HomeMy WebLinkAbout20230991 Ver 1_More Info Received_20230720Moore, Andrew W
From: Warren Eadus <eadus@quible.com>
Sent: Thursday, July 20, 2023 4:42 PM
To: Anderson, Mitchell L CIV USARMY CESAW (USA); Moore, Andrew W
Subject: [External] SAW 2023-00859(Garvey Fera Luna/Brush Creek Rd/Buncombe)
Attachments: P22171-PCN Overview - 20230720.pdf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Gentlemen,
Please find attached an updated plan and details sheet for the above referenced project. The attached plan updates the
proposed addition of some rock for bank stabilization along the driveway at Brush Creek. On our original plan we
showed the stabilization occurring on the adjacent property. That was not the intent —there will be no disturbance on
the adjacent property and this work would occur above the ordinary high water mark. Also, we have included some
details for the replacement culvert at UT-2. Please let me know if you have any questions.
Thanks,
Warren D. Eadus, P.G.
President
Quible & Associates, P.C.
90 Church Street, Suite B
Black Mountain, NC 28711
t 828.357.5149
m 252.202.8166
www.guible.com
LEGAL DISCLAIMER
The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material.
Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended
recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer.