Loading...
HomeMy WebLinkAbout20150633 Ver 1_More Info Received_20150722Strickland, Bev From: Hamlett, Mark A. Sent: Wednesday, July ZZ'ZUl58:3ZAM To: Strickland, Bev Subject: RE: South Mountain Game Land Culvert DVVR#150633 Bev, Sorry for the delay. | was on vacation for the past week and just got back in the office today. Attached are pdfsofthe permit drawings. Please let me know if you need anything else. lftid( ��i 4mmUett, 0 Secfioin Q�h�mf EnQineerinQ �NC KUMUfe �Iesouirces Commmm��ss��oin ��oi|inQAddreoo� 1720 KAoi| Semine Center �Ro|eiQh.NorflhCoro|ino27699 -172O off�ne�� 919 -7O7-0155 0 fox� 919 -7O7-0162 From: Strickland, Bev Sent: Wednesday, 3uh15, 2015 10:01 AM To: Hamlett, Mark A. Subject: South Mountain Game Land Culvert - DWR#150633 Mr. Hamlett, I am trying to scan in the maps/site plans for the above project and the details are not being captured because they are so light. Can you email meapdf copy of the plans submitted for the above project? Thanks Bev Beve�dy Striddarid, Laserfid� ie AdrrflrflstraU)r NCDENR Division of Water Resources Physical: Suite 1229,512N Salisbury, N[ Mailing: Mail Service Center 1617, Raleigh, N[ 27699'1617 Phone#919'7O7f8789 Email Address: Bev.Strick|and@ncdenr.gov 1 smallomrr*qwna*ncwm and nnmmIm sender immuNwommww o puumpZcon:JmI mw and may u*aimmmwammli'dpmmwm INOT RELEASED FOR CONSTRUCTION DATE: JUNE 19, 2015 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING SERVICES SHEET INDEX SD -1.0 EXISTING CONDITIONS AND DEMOLITION PLAN SD -3.0 GRADING PLAN SD -6.0 PROFILES SD -7.0 LANDSCAPE PLAN SD -7.1 PLANT SCHEDULE SD -8.0 DETAILS SD -8.1 DETAILS 1720 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699 -1720 (919) 707 -0150 FAX: (919) 707 -0162 PROJECT SOUTH MOUNTAINS GAME LAND STREAM CROSSING #1 GAME LAND ACCESS ROAD (OF OFF US 226) RUTHERFORD COUNTY, NC PERMIT DRAWINGS NOTE Elevations For All Sheets are based on assumed elevations VICINTY MAP 35' COORDIN 35' 81' 49' 25.1 " J64 IMCDC WELL COUNT RUTHERFO' 0 o 1 II _ \ p \ 1 I 1 0 f r / I � i 0 CD CD QD / ° CX0O m I - m U) m 0 o I � A o n I O Z C O 0 co O Z. NORTH CAROLINA WILDLIFE RESOURCES COMMISSION o o m T O NORTH DIVISION OF ENGINEERING SERVICES Z°= O m Z S M G L CULVERT - C R 1 CAROLINA 1720 MAIL SERVICE CENTER .. _ m Z n a n 3 N v ALEIGH, NORTH CAROLINA 27699 ° RUTHERFORD COUNTY, NC SOUTH MOUNTAINS GAME LAND �'� / n p - RESOURCES phone: 919.707.0150 O 7J c Fax: 919.70 MMISS�O� EXISTING CONDITIONS z www.ncwildiife.org .org ni=T r SNOT RELEASED FOR CONSTRUCTION- Z V5 O 0 \ O 0 U O M W EXCAVATE STEAMBED MATERIAL TEMPORARY TO MATCH PROFILE AS SAND BAG DIKE 0 2 M SHOWN IN 2 15D -6.0 W r W w „ U-0 W z J Z H J \ a RZ O W W W Z_ W 0 Lo 2 21 CMP PIPE ARCH \ W z o o ��� Q O J a a O INV. IN = 992.39 = z = / / \ Q / F 0 g W - c LD 0 N J O 2 X 3zG Q ti Q L (6 5 70 / / z 0- LL S 10\ \ \ / O� 0 83 X57" CMP f(PE ARCH "� o �J _ ¢ w o 25 L (9 0% \ TEMPO "AY STREAM DIVERSION SINGLE WA L 24" HDPE W 2' MIN. 0 UNDER GRAVEL ROAD. Q PUMP AR UN D MAY BE USED IN LIEU Ur / OF DIVERSION PIPE. � � z � o Z / CMP PIPE ARCH OUT 992.39' c7 % i W C� U) Z TEMPORARY / \ SAND BAG DIKE - I ' / % \� \ \\ 7 000 J z Cl) o LL OC —� W 2 ry Date: 2 -26 -2015 / File Name: SMGL -CR1 1 Designed: MAH 10 0 20 30 / Drawn: MAH Approved: N/A Sheet No. Scale 1" = 10' / SD -1.0 1000 999 — — — — — — — — — — — — — — 998 997 --- -__�__ 996 —_ -- 995 994 -------- - - - - -- 993 — — — — — — — — — — — — — — 992 0 +00 0 +10 EXISTING GRAVEL ROAD 24 " CMP TO BE REMOVED -----tttt t--;� TT- utLu ut Ju ut4u ut Ju utOu ut /u 18 " RCP TO BE REMOVED 1 /SD -6.0 EXISTING PROFILE - STREAM CENTERLINE NO SCALE 1001 1000 999 998 - - -- 997 996 995 994 993 992 991 0 +00 //EXISTING THALWEG PROFILE 11—PROPOSED THALWEG ncncu r MIN. 12" COVER OVER PIPE INOT RELEASED FOR CONSTRUCTION utau ut� ituu 8" STEEL CULVERT TO BE REMOVED EXISTING GRAVEL ROAD itiu --------------------------------- - - - - -- — / - - - -- L — A -N' €T- -V. -- � - - -- 9,4.45 S-3T-7 — — — 0 +10 0 +20 0 +30 0 +40 0 +50 0 +60 0 +70 0 +8 0 +90� +00 1 +10 EMBED INLET MAX. 40% CMP PIPE ARCH CMP PIPE ARCH INV. OUT = 992.46 EMBED OUTLET INV IN — 992.46 MIN. 20% PROPOSED STREAMBED PROFILE 2 /SD -6.0 PROPOSED PROFILE - STREAM CENTERLINE NO SCALE Ww U W � � W N LLf.7WZ o�zp �wUa Q Z W U ZC7U2 0o w 00 QO LL JO aaim-o V Z -2 rnrn 3i Q H��C7 �NJ O z0� ^ 0-L-6L 3 Z 2 U Q .0 K N 0. O Z Q N O U \ / K V r) z a J W a U) z a z V D 0 5 W W W J JU) LL V z a V z 0 O IL LU 2 H Date: 2 -26 -2015 File Name: SMGL -CR1 Surveyed: JCF Designed: MAH Drawn: MAH Approved: NIA Sheet No. SD-6.0 Z O Q) rn ° + 0 O V 14 CORA + + + �W OV rn + W� m W W N LL (D W z JZ I-J 14 ARON ° + a z LLJ � o 2 z- = oo + I I J W I ' - +.. 1 WLL ° 1O ooh Q O J a o 0 V Z Q 2 rn rn 3 Ln I3 SAMC — \ o >_ =x333 1 + zr7�� a� 3 7 — 0 ° j ° \ �o o, o ° + + + + + + + + + + + + + 4�' + - + + +I + + + ++++++ + + + + +i+ + + + + + + + + + + -+ + + + + + + ++ + + LU + + + + + + + + + + + + ++++ + (� + + + + + + + + + + \ + + + + + + + + + + + + + EDGE OF GRAVEL z + ++- + + ++++++++++++++++++++++++ + + + SEED MIX ++ + + + + + + + + ++ o r z + +++++,+++++++++++++++++++++ +�� +++++++++++ + \ + + J Q Z / + + + + + + + + + + +� + + ++ J i + + + + % ++ + + + + + + + + + +� + + + + + + + + LU > ° zJ U) — } ° PLANTING NOTES /()()o D / ! / ° O / 1. Tree plantings and bed lines shall be stoked by Landscape Contractor U + for Landscape Architect's approval prior to installation. The Landscape Q / Architect reserves the right to make adjustments to planting locations 0 / / I as necessary. 2. Add shredded hardwood mulch to all planting beds at a depth of 3 inches. O J. Landscape Contractor is responsible for maintaining all installed plants and town areas until issuance of Written Certificate of Final Completion LU by the Landscape Architect. I �— 4. All tree, shrub & groundcover materials shall be planted within 24 hours after delivery. 5. Landscape Contractor shall make all arrangements for temporary irrigation / system services, permits and fees as needed. Date: 6. Plant material list is prepared for estimating purposes only. Contractors 6 -16 -2015 / make their own quatity takeoffs using drawings to determine quantities to their File Name: 1 0 30 / satisfaction, reporting any discrepancies which may affect bidding to Landscape SMGL -CR1 Architect. Surveyed: JCF Designed: MAH 7. Nursery tags to remain on trees until plant material is approved by Landscape Drawn: MAH Scale 1" = 10' / Architect. Approved: N/A B. All disturbed areas to be seeded per Erosion Control Plan Permanent Seeding bheet No. / I Schedule unless otherwise specified. SD -7.0 Z O TEMPORARY & PERMANENT SEED SCHEDULE T PROVIDE 3 GUYS FOR EACH TREE SPACED EQUALLY AROUND TREE THREAD WIRE THRU COMMON NAME SCIENTIFIC NAME RATE O GROMMETTEO TAPE BY GCS, INC. (PHONE: 800/360 -3584) ANNUAL SEED MIX V OR APPROVED EQUAL Browntop Millet Panicum ramosum 10 lb/ac W 2 STRANDS 12 GAUGE GALV. WIRE TWISTED TIGHT. GROUNDCOVER PLANT (TYP.) Buckwheat Eriogonum spp. 151b /aC U x W STAKING NOTE PROVIDE SAFETY FLAGGING ONLY STAKE &GUY TREES 4'" CAC /PER Winter Rye Lolium spp. 30 lb/ac � W ON EACH GUY AND LARGER OR IN WINDY LOCATIONS O O O4 Winter Wheat Triticums 15 lb /ac pp' O U 0) to AS DIRECTED BY LANDSCAPE ARCHITECT 8" SOIL SAUCER AROUND TREE W 0' � O PERMANENT NATIVE MIX W N N 42" LONG #4 REBAR Arrowleaf tearthumb Polygonum sagittatum LL Q STAKE DRIVEN 39 INTO GROUND (PLACE STAKES SPACING PER PLANT SCHEDULE O O O O� Big bluestemn Andropogon gerardii J Z ? J WITHIN MULCHED AREA) _ EE PIT _ _ AMENDED FINISHED GRADE 3'" DEPTH MULCH - - SOIL AREA - Blackeyed Susan Rudbeckiahirta ❑_ Z J 2 W O W W (REEK MULCH 6" FROM O O O �� Blue wmain Verbena hastata U < W Q O N TRUNK OF TREE) Deer tongue Panicum clandestinum Q Z W � Eastern bur reed Spargantum americanum Z O > H o o °) AMENDED SOIL AREA THOROUGHLY TILL IN / PLANT Green bulrush Scirpus atrovirens JO W iY � O r- N REMOVE TOP 1/3 BURLAP - LCH Grey headed cone flower Raribida pinnata OL LL r` r AND TOP OF WIRE &45KE7 45 °MIN. PLANTING 50 /L MIXTURE AFTER TREE /S SET AND AMENDMENTS TO DEPTH Hop sedge Carex lupulina Q Q J of of -p APPROVED BY LANDSCAPE 8' MIN OF 8" (IN SOME SITUATIONS, LAWN WILL ****4 Indian wood oats Chasmanthium datifolium = a (9 O O ci _ ARCHITECT - ( HERE SPACE ALLOWS) -' BE PLANTED OVER THIS 6° DEPTH PLANTING 50 /L AREA). 