Loading...
HomeMy WebLinkAboutSW8051112_Approved Plans_20070305US R� 9��M1k �* JS F SITE ✓aCkf YS � aT CR� LPG LOCATION MAP NOT TO SCALE MAINTENANCE PLAN GF f -r % 01L 1. All measures to be inspected weekly and after any rainfall event and needed repairs made immediately, 2. Sediment Basin to be cleaned out when the level of sediment reaches 5.6' below water surface, Riser structure to be cleaned if excess water above design surface no longer drains properly, 3. Sediment to be removed from pond foreboy when it is approximately 25% filled or sediment level is within 5.6 of water surface. 4. Sediment to be removed from behind the any Silt Fence and inlet protection devices when it becomes 0,5' deep. Fencing and inlet protection to be repaired as needed to maintain a barrier. 5. All seeded areas shall be fertilized, mulched, and re -seeded as necessary, according to specifications provided, to maintain a suitable vegetative cover. 6. Construction entrances to be maintained in a condition to prevent mud or sediment from leaving the construction site. Periodic topdressing with 2"stone may be required, Remove all objectionable material spilled, washed, or tracked onto public roadways immediately, 7. Inspect check dams for damage after every rainfall event and repair as necessary to maintain design height and cross section. VEGETATIVE PLAN - 1, Permanent vegetation to be established in accordance with North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6,11, latest version. See next Sheet. MODIFICATIONS TO SW8 051112 OUTLETSTRUCTURE NTS 0.5'V1EIR CUT j ELEVATION- 18.5 TRASH RACK BOLTED SECURELY IN PLACE OUTLET 18'RCP 6" PVC WITH/ 1-1/2" HOLE ORIFACE Q5'HVR CUT TRASH RACK PLAN VIEW 5 CONSTRUCT 1 3 MAX. EL-19.6 GRATE TOP 90; EL80W DOWN TRASH 8 'BEL 0W WSEL RACK EL= 18.5 4" _ WSEL= MIN, lzov INV= S13 1-1/2" HOLE IN 17.0 6'PVC PiPE, OR 1-1/2' PER 'ORA TED PVC W/ GRAVEL AND FABRIC FILTER MAINTAIN COVER ON OUTLET PIPE �0.5'IMOE OUTLET WEIR CUT 18 RCP 16.3 9"GROUT !N- OR CONC. POND BOTTOM 4X4 Precast Conc.Box POND BOTTOM MAY BE OVER- ELEV= NCProducts 4849 or Equivalent EXCAVATED FOR SEDIMENT STORAGE SECTION VIEW SW8 051112 EMERGENCY EMBANKMENT TOP= 21.0✓ SPILLWAY= 49,1-; 19.6 Ill as w w (D 18"RCP Li M to OUTLET PIPE ✓ c° 80LF ® 0.6% SEE NEXT SHEET FOR ADDITIONAL w OUTI_=T STRUCTURE AND ROSION CONTROL DEL= _= EMBANKMENT NOT TO SCALE x 1 � 1 Q No LU 0 - \ \ I LL_ 1 V) \ W 10 /9/101 CO ♦ \10 r.,.... \ C.11 Vn 0Alm1 3 51 1781 9Z ®---- �. �` - I sA l � 1 ,\ NOTES. 1. PORTABLE PUMP TO BE USED TO DRAIN POND IN CASE OF EMERGENCY. PUMP TO BE it 35 'FES PLACED ON TOP OF BERM WITH SCREEN INV. 16.49 ATTACHED TO HOSE INLET AND COVERED WITH 1 �� STONE, HOSE OUTLET TO DRAIN ACROSS STABLE SW8 051112 UPLAND AREA SUFFICIENT TO RESTRICT EROSION. ASBUILT �' o 2, ALL BUILDING ROOF DRAINS MUST BE DIRECTED 18"RCP®0.6% OUTLET INTO THE STORM DRAINAGE COLLECTION TOP BOX= -10.0 19.5 19.6 ' 2 3 SYSTEM OR INTO THE STREET/PARKING LOT, 6-PVC W/ 1-1/2"HOLE OR 1-1/2"PERFORATED PVC 16.96 ✓ WEIR EL= 18.9 18.5 18.54 Q WEIR LENGTH=zz- 0.5 l lW AQUATIC VEGETATION ZONE FROM EL-= 16.0 TO EL= 17.0 IE OUT= 16,5 SUITABLE SPECIES FOR PLANTING IN EM,SPILLWAY LENGTH= 40' 40' r `` a, THIS ZONE ARE AS FOLLOWS: ~- - SAGITTARIA LATIFOLiA (COMMON ARROWHEAD) TOP LOF BANK=� 19.$' 2;6 ""'^--- - SAGITTARIA LANCiFOLIA (DUCK POTATO) 112 _ - SAURURUS CERNUUS (LIZARDTAIL) ! ' -- - PELTANDRA ViRGiNICA (ARROW ARUM) iF ONE OR MORE OF THE SUGGESTED SPECIES (D IS UNAVAILABLE, APPROPRIATE WETLANDS .� VEGETATION COMMON TO THE COASTAL CAROLINA ! / '- -. __ �' ---�� f REGION MAY BE SUBSTITUTED, Q 1- U tore p / � LJ 0 V jn d EMERbENGY SPILLWA ELEV, 19.6 TOP OF OUTLE STRUCTURE 1 < WEIR INV 18:522, 6"PVG INV 16,R�/I1; CeN.223 f 36 "FES UiVQ • • ® -- - _ IN V16.49 . x 20,4/ • �� '-se-- _ .2�,1 �iT77<��� / i' // /''/ ,,46� E7t pins `wwgw 0 x 1 x DRAIN POND IN AN • x 21 / x 5 1..� --� \ 15,8 x x 2� '� 6 9 2.9 1 ci 1 EMERGENCY. / J6� 14-3--- r / 1 4 x 13, �.7 / a I �x�`. Cx ,4 4,16 �9 BOTTOM 8.6' x 20 5 x 16 �x 1�61 �� 4 3' -x 9,Z4-- I x 16,8 14/ � ��l 1 1 k 16,3� 1 1' 8 fX 1 4 k 21.7 �J x lea, 4 \\ �j/ x 21,1 • •• x 20 `8 \ 1 n • 0 IS 6 O� /9� • J 1� €i.2 •• 16.2 �k 16,9 % / x 20, � 'a x ,} k•f 6� ///��j / // / / 141/ / - 34. AS -BUILT SUMMARY . 5/ k 29 j ITEM AS -BUILT 1. Impervious area (bldgs., etc.) 3.2 acres 2. Normal pool surface area 13,660 sf j J x 3�\61•4- -� ''�/ r` 3. Normal pool Surface Elevation 17.0 MSL Actual pool Surface Elevation 17.0 MSL EMERGENCY SPILLWAY �\` '� x 1 / / 4. Pond depth (deepest point) 8.4 feet x 16,5 / ELEV. 19.6 x 20,6 - j4 / /''f f,F yfr� 5, Bottom elevation (deepest) 8.6 MSL x 6. Orifice elevation 17.0 MSL TOP OF OUTLE x 2011 x 20, -_ _ ---' x 20.8 ,' 7. Weir elevation (State storage) 18.5 MSL STRUCTURE 19.60 INV 16.25 x 20.7 ,, 8. state storage volume 23,460 cf 9. 10 shelf -Yes WEIR INV 18.54 ff 10. 10'access Yes 6"PVC INV 16.96 °' x 20,4 ! 11. Forebay Yes 12. Outlet elevation 16,3 MSL 13. Primary Spillway elevation 19.6 MSL i 14, Emergency Spillway elevation 19.6 MSL 24 RCP / 15. Average embankment elev. 20.7 MSL IN 15.87 ' ,l 16. Side slopes (typixcal) 3: 1 to 4: 1 /'f , 17. Orifice size 6" PVC w/1-1/2"holl 4 TOP BOX = 19.8 19.6 STATE STORAGE VOLUME POND - T4 "rove-tif 23,"0 cf WEIR CUT EL= 18.5 "®'E17- i e"8" 0 EL- 18.5 NORMAL WSEL= 17.0 ✓ __ �7 _ \�� 10'VEGETATED /� STATE SHELF ® 10:1 Aquatic Vegetation Zone .............. _... POND BOTTOM EL= 11.0 BENOVER BOTTOM M Y ������/ EXCAVATED FOR SEDIMENT STORAGE A SW8 051112 WESTGATE - OCEANGATE PLAZA WATER QUALITY POND CONSIDERATIONS - Surface Area required = ;,489 5f- 9,800 sf Surface Area provided =-1.3-886--sf 13,660 sf Storage Volume required = -6,55 cf- 15,700 cf Storage Volume provided = -i ,568 f- 23,460 ct F� 50 25 0 50 100 Scale in feet: 1"= 50' 67 6'min, 12'min, SEE PLAN ALL SLOPES o 3:1 MAXIMUM w Forebay volume WSEL 20% of required wo 17.0 storage, typical - 1,0' ,�o� Forebay o0 Bottom OUTLET '0 4'min.�4 Elev.= N PROTECTION Qe / 12 AS ON h Armor as necessary minimum 1' Stone FOREBA Y SECTION DETAIL NOT TO SCALE Future paving >� M►NATER POND, 2 . C E�A/V 0.4 22.1 174! A PORTABLE PUMP TO BE USED TO !� 1 4 ��i \ DRAIN POND IN AN /y1 x -,q�e t .a kl,'.'"- ?AERGENCY, X BOTTOM 8.6' 1S7 •6 Ocean Gate Plaza Pond x lf,• 6c416.0 al� 6, �A,B211 A Pond WSEL= 17,0 ✓ Surface= 13,000sf ✓ 'r� 2 z--_x,6-.9/�! 20. Nominal Depth= 6,0 ✓ 41 ' Bottom=10.0 ve � k,/ .4, SEE INSET NOTES: SURVEYED IN MARCH OF 2008. RE -INSPECTED JUL Y 2009. O.k k 20. �,-�y._"'_---_>>�•-� /h 20.8 20. 6 16.25 20,7 33 - -- 2jP OF 01 ` BANK r/24" RCP / //`` .,� INV 15.87 15.9 PERMITTED I SEE DWQ# SW8 040703 HunterStore Apartments 10 DESIGN DATA SW8 051112 VOLUME REQUIRED: R=[(P)(Pj)(Rv)/12xA) WESTGATE- OCEAN GATE PLAZA -Wet detention/retention pond Additional Calculation Summary for NCDENR / DWQ : SEE PAGES A.1 and A.2, "Controlling Urban Runoff: WATER QUALITY CONSIDERATIONS - A Practical Manual for Planning and Designing Urban BMPs" (P)= 1" Impervious area calculations: See Project Data Sheet (Pj)= 0.9 TOTAL IMPERVIOUS - 4.20 acres (Rv)- 0.05 + 0.9(4.2/10.7) - 0.403 TOTAL AREA DRAINING TO POND - 10.70 acres (A)= 10.7 R= [(1)(0.403/12](10.7) 0 0.360 acre-feet 10.7 acres total - 4.2 acres Impervious = 6.5 acre green = 15,700 cf REQUIRED STORAGE SA REQUIRED: 4.2 / 10.7 - 0.39, or 39X 22,000 cf PROVIDED STORAGE O ELEV.- 18.5 DRAWDOWN: At 6.0' depth, 90% TSS removal, from chart - SA/DA factor == 2.1 Average head from storage elevation to orifice - 18.5 - 17.0 / 2 - 0.75' 1-i/2" PVC drain to drox-dc:,-: pond: 5.00 x 0.01 x 2.1 = 9,800 sf SA REQUIRED Orifice equation: Q = CA(2gh) 1/2 At Elev. = 17.0 = 13,000 sf SA PROVIDED T = 4 days REV. NO. REVISIONS DATE Copyright 0, Hanover Design Services, P.A., All rights reserved. Reproduction or use of the contents of this document, or odditions or deletions to this document, in whole or part, without written consent of the Lond Surveyor or Engineer, is prohibited. Only copies from the original of this document, marked with the original signature and original seal of the Surveyor or Engineer, shall be consldered to be valid and true copies. JUL 2 1 2009 BY: OCEAN GATE PLAZA at WESTGATE POND BRUNSWiCK COUNTY,ATED Pq TOWN L NOR LAND CAROLINA (POND AS D U I LT Date: 3-19- 08 Scale AS SHOWN Drawn; JJ Checked: DSH Project No: 6309-road3-POND -ASBUiLT.DITU Sheet No: 1 1 Of; EROSION & SEDIMENT CONTROL and WATER QUALITY PLAN. Line Line ID Flow Line size Line L IE IE Line HGL HGL no, rate DIA type down up slope down up (cfs) (in) LF (ft) (ft) (%) (Ft) (Ft) 1 1 to 2 27,19 36 Cir 66 16.50 16,70 0.30 19.50 19.58 2 2 to 3 26.47 36 Cir 36 16,70 16,80 0,28 19.70 19,74 3 EX,2 TO 3 10.34 24 Cir 58 17.70 17,80 0.17 19.77 19,87 4 EX.3 TO 4 9.47 24 Cir 36 17.80 17,90 0.28 19.89 19,90 5 EXA TO 5 8,89 24 Or 44 18,00 18.10 0,23 20,00 20,05 6 5 TO 6 8,31 24 Cir 17 18.10 18,20 0,59 20,10 20,12 7 6 TO 7 7.23 24 Cir 232 18.20 19.20 0,43 20.20 20.40 8 7 TO 8 5.06 24 Cir 192 19.20 19.70 0.26 21,20- 21.27 9 8 TO 9 2.17 18 Cir 180 20.20 20.50 0.17 21.70 21.76 10 9 TO 10 2,17 18 Cir 76 20.50 20,80 0.39 22.00 22,02 it 10 TO 11 1.81 18 Cir 112 20.80 21,00 0,18 22,30 22,32 12 11 TO 12 1.08 18 Cir 36 21.00 21,10 0.28 22.50 22,50 13 6 TO 6A 1.08 18 Cir 17 18.50 18.60 0.59 20.13 20.13 14 7 TO 7A 1.08 18 Cir 17 19.40 19.60 1.18 20.90 20.90 15 7 TO 7B 1.08 18 Cir 17 19.40 19.60 1,18 20,90 20.90 16 8 TO 8A 1.45 18 Cir 17 20,00 20,20 1.18 21,50 21.50 17 8 TO BB 1.45 18 Cir 17 20,00 20,20 1,18 21.50 21.50 18 NEW3 TO 4 15,26 30 Cir 172 17.30 17.50 0.12 19.80 20.00 19 NEW4 TO 5 14.11 30 Cir 204 17.50 17.80 0.15 20.01 20.20 20 5 TO 6 12,37 30 Cir 392 17.80 18.10 0.08 20.30 20.60 21 6 TO 7 9.95 30 Cir 372 18.10 18.40 0.08 20.61 20.78 22 7 TO 8 7.83 24 Cir 356 18.80 19.00 0.06 20,80 21.16 23 8 TO 9 4.26 24 Cir 36 19.00 19.10 0.28 21.17 21.18 24 9 TO 10 3.68 24 Cir 94 19.10 19.30 0.21 21.19 21.21 25 10 TO 11 2.42 18 Cir 94 19,30 19.50 0.21 21.21 21.25 26 11 TO 12 1.84 18 Cir 36 19.50 19,60 0.28 21.25 21.26 27 12 TO 12A 1.26 18 Cir 94 19.60 19,80 0,21 21.26 21.28 28 NEW4 TO 4A 0.58 18 Cir 36 18.50 18.70 0.56 20,01 20.02 29 5 TO 5A 0.87 18 Cir 36 18,80 19,00 0.56 20.30 20.30 30 6 TO 6A 1.26 18 Cir 36 19.00 19.20 0.56 20.61 20.61 31 7 TO 7A 1.01 18 Cir 36 19.30 19,50 0.56 20.80 20.80 32 8 TO 8A 3.00 18 Cir 104 19.00 19.20 0.19 21.17 21.25 33 BA TO 811 1.73 19 Cir 105 19.20 19,40 019 21.25 21,27 34 8B TO 8C 0.87 18 Cir 36 19,40 19.50 0,28 21.28 21.28 Notes, Project file, 6309-west,stM Return period = 25 Yrs, Line Line ID Flow size Line L IE IE Line HGL HGL no. rate DIA type down up slope down up (cf s) (in) LF (ft) (ft) (%) (f t) (f t) 1 19 TO 20 23,98 30 Cir 48 10,30 10.50 0.42 12.80 12.93 2 20 TO 20A 23.12 30 Cir 36 10.50 10,60 0.28 13,00 13,10 3 20A TO 22A 20.54 30 Cir 404 11.00 12.50 0.37 13.50 14.31 4 22A TO 23A 18.82 30 Cir 348 12.50 13.30 0.23 15.00 15.56 5 23A TO 24A 17.09 30 Cir 312 13.30 13.90 0.19 15.80 16.26 6 24ATO 25A 15.37 30 Cir 242 13,90 14.20 0.12 16.40 16.68 7 25A TO 27 14.07 24 Cir 55 14.20 14.50 0.55 16.69 16.88 8 27 TO 28 11.12 24 Cir 20 14.50 14.60 0.50 16.91 16.95 9 28 TO 29 10.47 24 Cir 35 14.60 14.80 0.57 16.97 17.03 10 29 TO 30 9.17 24 Cir 389 15.50 16.50 0.26 17.50 18.02 11 30 TO 31 6.87 18 Cir 410 16.50 18,00 0.37 18.04 19.44 12 31 TO 32 4.58 18 Cir 311 18.50 20,10 0.51 20.00 20.92 13 32 TO 33 2.74 18 CIr 234 20,10 20.50 0.17 21.60 21.73 14 33 TO 34 1.43 18 Cir 93 20,50 20.70 0,22 22.00 22.01 15 20A TO 21 1.72 18 Cir 269 12,00 14.70 1.00 13.50 15.20 16 21 TO 21A 0.86 18 Cir 36 14.70 14.80 0.28 16,20 16.20 17 22A TO 22B 0.86 18 CIr 36 13.50 13.70 0.56 15,00 15.00 18 23A TO 23B 0.86 18 Cir 36 14.30 14,40 0.28 15,80 15,80 19 2 4A TO 2 4B 08 , 6 18 Cir 36 16 ,90 17.00 0.28 18.40 18.40 20 25A TO 25B 0,65 18 Cir 36 15,20 15,30 0,28 16,70 16.70 21 27 TO 35 2.30 18 Cir 312 15,50 17.50 0.64 17.00 18.08 22 35 TO 35A 1.15 18 Cir 20 17,50 17.60 0.50 19,00 19.00 23 29 TO 29A 0.6518 Cir 36 15,80 15.90 0.28 1730 17.30 24 30 TO 30A 1,15 18 Cir 36 17.00 17.10 0,28 18,50 18,50 25 31 TO 31A 1,15 18 Cir 36 18,50 18.60 0.28 20.00 20.00 26 32 TO 32A 0.86 18 Cir 36 20.10 20.20 0.28 21.60 21.60 27 33 TO 33A 0.65 18 Cir 36 20,50 20.60 0.28 22.00 22.00 Notes, Project file, 6309-east,stM Return period = 25 Yrs. Line Line ID Flow size Line L IE IE Line HGL HGL no, rate DIA type LF down up (ft) (ft) slope down up (%) (ft) (ft) 1 (trs) (in) EX.OUT TO EX, 8,50 24 Cir 35 20.50 20.60 0.29 2250 22.54 2 EX.TO NEW13 7.85 24 Cir 28 20.60 20.70 0.36 22.60 22.62 3 13 TO 14 7.20 24 Cir 136 20.70 20.90 0.15 22.70 22.81 4 14 TO 15 2.61 18 Cir 177 21.00 21.20 0.11 22.82 22.91 22.92 5 15 TO 16 1.30 18 Cir 75 21.20 21,40 0.27 22.91 6 16 TO 16A 0.65 18 Cir 36 21.40 21.50 0,28 22.92 22.92 7 14 TO 14A 0,86 18 Cir 36 21.30 21.40 0,28 22.82 22.82 8 15 TO 15A 0.65 18 Cir 36 21.30 21.40 0.28 22.91 22.91 9 14 TO 17 2.87 18 Cir 383 36 21.00 21,50 21.50 21.60 0.13 22.82 23,06 0.28 23.06 23,07 10 17 TO 17A 1.43 18 Cir Notes, Project file, 6309-north.stm Return period = 25 Yrs, GENERAL NOTES: 1. This map is not for conveyance, recordation, or sales. 2. Portions of this property are located within o special flood hazard area according to Flood Insurance Rate Map Community Panel #3702095-0130C, effective date May 15, 1986. 3. This property is zoned Town of Leland MIT, C-2. 4. Sewer service to be public. Water service to be public. 5. Boundary not field surveyed at this time. Topographic survey data by Hanover Design Services & Arnold W,Corson, PLS, PC. LEGEND STMH-14 • PROP. STORM MANHOLE PROPOSED SANITARY = SEWER & MANHOLE 00148 DROP INLETS EXISTING SANITARY SEWER & MANHOLE WL SSMH-1 0 PRORSAN/TARY MANHOLE PROPOSED WATERLINE ® & HYDRANT ASSEMBLY Fol IRON /N EXIST, CONC. MON. ------- EXISTING WATERLINE E.I.P. EXIST, IRON PIPE PROPOSED STORM ® I WATER METER SERVICE CONNECTION SEWER &CATCH BASIN E.C.M. EXIST. CONCRETE MON. E.I.P. = EXISTING IRON PIPE X GATE VALVE E.I.R. = EXISTING IRON REBAR p REDUCER E.C.M. = EXISTING CONCRETE MONUMENT LS. = IRON SET Sg� DRAINAGE FLOW W/V = WATER VALVE +49.0 INDICATES SPOT ELEVATION = W/M WATER METER F/H = FIRE HYDRANT P/P = POWER POLE TREE (TYPICAL) C.P. = COMPUTED POINT FIRE HYDRANT ASSEMBLY W r f :w I b i v _ c M J\ , \ SW8040703 I LOCATED IN THE TOWN Of LELAND BRUNSWICK COUNTY NORTH CAROLINA DATE: JUNE 2006 10 SITE p ✓q�Frs z oyA LOCATION MAP NOT TO SCALE (0) Q J �Ncj � PQ P\_11 LSD. aOPO � \ , ,/�• 4NOY COMMUNICATIONS 80igCCEEg .48 EMENT , V.It I1 i I----- - -- I s _ I R - �J�-� I TOTAL �\ "� I 1 - �//-��-� _ { ;4. loS TRACT4 I/ o M F. f hill �� � �9.60 ACtRES VI 1 V R•ACT 10 i !' '-J j 1 \\ 1' i• t � \ (, 1 ff 1 6 404 WE"ND \\ TI►CT 8 I I 992'ACRES ri C T 7 ACRES rRACT AC,VES VII I w a W �\\``� a=-------"- 'err - 404 WETLAND \�l o VJ BENCHMARK LOCATIONS AND ELEVATIONS LOCATION: ELEVATION 1 NCDOT RW MON. SOUTH INTERSECTION OF PLOOF ROAD & HIGHWAY 17 27.86 t y661 \ 00 �r �s 0 CHAPEL LOOP f Homes rce t0 _ ( 1 1 1 I �ITOWN et BEL,�,��u�g♦� I �w 1 --- _ _ _ _ 1 I/,•'/ PUMP STATON \`-`•y H.1-, 1� �T RACT 5 -. ; _ 25.27 ACRES NQQRR' 1O�D ' 41.91 ACRESjT, ,AR_ ®-1 mo\a:,.• AREA 70 POND )DA - 120 odes r- 404 WETLAND 121.76 ACRES RUN OF JACKEY'S CREEK IS THE PROPERTY LINE SCALE IN FEET� 1"= 00 im REV. N0, I REVISIONS ` DAk i Coppight p, Hanover Design Service; P.A., All rights reserved Reproduction or use of tite contents of this document, or additions or deletions to this docum� Who le ole of port, without written consent of the Land Surwyor or Engineer, is prohiblted. Only copies Gam the original of this docwne:l, marked with the original signature and arigi)al seal of the Surveyor or Engineer, shall be lkbonnsidered to be .did and Irue copies. I OVA NORTH UJIAb-INAENVIROi !iviENTAL MANAGEMENT C*MMIc SION DIVISION OF WAIM OL AUTY STANDARD OTEtS 1. Information co cerning underground utilities was obtained fro available reco,ds. ff shall be the responsibility of the i Contractor to determine the exact elevations and locations of all existing utilities at all crossings prior to commencing ench'! excavation, If actual clearances are less than indicated on Flan, the Contractor shall contact the Design Engine r before proceeding with construction. !; Any condition discovered or existing that would necessitate a modificatioA of these plans shall be brought to the attention of the Design Engineer before proceeding with construction. 2. NO CONSTRUC T/ON IS TO BEGIN BEFORE LOCATION OF EXISTING UTILITIES HA BEEN DETERMINED. CALL "NC ONE -CALL" AT LEAST 48 HOURS B FORE COMMENCING CONSTRUCTION. 3. All trees which are not required to be cleared for constuction all be preserved wherever possible unless otherwise dir cted, 4. Contractor sh ll adjust all manholes, valve and curb boxes to the final gro a upon completion of all construction. Any bakes damaged or therwise disturbed by the Contractor shall be repaired at the expense of the Contractor. 5. The Contractor is responsible for controlling dust and erosidn during const ction' at his expense. Parking areas shall be watered to c ntrol dust when ordered by the Engineer. j i 6. No geotechni&l testing has been performed on site. No warranty is ode for suitability of subgrode, and undercut and any required rep cc ment with suitable material shall be the responsibility f th l contractor, 7. Extreme care isho/l pe taken to ensure minimum separations at all utility crossings.1 8. Contractor to ensure that pavement is placed so as to drain positively to the parking lot inlets and catch basins. All roof drain downspouts to be directed to the storm sewer system. 9. Contractor is responsible for obtaining all required permits. 10. This plan is r site grading, utilities, siting, and drainage only. See building plons for details on utilities hookups to buildings. 11. Contractor and Builder are responsible for coordinating Finished Floor Elevation of oVl buildings with the Owner and the Architect. 12. Affected Non Munic�oo/ Utilities shall be contacted and provided with plans and other pertinent information, when feasible, to coordinate opp opriate scheduling and placement. At the minimum this should include BellSouth and CP&L, MORE GENERAL NOTES: 1. ALL CONSTRU TION �O CONFORM TO TOWN OF LELAND STANDARDS APPLICABLE S TE & LOCAL CODES. 2. CONTRACTOR 0 COORDINATE ANY REQUIRED TRAFFIC CONTROL WITH THE STATE AND THE TOWN. 3, CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE AWA FROM BUILDINGS AND TO RECEIVING STRUCTURES. 4, CONTRACTOR 1 RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, RE-ALIGNMEN ,DISCONNECTIONS OR CONNECTIONS OF EXISTING. UTILITIES WITH APPLICABLE AUTHORITIES. N INCLUDE REMOVAL OF EXISTING 5. CLEARING AND GRUBBING OF SITE TO NCL DE CURB, ASPHALT, iNL&S, AND ANY OTHER STRUCTURES INCLUDING TREES, T REQUIRED STUMPS AND EBRIS EXISTING ON SITE, TREES NO T D BE N MAIN N OTHERWISE DIRECTED. CLEARED FOR ONS1`RUCTIO SHALL RE UNLESS A I AMAINTAINEDF 6. MINIMUM SEPA T Ohl SHALL BE AS FOLLOWS: a. HORIZONTAL CLEARANCE OF 10 FEET BETWEEN SANITARY SEWER AND WATER MAINS, 1 b. WHERE VE TICAL !CLEARANCE IS LESS THAN 18" BETWEEN SANI TARY SEWER ANO WATER OR WHERE SEWER LINE CROSSES ABOVE WATER MAIN, BOTH PIPES SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITI IER SIDE OF CROSSING. c. WHERE VEh TICAL ; CLEARANCE IS LESS THAN 12" BETWEEN SANI TARY SEWER ANI STORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON PIPE FOR MINIMUM OF 10' EITHER SIDE OF CROSSING. d. WHERE VERTICAL 'CLEARANCE IS LESS THAN 12" BETWEEN WATER MAIN AND TOR DRAIN, WATER MAIN SHALL BE DUCTILE IRON PIPE FOR MINIMUM OF 10' EITHER SIDE OF CROSSING. Z CONTRACTOR T ENSURE THAT A MINIMUM OF 0,409 GRADE IS CONSTRUCTED ON ALL 8"DIAM TER SANITARY SEWER MAINS. 8. SEE DETAIL SHEETS FOR TYPICAL UTILITIES HOOKUPS. 9. ALL LOCAL RESIDENTIAL AND COLLECTOR ROADS ARE TO BE BUILT TO NCDOT STANDARDS. CONTRACTOR RESPONSIBLE FOR COMPACTION ;TESTING. 10. ALL SANITARY EWER! MAINS TO BE 8" UNLESS OTHERWISE INDICATED. 11. ALL WATER MA I S TO BE 8" UNLESS OTHERWISE INDICATED. 12. TWO VALVES A E REQUIRED AT "T" INTERSECTIONS AND ONE VALVVE ON THE WATER LIN TO FIRE HYDRANTS. 13. A BLOW -OFF V LVE IS REQUIRED AT THE TERMINUS OF ALL "DEAD END" WATER LINES. ! 1 14, A NCDENR / D Q WATER QUALITY PERMIT IS REQUIRED PRIOR I'd PLACING ANY IMPERVIOUS SURFACES. INDIVIDUAL APPROVED SITE SPECIFIC PLANS ARE REQUIRED koR FUTURE DEVELOPMENT. i i. \ INDEX TO DRAWINGS SHE T No. 'DESCRIPTION ORA WING No. 1 F 6 COVER SHE T and GENERAL NOTES 6309-ESC-WQ1 2 F 6 WEST GATE rROSION & SEDIMENT CONTROL 6309-ESC-W03 3 OF 6 WEST GATE ROSION & SEDIMENT CONTROL 6309-ESC- WQ4 / 4 5 6 NOTE WELL: PF 6 WEST GATE WATER QUALITY OCEANGATE POND NO.1) 6309-ESC-WQ2 dF 6 WEST GATE VATER QUALITY (PLAZA POND MOD) 6309-RD3-MOD F 6 SEDIMENT CONTROL SPECIFICATIONS & DETAILS 6309-ESC-WQ5 ATE CONSTRUCTION DRAWINGS", SHEETS 1-15 F6R MORE DETAILS. SEE HDS "WEST COVER SHEET and GENERAL WESTGATO- LOCATED iN THE TOWN BRUNSWICk COUNTY NOTES Erosion Control OF LELAND � i & Water Quality ; TOWN CREEK TOWNSHIP NORTH CAROLINA Date: 8- i l -06 Scale: 1 "= 400' Drawn: DSH ' 1 ���A fe ._°''' � �A�� �!"bSt(j�®Dfd� • C1, , •� a� S AL %2 007 r � � OWNER: 0 P WI (9 AN IGATE, LLC. BD 3167 MIN(STON, NC 28406 0) 91-1196 Checked: DSH Project No: 6309-ESC-W01 +�adoe� R dESIGN SERVICES, P.A. I HANOVE _� 4L►�� LAND RVEYORS, ENGINEERS & LAND PLANNERS a WIL WALNUT STREET 1 IS r WILMMGTON, N.C. 28401 PHONE: (910) 343-8002 dhollis hdsilm.com IS I i I/ 0 10VNO w OUTFALL CHANNE INSET GC Q Jr �� iCag hp i A A U NOTE WELL: / EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. NOTE WELL: ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. ANY SLOPES TO BE STABILIZED AFTER 15 DAYS. SEE NEXT SHEET FOR EROSION dt. SEDIMENT CONTROL PRACTICES, CONSTRUCTION SCHEDULE, MAINTENANCE d: VEGETATIVE PLANS. 0 IE22.90 T 3 =2 �u NOTE: The twin 42" pipes and Ditch 2 into existing OCeangate Pond No.1 AND the new 30' pipe from existing Inlet 3 into existing Ocean Gate Plaza Pond are to be constructed FIRST and left open to facilitate and accommodate oil disturbed area flows into the existing ponds. Westgate Drive is to be substantially in cut and flows from disturbed areas will generally travel along cut roadway to the existing ponds. No sediment may leave site or enter any wetlands areas. —7 ' SNEE SEr00 WASHED STONE P CLASS 1 OR B FLOW DIRECT*s THICK ON FACE EROSION CONTROL FROM TOE OF DAM STONE TO WEIR. I FILTER 2' NA_X FABRIC AT CENTER SECTION A -A CLASS 1 OR B 1 MIN 1,5' MIN EROSION CONTROL STONE' GRASS -LINED FILTER FABRIC _ ]I A CHECK DAM DETAIL NOT TO SCALE CD OP I La=20' I TRIPLE — 24"RCP 2-SEPARATION RAIN. og00000 — d50=3" 15' 00000o Apron=ll MIN. 6Qo°o°0 — 0 00 �n MINIMUM DIMENSIONS OUTLET AT CULVERT 11 Cy OUTLET PROTECTION NOT TO SCALE Te \ or vS n e8 StOck . _ e V/y AiZ \ °w "o, cot \ � o�ds %y °a\ `�R, ay IP B \ � \ Ir CT 10 u 0 < SEE INSET THIS I 1 ­4 _L 195 I I I -- _--_ _ �— FOR FUTURE _ 12EXTENSION I _T _ l END P. T. �_ I -�_ I ENO 9 e Ll _�J • v I I .BA 'RICH t C N I I rr�'r_ SF — Oh Cr e _T — — o k SubdiviS _T -- — _ — 1 1°" 1 C I C7 IP — _ — CATCH 2HAO BASINS IP EX 194 _l 18PLT-1B'SRT I STA 12+71 a l ' ' I 1 to 18A CE ,� 13 x IE d13 CAATCH"BASH 14 15 I I EX IE17.3 6 J' CCNMCI ro I 'TA 12+15 $ ^ U 1 7 { 18 I h 9 B'LT ,e'RT B 8 � I POLF 15 20 15A EXISTING TO � —�' ML --L�a_ G � - B WATER T 2 3 1 2 4 I I -- I 25 _ 21 ` __�__ 28 2 9 ' 193 I I \ T \ 30 I I I N I.A. -_�__ 31 32 I I 192 T; HT HA 33 15 I I ._ I rr RB�R 34 L rn Q �R�V 35 SMH-15 ; OD IP '�CT,� 36', STA 11+1 ^ A bO T 37 1 astt \ IEzO. D cn r 1 38 39 14 'INC 00 a t eItgato\38LF 13 IE20,50 I EVS — co N TWC T CIS BASINS �RAIMACE EA T� I Q \ I IP 1qA y� IP OP ow:i 8 =ANT co aao 1, —� CATCH BASINS co STA ,0+35 �\ � 18'LT-18'RT }� pREV St►,a IOUS LO " 0 98040 \ 28R o' -� 0) to ` �- �_ '_ co I CO n 3 •� — c0 ,a ; ca 9AH-16 STA 9+12 � L N� — ONN is 35 DA= 39 acres ` \ W = EARTH n= 0.020 PREyoUS Lop 402 GRASS LINED n 0.045 BARE E o BR nominal s= 0.19 \ \ Q CAPACITY = 165 cfs ® 2.2 fps \\ \ ( °V I 0(2)= 49 cfs V2 EARTH= 2.56pS V2 GRASS= 1.4fps \ 0(25)= 78 cfs V25 EARTH= 2.9fps V25 GRASS= 1,6fps IP \ n Ip AC / NOTE. Line channel with jute mesh until stable. CATCH BASNS Check dams every 15OLF. STA a+50 s6 4 � ,e'LT-te'RT 17A 30, � Y � I SMH-17 17 \ 1 STA 8+0, F GAJC IP B= 5' M=3 _ `moo\ .� GRASS LINED CHANNEL I \ BETWEEN TRACT 8 AND TRACT 9 I \ "� NTS I - N o Silt Fence Around 01 c Stocpile Areas 1 TA +00 I 30.5 ACRES ADDITIONAL DISTURBED AREA THIS SHEET IP '1;1 13 IP � oe 3 ` + 8C MODER ROUN A N I ® ONE W Y ROTAR I IP � r _- 340 Silt Fence Around Temporay 4 2, ND TRIPNG °A StOCplle Areas Typical e�' �`�,. �` STACAT H , es 'Ns �� Tempora /°� rY as neQe S I , z. B• TRIPLE 24•RCP ISO kpil a FOR. FUTURE USE IP s exa cRoss °V "i2 zA' s' a CATCH BABI IP STA 3+BO F.HYO "' CP ROUNDABOUT •! •�� H STA 5+25 t 2 Ip _ 1B'LT-15'R 39B �,/dQ� � STP 0+83 34A i s.o iS B'Cv -uy I 1B RT I P AS CES ARY TYP NE 270LFSMH-2 �r'i,�r"'� , y IP F.H I. IP i STA 1+50 Wev ss. J 2 IPCONNECTION 7A W OP IP ,D aJ J �ze SMH-21 A MAINTAIN CLEARANCE ZS'LT STA +21 Y CONCRETE lmNOUTNIC v BETWEEN FORCE MAIN ISLAND (SURFACE MOUNTED) AND WATER MAN DR SEE NCDOT e52.01 BA 5 USE DUCTILE IRON PIPE / ADDI AAS IP 11 ST• 1+e5 t r-te' IP �Z SMH 23 LOD Z CTo C U I l� i CD I �m CID ^O q / ZIP CD l 03 o / a U V 100 50 0 100 SCALE //V FEET.1"-- 100, 2'BO 23 ST 1+e II CONNECTION �rEN�P,BAR STAT0-11 Ir 26 LOD Silt Fence Around Temporay Stoopile Areas Typical Tempo rOrY Stockpile St kpile P ess as necessary fie ore ry ICAT BASINS a8 tic STA IP 32 te'LT-1e !� SSTA 11+ 4 CATCH BASINS 25'L7 r.�-- - 23ALF X- W8 980403 t t .`-3 r ram. I g N IP " SMH-11 + �+ 410LF j STA 4+19 , S}i g 25'RT 30 Roadway Ir) �, ` 8t 10 CAT 2�p Flow Tow Cut (typical) iP � 6AL,";8'RT orris Rbodwa Y � 5F LOD ' if nece sary 30.5 ACRES ADDITIONAL DI TU BED SltIon gcany oW are s AREA THIS i SH ET 49.0 ACRES TOTAL ADDITI A DISTURBEDCT rb� i j 1 ! ii NO WELL. SEE HDS "WE TGA TE CONSTRUCTION DRAWINGS", SHEET/ S 1-119 FOR MORE DETAILS. C �Y I 11, REVISED AS ER LQS COMMENTS 9-20-06 REVI NO. REVISIONS DATE O:opyrlght Q, Hanover Design Services, P., MI 'this reasrved Reproduction or we of the Contents of this document, or obcuhlent hr whole or part, without milt Consent of the Land Surveyor or Engineer, Is prohiblled. Only copies kam the okgdnol bdditions or deletions to this of this document, malted with the orlgMd signature and or al seaI of the Surveyor or Engineer, shoo be considered to be v f1d and true o*be. EROSION CONTROL PLANS Date: WESTGATI'E- Erosion Control & Water uali �: tg-"-06 SC019: LOCATED IN THE TO OF LELAND TOWN CREEK TOWNSHIP 1 "= 100' BRUNSWICK COUNTY NORTH CAROLINA Drawn: DSH G�Q���e�,� e®"gn"•, OWNER: OCEAN GATE, LLC. Checked: DISH ram' i$®�tSSIp,;y9,,�' 0 BOX 3167 Project No: E ISE ILMINGTON, NC 28406 d Al 910) 791-1196 6309-ESC-WQ3 )�0007 44�1 �E�C;;•r�� , A°��� �i °••••'' �`•v� HANOVER'DESIGN SERVICES, P.A. °mt _aA O•*�� LAN SURktYORS; ENGINEERS dr LAND PLANNERS _J WALNUT STREET WIL WILMINGTON, N.C. 28401 Z� `LJL fS� PHONE: (910) 343-8OD2 dhollis @ hdsilm,CO i 1 I I i I NOTE WELL: EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, ( LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. L\ NOTE WELL: ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. BlrCh Creek ter I -i I ANY SLOPES TO BE STABILIZED AFTER 15 DAYS. eekSubd►visi � ; I----_ on \ J -- I 1 1 1 -T _/ _F_ - - - _ _--J i L 1 I I � I P 610 �_-�S 9g U' I I 04028 1 1 rr - 1 40 i 41 I 42 1 43 I 44 I i ' The �1rbo' ' � I - �- ,- � -f ,- - _ I J I I I I ll \�_ � -I J 1 1 45 I 1 1 rs atl i �- J 1 J 1 J I I I - -L - - - - 1 , 46 1 47 1 , 1 1 " ' es tga f llr I ' J J I I J , I --2 O' D . E . -L--_ 148 49 1 � i 50 JJ 51 J I J I J J j I Jl pR� J I -_T i 52 1 53 i 54 ll I 1 SOUS 98040�SR I' 1 - i- - L _ _ I _ - - 20'D.E. --L_ 1 55 1 i 1 I I - Q 56 1 57 I J 1 I 1 1 I 7- -_ �IA,�°I J 1 e�Tyl- I I 1 58 I 59 J 60 ' 1 I I 1 J J / /- T_`-- 1 � -L I J 1 / MINIMUM CKFIL 8' �OLLIIPACTFD THICK LAYER OF GRAVEL wRE IVA RE V-TRENCII 14"MIIeM1M a i SECTION 1'MNIMIAI SECTION SF SEDIMENT FENCE !(SILT FENCE ) NT8 PRAcncEen C° i `�' 1 I I 1 1 "1 J ,ea �� ' ' j T' �''L -_ I I I 61 16 2 1 6 3 1 J ' 1 /- 1I I J J I 1 I 1 1 T- -L--L_ I I 64 1 to Iga„Na 67 / -1- ` -1 I EX16R s I to 1 d- I I 1 J 1- --I III� i / 68Isis.- 69 PR�j _ "- s *OD� --�__I I I I ,� I 1 ' I j_- J \L\ l l70 D S LOp 980 - - _ '" ' -� - _ ' 1 I I I to \ / BR 1 -� -� I �- I CE 71 1 I _ �Ewy ` - _ owQSwe o4os> _ -\ _ 1 I 1 1 I I o 1 / \ -�`! °' / 72 u +oo eEcsPRE-0/73 I raANSTRaM S 9 4- - -__ // 74 02 / I 75 CD / / \ \�\ m DR A A A TO o.1\\ \ \ ��°�// // ���_rT �__ � M I SNNE FITTINGSFITTINGS ITd.ESSARY la DA 12 IP I I ISTA4+ Mry ATCH s INSTA 3+ I \ \ T-9' T 35 Silt Fence Around Temporay - \ I In1 N II \� G I IP Stocpile Areas Typical / -�- _ \ \ \ \ _ _ I _ I H-6 11 R 7 12 7 LOD _ 424 L l I ll Silt I \ _- `79 I lP IP { / S o c AC ES T TA A I I TURBED AI l 12 I 1 1 ' 2B / / IP e e s ?�Por 1 .5 A D T R ED i '� i � I `80 / Z yPfCO y NOTE: The twin 42" Les and Ditch 2 into existingOceon ote Pond No.i I IP w / A EA THIS AND the new 30" pipe from existing Inlet 3 into existing Ocean Gate 37aF f9�= �! _\ Q$ty69 V / Plaza Pond are to be constructed FIRST and left open to facilitate �\ `811 ' I Q0403� and accommodate all disturbed area flows into the existing ponds. m 27 sr C ` COD Westgate Drive is to be substantially in cut and flows from _ _ _ - (V I II 7 cv a(� / disturbed areas will generally travel along cut roadway to the existing Tempo, \ ponds. No sediment may leave site or enter any wetlands areas. d' IP �~ T �, F c 24A IP °S receft° c<P;le / / 123 0000 1 �82� 1 SMH- zsA 5+ 7 8 IP IP 122 0 // W_ / BASNS 248 � t- - _ _ - \ \ @ � C,' � � \ O LOD f sTA ,e 18'LT B'R6 \ \ rp N. �07�e 121 I I l T s^CV Roo z3s F_H 4 \ \ SQ OS T je p 1 ~ F-10W y in�,CU IP SMH \ '/e �a; ,o0 120 1 \ 8b \ \ W°' d3 r� pt('Q�) 24 LTSTA22+4a \ dLP 1 �y --ExrJe.tB \ ` \ _ way \ \ IP61 STA 25+4 \ = STA CATCH 8 S / \ B'LTZSB ---�� \ \ \ � \ Chonnei with to 118 - Une I U.g sto eO CD J _ \ esh GC pffCH 2 93 - t3°a° \ \ \ 19 O N° 42'RCPs OP \ NEW U1-TNECE BOXE I SF \ \ I 1 1 7 � DEP7RHTkARYS \ \ � I - \ e'cv �\ 0/ `% _ ge�r�ie oRis H-2 2 21_ s� _ 115 IP i / 404 WETLANDS I 100 50 0 100 SCALE IN FEET' 1"_ 100' / NSF / 04 WETLANDS IP UAIKJ \ Si )f H 5NS 1BLT-,8'RT IP SF \ �` \\ \ \/ SF-/ on j 2'X 4' FRAME AROUND CREST OF OVERFLOW STAKED 2'X a j 1.5' MAXIMUM HEIGHT WOODEN FRAME SEE NARRATIVE FOR 3' SPACING\ \\ MORE DETAIL AND ALTERNATE METHODS GATHER EXCESS FILTER FABRIC AT CORNERS X N EXTENSION OF FABIT' V MIN. Z INTO TRENCH ,'CRUSHED STONE OR I 12'COMPACTED SOr. Z 1n ol am\ I\ I t o FILTER FABRIO! PERNOUS SHEET OF NYLON, POLYESTER, OR ETHYLENE YARN, EXTRA DROP INLET I Vol Ili ORATE I STRENGTH ( 60 PSI MN.) I WITH ULTRAVIOLET RAY J INHIBITORS AND STABA12ERe `I 'LXCnAAFTRir' W `LJ INTO PRACTICEHi51 PUBLIC •�wwe• PLANNED EROSION AND SEDIMENT CONTROL PRAC710ES - CE 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE Practice 6.06 Shall be installed at the entrances of the proposed project in and from Westgate Drive or other roadways. Drainage is away from the road and sedimentation will be controlled with downstream practices. During wet weather it may be necessary to wash truck tires at these locations. 2. LAND GRADING Practice 6.02 j Grading should be limited to areas as shown on the Plans. Cut and fill slopes shall be 3:1 or flatter except where specifically indicated. Care shall be token during land grading activities not to damage existing trees that are not required to be removed. SF 3. SEDIMENT FENCE Practice 6.62 Sediment fencing should be installed as shown on the Pion, first, to delineate and protect low areas, and around any temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent lands or roadway, or into Inlets IP 4. INLET PROTECTION Practice 6.52 Storm sewer inlet barriers of block and gfovel inlet protection are to be constructed to help prevent sediment from entering the storm sewer system. After permanent stabilization of the entire contributing watershed area, the storm sewer system is to be flushed to remove accumulated sediment and ensure design flows. VP 5. OUTLET STABILIZATION Proctice 6.41 Riprop aprons will be located at the downbireo n end of of discharge pipes to prevent scour. 6. CONSTRUCTION ROAD STABILIZATION Practice 8.80 Upon reaching final grade and after storm' sewer has been installed, roadways and parking areas ore to be stabilized by placing sub -base course of approved 6" ABC stone, as shown in the typical cross-section detoii on the Pion, to reduce erosion and dust during the remainder of building construction. $B 7. SEDIMENT BASIN Practice 6.61 The Sediment Basins are the primary Practice t6 prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the details as Shawn on this Pion and the Norrath,". The PVC orifaces are to be blocked during sedimentation function (or not installed) until entire watershed is permanently stabilized and pond is, converted to permanent stormwater management detention /': retention function, II GC 4. GRASS -LINED CHANNELS Practice 6.30 All overflow ditches to be graded to desk, j configuration, seeded, and stabilized if necessary with temporary straw -net liners to collect and convey site water as shown on Plan. After finol project stabilization, ditches to be re -graded and cleaned of siltation as needed to establish original contours for stormwater conveyance. CD 8. CHECK -DAM Practice 5.83 j Check dams are to be installed as indicated on plan (nominally every 150 feet) to reduce flow in ort open channel., serving as a temporary measure to limit erosidn. CONSTRUCTION SCHEDULE - SEE PLAN, THIS SHEET I 1. Obtain approval of Plan and any necessary permits, and hold a pre -construction conference prior to commencing any work. 2. Flog work limits and stake -out primary measures, and Silt Fencing and Limits of Disturbance for preliminary grading. 3. Install Gravel Construction Entrances. 4. Install Silt Fencing as shown on Plan prior to clearing and grubbing site. Sediment Bosins are existing. Any additional measures or diversion ditches to be contracted and stabilized prior to commencing any major grading operations. Storm sewer construction and direction of of runoff to the Sediment Bosins are to be completed as quickly as possible. NdTE: The twin 42" pipes and Ditch 2 into existing Ocachgate Pond No.1 AND the new 30" and from existing Inlet 3 into existing Ocean Gate Plaza Pond are to be constructed FIRST and left open to facilitate and accommodate all disturbed area flaws into the existing ponds. Westgate Drive is to be substantidly in cut and flows from disturbed areas will generally travel along cut roadway to the existing ponds. No sediment may leave site or enter any tvetlonds areas. 5. Construct ditches and any other sediment contra( Practices shown, prior to rough grading poking lot and site, stockpiling material and topsoil as necessary. 6. Install utilities In roadway, establish final grades end stabilize roadway areas with Stone base course. 7. Final grade roadways, install non -municipal utilities as needed, and vegetatively stabilize all areas, 8. All erosion and sediment control Practices are t6 be Inspected weekly and after any rainfall, and repaired as necessary. 9. Upon completion of construction, the roadway areas are to be paved and all areas permanently vegetatively stabilized. After site stabilization, temporary measures are to be removed and the SedimentBasins cleaned to their original design contours, If necessary, and riser structure orifaces opened, so as to function asl stormwater management / water quality retention ponds. MPJNTENANCE PLAN - 1. All measures to be inspected weekly and after y rainfall event and needed repairs made immediately. 2. Sediment Basins to be cleaned out when the leTalel of sediment reaches 4.5' below water surface. Riser structures to be cleaned if excess water above design surface no longer drains properly. 3. Sediment to be removed from foreboys when they ore approximately 25% filled or sediment level is within 4.5' of top. NT3 j 4. Sediment to be removed from behind the any Set Fence and � \ - - 1�-f/ PREVIOU8dYAPPROVED inlet protection devices when it becomes 0.5' deep. Fencing / \ ( and inlet protection to be repaired as needed to maintain a \ \ barrier. 5. All seeded areas shall be fertilized, mulched, one re -seeded as necessary, according to specifications provided, to 1 ` / \ maintain a suitable vegetative cover. 1 VEGETATIVE PLAN - J / 1. Permanent vegetation to be established in occo,'dance with "North Carolina Erosion and Sediment Control Plahning and Design Manuol", Section 6.11, latest version. See next Sheet. `94� `8Jl0-- / I NOTE WELL: SEE HDS "WESTG TE CONSTRUCTION DRAWINGS'; SHEETS 1-15 FOR MORE DETAILS. / \ / \ _ 1 REVISED AS PER COMMENTS `96l 9-20-06 REV. NO. REVISIONS DATE sv Copyright 0. Hanover Deslpn Services, P.A., AN' rights re, erved. Reproduction or use of the contents or this document, or additions or de/etfms to this dowmen6 In whole or part, without written cohsent of t e Land Surveyor or Eeginser, is prolibited. Only original of this dooumsnt, / ♦�j��G` \ `g 71 marited with the original signature and original of it P Surveyor or Engineer, shad be considered to be valid and true copire. ``• _ ` / EROSION dON TROL PLANS f Date: 18A \ /V `9 9) // /!/ � � WESTGATE- ' I . 8-11-os CE / / IG Erosion on rol & Water Quality Scale: O / 102 / \ LOCATED THE TOWN OF LELAND TOWN CREEK TOWNSHIP 1 "= 100' $ 114 \ �S�► / 101 / O/ BRUNSWiCW,, COUNTY NORTH CAROLiNA Drown: \ 00 DSH *-.' L-\�\ LA Q1 / e rey Checked: • •••®• OWNER: OC AN ATE, LLC. i NSF /� 104 �. / \ V, g-�e.}^ Ayggl ••• � PO BOX 3167 { DSH �/ i e® a l b RdIT �/ ed G%® A��/ \ ` /^ / q �" /y� -& W!L ING ON, NC 28406 ' Project No: C1 i\ / SE AL a (91 �0) 7 1-1196 i 6309-ESC-WQ4 / A / to 20007 .@ ► low are s a s P w s 'e i v.,Sheet No: / 4 / f, HANOVE DESIGNSERVICES,P 0 i Op / � .., ��\,��b � P.A. LAND SiRVEYOA 5, ENGINEERS d LAND PLANNERS 3 a / F 319 LNUT STREET \O oc` WILMI TON, N.C. 28401 o W PHON (910) 343-8002 1% 6 7dhollis ®hdsilm.com Of: 0 CD 1�t P-1.\ CD O Q Z OP La=20' FLARED SECTION END TYPICAL 0 - d50=3" 30"RCP 15, 000000 Apron-1' MIN. 00000o 0 0 Ob r ILO MINIMUM 6UTLET DIMENSIONS h 1 cyt EAC OUTL T TO SCALE TION Rock to to of pipe 0 both sides ILL W LOPE MBANKMENT OP �a ' OUTLEif PIPE See Narrative for It►I I addit anal details 2'min. NOTE: Fll_ R FABRIC IS T BE PLACED UNDER ALL ST NE OUTLET PROTEC"N. USE NICOLON MIRAFI 600X POLYPROPYLENE, OR EQUI LENT I- PROTE T/DN - spir vIEW NT8 PREVIOUSLY APPROVED DWQ SW8 §80403 Line Chonnel with Jute l esh until vegetBUvely stobllized. GRASS LINED nom, inol s= a 3% CAPACITY = 306 IS; ® 3.2 fps 51 M= 4 n= 0,045 IL ¢ i "DITCH 1 and GRASStD CHANNEL STATE WATER QUALITY POND CONSIDERATIONS - AS -BUILT SUMMARY WESTGATE (0ceangate Pond No. 1) - MAINTENANCE PLAN - Wet detention / retention pond LEGEND Surface Area required = 73,200 sf ITEM AS -BUILT ;U Surface Area provided = 75,900 sf Additional Calculation Summary for NCDENR / DWQ 1, All measures to be inspected weekly and after any rainfall Storage Volume required = 208,000 cf 1, Impervious area (lotdgs. , etc,) 57, 0 acres WATER QUALITY CONSIDERATIONS - event and needed repoirs mode immediately, Storage Volume provided = 208,200 cf 2. Normal pool surface area 75,800 sf �¢ PROP.STORM MANHOLE N Storage Volume ume Drawdown Time me = 4. 6 days 3. Normal pool Surface Elevation evat i on 7, 3 MSL I mpery I ous area calculations: See Project Data Sheet 2. Sediment Basin to be Cleaned out when the level of sediment 9 y P reaches 5.6' below water surface. Riser structure to be cleaned Us A, Actual pool Surface Elevation 7, 3 MSL Q 1rB CURB INLET 5 e1 TOTAL IMPERVIOUS = 57. 0 acres if excess water above design surface no longer drains � R�>~ w 4, Pond depth (deepest est point) nt) 8. 8 feet 4 vs z PEAK DISCHARGE SUMMARY - p p p TOTAL AREA DRAINING TO POND = 120, 0 acres properly. co SEWER SERVICE CONNECTION 5. Bottom elevation (deepest) -1, 5 MSL Q( 2) post -developed = 79 cfs @ WSEL = 10.2 120.0 acres total - 57.0 acres Impervious = 63.0 acre green area 3. Sediment to be removed from and foreba when it is (� 9k P P 6. Orifice f I ce elevation 7. 3 MSL P Y � p IRON /N EXIST. CONC. MONUMENT rt � � Q< 10) post-deve toped = 266 cfs @ WSEL = 11.0 7, Weir elevation C State storage) 9. 7 MSL approximately 25% filled or sediment level is within 5.6 of v`D ` n Q( 100) ost-develo ed = 542 cfs @ WSEL = 11. 6 SA REQUIRED; 57 / 120 = 0. 475, or 47. 5% E.1.P, EXIST, IRON PIPE P P B. State storage volume 208, 200 cf water surface. SITE p 9, 6' she IF Yes WM ® WATER METER SERVICE CONNECTION ✓q0 A At 7, 5' depth, 90% TSS remove 1, from chart - SA/DA factor = 1, 4 4, Sediment to be removed from behind the any Silt Fence and 10, 10' Yes es E.C.M. EXIST. CONCRETE MONUMENT• S 9 POND SEDIMENTATION CONSIDERATIONS12. 0 x 0. O1 x 1, 4 = 73, 200 sf SA REQUIRED inlet protection devices when it becomes 0.5' deep. Fencing L o� 11. Forebays Yes Fir Storage Volume required = 65 X 1800 117,000 cf 12, Outlet elevation 5, 5 MSL At Etev. = 7.3 = 75,800 sf $A PROVIDED and inlet protection to be repaired as needed to maintain a N GATE VALUE i1y Store a Volume ume provided ded = 300, 000 cf barrier. g P 13. Primary Spillway elevation 9.7 MSL 14, Emergency Spillway elevation 10. 5 MSL VOLUME REQUIRED: R=[ (P) (P j) (Rv) /121(A) 0 REDUCER 15. Average embankment e t ev. 12, 0 MSL 5, All seeded areas shall be fertilized, mulched, and re -seeded FORESAY VOLUME: 9 SEE PAGES A. i and A. 2, ' Contra l t i ng Urban Runoff: as necessary, according to specifications provided, to HANDICAP RAMP 16. Side slopes (typical) 2, 5: 1 to 4; 1 A Practical Manual for Planning and Designing Urban BMPs' Volume Required = 306260 X 20% = 61,250 cf maintain a suitable vegetative cover. 17, Orifice f l c e size z e 2-3' P V C s HANDICAP PARKING SPACE Volume provided = 58, 700 cf (19'/.) ( P) =1- (PJ) = 0. 9 6, Construction entrances to be maintained in a condition to prevent � PROPOSED SANITARY': ( Rv) = 0, 05 + 0. 9( 57 / 120) = 0. 478 mud or sediment from leaving the construction site. Periodic ' SEWER & MANHOLE LOCATION MAP EXISTING` PERMIT Nos.: DENR 17WQ SW8 980403 DENR DLR 980402BR <A)= 120. 0 topdressing with 2"stone may be required, Remove all objectionable -� � R= [<1)C0.478)/12](12.0) = 4,775 acre-feet material spilled, washed, or tracked onto public roadways immediately. EXISTING SANITARY � NOT TO SCALE SEWER & MANHOLE = 209,000 cf REQUIRED STORAGE 7, Inspect check dams for damage after ever rainfall event and repair "'L PROPOSED WATERLIN? 208, 200 cf PROVIDED STORAGE 8 eLEV, = 9. 7 P g Y P � as necessary to maintain design height and cross section. �- & HYDRANT ASSMBLYI DEVELOPER: OCEAN GATE, LLC DRAWDOWN, EX/STING WATERLINE I / Average head from storage elevation to orifice - VEGETATIVE PLAN - PO BOX 3967 PROPOSED STORM 9. 7 - 7. 3 / P n 1. 2' 2-3' PVCs drain to draw -down pond; SEWER & CATCH y I WILMINGTON, NC 28106 Orifice equation; Q = CA(2gh) ^ 1 /2 Permanent vegetation to be established in accordance with BASIN / 9�0-791-� 996 T 4. 6 days "North Carolina Erosion and Sediment Control Planning and I¢ • PRORSAN/TARY MANHOLE �Q Design Manual', Section 6.11, latest version. See next Sheet, A PORTABLE PUMP -� / / TO BE USED TO DRAIN POND IN AN EMERGENCY, � I 6:1 VEGETATED SHELF j FROM EL= 7,0 TO / EL= 6.0, 6'WIDE MINIMUM \ Aquatic Vegetation Zone WSEL 7.0 Qod- EXISTING TOP OULET STRUCTURE 9.7 a; I CL UBHpUSE INV 18� RCP 5. 2 w INV 18 RCP 5.2 � zZZZ zazZ / \ TOP OULET STRUCTURE 9. 7 INV 18' RCP 5.4 o INV IS' RCP 5.4 INV 18' RCP 5.2 S! w 1` INV 18' RCP 5.4 3' PVC INV 7.3 .1 a 0 INV 18' RCP 5.2 J✓ _a INV 18' RCP 5.2 3' PVC INV 7.3 i C AN GAT o000 o00o i / I I �I V I \ 1 i / (01 AN 01 / 01 OU \ / / \ / / o(�001 \ 1a R \ � I O \�Y/ --- W IoI9 AS-BUiL' AREAS: EL7.0- 70?00 sf I EL8.0= ,100 sf 90 ✓f� EL9.0= 90,G00 sf / F � POND EL9.7= 94.800 9f „ EL10.0= S`,500 sfQ_J _'z >O State starage= j 208,200 cf I L i DRAINAGE LO POND 11,40.1 1 p TOTAL AREA _ 120,0 acresCO M IMPERVIOUS 57.0 acres ou LL CV 00 INV, 8.38 IN C18. L(Ln / EXTEND 42"RCPs NEW JUNCTION BOXES _ I ✓ SIZE AS NECESSARY CONTRACTOR TO 4 VERIFYDEPTH & l 1 1 LOCATION LU / z cr �(0 I I I W - - - - ORALS-- 1 m�N � - - _ - TONE 1 �- 1 I 1 ��� I I - �ouR 1 E _ T �I oa = z� o 00 co rr^^ I ! I Ln l I o N - W I 1 I Ln I� N X R I I a O LLJ NOTE: The twirl 42" pipes d Ditch 2 into existi Oce ngte Pond No.t AND the new ' N N N e 30" pioe from existing Inlet into, existing Ocean Gate f Plaza P nd are to bie constructed FIRST and left co open to facilitate I r- I I � and accommodate ail disturbed area flows Into t�1e existing ponds. i I I Westgate Drive is to be substantially in cu and lows from I 1 `�' I 1 REVISED AS PER. LQS COMMENTS 9-20-06 difsturb4d areas will generally travel along cut ro(�dway to the existing I REV. N0. REVISIONS DATE �( I ponds. o sediment may leave site or enter any1wetlands areas. 1 � � J 1 Copyr/ghf ®, Hanover Design Services, P.A. All role reserved. Reproduction or use of the contents or this document, or additions a deletions to lhia I � ' document, !n whole or part, without written, consent of the Land Surveyor or Engineer, is prohibited. only copies from the original of this doc�+eI marked with fin original signature and originalsod of the Surveyor or Engineer, eholl be considered to be valid and true copies. STATE STORAGE VOLUME AS -BUILT CERTIFICATION RECORD DRAWING and REVISED WATER QUALITY PLAN MODIFICATION DOFG ' 208,200 ct `/ 9.7 No EL = ?8C GRATE TOP 8- 11- 06 EMBANKMENT TOP= 12.0 SETTLED , = 12.5 CONSTRUCTED 3 N AVE. a A ( ) ( ) �1 rJ 90.EL60W DOM'N 3 dos. 100-YEAR WSEL- 11.6 EMERGENCY SPILLWAY EL = 10.5 3 II " WESTGA A Southern Village of Homes and Commerce � � �3`' B BELOW WSEL � p t LOCATED IN TOWN OF LELANd 9.7 9.7 ��ti w ; wsEL= (� BRUNSWICK COUNTY, NORTH CAROLINA Drawn: STATE STORAGE ELEVATION='f3'B- TOP OF BOX =�9- G� _ Q �.� 4 - 8 RCP 7.3 5.6 o OP 7.3 INV= 5.6 PIPES ► + DSH NORMAL WSEL= � INVERT OUT= � 18"RCP O � !N'v=erg G� �• � �t � ��� ' DEVELOPER: cnecl�ed: .......... I $e / 7.3 4' 1 „aeeweso�/� 0, OSH I � O 3 PVC W/ GRAVEL V stkw � I ere "$ seose S1 see '�� OCEAN GATE, LLC I s' MADE, 6:1 AND FABRIC FILTER for QE/�et,t1T m e® L�J �'� PO BOX 3167 Project No. VEGETATED _��� WILMINGTON, NC 28106, (910)-791-1196 SHELF 6309-ESC-NO2-dh ( /�/��/� water Surface SEAL J ............................. ...:...::.:. /�/ Directly under *t-- .............. 00 S9 ,,1.= 6.0tiort'zc►t. SECTION WE T T 5 cn �+ Pt ®ses's®PIA®yam Sheet No: I 4BOTTOM EL= -1.oD \/\/ NOTE WELL: TWO BOXES REQUIRED I�FIIIIIIIIIIIM °ie•°"ea=' � HANOVER DESIGN SERVICES, P.A. ���� /�/�/ r N 1 30 15 0 30 60 90///�//�/j //////////j//j./ NOTE WELL TWO BOXES REQUIRED ```` `` `` ``' OUTLET STRUCTURE DETAIL e e� 0aO LAND SURVIre EYORS, ENGINEERS &LAND PLANNERS 319 WALNUT STREET �//%/i%r/��/%//%//%/i`r./ EMBANKMENT SECTION WLMINGTON, N.C. 28401 dhollis@hdsilm.com PHONE: (910) 343-8002 Of: NOT TO SCALE NOT TO SCALE d SCALE IN FEET: 1"= 30' 6 l SITE .444 LOCATION MAP NIGHT HARBOR DRIVE p1,A7 N Op,-�E GEA� _ 0 is _ 5 side%mc Eos 0--� 11 aVement 36,00'P CE FUTURE SIRIPIMG \ f I � L 90' ELBOW DOWN TRASH 8 BELOW WSEL RACK MAINTAIN COVER EL- fB 5 a MIN. ON OUTLET PIPE WSEL= 0.5'MIDEll OUTLET 17.0 V WEIR CUT 18 RCP ✓ - IN SB 1•-1/2" HOLE /N ' 1 Z 0 O g"GROUT 6 PVC PIPE, OR OR CONC. 6 5 1-1/2" PERFORATED '' PVC W GRAVEL AND FABRIC FILTER R i! •''' ' BOX !NV=14. 5 . POND BOTTOM 4X4 Precast Conc.Box ELEV= 11.0 NCProducts 4849 or Equivalent POND BOTTOM MAY BE OVER- SECTION VIEW EXCAVATED FOR SEDIMENT STORAGE i bill r i 125 ' �Z w q PROP.18"RCP Ujw(0 Lnu OUTLET PIPE ✓ t° 8OLF ® 0.6%ov S B SEE NEXT SHEET FOR ADDITIONAL W �\���� OUTLET STRUCTUV- TA✓ \\/Z, DAND ETAILS. STATE COF ST TTEG SHELF EMBANKMENT 010:10 To 16.0 % SECTION NOT TO SCALE Aquatic Vegetation Zone rn �m C Q Q rn See Sheet 2 for Storm o (ASewer construction details. �' �? V)i LU . . to IP 10 2 IIIII IP oho L $ IE=15.5 (� /9 _ N _-----24- --= - '- -- 4 IP BY OTHERS - '-tiz_---S `�\ IP IP__ 22 N II) \\ \ I \ JMP TO BE USED TO DRAIN I / iE OF EMERGENCY. PUMP TO BE TOP OF BERM W17H SCREEN \ D HOSE INLET AND COVERED WITH OUTLET TO DRAIN ACROSS STABLE MODIFICATIONS TO SW8 0511121" / /' A SUFFICIENT TO RESTRICT EROSION.Lid ROOF DRAINS MUST BE DIRECTED 18"RCP0D.6% OUTLET / / a. 'ORM DRAINAGE COLLEC17ON TOP BOX= i9-8- 19.5 - �/ t >_ NTO THE STREET/PARKING LOT. 6-PVC, W/ 1-1/2"HOLE / 1045 ORI-1/2"PERFORATED PVC / J WEIR tL= -q 8.9 18.5 / I / O EGETA77ON ZONE: WEIR LENGTH=_ L 0.5' I 16.0 TO EL= IZO IE OUT= 16.5 ;PECIES FOR PLAN77NG IN EM.SPILLWAY LENGTH= 40' ARE AS FOLLOWS.* SPILLWAY EL= 19.5 19.6' RIA LATIFOLIA (COMMON ARROWHEAD) TOP OF BANK= 21.0 RIA LANCIFOLIA (DUCK POTATO) US CERNUUS (LIZAROTAIL) )RA 14RCINICA (ARROW ARUM) MORE OF THE SUGGESTED SPECIES / .ABLE, APPROPRIATE WETLANDS CE / N COMMON TO THE COASTAL CAROLINA iY BE SUBSTITUTED. i EXISTING PVMT., / C&G, AND / I PSC PRE I UTILITIES / / PERMITT SW8 04070 ....... . ✓ POND BOTTOM EL= 11.0 777 XX� R PND BO OVEBOTTOM MAY EXCAVATED FOR SEDIMENT STORAGE WATER QUALITY POND CONSIDERATIONS - Surface Area required = 3,;il9@ 5f 9,800 sf Surface Area provided = 13,000 sf ✓ Storage Volume required = 6,135 ,f 15,700 cf Storage Volume provided = 14,58e cf 16,000 cf Storage Volume Drowdown Time = 4 days v/ SEDIMENTATION POND CONSIDERATIONS - Storage required - 11 X 1800 - 19,800 cf Storage provided = 57,000 cf FOREEAY CALCULATION: Approximate Foreboy Volume = 7,000 cf ✓ 20% Volume of Storage = 35,800 X .2 = 7,000 cf JR DWQ SW8 051112 2 VOLUME REQUIRED: R=[(P)(Pj)(Rv)/12XA) ention/retention pond DWQ : SEE PAGES A1 and A.2, "Controlling Urban Runoff: A Practical Manubl for Planning and Designing Urban BMPs" (P)= 1" a Sheet j (Pj)= 0.9 (Rv)- 0.05 + 0.0(4,2/10.7) - 0,403 (A)- 10.7 49-eleFe•lgfeeig R- [(1)(0.403/12XI0.7) - 0,360 acre-foot acre green - 15,700 cf REQUIRED STORAGE .E 22,000 of PROVIDEO STORAGE O ELEV.- 18.5 DRAWDOWN: SA/DA factor - 2.1 Average head from storage elevation to orifice - 8.5i A 18.5 - 17,0 / 2 - 0.75' 1-1/2" PVC drain to draw -down pond: 5.00 x 0.01 x 2.1 - 9,800 of SA REQUIRED Orifice equotioh: Q = CA(2gh)"1/2 At Elev. = 17.0 = 13,000 sf SA PROVIDED ✓ T = 4 days j -4. IP 0 vi I Elevation= 19.9�\ Appro '3OCa \ 7 ne Ansrtments 2 MODIFICATION TO POND TO ACCEPT ADDITIONAL INPUT AREAS 8-11-06 1 REVISED AS PER DENR / DWQ COMMENTS 11-22-05 REV. NO, REVISIONS DATC Copyright O. Hanover Design Services, P.A., All rights reserved. Rdproduction or use of the contents of this document or additions or deletions to this document in whale or port, wlthout written consent of the Land SBrveyor or Engineer, is prohibited. Only copies lam the original of this document, marked with the original signature and original seal of the Surveyor or Engineer, shall be considered to be valid and true copies. i I COLLAR TO POURED AFTER iw PIPE IS IN P ACE. MIN REINFORCING AS NEEDED M--SE P COLLAR NOT! TO SCALE 7 -s76 Future ilpovi 21 22 19 20 17 18 r 3 1 ide Slope::`, \\..��ll•li I i �Q 0 Anti -Seep Collor rp� 50 25 0 ' 50 100 Scale in feet: 1i"= 50' 6'min. 12'min. SEE PLAN ALL SLOPES 0 3:1 MAXIMUM W 0ZPIPE Forebay volume 2090 of required r W11 LO Storage, typical - II 1.0' �oF Forebay o� Bottom OUTLET a� Elev.= 11 PROTECTION X.4'min. 1 AS ON PLANS e Armor of nondddary minimum V Stone FOREBAY SECTION UEIAIL NOT TO SCALE r7 vy G�TEP A PORTABLE PUMP TO BE USED TO DRAIN POND IN AN EMERGENCY. Ocean Gate Plaza Pond Pond WSEL= 17.0 ✓', Surface= 13,000sf ✓'. Nominal Depth= 6.0 Bottom=10.0 ✓ SEE INSET IE=1s.0Ox G� ' ` �/l MODIFICATIONS TO SW8 051112 OP SF ELEV. AREA VOL, STORAGE STORAGE (ft) (S0 (C0 (Cf) (ac-ft) 17.0 0,000 - 18.0 16,000 14,500 14,500 0.33 18.5 17,500 8,375 22,875 0.53 1910 19,000 9,125 32,000 0.73 ' 20.0 22,000 20,500 52,500 1.21 ' 21.0 26,000 24,000 76,500 1.76 /i STATE STORAGE at EL=185 i 22,875 0.53 \\q PREVIOUSLY APPROVE: MODWICATIONS TO SW8 051112 5.0 ACRES DRAINS T POND PROP SED ADDITIONAL SW8 051112 1.58 adres, USE 1.6 ACRES PREVIOUSLY APPROVED I PERVIOUS FS/_ j Sw C 8888.8 SO. FT. SW'' 0.20 ACRES 1403.4 to. FT. < TO OC ANGATE PLAZA POND TE 0.03 ACRES ROAD F 91520.7 SQ. FT. 2.10 ACRES 0 OCEANGATE PLAZA POND Sw ROADWAY IMPERVIOUS REAS ARE 79.18 CRSO. Fr. sw 018 ACRES 1233.5 SQ, FT. BACK OF CURB BCj 0.03 ACRES TOTAL R ADWAY IMPERVIOUS AREA = 9 ,521 1 SF = 2.101 ACRES TOTALS: TOTAL SIbEWALK IMPERVIOUS AREA = 1 4381 SF = 0.446 ACRES 10.7 ACRES DRAINS TO POND TOTAL R/W IMPERVIOUS AREA = 110,l959 { F = 2.547 ACRES 4.13 acres, USE 4.2 ACRES 9 West aie Ocean Gate Plaza Additional Pavement and Sidewalk Area Inset Scale: NTS August 2006 l ! NOTE WELL: SEE HDS "WESTGATE CONSTRUCiJON DRAWINGS", SHEETS 1-15 FOR MORE DETAILS. WEST ATE- Eros on, Control & Water Quality v MODIPICATIONS� TO SW8 05111 WATER vdvALI TY and iROSION & SEDIMENT 11ONTROL PLAN MODIFICATION Date: 8-"-06 OCEAN GATE PLAZA at WESTGATE BOND Soule: LOCATED IN TOWN OF LELAND AS SHOWN BRUNSWI K COUNTY NORTH CAROLINA Drawn: DSH q� A tie 's Checked: �,. ��`4 '...."'°�• OCEAN CAT LLC DSH °. 1 I0 ,a� ' t �' SE A! i It 0007 i ci olltisZsilm.com PO BOX 3167 WILMIN TONj NC 28106, (910)-791-1196 HAND R DESIGN SERVICES, P.A. LAND SU VEYOAS, ENGINEERS & LAND PLANNERS j 319 WALNUT STREET WILMINGTON, N.C. 28401 j�JJtt�� PHONE: (910) 343-8002 I Project No: 6M-road3-MOD Sheet No- 5 6 �1Of: Construction Road Stabilization Specification # 6.80 - Construction Specifications 1. Clear roadbed and parking areas of all vegetation, roots and other objectionable material_ 2. Ensure that road construction follows the natural contours of the terrain if it is possible. 3. Locate parking areas on naturally flat areas if they are available. Keep grades sufficient for drainage but generally not more than 2 to 3% 4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References: Runoff Control Measures). 5_ Keep cuts and fills of 2:1 or flatter for safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6-inch course of "ABC" crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Were seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Drain). S. Vegetate oil roadside ditches, cuts, fills and other disturbed areas or otherwise appropriately stabilize as soon as grading is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roads and parking areas periodically for condition of surface. Topdress with new grovel as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff -producing rains. Maintain all vegetation in a healthy, vigorous condition. Sediment -producing areas should be treated immediately. gTemporary Gravel Construction Entrance/Exit Specification # 6.06 - Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it. 2. Place the gravel to the specific grade and dimensions shown on the plans and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. Temporary Seeding Specification # 6.10 - Specifications Complete grading before preparing seedbeds and install oil necessary erosion control practices, such as dikes, waterways and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard. If soils become compacted during grading, loosen them to a depth of 6-8 inches using o ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation Is essential to successful plant establishment. A good seedbed is well -pulverized, loose and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones. Liming - Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone of the rate of 1 to 1 1/2 tons/acre on coarse -textured soils and 2-3 tons/acres on fine -textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. Fertilizer- Base application rotes on soil tests. When these are not possible, apply o 10-10-10 grade fertilizer at 700-1,000 lb./acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recent tillage operations hove resulted in a loose surface, additional roughening may not be required except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods, Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6:03, Surface Roughening). Plant Selection 1 for seeding Table Oa mixture from ab e 6 r is e i species o species e 9 Select an appropriate sp p in late winter and early spring, Table 6.10b for summer, and Table 6.10c for fall. Seeding Evenly apply seed using a cyclone seeder (broadcast), drill, cultipacker seeder, or hydroseeder. Use seeding rates given in Table 6.10o-6.10c. Broadcast seeding and hyroseeding are appropriate for steep slopes where equipment cannot be driven. Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution_ Small grains should be planted no more than 1 inch deep, and grosses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cultipacker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. Mulching The use of appropriate mulch will help ensure establishment under normal conditions and is essential to seeding success under harsh site condition (Practice 6.14, Mulching). Harsh site conditions include: -seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), -slopes steeper than 3:1, -excessively hot or dry weather, -adverse sols(shollow, rocky, or high in clay or sand), and -areas receiving concentrated flow. If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14. Mulching). Table 6.10a - Temporary Seeding Recommendation for Late Winter and Early Spring Seeding mixture Species- Rye(groin), Annual lespedezo (Kobe in Piedmont and Coastal Plain Rate (lb/acre)- 120 Omit annual lespedezo when duration of temporary cover is not to extend beyond June Seeding dates -Coastal Plain - Dec. 1 - Apr. 15. Soil amendments- Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,000lb/ocre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance - Refertlize If growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 8.10b - Temporary Seeding Recommendations for Summer Seeding mixture Species -German millet Rcte(lb/acre)- 40 Seeding dotes -Coastal Plain- Apr, 19-Aug, 15 Soil amendments -Follow recommendations of soli tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,000 Ib/ocre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. main tenon ce-Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10c - Temporary Seeding Recommendation for Fall Seeding mixture Species-Rye(groin) Rote(lb/ocre) - 120 Seeding dotes - Coastal Plain and Piedmont -Aug 15 - Dec. 30 Sol amendments - Follow soil tests or apply 2,000 lb./acre ground agriculture) limestone and 1,000 Ib/ocre 10-10-10 fertilizer. Mulch- Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight con be used as a mulch anchoring tool. Maintenance- Repair and refertilize damaged areas immediately. Topdress with 50 Ib/ocre of nitrogen in March, if it is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) Permanent Seedina Specifications # 6.11 - Specifications Seedbed Requirements Establishment of vegetation should not be attempted on sites that are unsuitable due to inappropriate soil texture (Table 6.11o), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should have these criteria: - Enough fine-grained (silt and cloy) material to maintain adequate moisture and nutrient supply (available water capacity of at least .05 Inches water to I inch of soil). - Sufficient pore space to permit root penetration. - Sufficient depth of soil to provide an adequate root zone. The depth to rock or impermeable layers such as hordpons should be 12 inches or more, except on slopes steeper than 2:1 where the addition of soil is not feasible. - A favorable pH range for plant growth, usually 6.0-6.5. - Freedom from large roots, branches, stones, large clods of earth, or trosh of any kind. Clods and stones may be left on slopes steeper than 3:1 if they are to be hydroseeded. If any of the above criteria are not met-i.e., if the existing soil is too coarse, dense, shallow or acidic to foster vegetation -special amendments ore required. The soil conditioners described below may be beneficial or, preferably, topsoil may be applied in accordance with Practice 6.04, Topsoiling. Soil Conditioners In order to improve the structure or drainage characteristics of a soil, the following material may be added. These amendments should only be necessary where soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat -Appropriate types are sphagnum moss peat, hypnum moss peat, reedsedge peat, or peat humus, all from fresh -water sources. Peat should be shredded and conditioned in storage piles for at least 6 months after excavation. Sond-clean and free of toxic materials Vermiculite -horticultural grade and free of toxic substances. Rotted manure -stable or cattle manure not containing undue amounts of straw or other bedding materials. Thoroughly rotted sawdust- free of stones and debris. Add 6 lb. Of nitrogen to each cubic yard. Sludge -Treated sewage and industrial sludges are available in various forms: these should be used only in accordance with local, State and Federal regulations. Species Selection Use the key to Permanent Seeding Mixtures (Table 6.11b) to select the most appropriate seeding mixture based on the general site and maintenance factors. A listing of species, including scientific names and characteristics, is given in Appendix 8.02. Seedbed Preparation Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Soil testing is performed free of charge by the North Carolina Department of Agriculture soil testing laboratory. Directions, sample cartons, and information sheets are available through county agricultural extension offices or from NCDA. Because the NCDA soil testing lab requires 1-6 weeks for sample turn -around, sampling must be planned well in advance of final grading. Testing is also done by commercial laboratories. When soil test are not available, follow rates suggested on the individual specification sheet for the seeding mix chosen (Tables 6.11c through 6.11v). Applications rates usually fall into the following ranges: - Ground agricultural limestone Light -textured, sandy soils; 1-1 1/2 tons/acre Heavy textured, clayey soils 2-3 tons/acre - Fertilizer: Grasses 800-1200 lb/acre of 10-10-10 (or the equivalent) Grass -legume mixtures: 800-1200 lb/acre of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and incorporate into the top 4-6 inches of soil by disking or other suitable means. Operate machinery on the contour. When using a hydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 6.03, Surface Roughening. Complete seedbed preparation by breaking up large clods and raking into a smooth, uniform surface (slope less than 3:1) Fill in or level depressions than can collect water. Broadcast seed into a freshly loosened seedbed that has not been sealed by rainfall. Table 6.11s - Seeding No. 4CP for: Well -Drained Sandy looms to Dry Sands, Coastal Plain; Low to Medium -Care Lowns Seeding mixture Species - Centipedegross - Rate - 10-20 lb/acre (seed) or 33 bu/acre (sprigs) Seeding dates - Mar. - June, (Sprigging can be done through July where water is available for irrigation.) Soil amendments - Apply lime and fertilizer according to soil test, or apply 300 lb/acre 10-10-10. Sprigging - Plant sprigs in furrows with a tractor -drown transplanter, or broadcast by hand. Furrows should be 4-6 inches deep and 2ft apart. Place sprigs about 2 ft. apart in the row with one end at or above ground level (Figure 6.11d). Broadcast at rates shown above, and press sprigs into the top 1 1/2 inches of soil with o disk set straight so that sprigs are not brought bock toward the surface. Mulch - Do not mulch Maintenance - Fertilize very sparingly- 20 lb/acre nitrogen in spring with no phosphorus. Centipedegross cannot tolerate high pH or excess fertilizer. Table 6.11t - Seeding No. 5CP for: Well -Drained Sandy Looms to Dry Sands; Low Maintenance Seeding mixture Species Rote (lb/acre) Pensocolo Bohiagross 50 Sericea lespedezo 30 Common Bermudogross 10 German millet 10 Seeding notes 1. Where a neat appearance is desired, omit sericea 2. Use common Bermudagross only on isolated sites where it cannot become a pest. Bermudogross may be replaced with 5 lb/acre centipedgross. Seeding dates - Apr. 1 - July 15 Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch Apply 4,000 Ib/ocre grain straw or equivalent cover of another suitable mulch. Anchor by tacking with asphalt, roving and netting or by crimping with a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool, Maintenance - Refertilize the following Apr, with 50 lb/acre nitrogen. Repeat as growth requires. May be moved only once a year, Where a neat appearance is desired, omit serlcea and now as often as needed. Table 6.11v - Seeding No. 7CP for: Grass-Iined Channels; Coastal Plain Seeding Mlxture Species - Common Bermudogross - Rate - 40-80 (1/2 Ib/1,000 ft ) Seeding dotes - Coastal Ploln; Apr - July Soil amendments - Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 lb/acre 10-10-10 fertilizer. Mulch - Use jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowed to wash down slopes where they can clog drainage devices, Maintenance -A minimum of 3 weeks is required for establishment. Inspect and repair mulch frequently. Refertflize the following Apr. with 50 lb/acre nitrogen. Refer to Appendix 8.02 for botanical names GC Grass -Lined Channels Specification # 6.30 - Construction Specifications 1. Remove all trees, brush, stumps, and other objectionable material from the foundation area and dispose of )roperly. 2. Excavate the channel and shape it to neat lines and dimensions shown on the plans plus o 0.2 ft overcut around the channel perimeter to allow for bulking during seedbed preparations and sod buildup. 3. Remove and properly dispose of all excess soil so that surface water may enter the channel freely, 4. The procedure used to establish gross in the channel will depend upon the severity of the conditions and seection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period (Appendix 8.05). Maintenance During the establishment period, check gross -lined channels after every rainfall. After grass is established, p(.. iodically check the channel; check it after every heavy rainfall event. Imrediately make repairs. It is particularly important to check the channel outet and all road crossings for bank stability and evidence of piping or scour holes. Remove all significant sediment accumulations to maintain the desicned carrying capacity. Keep the grass in a health, vigorous condition at all times, since it is the primary erosion protection for the channel (Practice 5.11, Permanent Seeding). O P Outlet Stabilization Structure Specification # 6,41 - Construction Spenificotions F 1. Ensure that the subgrade for the filter and riprop follows the required lines and grades shown in the plan. Compact any fill required in the subcrade to the density of the surrounding undisturbed material. Low areas in the subgrode on undisturbed soil may -'so be filled by increasing the riprap thickness. 2. The riprop and grovel filter must conform to the specified grading Remits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the riprop and placing mother piece of filter cloth over the damaged area. All connecting joists should overlap a minimum of 1 ft. If the damage is extensive, replace :he entire filter cloth. 4. Riprap may be placed by equipmert, but toke care to avoid damaging the filter. 5. The: minimum thickness of the riprcp should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather -resistant and well graded. 6. Construct the apron on zero grade with no overfall at the end. Make the top of the riprop at the downstream end level with the receiving area or slightly below it. 8. Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length. If o curve is needed to fit site conditions, place it in the upper section of the apron. 9. Immediately after construction, sto',"'-e all disturbed areas with vegetation (Practice 6.10, Temporary Seeding, and 6.11, Permanent Seeding). Maintenance Inspect riprop outlet structures after heavy rains to see if any erosion around or below the riprop has token place or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. 7 - - r�rl P Fabric Drop Inlet Protection (Temoorar_y Specification # 6.51 - Construction Specifications 1. As synthetic fabric, use a pervious sheet of nylon, polyester, or ethylene yarn -extra strength (50 Ib/l inch minimum) -that contains ultraviolet ray Inhibitors and stabilizers. Fabric �` old be sufficiently porous to provide adequate drainage of the temporar,+ sediment pool. Burlap may be used for short-term applications. It must to replaced every 60 days. 2. Cut fabric from a continuous roll to eliminate joints. 3. For stakes, use 2 x 4 inch wood (preferred) or equivalent metal with a minimum length of 3 ft. 4. Space stakes evenly around the 'perimeter of the inlet a maximum of 3ft. apart, and securely drive them it ," the ground, approximately 18 inches deep. 5. To provide needed stability to the inetollation, frame with 2 x 4-inch wood strips around the crest of the overfluw area at a maximum of 1.5 ft above the drop inlet crest. 6. Place the bottom 12 inches of the fabric in a trench and backfill the trench with at least 4 inches of crushed stone or 12 inches of compacted soil. 7. Fasten fabric securely to the stakes and frame. Joints must be overlapped to the next stoke. 8. The top of the frame and fabric must be well below the ground elevation down slope from the drop inlet to keep runoff from bypassing the inlet. It may be necessary to build a temporary dike on the down slope side of the structure to prevent bypass flow. Material from within the sediment pool may be used for diking. Maintenance inspect the fabric barrier after each rain and make repairs at needed. Remove sediment from the pool area as necessary to provide adequate storage volume for the next rain. Take core not to domage or undercut the fabric during sediment removal. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable sediment and dispose of them properly. Bring the disturbed area to the grade of the drop inlet and smooth and compact it. Appropriately stabilize oil bare areas around the inlet. Land Grading Specification # 6.02 - Construction Specifications 1.Construct and maintain all erosion ant sedimentation control practices and measures in accordance with the approved sedimentation control plan and construction schedule. 2.Remove good topsoil from areas to be graded and filled, and preserve it for use in finishing the grading of all critical areas. 3.Scarify areas to be topsoiled to a minimum depth of 2 inches before placing topsoil (Practice 6.04, Topsoiling). 4.Cleor and grub areas to be filled to remove trees, vegetation, roots, or other objectionable material that would affect the planned stability of the fill. 5.Ensure that fill material is free of brush, rubbish, rocks, logs, stumps, building debris, and other materials inappropriate for constructing stable fills. 6.Place all fill in layers not to exceed 9 inches in thickness, and compact the layers as required to reduce erosion, slippage, settlement, or other related problems. 7.Do not incorporate frozen material or soft, mucky, or highly compressible materials into fill slopes. B.Do not place fill on a frozen foundotion, due to possible subsidence and slippage. 9.Keep diversions and other water conveyance measures free of sediment during all phases of development. 10.Handle seeps or springs encountered during construction In accordance with approved methods (Practice 6.81, Subsurfoce Drain), 11,Permonently stabilize all graded areas immediately after final grading is completed on each area in the grading plan. Apply temporary stabilization measures on all graded areas when work is to be interrupted or delayed for 30 working days or longer. 12.Ensure that topsoll stockpiles, borrow areas, and spoil areas are adequately protected from erosion with temporary and final etabllizotlon meoeuree, Including sediment fencing and temporary seeding as necessary. Maintenance Periodically check all graded areas and the supporting erosion and sedimentation control practices, especially after heavy rainfalls. Promptly remove all sediment from diversions and other woter-disposal practices. If washouts or breaks occur, repair them immediately, Prompt maintenance of small eroded areas before they become significant gullies is an essential part of an effective erosion and sedimentation control plan, NOTE WELL: EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE OF NORTH CAROLiNA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NU&IBERS REFER TO THIS MANUAL. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING A COPY OF THiS MANUAL ON -SITE AND ENSURING THAT ALL SUPERVISORS ARE FAMILIAR WITH THE STANDARDS AND SPECIFICATIONS SHOWN IN THE MANUAL AND ON THE PLAN. S col Sediment Basirt Specifications # 6.61 - Construction Specifications 1.Site preparations -Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees and other objectionable materials to facilitate sediment cleanout. Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2.Cut-off trench-Excavote a cut-off trench along the centerline of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 ft, deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 ft. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3. Embankmen t- Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rocks and other objectionable material. Scarify areas on which fill is be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a boll without crumbling. If water con be squeezed out of the ball, it is too wet for proper compaction. Place fill material in 6 to 8-inch continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each layer is traversed by of least one wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 10% higher than the design height to allow for settling. 