Loading...
HomeMy WebLinkAboutAugust Site InspectionWetland Inspection Report Project Num: 20191658 Version: 3 Status: Issued Project Name: TPB NCDOT - Replace Bridge 8 on NC 194 Project Type: Replace bridge with bridge County: Ashe (BR-0002) Region: Winston-Salem Location: TPB NCDOT - Replace Bridve 8 on NC 194 (BR-0002) Latitude: +360 27' 59" Longitude: -81' 30' 40" SW Plan Location: Site Owner Name: NC DOT Division 11 Inspection Date: 8/16/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: page 1 Site Number: 20191658 Owner: Wood, Jamie Inspection Date: 8/16/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I reviewed the project with Div 11 DEO and other staff. Half the bridge was demolished allowing for work on the new bridge. The old bridge was still cgMing traffic. A support wall to carr road extension was in place with a bit more to be completed. Other permit sites were completed per the plans except for Site 4 where work has not started. Site was well maintained. page 2