1 } L Indinangrass Lanceleafcoreopsis Sorghastrum nutans _Q ~ to Lu - 0 _3 O O x 3 MIXTURE TAMPED FIRM _ 3X BALL D/A. FIN /SH GRADE Coreopsislanceolata Q _ n Q Z lY 0- @ a W c MULCH RING FOR BENEATH Roo? BALL. - TREES IN LAWN PLANTING SOIL Little bluestem Shizachyriumscoparium GENERAL NOTES: MINIMUM 5 DIAMETER. MIXTURE Man leaved bulrush Y Sci rpuspolyphyllus 1. PLANT SO THAT TOP OF ROOT BALL IS 2" ABOVE FINISH GRADE. THAT 45' MIN. Nodding bur-marigold Bidens cernua a 2. SCARIFY AND BOTTOM OF PIT GENERAL NOTES.- Oxeye sunflower Y Helto s:s helianthoides p a ' wy - Q J. BACKFILL TREE PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN B" LAYERS, HAND TAMPED TO REMOVE VOIDS 4. WHEN 213 BACKFILLED. FILL WITH WATER. 1. THROROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" IN ENTIRE GROUNDCOVER BED AREA. Partridge pea Chamaecrista fasciculata F j rc o S2 5. AFTER PLACING AND AND - TAMPING FINAL LAYERS, WATER AGAIN UNTIL NO MORE IS ABSORBED. 2. WORK SOIL TO LOOSE, UNIFORMLY FINE TEXTURE Pennsyhania smartweed Polygonumpensylvanicum ¢ y 6. STAKE AND GUY TREES IF APPLICABLE Z DO NOT WRAP TREE TRUNKS. 3 HAND -TAMP BACKFILL 70 REMOVE VOIDS AND AIR POCKETS, 4, WATER IMMEDIATELY AFTER PLANTING UNTIL NO MORE WATER IS ABSORBED. Purple Cone flower Echinacea purpurea GROUND COVER PLANTING Showyats Oenothraspelarifolium Showy evening primrose Oenorhera speciosa TYPICAL TREE PLANTING Showy tickseed sunflower Bidens arisrosa Smooth panic grass Panicum dichotomiflorum Q Soft rush Juncus effusus z Switch grass Panicum virgatum Q Virgin wild rye Elymus virginicus J COMBINED TOTAL: 15 lb/ac w FINISHED GRADE G G THOROUGHLY TILL IN PL AN SOIL MIXTURE AMENDMEDME NTS TO DEPTH PLANT SCHEDULE � Ir�� V OF 8" IN ENTIRE SHRUB BED AREA. , w 3" DEPTH MULCH BOTANICAL NAME COMMON NAME QUANTITY HEIGHT SPREAD /CALIPER SPACING REMARKS Z (KEEP MULCH AWAY FROM CODE TREES J SHRUB PIT BASE OF PLANT MIN. 4 ) Z H LLI p PULL ROOTS CUT OF FROM CONTAINER STOCK BURLAP As Mi" SHRUBS H W REMOVE TOP 1/3 FROM B STOCK ARON ARON/A ARBUTIFOLIA RED CHOKEBERRY 14 5 GAL AS SHOWN FWF CON &B CORA CORNUS AMOMUM SILKY DOGWOOD 14 5 GAL - A.S.SHOWN FWF CON W � O s" DEPTH PLANTING SOIL MULCH RING FOR MIXTURE TAMPED FIRM SAMC SAMBUCUS CANADENSIS ELDERBERRY 13 5 GAL AS SHOWN FWF CON SHRUBS IN LAWN v J BENEATH ROOT BALL _ 3X BALL CIA. MINIMUM 4' DIAMETER: - ' Q W GENERAL NOTES: U U T i 7. PLANT SO THAT TOP OF ROOT BALL IS 1" ABOVE FINISH GRADE Z 21 SCARIFY SIDES AND BOTTOM OF PIT. t 1 3 BACKFILL SHRUB PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 6" LAYERS, HAND - TAMPED, TO REMOVE VOIDS V 4. WHEN 213 BACKFILLED, FILL WITH WATER. 'i� } /A 5. AFTER PLACING AND HAND - TAMPING FINAL LAYERS, WATER AGAIN UNTIL NO MORE lS ABSORBED. v GROUND COVERS / GRASSES / PERENNIALS z TYPICAL SHRUB PLANTING U) Z) Z SEED PERMANENT NATIVE MIX 650 SF NATIVE CRASS AREA TO BE MOWED O Q A41X ONCE IN LATE WINTER TO 6' -8" HEIGHT (� /J SEED ALL DISTURBED AREAS li PER PERMANENT SEEDING SCHEDULE O SEE EROSION CONTROL PLAN TURF F MULCH LL ry LLI NOTES: APPROX. 3Q DEGREES 7 1. EXCAVATE TRENCH BY HAND W/ SPADE MULCH SHREDDED HARDWOOD 1,250 SF APPROX. 45 DEGREES r, _ TURF 2. ADD Exc£ss solL To ADJACENT PLANT MULCH BED AFTER PULLING BACK EXISTING MULCH. RATE SOIL AND SMOOTH BEFORE MULCHING Date: SUBGRADE =i i'- 4'MlN 6 -16 -2015 614Ax. File Name: — _ = SMGL -CR1 ABBREVIATIONS: EWE FULL WELL FORMED MS MULTI- STEMMED TRUNK EGG EGG CAN CONTAINER CON CONTAINERIZED MATERIAL Surveyed: JCF Designed: MAH SP SPECIMEN MATERIAL CAL TRUNK CALIPER B &B BALLED AND BURLAPPED BR BARE ROOT MATERIAL Drawn: MAH LAWN EDGE DETAIL IF TREE FORM HABIT GAL GALLON CONTAINER SF SQUARE FEET ESP ESPALIER Approved: NIA Sheet No. SD -7.1 EX. CANAL /CHANNEL -\ Sp \ sF INSTALL SAND BAG DIKE UPSTREAM AND DOWNSTREAM OF PIPE PRIOR TO REMOVAL, MAINTAIN DIKES UNTIL CULVERT IS REPLACED AND BACKFILLED 1 /SD -8.0 TYPICAL CULVERT INSTALLATION NO SCALE �i. V / INSTALL SILT FENCE ACROSS TOP OF EA. END OF PIPE s� \ EX. ROAD /PATH ST� \ SF INSTALL SILT FENCE ACROSS TOP OF EA. END OF PIPE EX. CANAL /CHANNEL MIN. 12" COVER III III I III III III II -III 2 /SD -8.0 CULVERT CROSS SECTION NO SCALE EXISTING GRAVEL ROAD —III III - - COMPACT BACKFILL IN 6" LIFTS 83'X57" CMP PIPE ARCH WITH 912" CORRUGATIONS (� I (CONTECH OR EQUIVALENT( — i —I, EXISTING STREAM BED PLACE ROCK TO MATCH NATURAL STREAM CHANNEL INOT RELEASED FOR CONSTRUCTION NOTES: 1. ONLY PERFORM CULVERT REPLACEMENT DURING A PERIOD OF LOW OR NO FLOW, AND WHEN NO SIGNIFICANT RAIN IS FORECASTED. 2. INSTALL SAND BAG DIKES UPSTREAM AND DOWNSTREAM OF EXISTING CULVERT. PUMP OUT ANY WATER TRAPPED BETWEN DIKES. IF THERE IS ANY FLOW IN EX. CHANNEL, MAINTAIN A BYPASS PUMP DURING INSTALLATION. 3. REMOVE EX. CULVERT. 4. INSTALL STONE BASE, CULVERT, AND BACKFILL CULVERT. 5. INSTALL SILT FENCE ON EITHER SIDE OF NEW CULVERT. 6. REMOVE SAND BAG DIKES. 7. SEED AND MULCH ALL DISTURBED AREAS. 1) GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DISPOSITION TIME FRAME FRAME EXCEPTIONS • PERIMETER DIKES, SWALES, DITCHES 7 DAYS NONE AND SLOPES • HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES • SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED • SLOPES 3:1 OR 14 DAYS 7 —DAYS FOR SLOPES GREATER FLATTER THAN 50 FEET IN LENGTH • ALL OTHER AREAS WITH SLOPES 14 DAYS NONE (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HOW ZONES) 3 /SD -8.0 DWR GROUND COVER REQUIREMENTS NO SCALE ww =)W U W W M W N LLaLuz J Z F-- J 2 Z 0 � LU < Q Z W L) ZC7U2 0o w JO w W of C" c 00 QO0) z alai= V Z Q 2 M rn 3 H�2i z�NJ O i< 333 O��aL -LL 3 /o z 4 0 o 0 z J LLJ Q U) z a z V D 1 2 2 W O J J U) ~ W U c) /Jj z V � z V/ O 0 LL LU Date: 2 -26 -2015 File Name: SMGL -CR1 Surveyed: JCF Designed: MAH Drawn: MAH Approved: NIA Sheet No. SD-8.0 I . OBTAIN ALL REQUIRED FEDERAL, STATE AND LOCAL APPROVALS AND PERMITS. 2. SCHEDULE AND HOLD A PRE— CONSTRUCTION MEETING PRIOR TO BEGINNING ANY LAND— DISTURBING ACTIVITIES. THIS MEETING SHOULD BE ATTENDED BY A REPRESENTATIVE OF THE FINANCIALLY RESPONSIBLE PARTY, ALL INVOLVED CONTRACTORS AND THE DESIGN TEAM. 3. INSTALL TEMPORARY 24" SINGLE WALL HDPE DIVERSION PIPE. ENSURE MINIMUM 2' COVER UNDER EXISTING GRAVEL ROAD. 4. INSTALL TEMPORARY SAND BAG DAMS AND ROUTE STREAM THROUGH DIVERSION PIPE. 5. WHEN THE WORK AREA IS DRY, REMOVE EXISTING CULVERTS. 6. INSTALL NEW CMP PIPE ARCH CULVERT. EMBED PIPE AS SHOWN ON PLANS. PLACE MATERIAL IN PIPE TO MATCH EXISTING STREAM CHANNEL. 7. EXCAVATE MATERIAL FROM EXISTING STREAM BED TO MATCH PROPOSED PROFILE, B. REMOVE SAND BAG DAMS AND DIVERSION PIPE TO RESTORE STREAM FLOW THROUGH THE CULVERT. 9. PROVIDE ALL DISTURBED AREAS WITH GROUND COVER WITHIN THE SPECIFIED NUMBER OF DAYS. 1 /SD-8.1 CONSTRUCTION SEQUENCE NO SCALE 3 /SD -8.3 NOT USED NO SCALE INOT RELEASED FOR CONSTRUCTION CONSTRUCTION STEP 1: REMOVE BRANCHES AND LARGE ROCKS FROM AREA WHERE THE SAND BAGS WILL BE PLACED. INSTALL SANDBAGS UPSTREAM AND DOWNSTREAM OF CULVERTS TO BE REPLACED, IF THERE IS STANDING WATER IN THE EXISTING CHANNEL. STEP 2: LAY OUT THE IMPERVIOUS POLY - FABRIC LINER WITH THE CENTER OF THE LINER LOCATED UNDER THE CENTER OF THE SAND BAG DIKE. STEP 3: PLACE THE SANDBAGS TO THE DESIRED HEIGHT. THE DIKES SHALL HAVE A WIDTH SUITABLE TO SUPPORT THE HEIGHT. EACH ROW SHALL BE OFFSET SO THE JOINTS ARE STAGGERED. PACK SANDBAGS TIGHTLY TOGETHER. STEP 4: WRAP IMPERVIOUS POLY - FABRIC LINER AROUND SANDBAG DIKE AND SECURE WITH FINAL LAYER OF SANDBAGS. STEP 5: PUMP OUT ANY WATER TRAPPED BETWEEN THE TWO SAND BAG DIKES. MAINTENANCE - PERIODICALLY INSPECT SANDBAG DIKE FOR DAMAGE AND LEAKS - REMOVE IMPOUNDED TRASH AND SEDIMENT - REMOVE ONCE CONSTRUCTION IS COMPLETE 2/SD -8.2 SAND BAG DIKE NO SCALE 4/SD -8.1 NOT USED NO SCALE FILTER BAGS FILLED WITH SAND IMPERVIOUS POLY - FABRIC, INSTALL UNDER, AROUND AND OVER SAND BAGS I INSTALL SAND BAGS TO MATCH EXISTING HEIGHT AND WIDTH OF CHANNEL EX. CHANNEL w w :)W O fU rn W M W N LL0LuZ J Z R- J �2ZO W U Q Q Z W U ZC7U2 00 2> JO w W of 0o c W LL W z t-: � w Q O J a) 0) _0 V Z —Q 2 -M 0-) 3i 2O�C7 c Q �NJ iC z0� <_ aO LCL a w 20 K K N .O- z N'O 0 z a J LLJ a U) z a z V D O W O J J U) ~ W U c) J z z O U r) ry O LL ry w H ry Date: 2 -26 -2015 File Name: SMGL -CR1 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -8.1 INOT RELEASED FOR CONSTRUCTION DATE: JUNE 19, 2015 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING SERVICES SHEET INDEX SD -1.0 EXISTING CONDITIONS AND DEMOLITION PLAN SD -3.0 GRADING PLAN SD -6.0 PROFILES SD -7.0 LANDSCAPE PLANS SD -7.1 PLANT SCHEDULE SD -8.0 DETAILS SD -8.1 DETAILS 1720 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699 -1720 (919) 707 -0150 FAX: (919) 707 -0162 PROJECT SOUTH MOUNTAINS GAME LAND STREAM CROSSING #2 GAME LAND ACCESS ROAD (OF OFF US 226) RUTHERFORD