HomeMy WebLinkAboutWM0301306_Final Permit_20230821ROY COOPER
Govemar
ELIZABETH S. B1SER
Secretory
RICHARD E. ROGERS, JR.
birector
August 21, 2023
Mr. Mathis Nedell (via email)
McDonald's USA, LLC
110 N. Carpenter St.
Chicago, IL 60607
RE: Monitoring Well Construction Permit
Permit # WM0301306
McDonald's USA
9725 Rocky River Rd., Charlotte
Mecklenburg County
Dear Ms. Nedell,
In accordance with your completed application received on August 18, 2023, we are forwarding herewith
Monitoring Well Construction Permit Numbered WM0301306 and issued for the construction of two (2)
monitoring wells located near the subject site in Charlotte, Mecklenburg County.
This Permit will be effective for one year from the date of issuance and shall be subject to the conditions and
limitations as specified therein.
Should you have any questions, please contact Edward Watson at (704) 235-2199, or by email at
edward.watson@deg.nc.gov.
Sincerely,
DocuSigned by:
40 u N NUft
F161FB69A2D84A3...
Andrew H. Pitner, P.G. Regional Supervisor
Mooresville Regional Office
Water Quality Regional Operations Section
Division of Water Resources
CC: WQROS, Central Office (via Laserfiche)
Mackie McMahan, ECS Limited (via email)
3D Environmental Investigations
North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1 601 East Center Avenue, Suite 3011 Mooresville, NC 28115
NORTH CAROLINA ^ 704.663.1699
n,o.m.m or �.n—1 o..izllkla�
NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WATER RESOURCES
PERMIT FOR THE CONSTRUCTION OF A MONITORING WELL
In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws,
Rules and Regulations.
PERMISSION IS HEREBY GRANTED TO
McDonald's USA, LLC (ECS Limited as Agent)
FOR THE CONSTRUCTION OF A MONITOR WELL SYSTEM consisting of two (2) monitoring wells owned by McDonald's
USA, LLC at the subject site located at 9725 Rocky River Rd., Charlotte, Mecklenburg County. This Permit is issued in
accordance with the application received on August 18, 2023, in conformity with specifications and supporting data, all of
which are filed with the Department of Environmental Quality and are considered integral parts of this Permit.
This Permit is for well construction only and does not waive any provision or requirement of any other applicable law or
regulation. Construction of any well under this Permit shall be in strict compliance with the North Carolina Well Construction
Regulations and Standards (15A NCAC 02C .0100), and other State and Local Laws and regulations pertaining to well
construction.
If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon
written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to
Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service
Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding.
This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions,
limitations, or exceptions as follows:
1. Issuance of this Permit does not obligate reimbursement from State trust funds, if these wells are being installed as
part of an investigation for contamination from an underground storage tank or dry cleaner incident.
2. Issuance of this Permit does not supersede any other agreement, permit, or requirement issued by another agency.
3. The well(s) shall be located and constructed as shown on the attachments submitted as part of the Permit application.
4. Each well shall have a Well Contractor Identification Plate in accordance with 15A NCAC 02C .0108(o).
5. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information
Processing Unit within 30 days of the well completion.
6. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a
well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing
Unit within 30 days of the well abandonment.
7. If the well penetrates any water -bearing zone that contains contaminated waters, the upper three feet of the well
shall be grouted within one day after the casing is set or the well abandoned.
8. Temporary wells must be permanently abandoned or converted to a permanent well within seven days (168 hours)
of completion of drilling the borehole.
9. Adequate permits shall be obtained from Mecklenburg County Groundwater and Wastewater Services.
Permit issued the 21st day of August 2023
FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
DocuSigned by:
E
w u N P44�t4
F161F969A2D84A3...
Andrew H. Pitner, P.G., Regional Supervisor
Division of Water Resources
By Authority of the Environmental Management Commission
Permit No. # WM0301306
D North Carolina Department of Environmental Quality I Division of Water Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
ND Rid OAR!�I_'NAlp_
a°ann 704.6631699