4.Conduit spillways -Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, grovel, or crushed stone as bockfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Core must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 211. of hond-compacted bockfill over the pipe spillway before crossing it with construction equipment. Anchor the riser In place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5.Emergency spillway -Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of emergency spillway. 6.Inlets-Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 7.Erosion control Construct the structure so that the disturbed area Is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared, Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction (References: Surface Stabilization). 8.Safety-Sediment basins may attract children and con be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing Is likely. Follow all state and local requirements. GC Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one- half the design depth. Check the embankment, spillways, and outlet for erosion damage, and Inspect the embankment for piping and settlement, Make all necessary repairs immediately. Remove all trash,ond other debris from the riser and pool area. Grass -Lined Channels Specification # 6.30 - Construction Specifications 1. Remove all trees, brush, stumps, and other objectionable material from the foundation area and dispose of properly. 2. Excavate the channel and shape it to neat lines and dimensions shown on the plans plus a 0.2 ft overcut around the channel perimeter to allow for bulkng during seedbed preparations and sod buildup. 3. Remove and properly dispose of oil excess soil so that surface water may enter the channel freely. 4. The procedure used to establish gross in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period (Appendix 8.05). Maintenance During the establishment period, check gross -lined channels after every rainfall. After gross is established, periodically check the channel; check it after every heavy rainfall event. Immediately make repairs. It Is particularly important to check the channel outlet and all road crossings for bank stabilit,, and evidence of piping or scour holes. Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the grass in a health, vigorous condition at all times, since it is the primary erosion protection for the channel (Practice 6,11, Permanent Seeding). i CD Check Dams 6.83 Construction Specifications 1. Place stone to the lines and dimensions shown in the plan on a filter fabric foundation. 2. Keep the center stone section at least 9 inches below natural ground level where the dam abuts the channel banks. 3. Extend stone at least 1.5 ft beyond the ditch banks (Figure 6.831b) to keep overflow water from undercutting the dam as It re-enters the channel. 4. Set spacing between dams to assure that the elevation of the top of the lower darn is the some as the toe elevation of the upper dam. 5. Protect the channel downstream from the lowest check dam, considering that water will flow over and around the dam (Practice 6.41, Outlet Stobilization Structure). 6. Make sure that the channel reach above the most upstream dam is stable. 6. Ensure that channel appurtenances, such as culvert entrances below check dams, orc not subject to damage or blockage from displaced stones. Maintenance Inspect check dams and channels for damage after each runoff event, Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. Correct oil damage immediately. If significant erosion occurs between dams, install a protective riprop liner In that portion of the channel (Practice 6.31, Riprop-Iined and Paved Channels) Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation, allow the channel to drain through the stone check dam, and prevent large flows from carrying sediment over the dam. Add stones to dams as needed to maintain design height and cross section. SF Sediment Fence (gilt Fence Specification 6.62 - Construction Specifications MATERIALS 1.Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethylene yarn, which is certified by the manufacturer or supplier as conform ing to the requirements shown in Table 6.62b. Synthetic filter fabric should (contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F. 2.Ensure that posts or sediment fences are either 4-inch diameter pine, 2-inch diameter oak, or 1i33 lb/linear ft steel with a minimum length of 4 ft. Make sure that steel posts have projections to facilitate fastening the fabric. 3.For reinforcement df standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches. I Table 6.621b Specifications For Sediment Fence Fabric Physical Property Requirements Filtering Efficiency - ,85% (mm) Tensile Strength at Standard Strength- 30 Ib/Iln in (min) i Extra Strength- 50 Ib/lin in (mm) Slurry Flow Rate - 0L3 gal/sq ft/min (min) CONSTRUCTION ` 1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 18 inches above I the ground surface4 (Higher fences may impound volumes of water sufficient to i cause failure of the structure.) 3.Construct the filter', fabric from a continuous roll cut to the length of the barrier to avoid jots. When joints ore necessary, securely fasten the filter I cloth only at a support post with overlap to the next post. 4 4.Support standard s rength filter fabric by wire mesh fastened securely to the 1 up slope side of t e posts using heavy duty wire staples at least 1 inch long, `. or tie wires. Extend the wire mesh support to the bottom of the trench. I 5.When a wire mesh IlsIupport fence is used, space posts a maximum of 8 ft opartl Support posts should be driven securely into the ground to a minimum of 18 i inches. i 6.Extra strength filter fabric 'with 6ft post spacing does not require wire mesh support fence. Staple or wire the filter fabric directly to posts. 7.Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of pbsts and upslope from the barrier (figure 6.62a). 8.Backfill the trench with compacted soil or grovel placed over the filter fabric. , 9.Do not attach filter fabric to existing trees. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of'o sediment fence collapse, tear, decompose or become I ineffective, replace it''. promptly. Replace burlap every 60 days. I Remove sediment de posits os necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. i Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilized it after the contributing drainage area has been properly stabilized. I OP I La=20' I FLARED END SECTION TYPICAL 30"RCP �� d50=3' 700() 115' 00Apron=1' MIN, 00 O 00 O .s 0 MINIMUM DiMEN510NS OUTLET 11 cyf EACH I � OUTLET PROTECTION 1 NOT TO SCALE f i Rock to top o pipe both sides L2LO MBPA'NKMENT OUTLET PIPE See Narrative for 10, s-I I additional details 2'min. �. NOTE: FILTER FABRIC IS TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. USE NICOLON MIRAFI 60OX POLYPROPYLENE, OR EQUIVALENT PROTECTION -SIDE VIEW NTS OP La=20' TRIPLE - 24"RCP 00 2 'SEPARATION MiN. d50=3" 0 000000 tS11�0 Apron=I 15' MIN. °000°o 00000 0 L MINIMUM DIMENSIONS OUTLET AT CULVERT I 11 Cy OUTLET PROTECTION NOT TO SCALE NOTE WELL; SEE !HDS "WESTGATE CONS'TRUCfION DRAWINGS", SHEETS 1- 15 FOR MORE DETAILS. EROSION CON TPOL SPECIFICATIONS & IDETAILS WESTGIATE- Erosion Control & Water Quality LOCATED IN TH� TOWN OF LELAND i TOWN CREEK TOWNSHIP BRUNSWiCK COUNTY I i NORTH CAROLiNA I ' ' iS I cr- aLIAf 20007 , o �% N�, ( �.4"e`,g I ��. , , 011 - REVISIONS C47E ��'I � dhollis ,� hc sllm.com OWNeR: OCEAN GATE, LLC. i PO BOX 3167 iWILMINGTON, NC 28406 (910) 791-1196 VOVER DESIGN SERVICES, P.A.' e LANO SURVEYORS, ENGINEERS dr LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 ��// 1 PHONE: (910) 343-8002 Date: 8-11- 06 Scale: 1 "= 50' Drown: DSH Checked: DSH Project No: 6309-ESC-W05 11 Sheet No: 6 6 Of: RE NO. W SANITARY SEWER SYSTEM PIPE and MANHOLE SUMMARY, MH TOP INVERT LENGTH DIA SLOPE MH TOP INVERT TO EXISTING PUMP STATI❑N NO. 1: EX 13.0 7.90 133 8 0. 41 % 1 18.5 8.95 1 18.5 9.05 399 8 & 41 % 2 15.2 10.65 2 15.2 10.75 394 8 0. 41 % 3 19.4 12.35 3 19.4 12.45 285 8 0. 41 % 4 18.8 13.60 EX 22.0 10.50 337 8 0. 41 % 6 22.3 11. 90 6 22.3 12.00 350 8 0. 41 % 7 19.4 13.45 7 19.4 13.55 400 8 0. 41 % 8 22.8 15,20 8 19.4 13.55 370 8 0. 41 % 9 20.4 15.05 9 20.4 15.15 342 8 0. 41 % 10 23.7 16.55 10 23.7 16.65 389 8 0. 41 % 11 23.4 18.25 11 23.4 18.35 330 8 0, 41 % 12 25.2 19.70 12 25.2 19.80 190 8 0, 41 % 13 23.6 20.60 13 23.6 20.70 338 8 0. 41 % 14 25.9 22.10 EX 25.5 18.25 184 8 0. 41 % 15 26.0 19. 00 15 26.0 19.10 218 8 0. 41 % 16 25.8 20.00 16 25.8 20.10 310 8 0. 41 % 17 25.4 21.40 TO NEW PUMP STATI❑N NO. 2, EX 22.0 6.00 294 8 0, 41 % 18 25.1 7.20 18 25.1 7.30 398 8 0, 41 % 19 26.7 8.95 19 26.7 9.05 276 8 0. 41 % 20 26.4 10.20 20 26.4 10.30 270 8 0, 41 % 21 24.4 1 1. 40 21 24.4 1 1. 50 372 8 0, 41 % 22 24.1 13.00 22 24.1 13.10 270 8 0. 41 % 23 24.0 14.00 EX 22,0 5.50 25 8 0. 80% A 22,0 5.30 A 22.0 5.20 10 8 2, 00% PSTA 22.0 5.00 6884 LF 8' GRAVITY SEWER MAIN TOTAL 11,000 LF TWIN-8' SDR21 SEWER FORCE MAIN TOTAL STANDARD NOTES: 1, information concerning underground utilities was obtained from available records. It shall be the responsibility of the Contractor to determine the exact elevations and locations of all existing utilities at all crossings prior to commencing trench excavation. If actual clearances are less than indicated on Plan, the Contractor shall contact the Design Engineer before proceeding with construction. Any condition discovered or existing that would necessitate a modification of these plans shall be brought to the attention of the Design Engineer before proceeding with construction. 2. NO CONSTRUCTION IS TO BEGIN BEFORE LOCATION OF EXISTING UTILITIES HAS BEEN DETERMINED. CALL "NC ONE -CALL" AT LEAST 48 HOURS BEFORE COMMENCING CONSTRUCT/ON. J. All trees which are not required to be cleared for constuction shall be preserved wherever possible unless otherwise directed. 4. Contractor shall adjust all manholes, valve and curb boxes to the final grade upon completion of all construction. Any boxes damaged or otherwise disturbed by the Contractor shall be repaired at the expense of the Contractor. 5. The Contractor is responsible for controlling dust and erosion during construction at his expense. Parking areas shall be watered to control dust when ordered by the Engineer. 6. No geotechnical testing has been performed on site. No warranty is made for suitability of subgrade, and undercut and any required replacement with suitable material shall be the responsibility of the contractor. 7. Extreme care shall be taken to ensure minimum separations at all utility crossings. 8. Contractor to ensure that pavement is placed so as to drain positively to the parking lot inlets and catch basins. All roof drain downspouts to be directed to the storm sewer system. 9. Contractor is responsible for obtaining all required permits. 10. This plan is for site grading, utilities, siting, and drainage only. See building plans for details on utilities hookups to buildings. 11. Contractor and Builder are responsible for coordinating Finished Floor Elevation of all buildings with the Owner and the Architect. 12. Affected Non -Municipal Utilities shall be contacted and provided with plans and other pertinent information, when feasible, to coordinate appropriate scheduling and placement. At the minimum this should include BellSouth and CP&L. LEGEND PROPOSED SANITARY STMH-14 0 PROP.STORM MANHOLE SEWER & MANHOLE ®� 14B DROP INLETS ��.y►. EXISTING SANITARY SEWER & MANHOLE SSMH-1 0 PROP. SANITARY MANHOLE WL PROPOSED WATERLINE ® & HYDRANT ASSEMBLY ❑O IRON /N EXIST, CONC. MOM EXISTING WATERLINE E.I.P. EXIST. IRON PIPE PROPOSED STORM ® I WATER METER SERVICE CONNECTION --fLt'r-� SEWER & CATCH BASIN E.C.M. EXIST, CONCRETE MON. E.I.P. = EXISTING IRON PIPE Z GATE VALVE E.I.R. = EXISTING IRON REBAR p REDUCER E.C.M. = EXISTING CONCRETE MONUMENT OS,-., FLOW I.S. = IRON SET DRAINAGE W/V = WATER VALVE + 49.0 INDICATES SPOT ELEVATION = W/M WA TER METER F/H = FIRE HYDRANT PIP = POWER POLE TREE (TYPICAL) C.P. = COMPUTED POINT FIRE HYDRANT ASSEMBLY >> 0 PLANS and PROFILES of I E� A SSouthernV/llageo fHomes.and Commerce LOCATED IN THE TOWN of LELAND BRUNSWI/CK COUNTY WATER MAIN SYSTEM NORTH CAROL/NA by_ROADWAY, DATE; JUNE 006 WEST GATE DRIVE - 8' PVC WATER MAIN! 5400 LF PL❑❑F ROAD EXTENDED- 8' PVC WATER MAIN! 1700 LF I . STREET ' G' - 8' PVC WATER MAIN 850 LF X0_0_00�1� TOTAL 8'PVC WATER MAIN 7950 LF I %\ I nr_AT1r1N KAAP 49 WETLAND BENCHMARK LOCATIONS AND ELEVATIONS LOCATION: ELEVA PON 1 NCDOT RW MON. SOUTH INTERS-ECTION OF PLOOF ROAD & HIGHWAY 17 _T 27.86 L ,h661 �SR P�'�Of P�PO 404 WETLANE 121.76 ACRES RUN OF JACKEYS CREEP IS THE PROPERTY LINE i I i GENERAL NOTES: I 1. This mop is not for conveyance, recordation, or sales. 2. Portions of this property are located within a special flood hazard area according to Flood Insurance Rate Map Community Panel #370295-0136C, effective date May 15, 1986. 3. This property is zoned Town of Leland MF, C-2. 4. Sewer service to be public. Water service to be public. 5. Boundary not field surveyed at this time. Topographic survey data by Hanover Design Services & Arnold W.Corson, PLS, PC.', MORE GENERAL NOTES: j 1. ALL CONSTRUCTION PTO CONFORM TO TOWN OF LELAND STANDARDS APPLICABLE STATE & LOCAL CODES. 2. CONTRACTOR TO COORDINATE ANY REQUIRED TRAFFIC CONTROL WITH THE STATE AND THE TOWN. 3. CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND TO RECEIVING STRUCTURES. 4. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, RE -ALIGNMENTS, DISCONNECTIONS OR CONNECTIONS OF EXISTING UTILITIES WiTH APPLICABLE AUTHORITIES. 5. CLEARING AND GRUBBING OF SITE TO INCLUDE REMOVAL OF EXISTING CURB, ASPHALT, INLETS, AND ANY OTHER STRUCTURES INCLUDING TREES, STUMPS AND DEBRI EXISTING ON SITE. TREES NOT REQUIRED TO BE CLEARED FOR CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE DIRECTED. 6. MINIMUM SEPARATIO SHALL BE MAINTAINED AS FOLLOWS: a. HORIZONTAL CLE RANCE OF 10 FEET BETWEEN SANITARY SEWER AND WATER MAINS. b. WHERE VERTICAL CLEARANCE IS LESS THAN 18' BETWEEN SANITARY SEWER AND WATkR OR WHERE SEWER LINE CROSSES ABOVE WATER MAIN, BOTH PIPES SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. c. WHERE VERTICAL CLEARANCE IS LESS THAN 12" BETWEEN SANITARY SEWER AND STORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. d. WHERE VERTICAL CLEARANCE IS LESS THAN 12" BETWEEN WATER MAIN AND STORM DRAIN, WATER MAIN SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. 7. CONTRACTOR TO ENSURE THAT A MINIMUM OF 0,409 GRADE IS I CONSTRUCTED ON ALL 8"DIAMETER SANITARY SEWER MAINS. 8. SEE DETAIL SHEETS FOR TYPICAL UTILITIES HOOKUPS. 9. ALL LOCAL RESIDENTIAL AND COLLECTOR ROADS ARE TO BE BUILT TO NCDOT STANDARDS. CONTRACTOR RESPONSIBLE FOR COMPACTION TESTING. 10. ALL SANITARY SEWER' MAINS TO BE 8" UNLESS OTHERWISE INDICATED. 11. ALL WATER MAINS TO BE 8" UNLESS OTHERWISE INDICATED. 12. TWO VALVES ARE REQUIRED AT "T" INTERSECTIONS AND ONE VALVE ON THE WATER LINE TO FIRE HYDRANTS, 13. A BLOW -OFF VALVE iS REQUIRED AT THE TERMINUS OF ALL, "DT'AD END" WATER LINES. 14. A NCDENR / DWQ WATER QUALITY PERMIT IS REQUIRED PRIOR TO PLACING ANY IMPERVIOUS SURFACES. INDIVIDUAL APPROVED SITE SPECIFIC PLANS ARE REQUIRED FOR FUTURE DEVELOPMENT. INDEX TO DRAWINGS SHEET No. DESCRIPTION bRAWING No. 1 OF 15 COVER SHEET and GENERAL NOTES 6309-MSTR1 2 OF 15 WEST GATE DRIVE PLANS & PROFILES 6309-MSTR2 3 OF 15 WEST GATE DRIVE PLANS & PROFILES 6309-MSTR3 4 OF 15 WEST GATE DRIVE PLANS & PROFILES 6309-MSTR4 5 OF 15 WEST GATE DRIVE PLANS & PROFILES 6309-MSTR5 6 OF 15 PLOOF ROAD EXTENDED PLANS & PROFILES 6309-MSTR6 7 OF 15 STREET G PLANS & PROFILES 6309-MSTR7 8 OF 15 FORCE MAIN PLANS & PROFILES 6309-MSTR8 9 OF 15 FORCE MAIN PLANS & PROFILES 6309-MSTR9 10 OF 15 FORCE MAIN PLANS & PROFILES 6309-MSTR10 11 OF 15 FORCE MAIN PLANS & PROFILES 6309-MSTRll 12 OF 15 FORCE MAIN PLANS & PROFILES 6309-MSTR12 13 OF 15 PUMP STATION DETAILS 6309-MSTR13 14 OF 15 GENERAL DETAILS 6309-MSTR14 15 OF 15 GENERAL DETAILS '6309-MSTR15 COVER SHEET and GENERAL NOTES WESTGATE- Construction Drawings LOCATED iN THE TOWN OF LELAND TOWN CREEK TOWNSHIP BRUNSMCK COUNTY NORTH CAROLINA j OWNER: OCEAN GATE, LLC. PO BOX 316 7 WILMiNGTON, NC 28406 (910) 791-1196 HANOVERffIDESIGN SERVICES, P.A. LAND SURI YORS, ENGINEERS & LAND PLANNERS WIWALNUT STREET L y YVIMINGTON, N.C. 28401l'+/j��J PHONE: (910) 343-8002 Dote: 6-23- 06 Scale: 1"= 400' Drown: DSH Checked: DSH Project No: 009-MS1RI -DH Sheet No: 1 15- Of: 011 25 20 WALMARTi, J i w NTERSTONE MWMM 5 Q Li Lisle Line ID Flow Line size Line L IE IE Line HGL HGL noI rate DIA type down'up slope down up (cis) (in) LF (ft) (ft) M (ft) (ft) 1 1 to 2 27,19 36 Or 66 16.50 16,70 0.30 19.50 19.58 2 11 2 to 3 26.47 36 Cir 36 16.70 16.80 0.28 19.70 19.74 3 EX.2 TO 3 10.34 24 Cir 58 17,70 17.80 0.17 19.77 19.87 4 EX.3 TO 4 9.47 24 Cir 36 17.80 17.90 0.28 19.89 19.90 5 EX.4 TO 5 8,89 24 Cir 44 18.00 18.10 0.23 20.00 20.05 6 5 TO 6 8.31 24 Cir 17 18.10 18.20 0.59 20.10 20.12 \\ 7 j 6 TO 7 7.23 24 Cir 232 18.20 19.20 0.43 20.20 20.40 \1J \ (\ 8 I 7 TO 8 5.06 24 Cir 192 19.20 19.70 0.26 21.20 21.27 �� / 9 1 8 TO 9 2,17 18 Cir 180 20.20 20.50 0.17 21.70 21.76 101 9 TO 10 2.17 18 Or 76 20.50 20.80 0.39 22,00 22.02 11 10 TO 11 1.81 18 Cir 112 20.80 21.00 0.18 22.30 22.32 121 11 TO 12 1.08 18 Cir 36 21.00 21.10 0.28 22.50 22.50 / 13 i 6 TO 6A 1.08 18 Cir 17 18.50 18.60 0.59 20.13 20.13 NOTE WELL: \ ISTING PAVEMENT OFF -CENTER IN R/W �/ 14'i 7 TO 7A 1.08 18 Cir 17 19.40 19.60 1.18 20.90 20.90 i �/ / THROUGH THIS CURVE BECAUSE 15 � 7 TO 7B 1.08 IS Cir 17 19.40 ' 19.60 1.18 20.90 20.90 F.HYD. ` 16i 8 TO BA 1.45 18 Cir 17 20.00'20,20 1.18 21.50 21.50 OF R/W TRANSITION FROM 70' TO 60'. 17' 8 TO 8B 1.45 18 Cir 17 20.00 '20.20 1.18 21.50 21.50 (f1 G 18 j NEWS TO 4 15.26 30 Cir 172 17.30 17.50 0.12 19.80 20.00 N a ,, n/ , / p 19i NEW4 TO 5 14.11 30 Cir 204 17.50 17.80 0.15 20,01 20.20 • % \ \ C) `�TV 0 �;cJ 70 -6"PV 205 TO 6 12.37 30 Cir 392 17.80 18.10 0.08 20.30 20.60 •�\ N� / C NDUIT 2 21 6 TO 7 9.85 30 Cir 372 18.10 18.40 0.08 20.61 20.78 T PICAL _ 22 7 TO 8 7.83 24 Cir 356 18.80 19.00 0.06 20.80 21.16 co CA 8 �� 23'' 8 TO 9 4.26 24 Cir 36 19.00 19.10 0.28 21.17 21.18 + 42 \� 24 9 T❑ 10 3.68 24 Cir 94 19.10 19.30 0.21 21.21 21.21 • / \ 25, 10 TO 11 2,42 18 Cir 94 19.30 19.50 0.21 21,21 21.25 / \ NOTE WELL: i �o I I 2 2 I I oi NOTE \ \ \ \ \ W \ SEE ADDITIONAL PLANS FOR POND RE -PERMITTING, \ \ \ \ AND EROSION CONTROL. I ' WEST GATE DRIVE WE T 50' V. 4. . 30 30 1.61 6 6A I (ti 5 5A O oo 36 LF o 0r 06 18"RCP oy w w © C.6% I-' twin 0 0 36 LF N 18 , CP °y w @ 0.6% EJ 25 1 25 1 ADDED NOTE THAT C-900 PVC OR DIP REQUIRED OVER 12' DEPTH 7-18-06 REV. NO. REVISIONS DATE 20 WET SW8 1 15 Omni] �apy,{ght Hanger Design 8ervlaes P.A.. All rights reserved Reprodueflon or use of the contents of this document, or additions or deletions to this dowmanf, in whds ar part. without mitten consent of the Land Surveyor or Engineer, is prohbited. Only copies Isom the origlnol of this document, mocked with the originol signature and will seal of the Surwyw or Engineer, shall be conddered to be wild and t-v copies. PLANS & PROFILES of WEST GATE DRIVE W E STGAT E A Southern Village of Homes and Commerce LOCATED IN TOWN OF LELAND BRUNSWICK COUNTY, NORTH CAROLINA r k. ,It8 Ci r �0�$ s '$. DEVELOPER: li� S0� e 9 � OCEAN GATE, LLC �� PO BOX 3167 ®�« SE L WILMINGTON, NC 28106, (910)-791-1196 20007 c. Q 'Pf 6�f HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLAN/'VERS 319 WALNUT STREET ---� "7 y., , 0 & WILMINGTON. N.C. 28401 dhollis@hdsllm.com PHONE: (910) 343-8002 DatC: 6 - 23- 06 Scale: 1"= 50' Drown: DSH Checked: DSH Project No: 6309-mstr2-dh Sheet No: 2 15 Of: L:1 EX 0 26 RT--- 8"FORCE MAINS NOT SHOWN GRAPHICAL L 261 11 TO 12 1.84 18 Cir 36 19.50 19.60 0.28 21.25 21.26 .. \ \ 27 12 T❑ 12A 1.26 18 Cir 94 19.60 19.80 0.21 21,26 21.28 IN PROFILE (SAME DEPTH AS WATER MAIN) \� C \\__ I- - ALL PLACES. MANITAIN 36"COVER AND 28' NEW4 TO 4A 0.58 18 Cir 36 18.50 18.70 0.56 20.01 20.02 3LtF EXISTING c_ \ V'E DIP AT CROSSINGS WHEN REQUIRED, 29 5 TO 5A 0.87 18 Cir 36 18.80 19.00 0.56 20,30 20.30 _ _ _ "1 SEE AVER SHEET NOTES. 30� 6 TO 6A 1.26 18 Cir 36 19.00 19.20 0.56 20.61 20.61 r ' all 7 TO 7A 1.01 18 Cir 36 19.30 19.50 0.56 20.80 20.80 n _ 94LF \ \ ACT 3 I 38 8 TO SA 3.00 18 Cir 104 19.00 19.20 0.19 21.17 21.25 STA 16+62 _18, �Z 18 \ EX.18'LT 62 RT \ 33 8A TO 8B 1.73 18 Cir 105 19.20 19.40 0.19 21.25 21.27 \ \ \ 398`F \ \ \ \ \^ _^ 3� 8B TO 8C 0.87 18 Cir 36 19.40 19.50 0.28 2L28 21.28 w\` Ndtesi �� _ \ \ ♦ ♦ Pro,Ject file: 6309-west.stm � / � 4- � ` `\ \ \ Q�j \ \ RE�turn period = 25 Yrs. 0000 .1\" \\ 0100 CATCH BASINS `20�CF \ \ ♦ \ �� ��'� STA 15+ 15 \ \ 18'LT-18'RT CL 3 EX.SMH �DWQ SW8 051 112 L=326.70' STA 17+34 \ R=455.00' \ ♦ 3 EXISTING A=41'08'22' \ \ ♦ \ ♦ - CATC SINS C LEN=319.73' \ \ \ \ BRG=S 82'36'51" E CATCH BASINS \ NOTE : STA 13+00 5 \ \ \ \ SMH-19 FOR PUMP ST 18'LT-18'RT \ \ ♦ �\ \ ♦ ♦ \ STA 10+4 DETAILS SEE HEET 13 \ \ �coN \ \26'RT o0 Y. \ \ 19 ♦ \ CATCH BASINS \ ` \ \ ♦ \ \ \ STA 9+05 �\ 18LT-18RT ti \ 6A 40 \ \ \ 5 CCN- o / Z C, Wq�k ^ // o J CATCH BASINS p \ \ ♦ \ IV �, Q = STA 5+25 + \ \ \ ♦ \ \ _ TeR / to �? 18'LT-18'RTI \ 6 Fo � �\�372LF �- _. - ----- C MAl- \ J \ 20 _ 8" GV BnGV TRACT 10 1 - Q MF-M 270LF 21 SMH-20 F•HYD STA 7+81 �. FOR FUTURE CONNECTION j SMH-21 / MAINTAIN CLEARAL STA 5+21 C BETWEEN FORCE MAIN 25 LT \ \ AND WATER MAIN OR CL USE DUCTILE IRON PIPE TRACT L=284.70'9 C LEN=282.2 MF-M F \ / R74.41'22" W / � FROM N MATCH LINE TYPICAL j / 50 25 0 50 100 150 / SCALE IN FEET: 1 = 50 80 V.C. 50' V.­41100' V.C. 100' V.C. i 0 100' V.C. + 100' V.C. 100 V.C. o -4.00 .54% o - .27%O o ,� .00%- O I o 0 1,00% - o d.75% oo -1. 0% o0 20 + 0.90%,'' 30 4 �•i& P, N 07 O 'r O O O O (MD O tb N 1 „ l Ln (� � M N !rl tl) _ N d f7 Ki 4 d (1) U7 (n (17 ([l cf) t1) N N N N N N N N N N N N N N (v N N CV (V N 17 00 16 50 16�00 I 15�50 15�00 14+50 14�00 13t5o I 13+00 12 19 0 O (AI O O 00 t0 to 'T to n o0 'T I N O O I ub I N (0 It O N Ln � ^ f\ (0 N O ID N N M O QV N O (10(6 m (0 c0 (o (6 (6 O (6 (D Lin 0 0 6 (0 4b (.6 (6 u'i N N N ; N N N N N N� N N N N N N N QN N N N 12+00 1 11 �50 I 1 1400 1 1050 I 1000 1 9+50 1 9�00 1 81111150 1 08 }00 1 7�50 TH 20 1 1 z 15 A Line Line ID Flow Line size Line L IE IE Line HGL HGL ` , I I I no. rate DIA type down up slope down up 1 \ LA \ (cfs) (In) LF (ft) (ft) (%) (ft) (ft) 1 I I to ! 27.19 110 Girl 66 16,50 10170 0130 191% 191%0 \ I \ 2 2 to 3 26.47 36 Cir 36 16.70 16.80 0.28 19.70 19.74 3 EX.2 TO 3 10.34 24 Cir 58 17.70 17.80 0.17 19.77 19.87 I 4 EX.3 TO 4 9.47 24 Cir 36 17.80 17.90 0.28 1939 19.90 5 EX.4 TO 5 8.89 24 Cir 44 18,00 18.10 0.23 20.00 20.05 +00 6 5 TO 6 8.31 24 Cir 17 18.10 18.20 0.59 20.10 20.12 7 6 TO 7 7.23 24 Cir 232 18.20 19.20 0.43 20.20 20.40 8 7 TO 8 5.06 24 Cir 192 19.20 19.70 0.26 21.20 21.27 I 9 8 TO 9 2.17 18 Cir 180 20.20 20.50 0.17 21.70 21.76 1 ' I 0 I 10 9 TO 10 2.17 18 Cir 76 20.50 20.80 0.39 22.00 22.02 11 10 TO 11 1.81 18 Or 112 20.80 21.00 0.18 22.30 22.32 1 I I 0 12 it TO 12 1.08 18 Cir 36 21.00 21.10 0.28 22.50 22.50 13 6 TO 6A 1.08 18 Cir 17 18.50 18.60 0.59 20.13 20.13 14 7 TO 7A 1.08 18 Cir 17 19.40 19.60 1.18 20.90 20.90 15 7 TO 7B 1.08 18 Cir 17 19.40 19.60 1.18 20.90 20.90 ALL ST IPING AND SIGN AGE 16 8 TO 8A 1.45 18 Cir 17 20.00 20.20 1.18 21.50 21.50 TO MU CD STANDARDS. 17 8 TO 811 1.45 18 Cir 17 20.00 20.20 1.18 21.50 21.50 18 NEW3 TO 4 15.26 30 Cir 172 17.30 17.50 0.12 19.80 20.00 I 19 NEW4 TO 5 14.11 30 Cir 204 17.50 17.80 0.15 20.01 20.20 1 4-6°PVC I 20 5 TO 6 12.37 30 Cir 392 17.80 18.10 0.08 20.30 20.60 1 CONDUITS 21 6 TO 7 9.85 30 Cir 372 18.10 18.40 0,06 20.61 20.78 (TYPICAL) 22 7 TO 8 7.83 24 Cir 356 18.80 19,00 0.06 20.80 21.16 23 8 TO 9 4.26 24 CIr 36 19.00 19.10 0.28 21.17 21.18 1 CATCH BASINS I STA2+00 24 9 TO 10 3.68 24 Cir 94 19.10 19,30 0.21 21.19 21.21 1 STA 1+65 25 10 TO 11 2.42 18 Cir 94 19.30 19.50 0.21 21.21 21.25 1 18'LT-18'RT 18 18' 13 SMH 1+75 26 11 TO 12 1.84 18 Cir 36 19.50 19.60 0.28 21.25 21.26 STA 27 12 TO 12A 1.26 18 Cir 94 19.60 19.80 0.21 21.26 21.28 �i-•--1 _� N 3 LF N 25'RT 28 NEW4 TO 4A 0.58 18 Cir 36 18.50 18.70 0.56 20.01 20.02 �� 8B + + 29 5 TO 5A 0.87 18 Cir 36 18.80 19.00 0.56 20.30 20.30 A��-+' �„�r�J� 8C MODERN R O U I (�� V A U 30 6 TO 6A 1.26 18 Cir 36 19.00 19.20 0.56 20.61 20.61 I 15, 15' 31 7 To 7A 1.01 18 Cir 36 19.30 19.50 0.56 20.60 20.80 ( Y 32 8 TO 8A 3.00 18 Cir 104 19.00 19.20 0.19 21.17 21,25 \ ONE W Y ROTA R 33 8A TO 8B 1.73 18 Cir 105 19.20 19.40 0.19 21.25 21.27 I / �/ 34 8B T❑ SC 0.87 1S Cir 36 19.40 19.50 0.28 21.28 2L28 I �] 5" CONCR TE M�NOLIT IC ISLAND ( URFAC MOU TED) I �� �x ~ x23> SEE NCD T 85 .01 Notes TRACT 3 I N tip' 34 FOR ADD TIONA DETAI S. 1 ii 24' NO STRIPING SEE SHE T 15 Project file, 6309-west.stro i1�� 24.25 Return period = 25 Yrs. C-2 I 8A O j�� ° X�� \` CAT H BA INS I NOS a. 12 -.5 °. ° 2s 8 STA 1 +65 1 / xC . ,25.o x \ 18'L -18'R $„GVI STAND-UP ��8 \ i g C&G AND x s ` =3 'B 33 i 2'wiDE, 6„ �7 ��, PC CONCRETE A YI EMERGENCY LANE s CATCH B SINS I /^ SEE DETAIL STA 1+ �/ ° I ° X 18'LT �18'RT ' � 8 GV +2 .o TRIPLE 24"RCP / ° I � � 5 / @ 0 2% 8 ° 8X8 CROSS / FOR FUTURE USE "' n -024 12 5�� o z O zjz STA 3+80 _ F.HYD' x ICP ROUNDABOUT "N N 15' + ONC W ^+ O CATCH BASINS o Z, + ° STAO+00 o . Ln N 8" �Lk Q / = STA 5+25 Ln N 133.00 N g0'29 31 12 WgT£R � 18LT-18'RT N vi f- �- - CA CL S 84"48 0 W CL 133.p0 wti --- �'--- TE � 356LF�DWQ SW8 _0511- 12 - �-n g"FORCE MAINS 34A � _ - 93.0+ i TWIN- SMH-12 ° + \ -_ e 1 I STA 0+83 4-6"PVC o 20 ` 8 GV 8„ V _ +-- --O 2e X 22 BENDS & FI TINGS I 16 RT a CONDUIT$ O Q WEST G w •� -< ° AS NECES ARY (TYPICAL) CL N - TE DRIVE TYPICAL x / - - -- O 9 G : a x2 X 270LF �@21 _ _ 4-6"PVC o 2j� x� A6 ° ^D 0 \ F.HYD. o CONDUITS + SMH-2 ` <,�, „ / FORCE MAIN + (TYPICAL) STA 1 +50 9AX ��s 8 GV 25.0 SMH-20 ` � � cn 27 LT STA 7+81 - / 47 W "' X� 24.5 °° S 82'38 , x �� / 12A 25 LT 2„BO - - - - - 7A / N' / CL 354.21 V) ��� 9Q 4,25 FOR FUTURE CONNECTION 1O ANCE CL T121 0/ 24z / SEE SHEET 15 ''" k MAINTAIN CLEAR A 5+/ 5" CONCRETE MONOLITHIC � L-112.79' STA ISLAND (SURFACE MOUNTED) / l Line Line ID Flow size Line L IE Line HGL HGL no. rate DIA type down up slope down up (ef's) Ems' 6F Eft) Eft) 00 (ft) (ft) 1 19 TO 20 23.98 30 Cir 48 10.30 10.50 0.42 12.80 12.93 2 20 TO 20A 23.12 30 Cir 36 10.50 10.60 0.28 13.00 13.10 3 20A TO 22A 20.54 30 Or 404 11.00 12.50 0.37 13.50 14.31 4 22A TO 23A 18.82 30 Cir 348 12.50 13.30 0.23 15.00 15.56 5 23A TO 24A 17.09 30 Cir 312 13.30 13.90 0.19 15.80 16.26 6 24A TO 25A 15.37 30 Cir 242 13.90 14.20 0.12 16.40 16.68 7 25A TO 27 14.07 24 Cir 55 14.20 14.50 0.55 16.69 16.88 8 27 TO 28 11.12 24 Cir 20 14.50 14.60 0.50 16.91 16.95 9 28 TO 29 10.47 24 Cir 35 14.60 14.80 0.57 16.97 17.03 10 29 TO 30 9.17 24 Cir 389 15.50 16.50 0.26 17.50 18.02 11 30 TO 31 6.87 18 Cir 410 16.50 18.00 0.37 18.04 19.44 I 12 31 TO 32 4.58 18 Cir 311 18.50 20.10 0.51 20.00 20.92 13 P2 TO 33 2.74 18 Cir 234 20.10 20.50 0.17 21.60 21.73 14 33 TO 34 1.43 18 Cir 93 20.50 20.70 0.22 22.00 22.01 15 2OA TO 21 1.72 18 Cir 269 12.00 14.70 1.00 13.50 15.20 16 21 TO 21A 0.86 18 Cir 36 14.70 14.80 0.28 16.20 16.20 \ 17 22A TO 22B 0,86 18 Cir 36 13.50 13.70 0.56 15.00 15.00 18 23A TO 23B 0.86 1S Cir 36 14.30 14,40 0.28 15.80 15.80 \ 19 24A TO 24B 0.86 18 Cir 36 16.90 17.00 0.28 18.40 18.40 20 25A TO 25B 0.65 18 Cir 36 15.20 15.30 0.28 16.70 16.70 21 27 TO 35 2.30 18 Cir 312 15.50 17.50 0.64 17.00 18.08 22 35 TO 35A 1.15 18 Cir 20 17.50 17.60 0.50 19.00 19.00 TRACT 4 23 29 TO 29A 1.15 18 Cir 36 15.00 17.10 0.28 18.50 18.30 24 30 TO 30A 1,15 18 Cir 36 17.00 17.10 0.28 18.50 18.50 25 31 TO 31A 1.15 18 Cir 36 18.50 18.60 0.28 20.00 20.00 26 32 TO 32A 0.86 18 Cir 36 20.10 20.20 0.28 21.60 21.60 MF-M 27 133 TO 33A 0.65 18 Cir 36 20.50 20.60 0.28 22.00 22.00 Notes! Project file: 6309-east.stM Return period = 25 Yrs. I CATCH BASINS STA 4+00 32 18'LT-18'RT CATCH BASINS STA 7+10 n 18'LT-18'RT _ MH-10 I _'- 31A STA 8+07 ��F _ _ �- _51T W8 980403 > M 11 -37 WEST GATE DRIVE F!!2 MAI g' I 330LF QP ��- - - 389LF - `. t 3! !2A� t,- F�Z - D �0) SMH -11 '�- `�� •••� w CL + STA 4+19 - -"ft. 410LF o L=171.02' $ 25'RT Ln CL S 82'23'37" FH p o R=655.00' o E 288.19 �•- A=14'57'36' o I 31 C LEN=170.54' 7 BRG=S 89.52'25' E / BETWEEN FORCE MAIN R=645.00' AND WATER MAIN OR - • SEE NCDOT 852.01 r H BASINS I U USE DUCTILE IRON PIPE=10 O1 09 / OR ADDITIONA TAILS. ST 1+65 C LEN=112.65' / 11 0 1' T-18' T BRG=N 87'39'21' E ' "' I TO MATCH LINE (TYPICAL) �' 3g F 12 SMH 23 2"BO 23 ST 1 +6 / / \ FOR FUTURE LT CONNECTION rEM g -/ DE Sr +OS0-11 GOW OTA TRACT TRACT 7 Z, MF-M MF-M / ;, � RACT 8 / w / MF-M / C0 1 50 25 0 50 100 150 SCALE IN FEET: 1 "= 50' 200' v.c, < WEST GATE DRIVE EST o WET GATE D �IVE EAST 10 ' V.C. N89%1 o 1.18% 0 0 1. 1 % ,0n RI�MH-22 = 24.1 30 20 5 7 21 MM TAILED ME MIN VIEW IMM IMM �� M =IMMMOM �r�llllliri�� � • i 15 ���r.•�•>r>•�I���®sari N �-=-' ' - --RI• lid MON � TRACT A MF-M 100.1 V.C. 1.1 % 0 0-1.0 32 100'I V.C. 1.0 % �+ 11 0 2001 V.C. I I I i W, 1 10011 V.C. lop, V.C. -1.61,',0 _., 1.0% � 30 31 RTH SOUTH WWI MMMME MMMMM • .. ..PLAN VIEW PROFILESPLANS & r_ ►•6-23-06 IN WESTGATE �i�liiiiftrl■:liiiiiiiiiiii•I� �m m ��m����_�r.11�■���1 ■�_ l _��� ���� [r7 [ I ■ IMMMI tri A Southern.•- of • - and Commerce I IMMMEM LOCATED iN TOWNOF r � .. ��rT=lii�ll7ii����l,711�� - ��■ T7�T�� ►ii�eT7iira� �eT7ii�7i�� _ eCOUNTY,NORTH - • , . � _-�1■'!'�:i������ � - ; ���:i� G�11i�3►3<ii>• �' �i��►I�?r"� �■L/�ii■� �I�� ������' ��I ��I������I� �I A 1-����i� � Ir��l� �I ��1 rail ! ■■��■■�MIT MMMME PO BOX 3167 Ld v)W @ Q.3o''-'Ed Cr N LJ _ CY) 0) N 24 0.2 w (s0.2 �w@0.%w ry w @0. _ 3- - N vo W J@ 0. L 2%UJ Ilk AQ 7 W w � 36 F � . a ••••••••q°tj " HANOVER DESIGN SERVICES P.A. 3 0 `2 318"R Pw°o gAee ti(� °� U) '` 'i' V ® 0. �w •�® Y LAND SURVtYORS, ENGINEERS & LAND PLANNERS 1 319 WALNUT STREET ( ` p WILMINGTON. N.C. 28401 dhollis@hdsiirn..com PHONE: (910) 343-8002 Sheet No: 3 15 Of: C ✓ \ PI 1+01.05 Ltvv PI 0+38.88 =STA 20+90 NOTE WELL: NEW TWIN 8"FORCE MAIN TO BE PLACED IN EXISTING EASEMENT. CONTRACTOR TO EXERCISE EXTREME CARE NOT TO DAMAGE EXISTING FORCE MAINS ALREADY IN PLACE IN THE EASEMENT. \ 78 \ 3+ 00 E.C.M. / r \ \ 63 /<\ .O 62 \ 76 \ \ \\ \\ // / \ >_7 7 G' �N \ \ Ilk y// // \\ \ 60 \\ 52 C.M. \ ; ♦� 20'D.E. \y/ /// /// \\\ \\ \\� / // \\ /// \\ \\ 57 /,/ \\ `� �/ /✓ �/ \\ \\--''-�\ 100, // PROPOSED \\ \ // \\ // ,' 16+00 -.�'Qp BIRCH CREEK \ \\ / 15+00 SUBDIVISION ^ \� 53 59 ,(/ 56 // \ / / PI 15+61.43 / R 20'D.E, E.C.M. y / / �� / 17+00 // / �T--,58 14+00 / / » _ 5+ 00 — � — / 3+89.36 _ — / _ _4-�\ // / 7+00 AIR RELEASE ItC 20'UTILITIES EASEMENT VALVE, SEE 13+ OO [=tTi— \ \ I ��j I DETAIL \ / / / / t...� .. G 8+00\\\ I �' C(SQ) I MIN. \ / / 16" _ T III ... \ MIN. ' III It \/ / PLAN 12+ OO D(sQ) A A BENDS PIPE ZONE \ \ \ / / CUT TO PLAN AND ELEVATION ST3�ANSHOR PLAN PIPE ZONE \ / / NEAT CUT -BACK TO BE PLUGS TEES 45'ERFORED AFTER III EDGE TRENCCHMB CKFILL NG \ \ / (TYP.) AND COMPACTION : I I 6" O.D. 6 6" O.D. 6" 1 O+ OO \ \ / / F:'!STINc MIN MIN / \ \ / BiiUMNous PAYMENT LIMB d — — �$— MIN MIN \ \ / SURFACE TYPE I-1 oN.C.D.O.T. SPEC. "MIN: = m dE.LP. \ — -III—III-111- FINAL BACKFI CLASS 1, 2, OR 3 PIPE SIZE AS INDICATED ON THE PLANS — CLASS 1 OR DUCTILE IRON PIPE z_ STABLE FOUNDATION MATERIAL FINAL BACKFILL�� PIPE SIZE AS INDICATED ON THE PLANS --, INITIAL BACKFILL CLASS 1 — PIPE BEDDING DETAILS N.T.S. PVC PIPE STABLE FOUNDATION MATERIAL v/11 +00 PI 10+78.26 EXISTING —�/ j BASE COURSE 12 :.'.'. .. . COMP.','TED A.B.C. NOTE: BACKFILL TO BE INSTALLED IN 6"LIFTS (MAXIMUM) AND COMP"CTED TO A MINIMJM DENSITY OF 95% AS DETERMINED BY THE MODIFIED PROCTOR A, METHOD. D.I.P. IF COVER LESS THAN 36" NOTE: DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY NORTH BRUNSWICK SANITARY DISTRICT. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A GUIDE. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL TOWN, DISTRICT AND STATE ENGINEERING CODES AND CONSTRUCTION STANDARDS. 12" _ SECTION C—C D(SQ) BENDS AND TEES NOTE: Au vEm PLws Am so= O LLL BE BLACKED AGAINBT FM ENM 45' VERTICAL BENDS wff" CL"M c COMM PIPE DIA. 90' BENDS 45' BENDS 22 1/2' BENDS TEES PLUGS 45'VERT. A B A B A 8 A B C D D 3" 8" 10" 5" 10" 3" 8" 5" 12" 6" 14" 21 0.2 4" B" 10" 5" 10" 3" 8" 5" __12 6" 14" 21 —6 _2 6" 12" 8" 9" 8" 6" 8" 12" 8" 10" 20" 27" 0.4 8" 14" 12" i2 10" 8" 12" t4" 12 12" 26 33" 0.8 STANDARD THRUST BLOCKING N.T.S. PIPE TRENCH WIDTH PAVEMENT REPLACEMENT 50 25 0 50 100 150 FOR PIPE INSTALLATION N.T.S. SCALE IN FEET w w cwn J W I.IJ K Q > O 20.00 20.00 i _. 15.00 10.00 10.00 I 5.00 — w 5.00 14+ .00 15+ .00 16+ .00 0.00 13+ .00 0.00 vc PLANS & PROFILES of FORCE MAIN SEWER WV E S T G A T E A Southern Village of Homes and Commerce LOCATED IN TOWN OF LELAND BRUNSWICK COUNTY, NORTH CAROLINA Oats: 6-23— 06 sc°'° 1 "= 50' 10+ .00 11+0 00 12+0.00 -5.00 Drown: .n, �,.. V s; �3l Q SEAL OOQ7 `` ' . t. sr°"` dhollis@hdsilm.com DEVELOPER: OCEAN GATE, LLC PO BOX 3167 WILMINGTON, NC 28105, (910)-791-1196 DSH Checked: DSH -10.00 00 Project No: 6309-mstr9-dh Sheet No: 9 15 ot: 3+0 00 4+0 00 5+0 00 6+0 00 7+0100 8+0 00 9+0 00 HOVER DESIGN SERVICES P.A."a-� LAND SURVEYORS, ENGINEERS & LAND PLANNERS WIL WALNUT STREET WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 0+0 00 1+0 00 2+0 REV. N0. RREVISIONS DATE NO. 11 GAUGE & BEVELED GALVANIZED STEEL BAND * NOTE: WITH BOLT AND NUT A WOODEN ENCLOSURE, SUITABLE TO THE 3/8" DIA DIAG. TENSION RODS AT EACH OWNER MAY BE SUBSTITUTED FOR FENCE. GATE & CORNERS OF LINE FENCING (TYP.)� WELDED 2" DIA. GATE FRAMES (TYP.) ONE TENSION WIRE i CLIP EA. LINE POLE (THE 6 OUNCE MIN.) I!'• > > ;I t I. TOP HINGE PER MANUFACTURER I; x: �, x" Xf HEIGHT OF BRACE SHALL BE --- IN ACCORDANCE WITH F-.--- MANUFACTURERS SPECS. I<' : : ♦ �,' ,•� I. 3/8" MIN. ROUND ROD WITH TURNBUCKLE r TENSION WIRE 140. 7 GAUGE GALVANIZED COIL SPRINGS _4� i/2' { STRETCHED OUT Iy` CROWN GROUND CLEARANCE 3" I ✓ x MAXIMUM 1" MINIMUM II-�r BOTTOM HINGES PER (TYP.) MANUFACTURER CONC. FOOTING 1'D" DIA. (TYP,) 1'2" DIA AT CORNER AND POSTS 10'0" MAXIMUM MUSHROOM TYPE GATE ANCHOR FENCE DETAIL NOT TO SCALE TOP ROLL LINE ROLL DIMENSIONS AND WEIGHTS: NOMINAL DIAMETER AND MINIMUM WEIGHTS FOR ALL CHAIN LINK POSTS, FRAMES AND GATES SHALL BE IN ACCORDANCE WITH THE FOLLOWING TABLE: USE AND SECTION OUTSIDE DIAMETER MINIMUM WT. PER FOOR NORMINAL INCHES NOMINAL POUNDS END CORNER AND PULL POST (TUBULAR FABRIC HEIGHTS, 8'0" 2.375 3.65 AND LESS: ROUND OVER 6'0": ROUND 2.875 5.79 INTERMEDIATE POST FOR FABRIC 1.90 2.72 HEIGHTS (TUBULAR) 6'0" AND LESS OVER 6'0" 2,375 3.65 RAILS AND POST BRACES 1.66 1.35 GATE POSTS FOR NOMINAL WIDTH OF GATE SINGLE OR ONE LEAF OF 2.875 5.79 DOUBLE GATE WIDTH 6'0" OF LESS: ROUND ISO" OR LESS: ROUND 4.00 9.10 13'0" TO 18'0": ROUND 6.625 18.97 OVER 18'0' 6.625 24.70 GATE FRAMES 6'0" OR LESS IN HEIGHT 8'0" OR LESS IN WIDTH: 1.660 1.806 ROUND GATE FRAMES OVER 6'0" IN HEIGHT OVER 8'0" IN WIDTH 1.90 2.72 ROUND NOTES FOR SITE PLAN: 1. ALL STRUCTURES TO BE PARALLEL AND PERPENDICULAR TO EACH OTHER. 2. PROVIDE 3 FT MIN. SEPARATION BETWEEN ALL STRUCTURES AND TO FENCE. 3. AREA INSIDE FENCE TO HAVE 6 MILL BLACK PLASTIC BENEATH 4" No. 57 HEIGHTS TOWER SYSTEM WASHED STONE. 80-7-100 ALUMINUM 4. UTILITY METER BASE TO BE LOCATED OUTSIDE OF FENCE. TOWER W/ 2"MAST 5. ACCESS DRIVE AND TURN AROUND (WHERE REQUIRED) TO BE 6" ABC MIN. OR EQUIVALENT, TO CONFORM TO NBSD 6. FENCE GATE MUST ALLOW DIRECT ACCESS TO WET WELL. SPECIFICATIONS, TELEMETRY NOTE: FENCE GATE MUST BE 14' WIDE. INSTALLATION BY NBSD. 7. CONTRACTOR TO COORDINATE ELECTRICAL HOOKUPS WITH APPROPRIATE AUTHORITIES AND AGENCIES. 30' LOCATION OF CONTROL 3' 10' PANEL, ALARM, VENT, CONCRETE 3' WESTGATE AND LIGHTING, ETC. TO BE GENERATOR 4' COORDINATED WITH PAD PUMP STATION No.2 PUMP AND WET WELL PRECAST WET WELL 8X10 NORTH BRUNSWICK MANUFACTURERS AND TRASH N SANITARY DISTRICT APPLICABLE AUTHORITIES. BASKET p & RAILS GENERATOR TO BE ® El O PROVIDED AND MOUNTED NEW AS PER MANUFACTURER'S NEW 8" (IN) AREA LIGHT RECOMMENDATIONS BY MH A CONTRACTOR. CONTRACTOR TO GRAVITY 6"CHECK POWER COORDINATE NTH NBSD, VALVESFF ENGINEER AND 6"GATE 3"QUICK ® METER MANUFACTURER. SEE SPECIFICATIONS, VALVES DISCONNTTEEEC STANDBY POWER GENERATOR TO BE 6X8 REDUCERS 8'GA DETRO17 DIESEL SPECTRUM MODEL, NTH LL 3, 48-HOUR CAPACITY SUB -BASE FUEL TANK OR EQUIVALENT. SFF SPECIFICATIONS.N PRECAST VALVE BOXES HOBIB R/W tLOCKABLE w 3 5 14' GATE EXISTINGFLOW FLO 5; TWIN 8" WETWELL Z Q GRAVELMETES IF L Ld Ld SDR21 PVC TO BE CONVERTED � ENTRANCE FM OUT TO MANHOLE ao EXISTING H BENDS & FITTINGS NEW a"GRAVITY ® 8"GRAVITY 3 AS NECESSARY TWIN 8"FM BENDS & FITTINGS CURB & GUTTER AS NECESSARY NOTE: ITT FLYGT CONTROL CENTER CONTROL PANEL TO BE SIZED FOR SUBJECT TO ENGINEER'S SPECIFICATIONS Access X 48"Double Door INSIDE PLAN VIEW PHASE 2 PUMP UPGRADES. PUMP HOISTS NOTE: Access Hatch Factory Mounted TO BE SIZED FOR PHASE 2 PUMPS. AUTOMATIC DIALER TO BE (WALL, POLE, OR PEDESTAL MOUNTING) ALUMINUM Cast -in Socket 150 PSF ALU KAYE INSTRUMENTS, INC. DIALOG PLUS" JUNCTION BOXES (NOT SHOWN) FOR THE +'T. r : "',. CONTROL PANEL PUMP CABLES MUST BE LOCATED ABOVE Factory Mounted o BY FLYGT: THE FLOOD ELEVATION. 1.,• Cast -In Socket 10t'. '-0" 4'-0" 4'-0" 2-0 24"X24"" Double Door Trash Basket : 72" X 48" 150psf 6' PANEL PEDESTAL Alum. Hatch 3" PVC Vent w/Bronze „ 32%48" 150 sf Access Hatch Insect Screen Typ.) 32 x48 150psf P 150 PSF ALUMINUM Influent Pipe "Ll!i Trash Basket Alum. Hatch Alum. Hatch Alum. Hatch 8" ID..D.,-Top Elev.C_ o o -Finished -IPVCGrade LIFT -OUT mVENTW/LIFT-BAIL 6" • Stn. Steel Gasket ! Check Valve Gasket Gasket Gasket:s:.', • ..': '. Float Bracket SEE DETAIL Type Type Type Type 3" PVC VENT 3" PVC DRAIN Note: "C" Seal Seal Seal Seal - NOTE: Suitable Trash Basket & 6X8 Reducer CONTRACTOR TO VERIFY THAT ACCESS HATCHES > removal guide rails to ARE SUFFICIENTLY SIZED AND POSITIONED TO ALLOW ",;� 6" be supplied by Installed by / Contractor ADEQUATE ACCESS TO PUMPS, VALVES &BASKET. r a a Check .. contractor & installed Guide Rail Brackets "M"-q Discharge I ,o . . at influent pipe, PLAN VIEW 9=w valve Elev. coordinate w/ NBSD staff. " 3�aL3 6 0<�0 ® 6„ See specifications. Gates; Gate ' Valve m Valve Station NOTES: Height 3"PVC Drain 6"Gate 8X8 BeT1. LOCATE ANCHOR BOLTS USING CLEAR INSIDE 3"Guide Bar to Wet Well EDGE OF ACCESS FRAME AND CENTER LINE Stainless Steel Valve 8"Gate `• • �� Valve OF PUMP AS REF. POINT. BOLT LOCATIONS 6 Flanged DIP Brick or Block MUST BE HELD TO MAINTAIN EXACT POSITION 6X8 6X8 OF PUMP RELATIVE TO ACCESS FRAME. ReducerR Reducer *: Support (typical) 2. GROUT OPENING FOR ACCESS FRAME. „E„ ' Note: 3. CONFIGURATION AND DIMS. SHOWN ARE SUGGESTED '; •.+ INBase het t be modified by REQUIREMENTS ONLY. ALL DETAILS, INCLUDING TERMEDIATE height and riser heights y hts may g Influent Pipe Trash Basket GUIDE BAR BRKT. manufccturer if desired, as long as overall Station SIZING OF PIT, TYPE, LOCATION AND (Inv. Elev.) ::• •' (USED FOR GUIDE height and critical elevations remain as Shown. ARRANGEMENT OF VALVES AND PIPING, ETC. ARE FT. TO BE SPECIFIED BY THE CONSULTING ENGINEER „s.. BARS OVER 20 LONG) AND ARE SUBJECT TO HIS APPROVAL. Intermediate `• (2) Submersible 4. INITIAL PHASE 1 PUMPS TO BE MODIFIED Riser Height Non -Clog Pumps TO OPERATE ON THE 3 STAINLESS GUIDE RAILS. Conavalve Vault '' "F° "ALARM" Elev.: = •;: Supplied & Installed SEE DETAIL A" By Contractor ITT FLYGT Inside Dim.3X6 or greater w/access hatch "G"-"LAG ON" Elev. ' - Model No.NP3127/NP3202 - 10 HP and 60 HP "H"-"LEAD ON" Elev._,..,. _4 SEE SPECIFICATIONS "J"--"OFF" Elev. _ SEE DETAIL "B" ITT FLYGT LIQUID LEVEL SENSOR (4x DUPLEX) 6" Universal Liftouf Elbow - Installed by BASE Contractor Invert Required HEIGHT 3"Concrete Pad %: Installed by Contractor Anti -Flotation O Lip „ Base Extension a. " „ K"-Wet Well Floor Elev, 8" ..:,:•.." . ,:•';t:. •,: 'i .. " . '�,a a�..'. ' o _ „L"-Bc'torn Ele- 0000ao ouoo�> p0 Door 100000oc"-0.00r' ''IOa+J.`+� Mtn. 12" Compacted stone ELEVATION SIDE VIEW' Note: Wall thicknesses and slab thickness, as well as reinforcing as per Manufacturer's recommendation. Rock base as per Geotech Consultant's recommendations. / a INSIDE o° a ., � OUTSIDE Butyl Rubber 4 Sealant - Apply To A Clean, Dry, e & Dust Free Surface Non -shrink G e Grout - Pack a Into Joint After Setting Of Section a.. .4 a DETAIL "A" DETAILS N.T.S. / 3/4" SS Bolt \ Threaded Insert cast -in DETAIL "B" NP3127 NP3202 PHASE 1 PHASE 2 DIMENSIONAL DATA 10 HP 60 HP "A" Station Height 28'-0" 28'-0" Base Height 6'-0" 6'-0" Intermediate Riser Height 5'-0" 5'-0" Number Of Risers Required 3 3 "C" Finished Grade Elevation 21.51MISL 21.51VISL "D" !Top Of Wet Well Elevation 22.OMSL 22.OMSL "E' Invert Of Influent Elevation 5.OMSL 5.OMSL "F" High Water "ALARM" Elevation 5.0MSL 5.0MSL "G" "LAG ON" Pum Elevation 4.oMSL 4,OMSL "H" "LEAD ON" Pump Elevation -2.01VISL 3.OMSL ",1" "OFF" Pump Elevation -4.01vISL -4.OMSL "K" "Wet Well Floor Elevation -5.OMSL -5.OMSL "L" Bottom Elevation -5.7MSL -5.7MSL "M" Discharge Elevation 18.OMSL 18.0MSL Precast Structure Stainless Steel Expansion Joint Stainless Steel Pipe Clamp Rubber soot ASTM C923 FLEXIBLE PIPE CONNECTOR DETAIL "C" Flc Ad Clamp on Transit Time Ultrasonic Flow Meter Panametrics Model DF868-1-11-1 or equivalent Conc.Valve Vault Inside Dim,3X6 or greater w/access hatch NOT TO SCALE Allow 1/2" Clearance Between End Of Pipe & Face Of Ck. Valve DETAIL Valve w�• n•�u s• e Il�Jll Ilw � No WEST GATE DRI w� PUMP STATION CONNECTIONS CL N.T.S. d 24" X 24" Trash Basket Access Hatch 150 PSF ALUMINUM 72" X 48"Double Door Access Hatch 150 PSF ALUMINUM 3" / PVC Vent w/Bronze Insect Screen (Typ.) ter-- -Top Elev:'D" Finished Grade Note: Suitable Trash Basket & ' removal guide rails to ;`.. be supplied by contractor & installed at influent pipe, coordinate w/ NBSD staff. Sf' I • ee spec . 2'-0" 4'-0" 4'-0" "E„ Influent Pipe (Inv. Elev.) ITT FLYGT LIQUID LEVEL SENSOR (4x DUPLEX) „F "ALARM" Elev. "G" "LAG ON" Elev, ' "H, "LEAD ON" Elev. "J "OFF" Elev. 3"Concrete Pad Installed by Contractor 17 - .� 8„ "L" •.. ••�OOo OOO��p oUn 00p 00 Do^or ')oao° Min. 12" Compacted Stone Note: Wall thicknesses and slab thickness, as ELEVATION REAR VIEW well as reinforcing as per Manufacturer's recommendation. Rock base as per Geotech Consultant's recommendations. WEDGE / 0 ANCHORS K�l � ; 1/4"SS PLATES 1/2"SS ROD -' PARTS TO BE STAINLES STEEL tv to STAINLESS DROP PIPE STEEL NUTS TYPICAL STAINLESS STEEL ANCHOR STRAPS N,T.S, i FLYGT ITT FLYGT CORPORATION, TRUMBULL, CONNECTICUT 06611 PORTIONS OF THIS DOCUMENT ARE 7HE PROPRIETARY PROPERTY OF ITT FLYGT CORP. IT HAS BEEN FURNISHED UPCN THE CONDIT CN THAT IT SHALL NOT BE RELEASED, DUPLICATED, USED, OR DISCLOSED IN WHOLE OR IN PART FOR ANY PURPOSE WITHOUT THE EXPRESS WRITTEN PERMISSION OF 1 ITT FLYGT AND SHALL BE CONSIDERED CONFIDENTIAL INFORMATION. NOTE/ SEE SPECIFICATIONS FOR ADDITIONAL DETAILS. ALL CONSTRUCTION TO CONFORM TO APPLICABLE STATE AND TOWN CODES. 2 RE111SED WET WELL TO RECTANGULAR BOX 5-'7-06 1 ADDED HEIGHTS TOWER SYSTEM TELEMETRY TC',','ER 7-'8-06 REV. NO. REVISIONS DATE �+ Copyr4hf 0. Hanover Design Services, RA., M rights reserved Rwrvductlan x use of the contents of Phis docowr x ac:": b-z x deletkm ro s document, in whole or port, without "rittw,, consent of the Lond Surveyor ,Y £ng:es,, .s PrCAWted Only Copies ham IM ar:pr,;Y o` �d dOsumenL marked with the OdOwl sloe cture and agvrel seal of the Surveyor or Fnglneer, sha be cons wed to be vdid and true copses C P-3127/3202 ACCESS COVER N 1 G K REF. LINE S 8 (CLEAR INSIDE EDGE) I 9 s 41e 516 I POWER CABLE TYPICAL SIMPLEX 3" GUIDE BAR (2x) (SCHEDULE 40 PIPE) TYPICAL DUPLEX (NOT BY ITT FLYGT, CUT TO LENGTH AT ASS'Y) STD. CLASS 125 I..I C.I. FLANGE 111 (NOM. SIZE) MIN. LIQUID LEVEL IF Eo - -� O J T o NOTES: 1. DIM. TO ENDS OF GUIDE BARS, 2 \ 2. REPRESENTS CLEAR 3"CONCRETE PAD U 25 W INSIDE EDGE OF ACCESS INSTALLED BY CONTRACTOR FRAME OR OPENING. REF. LINE 02 3. SEE STATION DWGS. A� FOR COMPLETE INSTALLATION DIMENSIONS. DISCH. D C I B �7\ 4 DIA, ANCHOR VIEW FZ - l BOLT (4x) nI nike rcnlcinflc onl Itlf'IIFC TYPE NOM. SIZE VERSION WEIGHT (LBS) PUMP DISCH Cl/SST Cl/SST NP3127 6 MT 335 120 NP3202 11266 177 TYPE NOM, SIZE VERSION DIMENSIONAL CHART A B C D E F G H J K L M N P R S T U V W NP3127 6 MT 4 11 10 5 SEE CALCULATIONS AND SPECIFICATIONS BOOKLET. NP3202 8 HT 2 11 10 s FINISHED GRADE MANHOLE FRAME AND COVER ii r5'��'GRADE ADJUSTMENT RINGS OR BRICK AND MORTAR • . •A 8"MAXIMUM PIPE STRAP SUPPORT STAINLESS STEEL 5'DIA DOGHOUSE !4 PRECAST CONCRETE FLEXIBLE HOSE 5' DIA MANHOLE OR VAULT FLAT TOP 1/2" SHUT OFF - ' AIR RELEASE rn VALVE 'J I 1' BLOW j OFF - 2' UNION SEWAGE AIR 0 2' GATE VALVE RELEASE VALVE ° ' TO BE VAL-MATIC 300 10'MJ FLAMED TEE OR EQUIVALENT W/ BLIND FLANGE TAPPED 2X2 BRONZE NIPPLE #57 CRUSHED STONE AIR / VACUUM VALVE VAULT N.T.S. NPT YARD SPIGOT m N 4" CONCRETE PAD BEDDING AS ........ SPECIFIED 3/4"SERVICE LATERAL YARD HOSE BIB N.T.S. PUMP STATION DETAILS WESTGATE-Pump Station No.2 LOCATED iN THE TOWN OF LELAND TOWN CREEK TOWNSHIP BRUNSWICK COUNTY NORTH CAROLINA � age'f4e71!•td CAR Kg1• bec am SE At 20�C� 7 se I���_�°- �"�! MEN-•r ti r i 7, CDC dholl's s hcsilm.com Date: 6-23-06 Scale: N TS Drawn: DISH, OTHERS Checked: OWNER: OCEAN GATE, LLC. DSH PO BOX 3167 WILMINGTON, NC 28406 Project No: (910) 791-1196 6309-msfri3-dh HANOVER DESIGN SERVICES, P.A. Sheet No: LAND SURVEYORS, ENGINEERS & LAND PLANNERS 1%3 WIL WALNUT STREET PHONE: ON,(91 N.C. 28401 15 PHONE: (910) 343-8002 Of: CAST IRON FRAME & VARIES FOR WOODS OR COVER, TOP TO BE FLUSH PAVED WITH STREETS, WALKS, OR —OTHER OTHER AREAS OUT OF TRAFFIC, TOP TO BE AS RESIDENTIAL AREAS. 3/8" CEMENT NOTED ON PLANS. ON UNPAVED ROADS PROVIDE MORTAR 8" COVER OVER LID, AND SET LABELED CONCRETE MONUMENT, NEAREST R/W LIMIT. : :::..:.....:..:....:::.. MANHOLE FRAME & COVER / T i CONCRETE COLLAR 12"MAX. 8D o'. 24" MIN, W 0 4' CONCRETE SPACERS FOR U .' ADJUSTMENT TO GRADE V D z W U ,. W /f MH STEP D REINFORCING d ' v PRECAST ECCENTRIC TOP Of 4.I•. �.' PRE -CAST MANHOLE 0 o — SECTIONS o w 5" MIN. WALL THICKNESS cn 4" 48" DIAMETER STD. FOR 4' DIA. BARREL 6" MIN. WALL THICKNESS :m 0 0 0 5" (TYP) I ' MANHOLE IN ACCORDANCE D FOR 5' DIA. BARREL 1 .1 W . WITH ASTM C 478 N d VI 131TUMASTIC JOINT SEALANT I• AS APPROVED BY THE ENGINEER GROUTED INSIDE AND OUT WITH APPROVED I. Cn N NON -SHRINKING GROUT _J PIPE 1" PER o Z DIAMETER FOOT I 4" . LRET I ,AGS 3-MIN PIPE ) MINIMUM 8" STONE BEDDING FOUNDATION 8„ — a — 0 RUBBER GASKET 6" EXTENDED LIP MONOLITHICALLY CAST BASE SECTION ( EXTENDED BASE NOT REQUIRED FOR MANHOLES < 8' DEEP ) 48 DIAMETER STANDARD MANHOLE N.T.Q. M M I 1 1/4" O A IA I AID FE _LEVAT�oN 10 3/4- 1/2" GRADE 60 12' STEEL REINFORCEMENT PLAN A COPOLYMER POLYPROPYLENE PLASTIC ELEVATION SECTION A —A MANHOLE STEP DETAIL N.T.S. A -r --� EXISTING OR PROPOSED SHOULDER + VARIES 6' 5 VERTICAL TO 10' CURVE 8' ,F10% ORIGINAL GROUND LINE /\'�/ CULVERT -27g S r� \ r SHOULDER SECTION A -A VARIABLE WIDTH 0� F ' I DITCH GRADE SECTION B-B DRIVEWAY CONNECTIONS 5WEEAN Q ®RAT NACU REQUIREMENTS N.T.S. ' NOTE: MAXIMUM LIMIT FOR VEHICUILAR CLEARANCE, t 15% DESIRABILE MAXIMUM. PIPE ZONE 6" O.D. 6" MIN MIN CAST IN RUBBER FINAL BACKFILL BOOT WITH STAINLESS STEEL CLAMPS � MANHOLE ALL `� CONNECTIONS) CLASS 1, 2, OR 3 e 6"EXTENDED LIP PIPE SIZE AS INDICATED ON THE PLANS 0.D• 90' — — — — CLASS 1 OR 2 Y Z_ SMOOTH, LONG RADIUS BENDS �// // ....•..•..•.•...'....•....•.... . a •' �/i�\/i�%i�%i�%��%i�\/i�%i�%i�\/ ' � STABLE NO JOINTS FOR PIPE WILL BE FOUNDATION ALLOWED IN WALL SECTION DUCTILE IRON and RC PIPE MATERIAL PIPE ZONE 48" DIAMETER MANHOLE FLOOR 6" O.D. 6" / N.T.S. MINM I N MARKED: SANITARY SEWER OR STORM DRAIN AS REQUIRED RING AND COVER CONTACT SURFACES SHALL BE MACHINED SO AS TO INSURE EVEN BEARING OF COVER ON RING. TOP OF COVER A BOTTOM OF COVER A B C D I E I F 1'-11 1/2 1'-9 5/8" V-10 3/4 2'-9 1/4" 7 1/2" 2 1/8" (MANUFACTURERS) -'- 1. G.R. ENNIS & SON g E N0. MH—GRE-24 2. DEWEY BROS. N0. MH-RCR-2001 I r C I _I 3. VULCAN NO. VM-84 MINIMUM WEIGHTS: OR EQUAL D RING - 190 LBS. COVER - 120 LBS. SECTION A - A MANHOLE FRAME AND COVER N.T.S. 3000psi CONCRETE 12" 12" � N 1 1 /2" MIN. BITUMINOUS PAVEMENT z � n 0 1 CONCRETE CURB DETAIL 6" ABC J 8" BRICK NOT TO SCALE 15" CASTING FINAL BACKFILL - Y//////// F////// PIPE SIZE AS INDICATED 3" ON THE PLANS INITIAL BACKFILL CLASS 1 — O.D. /%\\/ STABLE FOUNDATION PVC PIPE MATERIAL PIPE BEDDING DETAILS N.T.S, NOTES: 1. ALL ROADS TO BE PUBLIC (BUILT TO TOWN OF LELAND STANDF\RDS). 2. STREET LIGHTS WILL BE CONSTRUCTED. 3. SIDEWALKS TO BE PLACED ALONG ALL STREETS. 4. A 10 FT. IN WIDTH NON PUBLIC UTILITY EASEMENT TO BE LOCATED ALONG ALL R/W'S. 5. GEOTECHNICAL TESTING TO NCDOT STANDARDS REQUIRED, 70' R /W -- 40' 1 1 WITH SIDEWALK WITH SIDEWALK Ir 36' PAVEMENT 1 4' 1 9' 1 20' 20' _ I - 9' 4 _I SIDEWALK GRASSED AREA — 2' VALLEY CURB 1-1/2" 1-2 I,.I z 1-1 2"S9 5A � GRASSED AREA 8"ABC ASPHALT BASE TYPICAL STREET SECTION NOT TO SCALE CLEANOUT FRAME & COVER CO I I I I 3/4" 6 15/16" II II TOPIT&VIE�Y f � FINISHED GRADE , 7 7/8"4. 