COUNTY, NC PERMIT DRAWINGS NOTE Elevations For All Sheets are based on assumed elevations VICINTY MAP CPS COORDIN 35 32' 53.09" I 81' 49' 41 .3 46� IMCDCWELL COUNT IRUTHERI , 0 o C) cn 0 v m 0 6 CD C) l/> D O O cn ?! O O m o m _ r (i O_ N fT n= =T m 0 SMGL CULVERT - CR2 RUTHERFORD COUNTY, NC SOUTH MOUNTAINS GAME LAND EXISTING CONDITIONS Z O m r m D m 0 m O A C7 O Z C 0 O Z NORTH CAROLINA WILDLIFE RESOURCES COMMISSION NORTH DIVISION OF ENGINEERING SERVICES CAROLINA 1720 MAIL SERVICE CENTER \,>RALEIGH, NORTH CAROLINA 27699 RESOURCES Phone: 919.707.0150 °^mnss°a Fax: 919.707.0162 www.ncwiidiife.org L i 20 0 i I TEMPORARY SAND O� BAG DIKE 700 EXCAVATE STEAMBED"MATERIAL TO MATCH PROFILE-,AS SHOWN IN 21SD4.0- - -- -- CONCRETE HEADWAEC EXISTING CONTOUR \ PROPOSED CONTOUR MIN. ELEVATION 1001 OVER -- - CULVERT 13' -1 I 'X8' -7" CMP PIPE -ARCH WITH 2" DEEP CORRUGATIONS 1 (CONTECH OR EQUIVALENT) 20 40 Scale 1" = 20' CONCRETE ENDWALL RELOCATED THALWEG AREA OF DEPOSITIC TO BE REMOO X � 1�1 6" COMPACTED ABC TO BE INSTALLED IN AREAS OF FILL TO REBUILD ROAD TEMPORARY STREAM DIVERSION SINGLE WALL 24" HDPE X2 2' MIN. COVER UNDER GRAVEL ROAD. DEPENDING ON FLOWS, A PUMP AROUND MAY BE USED IN LIEU OF DIVERSION PIPES. EDGE OF GRAVEL INOT RELEASED FOR CONSTRUCTION : w w U W W M W N LLf.7WZ J Z t_ J 2 Z 0 3W�a Q z W U K 0 = o o w JO w 0 00 K LL ,n z w QOJ rna o U z Q 2 rn rn 3 H 0 2 0 L4 ui 0 E C) -j O i< 33 z0 ^ aii 3 pa w 2p J K N & � O a Np U � 0 Z J W 2 U) Z N z Z L) o O ' � I- F- 2 F3 W O O J`n V V c) Z J z Z Cl) ::) W O U r) ry O ILL ry LU H ry Date: 2 -26 -2015 File Name: SMGL -CR2 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD-3.0 1001 1000 999 998 997 996 995 -- - - - - -- - -- 994 993 992 991 0 +00 0 +10 INOT RELEASED FOR CONSTRUCTION EXISTING GRAVEL 65'X53" CMP TO BE ROAD REMOVED - - -- III I I I I —� — .. . . IIIIL .. I 0 +2C J,R, 0 +40 0 +50 0 +60 0 +70 J +80 0 +90 1 +00 1 +10 1 +20 EXISTING THALWEG PROFILE 1 /SD -6.0 EXISTING PROFILE - STREAM CENTERLINE NO SCALE 1006 I nnF- 1002 1001 1000 999 998 EXISTIn�G ; Ha: WEG 997 SRC FiL, 996 PROP )SLD '-HA' WEG 995 994 — „ - - - -- � — -------------- - - - - -- 993 i MIN. 24 C9VER i% CRAVEL _ -LFL - ti'ATERIAL (LIA7CHED AREA) 1,3-11"X3'-7” CMP PIPE APCH USED AT iiv E7 30 LF @ O. J� / I / F / � 93 134 ------------------------ - - - - -- --------- - - - - -- 3fO AT 05TLET -, — ELEV. — 9�. c2 \ 0+50 0+60 PIPE ARCH 0 +60 +70 cMP PIPE ARCH 0 +80 PROPOSED STREAMBED INV. IN = 989.45 PROFILE INV. OUT = 989.45 1- 3K Ww =)W O U rn W W W W N LLf.7WZ J Z l.-- J 2 Z 0 �Lu0< Q z W U z— C7U2 0o w i W W W �� O 00 W LL W z � � w Q O a) 0) -o U z J 2 rn rn 3 2 O U c u 0 N J O iC z a W a L'L 0 a >> 2 � K J U Z a J W Q U) Z a N Z D U 0 75 W W W ZO J J c) u- 0 v z a J C7 } z cl) ::) O 0 w z H Date: 2 -26 -2015 File Name: SMGL -CR2 Surveyed: 0+90 O' JCF + Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD-6.0 7000- - C CONCRETE ENDWALL 12 SAMC 20 0 20 40 60 Scale 1" = 20' o (D GE OF GRAVEL PLANTING NOTES 1. Tree plantings and bed lines shall be staked by Landscape Contractor for Landscape Architect's approval prior to installation. The Landscape Architect reserves the right to make adjustments to planting locations as necessary. 2. Add shredded hardwood mulch to all planting beds at a depth of 3 inches. J. Landscape Contractor is responsible for maintaining all installed plants and lawn areas until issuance of Written Certificate of Final Completion by the Landscape Architect. 4. All tree, shrub & groundcover materials shall be planted within 24 hours after delivery. 5. Landscape Contractor shall make all arrangements for temporary irrigation system services, permits and fees as needed. 6. Plant material list is prepared for estimating purposes on /y. Contractors make their own quatity takeoffs using drawings to determine quantities to their satisfaction, reporting any discrepancies which may affect bidding to Landscape Architect. 7. Nursery tags to remain on trees until plant material is approved by Landscape Architect. 8. All disturbed areas to be seeded per Erosion Control Plan Permanent Seeding Schedule unless otherwise specified. Z O rn O U M W U tY rn � W OV rn w� d' W N LL 0 W Z JZI- _J ❑ F2 Z Q LU W Q Z W U ° ro Z z > = o o 21 J Z W H � � O OW WO °Oa) W W , Z w Q O J a o 0 U Z —: rn rn 3 20(7 0 J O X z0 W dli 5 a x ? uy4 o o y O U � 0 Z J LU 75 Q C� G7 Z_ Q N Z U � Q J � ? a LU > O) Z_ J M F- U z Q J J z a O U ry O LL ry LU Date: 6 -16 -2015 File Name: SMGL -CR2 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -7.0 REMOVE TOP 1/3 BURLAP PROVIDE 3 GUYS FOR EACH - THOROUGHLY TILL IN TREE SPACED EQUALLY AROUND i. EXCAVATE TRENCH HAND W/ SPADE 2. ADD EXCESS SOIL TO TO ADJACENT PLANT TREE THREAD WIRE THRU AFTER TREE IS SET AND APPROVED BY LANDSCAPE 8" MIN GROMMET TED TAPE BY GCS, INC. AMENDMENTS T DEPTH OF 8" (IN SOME (PHONE: 800/360 -3584) _ OR APPROVED EQUAL 2 STRANDS 12 GAUGE AREA). GALV. WIRE TWISTED TIGHT. STAKING NOTE PROVIDE SAFETY FLAGGING ONLY STAKE & GUY TREES 4" CALIPER ON EACH GUY AND LARGER OR IN WINDY LOCATIONS 1. PLANT 50 THAT TOP OF ROOT BALL IS 2" ABOVE FINISH GRADE AS DIRECTED BY LANDSCAPE ARCHITECT. 6" SOIL SAUCER AROUND TREE - III = III =III = 42" LONG J'4 REBAR TAMPED TO REMOVE VOIDS. STAKE DRIVEN 39" INTO Blackeyed Susan GROUND (PLACE STAKES G STAKE AND GUY TREES IF APPLICABLE WITHIN MULCHED AREA) EE PIT AMENDED DEPTH MULCH - _ SOIL AREA FINISHED GRADE (KEEP MULCH 6" FROM TRUNK OF TREE) Sparganium americanum Green bulrush Scirpusatrovirens AMENDED SOIL AREA REMOVE TOP 1/3 BURLAP SCIENTIFIC NAME - THOROUGHLY TILL IN AND TOP OF WIRE BASKET 4 IN, PL i. EXCAVATE TRENCH HAND W/ SPADE 2. ADD EXCESS SOIL TO TO ADJACENT PLANT PLANTING SOIL MIXTURE AFTER TREE IS SET AND APPROVED BY LANDSCAPE 8" MIN Panicum ramosum AMENDMENTS T DEPTH OF 8" (IN SOME ARCHITECT ( HERE SPACE ALLOWS) _ SITUATIONS, LAWN WILL BE PLANTED OVER THIS 6" DEPTH PLANTING SOIL AREA). MIXTURE TAMPED FIRM 3X BALL DIA. A MULCH RING FOR BENEATH ROOT BALL. TREES IN LAWN GENERAL NOTES: MINIMUM 5' DIAMETER. 1. PLANT 50 THAT TOP OF ROOT BALL IS 2" ABOVE FINISH GRADE Arrowleaf tearthumb 2. SCARIFY SIDES AND BOTTOM OF PIT. - III = III =III = J. BACKFILL TREE PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 8" LAYERS HAND TAMPED TO REMOVE VOIDS. 4. WHEN 2/3 BACKFILLED, FILL WITH WATER. Blackeyed Susan 5. AFTER PLACING AND AND - TAMPING FINAL LAYERS, WATER AGAIN UNTIL NO MORE IS ABSORBED, G STAKE AND GUY TREES IF APPLICABLE Blue vervain 7: DO NOT WRAP TREE TRUNKS. TYPICAL TREE PLANTING FINISHED GRADE THOROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" IN ENTIRE SHRUB BED AREA. // _ SHRUB P/ T 1T L / e PULL ROOTS OUT OF BALL FROM CONTAINER STOCK _ 45' REMOVE TOP 113 BURLAP FROM B &B STOCK 6" DEPTH PLANTING SOIL MIXTURE TAMPED FIRM BENEATH ROOT BALL 3X BALL DIA. 3 " DEPTH MULCH (KEEP MULCH AWAY FROM BASE OF PLANT MIN. 4 ) r GROUNDCOVER PLANT (TYP.) ��jlll 0 0 0-� 0 0 0 0-/- SPACING PER PLANT 0 0 0 O= SCHEDULE C ' PLANT 'CH FINISH GRADE PLANTING SOIL MIXTURE 45' MIN. GENERAL NOTES L THRRROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" IN ENTIRE GROUNDCOVER BED AREA. 2 WORK SOIL TO LOOSE UNIFORMLY FINE TEXTURE 3. HAND_ TAMP BACKFILL TO REMOVE VOIDS AND AIR POCKETS, 4. WATER IMMEDIATELY AFTER PLANTING UNTIL NO MORE WATER IS ABSORBED. GROUND COVER PLANTING PLANT SCHEDULE BOTANICAL NAME CODE TREES COMMON NAME TEMPORARY & PERMANENT SEED SCHEDULE COMMON NAME SCIENTIFIC NAME RATE ANNUAL SEED MIX i. EXCAVATE TRENCH HAND W/ SPADE 2. ADD EXCESS SOIL TO TO ADJACENT PLANT MULCH Browntop Millet Panicum ramosum 10 lb /ac Buckwheat Eriogonumspp. 15 lb /ac Winter Rye Loliumspp. 30 lb /ac Winter Wheat Triticumspp. 15lb/ac PERMANENT NATIVE MIX Arrowleaf tearthumb Polygonum sagittatum - III = III =III = Big bluestem Andropagongerardit Blackeyed Susan Rudbeckia hirta Blue vervain Verbena hastata Deer tongue Panicum clandestinum Eastern bur reed Sparganium americanum Green bulrush Scirpusatrovirens Grey headed cone flower Ratibidapinnata Hop sedge Carex lupulina Indian wood oats Chasmanthium latifolium Indinangrass Sorghastrumnutans Lanceleafcoreopsis Coreopsislanceolata Little bluestem Shizachyriumscoparium Many leaved bulrush Scirpuspolyphyllus Nodding bur - marigold Bidenscernua Oxeye sunflower Hehopsis helianthoides Partridge pea Chamaecristafasciculata Pennsylvania smartweed Polygonumpensylvanicum Purple cone flower Echinacea purpurea River oats Chasmanthium latifolium Showy evening primrose Oenotheraspeciosa Showy tickseed sunflower Bidensaristosa Smooth panic grass Panicum dichotomiflorum Soft rush Juncus effusus Switch grass Panicum virgatum Virgina wild rye Elymus virginicus COMBINED TOTAL: 151b /ac QUANTITY HEIGHT SPREAD /CALIPER SPACING REMARKS SHRUBS AYON ARONIA ARBUTIFOLIA RED CHOKEBERRY 15 5 GAL CORA CORNUS AMOMUM SILKY DOGWOOD 12 5 GAL MULCH RING FOR SAMC SAMBUCUS CANADENSIS ELDERBERRY 12 5 GAL SHRUBS IN LAWN MINIMUM 4' DIAMETER. GENERAL NOTES i. PLANT SO THAT TOP OF ROOT BALL IS I" ABOVE FINISH ORADE 2. SCARIFY SIDES AND BOTTOM OF PIT 3. BACKFILL SHRUB PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 6" LAYERS, HAND- TAMPED, TO REMOVE VOIDS. 