,111 1%$ "OO•E CITY,r CHARLOTTE 0 Septic NOV Issued by Public Health -Streams ( '/ 11STORM/ I I Watershed Basin MWATER /�/�Services_-M1 Figure 9: NOVs Issued for Septic System Failures in Phase II TMDL Watersheds 3. On August 10, 2022, the four(4)major outfalls in the Rocky River TMDL watershed in Mecklenburg County were inspected. No dry weather flows or pollution sources were detected. 4. During FY2023,there were three (3) sewer pump stations in operation in the Goose Creek and none in the Rocky River TMDL watersheds. The Goose Creek pump stations 23 NCharlotte-Mecklenburg /STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 N`WATER lam\Services were inspected as follows: Philadelphia Presbyterian Church Lift Station(Activity Report #75990), Mint Lake Village Lift Station(Activity Report#75991), and Bain Elementary School Lift Station (Activity Report#76125). All pumps at the lift stations were present and operable, the wet wells were free of excessive debris, and all floats/controls for pumps were operable along with their corresponding audio and visual alarms. In addition, the facilities were properly secured with a 24-hour notification signage posted. However, the telemetry systems that provide automated notification when a pump failure occurs were not operable during the inspection. Following the inspections, recommendations were made to the owners of these systems to correct the problems with these telemetry systems. Follow-up inspections conducted by CMSWS in July 2023 revealed that all the telemetry systems were repaired and were fully operational. Isiah Glover with Charlotte-Mecklenburg Schools confirmed that the Bain Elementary School lift station telemetry is now connected to a 24hr local police dispatch which will alert the appropriate CMS service contractors that there is an issue at the lift station. This was previously connected to a CMS office which was not a 24 hour line. The Mint Lake Village and Philadelphia Presbyterian Church lift stations are now serviced by McCall Brothers and confirmed the telemetry systems are now connected directly to McCall Brothers 24hr phone line. These lift stations were previously serviced by Aqua-Trol but they are no longer in business. 5. Routine fixed interval monitoring was conducted monthly at site MY9 (Goose Creek— Stevens Mill Road) for 16 parameters including fecal coliform and E. coli. Monitoring results are described in Section 3.2. 4.3 Additional BMPs to be Implemented in FY2024 During FY2024, the following additional BMPs will be implemented in the Rocky River and Goose Creek watersheds to reduce fecal coliform bacteria levels and enhance water quality: 1. By June 30, 2024, CMSWS will complete a review of Health Department records to determine where failed septic systems have been identified in both the Rocky River and Goose Creek TMDL watersheds. Follow up inspections and monitoring will be performed as necessary to ensure the elimination of sources of fecal coliform bacteria associated with failed septic systems thereby addressing impaired waters. 2. By June 30, 2024, major outfalls will be inspected in the Rocky River TMDL watershed. Dry weather flows will be identified, and pollution sources eliminated thereby addressing impaired waters. 3. In April 2024, the three (3) sewer pump stations located in the Goose Creek watershed will be inspected and the necessary corrective actions implemented to ensure proper operation and maintenance. Currently, there are no sewer pump stations in operation in the Rocky River TMDL watershed. If any are added in FY2024, they will be inspected as well. 4. Routine monitoring will continue to be performed monthly by CMSWS at MY9 on Goose Creek at Stevens Mill Road and by NCDEQ, Division of Water Quality at site Q7330000 on Rocky River at SR 2420. Exceedances of established water quality watch and action levels will be identified and follow up actions conducted as necessary for the identification and elimination of pollution sources. 