Loading...
HomeMy WebLinkAboutWQ0002523_Annual Performance_20230502Town of Beech Mountain Wastewater Collection and Treatment System Performance Report 2022-2023 Fiscal Year This report provides information on the collection and treatment system operated by the Town of Beech Mountain Public Utilities Department. Summarized herein is general information and performance data covering the period from July 1, 2022 to June 301h, 2023. A copy of this report is available to the public upon request. Please direct questions about this report to the Public Works and Utilities office at (828) 387-9282. Collection and Treatment System Description The Town of Beech Mountain Wastewa*ecollection and treatment system consists of approximately 60 miles of sewer pipe, five Wpump stations, and two treatment plants. The Town collection system is operated under Pe it # WQCS00210. The Town is permitted to treat wastewater at two facilities: Pond Creek Wastewater Treatment Plant (PCWWTP) and Grassy Gap Creek Wastewater Treatment Plant (GGCWWTP). The Pond Creek WWTP operates under National Pollutant Discharge Elimination System (NPDES) Permit # NC0069761. Wastewater is collected via a gravity system with two pump stations to a 0.400 million gallons per day extended aeration treatment plant with UV disinfection. No tonnage of biosolids for FY 2022-2023 have been disposed of. The Town maintains a Biosolids Disposal DCAR Residuals Management Systems Land Application Permit WQ0002523. The Grassy Gap Creek WWTP operates under NPDES Permit # NC002273. Wastewater is collected via a gravity system with two pump stations to a 0.080 million gallons per day extended aeration treatment plant with C 12 disinfection. Combined, the facilities have a treatment capacity of 0.480 million gallons/day. Reference Table 1 and Table 2 for Discharge Monitoring Report Statistics. Performance Summary Between July Is', 2022, and June 30t', 2023, Wastewater Treatment facilities had no violations during the period. During the FY 2022-2023, the utility has also begun the Water and Sewer Rehabilitation Project. This project focuses on the replacement and rehab as well as many manhole repairs in 17,000 feet of sewer main in the continuing effort to reduce inflow and infiltration to our system. Project completion is expected by November 2025. The Utility continues to plan for future repairs in our system and ask for customer involvement in reducing SSO volume and the reduction of water getting into the system. Help us to keep the system free of materials that cause blockages by not dumping debris, fats, oils, or grease into the system. To report a sewer spill, please contact the Town of Beech Mountain Emergency Dispatch at 828-387-2342. For questions regarding the Town Utilities programs or additional information regarding this report, please contact Mr. Daniel Davis, Utilities Director at (828) 387-9282. Copies of this report may be obtained by calling Public Works at (828)387-3828 and requesting a copy or Town Hall at (828) 387-4236 and requesting a copy. This report is also available at the town website, TownofBeechMountain.com, httos://townofbeechmountain.com/water- sewer/#water-reports. This document includes details about monitoring system discharges and overflows from our system, the preventative maintenance program the Commission has established to prevent potential problems and the degree to which we complied with State and Federal standards during the fiscal year ending June 30, 2008. Certification of Accuracy I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to all persons or customers of the Town of Beech Mountain Municipal water and sewer system and have been notified of the availability of this report. Qam i e,2 6. QaA" Date 5/2/2023 Daniel Davis Public Utilities Director Town of Beech Mountain Appendices: Pond Creek WWTP Total MG Min MGD Max MGD Average MGD Jul `22 4.805 0.12 0.23 0.155 August `22 4.278 0.09 0.17 0.138 September `22 4.56 0.08 0.26 0.152 October `22 4.74 0.09 0.34 0.153 November `22 5.79 0.08 0.477 0.193 December `22 5.828 0.022 0.313 0.188 Janua `23 8.685 0.15 0.46 0.28 Februa `23 7.756 0.15 0.59 0.277 March `23 5.704 0.09 0.48 0.184 A ril `23 3.93 0.11 0.16 0.131 Ma `23 5.208 0.09 0.47 0.168 June `23 Table 1: Pond Creek WWTP Effluent Flow Monthly Statistics `22-'23 FY. Total effluent flow discharged from treatment plant is measured in million gallons (MG). Min, max and average daily values are represented in units of millions of gallons per day (MGD). Grassy Gap WWTP Total flow MG Min MGD Max MGD Average MGD Jul `22 0.9455 0.011 0.064 0.0305 August `22 0.775 0.009 0.037 0.025 September `22 0.72 0.011 0.055 0.024 October `22 0.774 0.007 0.071 0.024 November `22 2.4 0.008 0.054 0.08 December `22 1.147 0.021 0.054 0.037 Janua `23 2.216 0.03 0.15 0.071 Februa `23 1.82 0.024 0.176 0.065 March `23 1.085 0.012 0.075 0.035 A ril`23 1.02 0.013 0.062 0.034 May `23 1.519 0.014 0.198 0.049 June `23 Table 2: Grassy Gap WWTP Effluent Flow Monthly Statistics `22223 FY. Total effluent flow volume is measured in million gallons (MG). Min, max and average daily values are represented in units of millions of gallons per day (MGD). Table 3: NPDES Permit Compliance Violations Summary `22223 FY Grassy Gap WWTP Pond Creek WWTP No Violations No Violations