4. WHEN 213 BACKFILLED, FILL WITH WATER. 5. AFTER PLACING AND HAND - TAMPING FINAL LAYERS, WATER AGAIN UNTIL NO MORE IS ABSORBED, TYPICAL SHRUB PLANTING LAWN EDGE DETAIL GROUND COVERS /GRASSES /PERENNIALS SEED PERMANENT NATIVE MIX 1,547 SF MIX TURF & MULCH MULCH SHREDDED HARDWOOD ABBREVIATIONS: FWF FULL WELL FORMED MS MULTI- STEMMED TRUNK EGG EGG CAN CONTAINER SP SPECIMEN MATERIAL CAL TRUNK CALIPER B &B BALLED AND BURLAPPED IF TREE FORM HABIT GAL GALLON CONTAINER SF SQUARE FEET AS SHOWN FWF CON S WN FWF CON AS SHOWN FWF CON CON CONTAINERIZED MATERIAL BR BARE ROOT MATERIAL ESP ESPALIER NATIVE GRASS AREA TO BE MOWED ONCE IN LATE WINTER TO 6 " -8" HEIGHT SEED ALL DISTURBED AREAS PER PERMANENT SEEDING SCHEDULE SEE EROSION CONTROL PLAN Z O T 0 V to w in U Lu �w (n— U M W � M W N UJ LL LD W Z JZI —_j 0 2 Z 0 LLJ W Q Z w U ° ZU' U= oo 0 Z > H o W W 0 LL O O O w Q O J a o 0 V Z— 2 rn rn 3 20(7 N LLJ J O X z��of dLi 5 x z �yS z Q N W O V 0 z Q J LU G rrQn V Vi z J Q z H V :D W OCp 1 G ��( W W W J J � D M W U U = J z Cl) z V O Z U J a r O LL L.1_ W LL Date: 6 -16 -2015 File Name: SMGL -CR2 Surveyed: JCF Designed: MAH Drawn: MAH Approved: NIA Sheet No. SD -7.1 NOTES APPROX. 30 DEGREES APPROX. 45 DEGREES (�_ TURF i. EXCAVATE TRENCH HAND W/ SPADE 2. ADD EXCESS SOIL TO TO ADJACENT PLANT MULCH BED AFTER PULLING BACK EXISTING MULCH. RATE SOIL AND SMOOTH BEFORE MULCHING. SUBGRADE III —III 6 "MAX. - III = III =III = LAWN EDGE DETAIL GROUND COVERS /GRASSES /PERENNIALS SEED PERMANENT NATIVE MIX 1,547 SF MIX TURF & MULCH MULCH SHREDDED HARDWOOD ABBREVIATIONS: FWF FULL WELL FORMED MS MULTI- STEMMED TRUNK EGG EGG CAN CONTAINER SP SPECIMEN MATERIAL CAL TRUNK CALIPER B &B BALLED AND BURLAPPED IF TREE FORM HABIT GAL GALLON CONTAINER SF SQUARE FEET AS SHOWN FWF CON S WN FWF CON AS SHOWN FWF CON CON CONTAINERIZED MATERIAL BR BARE ROOT MATERIAL ESP ESPALIER NATIVE GRASS AREA TO BE MOWED ONCE IN LATE WINTER TO 6 " -8" HEIGHT SEED ALL DISTURBED AREAS PER PERMANENT SEEDING SCHEDULE SEE EROSION CONTROL PLAN Z O T 0 V to w in U Lu �w (n— U M W � M W N UJ LL LD W Z JZI —_j 0 2 Z 0 LLJ W Q Z w U ° ZU' U= oo 0 Z > H o W W 0 LL O O O w Q O J a o 0 V Z— 2 rn rn 3 20(7 N LLJ J O X z��of dLi 5 x z �yS z Q N W O V 0 z Q J LU G rrQn V Vi z J Q z H V :D W OCp 1 G ��( W W W J J � D M W U U = J z Cl) z V O Z U J a r O LL L.1_ W LL Date: 6 -16 -2015 File Name: SMGL -CR2 Surveyed: JCF Designed: MAH Drawn: MAH Approved: NIA Sheet No. SD -7.1 EX. CANAL /CHANNEL -\ Sp \ sF INSTALL SAND BAG DIKE UPSTREAM AND DOWNSTREAM OF PIPE PRIOR TO REMOVAL, MAINTAIN DIKES UNTIL CULVERT IS REPLACED AND BACKFILLED 1 /SD -8.0 TYPICAL CULVERT INSTALLATION NO SCALE �i. V / INSTALL SILT FENCE ACROSS TOP OF EA. END OF PIPE s� \ EX. ROAD /PATH ST� \ SF INSTALL SILT FENCE ACROSS TOP OF EA. END OF PIPE EX. CANAL /CHANNEL MIN. 24 COVER III III III II -III 2 /SD -8.0 CULVERT CROSS SECTION NO SCALE EXISTING GRAVEL ROAD -III II III III- - COMPACT BACKFILL IN 6" LIFTS 13'— 11 'X8' -7" CMP PIPE ARCH WITH 2" CORRUGATIONS (CONTECH OR EQUIVALENT) EXISTING STREAM BED PLACE ROCK TO MATCH NATURAL STREAM CHANNEL INOT RELEASED FOR CONSTRUCTION NOTES: 1. ONLY PERFORM CULVERT REPLACEMENT DURING A PERIOD OF LOW OR NO FLOW, AND WHEN NO SIGNIFICANT RAIN IS FORECASTED. 2. INSTALL SAND BAG DIKES UPSTREAM AND DOWNSTREAM OF EXISTING CULVERT. PUMP OUT ANY WATER TRAPPED BETWEN DIKES. IF THERE IS ANY FLOW IN EX. CHANNEL, MAINTAIN A BYPASS PUMP DURING INSTALLATION. 3. REMOVE EX. CULVERT. 4. INSTALL STONE BASE, CULVERT, AND BACKFILL CULVERT. 5. INSTALL SILT FENCE ON EITHER SIDE OF NEW CULVERT. 6. REMOVE SAND BAG DIKES. 7. SEED AND MULCH ALL DISTURBED AREAS. 1) GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DISPOSITION TIME FRAME FRAME EXCEPTIONS • PERIMETER DIKES, SWALES' DITCHES 7 DAYS NONE AND SLOPES • HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES • SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED • SLOPES 3:1 OR 14 DAYS 7 —DAYS FOR SLOPES GREATER FLATTER THAN 50 FEET IN LENGTH • ALL OTHER AREAS WITH SLOPES 14 DAYS NONE (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HOW ZONES) 3 /SD -8.0 DWR GROUND COVER REQUIREMENTS NO SCALE ww =)W U W W M W N LLaLuz J Z F-- J 2 Z 0 � LU < Q Z W L) ZC7U2 00 2> JO w W of C" c 00 QO0) z alai= V Z Q 2 M rn 3 H�2i z�NJ O i< 333 O��aL -LL 3 /o z 4 0 o 0 Z J LLJ Q U) Z a N Z U D 1 2 L J LU J U) Q I— W 0 c) 'J^ z V F- ''� ^ z V/ ::) O O LL LU Date: 2 -26 -2015 File Name: SMGL -CR2 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD-8.0 I . OBTAIN ALL REQUIRED FEDERAL, STATE AND LOCAL APPROVALS AND PERMITS. 2. SCHEDULE AND HOLD A PRE— CONSTRUCTION MEETING PRIOR TO BEGINNING ANY LAND— DISTURBING ACTIVITIES. THIS MEETING SHOULD BE ATTENDED BY A REPRESENTATIVE OF THE FINANCIALLY RESPONSIBLE PARTY, ALL INVOLVED CONTRACTORS AND THE DESIGN TEAM. 3. INSTALL TEMPORARY 24" SINGLE WALL HDPE DIVERSION PIPE. ENSURE MINIMUM 2' COVER UNDER EXISTING GRAVEL ROAD. 4. INSTALL TEMPORARY SAND BAG DAMS AND ROUTE STREAM THROUGH DIVERSION PIPE. 5. WHEN THE WORK AREA IS DRY, REMOVE EXISTING CULVERTS. 6. INSTALL NEW CMP PIPE ARCH CULVERT. EMBED PIPE AS SHOWN ON PLANS. PLACE MATERIAL IN PIPE TO MATCH EXISTING STREAM CHANNEL. 7. INSTALL CONCRETE HEADWALLS. FILL MATERIAL OVER CULVERT AND COMPACT IN 6" LIFT TO MEET PIPE COVER REQUIREMENTS. S. EXCAVATE MATERIAL FROM EXISTING STREAM BED TO MATCH PROPOSED PROFILE. 9. REMOVE SAND BAG DAMS AND DIVERSION PIPE TO RESTORE STREAM FLOW THROUGH THE CULVERT. 10. PROVIDE ALL DISTURBED AREAS WITH GROUND COVER WITHIN THE SPECIFIED NUMBER OF DAYS. 1 /SD-8.1 CONSTRUCTION SEQUENCE NO SCALE 3 /SD -8.3 NOT USED NO SCALE INOT RELEASED FOR CONSTRUCTION CONSTRUCTION STEP 1: REMOVE BRANCHES AND LARGE ROCKS FROM AREA WHERE THE SAND BAGS WILL BE PLACED. INSTALL SANDBAGS UPSTREAM AND DOWNSTREAM OF CULVERTS TO BE REPLACED, IF THERE IS STANDING WATER IN THE EXISTING CHANNEL. STEP 2: LAY OUT THE IMPERVIOUS POLY - FABRIC LINER WITH THE CENTER OF THE LINER LOCATED UNDER THE CENTER OF THE SAND BAG DIKE. STEP 3: PLACE THE SANDBAGS TO THE DESIRED HEIGHT. THE DIKES SHALL HAVE A WIDTH SUITABLE TO SUPPORT THE HEIGHT. EACH ROW SHALL BE OFFSET SO THE JOINTS ARE STAGGERED. PACK SANDBAGS TIGHTLY TOGETHER. STEP 4: WRAP IMPERVIOUS POLY - FABRIC LINER AROUND SANDBAG DIKE AND SECURE WITH FINAL LAYER OF SANDBAGS. STEP 5: PUMP OUT ANY WATER TRAPPED BETWEEN THE TWO SAND BAG DIKES. MAINTENANCE - PERIODICALLY INSPECT SANDBAG DIKE FOR DAMAGE AND LEAKS - REMOVE IMPOUNDED TRASH AND SEDIMENT - REMOVE ONCE CONSTRUCTION IS COMPLETE 2/SD -8.2 SAND BAG DIKE NO SCALE 4/SD -8.1 NOT USED NO SCALE FILTER BAGS FILLED WITH SAND IMPERVIOUS POLY - FABRIC, INSTALL UNDER, AROUND AND OVER SAND BAGS I INSTALL SAND BAGS TO MATCH EXISTING HEIGHT AND WIDTH OF CHANNEL EX. CHANNEL w w :)W O fU rn W M W N LL0LuZ J Z R- J �2ZO W U Q Q Z W U ZC7U2 00 2> JO w W of 0o c W LL W z t-: � w Q O J a) 0) _0 V Z —Q 2 -M 0-) 3i 2O�C7 c Q N c x z0 <_ aLCL a w 20 K K N .O- z N'O 0 Z a J LLJ a U) Z a N Z D U O 7. L J LU J U) Q H W V c) J z z cl) ::) O U r) ry O LL ry w H ry Date: 2 -26 -2015 File Name: SMGL -CR2 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -8.1 INOT RELEASED FOR CONSTRUCTION DATE: JUNE 19, 2015 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING SERVICES SHEET INDEX SD -1.0 EXISTING CONDITIONS AND DEMOLITION PLAN SD -3.0 GRADING PLAN SD -6.0 PROFILES SD -7.0 LANDSCAPE PLAN SD -7.1 PLANT SCHEDULE SD -8.0 DETAILS SD -8.1 DETAILS 1720 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699 -1720 (919) 707 -0150 FAX: (919) 707 -0162 PROJECT SOUTH MOUNTAINS GAME LAND STREAM CROSSING #5 GAME LAND ACCESS ROAD (OF OFF US 226) RUTHERFORD COUNTY, NC PERMIT DRAWINGS NOTE Elevations For All Sheets are based on assumed elevations VICINTY MAP 35' 2' 48 2 35' 32' 48.26' I 81' 50' 2.44" 64 MCDC ELL COUNT IRUTHERFOF 0 U) 0 M CD 6 - o po .fl C4 0 b O X y Z� b (n � b l O-T3 Q. ' O O G> 111 / O m r m U) m 0 m O A C7 O Z C n O Z NORTH CAROLINA WILDLIFE RESOURCES COMMISSION I -a o o m N z o ° m ? O z S M G L CULVERT - C R5 NORTH CAROLINA DIVISION OF ENGINEERING SERVICES 1720 MAIL SERVICE CENTER ALEIGH, NORTH CAROLINA 27699 RUTHERFORD COUNTY, NC SOUTH MOUNTAINS GAME LAND CD C7 - RESOURCES Phone: 919.707.0150 O _ N EXISTING CONDITIONS ° s5�a Fax: 919.70 www.ncwildiife.org .org la 111 i 10 0 INOT RELEASED FOR CONSTRUCTION OX K 2 (,X X \ ' EDGE OF GRAVEL STREAM THALWEG I — -- - - -- \ / TEMPORARY — EXCAVATE STEAMBED MATERIAL / SAND BAG DIKE TO �, TCI I ROF-�AS SHOWN IN 2 /SD -6.0 / / / s 1 Q 0 D— TEMPORARY STEAM DIVERSION SINGLE WALL 24" HDPE / 2' MIN. COVER UNDER GRAVEL ROAD. I / PUMP AROUND MAY BE USED IN LIEU / OF DIVERSION PIPE. - \ 112'X75" CMP PI7&'ARCH / / W 1" DEEP_CORRUGATIONS \ (CONTECH OR EQUIVALENT) / BEGIN FILL o� �Z � EXISTING STREAM k \ REROUTE STREAM TO z- z � ELIMINATE EXISTING BEND IN STREAM / (RE.-3�SD8. 1) EXISTI G STREAM I� T�BE FILLED AND REROUTED _ \ F APPROXIMATE STEAM-1 END FILL OF THALWEG EXISTING STREAM 10 20 30 \ TEMPORARY Scale 1" = 10' SAND BAG DIKE \ ww U W W M W N LLf.7WZ J Z l.-- J 2 Z 0 W U a Q Z W U zc7v= oo m �LLW0 ooh Q0J as V Z -2 rnrn 3i 2 L9 a ui 0 ENJ O za ^ au- 3 o\ a w O . O Q N O U I 0 z J w a U) Z Ln z Z V o O � F- W O O JU) V U U Z J z Z Cl) ::) W 0 0 IL LU 2 H Date: 2 -26 -2015 File Name: SMGL -CR5 Surveyed: JCF Designed: MAH Drawn: MAH Approved: NIA Sheet No. SD-11.0 1000 999 998 997 996 995 994 993 992 991 990 0 +00 ) +10 J +20 1 /SD -6.0 EXISTING PROFILE - STREAM CENTERLINE NO SCALE 48" CMP TO BE EXISTING GRAVEL REMOVED ROAD 0 +30 0 +40 0 +50 MIN, 24" COVER OVER PIPE PROPOSED THALWEG 1001 PROFILE 1000 999 _ -I—EV7 f T ALVI 998 997 - - -__ 996 -------- - - --- - 995 _ 994 993-------------------- - - - - -� 992 991 990 989------------------- - - - - -- 988 987 986 Jv 0 +00 ) +10 ) +20 2 /SD -6.0 PROPOSED PROFILE - STREAM CENTERLINE NO SCALE 0 +70 0 +80 0 +90 — — — — — — — — — — -------- - - - -4� - -- �_�.F gr� rI F-V = CP9 O3 / — — �L ---------------------- M' - - -7 77��r--77'7'? -------------------- - - - -s/ , =Er T E 4 ) +3C 0 +40 ) +50 0 +60 0 +70 EXISTING GRAVEL ROAD INOT RELEASED FOR CONSTRUCTION 1000 999 998 997 996 995 994 993 992 \ - 991 990 +00 1 +10 +20 EXISTING THALWEG PROFILE J �B ►T T OU=L T / f77 --- --- - - -- -7 - -- — ) +8C ) +90 1 +OC 1+1c CMP PIPE ARCH INV. OUT = 988.55 w w U rn > rn Q: m W N a W Z Z H J Z W wU¢ Z W U z >F- WOf tY 00 0 J p a o Z Q 2 rn rn 3 02LD c yC)J LLI O X 333 O�< 0-L -LL 3 0 X 2 w Kp p Z °� o Np z LO U W W J V IJ^ CV G U) r) z a J W a U) z a z D 0 0 U) z H z Z) 0 0 IL LU 2 H z O H F3 z O 'V V z H W Date: 2 -26 -2015 File Name: SMGL -CR5 Surveyed: JCF Designed: MAH Drawn: MAH Approved: NIA Sheet No. SD-8.0 O O + O + EDGE OF GRAVEL + + + + + + + + + + + + + y + + + + + + + + + + + + + +. \ \ o + +++++++++++,f++++++, + + + + + + + + + + + + + + + + + + + + + O + + + + + + + + + + + 1000— + + } + ++ + + + + + ++ _ + + + ++ + + } + + + + + ++ + \ + + + ++ + + + } } + + + + + ++ + + + + + + + + + + + + + + + + + + ++ + + + + + + + + + + + + + + + + + + + + + SEED MIX + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + }. + + 1+1+, + + + + + + + + + + + + + + +� + + + + + ... + + } + } + + + + I + + + + + + + + + + + + + + + + + + + + } + + + + + } + �+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + } + + + + } + + } + + + + J + + + + + + + + + + + + ++ + + + + + } + + } + }+ + + + + } +} + +,+++++ i ° + + + + + J PLANTING NOTES / + -+ 1. Tree plantings and bed lines shall be staked by Landscape Contractor O \ + for Landscape Architects approval prior to installation. The Landscape + Architect reserves the right to make adjustments to planting locations \ \ as necessary. O 2. Add shredded hardwood mulch to all planting beds at a depth of 3 inches. + + \ J. Landscape Contractor is responsible for maintaining all installed plants and lawn areas until issuance of Written Certificate of Final Completion by the Landscape Architect. 4. All tree, shrub & groundcover materials sholl be planted within 24 hours O + after delivery . \ 5. Landscape Contractor shall make all arrangements for temporary irrigation system services, permits and fees as needed. \ 6. Plant material list is prepared for estimating purposes only. Contractors make their own quatity takeoffs using drawings to determine quantities to their satisfaction, reporting any discrepancies which may affect bidding to Landscape 10 0 10 20 30 Architect. 7 Nursery togs to remain on trees until plant material is approved by Landscape Architect. Seale 1" = 10' 8. All disturbed areas to be seeded per Erosion Control Plan Permanent Seeding Schedule unless otherwise specified. Z O rn O U W W U tY N � W pU rn W � W W N UJ LL (D W Z ❑ 0 Z O W Z U NO W ° Q ° J Z > H o OW WW °O� <YLL�Z QO J rnrn-o U Z Q 2 rn rn 3 HO2i (7 4i z0 W 0-LL 3 a 2 UyQ 2 O K Z U p P y O K Z J W Q G7 15 CORA Q Ln z Z) U 0 ZQ J 14 SAMC a LU O) > Z J " a z 18 ARON J - >z: a 1-- Cl) ::) O U O LL w Date: 6 -16 -2015 \ File Name: SMGL -CR5 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -7.0 TYPICAL TREE PLANTING FINISHED GRADE PROVIDE 3 GUYS FOR EACH THOROUGHLY TILL IN TREE SPACED EQUALLY AROUND PLANTING SOIL MIXTURE TREE THREAD WIRE THRU AMENDMENTS TO DEPTH GROMMETTED TAPE BY GCS, INC. OF S" IN ENTIRE SHRUB (PHONE: 800/360 -3584) BED AREA. OR APPROVED EQUAL 2 STRANDS 12 GAUGE 3" DEPTH MULCH GALV WIRE TWISTED TIGHT STAKING NOTE PROVIDE SAFETY FLAGGING ONLY STAKE & GUY TREES 4" CALIPER ON EACH GUY AND LARGER OR IN WINDY LOCATIONS AS DIRECTED BY LANDSCAPE ARCHITECT. 6" SOIL SAUCER AROUND TREE 0 0 & 42" LONG J4 REBAR Winter Wheat STAKE DRIVEN 39 INTO O O O O GROUND (PLACE STAKES PERMANENT NATIVE MIX WITHIN MULCHED AREA) E£ PIT _ AMENDED DEPTH MULCH Polygonumsagittatum _ _ - - SOIL AREA - FINISHED GRADE (KEEP MULCH 6" FROM (K Andropogongerardii -` BlackeyedSusan TRUNK OF TREE) 0 0 0 Blue vervain Verbena hastata \ / Deertongue Panicumclandestinum AMENDED SOIL AREA REMOVE TOP 113 BURLAP /�v� / � - THOROUGHLY TILL IN AND TOP OF WIRE BASKET 45'MIN. VL PLANTING SOIL MIXTURE AFTER TREE IS SET AND APPROVED BY LANDSCAPE $ MIN AMENDMENTS TO DEPTH OF 8" (IN SOME ARCHITECT = ( HERE SPACE ALLOWS) SITUATIONS, LAWN WILL BE PLANTED OVER THIS 6" DEPTH PLANTING SOIL AREA). MIXTURE TAMPED FIRM 3X BALL DIA. BENEATH ROOT BALL. - - MULCH RING FOR TREES IN LAWN GENERAL NOTES MINIMUM 5' DIAMETER. 1, PLANT SO THAT TOP OF ROOT BALL IS 2" ABOVE FINISH GRADE. 2. SCARIFY SIDES AND BOTTOM OF PIT L GRADE 3 BACKFILL TREE PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 8" LAYERS, HAND TAMPED TO REMOVE VOIDS. 4. WHEN 213 BACKFILLED, FILL WITH WATER. 5. AFTER PLACING AND AND - TAMPING FINAL LAYERS WATER AC41N UNTIL NO MORE IS ABSORBED. 6. STAKE AND GUY TREES IF APPLICABLE 7 DO NOT WRAP TREE TRUNKS. Man leaved bulrush TYPICAL TREE PLANTING FINISHED GRADE THOROUGHLY TILL IN AS° MIN. PLANTING SOIL MIXTURE COMMON NAME AMENDMENTS TO DEPTH MULCH RING FOR OF S" IN ENTIRE SHRUB SHRUBS IN LAWN BED AREA. = MINIMUM 4' DIAMETER 3" DEPTH MULCH Panicumramosum 10 lb /ac (KEEP MULCH AWAY FROM SHRUB PIT BASE OF PLANT MIN. 4) PULL ROOTS OUT OF BALL FROM CONTAINER STOCK REMOVE TOP 1/3 BURLAP AS° MIN. FROM B &B STOCK COMMON NAME 6" DEPTH PLANTING SOIL MULCH RING FOR MIXTURE TAMPED FIRM SHRUBS IN LAWN BENEATH ROOT BALL = 3X BALL DA. = MINIMUM 4' DIAMETER GENERAL NOTES: 1. PLANT SO THAT TOP OF ROOT BALL IS 1" ABOVE FINISH GRADE 2. SCARIFY SIDES AND BOTTOM OF PIT. 3 BACKFILL SHRUB PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 6" LAYERS, HAND - TAMPED, TO REMOVE VOIDS. 4. WHEN 213 BACKFILLED, FILL WITH WATER. 5. AFTER PLACING AND HAND - TAMPING FINAL LAYERS WATER AGAIN UNTIL NO MORE 15 ABSORBED. TYPICAL SHRUB PLANTING NOTES APPROX. 30 DEGREES 1. EXCAVATE TRENCH BY HAND W/ SPADE APPROX. 