24 NI Charlotte-Mecklenburg /STORM WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 ram`Services 5. Targeted surface water sampling in headwater areas of the Goose Creek watershed will continue in FY2024. Based on the results of FY2024 activities, additional surface water quality and watershed data is needed to further delineate sources of fecal coliform to the system. Watershed modeling and septic system assessments will be utilized to inform decision making and identify potential problem areas. Section 5: Tracking and Reporting Success CMSWS will document all activities completed for the identification and elimination of pollution sources in the TMDL watersheds, including all inspections conducted and corrective actions implemented. All confirmed pollution sources will be mapped in GIS and, where possible,pollutant loads will be estimated. This data will be tracked over time as a measure of the success of program activities. Section 6: TMDL Reporting This report fulfills the SWMP TMDL reporting requirement by providing a summary of the following: 1. Description of water quality restoration activities completed during the past fiscal year. 2. Description of water quality restoration activities expected to occur next fiscal year. 25 '/ Charlotte-Mecklenburg /STORM N`WATER FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 lam\Services Appendix A: FY2023 TMDL Data for Mecklenburg County's Phase II Jurisdictions 03 C # 3 CD x aCI 4.0 Description ° u� E. stream restoration 0 2 0 0 1 0 0 0 0 0 3 projects stream restoration projects 0 0 0 1 1 0 0 0 0 0 2 expected to occur next fiscal year buffer mitigations 2 0 3 1 3 1 0 3 0 2 15 approved continuous monitoring 52,002 63,017 43,579 158,117 21,634 115,347 20,099 5,599 13,589 73,219 566,202 data points collected school presentations 0 0 0 3 0 10 0 0 0 0 13 conducted students attending 0 0 0 236 0 249 0 0 0 0 485 school presentations service requests 2 3 22 2 5 41 1 2 1 3 82 responded to service request 2 2 30 6 7 65 6 5 3 3 129 inspections conducted inspections conducted 1 4 0 2 0 0 0 1 0 0 8 for illicit discharges problems corrected through 0 3 0 0 0 0 0 0 0 0 3 illicit discharge inspections industrial facilities 0 0 2 0 0 0 0 0 0 3 5 inspected 26 / Charlotte•Mecklenburg f/ / �j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 n WATER p Nt Services ae 14 Q C � = bA bk C Cle .Qe i. v - C • C ~ x btt et y O Description ; .a x c F problems corrected through 0 0 0 0 0 0 0 0 0 0 0 industrial facility inspections industrial facilities 0 0 2 0 0 0 0 0 0 3 5 monitored problems corrected through 0 0 0 0 0 0 0 0 0 0 0 industrial facility monitoring samples collected through 52 52 52 208 51 366 53 51 52 104 1041 fixed interval monitoring municipal facilities 0 0 0 0 2 2 0 0 0 1 5 inspected outfalls inspected during 0 0 0 0 8 5 0 0 0 5 18 municipal facility inspections municipal facilities 0 0 0 0 2 2 0 0 0 1 5 monitored problems corrected through 0 0 0 0 0 0 0 0 0 0 0 municipal facility monitoring NOVs by TMDL 0 2 6 1 1 10 0 2 0 0 22 watershed. enforcement 0 0 1 0 0 0 0 0 0 0 1 actions 27 / Char!otte•Mecklenburg r/ / /j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 n WATER p Nt Services ae 14 Q C � = bA bk C Cle .Qe i. v C • C ~ x btt y O Description ; .a x c F septic systems repaired or 2 1 2 0 2 13 1 1 1 1 24 connected to municipal sewer miles of stream 8.75 11.26 0 65.17 0 0 0 23.31 0 101.89 210.38 walked outfalls inspected 14 70 0 349 0 0 0 57 0 356 846 during stream walks dry weather flows detected 0 11 0 48 0 0 0 13 0 67 139 during stream walks water quality problems corrected 0 0 0 3 0 0 0 0 0 21 24 during stream walks Adopt-A- Stream miles 0 0 0.51 0 0.25 4.8 0 15.25 0 11.28 32.09 cleaned pounds of trash removed 0 0 2,000 0 350 950 0 295 0 0 3595 through Adopt-A- Stream Big Spring Clean streams 0 0 0 0 0 1 0 0 0 0 1 miles cleaned pounds of trash removed 0 0 0 0 0 745 0 0 0 0 745 through Big Spring Clean 28 / CAarlotte•Mecklenburg �/ / /j STORM FY2023 TMDL Annual Report and Assessment for NPDES NCS000395 n WATER p Nt Services a4 i. C 7' = bA C �. i. v o •3 C x O Description C ; .a x c F volunteer monitoring 1 0 5 0 0 29 0 2 0 0 37 reports submitted volunteer samples 0 0 0 2 1 1 0 8 0 1 13 collected storm drains 18 64 43 19 0 182 0 53 0 60 439 marked Erosion Control 94 0 0 15 3 231 0 49 0 30 422 Inspections NOVs 1 0 0 0 0 3 0 1 0 1 6 Issued BMP 28 1 98 14 85 73 2 18 1 18 338 Inspections NOVs 0 0 2 0 4 2 0 0 0 0 8 Issued Corrective Action 0 0 2 0 4 1 0 0 0 0 7 Requests Issued Educational Notices 4 0 3 3 31 1 0 13 0 0 55 Provided Totals 52,232 63,243 45,853 159,095 22,195 118,335 20,162 6,212 13,647 74,012 574,985 29