Loading...
HomeMy WebLinkAboutNCC190787_NOT Closeout Documents_20230822 Sedimentation Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919)791-4200 County: Lee Project: South Park Apartments Phase A River basin: Cape Fear Person financially responsible:SPVII,LLC-Carter Keller,Member-manager Project#: LEE-2019-029 Address: PO Box 130,Sanford,NC 27331 1. Project Location: Commerce Drive,Sanford Pictures: Yes-Digital 2. Weather and soil conditions: Sunny and Dry-Workable Initial inspection: No 3. Is site currently-tinder notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): N/A Title: N/A Inspection report: Sent Report Dale given/sent: July 26,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for ConstructionActivities(NCGOI)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Celina Amaya Others present: N/A Date of inspection: July 26,2023 Time arriving on site: 1:10 PM Time leaving site: 1:15 PM cc: