HomeMy WebLinkAboutNCC230193_NOT Closeout Documents_20230822 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: Columbus Project: Delco 230kV Sub-Whiteville 230kV River basin: Lumber
Person financially responsible:Duke Energy Progress,LLC-Josh Witherspoon, Project#: COLUM-2023-003
Senior Transmission Permitting Manager
Address: 550 S.Tryon Street,Suite 4500,Charlotte,NC 28202
1. Project Location: Old Lake Road,Lake Waccamaw
Pictures: Yes-Digital
2. Weather and soil conditions: 80s clear,workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): none Title:
Inspection report: Sent Report Date given/sent: August 18,2023
9. Corrective action needed:
10. Comments: The project is complete.Permanent ground cover sufficient to restrain erosion has been
established.No additional self-monitoring or self-inspections are required.Project is in
compliance and released under the SPCA.The E&SC file will be closed.Termination of
coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)
must be requested by the permittee via a Notice of Termination(NOT).The NOT is available
at deq.nc.gov/NCG01.Please note that this correspondence must be uploaded as part of
completing the NOT process.
austin.turbitt@deq.nc.gov
Reported by: Austin Turbitt Others present:
Date of inspection: August 16,2023 Time arriving on site: 2:00 PM Time leaving site: 2:30 PM
CC: