Loading...
HomeMy WebLinkAboutAugust site inspectionWetland Inspection Report Project Num: 20221453 Version: 1 Status: Issued Project Name: TPB NCDOT - Replace Bridge 29 on NC 268 Project Type: Replace bridge with bridge County: Caldwell Region: Winston-Salem Location: TPB NCDOT - Replace Bridge 29 on NC 268 Latitude• +360 02' Longitude: -81' 28' 37" SW Plan Location: Site Owner Name: NC DOT Division 11 Inspection Date: 8/16/2023 Reason for Inspection: Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Dave Wanucha Phone: 336-776-9703 Secondary Inspector(s): Facility Compliance Status: 0 Compliant ❑ Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: Permit (401 WQC) Inspection Summary: page 1 Site Number: 20221453 Owner: Wood, Jamie Inspection Date: 8/16/2023 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WOO Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Comment: I reviewed the Droiect with Div 11 DEO and other staff. Half of the new bridge was mostly complete and will become new temporary bridge until old bridge is demolished. Banks were matted and seeded. Causeway may not be needed for demo part. DEO will let me know. Causeway for new bridge removed and area repaired and matted. New piers were drilled with no problems. Overall project looks to be in good shape and well maintained. page 2