3/4' 7 3/16" N/N MINIMUM OF 8' BETWEEN 3/8- = CAP & COVER If NOTE: 9 7/0 Li 1. BOX EQUIVALENT TO ENNIS ENTERPRISES NO. EEVB-001 12" MIN. I 2, STD. WEIGHT 30 LBS. 4 PIPE z Z va 4'-45' BEND 2"j 2Z 2+r 18" NIPPLE & t& n /GLUED CAP 12" 12"i� L—.11 ''I I , 1 11 "1 1 TYPICAL DETAIL MONUMENT CASTING 8c BASE STANDARD CLEANOUT N.T.S. N.T.S. NOTE: DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY NORTH BRUNSWICK SANITARY DISTRICT AND THE TOWN OF LELAND. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED 99NST4UCTION OXTAILS, BUT RATHER SERVES AS A GUIDE, THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL APPLICABLE COUNTY AND STATE CODES AND CONSTRUCTION STANDARDS. 4" WYE FLASHI 5' GROUND SL REFLECiIORIZED(TYP) EFLECTORIZED(TYP) 4-4 - 0' GROUND SURFACE• TYPE III BARRICADE N.T.S. NOTE: NPT EXISTING SEE HOSE BIB DETAIL YARD GRADE _\ SHEET 13, SPIGOT r— 4" CONCRETE PAD I—III—IIElII—lI1- II IIIIII; II' AUTOMATIC SERVICES UNDER PAVED DRAIN PE TUBING, SDR 9 AREAS TO BE INSTALLED ASTM D2737 Z WITHIN 1-1/2" SCH,40 1 "MINIMUM CASING PIPE. 2-3 CF GRAVEL CORPORATION STOP co BEDDING A` MUELLER BRONZE SPECIFIED H15008 —III—I I 1 � III-1 I WATER ' MAIN \ NOTE WELL: 3" SAND BED SEE STANDARD SPECIFICATIONS FCR SIDEWALK ALL AROUND LINE ADDITIONAL DETAILS ON CONNECTION, 30• METER BOXES, THRUST BLOCKING, VALVE BEDDING BOXES, AND CONSTRUCTION STANDARDS. AS SPECIFIED PUMP STATION SERVICE CONNECTION N.T.S. SEE STANDARD SPECIFICATIONS FOR ADDITIONAL DETAILS AND REQUIREMENTS. 3 �I PROPERTY v LINE 16" �1::� ':::o. ;:':::V II• MIN. :II ::; I'I—III-111 III —III= 'III —III III I D(SQ) A PLAN AND ELEVATION 5.S.ANCHOR PLAN PLUGS STRAPS TEES PLAN BENDS G SECTION C—C D(SQ) BENDS AND TEES NOTE: ALL TEES, PLUGS AND BENDS SHALL BE BLOCKED AGAINST FIRM EARTH 45' VERTICAL BENDS WITH CLASS C CONCRETE PIPE DIA. 90• BENDS 45' BENDS 22 1 /2• BENDS TEES PLUGS 45'VERT. A B A B A B A B C D D 3" 1 8" 10" 5" 10" 3" 8" 5" 12" 6" 14" 21 " 0.2 4" 8" 1O„ 5" 10" 3" 8" 5" 12" 6" 14" 21" 0.2 6" 12" 8" 9" 8'p 6" 8" 12" 8" 10" 20" 27" 0.4 8" 14"1 12 12" 10" 1 8" 1 12" 14" 12 12" 26" 33" 0,8 STANDARD FORCE MAIN and WATER MAIN THRUST BLOCKING N,T,S. SEE STANDARD SPECIFICATIONS FOR ADDITIONAL DETAILS AND REQUIREMENTS, ' o I ' \ BRICK -•- /MORTAR EXTENSION OR STACK FINISHED GRADE — ..- CASTING PLAN VIEW FLANGE N.T.S. CASTING s L ° n I, a CONCRETE COLLAR /��/��//��//� MORTAR OVER FIANCE STANDARD BRICK MorT� 1" ::•i:,•t;r::::•::: ::•r::::::•::::. NOTE:•::: —� THIS INSTALLADOTI REWIRED WHEN I VALVE BOXES AND CLEANOIDB ARE LOCATED IN PRESENT OR FUTURE WATER VALVE BOX EXTENSION AND CASTING CENTERED OVER PAVED AREAS. PRIOR TO SETTING CASTINGS, NEW INSTALLATIONS WILL VALVE NUT. SEWER CLEANOUT CASTING SEWER OVER STACK. REQUIRE 95% COMPACTION OF BACKFILL IN 8" LIFTS. CLEANOUT OR VALVE IN PAVED AREA N.T.S. NCDOT CATCH BASIN STD.840.02 O I N L`I TRANSITION 11 SECTION STD.CURB SECTION EXPANSION— JOINT Z 10 TAPER 3'-1 1/2" Do g PLAN VIEW a W W 0V w a FRAME, GRATE AND HOOD CURB a NCDOT STD. 840.038 NORMAL GUTTER FLOW LINE --- FRAME & GRATE I OPENING------- I G 1 1 I DEPRESSED GUTTER PRECAST CONCRETE I I I I CATCH BASIN W z I I-�-- _ LANDSCAPE LANDSCAPE -' g I 1 I" Q1--- TIMBER TIMBER Z Q 0 I I C.I. BOX & COVER UJ I i j 1 OUTLET C.I. BOX COVER PIPE It1 j/ LC 1 ------------ L---------- �-------------- 45'ELBOW 9 SEE NCDOT STDS. 852.05 MAXIMUM 45' LONG 1 840.02 SWEEP AS REQUIRED SECTION VIEW LATERAL TO REACH OPTIMUM 840.03E FRONT SECTION DEPTH - FOR FURTHER DETAIL �- GLUED -, CAP h PRECAST CURB INLET GLUED C ANGLE 45'ELBOW N.T.S. VARIABLE SLOPE \ AS 1.5% MINIMUM 45+ REQD. LATERAL. 'GLUED CAP GENERAL DETAILS L,LAx1Muu 45• LONG W E S T G A T E 9 BEDDING AS SWEEP BENDS As — A Southern Village of Homes and GommerCe SPECIFIED 11 REQUIRED f LOCATED IN THE TOWN OF LELAND TOWN CREEK TOWNSHIP FAR SIDE LATERAL SMAINRJ NEAR SIDE LATERAL eRUNSwicK COUNTY NORTH CAROLINA 48a1416 Bte- NOTE: USE WYE FITTINGS AT SERVICE a�:II N,s, STANDARD SERVICE CONNECTIONQz�Ess�o, TO SANITARY SEWER 0 SEAL NTS 200OT DDte: 601e23- 06 NTS Drawn: Dee Checked: DSH Project No: ��3o9'�rr►ettrl4 '' HANOVER DESIGN SERVICES, P.A. Sheet No: d °.��.�oo•� �1d LAND SURVEYORS, ENGINEERS & LAND PLANNERS 1 1 • 1f I 379 WALNUT STREET w � WILMINGTON, N.C. 28401 I �% ` • cD PHONE: (910) 343-8002 1% 5 dhollis 0 hdsi,lm.com of: NOTES FOR WATER SUPPLY AND INSTALLATION 1. ALL WATER MAINS TO BE AS PER NBSD SPECIFICATIONS. SEE SPECIFICATIONS FOR ADDITIONAL MATERIALS REQUIRED. 2. 3' MINIMUM COVER ON ALL WATER MAINS. 3. ALL WATER SERVICE LINES TO TO BE 1" UNLESS OTHERWISE NOTED. 4. FIRE HYDRANTS SHALL BE INSTALLED IN ACCORDANCE WITH DETAIL AS SHOWN. 5. BLOW OFF ASSEMBLIES SHALL BE IN ACCORDANCE WITH DETAIL AS SHOWN. 6. ALL BENDS AND TEES SHALL BE ADEQUATELY BLOCKED (SEE DETAIL). 7. ALL CONNECTIONS TO EXISTING WATER LINE AND BORES TO BE DONE ACCORDING TO NBSD SPECIFICATIONS. 8. ALL MAINS SHALL BE ADEQUATELY FLUSHED, PRESSURE TESTED, AND DISINFECTED IN ACCORDACE WITH THE SPECIFICATIONS, 9. ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE ENGINEER, NBSD ENGINEER AND THE N.C. DEPT. OF ENVIRONMENTAL HEALTH AND NATURAL RESOURCES. A PRE -CONSTRUCTION CONFERENCE IS REQUIRED. 10. ALL WATER SYSTEM WORK SHALL BE DONE TO NBSD SPECIFICATIONS. GENERAL NOTES 1. NO EXCAVATED MATERIAL SHALL BE PLACED IN ANY STREAM, DITCH OR DRAINAGE -WAY. 2. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES BEFORE ANY CONSTRUCTION BEGINS. 3. THE CONTRACTOR IS RESPONSIBLE FOR TEMPORARY SEDIMENT AND EROSION CONTROL MEASURES WHILE CONSTRUCTION IS IN PROGRESS. 4. THE CONTRACTOR IS RESPONSIBLE FOR STABILIZATION OF ALL DISTURBED AREAS. 5. THE CONTRACTOR IS RESPONSIBLE FOR LAYDOWN & STOCKPILE AREAS (TO ARRANGE AND INSURE COMPLIANCE WITH ALL LOCAL AND STATE REGULATIONS), STORM DRAIN 12" MIN, 450 BEND (D.I.P.) (4X) PRESSURE PIPE -� - 3'MIN. COVER PRESSURE I PIPE (SDR-21 / C-900) (SDR-21 / C-900) 3' MIN. 0- 1 3' MIN, MEG-A-LUGS THROUGHOUT NOTE: USE D.I.P. (CL51 OR BETTER) IF LESS THAN 2.5' SEPARATION OR COVER. USE P.V.C. (SDR 21 /C900) IF GREATER THAN 2.5' SEPARATION. FORCE MAIN / WATER MAIN DITCH & STORM DRAIN CROSSING NOT TO SCALE PAVED AREA UNPAVED AREA FINISHED GRADE ASPHALT PER PRECAST CONCRETE NCDOT SPECIFICATIONS COLLAR _ ABC STONE PER FINISH NCDOT SPECIFICATIONS GRADE 7-7 4. 3'-0" MIN. 1" BITUM CONC. SURFACE TYPE 1-2 TYPE 1-2 N.C. SPEC. DITCH % - I o_ _ PIPE (D.I.P. IF COVER IS LESS THAN 3-- NOTE: BACKFILL TO BE INSTALLED IN 6" LIFTS (MAX) AND COMPACTED TO A MINIMUM DENSITY OF 95% AS DETERMINED BY THE MODIFIRD PROCTOR METHOD. CUT -BACK TO BE PREFORMED AFTER TRENCH BACKFILLING AND COMPACTION. PAVEMENT REPAIR WHERE PIPE INSTALLED VALVE DETAIL NOT TO SCALE - 60' TYP R/W - -30' N"T-0 30' NOT TO SCALE RIGHT OR LEFT COMBINATION STRAIGHT AND STRAIGHT ARROW TURN ARROW LEFT OR RIGHT TURN ARROW 26' i 2320 •i K, 1n In" ID f ILI I } COMBINATION LEFT AND STRAIGHT AND RIGHT TURN ARROW COMBINATION LEFT AND RIGHT TURN ARROW GENERAL NOTES -ALL PAVEMENT MARKING SYMBOLS SHALL BE WHITE IN COLOR -PAVEMENT MARKING SYMBOLS SHALL NOT BE LOCATED AS TO ENCROACH INTO INTERSECTION AREAS. -ON PORTLAND CEMENT CONCRETE PAVEMENTS, PAVEMENT MARKING SYMBOLS SHALL NOT BE PLACED ACROSS TRANSVERSE EXPANSION JOINTS UNLESS APPROVED BY THE ENGINEER. Arrow Symbols 1-1/2" S9.5A PAVEMENT SLOPE IS 1/4" PER FOOT 8-BASE COURSE (ABC) VALVE BOX W/LID 5" CONCRETE MONOLITHIC ISLAND LID MARKED "WATER" SURFACE MOUNTED, SEE NCDOT 852.01 M.J. GATE VALVE "NO LEFT TURN" "DO NOT ENTER" FEATHERED EDGE Y4" FT EXISTING ASPHALT COMPACTED ABC EXISTING GRAVEL CAP W/2" TAP 3/4' STAINLESS TIE RODS, REINFORCED CONCRETE NUTS, & WASHERS COLLAR PLAN VIEW VALVE BOX W/LID LID MARKED "WATER" REINFORCED CONCRETE COLLAR -- CAP (THREADED) CAP W/2° TAP VALVE BOX W/LID 3/4" STAINLESS TIE RODS, LID MARKED "WATER" NUTS, & WASHERS -*a-CONCRETE BLOCK 2" BRASS NIPPLE 2" SCH. 40 PVC PIPE 2" GATE VALVE WITH 2" OPERATING NUT PROFILE 2" BLOW -OFF NOT TO SCALE 12'WIDE EMERGENCY LANE SEE PLAN VIEW 0-1" z'--o• 0'-1• 0'-1" 6"THICK PC CONCRETE 1'-4.5"_ /2'' SLOPE IS 1/4" PER FOOT WHERE REVERSE CROWN REINFORCING AS NECESSARY IS REQUIRED GUTTER SHALL 1" R SLOPE AWAY AS SHOWN 1 1/4" R BASE COURSE AND REINFORCING * INSIDE ISLAND AS PER COMPACTION TESTING ROUNDABOUT GEOTECHNICAL CONSULTANT. _. i 00 . a d'• •• o'.. i. .,4q.o, I •d .7" • t STANDARD CURB SECTION TYPE "A" (RIOPUNDABOUT ONLY) NTS \ b d W2-OUT 15' R=37'FC W2-IN 15, SEE NCDOT R=37'FC 852.01 36' RAISED ISLAND DETAIL NTS -NT MARKER SPACING CHART - =WEM�- ^,'T MARKING TYPICAL SPACING in FT (speed limit <= 45mph) ce-te,jires­plong through tones 40 Ce-+erilres- -along horizontal curves per Traffic Engineering Skip Lines --along through lanes 40 Tum Lanes --Skip Lines 40 Tum Lc^es--Solid Lc^e Lines 20 Tum Lores--Centerlines 40 Pointed Islands --White 20 Pointed Is9cnds--Yellow 40 Rased Median Islands 40 Other Markings per Traffic Engineering GENERAL NOTES -CRYSTAL/RED MARKERS SHALL BE USED ALONG WHITE PAVEMENT MARKINGS UNLESS OTHERWISE DIRECTED BY TRAFFIC ENGINEERING. RED SIDE OF MARKER TO FACE "WRONG -WAY" TRAFFIC. -PAVEMENT MARKERS SHOULD NOT BE PLACED CLOSER THAN 2 INCHES TO A PAVEMENT CONSTRUCTION JOINT, EXCEPT WHEN PLACED BETWEEN DOUBLE YELLOW CENTERLINES. -PAVEMENT MARKERS SHALL NOT BE PLACED DIRECTLY ON PAVEMENT MARKINGS. -PAVEMENT MARKERS USED IN CONJUNCTION WITH DOUBLE YELLOW CENTERLINES SHALL BE PLACED MID -WAY BETWEEN THE LINES, WITH A GAP BETWEEN MARKER AND MARKINGS. PLACEMENT A' ONG YELLOW CENTERLINES PLACEMENT ALONG TURN LANE LINES 20' c' S' 7 d �=- - - - \_•11.1 _c cC x'._ 6:we ce e! m morkea Mooed i,Pd lum IaneJ PLACEMENT ALONG WHITE 2 =' LINES -1 L>=GENp cu+lered'be een Ztll' wH�1e eldp 84 aaeTONaixnerlertovr .1 x'ter " e AM5M I AMW MAMM e CItl9TAL / "D MAPMR Seised Pavement Marker N.T.S. SEE NCDOT 904.50 12" DIA. ROUND OR "U" CHANNEL POST SQUARE SMOOTH WALL HOLES DRILLED, CORED, FORMED OR AIR HAMMERED & BACKFILLED WITH SOIL. 2" JOINT SEALER ISLAND PAVEMENT - SOIL INSTALLATION OF CHANNEL POST IN CONCRETE N.T.S. EDGE LINE 10' SKIP LINES YELLOW OR WHITE YELLOW OR WHITE TURN LANE LINE J WHITE CENTER LINE a YELLOW GORE LINE 2' MINI -SKIP LINES I YELLOW OR WHITE WHITE j DIAGONAL LINE -7 ,a �m 15 YELLOW OR WHITE N 'NOTE: WHERE TWO WIDTHS ARE INDICATED, THE FIRST CROSSWALK LINE .� WIDTH APPLIES FOR A 'WAMk''AIDTH UNE. THE SECOND WIDTH APPLIES FIKR A 'WIDE' UNE. 'WTE' LINES ARE i REQUIRED W-'EN DESGNATED IN THE PLAhIS, OR WHEN DIRECTED BY THE ENGINEER, WHITE STOP OR TRANSVERSE BAR }� Line Types WHITE S7 N DARD SIDEWALK AwETAIL N13� Q�P 4' OR 5'WIDE 1" SCORE(TYP) 4"THICK w z_ J PUMPING & HOSE CONNECTIONS FIRE HYDRANT CONNECTION EQUAL TO NBSD STANDARD WITH 4-Yz" PUMP CONNECTION 1' MIN. FACING ROADWAY I BREAK RING 00 24 x 24 x 4 THICK CONCRETE COLLAR 1-11 IJ 1III=11= I'-��I1�1 i -.... "= ! - - VATILIV=E1 11=Bi1 OI-X I W/LID COMPACTED - LID MARKED "WATE R" BACKFILLz 2' MINIMUM 6" M.J. GATE VALVE OR D.I.P. all (OPEN LEFT) IT 7 NOTE: WEEP HOLES TO BE II IIII FULLY FUNCTIONAL T T I-1 _ #57 STONE FILL (7 CIF MIN.) MEGA -LUGS (PREFERED) IN LIEU OF STAINLESS STEEL TIE RODS WITH STAINLESS STEEL NUTS AND WASHERS FIRE HYDRANT ASSEMBLY EXPANSION JOINT T 30' INTERVALS(TYP) 1. � 4: t .t- Q~ f � ALA- B 1/2" EXPANSION JOINT 1/2" EXPANSION JOINT SIDEWALK 4'-0" 3'-4" 4'-0" SCORE VAR VAR VAR 12:1 MAX 4CK OF CURB SLOPE GRASS STF DEPRESSED CURB VERTICAL BREAK FACE 2._D" IN CURB SLOPE NOT TO TEE NOTE 2 10'-0" MIN EXCEED 12:1 rcU-A-nvv PLAN VIEW WHEELCHAIR RAMP ►P )F CURB GUIDELINES FOR WHEELCHAIR RAMPS AND DEPRESSED CURBS(B) NTS SEE OBSTRUCTION DETAIL SIDEWALK A, PLAZA(VAR}--- VAR VAR ZAD(VAR) SEE NOTE( •10' MIN PED-X-ING VAR SEE NOTE 2(TYP) 4'-0" 2'- 0" TYPICAL LOCATION OF WHEELCHAIR, PEDESTRIAN CROSSWALKS & STOP BARS GUIDELINES FOR WHEELCHAIR RAMPS AND DEPRESSED CURBS(A) NTS GENERAL NOTES I. LOCATION OF WHEELCHAIR RAMPS: 1, IN ACCORDANCE WITH THE RATIFIED HOUSE BILL 1296, ALL STREET CURBS IN NORTH CAROLINA BEING CONSTRUCTED OR RECONSTUCTED FOR MAINTENANCE PROCEDURES, TRAFFIC OPERATIONS, REPAIRS, CORRECTION OF UTILITIES OR ALTERED FOR ANY REASON AFTER SEPTEMBER 1973 SHALL PROVIDE WHEELCHIR RAMPS FOR THE PHYSICALLY HANDICAPPED AT ALL INTERSECTIONS WHERE BOTH CURB AND GUTTER AND SIDEWALKS ARE PROVIDED AND AT OTHER MAJOR POINTS OF PEDESTRIAN FLOW. 2. WHEELCHAIR RAMPS SHOULD BE LOCATED AS INDICATED IN DETAIL DRAWINGS, HOWEVER EXISTING LIGHT POLES, FIRE HYDRANTS, DROP INLETS, ETC. MAY AFFECT PLACEMENT. II. CONSTRUCTION NOTES: 1. NO SLOPE SHALL EXCEED 1"-1" (12:1) ON THE RAMP OR SIDEWALK. 2. IN NO CASE SHALL THE 'MOTH OF WHEELCHAIR RAMPS BE LESS THAN 40" (3'-4"). WIDTHS MAY EXCEED 40- IF NECESSARY. 3. USE CLASS "A' CONCRETE WITH THE SURFACE HAVING A ROUGH, NON-SKID TYPE FINISH. 4, 1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE CONCRETE WHEELCHAIR RAMP JOINS ANY RIGID PAVEMENT OR STRUCTURE. 5, CONSTRUCTION METHODS SHALL CONFORM WITH THOSE OF THE GOVERNING BODY WHICH HAS JURISDICTION OF THE PARTICULAL STREET, III. ADDITIONAL NOTES: 1. THE INSIDE PEDESTRIAN CROSSWALK LINES SHALL BE ESTABLISHED BY BISECTING THE INTERSECTION RADI WHERE MARKED (SEE NOTE 6). 2. THE WHEELCHAIR RAMP SHALL BE LOCATED SO THAT THE BEGINNING OF THE WHEEL CHAIR RAMP WILL BE TWO FEET FROM THE INSIDE PEDESTRIAN CROSSWALK LINE. 3. THE WIDTH OF THE PEDESTRIAN CROSWALK SHALL BE 10 FEET UNLESS A GREATER MOTH IS REQUIRED TO ACCOMMODATE THE PEDESTRIAN TRAFFIC. 4. STOP BARS SHALL BE USED WHERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND WHICH VEHICLES ARE REQUIRED TO STOP IN COMPLIANCE WITH A TRAFFIC SIGNAL, STOP SIGN, OR OTHER LEGAL REQUIREMENTS. 5. PARKING SHALL BE ELIMINATED A MINIMUM OF 20 FEET BACK OF PEDESTRIAN CROSSWALK. 6. ALL PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES PUBLISHED BY THE FEDERAL HIGHWAY ADMINISTRATION. THIS IS AVAILABLE FROM THE SUPERINTENDENT OF DOCUMENTS, U.S GOVERNMENT PRINTING OFFICE, WASHINGTON, D.C. 20402. DRIPLINE GUIDELINES FOR 3' MIN. STAKE WHEELCHAIR RAMPS PROTECTIVE BARRIER I HEIGHT A'IOVE Ir- I GRADE Ij NOT TO SCALE 8" x 6" MJ TEE 30 MAX. STANDARD N.C.-601 STOP STOP SIGN 6' TO 12' b 2" PIPE I STANDARD INFORMATION SIGN WITHOUT CURB 0 _6 12 MIN. PARKING OR GUTTER MIN. 0 8 AM - 6 PM STREET NAME WEST GATE DRIVE 4 -0 $5.00 FINE SIGN 0'-6 3/4" 2" PIPE (SEE NOTE) " c° IN, M 2IN. I WITH SLOPE -FACE 00 CURB WITH CONCRETE CURB &GUTTER STANDARD SIGN INSTALLATION LOCATION NTS ;TING TREE TREES TO BE SAVED WILL BE CLEARLY MARKED PRIOR TO CONSTRUCTION ELEVATI N AND A PROTECTIVE BARRIER IS TO BE INSTALLED AT THE DRIPLINE. DRIP LINE - THE AREA OF SOIL DIRECTLY BENEATH THE TREE EXTENDING / �� \ CROWN OF TREE IS NEEDED FOR LEAF OUT TO THE TIPS OF THE OUTERMOST BRANCHES. / `\ GROWTH TO PRODUCE OXYGEN, FILTER / I \ THE AIR, REDUCE WIND, SOFTEN NOISE, METHOD OF TREE � \� ( 1 AND PROVIDE BEAUTIFUL APPEARANCE, I I DO NOT DISFIGURE CROWN WITH PROTECTION WRING I I INSENSITIVE PRUNING! CONSTRUCTION I i DRIPLINE NTS I 1 / PLAN TREE PROTECTION DURING CONSTRUCTION / 1. DO NOT COMPACT SOIL BENEATH TREES. NO VEHICLE SHALL BE ALLOWED TO PARK FEEDER ROOTS STRUCTURAL ROOTS UNDER TREES. NO HEAVY MATERIALS SHALL BE STORED BENEATH TREES. RESULTS OF FEEDER ROOTS ARE LOCATED STRUCTURAL ROOTS LOCATED COMPACTON CAUSE WATER AND AIR NOT TO REACH THE ROOTS AND THE TREE AT "DRIPLINE" OF TREE NEAR BASE OF TRUNK ARE WILL DIE. THESE "FEEDING ROOTS" OCCUR WELL AWAY FROM THE BASE OF AND PROVIDE TREE WITH NEEDED TO GIVE SUPPORT TO THE TREE TO THE EDGE OF THE OVERHEAD BRANCH CANOPY. DAMAGING ENTIRE TREE. IF REMOVED, THE BARK WITH LAWNMOWERS, CONSTRUCTION EQUIPMENT, OR ANYTHING ELSE MOISTURE AND NUTRIENTS, IS PROHIBITED. APROTECTIVE BARRIER SHOULD PREVENT DAMAGE: FROM SEE NOTE 1 & NOTE 4 TREE CANFAIL AND DAMAGE PROPERTY. OCCURING DURING CONSTRUCTION. SEE NOTE 2 &NOTE 4 2. NO CUTTING OF LARGE STRUCTURAL ROOTS LOCATED NEAR THE BASE OF THE METHOD OF TREE TRUNK. THESE ARE ESSENTIAL IN SUPPORTING THE TREE AND HOLDING IT UPRIGHT IN HIGH WINDS. REMOVAL OFTHESE ROOTS ALONG ONE SIDE IS PROTECTION DURING OFTEN DONE BECAUSE OF A WALK, PAVING VING OR BUILDING WHICH IS BEING CONSTRUCTED. 3, AVOID CUT AND FILL WITHIN DIAMETER OF TREE CROWN DURING EXCAVAT_'; CONSTRUCTION NTS METHOD OF TREE PROTECTION DURING CONSTRUCTION NTS REV. NO, I REVISIONS I DATE < J :oppight 4 Honow Design Services, P.A., All rights reserved Reproduction or use of the eanfents or fhh document, r odatNons or deletions to !`'s iocument, In whole or part, without written consent of the Land Surveyor ce Engrner, Is prohrblfed. Only copes from lee or'gral of this docume-t, norked with the anginal signature and o iginal seol of the Surveyor a Enghie , shc;l be considered to be vo17d and Ire coc m GENERAL DETAILS WESTGA'TE A Southern Village of Homes and Commerce LOCATED IN TOWN OF LELAND BRUNSWICK COUNTY, NORTH CAROLINA CAROp�AaBafAo 1 -i� II tesAt- ell"�1 -7-. dhollis©hds'il DEVELOPER: OCEAN GATE, LLC PO BOX 316 7 WILMINGTON, NC 28106, (910)- 791-1196 OVER DESIGN SERV7CES, P.A. � LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET j{ WILMINGTON, N.C. 28401 PHONE: (910) 343-8002 Date: 6-23-06 Scale: 1 "- 50' Drown: OSH Checked: DSH Project No: 6309-mstr15-dh 'Gheel Na: 15 Of: 15 PLANS and PROFILES of GENERAL NOTES: 1, This map is not for conveyance, recordation, or sales. 2. Portions of this property are located within a special flood hazard area according to Flood Insurance Rate Map Community Panel #370295-0130C, effective date May 15, 1986. 3. Handicap Ramps provided at all intersections and one per bldg. 4. Suitable trees are to be preserved or planted in accordance with Town of Leland standards. 5. Parking areas and streets to be lighted in accordance with Town of Leland standards, 6, Boundary not field surveyed at this time. Topographic survey data by Hanover Design Services & Arnold W Corson, PLS, PC. 7, All local residential and collector roads are to be built to NCDOT standards. MORE GENERAL NOTES. 1. ALL CONSTRUCTION TO CONFORM TO TOWN OF LELAND STANDARDS APPLICABLE STATE & LOCAL CODES, 2. CONTRACTOR TO COORDINATE ANY REQUIRED TRAFFIC CONTROL WITH THE STATE AND THE TOWN, 3. CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND TO RECEIVING STRUCTURES. 4. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, RE -ALIGNMENTS, DISCONNECTIONS OR CONNECTIONS OF EXISTING UTILITIES WITH APPLICABLE AUTHORITIES. 5. CLEARING AND GRUBBING OF SITE TO INCLUDE REMOVAL OF EXISTING CURB, ASPHALT, INLETS, AND ANY OTHER STRUCTURES INCLUDING TREES, STUMPS AND DEBRIS EXISTING ON SITE, TREES NOT REQUIRED TO BE CLEARED FOR CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE DIRECTED, 6. MINIMUM SEPARATION SHALL BE MAINTAINED AS FOLLOWS: a. HORIZONTAL CLEARANCE OF 10 FEET BETWEEN SANITARY SEWER AND WATER MAINS. b. WHERE VERTICAL CLEARANCE IS LESS THAN 16" BETWEEN SANITARY SEWER AND WATER OR WHERE SEWER LiNE CROSSES ABOVE WATER MAIN, BOTH PIPES SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING, c. WHERE VERTICAL CLEARANCE IS LESS THAN 12" BETWEEN SANITARY SEWER AND STORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. d. WHERE VERTICAL CLEARANCE IS LESS THAN 12" BETWEEN WATER MAIN AND STORM DRAIN, WATER MAiN SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10' EITHER SIDE OF CROSSING. LEGEND RAMP STMH-14 f ¢ /MN PROP, STORM MANHOLE HANDICAP 66 HANDICAP PARKING SPACE DROP INLET SSMH-1 • PROP. SANI TARY MANHOLE PROPOSED SANITARY SEWER & MANHOLE ❑ IRON IN EXIST, CONC. MON, EXISTING SANITARY E.I.P. EXIST. IRON PIPE SEWER & MANHOLE WATER METER WL PROPOSED WATERLINE SERVICE CONNECTION WT & HYDRANT ASSMBL Y E. C.M. EXIST. CONCRETE MON. EXISTING WATERLINE N GATE VALVE PROPOSED STORM Q REDUCER Q SEWER & CA TCH BASIN 5g, DRAINAGE FLOW E.I.P. = EXISTING IRON PIPE +49.0 INDICATES SPOT ELEVATION E.I.R. = EXISTING IRON REBAR E.C.M. = EXISTING CONCRETE MONUMENT F/H = FIRE HYDRANT I.S. = IRON SET P/P = POWER POLE W/V = WA TER VALVE C. P. = COMPU TED POIN T W/M = WATER METER L OCA TED IN THE TOWN of L ELAND BRUNSWICK COCJNTY NORTH CA ROL INA DA TE:eOCTOBEI' 2005 SCALE: 1 `200" OWNER / DEVELOPER. Ocean Gate, LLC �aG PV Box 3167 Wilmington, NC 28106'�-°' 910-791-1196 5 r� c,� lei����e Ne 1 , < DWQ SW8 990807 y y, 41 y, 4 ��e 4, dic + v. ti y v. v. V / a, 1r 1 v vv v v ,v y 1 vL c> LOCATION MAP NOT TO SCALE 200 100 0 200 400 SCALE IN FEET: 1"= 200' NQ SW8 040703 y r , ti i, V v y DWQ SW8 980403 -,�- 1 REVISED AS PER DENR / DWQ COMMENTS 11-22-05 REV. N0. REVISIONS DATE Copyright 0, Han~ Design Services, P.A., All rights reserved. Reproduction or use of the contents of this document, or additions or awatias to this document, in whole or port, without written consent of the Land Surroyor or Engineer, is prohibiled. Only copies /rom the original of this document marked with the original signature and M91not seal of the Surveys' or Engineer, shall be considered to be vo6d and true copies. STANDARD NOTES: 1. Information concerning underground utilities was obtained from available records, It shall be the responsibility of the Contractor to determine the exact elevations and locations Of all existing utilities at off crossings prior to commencing trench excavation. If actual clearances ore less than indicated on Plan, the Contractor shall contact the Design Engineer before proceeding with construction. Any condition discovered or existing that would necessitate a modification of these plans shall be brought to the attention of the Design Engineer before proceeding with construction. 2, NO CONSTRUCTION IS TO BEGIN BEFORE LOCATION OF EXISTING UTILITIES HAS BEEN DETERMINED. CALL "NC ONE -CALL" AT LEAST 48 HOURS BEFORE COMMENCING CONSTRUCTION, 3. All trees which are not required to be cleared for constuction shall be preserved wherever possible unless otherwise directed. 4. Contractor shall adjust all manholes, valve and curb boxes to the final grade upon completion of all construction. Any boxes damaged or otherwise disturbed by the Contractor shall be repaired at the expense of the Contractor, 5, The Contractor is responsible for controlling dust and erosion during construction at his expense. Parking areas shall be watered to control dust when ordered by the Engineer. 6. No geotechnico/ testing has been performed on site. No warranty is made for suitability of subgrode, and undercut and any required replacement with suitable material shall be the responsibility of the contractor. 7. Extreme core shall be taken to ensure minimum separations at all utility crossings, 8, Contractor to ensure that pavement is placed so as to droin positively to the parking lot inlets and catch basins, All roof drain downspouts to be directed to the storm sewer system. 9. Contractor is responsible for obtaining all required permits. 10. This plan is for roadway grading, storm sewer, and drainage only. 11. Affected Non -Municipal Utilities shall be contacted and provided with plans and other pertinent information, when feasible, to coordinate appropriate scheduling and placement. At the minimum this should include BellSouth and CP&L. INDEX TO DRA WINGS SHEET No. DESCRIPTION DRAWING No. 1 OF 4 COVER SHEET and GENERAL NOTES 6309-roadia 2 OF 4 STREET PLANS & PROFILES 6309-rood2 3 OF 4 WATER QUALITY and EROSION CONTROL 6309-rood3 4 OF 4 DETAILS and SPECIFICATIONS 6309-road4 r C I l '� NOV.. 11 2 Z005 BENCHMARK LOCATIONS AND ELEVATIONS LOCA TION: ELEVATION 1 NCDOT RW MON. SOUTH INTERSECTION OF 27.86 PLOOF ROAD & HIGHWAY 17 COVER SHEET and GENERAL NOTES OCEAN GATE PLAZA at WESTGATE LOCATED IN THE TOWN OF LELAND TOWN CREEK TOWNSHIP BRUNSWICK COUNTY NORTH CAROLINA j� CARD �' a pe eeSS10 e ���. o e "�al SE 2000? ." m p Gj `eQ�,�wa I ps N VA Edhollis 0 hdsilm.com OWNER: OCEAN GATE, LLC PO BOX 3167 Wilmington, NC 28106 910-791-1196 HANOVER DESIGN SERVICES, P.A. LAND SUR✓E1'ORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET J WILMINGTON, N.C, 28401 l PHONE: (910) 343-8002 Dote: 10— 07— 05 Scole: 1 "= 200' Drawn; DSH Checked GA W Project No: 6309-roadia Sheet No: 1 4 Of: 6309-roadia Model (1): 11:39:06 11/ZZ/ZU05 Ocean Gate Plaza.pdf: 12:44:32 11/22/2005 LOCATION MAP 'Tesipa- _10 ADJUST HYDRANT AS NECESSARY, GX 12 36,00'Povement r , 0 EXISTING PVMT., C&G, AND UTILITIES BY OTHEF 3000psi CONCRETE 12" 12' 1 1/2" MIN. BITUMINOUS PAVEMENT to CONCRETE CURB DETAIL in WESTGATE DRIVE t=TO SCALE VARIABLE R/W AT ENTRANCE M tO 60' R/W 6 W � 10' 2' 36' 2' 10' 1/2"PER FOOT 1 4"PER FOOT 1/4"PER FOOT 1 2"PER FOOT 6­­� 7 8"ABC & 1-1/2"SF9,5A MODIFIED VAL Y CURB A'THiCK 5'WIDE ICONC.SIDEWALK TO BE PROVIDED DE TYPICAL STREET DETAIL ORUEAST ISIDE NOT TO SCALE (APPLIES TO COLLECTOR ROADS) WEST GATE DRIVE and OCEAN GATE PLAZA NIGHT HARBOR DRIVE \ NOTE: CONTRACTOR TO ENSURE THAT STREET PAVEMENT & CURBING IS PLACED L 50 AS TO DRAIN POSITIVELY TO CURB INLETS AND DRAINAGE STRUCTURES. Q CURB INLET BOXES AND STORM MANHOLES TO BE SIZED AS NECESSARY TO ACCOMODATE C OVERSIZE PIPES. u. NOTE WELL: ' S - FOR CENTERLINE GEOMETRY ¢ f` 1 THIS PLAN IS FOR STORM SEWER, CURB & GUTTER, ,7� AND STATIONING, SEE AND PAVING CONSTRUCTION ONLY. SANITARY o 1: "+� 1 PREVIOUSLY APPROVED PLANS. � SEWER AND WATER WAS PREVIOUSLY PERMITTED, AND IS EXISTING, RELOCATION OR MODIFICATION OF EXISTING UTILITIES BECAUSE OF CONFLICTS WITH STORM SEWER SYSTEM IS THE RESPONSIBILITY OF w PI STATION EQUALITY / \ i THE CONTRACTOR. SEE COVER SHEET NOTES. 18 -t- 60.45 � L28 1 0 15.5 ADJUST H'i(DRANT / \ Vh ! Gz._ - t \ / 2go AS NECESSARY. \ / EXISTING WATERLINE ELEVATION _ ADJUST �1-IYDR-fz q A5 NECESSARY-25� N ,,, 9 _ _� '•• .... ""'�- �MAY NEED ADJUSTMENT, _ o AZi"' �__ ... .- - - - - - - \ 22 BY OTHERS _ Adoill BY OTHERS ; z ;ADJUST MANHOLE Rllvl NECESSARY. --_t'e 9� � 0 I 16) Do J\ � I NCOOT CATCH BASIN / STD.840,02 STD.CURB SECTION N N TRANSITION SECTION JOINT- +a zto 10'TAPER 3'-1 1/2" 10'TAPER > W PLAN VIEW W z< FRAME, GRATE AND HOOD CURB $ W' NCDOT STD. 840.03 c B NORMAL GUTTER FLOW LINE 17 FRAME & GRATE OPENING DEPRESSED GUTTER PRECAST CONCRETE CATCH BASIN t� NOTE WELL, 50 25 0 50 100 ANY AREAS ON -SITE WITHOUT ACTIVITY IN A (/ \j a 15 DAY PERIOD SHALL BE TEMPORARILY > I I, SET STABILIZED AS PER THE SPECIFICATIONS. Scale In feet: 1"= 50' ANY SLOPES TO BE STABILIZED AFTER 15 DAYS. - - - L _ - C� SEE NCOOT SIDS. 852. D5 Data: SECTION VIEW 40.02 FRONT SECTION STREET PLANS & PROFILES - OCEAN GATE PLAZA 10_07-05 FOR FURTHER DETAIL OCEAN GATE PLAZA at WESTGATE HORZ.: 0' PRECAST CURB INLET VERT.: f = 51 N.T.S. LOCATED IN TOWN OF LELAND Orown: BRUNSWICK COUNTY, NORTH CAROLINA �a�a�$ DSH Jp 11 It Chocked: 101, 5j, OCEAN GATE, LLC DSH sad 9 PO BOX 31 Project No: WILMINGTON, NC 28106f. AL, (910)--791-1196 6309-raad2-din • 20007 � Sheet No: 1 REVISED AS PER DENR / DWO COMMENTS 11-22-05 ,�/(a "'"'•'(a�"� �"` HOVER DESIGN SERVICES.. PA. REV. N0, REVISIONS DATE rr LAND SURVEYORS, ENC/NEERS & LANO PLANNERS 319 WALNUT STREET Copyright O , Honour Design Serdaee, P.A., All rights r*"rVed. Reproduction or use of the contents of this document a oddrtlone or detetlons to this 319 WALNUT N. R 28401 111///��� document, 0 vends or par, without mitten consent or the Land Surveyor or Engineer, is prohrbiteot onty copes nom the origins of this document, PHONE: ON, C. 8401 Of: rooked with the orlg:'a signature and origind sod of the Stirv, or Engineer, whdl be considered to be wlid and trus cwiss. 21 2 / 19 O � 17 i EXISTING PVMT., C&G, AND UTILITIES x�/ i ao Qa I -- dhollis®hdsilm.Corn --- 11 o i0 wz FIR 30. 0 30.0 ®alttlfi'��i�n ��III®�� NJ [i �r 100 CONTRACTOR TO EXERCISE EXTREME CARE AT UTILITIES CROSSINGS. SEE NOTES, 0 0 rim E 25.0 we STORM SEWER SYSTEM - WEST GATE (OCEAN GATE PLAZA) PIPE SUMMARY: DI- GRATE INVERT LENGTH DIA SLOPE DI GRATE INVERT END 17.00 66 24 0. 30% 1 21.10 17.20 1 21.10 17.60 36 24 0.287 2 21.10 17.70 2 21. 10 17, 70 58 24 0, 17% 3 21. 10 17. 80 3 21.10 17.80 36 24 0.28% 4 21.10 17.90 4 21.10 18.00 44 24 0.23% 5 21.10 18. 10 5 21.10 18.10 17 24 0.59% 6 21.70 18.20 6 21.70 18.20 232 24 0, 43% 7 23.25 19.20 7 23.25 19.20 192 24 0.26% 8 23.80 19.70 8 23.80 2D, 20 180 18 0, 17% 9 24.25 20.50 9 24,25 20,50 76 18 % 0 4 0 . 10 23.90 20.80 10 123. 90 80, SO t i Ifl 18 0. 19Y. It 94,150 IIR 1. 00 11 24.00 21.00 36 18 0, 28% 12 24.00 21.10 6 21.70 18.50 17 18 0, 59% 6A 21.10 18.60 TEMPORARY ENO OF 7 23. 25 19, 40 17 18 1, 18% 7A 22. 60 19. 60 PAVING, INSTALL BASE COURSE 7 23. 25 19, 40 17 18 1, 18% 7B 22. 60 19, 60 AND BARRICADE, 8 23, 80 20, 00 17 18 1, 18% BA 23. 20 20. 20 '1 8 23, 80 20, 00 17 18 1. 18% 8B 23. 20 20. 20 100' V.C. Y s� -III ININII 'me il, 5.0 •J q-� 25.0 20.0 - 15.0 10.0 5.0 „sue•- , LOCATION MAP NOT TO WAI 11 ATE P OCEAN _ -- Vogt 5%1d _ . �� Sidewalk IP "t t2 CONTRACTOR MAY INSTALL PLAN VIEW ORIFACE AND LEAVE OPEN DURING CONSTRUCTION IF THE OPENING IS SCREENED CONSTRUCT 1 3 MAX. AND COVERED BY 057 STONE. GRATE TOP FL=19,0 1 14' 90' EL BOW DOW1V TRASH ,'BELOW WSEL RACK [le_ 4. EL= 18,0 MIN WSEL= 17.0 p _ _- --- INV= 1-112" MOLE IN 17.0 SB 6 PVC PIPE, OR 1-112" PERFORA TED PVC W/ GRAVEL AND FABRIC FILTER MAINTAIN COVER ON OUTLET PIPE EL= 18.0 2,O'NDE OUTLET WEIR CUT 18 RCP 9"GROUT INV= OR CONC. 16.5 �. B4OXINV=14.5 POND BOTTOM 4X4 Precast COnG.BOX ELEV= 11.0 NCProducts 4849 or Equivalent POND BOTTOM MAY BE OVER- SECTION VIEW EXCAVATED FOR SEDIMENT STORAGE s� n 36,00'Povem FU'NRE STRIPING IP � 11 7, \ NIGHT HARBOR DRIVE rn Q c i � See Sheet 2 for Storm ✓ Sewer construction details. Li 0 LU•'`\ / % S IE=15.5 5z -26 elf / \ N U' I -- _ 1,9 3 _ - -2a 1 '�`• 8Y C)THERS - -sz _' "" --_ =." P � ' �� � _ .. _ W. IP \\ / 9Z \ 1 \ r, \ \ Cx4 i -- - -V 1 UMP TO BE USED TO DRAIN SE OF EMERGENCY. PUMP TO BE TOP OF BERM WITH SCREEN 0 HOSE INLET AND COVERED WITH OUTLET TO DRAIN ACROSS STABLE "A SUFFICIENT TO RESTRICT EROSION, \ S ROOF DRAINS MUST BE DIRECTED 18"RCP®0.67. OUTLET rORM DRAINAGE COLLECTION TOP BOX= 19.0 NTO THE STREET/PARKING LOT, 6"PVC W/ 1-1/2"HOLE / 1 OR 1-1/2-PERFORATED PVC WEIR EL= 18,0 EGETATION ZONE: WEIR LENGTH- 2' S 16.0 TO EL- IZO IE OUT- 16.5 L SPECIES FOR PLANTING IN EM.SPILLWAY LENGTH- 40' / a ARE AS FOLLOWS: SPILLWAY EL= 19.5 d RIA LATIFOLIA (COMMON ARROWHEAD) TOP OF BANK= 21,0 / RIA LANCIFOLIA (DUCK POTATO) / US CERNUUS (LIZARDTAIL) / )RA VIRGINICA (ARROW ARUM) MORE OF THE SUGGESTED SPECIES / _ABLE, APPROPRIATE WETLANDS CE N COMMON THE COASTAL CAROLINA Y BE SUBSTITUTED, EMERGENCY EMBANKMENT TOP= 21.0 100-YEAR WSEL= 19.1 SPILLWAY= 19.5 TOP BOX = 19.0 STATE STORAGE VOLUME ANTI -YEAR WSEL= 18.5 ANTI -SEEP a.-. POND - 14,500 cf LO U OUTLET PIPE iO 80LF 0 0.6% II SEE NEXT SHEET O FOR ADDITIONAL OUTLET STRUCTURE AND EROgON CONTROL DETAILS. EMBANKMENT SECTION NOT TO SCALE WEIR CUT EL= 18.0 NORMAL WSEL= 17.0 F'tAK UI5(:I'1AKVt JUMMAK T - Q 10) pre -developed = 2.7 cfs Q 50) pre -developed = 5.2 cfs Q((10) post -developed = 2.1 cfs 0 WSEL = 18.5 Q(50) post -developed = 5.7 cfs Cal WSEL = 18,9 Q 100)post-developed = 8.7 cfs @ WSEL = 19.1 WATER QUALITY POND CONSIDERATIONS - Surface Area required = 3,700 sf Surface Area provided = 13,000 sf Storage Volume required = 6,135 cf Storage Volume provided = 14,500 of Storage Volume Drowdown Time = 4 days SEDIMENTATION POND CONSIDERATIONS - Storage required = 5 X 1800 = 9,000 cf Storage provided = 57,000 cf FOREBAY CALCULATION: Approximate Foreboy Volume = 7,000 cf 20% Volume of Storage = 35,800 X .2 = 7,000 cf in z +--- a,u -• Mpi NOTIii � AR TO iS p916100 AP'190 Afl� PIP IB IN PLACE. REINFORCING As NEEDED ANTI -SEEP COLLAR NOT TO SCALE p2::I; F--.� e Pa vin 9 IP j I - 21 5:1 Sid, StaPe 19 20 OP 17 18 r ..,lde Slope I so 1 li� •,�1� 1, I�III �t�f� is ui � t 19 h� t 18VO9etative Shelf.�? 20 OP 21 n»rgena; SPiof t9 z 2 Oq� Elevation= 199 . n to Anti -Seep / 16 Appro- x,136CY Gollor SF 76 / A04 WETLAP)DS: l PVMT., PSC PR VI L PERMITT SE SW8 0407 I Hu erS ne art nts aQ) 7 CI L] �1 5, S;dewolk Vast S''ide I-_ 7! g6.00'Pove Me 40• .09ervious do � ,ERMITTEO _. FLOW Sidewalk One Side Only 5' Wide Typical OC��GgT\ Westgate - Ocean Gate Plaza Pavement and Sidewalk Area Inset Scale: 1 "= 100' October 2005 :ention/retention pond VOLUME REQUIRED: R=[(P)(Pj)(Rv)/12](A) DWQ SEE PAGES A.1 and A,2, "Controlling Urban Runoff: A Practical Manual for Planning and Designing Urban BMPs" (p)= 1„ (Pj)= 0.9 Impervious area calculations: See Project Data Sheet (Rv)= 0.05 + 0.9(1.60/5.00) = 0.338 TOTAL IMPERVIOUS = 1.60 acres (A)= 5.00 TOTAL AREA DRAINING TO POND = 5.00 acres R= [(1)(0,338/12X5.00) = 0.141 acre-feet 5,00 acres total - 1,60 acres impervious = 3,40 acre green = 6,135 cf REQUIRED STORAGE 14,500 cf PROVIDED STORAGE 0 ELEV.= 18,0 SA REQUIRED: 1.60 / 5.00 = 0.32, or 32% DRAWDOWN: Average head from storage elevation to orifice - At 6.0' depth, 9TSS removal, from chart - SA/DA factor = 1,7 18.0 - 17.0 / 2 = 0.5' 1-1/2" PVC drain to draw -down pond: 5.00 x 0.01 x 1.7 = 3,700 sf SA REQUIRED At Elev. = 17.0 = 13,000 sf SA PROVIDED Orifice equation: Q = CA(2gh)"1/2 T= 4days 1 REVISED AS PER DENR / DWQ COMMENTS 11-22-05 REV. NO. I REVISIONS DAT Copyright 0, Hanover Design Services, RA„ All rights reserved. Reproduction or use of the contents of this document, or additions or deletions to this document, In whole or part, without written consent of the Land Surveyor or Engineer, is prohibited. Only copies from the original of this OOovment, mdrked with the original algnature end original Seal of the Surveyor or Engineer, shall be considered to be volld and true copies. 50 25 0 50 100 Scale in feet: 1 "= 50' 6'min. 12'min. SEE PLAN ALL SLOPES 0 3:1 MAXIMUM w o OUTLET Forebay volume � 209 of required r PIPE WSEL storage, typical p Forebay �a Bottom OUTLET ra 4'min, Elev.- 11 ASOON CTIPLOAN5 4 Armor as necessary minimum V Stone FOREBAY SECTION DETAIL NOT TO SCALE A PORTABLE PUMP TO BE USED TO DRAIN POND IN AN EMERGENCY. VGqr,,t,. Ocean Gate Plaza Pond Pond WSEL= 17.0 Surface= 13,000sf Nominal Depth= 6.0 Bottom=10.0 SEE INSET ELEV. AREA VOL. STORAGE STORAGE (ft) (Sf) (C0 (cf) (cc-ft) 17.0 13.000 18.0 16.000 14.500 14.500 0.33 19.0 19,000 17,500 32,000 0.73 20.0 22,000 20,500 52,500 1.21 21.0 26,000 24,000 76,500 1.76 STA7E STORAGE of EL-19.0 14500 am O'er 1111iiN�l,1, 3 O 5.0 ACRES DRAINS TO POND 73814 SQ. -, F6 68943 SQ. FT. 1.58 acres, USE 1.6 ACRES TOTAL IMPERVIOUS LOCATED IN TOWN OF LELAND BRUNSWICK COUNTY, NORTH CAROLINA CARtj( SE AL 20007 dhollis(ghdsilm.com Sidewalk One Side Only -I 5! Wide Typical �o ono a a sore 004070703 OCEAN -------�. GA -re P�AZq OCEAN GATE, LLC PO BOX 3167 WILMINGTON, NC 28106, (910)- 791-1196 HOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 25401 PHONE: (910) 343-8002 Dote: 10- 07- 05 AS SHOWN Drown: DSH Checked: DSH Project No: 6309-road3-dh r Sheet No: 3 4 I 6309-road3 Model (1); 10:54:35 11/22/2005 Ocean Gate PLaza.pdf: 12:43:35 11/22/2005 VAR `' l ,4 k'; 'JLE OBS`1NUC1'IfiN DETAIL-"`' " RAD(VAR) SIDEWALK PLAZA(V) SEE NOTE(TYP) VAR - VAR 10' MIN - P ED-X ING --- + I - , t / SEE NOTE 2(TYP)1 !;, fr A,,.IE,, -0" 4 ,'I 1YPICAL LOCAT1Qtt...SHE._.WiLEI SQ IAIH3 E_WL1 ia1t3191:L-.f'`=^� ¢ GiOP BARS GUIDELINES FOR WHEELCHAIR RAMPS AND DEPRESSED CURBS(A) - NTS NOTE WELL: ANY AREAS ON -SITE WITHOUT ACTIVITY IN A 15 DAY PERIOD SHALL BE TEMPORARILY STABILIZED AS PER THE SPECIFICATIONS. ANY SLOPES Tp BE STABILIZED AFTER 15 DAYS, :��, A, ( _ +J)A -- - �I COVER PLAN VIEW RARE PLAN VIEW (BOTTOM) 0 -0 1/2" 1' 4 1 / 4" DIA, 0'-0 1/2" O' 1" - O'-0 7/8„ V-3 1/4" DIA, 0'-7 1/2" O'-0 1/8„ 0'-6 5/8„ H l- H ---.1 Q I -1.1 0 -0 3 '84" ,, 1 -3 1/4 DIA. �- ,- 00' 0 4" 5 C IO - A-_ ENT MO NUM NTS A A L J COVER PLAN VIEW (I"P SECTION 'B-B' 16 1/16" DIA. AT TOP 0'-0 1 /8" 10 1/2" DIA. -- --- O'-0 1 /8" 6" DIA. -'I O'-0 1/2" 0' 1 7/8" `Y --I -r -11 -.I.- _O'-0 7/8" �O,--0 1 /81, 0'--2 1 /8„ 0I-0 1/2" O'-2 3/8' - 1 /16" 15 7/8" DIA. -0'-0 1/2, AT BOTTOM 0 -0 5/8 PART OF SECTION 0'--O 3/8" ENLARGE G.R. ENNIS & SON NO, MBX-GRE-16 MINIMUM AVERAGE WEIGHT RING 120 L_BS. COVER 40 LBS. MONUMENT NTS 1/2" EXPANSION JOINT 1/2" EXPANSION JOINT SIDEWALK 4'-0" 3'-4" 4'-0 -- SCORE VAR 12:1 MAX VAR VAR BACK OF CURB SLOPE - -- GRASS STRIP I DEP E SED --- VERTICAL BREAK FACE OF CURB _0" IN CURB SLOPE NOT TO SEE NOTE 2 10' -0" MIN EXCEED 12:1 1 PED-X-ING PLAN VIEW WHEELCHAIR RAMP GUIDELINES FOR WHEELCHAIR RAMPS AND DEPRESSED CURBS(B) NTS GENERAL NOTES L LOCATION OF MIEELCHA69 RAMPS: 1. IN ACWHDANOF WITH THE RATIFIED HOUSE BILL 1296, ALL STREET CURBS IN NORTH CAROLINA BEING CGNSrRUCTEO OR RECONSNCTED FOR MAINTENANCE PROCEDURES, TRAFFIC OPERATIONS, REPAIRS, CORRECTION OF UTILITIES OR ALTERED FOR ANY REASON AFTER SEP TaMBEN 1973 SHALL PROVIDE WITEELCHIR RAMPS FOR ME PHYSICALLY HANDICAPPED AT ALL INTERSECTIONS *WERE BOTH CURD -AND GUTTER AND SIDEWALKS ARE PROVIDED AND AT OTHER MAJOR POINTS OF PEDESTRIAN FLOW, 2. WHEELCHAIR RAMPS SHOULD BE LOCATED AS INDICATED IN DETAIL DRAMMOS, HOWEVER ExISnNa LIGHT POLES. FIRE HYDRANTS, DROP INLETS, ETC. MAY AFFECT PLACEMENT. 11. CONSTRUCTION NOTES. I. NO SLOPE SHALL EXCEED 1"=1 (12: 1) ON THE RAMP OR SIDEWALK. 2, IN NO CASE SHALL THE WIDTH OF WHEELCHAIR RAMPS BE LESS THAN 40" (3'-4`). WOTHS MAY EXCEED f0"ENE CESSARY. 3. USE CLASS "A" CONCRETE NTH IHE SJRFACE HAVING A ROUGH, NON-SKID TYPE FINISH. 4. 1/2" EXPANSION JOINT WILL BE REQUIRED MERE THE CONCRETE WHEELCHAIR RAMP ANS ANY RIG'D PAVEMENT OR STRUCTURE. e. IO CONSTRUCTN METHODS SHALL CONFORM NTN ,HOSE OF THE GOVERRINO BODY WHICH HAS JURISOIc DON OF THE PARTICULAL STREET. 11, ADDITIONAL NOTES: I. THE INSIDE PEDESTRIAN CROSSWALK LINES SHALL BE ESTABLISHED BY BISECTING THE INTERSECT$ N ftADI WHERE MARKET) (SEE NOTE 6). 2. THE WHEELCHAIR RAMP SHALL BE LOCATED SO THAT THE 9EGINNINO OF THE WHEEL CHAIR RAMP WILL BE TWO FEET FROM THE INSIDE PEDESTRIAN CROSSWALK LINE. 3. THE WIDTH OF ME PEDESTRIAN CRaSWALK SHALL BE 10 FEET UNLESS A GREATER WIDTH IS REWIRED TO ACCOMMODATE THE PEDESTRIAN TRAFFIC. 4. STOP BARS SHALL BE USED WHERE IT IS IMPORTANT TO INDICATE THE POINT BEHIND WHICH VEHICLES ARE REOJIRED TO STOP IN COMPLIANCE NTH A TRAFFIC SIGNAY, STOP SIGN, OR OTHER LEGAL REOJIREMENTS. 5. PARKING SHALL BE ELMINATED A WNIMUM OF 20 FEET BACK OF PEDESTRIAN CROSSWALK. g. ALL PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES PUBLISHED BY THE FEDERAL HIGHWAY ADMINISTRATION. THIS IS AVAILABLE FROM THE SUPERINTENDENT OF DOCUMENTS, U.S GOVERNMENT PRINTING Ofi WASHINGTON, D.C. 20402 GUIDELINES FOR WHEELCHAIR RAMPS 6" ABC CASTING 1-1/2" I-2 12" MIN. -r F- 8" BRICK I- lu 4„ T --�+�►T� I I 12" � 11" � 12" TYPICAL DETAIL MONUMENT CASTING and EASE Al T.$. - NOTE: DETAILS SHOWN ARE TYPICAL OF INSTALLATIONS REQUIRED BY TOWN OF LELAND. THIS SHEET DOES NOT PURPORT TO SHOW ALL REQUIRED CONSTRUCTION DETAILS, BUT RATHER SERVES AS A GUIDE, THE CONTRACTOR IS RESP01 ;IdLE FOR ADHERING TO ALL COUNTY AND STATE CODES AND CONSTRUCTION STANDARD'; RQ1L WELL: EROSION CONTROL DETAILS AND SPECIFICATIONS ARE AS PER THE "EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL" OF THE STATE O NORTH CAROLINA, DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, LATEST EDITION. PRACTICE NUMBERS REFER TO THIS MANUAL. 0 P La= 2o' FLARED END TI N TYPICAL SECTION 0° ° 24"RCP d50=3" 121 000000 °�cNN r MIN, 0 0 0- O O On-1Apra o°g°o° ° V(10)=4fps 00 0 HGL(10)=19.2 MINIMUM OUTLET AT POND DIMENSIONS 7,5 cyt EACH OUTLET PROTECT/OlV NOT TO SCALE i= Rock to top of pipe :D both sides 0 r= SLOPE 1 OP O N w w0 t _ H- EMBANKMENT I OUTLET PI PE See Narrative for additional details ill � 2'min. NOTE: FILTER FABRIC IS TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. USE NICOLON MIRAFI 60OX POLYPROPYLENE, OR EQUIVALENT OUTLET PROTECTION - SIDE VIEW NTS OOP La=20' -TRIPLE - 24"RCP 2'SEPARATION MIN. 0000000 d50=3" 0 15' 000000 Apron=1 MIN, 0°0°0°0 o -,V(25)=18fps ° n - HGL(25)=20.1 MINIMUM DIMENSIONS OUTLET AT CULVERT 11 Cy OUTLET PROTE�T/Oi'V NOT TO SCALE 1/2" EXPANSION JOINT 1/2" EXPANSION JOINT SIDEWALK 4'-011 3'-4I. 4'-O" SCORE VAR 1 pj�qX VAR VAR BACK OF CURB SLOPE GRASS STRIP DEPRESSED --_----fAlR -.--- - - - _ -- VERTICAL BREAK FACE OF CURB 2'-O. IN CURB SLOPE. NOT TO SEE NOTE 2 10'-O" MIN EXCEED 12: 1 PED-X-ING PLAN VIEW WHEELCHAIR RAMP GUIDELINES FOR WHEELCHAIR RAMPS AND DEPRESSED CURBS(B) NTS PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - ``� 1, TEMPORARY GRAVEL CONSTRUCTION ENTRANCE Practice 6.06 Shall be installed at the entrances of the proposed project in and from Westgate Drive or Ocean Gate. Drainage is away From the road and sedimentation will be controlled with downstream practices. During wet weather it may be necessary to wash truck tires at these locations. 2. LAND GRADING Practice 6.02 Grading should be limited to areas as shown on the Plans. Cut and fill slopes shall be 3:1 or flatter except where specifically indicated. Care shall be token during land grading activities not to damage existing trees that ore not required to be removed, SF 3, SEDIMENT FENCE Practice 6.62 Sediment fencing should be installed as shown on the Plan, first, to delineate and protect low areas, and around any temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent lands or roadway, or into inlets. IP 4. INLET PROTECTION Practice 6.52 Storm sewer inlet barriers of block and grovel inlet protection are to be constructed to help prevent sediment from entering the storm sewer system. After permanent stabilization of the entire contributing watershed area, the storm sewer system is to be flushed to remove accumulated sediment and ensure design flows. TOP 5. OUTLET STABILIZATION Practice 6. 41 Riprop aprons will be located at the downstream end of all discharge pipes to prevent scour, 6, CONSTRUCTION ROAD STABILIZATION ti Prac ce 6.80 Upon reaching final grade and after storm sewer nos been installed, roadways and parking areas are to be stabilized by placing sub -base course of approved 8" ABC stone, as shown in the typical cross-section detail on the Plan, to reduce erosion and dust during the remainder of building construction. SB 7. SEDIMENT BASIN Practice 6.61 The Sediment Basin is to be constructed FIRST (see Construction Schedule) and is the primary Practice to prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the details as shown on this Plan and the Narrative. The 1-1/2"PVC orifoce is to be blocked during sedimentation function (or not installed) until entire watershed is permanently stabilized and pond is converted to permanent stormwater management detention / retention function, PSC 9. PERMANENT STREAM CROSSING O Practice tic 6.71 A large TRIPLE culvert is to be constructed in Westgate Drive and sized as shown an the Plan, to convey stormwater from offsite undisturbed areas in the existing well- definedtf ou alls. toexisting waath r channel defined wet e Care should be taken to construct the culvert as quickly as possible, during dry weather, and stabilize vegetatively and with rip -rap and base course as rapidly as is feasible. CONSTRUCTION SCHEDULE - SEE PLAN, THIS SHEET 1. Obtain approval of Pion and any necessary permits, and hold a pre -construction conference prior to commencing any work, 2. Flog work limits and stake -out parking lot, primary measures, and Slit Fencing and Sediment Basin for preliminary grading. 3. Install Gravel Construction Entrances. 4, Install Silt Fencing as shown on Plan prior to clearing and grubbing site. Sediment Basin to be constructed FIRST. Any additional measures or diversion ditches to be contructed and stabilized prior to commencing any major grading operations. Storm sewer construction and direction of all runoff to the Sediment Basin is to be completed as quickly as possible. 5. Construct ditches and any other sediment control Practices shown, prior to rough grading poking lot and site, stockpiling material and topsoil SolI as necessary. Culvert rt permanent stream it i ed. in z in to be installed and stab crossing 6. Install utilities in parking lot, establish final grades and stabilize parking areas with stone base course. 7. Final grade building site, install non -municipal utilities as needed, and vegetatively stabilize areas where building construction is not imminent. 8. All erosion and sediment control Practices ore to be inspected weekly and after any rainfall, and repaired as necessary. 9. Upon completion of building construction, the roadway and parking areas ore to be paved and all areas permanently vegetatively stabilized. After site stabilization, temporary measures ore to be removed and the Sediment Basin cleaned to its original design contours, if necessary, and riser structure oriface opened, so as to function as stormwater management / water quality retention ponds. MAINTENANCE PLAN - 1, All measures to be inspected weekly and after any rainfall event and needed repairs made immediately. 2. Sediment Basins to be cleaned out when the level of sediment reaches 4.5' below water surface. Riser structures to be cleaned if excess water above design surface no longer drains properly. 3. Sediment to be removed from foreboys when they are approximately 25% filled or sediment level is within 4.5' of top. 4. Sediment to be removed from behind the any Silt Fence onld inlet protection devices when it becomes 0.5' deep. Fencing and inlet protection to be repaired as needed to maintain a barrier. 5, All seeded areas shall be fertilized, mulched, and re -seeded as necessary, according to specifications provided, to maintain a suitable vegetative cover. VEGETATIVE PLAN - 1. Permanent vegetation to be established in accordance with "North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6.11, latest version. See next Sheet - _-_ 2"X 4" FRAME AROUND -- STAKED 2"X 4" MAXIMUM HEIGHT WOODEN FRAME - I* NARNAi* ON tQ ORE DETAIL AND 3' SPACING L1iRNAlE METHODS. GATHER EXCESS FILTER FABRIC AL CORNERS _ _ \ n ­ EXTEN510 OF - -_ - _ Z FABRIC Ir MIN. INTO TRENCH / i 4"CRUSHED STONE ON 12"COMPACTED SOIL Z 1-) I / o• FILTER FABRIC: <. --\(tN PERVIOUS SHEET OF NYLON, POLYESTER, OR DROP INLET ETHYLENE YARN, EXTRA WITH GRATE Q1 ( STRENGTHGTH O PSI WITH ULTRAVIOLET HAYAY INHIBITORS AND STABILIZERS L5OMETBt,Q VIEW FABRIC DROP INLETPROTECTION T NTS PNAaT101E 1i I P PUBLIC ROAD �L 1v C `& @ . v5aco - o- %s% yU, Gin 6" MINIMUM ��pQ THICKNESS , O 2"-3" COARSE AGGREGATE - NOTE: SEE NARRATIVE 12'MINIMUM FOR MORE DETAIL. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT CE:TAIL J N.T.S. �_._.-. MAXIMUM ^^��q_ SEE NARRq I�IVa, OF FAR IEU FLL IRE `Z^ OR AVEL EXTENSION OF FAR ANU WIRE NOTE: M70 THE TRENCH SEE NARRATIVE FOR MORE DETAIL ISOMETRIC VIEW EXTENSION OF FILTER FILTER - FABRIC FABRIC AND WINE.. INTO THE TRENCN - F'AJJNIC BACKFiLL ` IMPACTED MINIMUM 8" IILL THICK LAYER OF GRAVEL WIRE WIRE � �m 4c� .�`C.� .� 5 14"MINIMUM SECTION r� 4"MINIMUM �LcrloI�� SF SEDIMENT FENCE_::" ,:�ij FENCE firePRAGTxE o.A:) Temporary Sediment Trap - continued Protection from piping - Place filter cloth on the foundotion below the riprop to prevent piping. An alternative would be to excavate a keyway trench across the rlprop foundation and up the sides to the height of the dam. Weir length and depth - Keep the spillway weir et least 4 ft long and sized to poss the peak discharge of the 10-yr storm. A maximum flow depth of 1 ft. a minimum freeboard of 0.5 ft, and maximum aid„ siopes of 2:1 ore recommended, Weir length may be selected from Table 6.60o shown for most site locations In North Carolina. Table 5.600 Design of Spillways Drainage Area Weir Lengtn(1) (acres) (it) 1 4.0 2 6.0 3 6.0 4 10.0 5 12.0 (1) Dimensions shown ore minimum Construction Specifications 1. Clear, grub, and strip the area under the embonkrnent of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul oil objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionobie material: Place the fill in Ilfle not to exceed 9 inches and machine compact it, Over fill the embankment 6 inches to allow for settlement, 3. Construct the outlet section in the embanknent, Protect the connection between the riprop and the sail from piping by ,;amg filter fabric or a keyway cutoff trench between the rlprop structure and he soil. ! i (Place the fitter fobric between the riprop and soil. Extend the ,I fabric "rose the Spillway foundation and aides to the top of the h dam; or (Excavate a keyway trench along the centerline of the spillway foundotion extending up the aides to the height of the dam, The trench should be at least 2 ft deep and 2 ft wale with 1:1 sidle slopes. f the crest of the spillway to h area below the elevation o e 4, Clear the pond P Y f0 cultate sediment cleonout 5. All cut and fill slopes should be 2:1 or flalbr 6. Ensure that the stone (drainage) section ofthe ernbunkment hus a minimurn bottom width of 3 ft and maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spH wTy bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment Keep the thickness of the sides of the spillway ,utlet structure at a minimum of 21 Inches. The weir must De level and conetorted to grade to assure design capacity. f n should h a w B- rodad mixture o stone h on action ho d e tl Material in the es s 6. ola o used 9 with a d50 size of 9 inches (clans B erosion control stone is recommended) and o maximum stone size of 14 inches. The stone may be machine placed and the Smaller pL atones worked Into the voids of the larger atones. The stone should be hard, G angular, and highly weather -resistant. v 9. Ensure that the stone spillway outlet sectiarextends downstream post the toe of the embankment until stable conditions ;re reached and outlet velocity is acceptoble for the receiving stream. Keep the Idges of the stone outlet section flush with the surrounding ground and shape the center to confine the outflow stream (References: Outlet Protection), 10. Direct emergency bypass to notufol, stobii area$. Locate bypose outlets e0 that how will not damage the embankment. 11, Stabilize the embonkment and all disturbed areas above the sediment pool and downstream from the trap immediately offer construction (References: Surface Stabillzotbn). 12, Show the distance from the top of the spriwoy to the sediment cleanout level (one-half the design del on the plane ano Mork It In the f iiid. Maintenance Inspect temporary sediment traps after each period of significant rainfall. Remove sediment and restore the trap to its ^r'ginal dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the tf sediment that is removed in the designated disposal area and reploce the I contaminated part of the gravel facing. I Check the structure for Ilamage from erosion or piping. Periodically check the depth of the spilwoy to ensure it is a minimum of 1.5 ft below the low point of the embankment, Immediately fill any settlement of the embankment to slightly above design grade. Any riprop displaced from ute spillway must be replaced immediately. After all sediment -producing areas hove been Oermonently stabilized remove the wi the ad' inin n I h t v ar Ih structure and aII u aloe a sediment. Smoot eoo blend t !0 9 ill r n Surface Stabilization), Drew and stabilize p ape y (References: Su Stabs zot on): Construction Road Stabilization Specification # 6.80 -Construction Specifications 1. Clear roadbed and parking areas of oil vegetation, roots and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain if it is possible. 3. Locate parking areas on naturally flat areas if they are available. Keep grades sufficient for drainage but generally not more than 2 to 3%. 4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References: Runoff Control Measures). 5. Keep cuts and fills at 2:1 or flatter for safety and stability and to ( vegetation facilitate establishment o ve a atn and maintenance. o 9 6. Spread a 6-inch course of "ABC' crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6,81, Subsurface Drain). 8. Vegetate all roadside ditches, cuts, fills and other disturbed area$ or otherwise appropriately stabilize as soon as grading is complete (References: Surface Stabilization). 9: Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roads and parking oreos periodically for condition of surface. Topdress with new grovel as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff -producing rains. Maintain all vegetation in a healthy, vigorous condition, Sediment -producing areas should be treated immediately. CE Temporary Gravel Construction Entrance/Exit Specification # 6.06 - Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it, 2. Place the grovel to the specific grade and dimensions shown on the plans and smooth it. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2--Inch stone, After each rainfall, inspect any structure used to trap sediment and clean it out os necessary. Immediately remove all objectionable materials spilled, woshed, or tracked onto public roadways. 00 Temporary Seedina Specification # 6.10 - Specifications Complete grading before preparing seedbeds and install all necessary erosion control practices, such as dikes, waterways and basins. Minimize steep slopes because they make seedbed preparation difficult and increase the erosion hazard, If soils become compacted during grading, loosen them to a depth of 6-8 Inches using a ripper, harrow, or chisel plow. Seedbed Preparation Good seedbed preparation is essential to successful plant establishment. A good seedbed is well -pulverized, loose and uniform. Where hydroseeding methods are used, the surface may be left with a more irregular surface of large clods and stones, Liming - Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the rota of 1 to 1 1/2 tons/acre on coarse -textured soils and 2-3 tons/acres on fine --textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed, Fertilizer- Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-I,ODO Ib,/ocre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. Surface roughening- If recent tillage operations have resulted In a loose surface, additional roughening may not be required except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by disking, raking, harrowing, or other suitable methods, Groove or furrow slopes steeper than 3:1 on the contour before seeding (Practice 6:03, Surface Roughening), Plant Selection Select on appropriate species or species mixture from Table 6,100, for seeding in late winter and early spring, Table 6.10b for summer, and Table 6.10c for fall. Seeding Evenly apply seed using a cyclone seeder (broadcast), drill, cullipacker seeder, or hydroseeder. Use seeding rates given in Table 6.100-6.10c. Broadcast seeding and hyroseeding are appropriate for steep slopes where equipment cannot be driven, Hand broadcasting is not recommended because of the difficulty in achieving a uniform distribution. Small grains should be planted no more than 1 inch deep, and grosses and legumes no more than 1/2 inch. Broadcast seed must be covered by raking or chain dragging, and then lightly firmed with a roller or cullipacker. Hydroseeded mixtures should include a wood fiber (cellulose) mulch. Mulching The use of appropriate mulch will help ensure establishment under normal icondition n iessential o seedingsuccess underharsh site conditions and s t (Practice 6.14, Mulching), Harsh site conditions include: -seeding in fall for winter cover (wood fiber mulches are not considered adequate for this use), -slopes steeper than 3:1, -excessively hot or dry weather, -adverse soils(shollow, rocky, or high in clay or sand), and or receiving concentrated flow. ea s If the area to be mulched is subject to concentrated waterflow, as in channels, anchor mulch with netting (Practice 6.14, Mulching), Table 6.10a - Temporary Seeding Recommendation for Late Winter and Early Spring Seeding mixture Species-- Rye(groin), Annual lespedeza (Kobe in Piedmont and Coastal Plain Rate (lb/ocre)- 120 Omit annual lespedeza when duration of temporary cover is not to extend beyond June Seeding dotes -Coastal Plain - Dec. 1 - Apr, 15. Soil amendments- Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,000Ib/ocre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool, A disk with blades set nearly straight can be used as o 9 mulch anchoring tool: Maintenance - Refertilize if growth is not full adequate, Reseed, refertilize o e g Y q , and mulch immediately fallowing erosion or other damage: Table 6,10b Temporary Seeding Recommendations for Summer Seeding mixture Species -German millet Rate(lb/ocre)- 40 Seedi ng dates -Coastal Plain- Apr, 15-Aug. 15 P 9 Soil amendments -Follow recommendations of soil tests or apply 2.000 lb/acre ground ogriculturol limestone and 750 lb/acre 10-10-10 fertilizer. Mulch -Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoringtool. A disk with blades set near) straight can be used Y g as a mulch anchoring tool. Maintenance- Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Table 6.10c - Temporary Seeding Recommendation for Fall Seeding mixture Species -Rye(gro in) Rate(lb/ocre) - 120 Seeding dates - Coastal Plain and Piedmont -Aug 15 - Dec. 30 Soil amendments - Follow soil tests or apply 2,000 lb,/acre ground agriculturel limestone and 1,000 Ib/ocre 10-10-10 fertilizer. Mulch- Apply 4,000 lb/acre straw. Anchor straw by tucking with asphalt, netting, or a mulch anchoring tool, A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance- Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March, if it is necessary to extend temporary cover beyond June 15, overseed with 50 Ib/ocre Kobe (Piedmont and Coastal Plain) Permanent Seeding Specifications # 6.11 - Specifications Seedbed Requirements Establishment of vegetation should not be attempted on sites that are unsuitable due to inappropriate soil texture (Table 6.110), poor drainage, concentrated overland flow, or steepness of slope until measures have been taken to correct these problems. To maintain a good stand of vegetation, the soil must meet certain minimum requirements as a growth medium. The existing soil should hove these eriterio: - Enough fine-grained (slit and clay) material to maintain adequate moisture and nutrient suPPIY (ovoiloble water capacity of at least .05 inches water to I inch of soil). - Sufficient pore space to permit root penetration. - Sufficient depth of soil to provide an adequate root zone. The depth to rock or impermeable layers such as hardpans should be 12 inches or more, except on slopes steeper than 2:1 where the addition of sail is not feasible. - A favorable pH range for plant growth, usually 6.0-6.5, - Freedom from large roots, branches, stones, large clods of earth, or trash of any kind. Clods and stones may be left on slopes steeper than 3:1 If they are to be hydroseeded. If any of the above criteria are not met-i.e , If the existing soil is too coarse, dense, shallow or acidic to foster vegetation -special amendments ore required, The soil conditioners described below may be beneficial or, preferably, topsoil may be applied in accordance with Practice 6.04, Topsoiling, Soil Conditioners In order to improve the structure or drainage characteristics of a soil, the following material may be added. These amendments should only be necessary where soils have limitations that make them poor for plant growth or for fine turf establishment (see Chapter 3, Vegetative Considerations). Peat -Appropriate types are sphagnum moss peat, hypnum moss peat, reedsedge peat, or peat humus, all from fresh -water sources. Peat should be shredded and conditioned in storage piles for at least 6 months after excavation. Sand -clean and free of toxic materials Vermiculite -horticultural grade and free of toxic substances. Rotted manure -stable or cattle manure not containing undue orrounts of straw or other bedding materials. Thoroughly rotted sawdust- free of stones and debris. Add 6 Ib. Of nitrogen to each cubic yard. Sludge -Treated sewage and industrial sludges are available in various forms: these should be used only in accordance with local, State and Federal regulations. Species Selection Use the key to Permanent Seeding Mixtures (Table 6.11b) to select the most appropriate seeding mixture based on the general site and maintenance factors A listing of species, including scientific names and characteristics, is given in Appendix 8.02. Seedbed Preparation Install necessary mechanical erosion and sedimentation control practices before seeding, and complete grading according to the approved plan. Lime and fertilizer needs should be determined by soil tests. Soil testing is performed free of charge by the North Carolina Department of Agriculture soil testing laboratory. Directions, sample cartons, and information sheets are avoilable through county agricultural extension offices or from NCDA. Because the NCDA soil testing lob requires 1-6 weeks for sample turn -around, sampling must be planned well in advance of final grading Testing is also done by commercial laboratories. When soil test are not available, follow rates suggested on the individual specification sheet for the seeding mix chosen (Tables 6.11c through 6.11y). Applications rates usually fall into the following ranges: - Ground agricultural limestone Light -textured, sandy soils; 1-1 1/2 tons/acre Heavy textured, clayey soils 2-3 tons/acre _ Fertilizer: Grasses 800-1200 Ib/ocre of 10-110-10 (or the equivalent) Grass -legume mixtures: 800-1200 1b/ocre of 5-10-10 (or the equivalent) Apply lime and fertilizer evenly and incorporate into the top 4-8 inches of soil by disking or other suitable means, Operate machinery on the contour, When using a hydroseeder, apply lime and fertilizer to a rough, loose surface. Roughen surfaces according to Practice 5.03, Surface Roughening. Complete seedbed preparation by breasting up large clods and raking into a smooth, uniform surface (slope less than 3:1) Fill in or level depressions than can collect water, Broadcast seed info a freshly loosened seedbed that has not been sealed by rainfall. Note Well: See Landscaping Plan for oddltlonal specifications. Table 6.11s - Seeding No. 4CP for; Well -Drained Sondy looms to Dry Sands, Coastal Poln; Low to Medium -Core Lawns Seeding mixture Species - Centipedegrass - Rate - 10-20 Ib/ocre (seed) or 33 bu/acre (sprigs) Seeding dotes - Mar. - June, (Sprigg'r-,g can be done through July where water is available for irrigoilon.) Soil amendments - Apply lime and fe0lizer according to soil test, or apply 300 Ib/ocre 10-10-10. Sprigging - Plant sprigs in furrows with a tractor -drown transplanter, or broadcast by hand. Furrows should be 4-6 inches deep and 2ft apart. Place sprigs about 2 ft. apart in the row with one end of or above ground level (Figure 6.11d). Broadcast at rates shown above, and press sprigs into the top 1 1/2 inches of soil with a disk set straight so that sprig: are not brought back toward the surface. Mulch - Do not mulch Maintenance - Fertilize very sparingly- 20 b/ccre nitrogen in sprin g with no phosphorus, Centipedegrass cannot tolerate high pH or excess fertilizer. Table 6.111, - Seeding No. 5CP for: Well-Droined Sandy Looms to Dry Sands; Low Maintenance Seeding din mixture Species Rote (lb/acre) Pensacola Bohiogross 50 Sericeo lespedeza 30 Common Bermudograss 10 German millet 10 Seeding notes 1. Where a neat appearance is desired, omit, sericea 2. Use common Bermudograss only on isoiated sites where it cannot become a pest. Bermudograss may be replaced with 5 Ib/acre centipedgross. Seeding dates - Apr, 1 - July 15 Soil amendments - Apply lime ano fertilizer according to soil tests, or apply 3,000 lb/acre ground agricultural limestone and 500 Ib/ocre 10-10-10 fertilizer. Mulch Apply 4,000 Ib/ocre grain straw or equivalent cover of another suitoole mulch. Anchor by tacking with ospholt, roving and netting or by crimping with a mulch anchoring tool. A disk with blades se': nearly straight can be used as a mulch anchoring tool, Maintenance - Refertilize the followingApr, with 50 Ib ocre nitrogen Repeat / 9 P as growth requires. May be moved c a only one year. Where o neat appearance is 9 q Y PF Y Y desired, omit sericea and now as often as needed, Table 6.11v - Seeding No. 7CP for: Grass -lined Channels; Coastal Plain Seeding Mixture Species - Common Bermudograss - Rate - 40-80 (1/2 Ib/1,000 ft ) Seeding dates - Coastal Plain; Apr - July Soil amendments - Apply lime and fertilizer accordin g to soil tests or apply 3,000 Ib/ocre ground agricultural limestone and 500 lb/acre 10-10-11) fertilizer, Mulch - Use jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must be allowea to wash down slopes where they can clog drainage devices, Maintenance -A minimum of 3 weeks is required for establishment. Inspect and repair mulch frequently. Refertilize the following Apr, with 50 Ib/ocre nitrogen. NOTE THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION WiTH THE WRITTEN NARRATIVE, WHiCH iS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN, REV, NO, I REVISIONS DATE r Copyright 0. Hanover Design Services, P.A., All rights reserved. Reproduction or use of the contents of this documant, or additions ce deletions to this document, In whole or port, without written consent of the Land Surveyor or Engineer, !s prohibited, only copies from the original of this oocument, morked with the original signature and original seal of the Surveyor or Engineer, shoil be considered to be wlfd and true copies. 9 O P Outlet Stabilization Structure Specification # 6.41 - Construction Specifications 1. Ensure that the subgrade for the filter and riprop followe the required lines and grades shown in the pion. Compact any fill required In the subgrode to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the riprop thickness. 2. The riprop and gravel filter must conform to the specified grading limits shown on the plans. 3. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the riprop and placing another piece of filter cloth over the damaged area, All connecting p P joints should overlap o minimum of I ft. If the damage is extensive, replace the entire filter cloth. 4. Riprop may be placed by equipment, but take care to avoid damaging the filter, 5. The minimum thickness of the riprop should be 1.5 times the maximum stone diameter, 6. Riprop may be field stone or rough quarry stone. It should bs hard, angular, highly weather -resistant and well graded. 8. Construct the apron on zero grade with no overfoll at the and. Make the top of the riprop at the downstream and level with the receiving area or slightly below it. 8. Ensure that the apron is properly aligned with the receiving stream and length. If a curve 1 needed to fit site preferably straight throughout its ength e conditions, place it in the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation (Practice 6.10, Temporary Seeding, and 6.11, Permanent Seeding). Maintenance Inspect riprap outlet structures after heavy rains to see If any erosion around or below the riprop has taken place or if stones have been dislodged. Immediately make all needed repairs to prevent further damage. Fabric Drop Inlet Protection (Temporary) Specification # 6.51 - Construction Specifications 1. As synthetic fabric, use o pervious sheet of nylon, polyester, or ethylene yorn-extra strength (50 lb/1 inch minimum) -that contains ultraviolet ray Inhibitors and stabilizers. Fabric should be sufficiently porous to provide adequate drainage of the temporary sediment pool. Burlap may be used for short-term applications. It must be replaced every 60 days. 2. Cut fabric from a continuous roll to eliminate joints. 3. For stokes, use 2 x 4 inch woad (preferred) or equivalent metal with a minimum length of 3 ft, 4. Space stakes evenly around the perimeter of the inlet a maximum of aft. apart, and securely drive them into the ground, approximately 18 inches deep. 5. To provide needed stability to the installation, frame with 2 x 4-inch wood strips around the crest of the overflow area at a maximum of 1.5 ft above the drop inlet crest. 6. Place the bottom 12 inches of the fabric in o trench and bockfhl the trench with at least 4 Inches of crushed stone or 12 inches of compacted soil. 7. Fasten fabric securely to the stakes and frame. Joints must be overlapped to the next stake. B. The top of the frame and fabric must be well below the ground elevation down slope from the drop inlet to keep runoff from bypassing the inlet. It may be necessary to build a temporary dike an the down slope side of the structure to prevent bypass flow. Material from within the sediment pool may be used for diking. Maintenance Inspect the fabric barrier after each rain and make repairs at needed. Remove sediment from the pool area as necessary to provide adequate storage volume for the next rain. Take core not to damage or undercut the fabric during sediment removal. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable sediment and dispose of them properly, Bring the disturbed area to the grade of the drop inlet and smooth and compact It. Appropriately stabilize oil bore areas around the inlet. Sediment Basin Specifications # 6.61 - Construction Specifications 1.Site preparations -Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pod area until the dam is complete and then remove brush, trees and other objectionable materials to facilitate sediment cleanout, Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed, 2.Cut-off trench -Excavate a cut-off trench along the centerline of the earth fill embankment. Cut the trench to stohle soil material, but in no case make it less than 2 ft, deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 ft. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3.Embankment-Take fill material from the approved areas shown on the plans, It should be clean mineral soil, free of roots, woody vegetation, rocks and other objectionable material. Scarify areas on which fill is be placed before placing fill. The fill material must contain sufficient moisture so it can be formed by hand into a boll without crumbling. If water can be squeezed out of the ball, it is too wet for proper compaction. Place fill material in 6 to 8-inch continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that h it r f of the entire surface each layer is traversed t I o b a east one Y'e Y wheel or tread track of the heavy equipment, or a compactor may be used. Construct the embankment to an elevation 1OX higher than the design height to allow for settling, 4.Conduit spillways -Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti -seep collars. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Core must be token not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2ft. of hand -compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete, 5.Emergency spillway -Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of emergency spillway. 6.inlets-Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to Improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 7.Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bore areas Complete the embankm ent before h cleared. b e 1 e area Is c ea ed. Stabilize the s illwo embankment and all P Y other disturbed areas above the crest of the principalspillway Imme diately after construction (References: Surface Stabilization). 8.Sofety-Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with warning signs if trespassing Is likely. Follow all state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one- half the design depth. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. EROSION & SEDIMENT CONTROL DETAILS and SPECIFICATIONS OCEAN GATE PLAZA at WESTGATE LOCATED IN THE TOWN OF LELAND TOWN CREEK TOWNSHIP BRUNSWICK COUNTY NORTH CAROLINA 4 4o*11601110Ny %�i� ;: �r(�«v wwwe�rww�+wjasw® a^` *. ' " ee 'r��.. tM7l�ilr41 41y Rule ' 9 ;r/ e Sf. AL r w 2000111 S is w I,I-d-e1 'ill u `. .16I�w itI fweweao" W y 4,IS, 'X�', �e s 4+ px.r.. dhollis (9 hdd lm.com /-_ HANOVER DESIGN SERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WiLMINGTON N.C. 28401 PHONE: (910) 0 343-1302 CM Dote: 10- 07- 05 Scale: 1 "= 30, Drawn: DSH Checked: GA W Project No: 6309-rood4 Sheet No: 4 4 III Of:- -J 16309-road4 Model (1): OB:55:N5 Tu7uricuu� Ocean Gate Plaza.pdf: 12:43:05 11/22/2005 LOCA NOV 0 7 2005 N ,���'° " �" OCEAN GATE, LLC 60 p0 PO BOX 3167 WILMINGTON, NC 28106 � 1 31 G) wOVM y ` R=580.00' �`, m w - v=073257" 1 C LEN-79.73' ION MAPOCEAN 0 ZI BRG=S 0777'1 OCEAN GA TE, LLC o 70 _ NOT T0SCALE W�MINGTONOX 6 NC 28106 R-73000' 1 (� �215yo�+ 40 �. e=1379'f7" ++ C LEN=33.35 C LEN=169.3�' BRG=S 0571"03' BRG=S 17*5323" E •+ W LiiFt 20 15, t=158.43' W 2.3Me 0 n=047225Uc Ln L=178.12' R=370.00' �y°� p8 uy C LEN=38.17' m 6,p �, R=380.00'=2432'02' t' 2N S, ++ 62• �� BRG=S 09 07 32" w 2 c=26"5126' C LEN-157.23' n�^ L� �O `mot BRG s 137642' E BRG=N 127702" W+ L-155.78', °$1� POND AREA' N o0•oo'5e" w vi R=s7aoo 51315,0 SQ. FT. m G C. 'p ' + 00 � ++ 205.16� .yti'� ,9� C 1LEN9155.43' Z 1.18 ACRES �' OCEAN GATE PLAZA 5a BRG�S 173323" E Z js+d .0 do I L=130.14', N 89'11'16" 9W i R=430. 24.89 'y ca 00'58" E _ _ �s + + 1 a=1770�4" ' 14+ 205.16� L=184.13' C LEN=129. 64' °� n v A • + � 0 0' R=430.00' BRG=S 85'29'f 0' W co yd 4+ a=257734" e.=2432'03" 3 F, 10. 9, unoo C LEN=182.7 gg S/ 6+ C LEN=14 39 BRG=N 72*17�00" W ro ,� S 7,5 16" W go N Z BRG=S 1239 45" £ ' � '� � 1 ,yry� N 00'42 55" W Z �y a bio cc M 'f' yg� C'z + • 17 1pE?• a L. ; "'CO 6* W 5 S 09.57'38" W O�.F N10001 aaid 6� .�� y / �g tr2 30 16.33' / fI r J ('%/ N N 14 11'§1" E N 36 10'27" 22.1 6 , 4.72' s EXHIBIT MAP SHOWING PROJECT METES & BOUNDS 100 50 0 100 200 Scale in feet: 1 "= 100' PRELIMINARY PLAN NOT FOR RECORDATION OR CONVEYANCE CopyrlgM1t p, Hanover Design Servtcsr, P.A, AN ►lghts reserved. Reproduethn or use of the contents.of this document or oddltlons or deletions to this document In whole or part without written consent of the Land Swwyor or Engheer, As prohNoed Only cw,otee from the wlghel of thle dorwment marked with the oryhal signature and &*hot eed of the %rveyor or Engheer, shah be conskWred to be waNd end tmro eophm 30.41' 89' 10'57' W 25.58' N 79'45'35" W 18.46' 74 31'23" W OCEAN GATE PLAZA at WESTGATE LOCATED IN TOWN OF LELAND BRUNSWICK COUNTY, NORTH CAROLINA SCALE: 1 "= 100' DATE: 10-24-05 OWNER / DEVELOPER: OCEAN GATE, LLC PO BOX 3167 WILMINGTON; NC 28106; (.91n)-791-1196 NOV 317 2005 BY''S� HANOVER DESIGNSERVICES, P.A. LAND SURVEYORS, ENGINEERS & LAND PLANNERS 319 WALNUT STREET WILMINGTON, N.C. 28401 PHONE (910) 343-8002 6309—roodtract—dh