HomeMy WebLinkAboutAugust Site InspectionWetland Inspection Report
Project Num: 20191658 Version: 3 Status: Issued
Project Name: TPB NCDOT - Replace Bridge 8 on NC 194 Project Type: Replace bridge with bridge
County: Ashe (BR-0002)
Region: Winston-Salem
Location: TPB NCDOT - Replace Bridve 8 on NC 194 (BR-0002)
Latitude: +360 27' 59" Longitude: -81' 30' 40"
SW Plan Location:
Site Owner Name: NC DOT Division 11
Inspection Date: 8/16/2023
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
page 1
Site Number: 20191658 Owner: Wood, Jamie
Inspection Date: 8/16/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: I reviewed the project with Div 11 DEO and other staff. Half the bridge was demolished allowing for
work on the new bridge. The old bridge was still cgMing traffic. A support wall to carr road
extension was in place with a bit more to be completed. Other permit sites were completed per the
plans except for Site 4 where work has not started. Site was well maintained.
page 2