HomeMy WebLinkAboutAugust site inspectionWetland Inspection Report
Project Num: 20221453 Version: 1 Status: Issued
Project Name: TPB NCDOT - Replace Bridge 29 on NC 268 Project Type: Replace bridge with bridge
County: Caldwell Region: Winston-Salem
Location: TPB NCDOT - Replace Bridge 29 on NC 268
Latitude• +360 02' Longitude: -81' 28' 37"
SW Plan Location:
Site Owner Name: NC DOT Division 11
Inspection Date: 8/16/2023
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
page 1
Site Number: 20221453 Owner: Wood, Jamie
Inspection Date: 8/16/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: I reviewed the Droiect with Div 11 DEO and other staff. Half of the new bridge was mostly complete
and will become new temporary bridge until old bridge is demolished. Banks were matted and seeded.
Causeway may not be needed for demo part. DEO will let me know. Causeway for new bridge
removed and area repaired and matted. New piers were drilled with no problems. Overall project looks
to be in good shape and well maintained.
page 2