45 DEGREES < TURF 2, ADD EXCESS SOIL TO ADJACENT PLANT MULCH BED AFTER PULLING BACK EXISTING MULCH. RATE SOIL AND SMOOTH BEFORE MULCHING. SUBGRADE - � III - - 4 MIN. I1 I =1 III= 6'MAX. LAWN EDGE DETAIL MULCH SHREDDED HARDWOOD ABBREVIATIONS. FWF FULL WELL FORMED SP SPECIMEN MATERIAL IF TREE FORM HABIT 1.300 SF MS MULTI- STEMMED TRUNK EGG EGG CAN CONTAINER CON CONTAINERIZED MATERIAL CAL TRUNK CALIPER B &B BALLED AND BURLAPPED BR BARE ROOT MATERIAL GAL GALLON CONTAINER SF SQUARE FEET ESP ESPALIER Z O T 0 V to W N W pU rn W � W W N WN�Q J Z o2ZU LLJ W U Q z W U CD m J Z > H O OWWU °° LL Z f� w Q O J rn o 0 V Z— 2 rn rn 3 20 (7 U J O x z0�< dLi 5 a x z �y4 o o Z U O 0 z Q J LU 75 rrQn rV V) v, z J Ln Q z H V Z) W 06 LLI W J i p D W 0 U = J z co (5' V/ /G� z V/ O Z U J a O LL ry LU N�N L.I. Date: 6 -16 -2015 File Name: SMGL -CR5 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -7.1 TEMPORARY & PERMANENT SEED SCHEDULE COMMON NAME SCIENTIFIC NAME RATE ANNUAL SEED MIX Browntop Millet Panicumramosum 10 lb /ac GROUNDCOVER PLANT (TYP.) Buckwheat Eriogonum spp. 15 b/ac Winter Rye Lolium spp. 30 Ib /ac 0 0 & Winter Wheat Triticum spp. 15 lb /ac O O O O PERMANENT NATIVE MIX Arrowleaftearthumb Polygonumsagittatum 0 0 0 0 SPACING PER PLANT SCHEDULE Big bluestem Andropogongerardii -` BlackeyedSusan Rudbeckiahirta 0 0 0 Blue vervain Verbena hastata Deertongue Panicumclandestinum Eastern bur reed Sparganium americanum PLANT Green bulrush Scirpus atrovirens LCH Grey headed cone flower Ratibida pinnata 444*4 Hop sedge Carex lupulina Indian wood oats Chasmanthium lanfolium } Indinangrass Sorghastrum nutans L GRADE Lanceleaf coreopsis Coreopsis lanceolata J FINISH �I PLANTING sort Little bluestem Shizachyriumscoparium MIXTURE Man leaved bulrush Scir us of y h y llus 45' MIN. Nodding bur - marigold Bidens cernua GENERAL NOTES: Oxeye sunflower Hehopsis hehanthoides 1. THROROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" IN ENTIRE GROUNDCOVER BED AREA. Partridge pea Chamaecristafasciculata 2. WORK SOIL TO LOOSE, UNIFORMLY FINE TEXTURE. Pennsylvania smartweed Polygonumpensylvanicum J. HAND -TAMP BACKFILL TO REMOVE VOIDS AND AIR POCKETS. 4, WATER IMMEDIATELY AFTER PLANTING UNTIL NO MORE WAFER IS ABSORBED. Purple cone flower Echinacea purpurea GROUND COVER PLANTING Showy evening Oenothraspelatifolium Showy evening primrose Oenothera speciosa Showy tickseed sunflower Bidens aristosa Smooth panic grass Panicumdichotomiflorum Soft rush Juncus effusus Switch grass Panicum virgatum Virgin wild rye Elymus virginicus COMBINED TOTAL: 15 lb/ac PLANT SCHEDULE BOTANICAL NAME COMMON NAME QUANTITY HEIGHT SPREAD /CALIPER SPACING REMARKS CODE TREES SHRUBS ARON ARONIA ARBUTIFOLIA RED CHOKEBERRY 18 5 GAL AS SHOWN FWF CON CORA CORNUS AMOMUM SILKY DOGWOOD 15 5 GAL AS SHOWN FWF CON SAMC SAMBUCUS CANADENSIS ELDERBERRY = 14 5 GAL AS SHOWLN FWF CON GROUND COVERS/ GRASSES I PERENNIALS SEED PERMANENT NATIVE MIX 975 SF NATIVE GRASS AREA TO BE MOWED MIX ONCE IN LATE WINTER TO 6 " -B" HEIGHT SEED ALL DISTURBED AREAS PER PERMANENT SEEDING SCHEDULE _ SEE EROSION CONTROL PLAN TURF & MULCH MULCH SHREDDED HARDWOOD ABBREVIATIONS. FWF FULL WELL FORMED SP SPECIMEN MATERIAL IF TREE FORM HABIT 1.300 SF MS MULTI- STEMMED TRUNK EGG EGG CAN CONTAINER CON CONTAINERIZED MATERIAL CAL TRUNK CALIPER B &B BALLED AND BURLAPPED BR BARE ROOT MATERIAL GAL GALLON CONTAINER SF SQUARE FEET ESP ESPALIER Z O T 0 V to W N W pU rn W � W W N WN�Q J Z o2ZU LLJ W U Q z W U CD m J Z > H O OWWU °° LL Z f� w Q O J rn o 0 V Z— 2 rn rn 3 20 (7 U J O x z0�< dLi 5 a x z �y4 o o Z U O 0 z Q J LU 75 rrQn rV V) v, z J Ln Q z H V Z) W 06 LLI W J i p D W 0 U = J z co (5' V/ /G� z V/ O Z U J a O LL ry LU N�N L.I. Date: 6 -16 -2015 File Name: SMGL -CR5 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -7.1 INOT RELEASED FOR CONSTRUCTION zz w fn EX. CANAL /CHANNEL o U to W w y // O U rn cn W K W N Wf.7WZ J Z � J sF INSTALL SILT FENCE w w w sF ACROSS TOP OF EA. END OF a z w v °n cq PIPE NOTES: ? z U= o o m / sF 1. ONLY PERFORM CULVERT REPLACEMENT DURING A PERIOD OF LOW O Of Of o o OR NO FLOW, AND WHEN NO SIGNIFICANT RAIN IS FORECASTED. Q p'n z m m \ 2. INSTALL SAND BAG DIKES UPSTREAM AND DOWNSTREAM OF EXISTING v z Q x rn rn INSTALL SAND BAG DIK \s CULVERT. PUMP OUT ANY WATER TRAPPED BETWEN DIKES. IF THERE IS y 2i C) a C; UPSTREAM AND DOWNSTREAM EX. ROAD /PATH ANY FLOW IN EX. CHANNEL, MAINTAIN A BYPASS PUMP DURING p E N -1 OF PIPE PRIOR TO REMOVAL, sT INSTALLATION. z ° Qf o u- MAINTAIN DIKES UNTIL 3. REMOVE EX. CULVERT. CULVERT IS REPLACED AND s 4. INSTALL STONE BASE, CULVERT, AND BACKFILL CULVERT. w2 BACKFILLED \ 5. INSTALL SILT FENCE ON EITHER SIDE OF NEW CULVERT. o N sF\ 6. REMOVE SAND BAG DIKES. _ ° o 7. SEED AND MULCH ALL DISTURBED AREAS. INSTALL SILT FENCE ACROSS TOP OF EA. END OF ��• PIPE 0 EX. CANAL /CHANNEL Q J LLJ 5 1 /SD -8.0 Q TYPICAL CULVERT INSTALLATION C7 NO SCALE Z _ a EXISTING GRAVEL z MIN. 24" COVER ROAD U O COMPACT BACKFILL J IN 6" LIFTS W O _ 1) GROUND STABILIZATION J 112"-75" CMP PIPE ARCH SITE AREA STABILIZATION STABILIZATION TIME V U Q WITH T I » CORRUGATIONS DISPOSITION TIME FRAME FRAME EXCEPTIONS (CONTECH OR EQUIVALENT) PERIMETER DIKES, J z — SWALES, DITCHES 7 DAYS NONE AND SLOPES } —' HIGH QUALITY z _ WATER (HOW) 7 DAYS NONE U) ::) ZONES O = EXISTING STREAM BED SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN U • 7 DAYS LENGTH AND ARE NOT STEEPER THAN 3:1 THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7 –DAYS FOR SLOPES GREATER O 14 DAYS FLATTER THAN 50 FEET IN LENGTH LL • ALL OTHER AREAS w WITH SLOPES 14 DAYS NONE (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HOW ZONES) PLACE ROCK TO MATCH NATURAL STREAM CHANNEL Date: — I 2 -26 -2015 File Name: SMGL -CR5 Surveyed: JCF 2 /SD -8.0 3 /SD -8.0 Designed: MAH CULVERT CROSS SECTION DWR GROUND COVER REQUIREMENTS Drawn: MAH NO SCALE NO SCALE Approved: N/A Sheet No. SD-8.0 I . OBTAIN ALL REQUIRED FEDERAL, STATE AND LOCAL APPROVALS AND PERMITS. 2. SCHEDULE AND HOLD A PRE— CONSTRUCTION MEETING PRIOR TO BEGINNING ANY LAND— DISTURBING ACTIVITIES. THIS MEETING SHOULD BE ATTENDED BY A REPRESENTATIVE OF THE FINANCIALLY RESPONSIBLE PARTY, ALL INVOLVED CONTRACTORS AND THE DESIGN TEAM. 3. INSTALL TEMPORARY 24" SINGLE WALL HDPE DIVERSION PIPE. ENSURE MINIMUM 2' COVER UNDER EXISTING GRAVEL ROAD. 4. INSTALL TEMPORARY SAND BAG DAMS AND ROUTE STREAM THROUGH DIVERSION PIPE. 5. WHEN THE WORK AREA IS DRY, REMOVE EXISTING CULVERT. 6. INSTALL NEW CMP PIPE ARCH CULVERT. EMBED PIPE AS SHOWN ON PLANS. 7. FILL AND PERMANENTLY REROUTE EXISTING STREAM. 8. REMOVE SAND BAG DAMS AND DIVERSION PIPE TO RESTORE STREAM FLOW THROUGH THE CULVERT. 9. PROVIDE ALL DISTURBED AREAS WITH GROUND COVER WITHIN THE SPECIFIED NUMBER OF DAYS. 1 /SD-8.1 CONSTRUCTION SEQUENCE NO SCALE 6.0' BANKFULL WIDTH 3.5' CHANNEL WIDTH DEPTH TO MATCH EXISTING STREAM CROSS SECTION 3 /SD -8.1 STREAM CROSS SECTION NO SCALE INOT RELEASED FOR CONSTRUCTION CONSTRUCTION STEP 1: REMOVE BRANCHES AND LARGE ROCKS FROM AREA WHERE THE SAND BAGS WILL BE PLACED. INSTALL SANDBAGS UPSTREAM AND DOWNSTREAM OF CULVERTS TO BE REPLACED, IF THERE IS STANDING WATER IN THE EXISTING CHANNEL. STEP 2: LAY OUT THE IMPERVIOUS POLY - FABRIC LINER WITH THE CENTER OF THE LINER LOCATED UNDER THE CENTER OF THE SAND BAG DIKE. STEP 3: PLACE THE SANDBAGS TO THE DESIRED HEIGHT. THE DIKES SHALL HAVE A WIDTH SUITABLE TO SUPPORT THE HEIGHT. EACH ROW SHALL BE OFFSET SO THE JOINTS ARE STAGGERED. PACK SANDBAGS TIGHTLY TOGETHER. STEP 4: WRAP IMPERVIOUS POLY - FABRIC LINER AROUND SANDBAG DIKE AND SECURE WITH FINAL LAYER OF SANDBAGS. STEP 5: PUMP OUT ANY WATER TRAPPED BETWEEN THE TWO SAND BAG DIKES. MAINTENANCE - PERIODICALLY INSPECT SANDBAG DIKE FOR DAMAGE AND LEAKS - REMOVE IMPOUNDED TRASH AND SEDIMENT - REMOVE ONCE CONSTRUCTION IS COMPLETE 2/SD -8.1 SAND BAG DIKE NO SCALE 4/SD -8.1 NOT USED NO SCALE FILTER BAGS FILLED WITH SAND IMPERVIOUS POLY - FABRIC, INSTALL UNDER, AROUND AND OVER SAND BAGS INSTALL SAND BAGS TO MATCH EXISTING HEIGHT AND WIDTH OF CHANNEL EX. CHANNEL w w :)W O fU rn W M W N LL f.7WZ J Z R- J �2ZO W U Q Q Z W U ZC7U2 00 2> JO w W of 0o c W LL W z t-: � w Q O J a) 0) -o V Z —Q 2 -M 0-) 3i 2O�C7 c Q N c x z0 <_ aLCL a w 20 KJ K N 0 Z r) z a J LL] a U) z L a z U D 0 LU Z) J LU J O H LU U c) J z z 0 0 0 LL] ry Date: 2 -26 -2015 File Name: SMGL -CR5 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -8.1 INOT RELEASED FOR CONSTRUCTION DATE: FEBRUARY 26, 2015 REVISED: JUNE 10, 2015 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION DIVISION OF ENGINEERING SERVICES SHEET INDEX SD -1.0 EXISTING CONDITIONS AND DEMOLITION PLAN SD -3.0 GRADING PLAN SD -6.0 PROFILES SD -7.0 LANDSCAPE PLAN SD -7.1 PLANTING SCHEDULE SD -8.0 DETAILS SD -8.1 DETAILS 1720 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699 -1720 (919) 707 -0150 FAX: (919) 707 -0162 PROJECT SOUTH MOUNTAINS GAME LAND STREAM CROSSING #7 GAME LAND ACCESS ROAD (OF OFF US 226) RUTHERFORD COUNTY, NC PERMIT DRAWINGS NOTE Elevations For All Sheets are based on assumed elevations VICINTY MAP GPS COORDINAT- 35' 32' 44.05 ",�] 81' 50' 2.51"/ J64 MCDCWELL COUNT RUTHERI C' 0 C) A0 C) C \\� \\\ C) 1 / ..,. U) -T) 7,9 0 CD 11 C:) Q 0, m r- m z U) m 0 -n 0 C) C \\� \\\ C) 1 / ..,. C) C-) \� �� 7,9 0, m r- m U) m 0 -n 0 0 Z cn C 0 0 NORTH CAROLINA WILDLIFE RESOURCES COMMISSION u) > u p m S M G L CULVERT CR7 DIVISION OF ENGINEERING SERVICES C //CAROLINA 1720 MAIL SERVICE CENTER 'AR."'A Z c RUTHERFORD COUNTY, NC SOUTH MOUNTAINS GAME LAND ALEIGH, NORTH CAROLINA 27699 <\ C7 p O A Phone: 919.707.0150 - RESOURCES Fax: 919.707.0162 cn EXISTING CONDITIONS www.ncwildiife.org .org X z INOT RELEASED FOR CONSTRUCTION E GE OF GRAVEL 1 � RhOCATE GR VEL \ l l ROAD CONCRETE P "ALL CD CD C-0 ' \ o00 1 RECONSTRUCT STREAMBANK 1 I (-D EXISTING STREAM TO BE USED AS 00 BYPASS AROUND NEW CULVERT I i PROPOSED STREAM THALWEG DURING CONSTRUCTION 1 43. \ I \\ I EXISTING STREAM TO BE FILLED \ \ 1 AND REROUTED REROUTE SWALE AS NECESSARY' CONCRETE I I Q) II HEADWALL I BEGIN FILL OF I I II EXISTING STREAM I I / I � I CONCRETE ENDWALL o o / / l 3'— 1 1 'XB' -7" CMP PIPE ARCH APPROXIMATE STREAM // / I WITH 2" DEEP CORRUGATIONS THALWEG / / (CONTECH OR EQUIVALENT) REROUTE STR -AM ELIMINATE EXI1111V =, / B D IN STREAM 10 0 10 20 30 Scale 1" _ IU ww U M W N !ta LL, J Z I-,- J o�zp 3WUa Q Z W U ZC7U2 0o w JO W LL M p o o Q O J a s o U Z Q 2 rn rn 3 H — LD C; 0 ENJ O za ^ aLL 3 o\ Z w 20 K N O p Z U y O V 0 Z J w a U) Z ~ Z U 0 0 Z � a 0 J Z U v Q Z Z 0 0 0 LL LU 2 H Date: 2 -26 -2015 File Name: SMGL -CR7 Surveyed: JCF Designed: MAH Drawn: MAH Approved: NIA Sheet No. SD-3.0 1001 1000 999 998 997 996 995 994 993 991 990 989 0 +00 1 /SD -6.0 EXISTING PROFILE - STREAM CENTERLINE NO SCALE INOT RELEASED FOR CONSTRUCTION EXISTING GRAVEL 56 " CMP TO BE ROAD REMOVED 1 I_ 1 l f l II I I I I II I/ I h. I I I I I I I I I I I I I I I I I I _I_�t -�- ±+ I t-- 1- -i--�- I I I I I I i I I� - I I I I i I I 0 +50 1 +00 EXISTING THALWEG PROFILE RELOCATED GRAVEL ROAD FILL MATERIAL (HATCHED AREA) MIN. 24" COVER COMPACT IN 6 LIFTS OVER PIPE CONCRETE HEADWALL ,CONCRETE ENDWALL 1003 1002 �'�; I -------- - - - - -- 1002 1000 j STRFAMEXISTING /�/ j/ ���f! / /i�� � j 1000 999 _ 999 998 998 997 If 93' -7 9'X8'- -7" CMP PIPE aRri-, I ss7 996 40 LF (o i n% - 996 995 — TIE TO EXISTING 995 994 �LiEu VLt l �.STRFAMRF� 994 992 LLLV. = yy r - - - - -- 992 991 991 990 990 0 +0 0 +10 0 +20 0 +30 0 +40 0 +50 0 +60 0 +70 O +gO O +gO CMP PIPE ARCH BED AT OUTLET CMP PIPE ARCH INV. OUT = 997.5 PROPOSED STREAMBED ELEV. = 99.3.1 INV. OUT = 990.74 PROFILE 2 /SD -6.0 PROPOSED PROFILE - STREAM CENTERLINE NO SCALE W w =)W p L) W W W W N LLaLL)z J Z J oxz0 3Wc) a Q Z W U z L)= o w FW O zLLW0 ooh Qo J o a;� V Z Q 2 rn rn 3 �°2 L4 LLJ 0 ENJ O za ^ aLLL 3 o w 20 O p z Q N O V z a J LLJ a U) z a z U D 0 73 W W Z) J J U) LI- V z a 'J^ V } z 0 0 LL LU Date: 2 -26 -2015 File Name: SMGL -CR7 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD-11.0 SEED MIX F&OAMIATIFIM 21 ARON 21 CORA CONCRETE HEADWALL 10 0 10 / 20 / -_ Scale 1" _ 40 n D2 + ++ + + +I ++ + rY � -1 0 lx� CONCRETE ENDWALL 2 0 to 0 to W <Y N �W pU W �0 M W N W CO Q J Z � o §Zo U Q Z W W U = ° Z C� U o 0 LL 0� JZH "' o W � > � z�o ooh a o J a a; V Z Q 2 rn rn 3 � 0 0 05 E-J O X 333 z��� dLi 3 a x z �y4 o� 'o z Q y O U � z J W Q z z U 0 Q J � ? a LU > ° z_ J F- " z Q J J 5 z a 0 PLANTING NOTES ::) 1. Tree plantings and bed lines shall be staked by Landscape Contractor 0 for Landscape Architect's approval prior to installation. The Landscape Architect reserves the right to make adjustments to planting locations 0 as necessary. 2. Add shredded hardwood mulch to all planting beds at a depth of 3 inches. Q J. Landscape Contractor is responsible for maintaining all installed plants LL and town areas until issuance of Written Certificate of Final Completion w by the Landscape Architect. _ 4. All tree, shrub & groundcover materials shall be planted within 24 hours (- after delivery. 5. Landscape Contractor shall make all arrangements for temporary irrigation system services, permits and fees as needed. Date: 6. Plant material list is prepared for estimating purposes only. Contractors 6 -16 -2015 make their own quotity takeoffs using drawings to determine quantities to their File Name: satisfaction, reporting any discrepancies which may affect bidding to Landscape SMGL -CR7 Architect. Surveyed: 7. Nursery tags to remain on trees until plant material is approved by Landscape Designed: Architect. Drawn: 8. All disturbed areas to be seeded per Erosion Control Plan Permanent Seeding Approved: Schedule unless otherwise specified. Sheet No. SD -7.0 JCF MAH MAH N/A JCF MAH MAH N/A TYPICAL TREE PLANTING — FINISHED GRADE — THOROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" IN ENTIRE SHRUB BED AREA. 3" DEPTH MULCH (KEEP MULCH AWAY FROM _ SHRUB PIT BASE OF PLANT MIN. 4 PULL ROOTS OUT OF BALL FROM CONTAINER STOCK 45° MIN. REMQVf TOP 113 BURLAP FROM B &B STOCK 6" DEPTH PLANTING SOIL MULCH RING FOR MIXTURE TAMPED FIRM SHRUBS IN LAWN BENEATH ROOT BALL = 3X BALL DLA. = MINIMUM 4' DIAMETER. GENERAL N07ES: 1. PLANT SO THAT TOP OF ROOT BALL IS I" ABOVE FINISH GRADE 2. SCARIFY SIDES AND BOTTOM OF PIT. 3. BACKFILL SHRUB PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 6" LAYERS, HAND - TAMPED, TO REMOVE VOIDS, 4. WHEN 213 BACKFILLED, FILL WITH WATER. 5. AFTER PLACING AND HAND - TAMPING FINAL LAYERS, WATER AGAIN UNTIL NO MORE IS ABSORBED TYPICAL SHRUB PLANTING NOTES APPRDX 30 DEGREES : I. EXCAVATE TRENCH BY HAND W/ SPADE APPRDX 45 DEGREES TURF 2. ADD EXCESS SOIL TO ADJACENT PLANT MULCH BED AFTER PULLING BACK EXISTING MULCH RATE SOIL AND SMOOTH BEFORE MULCHING. SUBGRADE III = III =III= III III —III — 4 MIN fi "MAX. III -III= - III - III =I I II i I- III =IIII I I�,,� III 1I � i� LAWN EDGE DETAIL PROVIDE 3 GUYS FOR EACH TREE SPACED EQUALLY AROUND COMMON NAME TREE. THREAD WIRE RING RATE GROMMETTED TAPE BY GCS, INC. ANNUAL SEED MIX (PHONE, 800/360 -3584) OR APPROVED EQUAL 2 STRANDS 12 GAUGE Panicum ramosum GALV WIRE TWISTED TIGHT. STAKING NOTE: PROVIDE SAFETY FLAGGING ONLY STAKE & GUY TREES 4" CALIPER ON EACH GUY AND LARGER OR IN WINDY LOCATIONS Winter Rye AS DIRECTED BY LANDSCAPE ARCHITECT 6" SOIL SAUCER AROUND TREE 0 0 0__ 42" LONG #4 REBAR Triticumspp. STAKE DRIVEN 39" INTO O 0 O 0 GROUND (PLACE STAKES WITHIN MULCHED AREA) EE PIT AMENDED _ DEPTH MULCH SOIL AREA FINISHED GRADE (KEEP MULCH 6" FROM (K Andropogongerardii TRUNK OF TREE), Blackeyed Susan Rudbeckia hirta \ 0 0 0 / Verbena hastata AMENDED SOIL AREA REMOVE TOP 1/3 BURLAP - THOROUGHLY TILL IN AND TOP OF WIRE BASKET 45'MIN. VL PLANTING SOIL MIXTURE AFTER TREE IS SET AND APPROVED BY LANDSCAPE 8' MIN AMENDMENTS TO DEPTH OF 8" (IN SOME ARCHITECT - (4GHERE SPACE ALLOWS) SITUATIONS, LAWN WILL BE PLANTED OVER THIS 6" DEPTH PLANING SOIL AREA). MIXTURE TAMPED FIRM 1- 3X BALL OIA. MULCH RING FOR BENEATH ROOT BALL. TREES IN LAWN GENERAL NOTES: MINIMUM 5' DIAMETER. 1. PLANT SO THAT TOP OF ROOT BALL lS 2" ABOVE FINISH GRADE 2. SCARIFY SIDES AND BOTTOM OF PIT. Sorghastrumnutans J. BACKFILL TREE PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 8" LAYERS, HAND TAMPED TO REMOVE VOIDS. 4. WHEN 2/3 BACKFILLED, . FILL WITH WATER. Lanceleaf coreopsis 5. AFTER PLACING AND AND- TAMPING FINAL LAYERS, WATER AGAIN UNTIL NO MORE IS ABSORBED. 6. STAKE AND GUY TREES IF APPLICABLE PLANTING SOIL 7 DO NOT WRAP TREE TRUNKS. Shizachyriumscopari um TYPICAL TREE PLANTING — FINISHED GRADE — THOROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" IN ENTIRE SHRUB BED AREA. 3" DEPTH MULCH (KEEP MULCH AWAY FROM _ SHRUB PIT BASE OF PLANT MIN. 4 PULL ROOTS OUT OF BALL FROM CONTAINER STOCK 45° MIN. REMQVf TOP 113 BURLAP FROM B &B STOCK 6" DEPTH PLANTING SOIL MULCH RING FOR MIXTURE TAMPED FIRM SHRUBS IN LAWN BENEATH ROOT BALL = 3X BALL DLA. = MINIMUM 4' DIAMETER. GENERAL N07ES: 1. PLANT SO THAT TOP OF ROOT BALL IS I" ABOVE FINISH GRADE 2. SCARIFY SIDES AND BOTTOM OF PIT. 3. BACKFILL SHRUB PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 6" LAYERS, HAND - TAMPED, TO REMOVE VOIDS, 4. WHEN 213 BACKFILLED, FILL WITH WATER. 5. AFTER PLACING AND HAND - TAMPING FINAL LAYERS, WATER AGAIN UNTIL NO MORE IS ABSORBED TYPICAL SHRUB PLANTING NOTES APPRDX 30 DEGREES : I. EXCAVATE TRENCH BY HAND W/ SPADE APPRDX 45 DEGREES TURF 2. ADD EXCESS SOIL TO ADJACENT PLANT MULCH BED AFTER PULLING BACK EXISTING MULCH RATE SOIL AND SMOOTH BEFORE MULCHING. SUBGRADE III = III =III= III III —III — 4 MIN fi "MAX. III -III= - III - III =I I II i I- III =IIII I I�,,� III 1I � i� LAWN EDGE DETAIL SHRUBS ARON ARONIA ARBUTIFOLIA RED CHOKE-BERRY 21 5 GAL AS SHOWN FWF CON CORA CORNETS AMOMOM SILKY DOGWOOD 21 5 GAL AS SHOWN FWF CON SAMC SAMBUCUS CANADENSIS ELDERBERRY 18 5 GAL AS SHOWN FWF CON SEED MIX GROUND COVERS / GRASSES / PERENNIALS TURF & MULCH PERMANENT NATIVE MIX 1,280 SF NATIVE GRASS AREA TO BE MOWED ONCE IN LATE WINTER TO 6 "-8" HEIGHT MULCH SHREDDED HARDWOOD ABBREVIATIONS: FWF FULL WELL FORMED MS MULTI- STEMMED TRUNK EGG EGG CAN CONTAINER SP SPECIMEN MATERIAL CAL TRUNK CALIPER B &B BALLED AND BURLAPPED IF TREE FORM HABIT GAL GALLON CONTAINER SF SQUARE FEET CON CONTAINERIZED MATERIAL BR BARE ROOT MATERIAL ESP ESPALIER SEED ALL DISTURBED AREAS PER PERMANENT SEEDING SCHEDULE SEE EROSION CONTROL PLAN Z O T O V Lu W U in � W pU rn W�0 � W N LL (D W Z J Z H �:i ❑ re Z Q LLJ W QZUU Ld °N J Z > H o OWWU °° W W �Z I-1`w Q O J a o 0 V Z Q: rn rn 3 H0 (D uJ 0 NO J O X 333 z��Of 0- 3 a x ? uy4 O p z ¢ y O U � 0 z Q J LLI G Q (1) U) z J Q z H V :D W 0C 1 G ��( W W W 0 J J � D M W U U = J z z r O Z U J a 0 LL L.1_ W N� N Date: 6 -16 -2015 File Name: SMGL -CR7 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -7.1 TEMPORARY & PERMANENT SEED SCHEDULE COMMON NAME SCIENTIFIC NAME RATE ANNUAL SEED MIX Browntop Millet Panicum ramosum 10 lb/ac, GROUNDCOVER PLANT (TYR) Buckwheat Eriogonumspp. 151b /ac Winter Rye Loliumspp. 30 lb /ac 0 0 0__ Winter Wheat Triticumspp. 15 lb /ac O 0 O 0 PERMANENT NATIVE MIX Arrowleaftearthumb Polygonumsagittatum SPACING PER PLANT O O 0 SCHEDULE Big bluestem Andropogongerardii Blackeyed Susan Rudbeckia hirta 0 0 0 Blue vervain Verbena hastata Deer tongue Panicum clandestinum Eastern bur reed Sparganium americanum GROUNDCOVER PLANT Green bulrush Scirpusatrovirens 3" DEPTH MULCH Grey headed cone flower Ratibidapinnata Hop sedge Carex lupulina Indian wood oats Chasmanthiumlatifolium Indinangrass Sorghastrumnutans Lanceleaf coreopsis Coreopsis lanceolat a PLANTING SOIL Little bluestem Shizachyriumscopari um aRcRAD Many leaked bulrush Scir P us of Y h Y llus 45' MIN. Nodding bur - marigold Bidenscernua GENERAL NOTES. Oxeye sunflower Heliopsis helianthoides L THROROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" IN ENTIRE GROUNDCOVER BED AREA. Partridge pea Chamaecristafasciculata 2. WORK SOIL To LOOSE UNIFORMLY FINE TEXTURE Pennsylvania smartweed Polygonumpensylvanicum 3 HAND -TAMP BACKFILL TO REMOVE VOIDS AND AIR POCKETS 4. WATER IMMEDIATELY AFTER PLANTING UNTIL NO MORE WATER IS ABSORBED Purple cone flower Echinacea purpurea River oats Chasmanthiumlatifolium GROUND COVER PLANTING Showy evening primrose Oenothera speciosa Showy tickseed sunflower Bidens aristosa Smooth panic grass Panicum dichotomiflorum Soft rush Juncus effusus Switch grass Panicum virgatum Virgin wild rye Elymus virginicus COMBINED TOTAL: 15 lb/ac PLANT SCHEDULE BOTANICAL NAME COMMON NAME QUANTITY HEIGHT SPREAD /CALIPER SPACING REMARKS CODE TREES SHRUBS ARON ARONIA ARBUTIFOLIA RED CHOKE-BERRY 21 5 GAL AS SHOWN FWF CON CORA CORNETS AMOMOM SILKY DOGWOOD 21 5 GAL AS SHOWN FWF CON SAMC SAMBUCUS CANADENSIS ELDERBERRY 18 5 GAL AS SHOWN FWF CON SEED MIX GROUND COVERS / GRASSES / PERENNIALS TURF & MULCH PERMANENT NATIVE MIX 1,280 SF NATIVE GRASS AREA TO BE MOWED ONCE IN LATE WINTER TO 6 "-8" HEIGHT MULCH SHREDDED HARDWOOD ABBREVIATIONS: FWF FULL WELL FORMED MS MULTI- STEMMED TRUNK EGG EGG CAN CONTAINER SP SPECIMEN MATERIAL CAL TRUNK CALIPER B &B BALLED AND BURLAPPED IF TREE FORM HABIT GAL GALLON CONTAINER SF SQUARE FEET CON CONTAINERIZED MATERIAL BR BARE ROOT MATERIAL ESP ESPALIER SEED ALL DISTURBED AREAS PER PERMANENT SEEDING SCHEDULE SEE EROSION CONTROL PLAN Z O T O V Lu W U in � W pU rn W�0 � W N LL (D W Z J Z H �:i ❑ re Z Q LLJ W QZUU Ld °N J Z > H o OWWU °° W W �Z I-1`w Q O J a o 0 V Z Q: rn rn 3 H0 (D uJ 0 NO J O X 333 z��Of 0- 3 a x ? uy4 O p z ¢ y O U � 0 z Q J LLI G Q (1) U) z J Q z H V :D W 0C 1 G ��( W W W 0 J J � D M W U U = J z z r O Z U J a 0 LL L.1_ W N� N Date: 6 -16 -2015 File Name: SMGL -CR7 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -7.1 EX. CANAL /CHANNEL -\ Sp \ sF INSTALL SAND BAG DIKE UPSTREAM AND DOWNSTREAM OF PIPE PRIOR TO REMOVAL, MAINTAIN DIKES UNTIL CULVERT IS REPLACED AND BACKFILLED 1 /SD -8.0 TYPICAL CULVERT INSTALLATION NO SCALE �i. V / INSTALL SILT FENCE ACROSS TOP OF EA. END OF PIPE s� \ EX. ROAD /PATH ST� \ SF INSTALL SILT FENCE ACROSS TOP OF EA. END OF PIPE EX. CANAL /CHANNEL MIN. 24 COVER III III III II -III 2 /SD -8.0 CULVERT CROSS SECTION NO SCALE EXISTING GRAVEL ROAD -III II III III- - COMPACT BACKFILL IN 6" LIFTS 13'— 11 'X8' -7" CMP PIPE ARCH WITH 2" CORRUGATIONS (CONTECH OR EQUIVALENT) EXISTING STREAM BED PLACE ROCK TO MATCH NATURAL STREAM CHANNEL INOT RELEASED FOR CONSTRUCTION NOTES: 1. ONLY PERFORM CULVERT REPLACEMENT DURING A PERIOD OF LOW OR NO FLOW, AND WHEN NO SIGNIFICANT RAIN IS FORECASTED. 2. INSTALL SAND BAG DIKES UPSTREAM AND DOWNSTREAM OF EXISTING CULVERT. PUMP OUT ANY WATER TRAPPED BETWEN DIKES. IF THERE IS ANY FLOW IN EX. CHANNEL, MAINTAIN A BYPASS PUMP DURING INSTALLATION. 3. REMOVE EX. CULVERT. 4. INSTALL STONE BASE, CULVERT, AND BACKFILL CULVERT. 5. INSTALL SILT FENCE ON EITHER SIDE OF NEW CULVERT. 6. REMOVE SAND BAG DIKES. 7. SEED AND MULCH ALL DISTURBED AREAS. 1) GROUND STABILIZATION SITE AREA STABILIZATION STABILIZATION TIME DISPOSITION TIME FRAME FRAME EXCEPTIONS • PERIMETER DIKES, SWALES' DITCHES 7 DAYS NONE AND SLOPES • HIGH QUALITY WATER (HOW) 7 DAYS NONE ZONES • SLOPES STEEPER IF SLOPES ARE 10' OR LESS IN THAN 3:1 7 DAYS LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED • SLOPES 3:1 OR 14 DAYS 7 —DAYS FOR SLOPES GREATER FLATTER THAN 50 FEET IN LENGTH • ALL OTHER AREAS WITH SLOPES 14 DAYS NONE (EXCEPT FOR PERIMETERS FLATTER THAN 4:1 AND HOW ZONES) 3 /SD -8.0 DWR GROUND COVER REQUIREMENTS NO SCALE ww =)W U W W M W N LLaLuz J Z F-- J 2 Z 0 � LU < Q Z W L) ZC7U2 0o w JO w W of C" c 00 QO0) z alai= V Z Q 2 M rn 3 H�2i z�NJ O i< 333 O��aL -LL 3 /o z 4 0 o 0 z J LLJ Q U) z a z U D LU LU Z) J J U) Q I— W U c) /Jj z V F- ///G z v/) ::) O O LL LU Date: 2 -26 -2015 File Name: SMGL -CR7 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD-8.0 I . OBTAIN ALL REQUIRED FEDERAL, STATE AND LOCAL APPROVALS AND PERMITS. 2. SCHEDULE AND HOLD A PRE— CONSTRUCTION MEETING PRIOR TO BEGINNING ANY LAND— DISTURBING ACTIVITIES. THIS MEETING SHOULD BE ATTENDED BY A REPRESENTATIVE OF THE FINANCIALLY RESPONSIBLE PARTY, ALL INVOLVED CONTRACTORS AND THE DESIGN TEAM. 3. INSTALL TEMPORARY 24" SINGLE WALL HDPE DIVERSION PIPE. ENSURE MINIMUM 2' COVER UNDER EXISTING GRAVEL ROAD. 4. INSTALL TEMPORARY SAND BAG DAMS AND ROUTE STREAM THROUGH DIVERSION PIPE. 5. WHEN THE WORK AREA IS DRY, REMOVE EXISTING CULVERTS. 6. INSTALL NEW CMP PIPE ARCH CULVERT. EMBED PIPE AS SHOWN ON PLANS. PLACE MATERIAL IN PIPE TO MATCH EXISTING STREAM CHANNEL. 7. INSTALL CONCRETE HEADWALLS. FILL MATERIAL OVER CULVERT AND COMPACT IN 6" LIFT TO MEET PIPE COVER REQUIREMENTS. S. EXCAVATE MATERIAL FROM EXISTING STREAM BED TO MATCH PROPOSED PROFILE. 9. REMOVE SAND BAG DAMS AND DIVERSION PIPE TO RESTORE STREAM FLOW THROUGH THE CULVERT. 10. PROVIDE ALL DISTURBED AREAS WITH GROUND COVER WITHIN THE SPECIFIED NUMBER OF DAYS. 1 /SD-8.1 CONSTRUCTION SEQUENCE NO SCALE 8.5' BANKFULL WIDTH 4.0' CHANNEL WIDTH I � 3 /SD -8.1 STREAM CROSS SECTION NO SCALE —111`r �I DEPTH TO MATCH EXISTING STREAM CROSS SECTION 1 INOT RELEASED FOR CONSTRUCTION CONSTRUCTION STEP 1: REMOVE BRANCHES AND LARGE ROCKS FROM AREA WHERE THE SAND BAGS WILL BE PLACED. INSTALL SANDBAGS UPSTREAM AND DOWNSTREAM OF CULVERTS TO BE REPLACED, IF THERE IS STANDING WATER IN THE EXISTING CHANNEL. STEP 2: LAY OUT THE IMPERVIOUS POLY - FABRIC LINER WITH THE CENTER OF THE LINER LOCATED UNDER THE CENTER OF THE SAND BAG DIKE. STEP 3: PLACE THE SANDBAGS TO THE DESIRED HEIGHT. THE DIKES SHALL HAVE A WIDTH SUITABLE TO SUPPORT THE HEIGHT. EACH ROW SHALL BE OFFSET SO THE JOINTS ARE STAGGERED. PACK SANDBAGS TIGHTLY TOGETHER. STEP 4: WRAP IMPERVIOUS POLY - FABRIC LINER AROUND SANDBAG DIKE AND SECURE WITH FINAL LAYER OF SANDBAGS. STEP 5: PUMP OUT ANY WATER TRAPPED BETWEEN THE TWO SAND BAG DIKES. MAINTENANCE - PERIODICALLY INSPECT SANDBAG DIKE FOR DAMAGE AND LEAKS - REMOVE IMPOUNDED TRASH AND SEDIMENT - REMOVE ONCE CONSTRUCTION IS COMPLETE 2/SD -8.2 SAND BAG DIKE NO SCALE 4/SD -8.1 NOT USED NO SCALE FILTER BAGS FILLED WITH SAND IMPERVIOUS POLY - FABRIC, INSTALL UNDER, AROUND AND OVER SAND BAGS I INSTALL SAND BAGS TO MATCH EXISTING HEIGHT AND WIDTH OF CHANNEL EX. CHANNEL w w :)W O fU rn W M W N LL f.7WZ J Z R- J �2ZO W U Q Q Z W U ZC7U2 00 2> JO w W of 0o c W LL W z t-: � w Q O J a) 0) -o V Z —Q 2 -M 0-) 3i 2O�C7 c Q N c x z0 <_ aLCL a w 20 K K N .O- z N'O 0 z a J LL] a U) z a z U D 0 LU LU Z) J J U) Q H D W U c) J z } z 0 0 0 LL LL] Date: 2 -26 -2015 File Name: SMGL -CR7 Surveyed: JCF Designed: MAH Drawn: MAH Approved: N/A Sheet No. SD -8.1